IGV= 18%
garantia :
carta fianza
2 AMORTIZACIONES
datos:
V= MONTO DE LA VALORIZACION MENSUAL
C= MONTO DEL CONTRATO
Ae=monto del adelanto directo
C=
Am= Ae*(V/C)
N° VALORIZACIONES MONTO S/. S/IGV
1 S/. 364,382.81
2 S/. 646,077.64
3
4 S/. 470,710.17
5 S/. 187,938.99
6 S/. 146,367.75
7 S/. 69,054.91
8 S/. 105,674.88
S/. 175,300.33
S/. 704,280.09
S/. 879,580.42
S/. 2,198,951.06
S/. 439,790.21
amortizaciones
N° VALORIZACIONES PERIODO
1 Jan-16
2 Feb-16
3 Mar-16
4 Apr-16
5 May-16
6 Jun-16
7 Jul-16
8 Aug-16
S/. 1,037,904.90
S/. 518,952.45
S/. 3.32
S/. 23,252.70
V Am
S/. 364,382.81 S/. 72,876.56
S/. 646,077.64 S/. 129,215.53
S/. 41,748.78
MONTO DEL CONTRATO S/IGV: S/. 2,198,951.06
IGV: S/. 395,811.19
MONTO CONTRATADO C/IGV: S/. 2,594,762.25
ADELANTO DIRECTO S/IGV : S/. 439,790.21
ADELANTO DIRECTO C/IGV : S/. 518,952.45 S/. 518,952.45
ADELNATO DE MATERIALES S/IGV : S/. 879,580.42
ADELNATO DE MATERIALES C/IGV : S/. 1,037,904.90
S/. 777,241.48
S/. 74,202.84
163228.56
716351.86
879580.42
S/. 26,507.62
N° VALORIZACIONESMONTO S/. S/IGV IGV 18%
1. OBRAS PROVISIONALES
M 47
M 45
I 39
COEFICIENTE K (REAJUSTE)
COEFICIENTE k-1
2. AGUA
C 21
A 5
A 3
M 49
M 47
COEFICIENTE K REAJUSTE
COEFICIENTE K-1
3. ALCANTARILLADO
C 21
A 5
M 49
M 47
COEFICIENTE K REAJUSTE
COEFICIENTE K-1
INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO DEL CPM SAN RAMON DE PANGOA, DISTRITO DE PANGOA – SATIPO – JUNIN”
K= 0.120X(Mr/Mo)+0.508x(Mr/Mo)+0.372x(Ir/io)
ind.base
ELEMENTO REPRESENTATIVO COEFICIENTE % PARTICIPACION
(Abril 2015)
MANO DE OBRA 0.12 100% 523.15
MADERA TERCIADA PARA ENCOFRADO 0.508 100% 310.73
INDICE GENERAL DE PRECIOS 0.372 100% 411.50
COEFICIENTE K (REAJUSTE)
COEFICIENTE k-1
K= 0.078X(Cr/Co)+0.133x(Ar/Ao)+0.293x(Ar/Ao)+0.173X(Mr/Mo)+0.323X(Mr/Mo)
ind.base
ELEMENTO REPRESENTATIVO COEFICIENTE % PARTICIPACION
(Abril 2015)
CEMENTO PORTLAND TIPO I 0.078 100% 389.65
AGREGADO GRUESO 0.133 100% 401.16
ACERO CORRUGADO 0.293 100% 505.20
MAQUINARIA Y EQUIPO IMPORTADO 0.173 100% 279.73
MANO DE OBRA 0.323 100% 523.15
COEFICIENTE K REAJUSTE
COEFICIENTE K-1
K= 0.067X(Cr/Co)+0.368x(Ar/Ao)+0.468x(Mr/Mo)+0.097X(Mr/Mo)
ind.base
ELEMENTO REPRESENTATIVO COEFICIENTE % PARTICIPACION
(Abril 2015)
CEMENTO PORTLAND TIPO I 0.067 100% 389.65
AGREGADO GRUESO 0.368 100% 401.16
MAQUINARIA Y EQUIPO IMPORTADO 0.468 100% 279.73
MANO DE OBRA 0.097 100% 523.15
COEFICIENTE K REAJUSTE
COEFICIENTE K-1
TO DE PANGOA – SATIPO – JUNIN” 4210.57
4968.4726
1621.91 1913.8538
ind.real
k agosto k setiembre
(setiembre. 2016)
0.082 408.4 0.082
0.132 403.8 0.134
0.268 466.04 0.27
0.185 303.8 0.188
0.347 562.24 0.347
1.014 1.021
0.014 0.021
ind.real
k agosto k setiembre
(setiembre. 2016)
0.07 408.4 0.07
0.366 403.8 0.37
0.5 303.08 0.507
0.104 562.24 0.104
1.04 1.051
0.04 0.051
REAJUSTES AUTORIZADOS QUE NO CORRESPONDEN
POR EL ADELANTO EN EFECTIVO
(Con los K del mes siguiente al de la valorización)
Obra : : “MEJORAMIENTO DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO
DEL CPM SAN RAMON DE PANGOA, DISTRITO DE PANGOA – SATIPO – JUNIN”
LP Nº : Nº001-2015-CEP/MDP
Adelanto en Efectivo, sin IGV = 439,790.21 4-Jan-16
Monto del Contrato, sin IGV = 2,198,951.06
Montos sin IGV
Fórmulas Polinómicas Adel. Efectivo Del Contrato
A C
a. Obras Probicionales 5,311.22 26,556.11
b. Sist. de Agua 72,296.06 361,480.30
c. Sist. de Desague 362,182.92 1,810,914.62
Total 439,790.20 2,198,951.03
Valorización Coeficientes del mes del
No. Mes Monto Reajuste Pago del Adel.
