PROYECTO:

RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2


ESTRURA METALICA LIVIANA - EDIFICIO DE RECEPCIÓN DE CAMIONES
ACUMULAD
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES O ACTUAL ACTUAL TOTAL
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. PESO TOTAL (Kg) ANTERIOR
ANTERIOR (%) (Tn.) (Tn.)
(Tn.)
(%)
ITEM 5% 30% 10% 15% 25% 10% 5%
35,172.72 Σ Anterior Actual % Actual Σ Total % Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 73.51% 4.24% 25,855.43 1,492.24 27,347.67
1 1T-43ERB-AC-1 EDIFICIO RECEPCION ANGULO CIERRE LIVIANA 2 9.65 19.31 19.31 0% 100% 19.31 0% 100% 19.31 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.69 0.00 8.69
2 1T-43ERB-AC-2 EDIFICIO RECEPCION ANGULO CIERRE LIVIANA 6 60.06 360.34 360.34 0% 100% 360.34 0% 100% 360.34 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 162.15 0.00 162.15
3 1T-43ERB-AC-3 EDIFICIO RECEPCION ANGULO CIERRE LIVIANA 6 60.06 360.34 360.34 0% 100% 360.34 0% 100% 360.34 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 162.15 0.00 162.15
4 1T-43ERB-AC-4 EDIFICIO RECEPCION ANGULO CIERRE LIVIANA 2 47.70 95.40 95.40 0% 100% 95.40 0% 100% 95.40 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 42.93 0.00 42.93
5 1T-43ERB-AC-5 EDIFICIO RECEPCION ANGULO CIERRE LIVIANA 2 34.54 69.08 69.08 0% 100% 69.08 0% 100% 69.08 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.09 0.00 31.09
6 1T-43ER-AR1 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 142.89 142.89 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 0% 0% 0% 0% 85% 0.00% 121.46 0.00 121.46
7 1T-43ER-AR2 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 163.59 163.59 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 0% 0% 0% 0% 85% 0.00% 139.05 0.00 139.05
8 1T-43ER-AR3 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 344.06 344.06 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 0% 0% 0% 0% 85% 0.00% 292.45 0.00 292.45
9 1T-43ER-AR4 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 312.49 312.49 312.49 0% 100% 312.49 0% 100% 312.49 0% 100% 312.49 0% 100% 312.49 0% 100% 0% 0% 0% 0% 85% 0.00% 265.62 0.00 265.62
10 1T-43ER-AR5 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 166.78 166.78 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 0% 0% 0% 0% 85% 0.00% 141.76 0.00 141.76
11 1T-43ER-AR6 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 165.10 165.10 165.10 0% 100% 165.10 0% 100% 165.10 0% 100% 165.10 0% 100% 165.10 0% 100% 0% 0% 0% 0% 85% 0.00% 140.33 0.00 140.33
12 1T-43ER-AR7 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 341.12 341.12 341.12 0% 100% 341.12 0% 100% 341.12 0% 100% 341.12 0% 100% 341.12 0% 100% 0% 0% 0% 0% 85% 0.00% 289.95 0.00 289.95
13 1T-43ER-AR8 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 164.90 164.90 164.90 0% 100% 164.90 0% 100% 164.90 0% 100% 164.90 0% 100% 164.90 0% 100% 0% 0% 0% 0% 85% 0.00% 140.16 0.00 140.16
14 1T-43ER-AR9 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 312.49 312.49 312.49 0% 100% 312.49 0% 100% 312.49 0% 100% 312.49 0% 100% 312.49 0% 100% 0% 0% 0% 0% 85% 0.00% 265.62 0.00 265.62
15 1T-43ER-AR10 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 165.10 165.10 165.10 0% 100% 165.10 0% 100% 165.10 0% 100% 165.10 0% 100% 165.10 0% 100% 0% 0% 0% 0% 85% 0.00% 140.33 0.00 140.33
16 1T-43ER-AR11 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 341.12 341.12 341.12 0% 100% 341.12 0% 100% 341.12 0% 100% 341.12 0% 100% 341.12 0% 100% 0% 0% 0% 0% 85% 0.00% 289.95 0.00 289.95
17 1T-43ER-AR12 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 164.90 164.90 164.90 0% 100% 164.90 0% 100% 164.90 0% 100% 164.90 0% 100% 164.90 0% 100% 0% 0% 0% 0% 85% 0.00% 140.16 0.00 140.16
18 1T-43ER-AR13 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 4 142.89 571.56 571.56 0% 100% 571.56 0% 100% 571.56 0% 100% 571.56 0% 100% 571.56 0% 100% 0% 0% 0% 0% 85% 0.00% 485.83 0.00 485.83
19 1T-43ER-AR14 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 4 163.59 654.35 654.35 0% 100% 654.35 0% 100% 654.35 0% 100% 654.35 0% 100% 654.35 0% 100% 0% 0% 0% 0% 85% 0.00% 556.20 0.00 556.20
20 1T-43ER-AR15 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 4 344.06 1376.25 1376.25 0% 100% 1376.25 0% 100% 1376.25 0% 100% 1376.25 0% 100% 1376.25 0% 100% 0% 0% 0% 0% 85% 0.00% 1169.82 0.00 1169.82
21 1T-43ER-AR16 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 2 312.49 624.99 624.99 0% 100% 624.99 0% 100% 624.99 0% 100% 624.99 0% 100% 624.99 0% 100% 0% 0% 0% 0% 85% 0.00% 531.24 0.00 531.24
22 1T-43ER-AR17 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 4 166.78 667.11 667.11 0% 100% 667.11 0% 100% 667.11 0% 100% 667.11 0% 100% 667.11 0% 100% 0% 0% 0% 0% 85% 0.00% 567.04 0.00 567.04
23 1T-43ER-AR18 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 2 165.10 330.20 330.20 0% 100% 330.20 0% 100% 330.20 0% 100% 330.20 0% 100% 330.20 0% 100% 0% 0% 0% 0% 85% 0.00% 280.67 0.00 280.67
24 1T-43ER-AR19 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 2 341.12 682.24 682.24 0% 100% 682.24 0% 100% 682.24 0% 100% 682.24 0% 100% 682.24 0% 100% 0% 0% 0% 0% 85% 0.00% 579.90 0.00 579.90
25 1T-43ER-AR20 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 2 164.90 329.79 329.79 0% 100% 329.79 0% 100% 329.79 0% 100% 329.79 0% 100% 329.79 0% 100% 0% 0% 0% 0% 85% 0.00% 280.33 0.00 280.33
26 1T-43ER-AR21 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 142.89 142.89 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 0% 0% 0% 0% 85% 0.00% 121.46 0.00 121.46
27 1T-43ER-AR22 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 344.06 344.06 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 0% 0% 0% 0% 85% 0.00% 292.45 0.00 292.45
28 1T-43ER-AR23 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 163.59 163.59 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 0% 0% 0% 0% 85% 0.00% 139.05 0.00 139.05
29 1T-43ER-AR24 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 166.78 166.78 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 0% 0% 0% 0% 85% 0.00% 141.76 0.00 141.76
30 1T-43ER-AR25 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 142.89 142.89 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 0% 0% 0% 0% 85% 0.00% 121.46 0.00 121.46
31 1T-43ER-AR26 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 163.59 163.59 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 0% 0% 0% 0% 85% 0.00% 139.05 0.00 139.05
32 1T-43ER-AR27 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 344.06 344.06 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 0% 0% 0% 0% 85% 0.00% 292.45 0.00 292.45
33 1T-43ER-AR28 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 142.89 142.89 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 142.89 0% 100% 0% 0% 0% 0% 85% 0.00% 121.46 0.00 121.46
34 1T-43ER-AR29 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 166.78 166.78 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 0% 0% 0% 0% 85% 0.00% 141.76 0.00 141.76
35 1T-43ER-AR30 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 163.59 163.59 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 163.59 0% 100% 0% 0% 0% 0% 85% 0.00% 139.05 0.00 139.05
36 1T-43ER-AR31 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 344.06 344.06 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 344.06 0% 100% 0% 0% 0% 0% 85% 0.00% 292.45 0.00 292.45
37 1T-43ER-AR32 EDIFICIO RECEPCION ARRIOSTRE LIVIANA 1 166.78 166.78 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 166.78 0% 100% 0% 0% 0% 0% 85% 0.00% 141.76 0.00 141.76
56 1T-43ER-CA1 EDIFICIO RECEPCION COSTANERA LIVIANA 1 23.94 23.94 23.94 0% 100% 23.94 0% 100% 23.94 0% 100% 23.94 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 10.77 3.59 14.37
57 1T-43ER-CA2 EDIFICIO RECEPCION COSTANERA LIVIANA 1 37.80 37.80 37.80 0% 100% 37.80 0% 100% 37.80 0% 100% 37.80 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 17.01 5.67 22.68
58 1T-43ER-CA3 EDIFICIO RECEPCION COSTANERA LIVIANA 1 37.82 37.82 37.82 0% 100% 37.82 0% 100% 37.82 0% 100% 37.82 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 17.02 5.67 22.69
59 1T-43ER-CA4 EDIFICIO RECEPCION COSTANERA LIVIANA 1 23.94 23.94 23.94 0% 100% 23.94 0% 100% 23.94 0% 100% 23.94 0% 100% 23.94 0% 100% 0% 0% 0% 0% 85% 0.00% 20.35 0.00 20.35
