PLANILLA DE METRADOS DESAGREGADO

OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CERRO LA VIRGEN A TRAVÉS D
HUANCHACO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA LIBER

1.- EXCAVACIONES
CUADRO COMPARATIVO DE DIFERENCIA DE METRADOS DE E
1.1.- VOLUMEN EXCAVACION SEGÚN EXPEDIENTE TECNICO VIGENTE
Ref. PLANO DE PERFIL Y SECCIONES GEN-01, 1/1
VOLUMEN UNITARIO(m3/m)
PGSVA
METRADO ALTURA
h=2.4 h=5 h=8 VOLUMEN
(ML) CORTE TOTAL (m3)
(h=) 3.60 (m3/m) 11.25 (m3/m) 23.25 (m3/m)
0.00 1.20 3.60 3.60
20.00 4.10 11.25 225.00
40.00 7.00 23.25 465.00
60.00 8.20 23.25 465.00
80.00 8.10 23.25 465.00
100.00 8.03 23.25 465.00
120.00 7.94 23.25 465.00
140.00 7.86 23.25 465.00
160.00 7.77 23.25 465.00
180.00 7.69 23.25 465.00
200.00 7.61 23.25 465.00
220.00 7.50 23.25 465.00
240.00 7.44 23.25 465.00
260.00 7.35 23.25 465.00
I

280.00 7.27 23.25 465.00


300.00 7.18 23.25 465.00
T R A M O

320.00 7.10 23.25 465.00


340.00 7.01 23.25 465.00
360.00 6.93 23.25 465.00
380.00 6.84 23.25 465.00
400.00 6.76 23.25 465.00
420.00 6.67 23.25 465.00
440.00 6.59 23.25 465.00
460.00 6.50 23.25 465.00
480.00 6.42 23.25 465.00
500.00 6.33 23.25 465.00
520.00 6.25 23.25 465.00
540.00 6.16 23.25 465.00
560.00 6.06 23.25 465.00
580.00 6.00 23.25 465.00
600.00 5.92 23.25 465.00
620.00 5.83 23.25 465.00
640.00 5.74 23.25 465.00
660.00 5.66 23.25 465.00
671.25 671.25 15,606.56
680.00 5.58 11.25 0.00
T R A M O II

700.00 5.49 11.25 0.00


720.00 5.40 11.25 0.00
740.00 5.32 11.25 225.00
T R A M O II
760.00 5.24 11.25 225.00
778.25 107.00 1,203.75
780.00 5.15 11.25 225.00
800.00 5.06 11.25 225.00
820.00 4.98 11.25 225.00
840.00 4.90 11.25 225.00
860.00 III 4.38 11.25 225.00
880.00 4.76 11.25 225.00
900.00 3.74 11.25 225.00
T R A M O

920.00 2.95 11.25 225.00


940.00 2.40 3.6 72.00
960.00 2.45 3.6 72.00
980.00 2.40 3.6 72.00
1000.00 2.40 3.6 72.00
1020.00 2.40 3.6 72.00
1040.00 2.40 3.6 72.00
1060.00 2.40 3.5 70.00
1080.00 2.40 3.1 61.21
1087.00 308.75 1,111.50

Total Excavacion Masiva 17,921.81 M3

2.- OBRAS DE RELLENO


OBRAS DE RELLENO Und Metrado
340.0302 RELLENO COMPACTADO C/MATERIAL M3 15,499.16
PROPIO ZARANDEADO
ductos a 8m Profundidad 8m
Largo Ancho Alto Ancho
671.25 0.4 0.4 0.4 107.4

340.0303 RELLENO COMPACTADO C/MATERIAL M3 1,186.63


PROPIO ZARANDEADO
ductos a 5m Profundidad 5m
Largo Ancho Alto Ancho
107.00 0.4 0.4 0.4 17.12

340.0304 RELLENO COMPACTADO C/MATERIAL M3 1,062.10


PROPIO ZARANDEADO
ductos a 2.4 2.4m
m Profundidad
Largo Ancho Alto Ancho
308.75 0.4 0.4 0.4 49.4

