Está en la página 1de 38

Horas de Operación Anuales 2880.

00
Costo Diesel por litro $ 18.00
Cambio Dollar $ 20.00
Costo Tractor Bulldozer $ 2,340,000.00
Costo Cargadores Frontales $ 1,000,000.00
Costo Camiones $ 4,200,000.00
Tiempo (años) 10
Tasa de interes nominal 12%
Periodos por año 12
Tasa de interes efectiva 0.12682503013197
Inflacion 4%
Tasa real 0.083485605896125

Inversion Fija
Año Cantidad Costo Concepto
1 $ 2,300,000.00 Construccion
1 $ 600,000.00 Infraestructura
1 $ 936,000.00 Tractor Bulldozer
1° año
3 $ 1,200,000.00 Cargadores Frontales
4 $ 6,720,000.00 Camiones
1 $ 650,000.00 Planta Trituradora
2° año 4 $ 6,720,000.00 Camiones
3° año 3 $ 5,040,000.00 Camiones

Inversion Variable
Año Cantidad Costo Concepto
1 $ 144,000.00 Diesel Tractor Bulldozer
3 $ 302,400.00 Diesel Cargadores Frontales
4 $ 460,800.00 Diesel Camiones
1° año
10% $ 90,720.00 Costos Variables
7.50% $ 664,200.00 Herramientas y Refacciones
1 $ 16,557,105.37 Anualidad Maquinaria
1 $ 144,000.00 Diesel Tractor Bulldozer
3 $ 302,400.00 Diesel Cargadores Frontales
8 $ 921,600.00 Diesel Camiones
2° año
10% $ 136,800.00 Costos Variables
7.50% $ 1,168,200.00 Herramientas y Refacciones
1 $ 30,468,946.25 Anualidad Maquinaria
1 $ 144,000.00 Diesel Tractor Bulldozer
3 $ 302,400.00 Diesel Cargadores Frontales
11 $ 1,267,200.00 Diesel Camiones
3° año
10% $ 171,360.00 Costos Variables
7.50% $ 1,546,200.00 Herramientas y Refacciones
3° año

1 $ 42,166,840.26 Anualidad Maquinaria


4° año Total $ 45,598,000.26 Costos Variables
5° año Total $ 45,598,000.26 Costos Variables
6° año Total $ 45,598,000.26 Costos Variables
7° año Total $ 45,598,000.26 Costos Variables
8° año Total $ 45,598,000.26 Costos Variables
9° año Total $ 45,598,000.26 Costos Variables
10° año Total $ 45,598,000.26 Costos Variables
Costo Maquinaria Enganche Anualidad
$ 2,340,000.00 $ 936,000.00 1749937.96559724
$ 1,000,000.00 $ 400,000.00 747836.737434717
$ 4,200,000.00 $ 1,680,000.00 3140914.29722581
$ 4,200,000.00 $ 1,680,000.00 3477960.22155773
$ 4,200,000.00 $ 1,680,000.00 3899298.00261506
Concepto
Bulldozer año 1
Cargadores año 1
Camiones año 1
Camiones año 2
Camiones año 3
Dias de Operación 360
Produccion de Arena 47.00%
Produccion de Grava 53.00%
Costo metro cubico de arena $ 120.00
Costo metro cubico de grava $ 125.00
Factor de abundamiento 1.55

Concepto Cantidad por dia Cantidad anual

Capacidad de la mina año 1 36.36%


Capacidadde la mina año 2 72.73%
Capacidad a partir del año 3 100.00%

Toneladas por dia 3200.00 1152000


Año 1 1163.63636363636 418909.090909091
Año 2 2327.27272727273 837818.181818182

Volumen por dia 4960 1785600


Año 1 1803.63636363636 649309.090909091
Año 2 3607.27272727273 1298618.18181818

Arena volumen 2331.2 839232


Grava volumen 2628.8 946368
Arena volumen año 1 847.709090909091 305175.272727273
Grava volumen año 1 955.927272727273 344133.818181818
Arena volumen año 2 1695.41818181818 610350.545454545
Grava volumen año 2 1911.85454545455 688267.636363636
TREMA: 0.15
PLANEACIÓN: 15 años