60 1T-43ER-CA5 EDIFICIO RECEPCION COSTANERA LIVIANA 1 37.80 37.80 37.80 0% 100% 37.80 0% 100% 37.80 0% 100% 37.80 0% 100% 37.80 0% 100% 0% 0% 0% 0% 85% 0.00% 32.13 0.00 32.13
61 1T-43ER-CA6 EDIFICIO RECEPCION COSTANERA LIVIANA 1 37.82 37.82 37.82 0% 100% 37.82 0% 100% 37.82 0% 100% 37.82 0% 100% 37.82 0% 100% 0% 0% 0% 0% 85% 0.00% 32.15 0.00 32.15
62 1T-43ER-CS9 EDIFICIO RECEPCION COSTANERA LIVIANA 1 83.93 83.93 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 100% 100% 83.93 100% 100% 0% 0% 0% 0% 45% 40.00% 37.77 33.57 71.34
63 1T-43ER-CS10 EDIFICIO RECEPCION COSTANERA LIVIANA 8 83.93 671.42 671.42 0% 100% 671.42 0% 100% 671.42 0% 100% 671.42 0% 100% 671.42 0% 100% 0% 0% 0% 0% 85% 0.00% 570.71 0.00 570.71
64 1T-43ER-CS11 EDIFICIO RECEPCION COSTANERA LIVIANA 1 83.93 83.93 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 0% 0% 0% 0% 85% 0.00% 71.34 0.00 71.34
65 1T-43ER-CS16 EDIFICIO RECEPCION COSTANERA LIVIANA 1 83.93 83.93 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 100% 100% 83.93 100% 100% 0% 0% 0% 0% 45% 40.00% 37.77 33.57 71.34
66 1T-43ER-CS17 EDIFICIO RECEPCION COSTANERA LIVIANA 3 80.65 241.94 241.94 0% 100% 241.94 0% 100% 241.94 0% 100% 241.94 100% 100% 80.65 33% 33% 0% 0% 0% 0% 45% 23.33% 108.87 56.45 165.32
67 1T-43ER-CS20 EDIFICIO RECEPCION COSTANERA LIVIANA 24 80.65 1935.50 1935.50 0% 100% 1935.50 0% 100% 1935.50 0% 100% 1935.50 0% 100% 1935.50 0% 100% 0% 0% 0% 0% 85% 0.00% 1645.18 0.00 1645.18
68 1T-43ER-CS21 EDIFICIO RECEPCION COSTANERA LIVIANA 3 80.65 241.94 241.94 0% 100% 241.94 0% 100% 241.94 0% 100% 241.94 0% 100% 241.94 0% 100% 0% 0% 0% 0% 85% 0.00% 205.65 0.00 205.65
69 1T-43ER-CS22 EDIFICIO RECEPCION COSTANERA LIVIANA 3 80.65 241.94 241.94 0% 100% 241.94 0% 100% 241.94 0% 100% 241.94 100% 100% 80.65 33% 33% 0% 0% 0% 0% 45% 23.33% 108.87 56.45 165.32
70 1T-43ER-CS26 EDIFICIO RECEPCION COSTANERA LIVIANA 4 70.34 281.36 281.36 0% 100% 281.36 0% 100% 281.36 0% 100% 0% 0% 70.34 25% 25% 0% 0% 0% 0% 45% 6.25% 126.61 17.59 144.20
71 1T-43ER-CS29 EDIFICIO RECEPCION COSTANERA LIVIANA 16 80.65 1290.34 1290.34 0% 100% 1290.34 0% 100% 1290.34 0% 100% 1290.34 100% 100% 80.65 6% 6% 0% 0% 0% 0% 45% 16.56% 580.65 213.71 794.36
72 1T-43ER-CS30 EDIFICIO RECEPCION COSTANERA LIVIANA 2 80.65 161.29 161.29 0% 100% 161.29 0% 100% 161.29 0% 100% 161.29 100% 100% 80.65 50% 50% 0% 0% 0% 0% 45% 27.50% 72.58 44.36 116.94
73 1T-43ER-CS32 EDIFICIO RECEPCION COSTANERA LIVIANA 1 80.65 80.65 80.65 0% 100% 80.65 0% 100% 80.65 0% 100% 80.65 100% 100% 80.65 100% 100% 0% 0% 0% 0% 45% 40.00% 36.29 32.26 68.55
74 1T-43ER-CS33 EDIFICIO RECEPCION COSTANERA LIVIANA 2 80.65 161.29 161.29 0% 100% 161.29 0% 100% 161.29 0% 100% 161.29 100% 100% 80.65 50% 50% 0% 0% 0% 0% 45% 27.50% 72.58 44.36 116.94
75 1T-43ER-CS41 EDIFICIO RECEPCION COSTANERA LIVIANA 1 83.93 83.93 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 100% 100% 83.93 100% 100% 0% 0% 0% 0% 45% 40.00% 37.77 33.57 71.34
76 1T-43ER-CS43 EDIFICIO RECEPCION COSTANERA LIVIANA 8 83.93 671.45 671.45 0% 100% 671.45 0% 100% 671.45 0% 100% 671.45 0% 100% 671.45 0% 100% 0% 0% 0% 0% 85% 0.00% 570.73 0.00 570.73
77 1T-43ER-CS48 EDIFICIO RECEPCION COSTANERA LIVIANA 1 83.93 83.93 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 0% 0% 0% 0% 85% 0.00% 71.34 0.00 71.34
78 1T-43ER-CS31 EDIFICIO RECEPCION COSTANERA LIVIANA 1 71.10 71.10 71.10 0% 100% 71.10 0% 100% 71.10 0% 100% 71.10 100% 100% 71.10 100% 100% 0% 0% 0% 0% 45% 40.00% 32.00 28.44 60.44
79 1T-43ER-CS35 EDIFICIO RECEPCION COSTANERA LIVIANA 1 55.32 55.32 55.32 0% 100% 55.32 0% 100% 55.32 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.89 0.00 24.89
80 1T-43ER-CS36 EDIFICIO RECEPCION COSTANERA LIVIANA 2 8.10 16.20 16.20 0% 100% 16.20 0% 100% 16.20 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.29 0.00 7.29
81 1T-43ER-CS42 EDIFICIO RECEPCION COSTANERA LIVIANA 1 71.22 71.22 71.22 0% 100% 71.22 0% 100% 71.22 0% 100% 0% 0% 71.22 100% 100% 0% 0% 0% 0% 45% 25.00% 32.05 17.80 49.85
82 1T-43ER-CS44 EDIFICIO RECEPCION COSTANERA LIVIANA 1 55.31 55.31 55.31 0% 100% 55.31 0% 100% 55.31 0% 100% 0% 0% 55.31 100% 100% 0% 0% 0% 0% 45% 25.00% 24.89 13.83 38.72
83 1T-43ER-CS45 EDIFICIO RECEPCION COSTANERA LIVIANA 6 45.54 273.22 273.22 0% 100% 273.22 0% 100% 273.22 0% 100% 273.22 0% 100% 273.22 0% 100% 0% 0% 0% 0% 85% 0.00% 232.24 0.00 232.24
84 1T-43ER-CS46 EDIFICIO RECEPCION COSTANERA LIVIANA 1 45.54 45.54 45.54 0% 100% 45.54 0% 100% 45.54 0% 100% 45.54 0% 100% 45.54 0% 100% 0% 0% 0% 0% 85% 0.00% 38.71 0.00 38.71
85 1T-43ER-CS47 EDIFICIO RECEPCION COSTANERA LIVIANA 1 45.56 45.56 45.56 0% 100% 45.56 0% 100% 45.56 0% 100% 45.56 0% 100% 45.56 0% 100% 0% 0% 0% 0% 85% 0.00% 38.72 0.00 38.72
86 1T-43ER-CS56 EDIFICIO RECEPCION COSTANERA LIVIANA 6 11.77 70.63 70.63 0% 100% 70.63 0% 100% 70.63 0% 100% 70.63 0% 100% 70.63 0% 100% 0% 0% 0% 0% 85% 0.00% 60.04 0.00 60.04
87 1T-43ER-CS57 EDIFICIO RECEPCION COSTANERA LIVIANA 2 56.13 112.26 112.26 0% 100% 112.26 0% 100% 112.26 0% 100% 112.26 0% 100% 112.26 0% 100% 0% 0% 0% 0% 85% 0.00% 95.42 0.00 95.42
88 1T-43ER-CS58 EDIFICIO RECEPCION COSTANERA LIVIANA 1 63.78 63.78 63.78 0% 100% 63.78 0% 100% 63.78 0% 100% 63.78 0% 100% 63.78 0% 100% 0% 0% 0% 0% 85% 0.00% 54.21 0.00 54.21
89 1T-43ER-CS60 EDIFICIO RECEPCION COSTANERA LIVIANA 1 56.13 56.13 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 0% 0% 0% 0% 85% 0.00% 47.71 0.00 47.71
90 1T-43ER-CS65 EDIFICIO RECEPCION COSTANERA LIVIANA 1 33.71 33.71 33.71 0% 100% 33.71 0% 100% 33.71 0% 100% 33.71 0% 100% 33.71 0% 100% 0% 0% 0% 0% 85% 0.00% 28.65 0.00 28.65
91 1T-43ER-CS66 EDIFICIO RECEPCION COSTANERA LIVIANA 1 56.13 56.13 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 0% 0% 0% 0% 85% 0.00% 47.71 0.00 47.71
92 1T-43ER-CS67 EDIFICIO RECEPCION COSTANERA LIVIANA 1 63.78 63.78 63.78 0% 100% 63.78 0% 100% 63.78 0% 100% 63.78 0% 100% 63.78 0% 100% 0% 0% 0% 0% 85% 0.00% 54.21 0.00 54.21
93 1T-43ER-CS68 EDIFICIO RECEPCION COSTANERA LIVIANA 1 56.13 56.13 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 0% 0% 0% 0% 85% 0.00% 47.71 0.00 47.71
94 1T-43ER-CS72 EDIFICIO RECEPCION COSTANERA LIVIANA 1 19.65 19.65 19.65 0% 100% 19.65 0% 100% 19.65 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.84 0.00 8.84
95 1T-43ER-CS82 EDIFICIO RECEPCION COSTANERA LIVIANA 1 68.41 68.41 68.41 0% 100% 68.41 0% 100% 68.41 0% 100% 68.41 0% 100% 68.41 0% 100% 0% 0% 0% 0% 85% 0.00% 58.15 0.00 58.15
96 1T-43ER-CS84 EDIFICIO RECEPCION COSTANERA LIVIANA 1 56.13 56.13 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 56.13 0% 100% 0% 0% 0% 0% 85% 0.00% 47.71 0.00 47.71
97 1T-43ER-CS1 EDIFICIO RECEPCION COSTANERA LIVIANA 5 62.38 311.88 311.88 0% 100% 311.88 0% 100% 311.88 0% 100% 311.88 0% 100% 311.88 0% 100% 0% 0% 0% 0% 85% 0.00% 265.09 0.00 265.09
98 1T-43ER-CS2 EDIFICIO RECEPCION COSTANERA LIVIANA 1 62.37 62.37 62.37 0% 100% 62.37 0% 100% 62.37 0% 100% 62.37 0% 100% 62.37 0% 100% 0% 0% 0% 0% 85% 0.00% 53.02 0.00 53.02
99 1T-43ER-CS3 EDIFICIO RECEPCION COSTANERA LIVIANA 1 72.94 72.94 72.94 0% 100% 72.94 0% 100% 72.94 0% 100% 72.94 0% 100% 72.94 0% 100% 0% 0% 0% 0% 85% 0.00% 62.00 0.00 62.00
100 1T-43ER-CS4 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.18 73.18 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 0% 0% 0% 0% 85% 0.00% 62.21 0.00 62.21
101 1T-43ER-CS6 EDIFICIO RECEPCION COSTANERA LIVIANA 2 73.19 146.37 146.37 0% 100% 146.37 0% 100% 146.37 0% 100% 146.37 0% 100% 146.37 0% 100% 0% 0% 0% 0% 85% 0.00% 124.42 0.00 124.42
102 1T-43ER-CS7 EDIFICIO RECEPCION COSTANERA LIVIANA 1 34.66 34.66 34.66 0% 100% 34.66 0% 100% 34.66 0% 100% 34.66 0% 100% 34.66 0% 100% 0% 0% 0% 0% 85% 0.00% 29.46 0.00 29.46
103 1T-43ER-CS8 EDIFICIO RECEPCION COSTANERA LIVIANA 3 33.71 101.12 101.12 0% 100% 101.12 0% 100% 101.12 0% 100% 101.12 0% 100% 101.12 0% 100% 0% 0% 0% 0% 85% 0.00% 85.95 0.00 85.95
104 1T-43ER-CS13 EDIFICIO RECEPCION COSTANERA LIVIANA 6 70.34 422.04 422.04 0% 100% 422.04 0% 100% 422.04 0% 100% 422.04 0% 100% 422.04 0% 100% 0% 0% 0% 0% 85% 0.00% 358.74 0.00 358.74
105 1T-43ER-CS15 EDIFICIO RECEPCION COSTANERA LIVIANA 6 70.34 422.04 422.04 0% 100% 422.04 0% 100% 422.04 0% 100% 422.04 0% 100% 422.04 0% 100% 0% 0% 0% 0% 85% 0.00% 358.74 0.00 358.74