3.- OBRAS DE ELIMINACION


OBRAS DE ELIMINACION Und Metrado
340.0302 ELIMINACION MATERIAL EXCEDENTE m3 107.40
C/EQUIPO
Zanjah= 8m Profundidad (espacio ocupado por ductos)
a 8m
Largo Ancho Alto Ancho
671.25 0.4 0.4 0.4 107.4

340.0303 ELIMINACION MATERIAL EXCEDENTE m3 17.12


C/EQUIPO h= 5m
Zanja a 5m Profundidad (espacio ocupado por ductos)
Largo Ancho Alto Ancho
107 0.4 0.4 0.4 17.12

340.0304 ELIMINACION MATERIAL EXCEDENTE m3 49.40


C/EQUIPO h=2.4m
Zanja a 2.4mProfundidad (espacio ocupado por ductos)

Largo Ancho Alto Ancho


308.75 0.4 0.4 0.4 49.4

4.- OBRAS DE CONCRETO


OBRAS DE CONCRETO Und Metrado
340.0302 SOLADO CONCRETO e=3". h=8m m2 268.50
para ductos a 8m Profundidad
Largo Ancho Alto Ancho
671.25 0.40 268.5

340.0303 SOLADO CONCRETO e=3". h=5m m2 42.80


para ductos a 5m Profundidad
Largo Ancho Alto Ancho
107 0.40 42.8

340.0304 SOLADO CONCRETO e=3". h=2.4m m2 123.50


para ductos a 2.4 m Profundidad
Largo Ancho Alto Ancho
308.75 0.40 123.5

EQUIVALENCIAS DEL PRESUPUESTO


SEGÚN EXPEDIENTE TECNICO
2 MONTAJE ELECTROMECANICO
340.0000 EXCAVACIONES (POR METRO LINEAL)

DESCRIPCION UND CANT

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0302 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 671.25
1,50M X 8,00M (CUALQUIER TERRENO - ALTURA VARIABLE ENTRE 5-8m)

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0303 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 107.00
1.50m x 5.00m (CUALQUIER TERRENO - ALTURA VARIABLE ENTRE 2,4-5m)

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0304 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 308.75
1,50M X 2,40M (CUALQUIER TERRENO - ALTURA ENTRE 2,4m)
PRESUPUESTO CONTRACTUAL DESAGREGADO
Item Descripción Und. Metrado

01 MOVIMIENTO DE TIERRAS
OBRAS DE EXCAVACION
EXCAV MASIVA DE ZANJA MATERIAL SUELTO C/MAQUINARIA M3
H=8m 15,606.56
340.0303 EXCAV MASIVA DE ZANJA MATERIAL SUELTO C/MAQUINARIA M3
H=5m 1,203.75
340.0304 EXCAV MASIVA DE ZANJA MATERIAL SUELTO C/MAQUIN M3 1,111.50
OBRAS DE RELLENO
340.0302 RELLENO COMPACTADO C/MATERIAL PROPIO M3 15,499.16
340.0303 ZARANDEADO 8m
RELLENO COMPACTADO C/MATERIAL PROPIO M3 1,186.63
340.0304 ZARANDEADO 5m
RELLENO COMPACTADO C/MATERIAL PROPIO M3 1,062.10
ZARANDEADO 2.4m
OBRAS DE ELIMINACION
340.0302 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO h= 8m m3 107.40
340.0303 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO h= 5m m3 17.12
340.0304 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO h= m3 49.40
2.4m
OBRAS DE CONCRETO
340.0302 SOLADO CONCRETO e=3". h=8m m2 268.50
340.0303 SOLADO CONCRETO e=3". h=5m m2 42.80
340.0304 SOLADO CONCRETO e=3". h=2.4m m2 123.50
COSTO DIRECTO

SEGÚN EXPEDIENTE TECNICO


1 SUNINISTRO DE MATERIALES UND CANT

10.0000 POSTES Y ACCESORIOS


10.0600 DUCTOS DE CONCRETO DE :
10.0602 4 VIAS x 1.00 m. x 4" Ø u 1,087.00

2 MONTAJE ELECTROMECANICO UND CANT

210.0000 POSTES Y ACCESORIOS


210.0500 DUCTOS DE C.A.C. Y BLOQUES DE PROTECCION
210.0502 DUCTOS DE CONCRETO DE 1x4 VIAS m 1,087.00

230.0000 CABLES
230.0100 CONDUCTORES SUBTERRANEOS - CABLE DE ENERGIA
230.0109 TENDIDO DE CABLE SECO SUBTERRANEO DE mayor de 3-1X70 hasta 3-1X m 1,103.68

