PETROBOSCAN
Reporte Diario de Perforación
POZO No. CHEVRON PROY. No. PROYECTO D.E.L. DIAS EST. MD TVD EST. DE FLUJO DIAS PERF REPT NO FECHA
BN_1024 RR5478 0 DRILL & COMPLETE 4,85 23,00 EF-17 1,00 5 30/03/2018
SUPERVISOR TALADRO CAMPO TVD PROP MD PROP PROGRESO SPUD DATE POB
JAIME BEDOYA / ANDY VILLASMIL F-18 BOSCAN 8.476,0 8.912,0 29/03/2018 10
TOTAL DIARIO TOTAL ACUM TOTAL APROP AFE No HRS TOTAL ROT TIPO DE POZO POTENCIAL DIFERIDA ELEV ORIG MR ELEV RIG MR
63.075 281.458 4.720.572 HS1031743 INCLINADO 190,00 190,00 32,00
ULTIMO SURVEY: FECHA MD INC AZIM ULT REV SIG REV ULT PRB PRES BOP
(in) @ (ft) (in) @ (ft)
ACT. A LAS 00 Hrs
CIA WEATHERFORD DESVISTIO EQUIPOS ODS / RETIRO LINEAS HIDRAULICAS / ORGANIZO PLANCHADA
RESUMEN 24 Hrs
PERFORO HOYO DE 17 1/2'' HASTA 659' + BAJÓ REVESTIDORES 13-3/8" 54.5# K-55 BTC DESDE SUPERFICIE HASTA 657' + CIA
HALLIBURTON REALIZO CEMENTACION DE REV 13-3/8"
ACT. PROXIMAS 24 Hrs
INSTALAR CABEZAL + COMPLETAR FASE II. HOYO INTERMEDIO
ACT. A LAS 05:00 am
CIA CAMERON INSTALO CABEZAL 13-5/8" x 3K SLIP LOCK / PROBO SELLOS CON 900 PSI POR 10 MIN OK + INSTALO Y VISTIO
CONJUNTO BOP 13-5/8" x 3k (ACTIVIDAD EN PROGRESO)

SUMARIO DE OPERACIONES
DESDE HASTA Hrs T TRAB T. OPE ACT CAT SUB CAT DESCRIPCION
00:00 - 03:30 3,50 D&C N 1 2 TOD PERFORO HOYO DE 17 1/2'' CON MECHA PDC DESDE 290' HASTA 659'
CAUDAL: 550 GPM
PRESION: 850 PSI
PSM: 4-6 KLBS
RPM EN EL TOP DRIVE: 100 RPM
TORQUE EN SUPERFICIE: 4-7 KLBS/PIE
03:30 - 04:00 0,50 D&C N 1 1 CIR BOMBEO 60 BBLS DE PÍLDORA VISCOSA + CIRCULO HOYO CON 550
GPM / 800 PSI RECIPROCANDO SARTA CON 60 RPM HASTA RETORNOS
LIMPIOS
04:00 - 05:30 1,50 D&C N 1 5 STH SACO TUBERIA + BHA DESDE 659' DE FORMA CONVENCIONAL SIN
PROBLEMAS / QUEBRO MECHA 17-1/2"
05:30 - 09:00 3,50 D&C N 1 8 VEQ RETIRÓ TUBO CAMPAM + ORGANIZÓ PLANCHADA Y DESVISTE TOP
DRIVE / PARRILLAS + REVESTIDOR DE 20'' @ 66' POR DEBAJO DEL
TOPE DEL CELLAR + CORTÓ
09:00 - 10:30 1,50 D&C N 1 8 VEQ CIA WEATHERFORD VISTIÓ EQUIPO ODS PARA CORRIDA DE
REVESTIDOR DE 13-3/8"
10:30 - 11:00 0,50 D&C N 1 62 CDS DICTO CHARLA DE SEGURIDAD PARA BAJADA DE REVESTIDOR
11:00 - 13:30 2,50 D&C N 1 8 BRL CONECTÓ JUNTA DE ZAPATA FLOTADORA 13-3/8" + 1 REVESTIDOR Y
PROBÓ CIRCULACIÓN CON 200 GPM / 100 PSI OK / BAJÓ
REVESTIDORES 13-3/8" 54.5# K-55 BTC DESDE SUPERFICIE HASTA 657'
/ LLENANDO CON 30 SPM.