106 1T-43ER-CS18 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.19 73.19 73.19 0% 100% 73.19 0% 100% 73.19 0% 100% 73.19 0% 100% 73.19 0% 100% 0% 0% 0% 0% 85% 0.00% 62.21 0.00 62.21
107 1T-43ER-CS19 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.19 73.19 73.19 0% 100% 73.19 0% 100% 73.19 0% 100% 73.19 0% 100% 73.19 0% 100% 0% 0% 0% 0% 85% 0.00% 62.21 0.00 62.21
108 1T-43ER-CS23 EDIFICIO RECEPCION COSTANERA LIVIANA 1 70.34 70.34 70.34 0% 100% 70.34 0% 100% 70.34 0% 100% 70.34 100% 100% 70.34 100% 100% 0% 0% 0% 0% 45% 40.00% 31.65 28.14 59.79
109 1T-43ER-CS25 EDIFICIO RECEPCION COSTANERA LIVIANA 4 70.34 281.36 281.36 0% 100% 281.36 0% 100% 281.36 0% 100% 281.36 100% 100% 70.34 25% 25% 0% 0% 0% 0% 45% 21.25% 126.61 59.79 186.40
110 1T-43ER-CS51 EDIFICIO RECEPCION COSTANERA LIVIANA 1 83.93 83.93 83.93 0% 100% 83.93 0% 100% 83.93 0% 100% 83.93 100% 100% 83.93 100% 100% 0% 0% 0% 0% 45% 40.00% 37.77 33.57 71.34
111 1T-43ER-CS54 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.23 73.23 73.23 0% 100% 73.23 0% 100% 73.23 0% 100% 73.23 0% 100% 73.23 73.23 100% 200% 0% 0% 0% 0% 85% 25.00% 62.25 18.31 80.56
112 1T-43ER-CS55 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.23 73.23 73.23 0% 100% 73.23 0% 100% 73.23 0% 100% 73.23 0% 100% 73.23 73.23 100% 200% 0% 0% 0% 0% 85% 25.00% 62.25 18.31 80.56
113 1T-43ER-CS12 EDIFICIO RECEPCION COSTANERA LIVIANA 5 70.34 351.70 351.70 0% 100% 351.70 0% 100% 351.70 0% 100% 351.70 0% 100% 351.70 70.34 20% 120% 0% 0% 0% 0% 85% 5.00% 298.95 17.59 316.53
114 1T-43ER-CS34 EDIFICIO RECEPCION COSTANERA LIVIANA 1 70.34 70.34 70.34 0% 100% 70.34 0% 100% 70.34 0% 100% 70.34 100% 100% 70.34 100% 100% 0% 0% 0% 0% 45% 40.00% 31.65 28.14 59.79
115 1T-43ER-CS37 EDIFICIO RECEPCION COSTANERA LIVIANA 5 73.18 365.92 365.92 0% 100% 365.92 0% 100% 365.92 0% 100% 365.92 0% 100% 365.92 73.18 20% 120% 0% 0% 0% 0% 85% 5.00% 311.04 18.30 329.33
116 1T-43ER-CS38 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.18 73.18 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 73.18 100% 200% 0% 0% 0% 0% 85% 25.00% 62.21 18.30 80.50
117 1T-43ER-CS39 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.18 73.18 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 73.18 100% 200% 0% 0% 0% 0% 85% 25.00% 62.21 18.30 80.50
118 1T-43ER-CS40 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.18 73.18 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 0% 100% 73.18 73.18 100% 200% 0% 0% 0% 0% 85% 25.00% 62.21 18.30 80.50
119 1T-43ER-CS49 EDIFICIO RECEPCION COSTANERA LIVIANA 3 67.00 201.01 201.01 0% 100% 201.01 0% 100% 201.01 0% 100% 201.01 0% 100% 201.01 67.00 33% 133% 0% 0% 0% 0% 85% 8.33% 170.85 16.75 187.61
120 1T-43ER-CS50 EDIFICIO RECEPCION COSTANERA LIVIANA 1 67.00 67.00 67.00 0% 100% 67.00 0% 100% 67.00 0% 100% 67.00 0% 100% 67.00 67.00 100% 200% 0% 0% 0% 0% 85% 25.00% 56.95 16.75 73.70
121 1T-43ER-CS52 EDIFICIO RECEPCION COSTANERA LIVIANA 1 73.23 73.23 73.23 0% 100% 73.23 0% 100% 73.23 0% 100% 73.23 0% 100% 73.23 73.23 100% 200% 0% 0% 0% 0% 85% 25.00% 62.25 18.31 80.56
122 1T-43ER-CS59 EDIFICIO RECEPCION COSTANERA LIVIANA 1 62.38 62.38 62.38 0% 100% 62.38 0% 100% 62.38 0% 100% 62.38 0% 100% 62.38 62.38 100% 200% 0% 0% 0% 0% 85% 25.00% 53.02 15.59 68.61
123 1T-43ER-CS79 EDIFICIO RECEPCION COSTANERA LIVIANA 1 45.54 45.54 45.54 0% 100% 45.54 0% 100% 45.54 0% 100% 45.54 0% 100% 45.54 45.54 100% 200% 0% 0% 0% 0% 85% 25.00% 38.71 11.38 50.09
124 1T-43ER-CS87 EDIFICIO RECEPCION COSTANERA LIVIANA 1 45.56 45.56 45.56 0% 100% 45.56 0% 100% 45.56 0% 100% 45.56 0% 100% 45.56 45.56 100% 200% 0% 0% 0% 0% 85% 25.00% 38.72 11.39 50.11
125 1T-43ER-CS28 EDIFICIO RECEPCION COSTANERA LIVIANA 1 80.65 80.65 80.65 0% 100% 80.65 0% 100% 80.65 0% 100% 80.65 100% 100% 80.65 100% 100% 0% 0% 0% 0% 45% 40.00% 36.29 32.26 68.55
126 1T-43ER-CS27 EDIFICIO RECEPCION COSTANERA LIVIANA 1 70.34 70.34 70.34 0% 100% 70.34 0% 100% 70.34 0% 100% 70.34 100% 100% 70.34 100% 100% 0% 0% 0% 0% 45% 40.00% 31.65 28.14 59.79
127 1T-43ER-CS64 EDIFICIO RECEPCION COSTANERA LIVIANA 2 40.30 80.60 80.60 0% 100% 80.60 0% 100% 80.60 0% 100% 80.60 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 36.27 12.09 48.36
128 1T-43ER-CS80 EDIFICIO RECEPCION COSTANERA LIVIANA 1 48.88 48.88 48.88 0% 100% 48.88 0% 100% 48.88 Página 1
0% 100% 48.88 100% 100% 48.88 100% 100% 0% 0% 0% 0% 45% 40.00% 22.00 19.55 41.55
ESTRURA METALICA LIVIANA - EDIFICIO DE RECEPCIÓN DE CAMIONES
ACUMULAD
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES O ACTUAL ACTUAL TOTAL
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. PESO TOTAL (Kg) ANTERIOR
ANTERIOR (%) (Tn.) (Tn.)
(Tn.)
(%)
ITEM 5% 30% 10% 15% 25% 10% 5%
35,172.72 Σ Anterior Actual % Actual Σ Total % Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 73.51% 4.24% 25,855.43 1,492.24 27,347.67
129 1T-43ER-CS81 EDIFICIO RECEPCION COSTANERA LIVIANA 2 48.88 97.76 97.76 0% 100% 97.76 0% 100% 97.76 0% 100% 97.76 100% 100% 48.88 50% 50% 0% 0% 0% 0% 45% 27.50% 43.99 26.88 70.88
130 1T-43ER-CS85 EDIFICIO RECEPCION COSTANERA LIVIANA 1 48.90 48.90 48.90 0% 100% 48.90 0% 100% 48.90 0% 100% 48.90 100% 100% 48.90 100% 100% 0% 0% 0% 0% 45% 40.00% 22.01 19.56 41.57
131 1T-43ER-CS86 EDIFICIO RECEPCION COSTANERA LIVIANA 2 48.90 97.80 97.80 0% 100% 97.80 0% 100% 97.80 0% 100% 97.80 100% 100% 48.90 50% 50% 0% 0% 0% 0% 45% 27.50% 44.01 26.90 70.91
132 1T-43ER-CS14 EDIFICIO RECEPCION COSTANERA LIVIANA 33 70.34 2321.24 2321.24 0% 100% 2321.24 0% 100% 2321.24 0% 100% 2321.24 0% 100% 2321.24 70.34 3% 103% 0% 0% 0% 0% 85% 0.76% 1973.06 17.59 1990.64
133 1T-43ER-CS24 EDIFICIO RECEPCION COSTANERA LIVIANA 20 70.34 1406.81 1406.81 0% 100% 1406.81 0% 100% 1406.81 0% 100% 1406.81 100% 100% 70.34 5% 5% 0% 0% 0% 0% 45% 16.25% 633.07 228.61 861.67
134 1T-43ER-CS5 EDIFICIO RECEPCION COSTANERA LIVIANA 11 73.19 805.06 805.06 0% 100% 805.06 0% 100% 805.06 0% 100% 805.06 0% 100% 805.06 0% 100% 0% 0% 0% 0% 85% 0.00% 684.30 0.00 684.30
135 1T-43ER-CS53 EDIFICIO RECEPCION COSTANERA LIVIANA 6 73.23 439.40 439.40 0% 100% 439.40 0% 100% 439.40 0% 100% 439.40 0% 100% 439.40 0% 100% 0% 0% 0% 0% 85% 0.00% 373.49 0.00 373.49
136 1T-43ER-CS61 EDIFICIO RECEPCION COSTANERA LIVIANA 2 18.72 37.44 37.44 0% 100% 37.44 0% 100% 37.44 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.85 0.00 16.85
137 1T-43ER-CS63 EDIFICIO RECEPCION COSTANERA LIVIANA 1 38.36 38.36 38.36 0% 100% 38.36 0% 100% 38.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.26 0.00 17.26
138 1T-43ER-CS73 EDIFICIO RECEPCION COSTANERA LIVIANA 1 19.25 19.25 19.25 0% 100% 19.25 0% 100% 19.25 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.66 0.00 8.66
139 1T-43ER-CS74 EDIFICIO RECEPCION COSTANERA LIVIANA 1 23.04 23.04 23.04 0% 100% 23.04 0% 100% 23.04 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 10.37 0.00 10.37
140 1T-43ER-CS75 EDIFICIO RECEPCION COSTANERA LIVIANA 1 19.65 19.65 19.65 0% 100% 19.65 0% 100% 19.65 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.84 0.00 8.84
141 1T-43ER-CS76 EDIFICIO RECEPCION COSTANERA LIVIANA 1 19.25 19.25 19.25 0% 100% 19.25 0% 100% 19.25 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.66 0.00 8.66
142 1T-43ER-CS77 EDIFICIO RECEPCION COSTANERA LIVIANA 1 23.04 23.04 23.04 0% 100% 23.04 0% 100% 23.04 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 10.37 0.00 10.37
143 1T-43ER-IN1 EDIFICIO RECEPCION INSERTO LIVIANA 96 13.82 1326.92 1326.92 0% 100% 1326.92 0% 100% 1326.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 597.11 0.00 597.11
144 1T-43ER-IN2 EDIFICIO RECEPCION INSERTO LIVIANA 16 9.30 148.86 148.86 0% 100% 148.86 0% 100% 148.86 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 66.99 0.00 66.99
145 1T-43ER-PL1 EDIFICIO RECEPCION PLANTILLAS LIVIANA 16 23.89 382.29 382.29 0% 100% 382.29 0% 100% 382.29 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 172.03 0.00 172.03
146 1T-43ER-PL2 EDIFICIO RECEPCION PLANTILLAS LIVIANA 4 12.76 51.05 51.05 0% 100% 51.05 0% 100% 51.05 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 22.97 0.00 22.97
147 1T-43ER-TE1 EDIFICIO RECEPCION TEMPLADOR LIVIANA 10 5.56 55.57 55.57 0% 100% 55.57 0% 100% 55.57 0% 100% 55.57 0% 100% 55.57 0% 100% 0% 0% 0% 0% 85% 0.00% 47.23 0.00 47.23