SEGÚN MODIFICACION EJE SOTERRADO AL LIMITE DEL MTC (DEDUCCION DE 60 M DE SOTERRADO)


1 SUNINISTRO DE MATERIALES UND CANT
10.0000 POSTES Y ACCESORIOS
10.0600 DUCTOS DE CONCRETO DE :
10.0602 4 VIAS x 1.00 m. x 4" Ø u 1,020.00

2 MONTAJE ELECTROMECANICO UND CANT

210.0000 POSTES Y ACCESORIOS


210.0500 DUCTOS DE C.A.C. Y BLOQUES DE PROTECCION
210.0502 DUCTOS DE CONCRETO DE 1x4 VIAS m 1,020.00

230.0000 CABLES
230.0100 CONDUCTORES SUBTERRANEOS - CABLE DE ENERGIA
230.0109 TENDIDO DE CABLE SECO SUBTERRANEO DE mayor de 3-1X70 hasta 3-1X m 1,020.00

CUADRO COMPARATIVO PRESUPUESTO POR MAYOR METRADO DE MOVIMIENTO DE TIERRA

DESCRIPCION UND CANT

EXCAVACION NUEVA INCLUYE, RELLENO CON TIERRA CERNIDA,


SOLADO DE 10 CM, COMPACTADO Y ELIMINACIÓN DE DESMONTE
340.0302 PROPIO DE ZANJA DE 1,50M X 8,00M (CUALQUIER TERRENO - ALTURA ML 671.25
VARIABLE ENTRE 5-8m)

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0303 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 107.00
1.50m x 5.00m (CUALQUIER TERRENO - ALTURA VARIABLE ENTRE 2,4-5m)

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0304 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 308.75
1,50M X 2,40M (CUALQUIER TERRENO - ALTURA ENTRE 2,4m)

NUEVO PRESUPUESTO Y COSTO UNITARIO de MOVIMIENTO DE TIERRAS

DESCRIPCION UND CANT

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0302 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 611.25
1,50M X 8,00M (CUALQUIER TERRENO - ALTURA VARIABLE ENTRE 5-8m)

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0303 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 107.00
1.50m x 5.00m (CUALQUIER TERRENO - ALTURA VARIABLE ENTRE 2,4-5m)

EXCAVACION, RELLENO CON TIERRA CERNIDA, SOLADO DE 10 CM,


340.0304 COMPACTADO Y ELIMINACIÓN DE DESMONTE PROPIO DE ZANJA DE ML 308.75
1,50M X 2,40M (CUALQUIER TERRENO - ALTURA ENTRE 2,4m)
CUADRO RESUMEN VARIACION DEL PRESUPUESTO POR MAYOR Y MENOR M

COSTO GG Fijos GG variable Utilidad


PRESUPUESTO subtot
DIRECTO
17.55% 0.79% 5.00%
908,654.41 624,315.13 109,576.73 4,938.49 31,215.76 770,046.11
Mayor Metrado 46,973.92 8244.63 371.58 2348.7 57,938.83
Menor Metrado 7,692.66 1350.18 60.85 384.63 9,488.32
PRESUPUESTO MODIFICAD
S DESAGREGADO
– CERRO LA VIRGEN A TRAVÉS DEL SOTERRADO DE RED DE 10KV AÉREO, DISTRITO DE
UJILLO, DEPARTAMENTO LA LIBERTAD