TOTAL JTAS 16
****ZAPATA 13-3/8" 657' TEORICO****

13:30 - 14:30 1,00 D&C N 1 9 CIA HALLIBURTON POSICIONO EQUIPOS / VISTIO LINEAS DE
SUPERFICIE
CIRCULANDO HOYO @ 5 BPM / 210 GPM

14:30 - 15:00 0,50 D&C N 1 9 DICTO CHARLA DE SEGURIDAD Y PRE-TRABAJO CEMENTACION DE


REVESTIDOR DE SUPERFICIE 13-3/8"
15:00 - 18:00 3,00 D&C N 1 9 CIA HALLIBURTON REALIZO PROCEDIMIENTO DE CEMENTACION DE
REV 13-3/8" DE LA SIGUIENTE MANERA:
- LLENO SISTEMA Y PROBO LINEAS DE SUPERFICIE CON 2000 PSI - 5

Impreso: 31/03/2018 09:31:48 a.m.


Página 2 de 5
PETROBOSCAN
Reporte Diario de Perforación
POZO No. CHEVRON PROY. No. PROYECTO D.E.L. DIAS EST. MD TVD EST. DE FLUJO DIAS PERF REPT NO FECHA
BN_1024 RR5478 0 DRILL & COMPLETE 4,85 23,00 EF-17 1,00 5 30/03/2018

SUMARIO DE OPERACIONES
DESDE HASTA Hrs T TRAB T. OPE ACT CAT SUB CAT DESCRIPCION
15:00 - 18:00 3,00 D&C N 1 9 MIN OK
- BOMBEO 20 BBLS DE AGUA FRESCA @ 4 BPM
- BOMBEO 86 BBLS DE LECHADA EXTENDACEM TM CEMENT 12.5 LPG
@ 4 BPM
- BOMBEO 32 BBLS DE LECHADA HALCEN CEMENT 15.4 LPG @ 4 BPM /
RENDIMIENTO: 1.29 FT3/SK - REQUERIMIENTO DE AGUA 5.86 GAL/SK
DESPLAZO DE LA SIGUIENTE MANERA:
- 80 BBLS DE AGUA FRESCA @ 4 BPM
- 13 BBLS DE AGUA FRESCA @ 2 BPM
- PRESION FINAL 170 PSI
18:00 - 19:00 1,00 D&C N 1 9 ESPERA POR COMPORTAMIENTO DEL ANULAR POR ESPACIO DE UNA
HORA ESPERANDO GELIFICACION DEL CEMENTO, OBSERVANDO
CAIDA DE NIVEL DE 8' DE CEMENTO, SE PROCEDE A REALIZAR
TOPJOB. CONECTA LINEA Y BOMBEA 04 BLS DE CEMENTO.
19:00 - 20:00 1,00 D&C N 1 9 CIA HALLIBURTON DESVISTE LINEAS DE SUPERFICIE / RETIRO
EQUIPOS
20:00 - 22:00 2,00 D&C N 1 12A ICB CIA NABORS CORTÓ REVESTIDOR DE 13 3/8" EN BRUTO A 43.75' POR
DEBAJO DEL CELLAR, RETIRÓ CHICOTE
22:00 - 00:00 2,00 D&C N 1 8 DEQ CIA WEATHERFORD DESVISTIO EQUIPOS ODS / RETIRO LINEAS
HIDRAULICAS / ORGANIZO PLANCHADA.

NOTAS:

--------------------------EQUIPOS-------------------------

- EQUIPO DE SOLDAR ( OPERATIVO)


- RIG WATCH (OPERATIVO)
- SYSTEMA GAI-TRONICS (OPERATIVO)
- BOMBA DE RIO: DOS (02) EN SITIO (OPERATIVO)
- SILO DE BARITA (OPERATIVO)
- MONTACARGAS (OPERATIVO)
- LLAVE ST-80 (PRESENTA PROBLEMAS CON LOS RODILLOS)
- PIPEHANDLER (OPERATIVO)
- GENIE (OPERATIVO)
- SERVICIO DE TRANSPORTE DE PERSONAL / CAMBIO DE GUARDIA
(OPERATIVO)

----------------- MATERIAL ----------------------------

MATERIAL EN LOCALIZACION ACTUAL

- 02 JUEGOS DE TAPONES DE CEMENTACION 9-5/8"