148 1T-43ER-TE2 EDIFICIO RECEPCION TEMPLADOR LIVIANA 4 5.46 21.84 21.84 0% 100% 21.84 0% 100% 21.84 0% 100% 21.84 0% 100% 21.84 0% 100% 0% 0% 0% 0% 85% 0.00% 18.56 0.00 18.56
149 1T-43ER-TE3 EDIFICIO RECEPCION TEMPLADOR LIVIANA 72 5.56 400.11 400.11 0% 100% 400.11 0% 100% 400.11 0% 100% 400.11 0% 100% 400.11 0% 100% 0% 0% 0% 0% 85% 0.00% 340.09 0.00 340.09
150 1T-43ER-TE4 EDIFICIO RECEPCION TEMPLADOR LIVIANA 12 5.21 62.50 62.50 0% 100% 62.50 0% 100% 62.50 0% 100% 62.50 0% 100% 62.50 0% 100% 0% 0% 0% 0% 85% 0.00% 53.13 0.00 53.13
151 1T-43ER-TE5 EDIFICIO RECEPCION TEMPLADOR LIVIANA 12 5.78 69.38 69.38 0% 100% 69.38 0% 100% 69.38 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.22 0.00 31.22
152 1T-43ER-TE6 EDIFICIO RECEPCION TEMPLADOR LIVIANA 96 5.50 528.17 528.17 0% 100% 528.17 0% 100% 528.17 0% 100% 528.17 0% 100% 528.17 0% 100% 0% 0% 0% 0% 85% 0.00% 448.95 0.00 448.95
153 1T-43ER-TE7 EDIFICIO RECEPCION TEMPLADOR LIVIANA 10 24.48 244.81 244.81 0% 100% 244.81 0% 100% 244.81 0% 100% 24.481 10% 10% 24.48 10% 10% 0% 0% 0% 0% 45% 4.00% 110.16 9.79 119.96
154 1T-43ER-TE8 EDIFICIO RECEPCION TEMPLADOR LIVIANA 8 25.01 200.12 200.12 0% 100% 200.12 0% 100% 200.12 0% 100% 25.015 13% 13% 25.01 13% 13% 0% 0% 0% 0% 45% 5.00% 90.05 10.01 100.06
155 1T-43ER-TE9 EDIFICIO RECEPCION TEMPLADOR LIVIANA 9 5.90 53.10 53.10 0% 100% 53.10 0% 100% 53.10 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.89 0.00 23.89
156 1T-43ER-TE10 EDIFICIO RECEPCION TEMPLADOR LIVIANA 84 5.56 466.79 466.79 0% 100% 466.79 0% 100% 466.79 0% 100% 466.79 0% 100% 466.79 0% 100% 0% 0% 0% 0% 85% 0.00% 396.77 0.00 396.77
157 1T-43ER-TE11 EDIFICIO RECEPCION TEMPLADOR LIVIANA 12 5.35 64.18 64.18 0% 100% 64.18 0% 100% 64.18 0% 100% 64.18 0% 100% 64.18 0% 100% 0% 0% 0% 0% 85% 0.00% 54.55 0.00 54.55
158 1T-43ER-TE12 EDIFICIO RECEPCION TEMPLADOR LIVIANA 3 5.90 17.70 17.70 0% 100% 17.70 0% 100% 17.70 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.96 0.00 7.96
159 1T-43ER-TE13 EDIFICIO RECEPCION TEMPLADOR LIVIANA 6 24.48 146.89 146.89 0% 100% 146.89 0% 100% 146.89 0% 100% 24.481 17% 17% 24.48 17% 17% 0% 0% 0% 0% 45% 6.67% 66.10 9.79 75.89
160 1T-43ER-TE14 EDIFICIO RECEPCION TEMPLADOR LIVIANA 54 5.56 300.08 300.08 0% 100% 300.08 0% 100% 300.08 0% 100% 300.08 0% 100% 300.08 5.56 2% 102% 0% 0% 0% 0% 85% 0.46% 255.07 1.39 256.46
161 1T-43ER-TE15 EDIFICIO RECEPCION TEMPLADOR LIVIANA 9 5.21 46.88 46.88 0% 100% 46.88 0% 100% 46.88 0% 100% 46.88 0% 100% 46.88 0% 100% 0% 0% 0% 0% 85% 0.00% 39.84 0.00 39.84
162 1T-43ER-TE16 EDIFICIO RECEPCION TEMPLADOR LIVIANA 9 5.78 52.03 52.03 0% 100% 52.03 0% 100% 52.03 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.42 0.00 23.42
163 1T-43ER-TE17 EDIFICIO RECEPCION TEMPLADOR LIVIANA 72 5.50 396.13 396.13 0% 100% 396.13 0% 100% 396.13 0% 100% 396.13 0% 100% 396.13 0% 100% 0% 0% 0% 0% 85% 0.00% 336.71 0.00 336.71
164 1T-43ER-TE18 EDIFICIO RECEPCION TEMPLADOR LIVIANA 12 24.48 293.77 293.77 0% 100% 293.77 0% 100% 293.77 0% 100% 24.481 8% 8% 24.48 8% 8% 0% 0% 0% 0% 45% 3.33% 132.20 9.79 141.99
165 1T-43ER-TE19 EDIFICIO RECEPCION TEMPLADOR LIVIANA 6 25.01 150.09 150.09 0% 100% 150.09 0% 100% 150.09 0% 100% 25.015 17% 17% 25.01 17% 17% 0% 0% 0% 0% 45% 6.67% 67.54 10.01 77.55
166 1T-43ER-TE20 EDIFICIO RECEPCION TEMPLADOR LIVIANA 8 5.90 47.20 47.20 0% 100% 47.20 0% 100% 47.20 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.24 0.00 21.24
167 1T-43ER-TE21 EDIFICIO RECEPCION TEMPLADOR LIVIANA 64 5.56 355.65 355.65 0% 100% 355.65 0% 100% 355.65 0% 100% 355.65 0% 100% 355.65 0% 100% 0% 0% 0% 0% 85% 0.00% 302.30 0.00 302.30
168 1T-43ER-TE22 EDIFICIO RECEPCION TEMPLADOR LIVIANA 9 5.35 48.14 48.14 0% 100% 48.14 0% 100% 48.14 0% 100% 48.14 0% 100% 48.14 0% 100% 0% 0% 0% 0% 85% 0.00% 40.91 0.00 40.91
169 1T-43ER-TE23 EDIFICIO RECEPCION TEMPLADOR LIVIANA 12 5.56 66.68 66.68 0% 100% 66.68 0% 100% 66.68 0% 100% 5.557 8% 8% 5.56 8% 8% 0% 0% 0% 0% 45% 3.33% 30.01 2.22 32.23
170 1T-43ER-TE24 EDIFICIO RECEPCION TEMPLADOR LIVIANA 2 5.67 11.34 11.34 0% 100% 11.34 0% 100% 11.34 0% 100% 5.669 50% 50% 5.67 50% 50% 0% 0% 0% 0% 45% 20.00% 5.10 2.27 7.37
171 1T-43ER-TE25 EDIFICIO RECEPCION TEMPLADOR LIVIANA 3 5.21 15.63 15.63 0% 100% 15.63 0% 100% 15.63 0% 100% 5.208 33% 33% 5.21 33% 33% 0% 0% 0% 0% 45% 13.33% 7.03 2.08 9.11
172 1T-43ER-TE26 EDIFICIO RECEPCION TEMPLADOR LIVIANA 4 5.46 21.84 21.84 0% 100% 21.84 0% 100% 21.84 0% 100% 5.460 25% 25% 5.46 25% 25% 0% 0% 0% 0% 45% 10.00% 9.83 2.18 12.01
173 1T-43ER-TE27 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 5.90 5.90 5.90 0% 100% 5.90 0% 100% 5.90 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.65 0.00 2.65
174 1T-43ER-TE28 EDIFICIO RECEPCION TEMPLADOR LIVIANA 8 6.14 49.08 49.08 0% 100% 49.08 0% 100% 49.08 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 22.09 0.00 22.09
175 1T-43ER-TE29 EDIFICIO RECEPCION TEMPLADOR LIVIANA 6 6.19 37.14 37.14 0% 100% 37.14 0% 100% 37.14 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.71 0.00 16.71
176 1T-43ER-TE30 EDIFICIO RECEPCION TEMPLADOR LIVIANA 3 6.15 18.45 18.45 0% 100% 18.45 0% 100% 18.45 0% 100% 18.45 0% 100% 18.45 0% 100% 0% 0% 0% 0% 85% 0.00% 15.69 0.00 15.69
177 1T-43ER-TE31 EDIFICIO RECEPCION TEMPLADOR LIVIANA 3 6.15 18.45 18.45 0% 100% 18.45 0% 100% 18.45 0% 100% 18.45 0% 100% 18.45 0% 100% 0% 0% 0% 0% 85% 0.00% 15.69 0.00 15.69
178 1T-43ER-TE32 EDIFICIO RECEPCION TEMPLADOR LIVIANA 4 6.15 24.60 24.60 0% 100% 24.60 0% 100% 24.60 0% 100% 6.151 25% 25% 6.15 25% 25% 0% 0% 0% 0% 45% 10.00% 11.07 2.46 13.53
179 1T-43ER-TE33 EDIFICIO RECEPCION TEMPLADOR LIVIANA 4 6.15 24.60 24.60 0% 100% 24.60 0% 100% 24.60 0% 100% 6.151 25% 25% 6.15 25% 25% 0% 0% 0% 0% 45% 10.00% 11.07 2.46 13.53
180 1T-43ER-TE34 EDIFICIO RECEPCION TEMPLADOR LIVIANA 4 6.22 24.90 24.90 0% 100% 24.90 0% 100% 24.90 0% 100% 24.90 0% 100% 24.90 0% 100% 0% 0% 0% 0% 85% 0.00% 21.16 0.00 21.16
181 1T-43ER-TE35 EDIFICIO RECEPCION TEMPLADOR LIVIANA 4 6.22 24.89 24.89 0% 100% 24.89 0% 100% 24.89 0% 100% 24.89 0% 100% 24.89 0% 100% 0% 0% 0% 0% 85% 0.00% 21.16 0.00 21.16
182 1T-43ER-TE36 EDIFICIO RECEPCION TEMPLADOR LIVIANA 3 6.22 18.67 18.67 0% 100% 18.67 0% 100% 18.67 0% 100% 18.67 0% 100% 18.67 0% 100% 0% 0% 0% 0% 85% 0.00% 15.87 0.00 15.87
183 1T-43ER-TE37 EDIFICIO RECEPCION TEMPLADOR LIVIANA 3 6.22 18.67 18.67 0% 100% 18.67 0% 100% 18.67 0% 100% 18.67 0% 100% 18.67 0% 100% 0% 0% 0% 0% 85% 0.00% 15.87 0.00 15.87
184 1T-43ER-TE38 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 5.43 5.43 5.43 0% 100% 5.43 0% 100% 5.43 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.44 0.00 2.44
185 1T-43ER-TE39 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 5.65 5.65 5.65 0% 100% 5.65 0% 100% 5.65 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.54 0.00 2.54
186 1T-43ER-TE40 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 4.82 4.82 4.82 0% 100% 4.82 0% 100% 4.82 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.17 0.00 2.17
187 1T-43ER-TE41 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 5.05 5.05 5.05 0% 100% 5.05 0% 100% 5.05 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.27 0.00 2.27
188 1T-43ER-TE42 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 5.41 5.41 5.41 0% 100% 5.41 0% 100% 5.41 0% 100% 5.415 100% 100% 5.41 100% 100% 0% 0% 0% 0% 45% 40.00% 2.44 2.17 4.60
189 1T-43ER-TE43 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 4.62 4.62 4.62 0% 100% 4.62 0% 100% 4.62 0% 100% 4.618 100% 100% 4.62 100% 100% 0% 0% 0% 0% 45% 40.00% 2.08 1.85 3.93
190 1T-43ER-TE44 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 4.87 4.87 4.87 0% 100% 4.87 0% 100% 4.87 0% 100% 4.875 100% 100% 4.87 100% 100% 0% 0% 0% 0% 45% 40.00% 2.19 1.95 4.14
191 1T-43ER-TE45 EDIFICIO RECEPCION TEMPLADOR LIVIANA 1 5.39 5.39 5.39 0% 100% 5.39 0% 100% 5.39 0% 100% 5.386 100% 100% 5.39 100% 100% 0% 0% 0% 0% 45% 40.00% 2.42 2.15 4.58
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A

Página 2
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA METALICA MEDIANA - EDIFICIO DE RECEPCIÓN DE CAMIONES
ACUMULA
ACUM.
O.C. TRASLADO MONTAJE DO ACTUAL ACTUAL
PESO TOTAL FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ANTERIOR TOTAL (Tn.)
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. ANTERIOR (%) (Tn.)
(Kg) (Tn.)