DE METRADOS DE EXCAVACIONES
1.2.- VOLUMEN EXCAVACION EJE SOTERRADO
MODIFICADO A LIMITES MTC
AREA VOL
PGSVA ALTURA
CORTE CORTE CORTE
(h=) (M2) (M3)
0.00 2.00 3.42 0.00
20.00 4.94 20.77 161.95
40.00 7.64 53.81 688.89
60.00 8.52 76.60 1304.03
80.00 8.49 76.99 1535.91
100.00 8.38 77.70 1546.89
120.00 8.18 71.96 1496.55
140.00 7.98 68.90 1408.62
160.00 7.76 63.27 1321.71
180.00 7.64 59.84 1231.12
200.00 7.51 57.07 1169.14
220.00 7.32 53.49 1105.58
240.00 7.26 52.33 1058.22
260.00 7.01 47.72 1000.51
280.00 6.93 45.41 931.31
300.00 6.72 43.01 884.26
320.00 6.30 37.58 805.92
340.00 6.62 41.09 786.72
360.00 5.75 30.63 717.25
380.00 5.36 26.12 567.54
400.00 4.37 18.16 442.86
420.00 4.58 19.24 374.05
440.00 4.72 21.12 403.57
460.00 4.00 14.72 358.32
480.00 3.21 8.91 236.27
500.00 2.97 6.97 158.76
520.00 3.45 7.76 147.27
540.00 4.80 19.33 270.88
560.00 5.64 28.84 481.66
580.00 1.71 2.57 314.09
600.00 4.67 19.88 224.47
620.00 4.95 22.37 422.44
640.00 6.98 41.57 639.32
660.00 5.11 21.73 632.91
671.25 24,829.00
680.00 3.85 13.96 356.87
700.00 3.62 11.38 253.36
720.00 3.53 10.67 220.46
740.00 3.45 10.00 206.74
760.00 3.31 9.01 190.17
778.25 1,227.60
780.00 3.20 8.29 173.01
800.00 3.05 7.77 160.54
820.00 2.91 6.72 144.82
840.00 2.93 6.77 134.85
860.00 2.52 4.26 110.28
880.00 2.27 3.42 76.74
900.00 2.17 3.25 66.66
920.00 2.47 4.06 73.10
940.00 2.82 6.68 107.35
960.00 2.88 7.42 140.96
980.00 2.92 6.60 140.24
1000.00 3.01 7.34 139.43
1020.00 3.25 9.00 163.36
1040.00
1060.00
1080.00 POR DEDUCTIVO L=60 m. AL INICIO DE TRAMO LIMITE DEL MTC
1087.00 1,631.35

27,687.95 M3

97.80
244.50

PU (s/.) TOT (S/.)

276.39 185,526.79 185,526.79 0.00

158.03 16,909.21 16,909.21 0.00

107.31 33,131.96 33,131.96 0.00

235,567.96
PRESUPUESTO PROPUESTO DESAGREGADO
Precio Parcial Item Descripción
Unitario (S/.)
(S/.)

01 MOVIMIENTO DE TIERRAS
30,045.88 OBRAS DE EXCAVACION

1.69344 26,428.77 340.0302 EXCAV MASIVA DE ZANJA MATERIAL SUELTO C


1.66102 1,999.45 340.0303 EXCAV MASIVA DE ZANJA MATERIAL SUELTO C
1.45538 1,617.65 340.0304 EXCAV MASIVA DE ZANJA MATERIAL SUELTO C
183,804.41 OBRAS DE RELLENO
9.39966 145,686.80 340.0302 RELLENO COMPACTADO C/MATERIAL PROPIO
10.7632146 12,771.95 340.0303 ZARANDEADO 8m
RELLENO COMPACTADO C/MATERIAL PROPIO
23.86371 25,345.65 340.0304 ZARANDEADO 5m
RELLENO COMPACTADO C/MATERIAL PROPIO
3,946.52 ZARANDEADO 2.4m
OBRAS DE ELIMINACION
22.69160 2,437.08 340.0302 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO
22.69160 388.48 340.0303 8m
ELIMINACION MATERIAL EXCEDENTE C/EQUIPO
22.69160 1,120.97 340.0304 5m
ELIMINACION MATERIAL EXCEDENTE C/EQUIPO
17,771.15 2.4m
OBRAS DE CONCRETO
40.87200 10,974.13 340.0302 SOLADO CONCRETO e=3". h=8m
40.87200 1,749.32 340.0303 SOLADO CONCRETO e=3". h=5m
40.87200 5,047.69 340.0304 SOLADO CONCRETO e=3". h=2.4m
235,567.96

PU (s/.) TOT (S/.)