- 01 PUP JOINT 9-5/8" BTC X 10'
- 01 PUP JOINT 9-5/8" BTC X 15'
- 07 CROSSOVER 6 5/8'' (20 A 28 LBS/FT)
- 08 REJILLA PETROGUARD 6-5/8" LTC
- 114 REJILLA FACSRITE 6-5/8" LTC
Impreso: 31/03/2018 09:31:48 a.m.
Página 3 de 5
PETROBOSCAN
Reporte Diario de Perforación
POZO No. CHEVRON PROY. No. PROYECTO D.E.L. DIAS EST. MD TVD EST. DE FLUJO DIAS PERF REPT NO FECHA
BN_1024 RR5478 0 DRILL & COMPLETE 4,85 23,00 EF-17 1,00 5 30/03/2018

SUMARIO DE OPERACIONES
DESDE HASTA Hrs T TRAB T. OPE ACT CAT SUB CAT DESCRIPCION
22:00 - 00:00 2,00 D&C N 1 8 DEQ - 06 BLANK PIPE 6-5/8" LTC
- 07 REJILLA FACSRITE 5-1/2" LTC
- 07 BLANK PIPE 5-1/2" LTC
- 01 BLANK PIPE 5-1/2" BTC
- 10 REV 13-3/8" K-55 + 18 RECIBIDOS PDV-46
- 230 REV HC-95 9-5/8"
- 11 TUBING 4-1/2" EUE CONDICION A
- 01 CASING 9-5/8" CON CUELLO FLOJO
- 01 CASING 9-5/8" CON ZAPATA CONVENCIONAL
- 02 CASING 9-5/8" CON ZAPATA CONCENTRICA
- 02 CASING 9-5/8" CON CUELLO FLOTADOR
- 02 CASING 9-5/8" CON ZAPATA RIMADORA

---------------- SUMINISTRO DE COMIDAS ------------------

- 33 CUADRILLAS NABORS
- 15 PETROBOSCAN
- 48 TOTAL

------------------------------FLUIDOS----------------------------

VOL. SALMUERA EN FRAC TANK @ 10 LPG: 500 BBLS SUCIA + 200 BBLS
LIMPIA
VOL. AGUA INDUSTRIAL EN FRAC TANKS: 3.000 BBLS
VOL. LODO: 1000 BBLS BARADRILL RECUPERADOS

LECCIONES APRENDIDAS :

SEGURIDAD
TENETS TARJ. STOP CANT. SIMU. ULT. SIM. ULT. VIS. GER. FREC. NETA FREC BRUTA INC. x AÑO LTA x AÑO
0 0 0 0 0 0 0 0 0
DIAS SIN INC. DIAS LTA ULT. INC. LTA ULT. INSP. TALADRO PERM TRABAJO HRS HOMBRE TON. MILLAS PERSONAL (D/N/M)
0 0 0 0 0/0 240 0 0 /0 /0
INCIDENTE

BHA NO. BHA / CONDICIONES DEL HOYO MECHA NO.


PESO BHA BAJO MART PESO SARTA ARRIBA PESO SARTA ABAJO PESO SARTA ROT TORQUE / UNID LONG BHA
BHA SAVSUB HWDP DC MARTILLO ESTAB.
DESCRIPCION No JUNTAS LONGITUD O.D. I.D. TAM CONEX TIPO CONEX

MATERIALES / CONSUMO
ELEM UNIDAD USO DISPONIBLE ELEM UNIDAD USO DISPONIBLE

DENSIDAD(ppg) 8,40 SBG SAG LODO COSTO DIARIO 12.328 COSTO ACUM 20.025
FV PV/YP GELES WL/HTHP FC/T.SOL CRU/AGU %Arena/MBT Ph/pM Pf/Mf Cl Ca H2S LIMA ES
27 / / / / / / / /

Impreso: 31/03/2018 09:31:48 a.m.


Página 4 de 5
PETROBOSCAN
Reporte Diario de Perforación
POZO No. CHEVRON PROY. No. PROYECTO D.E.L. DIAS EST. MD TVD EST. DE FLUJO DIAS PERF REPT NO FECHA
BN_1024 RR5478 0 DRILL & COMPLETE 4,85 23,00 EF-17 1,00 5 30/03/2018

DATOS DE SURVEY
M.D. INCL. AZIMUTH T.V.D. N/S ACUM E/O ACUM SECCION M.D. INCL. AZIMUTH T.V.D. N/S ACUM E/O ACUM SECCION

BOMBA / DATOS HIDRAULICOS


NO. MARCA EMBOL(in) LINER SPM Q PRES. Q TOTAL SPM PRES RED / PRESION
1 HH 12,000 0,00
2 HH 12,000 0,00

VOLUMENES DE LODO(bbl) / VELOCIDADES ANULARES (ft/min)