PRIMER AÑO: 2000000 Reservas Cubicadas 133333.333


8.35% Pb
129.1 gr Ag
4 gr Au
VALOR : 47.5 ($/tn)

Año 1
Gastos
74000 Dolares Derecho de Exploración
215000 Trabajo de Exploración
67000 Estudios de Ingenieria
50000 Estudios Econónmicos

Año 2

25000 5km de Caminos


22000 Electricidad Y Telefonia
44000 Terraceria
250000 Casas
0.1 Imprevistos

Año 3

225000 Nivel de Acarreo


9000 Nivel de Maniobras
94500 Nivel N°1
162000 Nivel N°2
67500 Cruceros de Extracción
421000 Contraposos Obras Auxiliares
179100 Otros
15000 Construir las Oficinas
62000 Casa de Fuerza
125000 Almacenes Y Construcciones
2400000 Planta de Benficio
200000 Presa de Jales

79500 Ventiladores
394000 Cargado Y Acarre
45000 Perforadoras
97300 Compresores
40500 Otros Equipos
0.1 Imprevistos

Costos de Operación

721627 Dolares Anuales Mano de Obra


2.91 ($/tn) Insumos
1.57 ($/tn) Refacciones y Energía
0.65 ($/tn) Desarrollar Mina

319698 Dolares Anuales Planta


1.59 ($/tn) Reactivos
12000 Dolares Anuales Laboratorio
401625 Ingeniería Y Supervision
57062 Seguro

TREMA: 0.1
PLANEACIÓN: 15 años

PRIMER AÑO: 2000000 Reservas Cubicadas 133333.333


8.35% Pb
129.1 gr Ag 6333333.33
VALOR : 47.5 ($/tn)
4 gr Au 380.952381
PROYECTO "MINA REY MIDAS"

Anules de Mineral
Anules de Mineral

Ingresos Anuales

por día
1 año
Gastos 74000 Dolares Derecho de Exploración
215000 Trabajo de Exploración
67000 Estudios de Ingenieria
50000 Estudios Econónmicos

2 año

25000 5km de Caminos


22000 Electricidad Y Telefonia
44000 Terraceria
250000 Casas
10% Imprevistos

3 año

225000 Nivel de Acarreo


9000 Nivel de Maniobras
94500 Nivel N°1
162000 Nivel N°2
67500 Cruceros de Extracción
421000 Contraposos Obras Auxiliares
179100 Otros
15000 Construir las Oficinas
62000 Casa de Fuerza
125000 Almacenes Y Construcciones
2400000 Planta de Benficio
200000 Presa de Jales

79500 Ventiladores
394000 Cargado Y Acarre
45000 Perforadoras
97300 Compresores
40500 Otros Equipos
10% Imprevistos

Costos de Operación
721697 Dolares Anuales Mano de Obra
2.91 ($/tn) Insumos
1.57 ($/tn) Refacciones y Energía
0.65 ($/tn) Desarrollar Mina

319698 Dolares Anuales Planta


1.59 ($/tn) Reactivos
12000 Dolares Anuales Laboratorio
401625 Ingeniería Y Supervision
57062 Seguro

TREMA: 0.15
PLANEACIÓN: 15 años

2000000 Reservas Cubicadas 133333.333 Anules de Mineral


PRIMER AÑO: 8.35% Pb
129.1 gr Ag 6333333.33 Ingresos Anuales
4 gr Au
VALOR : 47.5 ($/tn)
Años del proyecto pre-producc 1 2 3 4 5
Año de Producción 1 2
INGRESOS 0 0 0 2533333.33 4116666.67

INVERSION
Dolares Derecho de Exploración 74000
Trabajo de Exploración 215000
Estudios de Ingenieria 67000
Estudios Econónmicos 50000

5km de Caminos 25000


Electricidad Y Telefonia 22000
Terraceria 44000
Casas 250000
Imprevistos (10%) 34100