32,588.26

29.98 32,588.26

PU (s/.) TOT (S/.)

60,774.17

55.91 60,774.17

25,561.23
23.16 25,561.23
118,923.66

SOTERRADO)
PU (s/.) TOT (S/.)
30,579.60

29.98 30,579.60

PU (s/.) TOT (S/.)

57,028.20

55.91 57,028.20

23,623.20
23.16 23,623.20
111,231.00

DE MOVIMIENTO DE TIERRAS

TOT (S/.)
PU (s/.) TOT (S/.)
Propuesto

276.39 185,526.79 219,042.26

158.03 16,909.21 17,205.53

107.31 33,131.96 46,294.09

235,567.96 282,541.88

DE TIERRAS

PU (s/.) TOT (S/.)


Propuesto Propuesto

358.351 219,042.26 219042.2626875

160.799 17,205.53 17205.53045

149.940 46,294.09 46294.0892375

282,541.88 282541.882375
OR MAYOR Y MENOR METRADO

Igv Incidencia
Total
(%)
18.00%
138,608.30 908,654.41
10428.99 68,367.82
1707.9 11,196.22
SUPUESTO MODIFICAD 965,826.01 106.29%
4590
ESTO DESAGREGADO
Descripción Und. Metrado Metrado Valorizado
Propuesto (S/.)

46,459.72
DE ZANJA MATERIAL SUELTO C/MAQUINARIA
M3H=8m 15,606.56 24,829.000 42,046.42
DE ZANJA MATERIAL SUELTO C/MAQUINARIA
M3H=5m 1,203.75 1,227.600 2,039.07
DE ZANJA MATERIAL SUELTO C/MAQUI M3 1,111.50 1,631.350 2,374.23
215,563.26
PACTADO C/MATERIAL PROPIO M3 15,499.16 17,530.790 164,783.40
8m
PACTADO C/MATERIAL PROPIO M3 1,186.63 1,210.480 13,028.66
5m
PACTADO C/MATERIAL PROPIO M3 1,062.10 1,581.950 37,751.20
2.4m 3,728.69
MATERIAL EXCEDENTE C/EQUIPO h= m3 107.40 97.800 2,219.24
MATERIAL EXCEDENTE C/EQUIPO h= m3 17.12 17.120 388.48
MATERIAL EXCEDENTE C/EQUIPO h= m3 49.40 49.400 1,120.97
16,790.21
ONCRETO e=3". h=8m m2 268.50 244.500 9,993.20
ONCRETO e=3". h=5m m2 42.80 42.800 1,749.32
ONCRETO e=3". h=2.4m m2 123.50 123.500 5,047.69
COSTO DIRECTO PROP 282,541.88
bi8

0 0
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
1.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m3 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
excavacion masivas de zanja material suelto con maquinaria 8m REN.CUADRILLA 500.0 m3/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 500.0 m3/dia 0.0 0.0
retroexcavadora de 1/4 a 12 yd3 1.00 8.0
PERSONAL BASE : Principal C. # B
CAPATAZ : 0.1 = 0.8 0.0
OPERARIO : 1.0 = 8.0 0.0 0.0
OFICIAL : 0.0 = 0.0 0.0 0.0
PEON : 2.0 = 16.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES : 0.00%
0.00 0.00 0.00%
0.00
0.00 0.00 0.00%
0.00 0.00 0.00%
0.00 0.00%
0.00
0.00 0.00 0.00%
MANO DE OBRA :
Capataz H.H. 0.002 20.00 0.03
Operario H.H. 0.016 18.00 0.29
Oficial H.H. 0.000 16.00 0.00
Peon H.H. 0.032 15.00 0.48
0.00
0.00 0.80
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 0.80 0.04
Equipos Seguridad EST. 5% 0.80 0.04
Equipos de Protección Personal - COVID-19 EQ. 0.05 0.74 0.04
retroexcavadora de 1/4 a 12 yd3 H.M 0.02 48.34 0.77

