ITEM CANTIDAD DESCRIPCION UNIDAD P.

UNITARIO PARCIAL
RETROEXCAVADORA CAT
01 568 420E (Operador Sr. Alex ML S/ 28.81 S/ 16,364.08
Arnold Gómez Tito)
RETROEXCAVADORA CAT
02 161 420F (Operador Sr. Jesús ML S/ 28.81 S/ 4,638.41
Gardica)

RETROEXCAVADORA NEW
03 17 HOLLAND (Operador Sr. Percy ML S/ 29.81 S/ 506.77
Arosquipa)
SUB-TOTAL: S/ 21,509.26 SR.ANGEL VILCA ARENAS
I.G.V. (18%) S/ 3,871.67 ITEM

TOTAL : S/ 25,380.93 01

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


RETROEXCAVADORA CAT
01 6 420E (Operador Sr. Lucio)
ML S/ 103.84 S/ 528.00
SUB-TOTAL: S/ 528.00
I.G.V. (18%) S/ 95.04
TOTAL : S/ 368.16

MAQUNQRIAS Y TRANSPORTES 3M SRL


3/4/2019
FECHA ITEM CANTIDAD DESCRIPCION UND P. UNITARIO PARCIAL
RETROEXCAVADORA CAT
000102 7.6 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 740.70
04.02.19 CRUZ
RETROEXCAVADORA CAT
000103 8.5 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 828.41
05.02.19 CRUZ
RETROEXCAVADORA CAT
000104 9.9 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 964.85
06.02.19 CRUZ
RETROEXCAVADORA CAT
000106 8.4 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 818.66
07.02.19 CRUZ
RETROEXCAVADORA CAT
000108 8.2 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 799.17
08.02.19 CRUZ
RETROEXCAVADORA CAT
000109 7.5 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 730.95
09.02.19 CRUZ
RETROEXCAVADORA CAT
000110 7.8 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 760.19
11.02.19 CRUZ
RETROEXCAVADORA CAT
000111 4.4 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 428.82
12.02.19 CRUZ
RETROEXCAVADORA CAT
000112 1 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 97.46
13.02.19 CRUZ
RETROEXCAVADORA CAT
000113 5.4 420E (Operador Sr.ELVIS HM S/ 97.46 S/ 526.28
14.02.20 CRUZ
68.7 SUB-TOTAL: S/ 6,695.50
I.G.V. (18%) S/ 1,205.19
TOTAL : S/ 7,900.69

ALBERTO CABRERA HUAMANI


05.03.19 02 6
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
01 6 PANEL DIA S/ 88.00 S/ 528.00
02 6 PANEL DIA S/ 52.00 S/ 312.00
SUB-TOTAL: S/ 840.00
I.G.V. (18%) S/ 151.20
TOTAL : S/ 991.20

CUTEC PACHA SAC


RUC :20456011374
FECHA CANTIDAD DESCRIPCION UND P. UNITARIO PARCIAL
RETROEXCAVADORA CAT
1 24.01.19 4.8 420F (Operador Sr.NOE HM S/ 97.46 S/ 467.81
FLORES
RETROEXCAVADORA CAT
2 27.01.19 6.5 420F (Operador Sr.NOE HM S/ 97.46 S/ 633.49
FLORES

RETROEXCAVADORA CAT
3 04.02.19 7.3 420F (Operador Sr.NOE HM S/ 97.46 S/ 711.46
FLORES
RETROEXCAVADORA CAT
4 05.02.19 8.6 420F (Operador Sr.NOE HM S/ 97.46 S/ 838.16
FLORES
RETROEXCAVADORA CAT
5 06.02.19 9.5 420F (Operador Sr.NOE HM S/ 97.46 S/ 925.87
FLORES
RETROEXCAVADORA CAT
6 07.02.19 7.9 420F (Operador Sr.NOE HM S/ 97.46 S/ 769.93
FLORES
RETROEXCAVADORA CAT
7 08.02.19 8.8 420F (Operador Sr.NOE HM S/ 97.46 S/ 857.65
FLORES
RETROEXCAVADORA CAT
8 11.02.19 8 420F (Operador Sr.NOE HM S/ 97.46 S/ 779.68
FLORES

RETROEXCAVADORA CAT
9 12.02.19 8.2 420F (Operador Sr.NOE HM S/ 97.46 S/ 799.17
FLORES
RETROEXCAVADORA CAT
10 13.02.19 7.6 420F (Operador Sr.NOE HM S/ 97.46 S/ 740.70
FLORES
RETROEXCAVADORA CAT
11 14.02.19 6.4 420F (Operador Sr.NOE HM S/ 97.46 S/ 623.74
FLORES

