Está en la página 1de 13

Bedoya Vargas, Andrea Naomi N00166374

Chambilla Chambi Ronald Lucio N00182469


Mogollón Aparcana, Cinthya Geraldine N00183466
EMPRESA: Susti 4ever SAC

ORDEN DE PRODUCCION No. 01

DESCRIP PRODUCTO: escritorios de metal PRODUCCION:

CONSUMO DE MATERIALES MANO DE OBRA DIRECTA


CANTID DESCRIPCION C.UNIT. IMPORTE DEPARTAM/C No. HORAS C. UNIT
2400 angulo 1,5 S/13.50 S/32,400.00 8 operarios 1520 S/ 7.71
214 patas plastico S/4.00 S/856.00
300 lijas N350 S/3.00 S/900.00
90 planchas de fierro S/450.00 S/40,500.00
90 material para soldar 18 1620

TOTAL S/76,276.00 TOTAL

DISTRIBUCION CIF COSTO DE LA ORDEN


TOTAL CIF S/ 70910
COSTO TOTAL DE LA ORDEN s/
Base Horas Total horas hombre Fact Distrib Total
5500 1520 12.89 S/ 19,596.95
COSTO UNITARIO s/

3500 2800 3000 3300


2500 3550 2500 8500
250 320 580 650
1570 2370 2500 1920
operarios 9600 operarios 7500 operarios 6500 operarios 7500
CIF 1 17420 CIF 2 16540 CIF 3 15080 CIF 4 21870
EMPRESA: Susti 4ever SAC

ORDEN DE PRODUCCION No. 02

1,200 DESCRIP PRODUCTO: escritorios de metal

RA DIRECTA CONSUMO DE MATERIALES


IMPORTE CANTID DESCRIPCION C.UNIT. IMPORTE
S/ 11,716.67 2000 angulo 1.5 S/ 15.50 S/ 31,000
75 plancha de fierro S/ 530.00 S/ 39,750
250 lijas n350 S/ 3.50 S/ 875
185 patas de plastico S/ 2.50 S/ 463
75 mat soldar S/ 15.00 S/ 1,125

S/ 11,716.67 TOTAL S/ 73,212.50

A ORDEN DISTRIBUCION CIF


TOTAL CIF S/ S/ 70,910.00
S/107,589.61
Base Horas Total horas hombre Fact Distrib Total
5500 1430 12.89 S/ 18,436.60
S/89.66

Cálculo de UTILIDAD BRUTA UNITARIA


Escritorio de metal P.V. sin IGV Costo Unit. Utilidad Bruta
Orden de Prod. N° 01 S/ 150.00 S/ 89.66 S/ 60.34
Orden de Prod. N° 02 S/ 150.00 S/ 87.98 S/ 62.02
Orden de Prod. N° 03 S/ 150.00 S/ 94.52 S/ 55.48
70910 Orden de Prod. N° 04 S/ 150.00 S/ 98.59 S/ 51.41

Cálculo de UTILIDAD BRUTA TOTAL


Escritorio de metal Venta total Costo Total Utilidad Bruta
Orden de Prod. N° 01 180,000 107,589.61 S/ 72,410.39
Orden de Prod. N° 02 172,500 101,182.43 S/ 71,317.57
Orden de Prod. N° 03 150,000 94,523.75 S/ 55,476.25
Orden de Prod. N° 04 120,000 78,868.95 S/ 41,131.05
Susti 4ever SAC EMPRESA: Su

ION No. 02 ORDEN DE PRODU

PRODUCCION: 1,150 DESCRIP PRODUCTO: escritorios de metal

MANO DE OBRA DIRECTA CONSUMO DE MATERIALES


DEPARTAM/C No. HORAS C. UNIT IMPORTE CANTID DESCRIPCION C.UNIT.
operarios 1430 S/6.67 S/9,533 1850 angulo 1,5 S/14.50
128.33 patas de plastico S/5.00
200 lijas N 350 S/2.50
68 planchas de fierro S/560.00
65 material para soldar 22

TOTAL S/9,533.33 TOTAL

COSTO DE LA ORDEN DISTRIBUCION CIF


TOTAL CIF S/
COSTO TOTAL DE LA ORDEN s/ S/101,182.43
Base Horas Total horas hombre Fact Distrib
5500 1340 12.89
COSTO UNITARIO s/ S/ 87.98
Susti 4ever SAC EMPRESA:

ORDEN DE PRODUCCION No. 03

escritorios de metal PRODUCCION: 1,000 DESCRIP PRODUCTO:

ERIALES MANO DE OBRA DIRECTA CONSUMO DE MATERIALES


IMPORTE DEPARTAM/C No. HORAS C. UNIT IMPORTE CANTID DESCRIPCION
S/26,825.00 operarios 1340 S/ 7.29 S/ 9,770.83 1520 angulo 1,5
S/641.67 110 patas de plastico
S/500.00 150 lijas N350
S/38,080.00 52 planchas de fierro
S/1,430.00 58 material para soldar