(%)
ITEM 5% 30% 10% 15% 25% 10% 5%
22,041.91 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 76.0% 7.02% 16,752.79 1,546.39 18,299.18
137 1T-43ER-CS62 EDIFICIO RECEPCION COSTANERA MEDIANA 1 234.69 234.69 234.688 0% 100% 234.688 0% 100% 234.688 0% 100% 234.688 0% 100% 234.688 0% 100% 0% 0% 0% 0% 85% 0.00% 199.48 0.00 199.48
139 1T-43ER-CS69 EDIFICIO RECEPCION COSTANERA MEDIANA 5 229.73 1148.67 1148.67 0% 100% 1148.67 0% 100% 1148.67 0% 100% 1148.67 0% 100% 338.766 0% 29% 0% 0% 0% 0% 67% 0.00% 773.89 0.00 773.89
140 1T-43ER-CS70 EDIFICIO RECEPCION COSTANERA MEDIANA 1 239.10 239.10 239.1 0% 100% 239.1 0% 100% 239.1 0% 100% 239.1 0% 100% 239.1 0% 100% 0% 0% 0% 0% 85% 0.00% 203.23 0.00 203.23
141 1T-43ER-CS71 EDIFICIO RECEPCION COSTANERA MEDIANA 5 233.97 1169.83 1169.83 0% 100% 1169.83 0% 100% 1169.83 0% 100% 1169.83 0% 100% 233.966 0% 20% 0% 0% 0% 0% 65% 0.00% 760.39 0.00 760.39
147 1T-43ER-CS78 EDIFICIO RECEPCION COSTANERA MEDIANA 1 234.69 234.69 234.692 0% 100% 234.692 0% 100% 234.692 0% 100% 234.692 0% 100% 234.69 100% 100% 0% 0% 0% 0% 60% 25.00% 140.82 58.67 199.49
148 1T-43ER-CS83 EDIFICIO RECEPCION COSTANERA MEDIANA 1 239.10 239.10 239.105 0% 100% 239.105 0% 100% 239.105 0% 100% 239.105 0% 100% 239.10 100% 100% 0% 0% 0% 0% 60% 25.00% 143.46 59.78 203.24
219 1T-43ER-VI2 EDIFICIO RECEPCION VIGA MEDIANA 1 436.50 436.50 436.5 0% 100% 436.5 0% 100% 436.5 0% 100% 436.5 0% 100% 436.5 0% 100% 0% 0% 0% 0% 85% 0.00% 371.02 0.00 371.02
220 1T-43ER-VI9 EDIFICIO RECEPCION VIGA MEDIANA 1 428.69 428.69 428.69 0% 100% 428.69 0% 100% 428.69 0% 100% 428.69 0% 100% 428.69 0% 100% 0% 0% 0% 0% 85% 0.00% 364.39 0.00 364.39
221 1T-43ER-VI12 EDIFICIO RECEPCION VIGA MEDIANA 1 436.50 436.50 436.5 0% 100% 436.5 0% 100% 436.5 0% 100% 436.5 0% 100% 436.5 0% 100% 0% 0% 0% 0% 85% 0.00% 371.02 0.00 371.02
222 1T-43ER-VI14 EDIFICIO RECEPCION VIGA MEDIANA 1 388.91 388.91 388.913 0% 100% 388.913 0% 100% 388.913 0% 100% 388.913 0% 100% 388.913 0% 100% 0% 0% 0% 0% 85% 0.00% 330.58 0.00 330.58
223 1T-43ER-VI1 EDIFICIO RECEPCION VIGA MEDIANA 2 305.57 611.13 611.132 0% 100% 611.132 0% 100% 611.132 0% 100% 611.132 0% 100% 611.132 0% 100% 0% 0% 0% 0% 85% 0.00% 519.46 0.00 519.46
224 1T-43ER-VI4 EDIFICIO RECEPCION VIGA MEDIANA 1 221.81 221.81 221.808 0% 100% 221.808 0% 100% 221.808 0% 100% 221.808 0% 100% 221.808 0% 100% 0% 0% 0% 0% 85% 0.00% 188.54 0.00 188.54
225 1T-43ER-VI6 EDIFICIO RECEPCION VIGA MEDIANA 1 1443.29 1443.29 1443.29 0% 100% 1443.29 0% 100% 1443.29 0% 100% 1443.29 0% 100% 1443.29 0% 100% 0% 0% 0% 0% 85% 0.00% 1226.80 0.00 1226.80
226 1T-43ER-VI7 EDIFICIO RECEPCION VIGA MEDIANA 3 348.25 1044.75 1044.75 0% 100% 1044.75 0% 100% 1044.75 0% 100% 1044.75 0% 100% 1044.75 0% 100% 0% 0% 0% 0% 85% 0.00% 888.04 0.00 888.04
261 1T-43ER-VI8 EDIFICIO RECEPCION VIGA MEDIANA 4 348.25 1393.00 1393 0% 100% 1393 0% 100% 1393 0% 100% 1393 0% 100% 348.251 1044.75 75% 100% 0% 0% 0% 0% 66% 18.75% 922.86 261.19 1184.05
262 1T-43ER-VI10 EDIFICIO RECEPCION VIGA MEDIANA 1 388.91 388.91 388.913 0% 100% 388.913 0% 100% 388.913 0% 100% 388.913 0% 100% 388.913 0% 100% 0% 0% 0% 0% 85% 0.00% 330.58 0.00 330.58
263 1T-43ER-VI13 EDIFICIO RECEPCION VIGA MEDIANA 1 428.69 428.69 428.69 0% 100% 428.69 0% 100% 428.69 0% 100% 428.69 0% 100% 428.69 0% 100% 0% 0% 0% 0% 85% 0.00% 364.39 0.00 364.39
264 1T-43ER-VI17 EDIFICIO RECEPCION VIGA MEDIANA 1 348.25 348.25 348.251 0% 100% 348.251 0% 100% 348.251 0% 100% 348.251 0% 100% 348.25 100% 100% 0% 0% 0% 0% 60% 25.00% 208.95 87.06 296.01
265 1T-43ER-VI18 EDIFICIO RECEPCION VIGA MEDIANA 6 348.25 2089.50 2089.5 0% 100% 2089.5 0% 100% 2089.5 0% 100% 2089.5 0% 100% 2089.5 0% 100% 0% 0% 0% 0% 85% 0.00% 1776.07 0.00 1776.07
266 1T-43ER-VI20 EDIFICIO RECEPCION VIGA MEDIANA 1 348.25 348.25 348.251 0% 100% 348.251 0% 100% 348.251 0% 100% 348.251 0% 100% 348.25 100% 100% 0% 0% 0% 0% 60% 25.00% 208.95 87.06 296.01
267 1T-43ER-VI21 EDIFICIO RECEPCION VIGA MEDIANA 2 348.25 696.50 696.502 0% 100% 696.502 0% 100% 696.502 0% 100% 696.502 0% 100% 696.50 100% 100% 0% 0% 0% 0% 60% 25.00% 417.90 174.13 592.03
268 1T-43ER-VI22 EDIFICIO RECEPCION VIGA MEDIANA 2 432.00 864.01 864.006 0% 100% 864.006 0% 100% 864.006 0% 100% 864.006 0% 100% 864.006 0% 100% 0% 0% 0% 0% 85% 0.00% 734.40 0.00 734.40
269 1T-43ER-VI23 EDIFICIO RECEPCION VIGA MEDIANA 2 388.91 777.83 777.826 0% 100% 777.826 0% 100% 777.826 0% 100% 777.826 0% 100% 777.826 0% 100% 0% 0% 0% 0% 85% 0.00% 661.15 0.00 661.15
270 1T-43ER-VI24 EDIFICIO RECEPCION VIGA MEDIANA 1 351.56 351.56 351.563 0% 100% 351.563 0% 100% 351.563 0% 100% 351.563 0% 100% 351.56 100% 100% 0% 0% 0% 0% 60% 25.00% 210.94 87.89 298.83
271 1T-43ER-VI26 EDIFICIO RECEPCION VIGA MEDIANA 1 336.85 336.85 336.851 0% 100% 336.851 0% 100% 336.851 0% 100% 336.851 0% 100% 336.851 0% 100% 0% 0% 0% 0% 85% 0.00% 286.32 0.00 286.32
272 1T-43ER-VI16 EDIFICIO RECEPCION VIGA MEDIANA 2 396.45 792.90 792.896 0% 100% 792.896 0% 100% 792.896 0% 100% 792.896 0% 100% 396.448 396.45 50% 100% 0% 0% 0% 0% 73% 12.50% 574.85 99.11 673.96
273 1T-43ER-VI3 EDIFICIO RECEPCION VIGA MEDIANA 2 396.45 792.90 792.896 0% 100% 792.896 0% 100% 792.896 0% 100% 792.896 0% 100% 792.896 0% 100% 0% 0% 0% 0% 85% 0.00% 673.96 0.00 673.96
319 1T-43ER-VI5 EDIFICIO RECEPCION VIGA MEDIANA 8 348.25 2786.00 2786 0% 100% 2786 0% 100% 2786 0% 100% 2786 0% 100% 696.5 2089.50 75% 100% 0% 0% 0% 0% 66% 18.75% 1845.72 522.37 2368.10
324 1T-43ER-VI25 EDIFICIO RECEPCION VIGA MEDIANA 2 248.05 496.09 496.092 0% 100% 496.092 0% 100% 496.092 0% 100% 496.092 0% 100% 496.092 0% 100% 0% 0% 0% 0% 85% 0.00% 421.68 0.00 421.68
325 1T-43ER-VI15 EDIFICIO RECEPCION VIGA MEDIANA 2 436.50 873.00 873 0% 100% 873 0% 100% 873 0% 100% 873 0% 100% 436.5 436.50 50% 100% 0% 0% 0% 0% 73% 12.50% 632.92 109.12 742.05
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRURA METALICA PESADA - EDIFICIO DE RECEPCIÓN DE CAMIONES
ACUMULA
ACUM.
O.C. TRASLADO MONTAJE DO ACTUAL
PESO PESO TOTAL FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ANTERIOR ACTUAL (Tn.) TOTAL (Tn.)
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. ANTERIOR (%)
UNIT. (Kg) (Tn.)