Nivel de Acarreo 225000


Nivel de Maniobras 9000
Nivel N°1 94500
Nivel N°2 162000
Cruceros de Extracción 67500
Contraposos Obras Auxiliares 421000
Otros 179100
Construir las Oficinas 15000
Casa de Fuerza 62000
Almacenes Y Construcciones 125000
Planta de Benficio 2400000
Presa de Jales 200000

Ventiladores 79500
Cargado Y Acarre 394000
Perforadoras 45000
Compresores 97300
Otros Equipos 40500
Imprevistos (10%) 461640

COSTOS

Costos Variables
Insumos 155200 252200
Refacciones y Energía 83733.3333 136066.667
Desarrollar Mina 34666.6667 56333.3333
Reactivos 84800 137800
Costos Fijos
Mano de Obra Mina 721627 721627
Mano de Obra Planta 319698 319698
Laboratorio 12000 12000
Ingenieria Supervision 401625 401625
Seguros 57062 57062
Derecho de Explotacion(5%) 126666.667 205833.333
Depreciación
Ventiladores 5300 5300
Cargado Y Acarre 26266.6667 26266.6667
Perforadoras 3000 3000
Compresores 6486.66667 6486.66667
Otros Equipos 2700 2700
Planta de Benficio 300000 300000
Casa de Fuerza ,etc 13466.6667 13466.6667

UTILIDAD GRAVABLE
-406000 -375100 -5078040 -179034.667 1459201.33
1280166.67
IMPUESTOS
ISR (33%) 422455
PTU (10%) 128016.667

UTILIDAD NETA -406000 -375100 -5078040 -179034.667 729695

Depreciación 343753.333 343753.333

FLUJO NETO -406000 -375100 -5078040 164718.667 1073448.33

VA -$353,043.48 -$283,629.49 -$3,338,893.73 $94,178.43 $533,693.54

TREMA(15%) 15% $4,100,260.00


VPN 2404947.932 -$3,975,566.70
TIR 24%
PRI $124,693.31
Base 10 años 10.64475 Años
124693.3081
6 7 8 9 10 11 12
3 4 5 6 7 8 9
5383333.33333333 6333333.33 6333333.33 6333333.33 6333333.33 6333333.33 6333333.33

720000

329800 388000 388000 388000 388000 388000 388000


177933.333333333 209333.333 209333.333 209333.333 209333.333 209333.333 209333.333
73666.6666666667 86666.6667 86666.6667 86666.6667 86666.6667 86666.6667 86666.6667
180200 212000 212000 212000 212000 212000 212000
721627 721627 721627 721627 721627 721627 721627
319698 319698 319698 319698 319698 319698 319698
12000 12000 12000 12000 12000 12000 12000
401625 401625 401625 401625 401625 401625 401625
57062 57062 57062 57062 57062 57062 57062
269166.666666667 316666.667 316666.667 316666.667 316666.667 316666.667 316666.667

5300 5300 5300 5300 5300 5300 5300


26266.6666666667 26266.6667 26266.6667 26266.6667 26266.6667 26266.6667 26266.6667
3000 3000 3000 3000 3000 3000 3000
6486.66666666667 6486.66667 6486.66667 6486.66667 6486.66667 6486.66667 6486.66667
2700 2700 2700 2700 2700 2700 2700
300000 300000 300000 300000 300000 300000 90000
13466.6666666667 13466.6667 13466.6667 13466.6667 13466.6667 13466.6667 13466.6667

2483334.66666667 3251434.67 3251434.67 3251434.67 3251434.67 3251434.67 2741434.67

819500.44 1072973.44 1072973.44 1072973.44 1072973.44 1072973.44 904673.44


248333.466666667 325143.467 325143.467 325143.467 325143.467 325143.467 274143.467

1415500.76 1853317.76 1853317.76 1853317.76 1853317.76 1853317.76 1562617.76

343753.333333333 343753.333 343753.333 343753.333 343753.333 343753.333 133753.333

1759254.09333333 2197071.09 2197071.09 2197071.09 2197071.09 2197071.09 1696371.09

$760,574.09 $825,960.40 $718,226.44 $624,544.73 $543,082.37 $472,245.54 $317,063.89