HOYO reserv V. DC2 V. RESER TOTAL LODO PERD LODO DESE VEL ANU DP VEL ANU DC VEL ANU RISER
98,7 350,0 448,7

DATOS GENERALES DE MECHAS


MEC / COR TAM COMP. TIPO SERIAL NO. CHORROS O No PROF ENT FECHA ENT I-O-D-L-B-G-O-R

PARAMETROS OPERACIONALES DE MECHAS


MEC / COR WOB RPM GPM PRES MECHA P HRS PIES 24Hr ROP 24Hr HRS ACUM PIES ACUM ROP ACUM

TARJETAS STOP

INVENTARIO DE LODO
ELEM UNIDAD USO COSTO DISPONIBLE
AGUAGEL 100,00 lb/sc 312 7.494,24 360
BARA BRINE DEFOAM 5,00 gl/cq
BARA BUF 50,00 lb/sc
BARACARB 150 50,00 lb/sc 240
BARACARB 25 50,00 lb/sc
BARACARB 50 50,00 lb/sc 126
BARAZAN D-PLUS 25,00 lb/sc
BAROID 100,00 lb/sc
CONCENTRADO III 55,00 gal/t
LUBRI-FILM 55,00 gal/t 35
BORE 3000 55,00 lb/gl
BXR - L 55,00 gal/t 16
CACO3 20/25 50,00 lb/sc 512
CACO3 40/45 50,00 lb/sc 576
CARBONOX 50,00 lb/sc 182
SODA CAUSTICA 55,00 lb/sc 10 985,20 125
CONDET 55,00 gal/t 2
ALDACIDE G 55,00 gal/t
N - VIS 50,00 lb/sc 54
N - DRILL HT PLUS 50,00 lb/sc 143
FIBER GRUESO 25,00 lb/sc 83
PAC L 50,00 lb/sc 35
PAC LV 50,00 lb/sc 88
CLORURO DE POTA. 100,00 lb/sc 156
SOLTEX 50,00 lb/sc
STEELSEAL 50,00 lb/sc 167
THERMA THIN 5,00 gl/cq
XC POLYMER 25,00 lb/sc 231
BARACARB 5 50,00 lb/sc 315
CLAY SEAL 55,00 gal/t
N - DRILL 50,00 lb/sc
Impreso: 31/03/2018 09:31:48 a.m.
Página 5 de 5
PETROBOSCAN
Reporte Diario de Perforación
POZO No. CHEVRON PROY. No. PROYECTO D.E.L. DIAS EST. MD TVD EST. DE FLUJO DIAS PERF REPT NO FECHA
BN_1024 RR5478 0 DRILL & COMPLETE 4,85 23,00 EF-17 1,00 5 30/03/2018

INVENTARIO DE LODO
ELEM UNIDAD USO COSTO DISPONIBLE
BIOCIDA 5,00 gl/cq 33
CARBWATE COARSE 50,00 lb/sc 150
NOXYGEN 5,00 gl/cq 2
ROPE 55,00 gal/t 2
NOVASOL 55,00 gal/t 1
MIL STARCH 50,00 lb/sc
OMC 5,00 gl/cq 1

DATOS DEL PERSONAL


COMPAÑIA TIPO PERSONAL NO. HORAS SERVICIO NOMBRE Y APELLIDO
PETROBOSCAN FIJO 1 24,00 COMPANY MAN JAIME BEDOYA
PETROBOSCAN FIJO 1 24,00 COMPANY MAN ANDY VILLASMIL
HALLIBURTON - BAROID CONTRATISTA 1 24,00 CONTROL DE SOLIDOS JAVIER LUZARDO
HALLIBURTON - BAROID CONTRATISTA 1 24,00 CONTROL DE SOLIDOS CLAUDIO ALAÑA
HALLIBURTON - BAROID CONTRATISTA 1 24,00 ING. DE FLUIDOS BARHENCIR CARDENAS
HALLIBURTON - BAROID CONTRATISTA 1 24,00 ING. DE FLUIDOS CARLOS INCIARTE
HALLIBURTON - BAROID CONTRATISTA 1 24,00 ING. DE FLUIDOS LUIS GAMBIN
HALLIBURTON - BAROID CONTRATISTA 1 24,00 ING. DE FLUIDOS JESUS FALCON
HALLIBURTON - BAROID CONTRATISTA 1 24,00 ING. DE FLUIDOS YORELITZA DOMINGUEZ
HALLIBURTON - BAROID CONTRATISTA 1 24,00 ING. DE FLUIDOS NESTOR TERAN