(%)
ITEM 5% 30% 10% 15% 25% 10% 5%
31,832.020 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 80.6% 4.38% 25,663.75 1,393.50 27,057.25
1 1T-43ER-CO12 EDIFICIO RECEPCION COLUMNA PESADA 1 1349.57 1349.565 1349.57 0% 100% 1349.57 0% 100% 1349.57 0% 100% 1349.57 0% 100% 1349.57 0% 100% 0% 0% 0% 0% 85% 0.0% 1147.13 0.00 1147.13
2 1T-43ER-CO15 EDIFICIO RECEPCION COLUMNA PESADA 1 1178.92 1178.92 1178.92 0% 100% 1178.92 0% 100% 1178.92 0% 100% 1178.92 0% 100% 1178.92 0% 100% 0% 0% 0% 0% 85% 0.0% 1002.08 0.00 1002.08
3 1T-43ER-CO18 EDIFICIO RECEPCION COLUMNA PESADA 1 1351.28 1351.279 1351.28 0% 100% 1351.28 0% 100% 1351.28 0% 100% 1351.28 0% 100% 1351.28 0% 100% 0% 0% 0% 0% 85% 0.0% 1148.59 0.00 1148.59
4 1T-43ER-CO1 EDIFICIO RECEPCION COLUMNA PESADA 1 1205.16 1205.155 1205.16 0% 100% 1205.16 0% 100% 1205.16 0% 100% 1205.16 0% 100% 1205.16 0% 100% 0% 0% 0% 0% 85% 0.0% 1024.38 0.00 1024.38
5 1T-43ER-CO9 EDIFICIO RECEPCION COLUMNA PESADA 2 1349.57 2699.13 2699.13 0% 100% 2699.13 0% 100% 2699.13 0% 100% 2699.13 0% 100% 2699.13 0% 100% 0% 0% 0% 0% 85% 0.0% 2294.26 0.00 2294.26
6 1T-43ER-CO5 EDIFICIO RECEPCION COLUMNA PESADA 1 1177.21 1177.209 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 0% 0% 0% 0% 85% 0.0% 1000.63 0.00 1000.63
7 1T-43ER-CO8 EDIFICIO RECEPCION COLUMNA PESADA 1 1177.21 1177.209 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 0% 0% 0% 0% 85% 0.0% 1000.63 0.00 1000.63
8 1T-43ER-CO11 EDIFICIO RECEPCION COLUMNA PESADA 1 1177.21 1177.209 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 0% 0% 0% 0% 85% 0.0% 1000.63 0.00 1000.63
9 1T-43ER-CO20 EDIFICIO RECEPCION COLUMNA PESADA 1 1209.21 1209.206 1209.21 0% 100% 1209.21 0% 100% 1209.21 0% 100% 1209.21 0% 100% 1209.21 0% 100% 0% 0% 0% 0% 85% 0.0% 1027.83 0.00 1027.83
10 1T-43ER-CO6 EDIFICIO RECEPCION COLUMNA PESADA 1 1384.48 1384.478 1384.48 0% 100% 1384.48 0% 100% 1384.48 0% 100% 1384.48 0% 100% 1384.48 0% 100% 0% 0% 0% 0% 85% 0.0% 1176.81 0.00 1176.81
11 1T-43ER-CO2 EDIFICIO RECEPCION COLUMNA PESADA 1 620.137 620.137 620.137 0% 100% 620.137 0% 100% 620.137 0% 100% 620.137 100% 100% 620.137 100% 100% 0% 0% 0% 0% 45% 40.0% 279.06 248.05 527.12
12 1T-43ER-CO4 EDIFICIO RECEPCION COLUMNA PESADA 1 514.069 514.069 514.069 0% 100% 514.069 0% 100% 514.069 0% 100% 514.069 0% 100% 514.069 0% 100% 0% 0% 0% 0% 85% 0.0% 436.96 0.00 436.96
13 1T-43ER-CO14 EDIFICIO RECEPCION COLUMNA PESADA 1 1177.21 1177.209 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 659.438 517.972 44% 100% 1177.21 0% 100% 0% 0% 0% 0% 78% 6.6% 922.96 77.70 1000.66
14 1T-43ER-CO17 EDIFICIO RECEPCION COLUMNA PESADA 1 1177.21 1177.209 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 1177.21 0% 100% 0% 0% 0% 0% 85% 0.0% 1000.63 0.00 1000.63
15 1T-43ER-CO21 EDIFICIO RECEPCION COLUMNA PESADA 1 493.624 493.624 493.624 0% 100% 493.624 0% 100% 493.624 0% 100% 493.624 0% 100% 493.624 0% 100% 0% 0% 0% 0% 85% 0.0% 419.58 0.00 419.58
16 1T-43ER-CO22 EDIFICIO RECEPCION COLUMNA PESADA 1 521.329 521.329 521.329 0% 100% 521.329 0% 100% 521.329 0% 100% 521.329 0% 100% 521.329 0% 100% 0% 0% 0% 0% 85% 0.0% 443.13 0.00 443.13
17 1T-43ER-CO23 EDIFICIO RECEPCION COLUMNA PESADA 1 1381.04 1381.04 1381.04 0% 100% 1381.04 0% 100% 1381.04 0% 100% 1381.04 0% 100% 1381.04 0% 100% 0% 0% 0% 0% 85% 0.0% 1173.88 0.00 1173.88
18 1T-43ER-CO16 EDIFICIO RECEPCION COLUMNA PESADA 2 1349.57 2699.13 2699.13 0% 100% 2699.13 0% 100% 2699.13 0% 100% 2699.13 0% 100% 2699.13 0% 100% 0% 0% 0% 0% 85% 0.0% 2294.26 0.00 2294.26
19 1T-43ER-VI11 EDIFICIO RECEPCION VIGA PESADA 1 1334.69 1334.689 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 0% 0% 0% 0% 85% 0.0% 1134.49 0.00 1134.49
20 1T-43ER-VI19 EDIFICIO RECEPCION VIGA PESADA 1 1334.69 1334.689 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 0% 0% 0% 0% 85% 0.0% 1134.49 0.00 1134.49
21 1T-43ER-VI27 EDIFICIO RECEPCION VIGA PESADA 1 1330.78 1330.779 1330.78 0% 100% 1330.78 0% 100% 1330.78 0% 100% 1330.78 0% 100% 1330.78 0% 100% 0% 0% 0% 0% 85% 0.0% 1131.16 0.00 1131.16
22 1T-43ER-VI28 EDIFICIO RECEPCION VIGA PESADA 1 1334.69 1334.689 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 0% 0% 0% 0% 85% 0.0% 1134.49 0.00 1134.49
23 1T-43ER-VI29 EDIFICIO RECEPCION VIGA PESADA 1 1334.69 1334.689 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 1334.69 0% 100% 0% 0% 0% 0% 85% 0.0% 1134.49 0.00 1134.49
24 1T-43ER-VI30 EDIFICIO RECEPCION VIGA PESADA 2 1334.69 2669.378 2669.38 0% 100% 2669.38 0% 100% 2669.38 0% 100% 2669.38 100% 100% 2669.38 100% 100% 0% 0% 0% 0% 45% 40.0% 1201.22 1067.75 2268.97
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
BARANDAS- EDIFICIO DE RECEPCIÓN DE CAMIONES

ACUMUL
ACUM.
PESO O.C. TRASLADO MONTAJE ADO
FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%) ANTERIOR ACTUAL (Tn.)TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT.PESO UNIT. TOTAL ANTERI
(Tn.)
(Kg) OR (%)
5% 30% 10% 15% 25% 10% 5%
80.30 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 36.14 0.00 36.14
1 1T-43ERK-BA-1
PLATAFORMA DE MUESTREO
BARANDA BARANDA 1 3.115 3.115 3.11503 0% 100% 3.11503 0% 100% 3.11503 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.40 0.00 1.40
2 1T-43ERK-BA-2
PLATAFORMA DE MUESTREO
BARANDA BARANDA 1 2.741 2.741 2.7405 0% 100% 2.7405 0% 100% 2.7405 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.23 0.00 1.23
3 1T-43ERK-BA-3
PLATAFORMA DE MUESTREO
BARANDA BARANDA 2 2.955 5.909 5.90903 0% 100% 5.90903 0% 100% 5.90903 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 2.66 0.00 2.66
4 1T-43ERK-BA-4
PLATAFORMA DE MUESTREO
BARANDA BARANDA 1 3.115 3.115 3.11503 0% 100% 3.11503 0% 100% 3.11503 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.40 0.00 1.40
5 1T-43ERK-BA-5
PLATAFORMA DE MUESTREO
BARANDA BARANDA 4 3.092 12.368 12.3684 0% 100% 12.3684 0% 100% 12.3684 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 5.57 0.00 5.57
6 1T-43ERK-BA-6
PLATAFORMA DE MUESTREO
BARANDA BARANDA 2 2.955 5.909 5.90903 0% 100% 5.90903 0% 100% 5.90903 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 2.66 0.00 2.66
7 1T-43ERK-BA-7
PLATAFORMA DE MUESTREO
BARANDA BARANDA 4 3.092 12.368 12.3684 0% 100% 12.3684 0% 100% 12.3684 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 5.57 0.00 5.57
8 1T-43ERK-BA-8
PLATAFORMA DE MUESTREO
BARANDA BARANDA 2 3.039 6.077 6.07718 0% 100% 6.07718 0% 100% 6.07718 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 2.73 0.00 2.73
9 1T-43ERK-BA-9
PLATAFORMA DE MUESTREO
BARANDA BARANDA 2 3.039 6.077 6.07718 0% 100% 6.07718 0% 100% 6.07718 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 2.73 0.00 2.73
10 1T-43ERK-BA-10
PLATAFORMA DE MUESTREO
BARANDA BARANDA 1 3.031 3.031 3.03095 0% 100% 3.03095 0% 100% 3.03095 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.36 0.00 1.36
11 1T-43ERK-BA-11
PLATAFORMA DE MUESTREO
BARANDA BARANDA 1 3.031 3.031 3.03095 0% 100% 3.03095 0% 100% 3.03095 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.36 0.00 1.36
12 1T-43ERK-BA-12
PLATAFORMA DE MUESTREO
BARANDA BARANDA 1 4.942 4.942 4.9418 0% 100% 4.9418 0% 100% 4.9418 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 2.22 0.00 2.22
13 1T-43ERK-BA-13
PLATAFORMA DE MUESTREO
BARANDA BARANDA 1 4.942 4.942 4.9418 0% 100% 4.9418 0% 100% 4.9418 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 2.22 0.00 2.22
14 1T-43ERK-BS-1
PLATAFORMA DE MUESTREO
BARANDA BARANDA 3 1.112 3.337 3.33738 0% 100% 3.33738 0% 100% 3.33738 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.50 0.00 1.50
15 1T-43ERK-BS-2
PLATAFORMA DE MUESTREO
BARANDA BARANDA 3 1.112 3.337 3.33738 0% 100% 3.33738 0% 100% 3.33738 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.50 0.00 1.50
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
ACUMULAD
ACUM.
PESO O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES O ACTUAL (%) ANTERIACTUAL (Tn.)TOTAL (Tn.)
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT.
TOTAL (Kg) ANTERIOR
OR (Tn.)
(%)
ITEM
5% 30% 10% 15% 25% 10% 5%
173.90 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 78.26 0.00 78.26
308 1T-43ECR-GR-1 CANAL DE RECOLECCIÓN GRATING GRATING 1 173.900 173.900 173.9 0% 100% 173.9 0% 100% 173.9 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 78.26 0.00 78.26
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
ACUMU
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES LADO ACTUA ACTUA TOTAL
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. ANTERI
PESO TOTAL (Kg) ANTERI L (%) L (Tn.) (Tn.)
OR (Tn.)
OR (%)
ITEM
5% 30% 10% 15% 25% 10% 5%
8,723.22 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 3925.45 0.00 3925.45
1056 3T-43T2-GR1 TORRE DE TRANSFERENCIA 2 y 3 GRATING LIVIANA 1 49 518.80 518.80 0% 100% 518.798 0% 100% 518.798 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 233.46 0.00 233.46
1057 3T-43T2-GR2 TORRE DE TRANSFERENCIA 2 y 3 GRATING LIVIANA 1 49 518.80 518.798 0% 100% 518.798 0% 100% 518.798 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 233.46 0.00 233.46
1058 3T-43T2-GR3 TORRE DE TRANSFERENCIA 2 y 4 GRATING LIVIANA 1 37.5 397.04 397.039 0% 100% 397.039 0% 100% 397.039 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 178.67 0.00 178.67
1059 3T-43T2-GR4 TORRE DE TRANSFERENCIA 2 y 5 GRATING LIVIANA 1 49.5 524.09 524.092 0% 100% 524.092 0% 100% 524.092 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 235.84 0.00 235.84
1060 3T-43T2-GR5 TORRE DE TRANSFERENCIA 2 y 6 GRATING LIVIANA 1 52.3 553.74 553.738 0% 100% 553.738 0% 100% 553.738 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 249.18 0.00 249.18
1061 3T-43T2-GR6 TORRE DE TRANSFERENCIA 2 y 7 GRATING LIVIANA 1 40.5 428.80 428.803 0% 100% 428.803 0% 100% 428.803 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 192.96 0.00 192.96
1062 3T-43T2-GR7 TORRE DE TRANSFERENCIA 2 y 8 GRATING LIVIANA 1 35.5 375.86 375.864 0% 100% 375.864 0% 100% 375.864 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 169.14 0.00 169.14
1063 3T-43T2-GR8 TORRE DE TRANSFERENCIA 2 y 9 GRATING LIVIANA 1 49 518.80 518.798 0% 100% 518.798 0% 100% 518.798 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 233.46 0.00 233.46
1064 3T-43T2-GR9 TORRE DE TRANSFERENCIA 2 y 10 GRATING LIVIANA 1 47.9 507.15 507.152 0% 100% 507.152 0% 100% 507.152 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 228.22 0.00 228.22
1065 3T-43T2-GR10 TORRE DE TRANSFERENCIA 2 y 11 GRATING LIVIANA 1 48.7 515.62 515.622 0% 100% 515.622 0% 100% 515.622 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 232.03 0.00 232.03
1066 3T-43T2-GR11 TORRE DE TRANSFERENCIA 2 y 12 GRATING LIVIANA 1 31.6 334.57 334.572 0% 100% 334.572 0% 100% 334.572 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 150.56 0.00 150.56
1067 3T-43T2-GR12 TORRE DE TRANSFERENCIA 2 y 13 GRATING LIVIANA 1 31.1 329.28 329.278 0% 100% 329.278 0% 100% 329.278 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 148.18 0.00 148.18
1068 3T-43T2-GR13 TORRE DE TRANSFERENCIA 2 y 14 GRATING LIVIANA 1 48.6 514.56 514.563 0% 100% 514.563 0% 100% 514.563 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 231.55 0.00 231.55
1069 3T-43T2-GR14 TORRE DE TRANSFERENCIA 2 y 15 GRATING LIVIANA 1 55 582.32 582.324 0% 100% 582.324 0% 100% 582.324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 262.05 0.00 262.05
1070 3T-43T2-GR15 TORRE DE TRANSFERENCIA 2 y 16 GRATING LIVIANA 1 55.5 587.62 587.618 0% 100% 587.618 0% 100% 587.618 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 264.43 0.00 264.43
1071 3T-43T2-GR16 TORRE DE TRANSFERENCIA 2 y 17 GRATING LIVIANA 1 44.1 466.92 466.918 0% 100% 466.918 0% 100% 466.918 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 210.11 0.00 210.11
1072 3T-43T2-GR17 TORRE DE TRANSFERENCIA 2 y 18 GRATING LIVIANA 1 49 518.80 518.798 0% 100% 518.798 0% 100% 518.798 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 233.46 0.00 233.46
1073 3T-43T2-GR18 TORRE DE TRANSFERENCIA 2 y 19 GRATING LIVIANA 2 97.40699599 194.81 194.814 0% 100% 194.814 0% 100% 194.814 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 87.67 0.00 87.67
1074 3T-43T2-GR19 TORRE DE TRANSFERENCIA 2 y 20 GRATING LIVIANA 1 10 105.88 105.877 0% 100% 105.877 0% 100% 105.877 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 47.64 0.00 47.64
1075 3T-43T2-GR20 TORRE DE TRANSFERENCIA 2 y 21 GRATING LIVIANA 1 12.6 133.41 133.405 0% 100% 133.405 0% 100% 133.405 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 60.03 0.00 60.03
1076 3T-43T2-GR21 TORRE DE TRANSFERENCIA 2 y 22 GRATING LIVIANA 1 9.1 96.35 96.3482 0% 100% 96.3482 0% 100% 96.3482 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 43.36 0.00 43.36

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
ACUMU
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES LADO ACTUAL (%)
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. ANTERIACTUAL (Tn.)