RETROEXCAVADORA CAT
12 15.02.19 8.3 420F (Operador Sr.NOE HM S/ 97.46 S/ 808.92
FLORES
RETROEXCAVADORA CAT
13 16.02.19 5 420F (Operador Sr.NOE HM S/ 97.46 S/ 487.30
FLORES
RETROEXCAVADORA CAT
14 18.02.19 8 420F (Operador Sr.NOE HM S/ 97.46 S/ 779.68
FLORES
RETROEXCAVADORA CAT
15 19.02.19 8 420F (Operador Sr.NOE HM S/ 97.46 S/ 779.68
FLORES

RETROEXCAVADORA CAT
16 20.02.19 8.6 420F (Operador Sr.NOE HM S/ 97.46 S/ 838.16
FLORES
RETROEXCAVADORA CAT
17 21.02.19 7.7 420F (Operador Sr.NOE HM S/ 97.46 S/ 750.44
FLORES
RETROEXCAVADORA CAT
18 22.02.19 8 420F (Operador Sr.NOE HM S/ 97.46 S/ 779.68
FLORES

RETROEXCAVADORA CAT
19 23.02.19 4.8 420F (Operador Sr.NOE HM S/ 97.46 S/ 467.81
FLORES
RETROEXCAVADORA CAT
20 25.02.19 7.8 420F (Operador Sr.NOE HM S/ 97.46 S/ 760.19
FLORES
RETROEXCAVADORA CAT
21 26.02.19 8.6 420F (Operador Sr.NOE HM S/ 97.46 S/ 838.16
FLORES

RETROEXCAVADORA CAT
22 27.02.19 3.5 420F (Operador Sr.NOE HM S/ 97.46 S/ 341.11
FLORES
SUB-TOTAL: S/ 15,778.77
I.G.V. (18%) S/ 2,840.18
TOTAL : S/ 18,618.95

GARDENS EIRL
3/7/2019
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL ITEM
RETROEXCAVADORA CAT
01 133.3 420E
HM S/ 115.00 S/ 12,570.19 01

SUB-TOTAL: S/ 12,570.19
I.G.V. (18%) S/ 2,759.31
TOTAL : S/ 15,329.50

ARENA GRUESA 3M

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


01 330 ARENA GRUESA M3 S/ 26.28 S/ 8,672.40
SUB-TOTAL: S/ 8,672.40
I.G.V. (18%) S/ 1,561.03
TOTAL : S/ 10,233.43

RETROEXCAVADORA EDY MAMANI CABANA CEL 98385 OF.16


4/2/2019
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
01 110.9 RETROEXCAVADORA 420E HM S/ 97.46 S/ 10,808.31
SUB-TOTAL: S/ 10,808.31
I.G.V. (18%) S/ 1,945.50
TOTAL : S/ 12,753.81

RETROEXCAVADORA EDY MAMANI CABANA CEL 98385 OF.17

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


01 74 RETROEXCAVADORA 420F2 HM S/ 97.46 S/ 7,212.04
SUB-TOTAL: S/ 7,212.04
I.G.V. (18%) S/ 1,298.17
TOTAL : S/ 8,510.21
DIBRIT ARENA GRUESA

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


01 300 ARENA GRUESA M3 S/ 31.00 S/ 9,300.00
SUB-TOTAL: S/ 7,881.36 7881.36
I.G.V. (18%) S/ 1,418.64 1418.64
TOTAL : S/ 9,300.00 9300

GARCIA
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
01 330 ARENA GRUESA M3 S/ 26.27 S/ 8,669.10
SUB-TOTAL: S/ 8,669.10
I.G.V. (18%) S/ 1,560.44
TOTAL : S/ 10,229.54

ELIMINACION ESCOMBRO

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


01 3 ELIMINACION ESCOMBR VIAJE S/ 100.00 S/ 300.00
SUB-TOTAL: S/ 254.24
I.G.V. (18%) S/ 45.76
TOTAL : S/ 300.00

DIBAPRO EIRL
ARENA GRUESA
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
01 585 ARENA GRUESA M3 S/ 30.80 S/ 18,018.00
SUB-TOTAL: S/ 254.24
I.G.V. (18%) S/ 45.76
TOTAL : S/ 300.00