en Efectivo
V K Ka
Obras Provicionales
1 Jan-16 4,757.94 1.021 1.021
2 Feb-16 1,831.73 1.024 1.021
3 Mar-16 - 1.026 1.021
4 Apr-16 6,412.04 1.026 1.021
5 May-16 2,446.19 1.025 1.021
6 Jun-16 5,264.91 1.030 1.021
7 Jul-16 477.83 1.029 1.021
8 Aug-16 361.60 1.031 1.021
SUB TOTAL 21,552.24
Sist. de Agua
1 Jan-16 2,906.57 1.016 1.016
2 Feb-16 33,096.77 1.024 1.016
3 Mar-16 - 1.006 1.016
4 Apr-16 36,034.10 0.990 1.016
5 May-16 112,211.47 1.003 1.016
6 Jun-16 73,377.76 1.012 1.016
7 Jul-16 7,686.50 1.011 1.016
8 Aug-16 2,424.56 1.014 1.016
SUB TOTAL 267,737.73
Sist. de Desague
1 Jan-16 356,718.30 1.057 1.057
2 Feb-16 611,148.10 1.070 1.057
3 Mar-16 - 1.048 1.057
4 Apr-16 428,264.04 1.031 1.057
5 May-16 73,281.32 1.040 1.057
6 Jun-16 67,725.08 1.035 1.057
7 Jul-16 60,890.58 1.037 1.057
8 Aug-16 102,888.71 1.040 1.057
SUB TOTAL 1,700,916.13
TOTAL 1,990,206.10
ESPONDEN
O
ización)
OTABLE Y ALCANTARILLADO
ATIPO – JUNIN”
Ka(Enero-2016)
1.021
1.016
1.057
Reintegro
que NO
Corresponde
D = V*A/C (K / Ka - 1)
-
1.08
-
6.28
1.92
9.28
0.75
0.71
20.01
-
52.12
-
-184.43
-287.16
-57.78
-7.57
-0.95
-485.76
-
1,503.30
-
-2,106.88
-235.72
-281.92
-230.43
-330.96
-1,682.61
-2,148.36
V1 V2 V3 V4 V5
CD 4,210.57 1,621.00 5,674.37 2,164.77 4,659.21
GG 336.85 129.68 453.95 173.18 372.74
UTIL 210.53 81.05 283.72 108.24 232.96
OBRAS SUB TOTAL 4,757.94 1,831.73 6,412.04 2,446.19 5,264.91
PROVISIONA
LES IGV 856.43 329.71 1,154.17 440.31 947.68
SUB TOTAL 5,614.37 2,161.44 7,566.20 2,886.50 6,212.59
FR 1.00 1.00 1.00 1.00 1.00
TOTAL 5,614.37 2,161.44 7,566.20 2,886.50 6,212.59
CD 2,572.19 29,289.18 31,888.58 99,302.19 64,936.07
GG 205.78 2,343.13 2,551.09 7,944.18 5,194.89
UTIL 128.61 1,464.46 1,594.43 4,965.11 3,246.80
AGUA SUB TOTAL 2,906.57 33,096.77 36,034.10 112,211.47 73,377.76
POTABLE IGV 523.18 5,957.42 6,486.14 20,198.07 13,208.00
SUB TOTAL 3,429.76 39,054.19 42,520.23 132,409.54 86,585.76
FR 1.00 1.00 1.00 1.00 1.00
TOTAL 3,429.76 39,054.19 42,520.23 132,409.54 86,585.76
CD 315,679.91 540,839.03 378,994.73 64,850.73 59,933.70
GG 25,254.39 43,267.12 30,319.58 5,188.06 4,794.70
UTIL 15,784.00 27,041.95 18,949.74 3,242.54 2,996.69
ALCANTARIL SUB TOTAL 356,718.30 611,148.10 428,264.04 73,281.32 67,725.08
LADO IGV 64,209.29 110,006.66 77,087.53 13,190.64 12,190.51
SUB TOTAL 420,927.59 721,154.76 505,351.57 86,471.96 79,915.60
FR 1.00 1.00 1.00 1.00 1.00
TOTAL 420,927.59 721,154.76 505,351.57 86,471.96 79,915.60
69,054.91 105,674.88
REAJUSTES QUE NO CORRESPO
1 Jan-16
2 Feb-16
3 Mar-16
4 Apr-16
Cemento Tipo I 21 5 May-16
6 Jun-16
7 Jul-16
8 Aug-16
1 Jan-16
2 Feb-16
3 Mar-16
4 Apr-16
Agregado grueso 5 5 May-16