TOTAL (Tn.)
PESO TOTAL (Kg) ANTERI
OR (Tn.)
OR (%)
ITEM
5% 30% 10% 15% 25% 10% 5%
1554.63 - - 1,554.63 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 699.58 0.00 699.58
763 2T-43T1-GR1 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 93.772 128.141678 128.142 0% 100% 128.142 0% 100% 128.142 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 57.66 0.00 57.66
764 2T-43T1-GR3 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 50.613 69.16387351 69.164 0% 100% 69.1639 0% 100% 69.1639 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.12 0.00 31.12
765 2T-43T1-GR4 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 37.785 51.63410508 51.634 0% 100% 51.6341 0% 100% 51.6341 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.24 0.00 23.24
766 2T-43T1-GR5 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 37.497 51.2405462 51.241 0% 100% 51.2405 0% 100% 51.2405 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.06 0.00 23.06
767 2T-43T1-GR6 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 59.568 81.40109492 81.401 0% 100% 81.4011 0% 100% 81.4011 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.63 0.00 36.63
768 2T-43T1-GR7 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 39.874 54.48877348 54.489 0% 100% 54.4888 0% 100% 54.4888 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.52 0.00 24.52
769 2T-43T1-GR8 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 39.863 54.47374172 54.474 0% 100% 54.4737 0% 100% 54.4737 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.51 0.00 24.51
770 2T-43T1-GR9 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 35.079 47.93629144 47.936 0% 100% 47.9363 0% 100% 47.9363 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.57 0.00 21.57
771 2T-43T1-GR10 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 52.604 71.88462257 71.885 0% 100% 71.8846 0% 100% 71.8846 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 32.35 0.00 32.35
772 2T-43T1-GR11 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 60.213 82.28250283 82.283 0% 100% 82.2825 0% 100% 82.2825 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 37.03 0.00 37.03
773 2T-43T1-GR12 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 49.678 67.88617368 67.886 0% 100% 67.8862 0% 100% 67.8862 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.55 0.00 30.55
774 2T-43T1-GR13 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 56.13 76.7029858 76.703 0% 100% 76.703 0% 100% 76.703 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 34.52 0.00 34.52
775 2T-43T1-GR14 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 59.868 81.81105209 81.811 0% 100% 81.8111 0% 100% 81.8111 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.81 0.00 36.81
776 2T-43T1-GR15 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 42.92 58.65120524 58.651 0% 100% 58.6512 0% 100% 58.6512 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 26.39 0.00 26.39
777 2T-43T1-GR16 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 43.25 59.10215813 59.102 0% 100% 59.1022 0% 100% 59.1022 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 26.60 0.00 26.60
778 2T-43T1-GR17 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 41.851 57.19039121 57.190 0% 100% 57.1904 0% 100% 57.1904 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 25.74 0.00 25.74
779 2T-43T1-GR18 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 41.851 57.19039121 57.190 0% 100% 57.1904 0% 100% 57.1904 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 25.74 0.00 25.74
780 2T-43T1-GR19 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 59.577 81.41339364 81.413 0% 100% 81.4134 0% 100% 81.4134 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.64 0.00 36.64
781 2T-43T1-GR20 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 70.404 96.20874776 96.209 0% 100% 96.2087 0% 100% 96.2087 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 43.29 0.00 43.29
782 2T-43T1-GR21 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 60.847 83.14887897 83.149 0% 100% 83.1489 0% 100% 83.1489 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 37.42 0.00 37.42
783 2T-43T1-GR22 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 50.407 68.88236959 68.882 0% 100% 68.8824 0% 100% 68.8824 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.00 0.00 31.00
784 2T-43T1-GR23 TORRE DE TRANSFERENCIA 1 GRATING LIVIANA 1 54.002 73.79502296 73.795 0% 100% 73.795 0% 100% 73.795 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 33.21 0.00 33.21

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
ACUMU
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES LADO ACTUAL (%)
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. ANTERIACTUAL (Tn.)
TOTAL (Tn.)
PESO TOTAL (Kg) ANTERI
OR (Tn.)
OR (%)
ITEM
5% 30% 10% 15% 25% 10% 5%
2,003.87 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 901.74 0.00 901.74
419 10T-43ERP-GR-1 CAJÓN DE ESCALERA GRATING LIVIANA 1 76.5 177.82 177.82 0% 100% 177.817 0% 100% 177.817 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 80.02 0.00 80.02
420 10T-43ERP-GR-2 CAJÓN DE ESCALERA GRATING LIVIANA 1 67.8 157.59 157.59 0% 100% 157.595 0% 100% 157.595 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 70.92 0.00 70.92
421 10T-43ERP-GR-3 CAJÓN DE ESCALERA GRATING LIVIANA 1 32.5 75.54 75.54 0% 100% 75.5432 0% 100% 75.5432 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 33.99 0.00 33.99
422 10T-43ERP-GR-4 CAJÓN DE ESCALERA GRATING LIVIANA 1 60.1 139.70 139.70 0% 100% 139.697 0% 100% 139.697 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 62.86 0.00 62.86
423 10T-43ERP-GR-5 CAJÓN DE ESCALERA GRATING LIVIANA 1 43.4 100.88 100.88 0% 100% 100.879 0% 100% 100.879 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 45.40 0.00 45.40
424 10T-43ERP-GR-6 CAJÓN DE ESCALERA GRATING LIVIANA 1 60.1 139.70 139.70 0% 100% 139.697 0% 100% 139.697 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 62.86 0.00 62.86
425 10T-43ERP-GR-7 CAJÓN DE ESCALERA GRATING LIVIANA 1 26.1 60.67 60.67 0% 100% 60.667 0% 100% 60.667 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 27.30 0.00 27.30
426 10T-43ERP-GR-8 CAJÓN DE ESCALERA GRATING LIVIANA 1 29.1 67.64 67.64 0% 100% 67.6402 0% 100% 67.6402 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.44 0.00 30.44
427 10T-43ERP-GR-9 CAJÓN DE ESCALERA GRATING LIVIANA 1 64 148.76 148.76 0% 100% 148.762 0% 100% 148.762 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 66.94 0.00 66.94
428 10T-43ERP-GR-10 CAJÓN DE ESCALERA GRATING LIVIANA 1 28.2 65.55 65.55 0% 100% 65.5482 0% 100% 65.5482 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.50 0.00 29.50
429 10T-43ERP-GR-11 CAJÓN DE ESCALERA GRATING LIVIANA 1 29.1 67.64 67.64 0% 100% 67.6402 0% 100% 67.6402 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.44 0.00 30.44
430 10T-43ERP-GR-12 CAJÓN DE ESCALERA GRATING LIVIANA 1 55.2 128.31 128.31 0% 100% 128.307 0% 100% 128.307 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 57.74 0.00 57.74
431 10T-43ERP-GR-13 CAJÓN DE ESCALERA GRATING LIVIANA 1 20 46.49 46.49 0% 100% 46.4881 0% 100% 46.4881 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.92 0.00 20.92
432 10T-43ERP-GR-14 CAJÓN DE ESCALERA GRATING LIVIANA 1 94.7 220.12 220.12 0% 100% 220.121 0% 100% 220.121 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 99.05 0.00 99.05
433 10T-43ERP-GR-15 CAJÓN DE ESCALERA GRATING LIVIANA 1 19.8 46.02 46.02 0% 100% 46.0232 0% 100% 46.0232 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.71 0.00 20.71
434 10T-43ERP-GR-16 CAJÓN DE ESCALERA GRATING LIVIANA 1 43 99.95 99.95 0% 100% 99.9494 0% 100% 99.9494 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 44.98 0.00 44.98
435 10T-43ERP-GR-17 CAJÓN DE ESCALERA GRATING LIVIANA 1 73.8 171.54 171.54 0% 100% 171.541 0% 100% 171.541 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 77.19 0.00 77.19
436 10T-43ERP-GR-18 CAJÓN DE ESCALERA GRATING LIVIANA 1 38.7 89.95 89.95 0% 100% 89.9545 0% 100% 89.9545 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 40.48 0.00 40.48
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
ACUM
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ULADO ACTUAL (%)
N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. PESO TOTAL (Kg)
ANTERIACTUAL (Tn.)TOTAL (Tn.)
OR (Tn.)
ANTER
ITEM
5% 30% 10% 15% 25% 10% 5%
4,638.48 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 2087.32 0.00 2087.32
308 1T-43ERK-GR-1 PLATAFORMA DE MUESTREO GRATING GRATING 2 199.754 399.507 399.507 0% 100% 399.507 0% 100% 399.507 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 179.78 0.00 179.78
309 1T-43ERK-GR-2 PLATAFORMA DE MUESTREO GRATING GRATING 2 199.754 399.507 399.507 0% 100% 399.507 0% 100% 399.507 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 179.78 0.00 179.78
310 1T-43ERK-GR-3 PLATAFORMA DE MUESTREO GRATING GRATING 1 202.154 202.154 202.154 0% 100% 202.154 0% 100% 202.154 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 90.97 0.00 90.97
311 1T-43ERK-GR-4 PLATAFORMA DE MUESTREO GRATING GRATING 2 199.754 399.507 399.507 0% 100% 399.507 0% 100% 399.507 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 179.78 0.00 179.78
312 1T-43ERK-GR-5 PLATAFORMA DE MUESTREO GRATING GRATING 2 230.054 460.107 460.107 0% 100% 460.107 0% 100% 460.107 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 207.05 0.00 207.05
313 1T-43ERK-GR-6 PLATAFORMA DE MUESTREO GRATING GRATING 2 199.754 399.507 399.507 0% 100% 399.507 0% 100% 399.507 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 179.78 0.00 179.78
314 1T-43ERK-GR-7 PLATAFORMA DE MUESTREO GRATING GRATING 4 228.554 914.215 914.215 0% 100% 914.215 0% 100% 914.215 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 411.40 0.00 411.40
315 1T-43ERK-GR-8 PLATAFORMA DE MUESTREO GRATING GRATING 4 199.754 799.015 799.015 0% 100% 799.015 0% 100% 799.015 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 359.56 0.00 359.56
316 1T-43ERK-GR-9 PLATAFORMA DE MUESTREO GRATING GRATING 2 227.154 454.307 454.307 0% 100% 454.307 0% 100% 454.307 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 204.44 0.00 204.44
317 1T-43ERK-GR-10 PLATAFORMA DE MUESTREO GRATING GRATING 1 210.654 210.654 210.654 0% 100% 210.654 0% 100% 210.654 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 94.79 0.00 94.79
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESCALERA- EDIFICIO DE RECEPCIÓN DE CAMIONES

ACUMULA
ACUM.