S/67,476.67 TOTAL S/ 9,770.83 TOTAL

CIF COSTO DE LA ORDEN DISTRIBUCION CIF


S/ 70,910.00 TOTAL CIF S/
COSTO TOTAL DE LA ORDEN s/ S/94,523.75
Total Base Horas Total horas hombre
S/ 17,276.25 5500 1210
COSTO UNITARIO s/ S/94.52
Susti 4ever SAC

ORDEN DE PRODUCCION No. 04

escritorios de metal PRODUCCION: 800

ONSUMO DE MATERIALES MANO DE OBRA DIRECTA


C.UNIT. IMPORTE DEPARTAM/C No. HORAS C. UNIT IMPORTE
S/ 13.50 S/ 20,520.00 operarios 1210 S/9.38 S/11,343.75
S/ 4.00 S/ 440.00
S/ 1.50 S/ 225.00
S/ 580.00 S/ 30,160.00
S/ 10.00 S/ 580.00

TAL S/ 51,925.00 TOTAL S/11,343.75

DISTRIBUCION CIF COSTO DE LA ORDEN


CIF S/ S/ 70,910.00
COSTO TOTAL DE LA ORDEN s/ S/78,868.95
Fact Distrib Total
12.89 S/ 15,600.20
COSTO UNITARIO s/ S/ 98.59
EJERCICIO 01

EMPRESA: METALICA BICA PREPARATE SAC


PRODUCTO: mesas metalicas

C C: corte
CONCEPTOS UNIDAD
CANTIDAD C.U. IMPORTE
MEDIDA
DEPARTAMENTO ANTERIOR
MATERIA PRIMA: S/ 87,500.00
plancha met UNIDAD 250.00 S/ 350.00 S/ 87,500.00

MATERIAS AUXILIARES S/ -
soldadura punto azul
ángulos de 1.5
patas de plástico
lijas
pintura martillada

MANO DE OBRA DIRECTA S/ 3,660.00


horas 200.00 S/ 7.50 S/ 1,500.00
horas 300.00 S/ 7.20 S/ 2,160.00

COSTOS CIF S/ 17,808.76


CIF MENSUAL 89,400.00
Horas hombre MOD 2,510.00
CIF del departamento 500.00 S/ 35.62 S/ 17,808.76

TERMINADO PASA AL
3,750.00 S/ 29.06 S/ 108,968.76
DEPARTAMENTO SIGUIENTE

ayudante horas 480.00 S/ 6.25 S/ 3,000.00


EJERCICIO 01: METALICA BICA PREPARATE SAC

C C: ensamblado
UNIDAD
CANTIDAD C.U. IMPORTE
MEDIDA
3,750.00 29.06 108,968.76
S/ -

S/ 14,608.00
kilos 200.00 S/ 35.00 S/ 7,000.00
unidad 500.00 S/ 13.50 S/ 6,750.00
ciento 13.20 S/ 65.00 S/ 858.00

S/ 11,256.00
horas 580.00 S/ 7.80 S/ 4,524.00
horas 720.00 S/ 9.35 S/ 6,732.00

S/ 46,302.79

1,300.00 S/ 35.62 S/ 46,302.79

3,750.00 S/ 48.30 S/ 181,135.55

horas 720.00 S/ 7.08 S/ 5,100.00

CACULO DEL PRECIO DE VENTA UNITARIO


Costo unitario S/ 58.49
Utilidad de 45% 26.32
Valor venta unitario 84.81
IGV 18% 15.27
Precio de lista(de venta) 100.08
CALCULO DE LA UTILIDAD CON VENTAS DE 3500 MESAS METALICAS
Venta 3500 84.81 296839.9078
Costo 3500 S/ 58.49 204717.1778
Utilidad Bruta 92122.73

INVENTARIO
Produccion 3,750
Venta 3500
Saldo o inventario 250.00 58.49
VALOR DE INV. 14,622.66
PRODUCCION: 3,750.00
UNIDAD MEDIDA: unidad

C C: Pintado
UNIDAD
CANTIDAD C.U. IMPORTE
MEDIDA
3,750.00 48.30 181,135.55
S/ -

S/ 7,650.00

unidad 100.00 S/ 4.50 S/ 450.00


galon 120.00 S/ 60.00 S/ 7,200.00

S/ 5,265.83
horas 710.00 S/ 7.42 S/ 5,265.83

S/ 25,288.45

710.00 S/ 35.62 S/ 25,288.45

3,750.00 S/ 58.49 S/ 219,339.83

horas 480.00 S/ 6.88 S/ 3,300.00