PIEDRA CHANCADA
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
01 30 PIEDRA CHANCADA M3 S/ 45.00 S/ 1,350.00
SUB-TOTAL: S/ 243.00
I.G.V. (18%) S/ 45.76
TOTAL : S/ 1,300.00

3M RETROEXCAVADORA 420 E

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


01 31.8 RETROEXCAVADORA 420E HM S/ 97.46 S/ 3,099.23
SUB-TOTAL: S/ 3,099.23
I.G.V. (18%) S/ 557.86
TOTAL : S/ 3,657.09

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


01 36.2 RETROEXCAVADORA 420E HM S/ 90.00 S/ 3,258.00
SUB-TOTAL: S/ 2,761.02
I.G.V. (18%) S/ 496.98
TOTAL : S/ 3,258.00
GARDENS EIRL.
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
RETROEXCAVADORA CAT
01 40.9 420E
HM S/ 97.46 S/ 3,986.11
SUB-TOTAL: S/ 3,986.11
I.G.V. (18%) S/ 717.50
TOTAL : S/ 4,703.61

MAVE

ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL


RETROEXCAVADORA CAT
01 84.8 420E
HM S/ 90.00 S/ 7,632.00
SUB-TOTAL: S/ 7,632.00
I.G.V. (18%) S/ 1,373.76
TOTAL : S/ 9,005.76

DIBAPRO EIRL
ITEM CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
01 795 ARENA GRUESA M3 S/ 30.80 S/ 24,486.00
SUB-TOTAL: S/ 20,750.85
I.G.V. (18%) S/ 3,734.25
TOTAL : S/ 24,486.00

MAQUINARIAS Y TRANSPORTES 3M SRL


RUC 20603881711
ALQUILER RETRO EXCAVADORA
OPERADOR : NOE FLORES C.

FECHA N° PARTE CANTIDAD DESCRIPCION UND P. UNITARIO PARCIAL


15/04/19 000279 7 RETROEXCAVADORA 420E HM S/ 90.00 S/ 630.00
16/04/19 000280 7.6 RETROEXCAVADORA 420E HM S/ 90.00 S/ 684.00
17/04/19 000281 7.7 RETROEXCAVADORA 420E HM S/ 90.00 S/ 693.00
18/04/19 000282 4.3 RETROEXCAVADORA 420E HM S/ 90.00 S/ 387.00
22/04/19 000283 7.6 RETROEXCAVADORA 420E HM S/ 90.00 S/ 684.00
23/04/19 000284 7.8 RETROEXCAVADORA 420E HM S/ 90.00 S/ 702.00
24/04/19 000285 7.8 RETROEXCAVADORA 420E HM S/ 90.00 S/ 702.00
25/04/19 000286 7.7 RETROEXCAVADORA 420E HM S/ 90.00 S/ 693.00
26/04/19 000287 7.8 RETROEXCAVADORA 420E HM S/ 90.00 S/ 702.00
27/04/19 000288 7.6 RETROEXCAVADORA 420E HM S/ 90.00 S/ 684.00
4/29/2019 000289 3 RETROEXCAVADORA 420E HM S/ 90.00 S/ 270.00
75.9 SUB-TOTAL: S/ 6,831.00
I.G.V. (18%) S/ 1,229.58
TOTAL : S/ 8,060.58
R.ANGEL VILCA ARENAS
CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
RETROEXCAV
53.1 ADORA CAT HM S/ 127.12 S/ 6,750.07
420E
SUB-TOTAL: S/ 6,750.07
I.G.V. (18%) S/ 1,215.01
TOTAL : S/ 7,965.08
}

PANEL DIA S/ 52.00 S/ 312.00


SUB-TOTAL: S/ 312.00
I.G.V. (18%) S/ 56.16
TOTAL : S/ 368.16
CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
RETROEXCAV
133.3 ADORA CAT HM S/ 97.46 S/ 12,991.42
420E
SUB-TOTAL: S/ 12,991.42
I.G.V. (18%) S/ 2,338.46
TOTAL : S/ 15,329.87
EQUIPO: RETROEXCAVADORA CAT 420E
OPERADOR: Sr. Lucio
PROG.
ITEM FECHA PARTE N° TURNO PROG. INICIO
TERMINO
01 12/6/2018 000001 3+435 3+495
02 12/8/2018 000002 0+545 0+630
03 12/10/2018 000003 Mañana 4+415 4+427
04 Tarde 4+635 4+680
06 12/11/2018 000004 Mañana 4+680 4+757
07 Tarde 4+784 4+791
08 Tarde 4+791 4+796