0.89
COSTO DIRECTO S/. 1.69
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
1.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m3 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
excavacion masivas de zanja material suelto con maquinaria 5m REN.CUADRILLA 510.0 m3/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 510.0 m3/dia 0.0 0.0
retroexcavadora de 1/4 a 12 yd3 1.00 8.0
PERSONAL BASE : Principal C. # B
CAPATAZ : 0.1 = 0.8 0.0
OPERARIO : 1.0 = 8.0 0.0 0.0
OFICIAL : 0.0 = 0.0 0.0 0.0
PEON : 2.0 = 16.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES : 0.00%
0.00 0.00 0.00%
0.00
0.00 0.00 0.00%
0.00 0.00 0.00%
0.00 0.00%
0.00
0.00 0.00 0.00%
MANO DE OBRA :
Capataz H.H. 0.002 20.00 0.03
Operario H.H. 0.016 18.00 0.28
Oficial H.H. 0.000 16.00 0.00
Peon H.H. 0.031 15.00 0.47
0.00
0.00 0.78
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 0.78 0.04
Equipos Seguridad EST. 5% 0.78 0.04
Equipos de Protección Personal - COVID-19 EQ. 0.05 0.74 0.04
retroexcavadora de 1/4 a 12 yd3 H.M 0.02 48.34 0.76

0.88
COSTO DIRECTO S/. 1.66
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
1.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m3 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
excavacion masivas de zanja material suelto con maquinaria 2.4m REN.CUADRILLA 580.0 m3/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 580.0 m3/dia 0.0 0.0
retroexcavadora de 1/4 a 12 yd3 1.00 8.0
PERSONAL BASE : Principal C. # B
CAPATAZ : 0.1 = 0.8 0.0
OPERARIO : 1.0 = 8.0 0.0 0.0
OFICIAL : 0.0 = 0.0 0.0 0.0
PEON : 2.0 = 16.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES : 0.00%
0.00 0.00 0.00%
0.00
0.00 0.00 0.00%
0.00 0.00 0.00%
0.00 0.00%
0.00
0.00 0.00 0.00%
MANO DE OBRA :
Capataz H.H. 0.001 20.00 0.03
Operario H.H. 0.014 18.00 0.25
Oficial H.H. 0.000 16.00 0.00
Peon H.H. 0.028 15.00 0.41
0.00
0.00 0.69
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 0.69 0.03
Equipos Seguridad EST. 5% 0.69 0.03
Equipos de Protección Personal - COVID-19 EQ. 0.04 0.74 0.03
retroexcavadora de 1/4 a 12 yd3 H.M 0.01 48.34 0.67