45256.8644
7.737 años
13 14 15 16 17 18
10 11 12 13 14 15
6333333.33 6333333.33 6333333.33 6333333.33 6333333.33 6333333.33

388000 388000 388000 388000 388000 388000


209333.333 209333.333 209333.333 209333.333 209333.333 209333.333
86666.6667 86666.6667 86666.6667 86666.6667 86666.6667 86666.6667
212000 212000 212000 212000 212000 212000
721627 721627 721627 721627 721627 721627
319698 319698 319698 319698 319698 319698
12000 12000 12000 12000 12000 12000
401625 401625 401625 401625 401625 401625
57062 57062 57062 57062 57062 57062
316666.667 316666.667 316666.667 316666.667 316666.667 316666.667

5300 5300 5300 5300 5300 5300


26266.6667 26266.6667 26266.6667 26266.6667 26266.6667 26266.6667
3000 3000 3000 3000 3000 3000
6486.66667 6486.66667 6486.66667 6486.66667 6486.66667 6486.66667
2700 2700 2700 2700 2700 2700
90000 90000 90000 90000 90000 90000
13466.6667 13466.6667 13466.6667 13466.6667 13466.6667 13466.6667

3461434.67 3461434.67 3461434.67 3461434.67 3461434.67 3461434.67

1142273.44 1142273.44 1142273.44 1142273.44 1142273.44 1142273.44


346143.467 346143.467 346143.467 346143.467 346143.467 346143.467

1973017.76 1973017.76 1973017.76 1973017.76 1973017.76 1973017.76

133753.333 133753.333 133753.333 133753.333 133753.333 133753.333


9000
2106771.09 2106771.09 2106771.09 2106771.09 2106771.09 2115771.09

$342,409.20 $297,747.13 $258,910.55 $225,139.61 $195,773.57 $170,965.13


Inversion 25000 187550
Tasa 12% 12%
n 15 15

pago S/. 3,670.61 S/. 27,536.89

Pago Numero Saldo Insoluto Interes amortizacion pago total


0 S/. 2,751,570.36
1 S/. 2,677,761.63 S/. 330,188.44 S/. 73,808.73 S/. 403,997.17
2 S/. 2,595,095.85 S/. 321,331.40 S/. 82,665.78 S/. 403,997.17
3 S/. 2,502,510.18 S/. 311,411.50 S/. 92,585.67 S/. 403,997.17
4 S/. 2,398,814.23 S/. 300,301.22 S/. 103,695.95 S/. 403,997.17
5 S/. 2,282,674.77 S/. 287,857.71 S/. 116,139.47 S/. 403,997.17
6 S/. 2,152,598.56 S/. 273,920.97 S/. 130,076.20 S/. 403,997.17
7 S/. 2,006,913.22 S/. 258,311.83 S/. 145,685.35 S/. 403,997.17
8 S/. 1,843,745.63 S/. 240,829.59 S/. 163,167.59 S/. 403,997.17
9 S/. 1,660,997.93 S/. 221,249.48 S/. 182,747.70 S/. 403,997.17
10 S/. 1,456,320.51 S/. 199,319.75 S/. 204,677.42 S/. 403,997.17
11 S/. 1,227,081.80 S/. 174,758.46 S/. 229,238.71 S/. 403,997.17
12 S/. 970,334.45 S/. 147,249.82 S/. 256,747.36 S/. 403,997.17
13 S/. 682,777.41 S/. 116,440.13 S/. 287,557.04 S/. 403,997.17
14 S/. 360,713.52 S/. 81,933.29 S/. 322,063.88 S/. 403,997.17
15 S/. 1.97 S/. 43,285.62 S/. 360,711.55 S/. 403,997.17
2539020
12%
15

S/. 372,789.68 S/. 403,997.17


Horas de Operación Anuales $ 2,880.00
Costo Diesel por litro $ 18.00
Cambio Dollar $ 20.00
Costo Tractor Bulldozer $ 2,340,000.00
Costo Cargadores Frontales $ 1,000,000.00
Costo Camiones $ 4,200,000.00
Tiempo (años) 10
Tasa de interes nominal 12%
Periodos por año 12
Tasa de interes efectiva 0.12682503013197
Inflacion 4%
Tasa real 0.083485605896125
Toneladas por dia 3200
Toneladas por dia año 1 1163.63636363636
Toneladas por dia año 2 2327.27272727273