EQUIPO: RETROEXCAVADORA CAT 420F


OPERADOR: Sr. Jesus Gandica
PROG.
ITEM FECHA PARTE N° TURNO PROG. INICIO
TERMINO
01 12/6/2018 005007 Mañana 3+690 3+694
02 Tarde 3+524 3+537
03 12/7/2018 005008 Mañana 3+523 3+524
04 3+495 3+516
05 Tarde 0+500 0+545
06 12/8/2018 005009 0+945 0+977
07 12/11/2018 005010 5+035 5+080

EQUIPO: RETROEXCAVADORA NEW HOLLAND


OPERADOR: Sr. Percy Arosquipa
PROG.
ITEM FECHA PARTE N° TURNO PROG. INICIO
TERMINO
01 11/29/2018 005007 Mañana 2+036 2+053
EQUIPO: RETROEXCAVADORA CAT 420F
OPERADOR: Sr. Roger Mamani

PARCIAL TOTAL (ML) ITEM FECHA PARTE N° TURNO

60 60.00 01 12/1/2018 000459 Mañana


85 85.00 02 Tarde
12 57.00 03 12/3/2018 000451
45 04 12/4/2018 000452
77 89.00 06 12/5/2018 000453 Mañana
7 07 Tarde
5 08 12/6/2018 000454 Mañana
SUMA (ML) 291.00 09 Tarde
10 12/7/2018 000455
11 12/8/2018 000456
12 12/10/2018 000457 Mañana
13 Tarde
14 12/11/2018 000458
PARCIAL TOTAL (ML)
4 17.00
13 EQUIPO: RETROEXCAVADORA CAT 420E
1 67.00 OPERADOR: Sr. Jasmani Mamani
21 ITEM FECHA PARTE N° TURNO
45 01 11/28/2018 000401
32 32.00 02 11/29/2018 000402 Mañana
45 45.00 03 Tarde

SUMA (ML) 161.00 04 11/30/2018 000403

05 12/2/2018 000404
06 12/3/2018 000406
07 12/4/2018 000407
08 12/5/2018 000408
PARCIAL TOTAL (ML) 09 12/7/2018 000409 Mañana
17 17.00 10 Tarde
SUMA (ML) 17.00 11 Tarde
12 12/8/2018 000410
13 12/10/2018 000411
14 12/11/2018 000412
EQUIPO: RETROEXCAVADORA CAT 420D
OPERADOR: Sr. Rene Luque.

ITEM FECHA PARTE N° TURNO

01 12/4/2018 000001
02 12/5/2018 000002 Mañana
03 Tarde
04 Tarde
06 12/6/2018 000003
07 12/7/2018 000004
08 12/10/2018 000005 Mañana
09 Tarde
10 Tarde
11 12/11/2018 000006 Mañana
12 Mañana
13 Tarde

EQUIPO: RETROEXCAVADORA CAT 420D


OPERADOR: Sr. Percy Apaza.

ITEM FECHA PARTE N° TURNO

01 12/4/2018 000001
02 12/5/2018 000002
03 12/6/2018 000003
04 12/7/2018 000004
06 12/8/2018 000005
07 12/10/2018 000006
08 12/11/2018 000007
HOROMETRO HOROMETRO TOTAL PROG.
PROG. INICIO PARCIAL TOTAL (ML)
(Inicial) (Final) (Hrs) TERMINO
4149.5 4156.7 7.2 2+742 2+749 7 28.00
2+364 2+385 21
4159.2 4165.1 5.9 2+385 2+402 17 17.00
4167.0 4170.9 3.9 3+385 3+415 30 30.00
4171.5 4179.5 8.0 3+335 3+385 50 61.00
3+580 3+591 11
4179.9 4187.2 7.3 3+538 3+577 39 50.00
3+580 3+591 11
4187.7 4195.5 7.8 3+667 3+685 18 18.00
4198.2 4201.5 3.3 3+650 3+660 10 10.00
4204.4 4210.3 5.9 4+792 4+812 20 57.00
4+823 4+860 37 37.00
4211.6 4219.3 7.7 4+860 4+936 76 76.00
TOTAL (Hrs) 57.00 SUMA (ML) 384.00

HOROMETRO HOROMETRO TOTAL PROG.