0.77
COSTO DIRECTO S/. 1.46
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
2.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m3 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
relleno compactado con material propio zarandeado 8m REN.CUADRILLA 181.1 m3/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 181.1 m3/dia 0.0 0.0
compactadora vibratoria tipo plancha 7hp 1.00 8.0
PERSONAL BASE : Principal C. # B
CAPATAZ : 0.1 = 0.8 0.0
OPERARIO : 1.0 = 8.0 0.0 0.0
OFICIAL : 0.0 = 0.0 0.0 0.0
PEON : 5.0 = 40.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES :
material propio zarandeado m3 0.345 10.00 3.45
agua m3 0.049 5.00 0.25
0.00
0.00
0.00 0.00
0.00
0.00
0.00 3.70
MANO DE OBRA :
Capataz H.H. 0.004 20.00 0.09
Operario H.H. 0.044 18.00 0.80
Oficial H.H. 0.000 16.00 0.00
Peon H.H. 0.221 15.00 3.31
0.00
0.00 4.20
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 4.20 0.21
Equipos Seguridad EST. 5% 4.20 0.21
Equipos de Protección Personal - COVID-19 EQ. 0.27 0.74 0.20
compactadora vibratoria tipo plancha 7hp H.M 0.04 20.00 0.88
0 H.M 0.00 0.00
- H.M 0.00 0.00
- H.M 0.00 0.00
0.00
0 0.00 1.50
COSTO DIRECTO S/. 9.40
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
2.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m3 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
relleno compactado con material propio zarandeado 5m REN.CUADRILLA 146.2 m3/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 146.2 m3/dia 0.0 0.0
compactadora vibratoria tipo plancha 7hp 1.00 8.0
PERSONAL BASE : Principal C. # B
CAPATAZ : 0.1 = 0.8 0.0
OPERARIO : 1.0 = 8.0 0.0 0.0
OFICIAL : 0.0 = 0.0 0.0 0.0
PEON : 5.0 = 40.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES :
material propio zarandeado m3 0.345 10.00 3.45
agua m3 0.049 5.00 0.25
0.00
0.00
0.00 0.00
0.00
0.00
0.00 3.70
MANO DE OBRA :
Capataz H.H. 0.005 20.00 0.11
Operario H.H. 0.055 18.00 0.99
Oficial H.H. 0.000 16.00 0.00
Peon H.H. 0.274 15.00 4.10
0.00
0.00 5.20
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 5.20 0.26
Equipos Seguridad EST. 5% 5.20 0.26
Equipos de Protección Personal - COVID-19 EQ. 0.33 0.74 0.25
compactadora vibratoria tipo plancha 7hp H.M 0.05 20.00 1.09
0 H.M 0.00 0.00
- H.M 0.00 0.00
- H.M 0.00 0.00
0.00
0 0.00 1.86
COSTO DIRECTO S/. 10.76
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
2.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m3 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
relleno compactado con material propio zarandeado 2.4m REN.CUADRILLA 51.2 m3/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 51.2 m3/dia 0.0 0.0
compactadora vibratoria tipo plancha 7hp 1.00 8.0
PERSONAL BASE : Principal C. # B
CAPATAZ : 0.1 = 0.8 0.0
OPERARIO : 1.0 = 8.0 0.0 0.0
OFICIAL : 0.0 = 0.0 0.0 0.0
PEON : 5.0 = 40.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES :
material propio zarandeado m3 0.345 10.00 3.45
agua m3 0.049 5.00 0.25
0.00
0.00
0.00 0.00
0.00
0.00
0.00 3.70
MANO DE OBRA :
Capataz H.H. 0.016 20.00 0.31
Operario H.H. 0.156 18.00 2.81
Oficial H.H. 0.000 16.00 0.00
Peon H.H. 0.781 15.00 11.72
0.00
0.00 14.84
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 14.84 0.74
Equipos Seguridad EST. 5% 14.84 0.74
Equipos de Protección Personal - COVID-19 EQ. 0.95 0.74 0.71
compactadora vibratoria tipo plancha 7hp H.M 0.16 20.00 3.13
0 H.M 0.00 0.00
- H.M 0.00 0.00
- H.M 0.00 0.00
0.00
0 0.00 5.32
COSTO DIRECTO S/. 23.86
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
3.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m3 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
eliminación de material excedente con equipo 8m REN.CUADRILLA 400.0 m3/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 400.0 m3/dia 0.0 0.0
Cargador sob llantas 125-155HP 2.5-3 Yd3 1.00 8.0
Camion volquete 6x4 330HP 15m3 4.00 32.0 PERSONAL BASE : Principal C. # B
CAPATAZ : 0.1 = 0.8 0.0
OPERARIO : = 0.0 0.0 0.0
OFICIAL : 0.0 = 0.0 0.0 0.0
PEON : 2.0 = 16.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES : 0 0.00%
0.00
0.00
0.00
0.00
0.00 0.00 0 0.00%
0.00
0.00 0.00 0 0.00%
0.00 0.00 0.00%
MANO DE OBRA :
Capataz H.H. 0.002 20.00 0.04
Operario H.H. 0.000 18.00 0.00
Oficial H.H. 0.000 16.00 0.00
Peon H.H. 0.040 15.00 0.60
0.00
0.00 0.64
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 0.64 0.03
Equipos Seguridad EST. 5% 0.64 0.03
Equipos de Protección Personal - COVID-19 EQ. 0.04 0.74 0.03
Cargador sob llantas 125-155HP 2.5-3 Yd3 H.M 0.0200 159.72 3.19
Camion volquete 6x4 330HP 15m3 H.M 0.0800 234.54 18.76