Inversion Fija
Año Cantidad Costo Concepto
1 $ 2,300,000.00 Construccion
1 $ 600,000.00 Infraestructura
1 $ 936,000.00 Tractor Bulldozer
1° año
3 $ 1,200,000.00 Cargadores Frontales
4 $ 6,720,000.00 Camiones
1 $ 650,000.00 Planta Trituradora
2° año 4 $ 6,720,000.00 Camiones
3° año 3 $ 5,040,000.00 Camiones

Inversion Variable
Año Cantidad Costo Concepto
1 $ 144,000.00 Diesel Tractor Bulldozer
3 $ 302,400.00 Diesel Cargadores Frontales
4 $ 460,800.00 Diesel Camiones
1° año
10% $ 90,720.00 Costos Variables
7.50% $ 664,200.00 Herramientas y Refacciones
1 $ 16,557,105.37 Anualidad Maquinaria
1 $ 144,000.00 Diesel Tractor Bulldozer
3 $ 302,400.00 Diesel Cargadores Frontales
8 $ 921,600.00 Diesel Camiones
2° año
10% $ 136,800.00 Costos Variables
7.50% $ 1,168,200.00 Herramientas y Refacciones
2° año

1 $ 30,468,946.25 Anualidad Maquinaria


1 $ 144,000.00 Diesel Tractor Bulldozer
3 $ 302,400.00 Diesel Cargadores Frontales
11 $ 1,267,200.00 Diesel Camiones
3° año
10% $ 171,360.00 Costos Variables
7.50% $ 1,546,200.00 Herramientas y Refacciones
1 $ 42,166,840.26 Anualidad Maquinaria
4° año Total $ 45,598,000.26 Costos Variables
5° año Total $ 45,598,000.26 Costos Variables
6° año Total $ 45,598,000.26 Costos Variables
7° año Total $ 45,598,000.26 Costos Variables
8° año Total $ 45,598,000.26 Costos Variables
9° año Total $ 45,598,000.26 Costos Variables
10° año Total $ 45,598,000.26 Costos Variables

Costos de Operación

721627
2.91
1.57
0.65

319698
1.59
12000
401625
57062

TREMA: $ 0.15
PLANEACIÓ $ 15.00 años

PRIMER AÑ $ 2,000,000.00 Reservas Cubicadas


$ 0.08 Pb
129.1 gr Ag
VALOR : $ 47.50 ($/tn)
4 gr Au
Sensibilidad de Ingresos
Ingresos
$ 0.40
$ 0.30
$ 0.20
$ 0.10
$ -
-$ 0.10

inversion
$ 0.40
$ 0.30
$ 0.20
$ 0.10
$ - 5503140
-$ 0.10
-$ 0.20
-$ 0.30
-$ 0.40

25%

20%

15%

Column F
10%
25%

20%

15%

Column F
10%

5%

0%
-$0.40 -$0.20 $- $0.20 $0.40

3500000

3000000

2500000

2000000

1500000 Column E
1000000 Linear (Column E)

500000

0
-$0.40 -$0.20 $- $0.20 $0.40
-500000

-1000000
Costo Maquinaria Enganche
$ 2,340,000.00 $ 936,000.00
$ 1,000,000.00 $ 400,000.00
$ 4,200,000.00 $ 1,680,000.00
$ 4,200,000.00 $ 1,680,000.00
$ 4,200,000.00 $ 1,680,000.00
Dolares Anuales Mano de Obra
($/tn) Insumos
($/tn) Refacciones y Energía
($/tn) Desarrollar Mina

Dolares Anuales Planta


($/tn) Reactivos
Dolares Anuales Laboratorio
Ingeniería Y Supervision
Seguro

1 factor
133333.333333333 Anules de Mineral

6333333.33333333 Ingresos Anuales

Diaria 380.952380952381

1
3561725.91372227

VAN TIR
S/. 7,777,534.20 29%
S/. 6,188,404.33 26% S/. 10,000,000.00
S/. 4,599,274.45 22%
S/. 3,010,144.58 18%
S/. 1,295,096.13 14%
S/. -1,003,395.30 7% S/. 8,000,000.00
f(x) = 17192486.2716183
R² = 0.994936069935442