PROG. INICIO PARCIAL TOTAL (ML)
(Inicial) (Final) (Hrs) TERMINO
9654.0 9658.3 4.18 2+490 2+520 30 30.00
9659.4 9667.7 8.18 2+520 2+545 25 33.00
2+742 2+750 8

9667.5 9675.3 7.48 2+310 2+364 54 54.00

9678.8 9684.5 5.42 3+110 3+175 65 65.00


9684.7 9692.6 7.54 3+175 3+210 35 35.00
9693.0 9701.0 8.00 3+210 3+275 65 65.00
9701.3 9709.7 8.24 3+276 3+333 57 57.00
9713.1 9720.6 7.30 1+907 1+910 3 36.00
3+429 3+435 6
0+644 0+671 27
9721.2 9726.3 5.06 0+672 0+680 8 8.00
9727.7 9735.8 8.05 4+516 4+564 48 48.00
9738.0 9746.3 8.18 4+564 4+600 36 36.00
TOTAL (Hrs) 77.63 SUMA (ML) 467.00

HOROMETRO HOROMETRO TOTAL PROG.


PROG. INICIO PARCIAL TOTAL (ML)
(Inicial) (Final) (Hrs) TERMINO
8140.0 8148.2 8.2 2+402 2+457 55 55.00
8148.6 8157.0 8.4 2+457 2+473 16 41.00
2+480 2+493 13
2+756 2+768 12
8158.0 8165.2 7.2 2+768 2+822 54 54.00
8165.6 8174.0 8.4 2+822 2+916 94 94.00
8180.4 8188.5 8.1 2+916 2+942 26 54.00
4+940 4+952 12
4+960 4+976 16
8194.5 8202.4 8.1 4+976 4+989 13 56.00
5+140 5+160 20
5+000 5+023 23
TOTAL (Hrs) 48.40 SUMA (ML) 354.00

HOROMETRO HOROMETRO TOTAL PROG.


PROG. INICIO PARCIAL TOTAL (ML)
(Inicial) (Final) (Hrs) TERMINO
7284.7 7289.9 5.2 2+730 2+740 10 10.00
7291.2 7299.3 8.1 2+716 2+730 14 14.00
7300.6 7309.3 8.7 2+690 2+716 26 26.00
7310.4 7319.5 8.06 2+645 2+690 45 45.00
7320.2 7325.7 5.5 2+621 2+645 24 24.00
7327.1 7334.3 7.2 2+580 2+621 41 41.00
7335.3 7343.8 8.5 2+545 2+580 35 35.00
TOTAL (Hrs) 51.26 SUMA (ML) 195.00
ITEM N° ORDEN SERV.CANTIDAD DESCRIPCION UNIDAD P. UNITARIO PARCIAL
ALQUILER
ESTACION
01 201 12 TOTAL(todos sus
glp S/ 70.00 S/ 840.00
accesorios)

ALQUILER
ESTACION
02 224 6 TOTAL(todos sus
glp S/ 70.00 S/ 420.00
accesorios)

03 249 2 SERV.TOP. glp S/ 70.00 S/ 140.00


ALQUILER
ESTACION
04 260 2 TOTAL(todos sus
glp S/ 70.00 S/ 140.00
accesorios)

05 05 1 SERV.TOP. glp S/ 120.00 S/ 120.00


06 08 1 SERV.TOP. glp S/ 984.00 S/ 984.00
SUB-TOTAL: S/ 2,644.00
I.G.V. (18%) S/ 475.92
TOTAL : S/ 3,119.92
CORPORACION B&V CONSTRUCCIONES SAC.
RUC : 20454667957

OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALACNTARILLADO DE LAS


PARTES ALTAS DEL DISTRITO DE PAUCARPATA
MAQUINARIA : Rodillo
OPERADOR : Victor Alvarez

FECHA N° PARTE INICIO TERMINO CANTIDAD UNIDAD


1 10/31/2019 001072 5325.8 5328.7 2.9 HORAS
2 11/2/2019 001073 5329.9 5331.9 2 HORAS
3 11/3/2019 001074 5331.9 5337.2 5.3 HORAS
4 11/5/2019 001075 5337.2 5341.5 4.3 HORAS
5 11/6/2019 001076 5341.5 5348.9 7.4 HORAS
TOTAL 21.9

RODILLO
INGRESO A OBRA: 2530-Oct-19
DE MAYO DEL 2019
INICIO
5325.8
LECTURA AL DIA 06 de noviembre del 2019
5348.9
TOTAL HORAS TRABAJADAS 21.9 HORAS