22.05
COSTO DIRECTO S/. 22.69
REF F O R M U L A R I O No. 10 : A N A L I S I S DE COSTOS UNITARIOS
Dólar/Sol
4.0000 FECHA : 23/09/20
OBRA REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AEROPUERTO – CECOSTO POR : m2 LUGAR HDNA
PARTIDA TABLA DE RENDIMIENTOS (En 8 horas) en
solado de e=3". 8m REN.CUADRILLA 80.0 m2/dia 0.0
FACTOR REND. 1.0 0.0
ESPECIFICACION CANTID. HORAS REN.EQUIPOS 80.0 m2/dia 0.0 0.0
mezcladora de concreto 9p3 1.00 8.0
PERSONAL BASE : Principal C. # B
CAPATAZ : 0.2 = 1.6 0.0
OPERARIO : 2.0 = 16.0 0.0 0.0
OFICIAL : 1.0 = 8.0 0.0 0.0
PEON : 6.0 = 48.0
METRADO C O S T O S INDICE CREPCO
COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %
MATERIALES : 0 0.00%
Cemento Portland tipo I bls 0.270 22.70 6.13
Hormigón m3 0.090 22.50 2.03
0.00
0.00
0.00 0.00 0 0.00%
0.00
0.00 0.00 0 0.00%
0.00 8.16 0.00%
MANO DE OBRA :
Capataz H.H. 0.020 20.00 0.40
Operario H.H. 0.200 18.00 3.60
Oficial H.H. 0.100 16.00 1.60
Peon H.H. 0.600 15.00 9.00
0.00
0.00 14.60
HERRAMIENTAS Y EQUIPOS :
Herramientas varias EST. 5% 14.60 0.73
Equipos Seguridad EST. 5% 14.60 0.73
Equipos de Protección Personal - COVID-19 EQ. 0.92 0.74 0.68
mezcladora de concreto 9p3 H.M 0.1000 159.72 15.97
0.00

18.11
COSTO DIRECTO S/. 40.87
FORMULA POLINÓMICA

REUBICACIÓN DE RED PRIMARIA EN EL AMT TNO004 10 KV, TRAMO AERO


SOTERRADO DE RED DE 10KV AÉREO, DISTRITO DE HUANCHACO, PROVI
LIBERTAD

PRESUPUESTO MODIFICADO S/. 818,372.17

Nº ELEMENTO REPRESENTATIVO INDICE SIMBOLO

1 MANO DE OBRA - MONTAJE ELECTROMECANICO 047 J


TRANSPORTE 032 FT
2 DUCTO DE CONCRETO 031 PC
FERRETERIA PARA POSTES 002 FP
RETENIDAS Y ANCLAJES 002 FE
CONDUCTOR DE COBRE Y ACCESORIOS 006 CU
MATERIAL PARA PUESTA A TIERRA 006 PT
EQUIPOS DE PROTECCIÓN 011 AE1
AISLADORES Y ACCESORIOS 011 AE2
3 CABLES DE ENERGÍA 019 NY
4 INDICE GENERAL DE PRECIOS AL CONSUMIDOR (INEI) 039 GG

K= 0.5477Jr/Jo + 0.0507 Dr/Do + 0.2124 Cr/Co + 0.1892 GGr/GGo

NOTAS:

1.- En la fórmula los sub-indices "o" de cada símbolo corresponden al indice de precios según (CREPCO) a la
fecha de Elaboración del Presupuesto (Presupuesto Base) y los sub-indices "r" al indice de precios al
momento de reajuste o fecha de valorización
2.- En el caso de los monomios compuestos por varios indices se ha considerado para efecto de denominación
el símbolo que tiene mayor porcentaje de incidencia
3.- En caso de cambios en el suministro se deberá actualizar la formula polinómica.
KV, TRAMO AEROPUERTO – CERRO LA VIRGEN A TRAVÉS DEL
NCHACO, PROVINCIA DE TRUJILLO, DEPARTAMENTO LA

9/10/2020
SIMBOLO
MONTO INCIDENCIA % PARCIAL COEFICIENTE
MONOMIO
J 437532.1 0.5346 0.976 0.5477
10760.16 0.0131 0.024
D 32409.62 0.0396 0.7827 0.0507
646.291 0.0008 0.016
639.12 0.0008 0.0154
1116.3 0.0014 0.027
334.57 0.0004 0.0081
5282.18 0.0065 0.1276
982.01 0.0012 0.0237
C 173793.14 0.2124 1 0.2124
GG 154876.68 0.1892 1 0.1892