S/. 6,000,000.00

VAN TIR

-616737.946518474 9% S/. 4,000,000.00


20541.3041458468 10%
657820.554810174 12%
1295096.13389582 14%
1932379.05613882 16% S/. 2,000,000.00
2569658.30680314 18%
3206937.55746747 21%

S/. -
-$0.20 -$0.10 $-

S/. -2,000,000.00

Column F
Column F

umn E
ear (Column E)
Anualidad Concepto
1749937.96559724 Bulldozer año 1
747836.737434717 Cargadores año 1
3140914.29722581 Camiones año 1
3477960.22155773 Camiones año 2
3899298.00261506 Camiones año 3

1 2 3 4 5
Año de Producción 1 2
INGRESOS 0 0 0 2533333.33 4116666.67

INVERSION

Estudios Econónmicos 50000

5km de Caminos 25000


Electricidad Y Telefonia 22000
Terraceria 44000

Casas 250000
Imprevistos (10%) 34100

Nivel de Acarreo 225000


Nivel de Maniobras 9000

Nivel N°1 94500


Nivel N°2 162000
Cruceros de Extracción 67500
Contraposos Obras Auxiliares 421000
Otros 179100
Construir las Oficinas 15000
Casa de Fuerza 62000
Almacenes Y Construcciones 125000
Planta de Benficio 2400000
Presa de Jales 200000

Ventiladores 79500
Cargado Y Acarre 394000
Perforadoras 45000
Compresores 97300
Otros Equipos 40500
Imprevistos (10%) 461640

COSTOS

Costos Variables
Insumos 155200 252200
Refacciones y Energía 83733.3333 136066.667
Desarrollar Mina 34666.6667 56333.3333
Reactivos 84800 137800
Costos Fijos
Mano de Obra Mina 721627 721627
Mano de Obra Planta 319698 319698
Laboratorio 12000 12000
Ingeniería Supervisión 401625 401625
Seguros 57062 57062
Derecho de Explotación(5%) 126666.667 205833.333
Depreciación
Ventiladores 5300 5300
Cargado Y Acarre 26266.6667 26266.6667
Perforadoras 3000 3000
Compresores 6486.66667 6486.66667
Otros Equipos 2700 2700
Planta de Beneficio 300000 300000
Casa de Fuerza, etc. 173466.667 13466.6667
Pago Financiamiento 403997.173 403997.173

UTILIDAD GRAVABLE
-50000 -375100 -5078040 -384962.506 1055204.16
Factor 1 1 1 670241.654
IMPUESTOS
ISR (33%) 221179.746
PTU (10%) 67024.1654
UTILIDAD NETA -50000 -375100 -5078040 -384962.506 670241.654

Depreciación 517220 357220

FLUJO NETO -50000 -375100 -5078040 132257.494 1027461.65


VAN -43478.2608695652 -283629.49 -3338893.73 75618.6512 510830.031
TIR 0.295381715698373
TREMA 0.15
Perido de Retorno Inversión 807509.789806802
Base 7 años 7.89541667 años
1046680.43606458

S/. 10,000,000.00

S/. 8,000,000.00
f(x) = 17192486.2716183 x + 1065636.79042544
R² = 0.994936069935442

S/. 6,000,000.00

S/. 4,000,000.00

S/. 2,000,000.00

S/. -
-$0.20 -$0.10 $- $0.10 $0.20 $0.30 $0.40

S/. -2,000,000.00
35%

30%
R² = 0.996419885450227
25%

20%
Column F
15% Polynomial (Column F)

10%

5%

0%
CASH FLOW

6 7 8 9 10 11 12 13
3 4 5 6 7 8 9 10
5383333.33 6333333.33 6333333.33 6333333.33 6333333.33 6333333.33 6333333.33 6333333.33
720000