6 Jun-16
7 Jul-16
8 Aug-16
AL
ADELANTO PARA MATERIALES No. 2 , sin IGV=
1 Jan-16
2 Feb-16
3 Mar-16
4 Apr-16
Cemento Tipo I 21
5 May-16
6 Jun-16
7 Jul-16
Aug-16
ABLE Y ALCANTARILLADO DEL CPM SAN RAMON DE PANGOA, DISTRITO DE PANGOA – SATIPO – JUNIN”
AGUA POTABLE
ALCANTARILLADO
356,718.30 73,839.00 405.81 389.65 408.4 0.067 100.00%
611,148.10 73,839.00 408.4 389.65 408.40 0.067 100.00%
- 73,839.00 408.4 389.65 408.40 0.067 100.00%
428,264.04 73,839.00 408.40 389.65 408.40 0.067 100.00%
73,281.32 73,839.00 408.40 389.65 408.40 0.067 100.00%
67,725.08 73,839.00 408.40 389.65 408.40 0.067 100.00%
60,890.58 73,839.00 408.40 389.65 408.40 0.067 100.00%
102,888.71 408.40 389.65 408.40
CD=
29
39,270.00
COSTO DE ALQUILER DIARIO S/. Ip IU 49 Io( abril 2015) HORAS X DIA cant de dias
330 297.17 279.73 4 30
200 297.17 279.73 4 30
TOTAL
COSTO DE ALQUILER DIARIO S/. Ip IU 49 Io( abril 2015) HORAS X DIA cant de dias
330 295.65 279.73 4 16
200 295.65 279.73 4 16
210 295.65 279.73 4 16
TOTAL
SUMA TOTAL
COSTO DE ALQUILER DIARIO S/. Ip IU 49 Io( abril 2015) HORAS X DIA cant de dias
330 295.65 279.73 4 15
200 295.65 279.73 4 15
210 295.65 279.73 4 15
TOTAL
COSTO DE ALQUILER DIARIO S/. Ip IU 49 Io( abril 2015) HORAS X DIA cant de dias
330 298.91 279.73 4 31
200 298.91 279.73 4 31
210 298.91 279.73 4 31
TOTAL
COSTO DE ALQUILER DIARIO S/. Ip IU 49 Io( abril 2015) HORAS X DIA cant de dias
330 303.08 279.73 4 22
200 303.08 279.73 4 22
210 303.08 279.73 4 22
TOTAL
SUMA TOTAL
MGG S/.
35222.57 ITEM EQUIPO COSTO DE ALQ
PC Ip
21347.01 1 EXCAVADORA 330 150 600.4
22414.36 2 RODILLO CS 5 200 150
78983.94
3 RETROEXCAV 210 150
MGG S/.
42068.9
25496.3
26771.12
94336.32
MGG S/.
22321.98
13528.47
14204.9
50055.35
223375.61
MGG S/.
20926.86
12682.94
13317.09 TOTAL PAGAD 438909.92
46926.89
MGG S/.
43725.73
26500.44
27825.46
98051.63
MGG S/.
31464.07
19069.13
20022.59
70555.79
215534.31
Io( abril 2015D* MGG S/.
279.73 273 S/. 1,289.10
273
273
“MEJORAMIENTO DEL SISTEMA INTEGRAL DE AGUA
POTABLE Y ALCANTARILLADO DEL CPM SAN RAMON
Obra : DE PANGOA, DISTRITO DE PANGOA – SATIPO –
JUNIN”
PAGADO
CONTRATO PRINCIPAL : S/. 1,978,049.86
adicional N°01: S/. 134,363.79
adicional deductivo N°01: S/. 61,020.34
SUB TOTAL: S/. 2,173,433.99
IGV 18% : S/. 391,218.12
TOTAL: S/. 2,564,652.11
SALDO A PAGAR
reajuste autorizado
contrato principal: S/. 89,445.64
adicional N° 01: S/. 88.68
adicional deductivon°01: S/. 6.10
Mayores generales : S/. 116,353.64
Costo de maquinaria parada: S/. 50,320.00
SUB TOTAL : S/. 256,214.06
IGV 18% : S/. 46,118.53
TOTAL: S/. 302,332.59
S/. 2,594,762.25
89,445.64
88.68
6.10
27,561.27
-
117,101.69
21,078.30
138,179.99