329800 388000 388000 388000 388000 388000 388000 388000


177933.333 209333.333 209333.333 209333.333 209333.333 209333.333 209333.333 209333.333
73666.6667 86666.6667 86666.6667 86666.6667 86666.6667 86666.6667 86666.6667 86666.6667
180200 212000 212000 212000 212000 212000 212000 212000

721627 721627 721627 721627 721627 721627 721627 721627


319698 319698 319698 319698 319698 319698 319698 319698
12000 12000 12000 12000 12000 12000 12000 12000
401625 401625 401625 401625 401625 401625 401625 401625
57062 57062 57062 57062 57062 57062 57062 57062
269166.667 316666.667 316666.667 316666.667 316666.667 316666.667 316666.667 316666.667

5300 5300 5300 5300 5300 5300 5300 5300


26266.6667 26266.6667 26266.6667 26266.6667 26266.6667 26266.6667 26266.6667 26266.6667
3000 3000 3000 3000 3000 3000 3000 3000
6486.66667 6486.66667 6486.66667 6486.66667 6486.66667 6486.66667 6486.66667 6486.66667
2700 2700 2700 2700 2700 2700 2700 2700
300000 300000 300000 300000 300000 300000 90000 90000
13466.6667 13466.6667 13466.6667 13466.6667 13466.6667 13466.6667 13466.6667 13466.6667
403997.173 403997.173 403997.173 403997.173 403997.173 403997.173 403997.173 403997.173

2079337.49 2847437.49 2847437.49 2847437.49 2847437.49 2847437.49 3057437.49 3057437.49


2749579.15 5597016.64

907361.119 1847015.49 939654.373 939654.373 939654.373 939654.373 1008954.37 1008954.37


274957.915 559701.664 284743.749 284743.749 284743.749 284743.749 305743.749 305743.749
2749579.15 3190299.49 1623039.37 1623039.37 1623039.37 1623039.37 1742739.37 1742739.37

357220 357220 357220 357220 357220 357220 147220 147220

3106799.15 3547519.49 1980259.37 1980259.37 1980259.37 1980259.37 1889959.37 1889959.37


1343155.01 1333643.97 647350.301 562913.305 489489.831 425643.331 353246.92 307171.235

Column E
Linear (Column E)

$0.40 $0.50
Column F
Polynomial (Column F)
14 15 16 17 18 19
11 12 13 14 15 16
6333333.33 6333333.33 6333333.33 6333333.33 6333333.33 6333333.33
388000 388000 388000 388000 388000 388000
209333.333 209333.333 209333.333 209333.333 209333.333 209333.333
86666.6667 86666.6667 86666.6667 86666.6667 86666.6667 86666.6667
212000 212000 212000 212000 212000 212000

721627 721627 721627 721627 721627 721627


319698 319698 319698 319698 319698 319698
12000 12000 12000 12000 12000 12000
401625 401625 401625 401625 401625 401625
57062 57062 57062 57062 57062 57062
316666.667 316666.667 316666.667 316666.667 316666.667 316666.667

5300 5300 5300 5300 5300 5300


26266.6667 26266.6667 26266.6667 26266.6667 26266.6667 26266.6667
3000 3000 3000 3000 3000 3000
6486.66667 6486.66667 6486.66667 6486.66667 6486.66667 6486.66667
2700 2700 2700 2700 2700 2700
90000 90000 90000 90000 90000 90000
13466.6667 13466.6667 13466.6667 13466.6667 13466.6667 13466.6667
403997.173 403997.173 403997.173 403997.173 403997.173

3057437.49 3057437.49 3057437.49 3057437.49 3057437.49 3461434.67

1008954.37 1008954.37 1008954.37 1008954.37 1008954.37 1142273.44


305743.749 305743.749 305743.749 305743.749 305743.749 346143.467
1742739.37 1742739.37 1742739.37 1742739.37 1742739.37 1973017.76

147220 147220 147220 147220 147220 147220

1889959.37 1889959.37 1889959.37 1889959.37 1889959.37 2120237.76


267105.422 232265.584 201970.073 175626.15 152718.392 148979.186

22258.7851
10.745