PUESTO EN OBRA MONTAJE PROTOCOLOS DO ACTUAL TOTAL
TOTAL O.C. ACTUAL (%) ANTERI
ITEM N° PLANO
ESTRUCTURA DESCRIPCIÓN TIPO CANT. UNIT. ANTERIO (Tn.) (Un.)
(UND.) OR (Un.)
FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES R (%)
5% 30% 10% 15% 25% 10% 5%
1.1000 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 0.50 0.00 0.50
1 1T-43ERK-ES-1
PLATAFORMA
ESCALERA
DE MUESTREO ESCALERA 1 0.550 0.550 0.55 0% 100% 0.55 0% 100% 0.55 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.25 0.00 0.25
2 1T-43ERK-ES-2
PLATAFORMA
ESCALERA
DE MUESTREO ESCALERA 1 0.550 0.550 0.55 0% 100% 0.55 0% 100% 0.55 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.25 0.00 0.25
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA - PLANTA DE AIRE

ACUMULA
LEVANTAMIENTO ACUM.
PESO DO ACTUAL ACTUAL TOTAL
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS ANTERIOR
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL OBSERVACIONES ANTERIOR (%) (Tn.) (Tn.)
(Tn.)
(Kg) (%)
5% 30% 10% 15% 25% 10% 5%
1,967.350 Σ Anterior Actual % Actual % Total Σ Anterior Actual % Actual % Total Σ Anterior Actual % Actual % Total Σ Anterior Actual % Actual % Total Σ Anterior Actual % Actual % Total Σ Anterior Actual % Actual % Total Σ Anterior Actual % Actual % Total 37% 0.00% 725.07 0.00 725.07
192 1T-43ERC-AR1 PLANTA DE AIRE ARRIOSTRE LIVIANA 2 23.341 46.681 46.68 0% 100% 46.68102 0% 100% 46.681 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.01 0.00 21.01
193 1T-43ERC-AR2 PLANTA DE AIRE ARRIOSTRE LIVIANA 2 50.092 100.184 100.18 0% 100% 100.1841 0% 100% 100.184 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 45.08 0.00 45.08
194 1T-43ERC-AR3 PLANTA DE AIRE ARRIOSTRE LIVIANA 2 22.414 44.828 44.83 0% 100% 44.83 0% 100% 44.8276 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.17 0.00 20.17
195 1T-43ERC-CO1 PLANTA DE AIRE COLUMNA LIVIANA 1 82.836 82.836 82.84 0% 100% 82.84 0% 100% 82.8364 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 37.28 0.00 37.28
196 1T-43ERC-CO2 PLANTA DE AIRE COLUMNA LIVIANA 1 81.601 81.601 81.60 0% 100% 81.60 0% 100% 81.6008 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.72 0.00 36.72
197 1T-43ERC-CO3 PLANTA DE AIRE COLUMNA LIVIANA 1 73.260 73.260 73.26 0% 100% 73.26 0% 100% 73.2602 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 32.97 0.00 32.97
198 1T-43ERC-CO4 PLANTA DE AIRE COLUMNA LIVIANA 1 82.836 82.836 82.84 0% 100% 82.84 0% 100% 82.8364 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 37.28 0.00 37.28
199 1T-43ERC-CO5 PLANTA DE AIRE COLUMNA LIVIANA 1 81.601 81.601 81.60 0% 100% 81.60 0% 100% 81.6008 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.72 0.00 36.72
200 1T-43ERC-CO6 PLANTA DE AIRE COLUMNA LIVIANA 1 73.260 73.260 73.26 0% 100% 73.26 0% 100% 73.2602 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 32.97 0.00 32.97
201 1T-43ERC-VG1 PLANTA DE AIRE VIGA LIVIANA 2 56.826 113.653 113.65 0% 100% 113.65 0% 100% 113.653 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 51.14 0.00 51.14
202 1T-43ERC-VG2 PLANTA DE AIRE VIGA LIVIANA 1 69.430 69.430 69.43 0% 100% 69.43 0% 100% 69.4297 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.24 0.00 31.24
203 1T-43ERC-VG3 PLANTA DE AIRE VIGA LIVIANA 2 48.239 96.477 96.48 0% 100% 96.48 0% 100% 96.4772 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 43.41 0.00 43.41
204 1T-43ERC-VG4 PLANTA DE AIRE VIGA LIVIANA 1 67.823 67.823 67.82 0% 100% 67.82 0% 100% 67.8234 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.52 0.00 30.52
205 1T-43ERC-VG5 PLANTA DE AIRE VIGA LIVIANA 2 43.976 87.951 87.95 0% 100% 87.95 0% 100% 87.9513 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 39.58 0.00 39.58
206 1T-43ERC-VG6 PLANTA DE AIRE VIGA LIVIANA 1 69.430 69.430 69.43 0% 100% 69.43 0% 100% 69.4297 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.24 0.00 31.24
227 1T-43ERC-TE7 PLANTA DE AIRE ANGULO LIVIANA 2 3.261 6.523 6.52 0% 100% 6.52 0% 100% 6.52285 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.94 0.00 2.94
274 1T-43ERC-CS1 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
275 1T-43ERC-CS2 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.61 0.00 0.61
276 1T-43ERC-CS3 PLANTA DE AIRE COSTANERA LIVIANA 1 11.849 11.849 11.85 0% 100% 11.85 0% 100% 11.8491 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.33 0.00 5.33
277 1T-43ERC-CS4 PLANTA DE AIRE COSTANERA LIVIANA 1 11.849 11.849 11.85 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.59 0.00 0.59
278 1T-43ERC-CS5 PLANTA DE AIRE COSTANERA LIVIANA 1 6.351 6.351 6.35 0% 100% 6.35 0% 100% 6.35051 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.86 0.00 2.86
279 1T-43ERC-CS6 PLANTA DE AIRE COSTANERA LIVIANA 1 6.351 6.351 6.35 0% 100% 6.35 0% 100% 6.35051 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.86 0.00 2.86
280 1T-43ERC-CS7 PLANTA DE AIRE COSTANERA LIVIANA 4 11.849 47.396 47.40 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 2.37 0.00 2.37
281 1T-43ERC-CS8 PLANTA DE AIRE COSTANERA LIVIANA 1 11.849 11.849 11.85 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.59 0.00 0.59
282 1T-43ERC-CS9 PLANTA DE AIRE COSTANERA LIVIANA 2 12.282 24.563 24.56 0% 100% 24.56 0% 100% 24.5631 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.05 0.00 11.05
283 1T-43ERC-CS10 PLANTA DE AIRE COSTANERA LIVIANA 5 12.282 61.408 61.41 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 3.07 0.00 3.07
284 1T-43ERC-CS11 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
285 1T-43ERC-CS12 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
286 1T-43ERC-CS13 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
287 1T-43ERC-CS14 PLANTA DE AIRE COSTANERA LIVIANA 2 8.513 17.026 17.03 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.85 0.00 0.85
288 1T-43ERC-CS15 PLANTA DE AIRE COSTANERA LIVIANA 2 17.904 35.807 35.81 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 1.79 0.00 1.79
289 1T-43ERC-CS16 PLANTA DE AIRE COSTANERA LIVIANA 2 17.409 34.819 34.82 0% 100% 34.82 0% 100% 34.8189 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.67 0.00 15.67
290 1T-43ERC-CS17 PLANTA DE AIRE COSTANERA LIVIANA 2 12.282 24.563 24.56 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 1.23 0.00 1.23
291 1T-43ERC-CS18 PLANTA DE AIRE COSTANERA LIVIANA 1 11.849 11.849 11.85 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.59 0.00 0.59
292 1T-43ERC-CS19 PLANTA DE AIRE COSTANERA LIVIANA 2 12.282 24.563 24.56 0% 100% 24.56 0% 100% 24.5631 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.05 0.00 11.05
293 1T-43ERC-CS20 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
294 1T-43ERC-CS21 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
295 1T-43ERC-CS22 PLANTA DE AIRE COSTANERA LIVIANA 1 10.861 10.861 10.86 0% 100% 10.86 0% 100% 10.8606 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.89 0.00 4.89
296 1T-43ERC-CS23 PLANTA DE AIRE COSTANERA LIVIANA 1 17.965 17.965 17.97 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.90 0.00 0.90
297 1T-43ERC-CS24 PLANTA DE AIRE COSTANERA LIVIANA 1 17.409 17.409 17.41 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.87 0.00 0.87
298 1T-43ERC-CS25 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
299 1T-43ERC-CS26 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
300 1T-43ERC-CS27 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
301 1T-43ERC-CS28 PLANTA DE AIRE COSTANERA LIVIANA 2 12.282 24.563 24.56 0% 100% 24.56 0% 100% 24.5631 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.05 0.00 11.05
302 1T-43ERC-CS29 PLANTA DE AIRE COSTANERA LIVIANA 2 8.513 17.026 17.03 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.85 0.00 0.85
303 1T-43ERC-CS30 PLANTA DE AIRE COSTANERA LIVIANA 1 6.351 6.351 6.35 0% 100% 6.35 0% 100% 6.35051 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.86 0.00 2.86
304 1T-43ERC-CS31 PLANTA DE AIRE COSTANERA LIVIANA 1 6.351 6.351 6.35 0% 100% 6.35 0% 100% 6.35051 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.86 0.00 2.86
305 1T-43ERC-CS32 PLANTA DE AIRE COSTANERA LIVIANA 1 12.282 12.282 12.28 0% 100% 12.28 0% 100% 12.2816 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.53 0.00 5.53
318 1T-43ERC-IN1 PLANTA DE AIRE INSERTO LIVIANA 24 2.891 69.378 69.38 0% 100% 3.10 0% 4% 69.3776 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 16% 0.00% 11.34 0.00 11.34
322 1T-43ERC-PL1 PLANTA DE AIRE PLANTILLA LIVIANA 6 5.115 30.689 30.69 0% 100% 5.11 0% 17% 30.6893 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 6.14 0.00 6.14
332 1T-43ERC-TE1 PLANTA DE AIRE TEMPLADOR LIVIANA 16 2.829 45.263 45.26 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 2.26 0.00 2.26
333 1T-43ERC-TE2 PLANTA DE AIRE TEMPLADOR LIVIANA 4 2.149 8.597 8.60 0% 100% 8.60 0% 100% 8.59741 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.87 0.00 3.87
334 1T-43ERC-TE3 PLANTA DE AIRE TEMPLADOR LIVIANA 2 2.149 4.299 4.30 0% 100% 4.30 0% 100% 4.2987 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.93 0.00 1.93
335 1T-43ERC-TE4 PLANTA DE AIRE TEMPLADOR LIVIANA 4 2.520 10.080 10.08 0% 100% 10.08 0% 100% 10.0802 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.54 0.00 4.54
336 1T-43ERC-TE5 PLANTA DE AIRE TEMPLADOR LIVIANA 8 5.053 40.425 40.42 0% 100% 40.42 0% 100% 40.4248 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.19 0.00 18.19
337 1T-43ERC-TE6 PLANTA DE AIRE TEMPLADOR LIVIANA 4 2.520 10.080 10.08 0% 100% 10.08 0% 100% 10.0802 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.54 0.00 4.54
338 1T-43ERC-TE8 PLANTA DE AIRE TEMPLADOR LIVIANA 1 2.149 2.149 2.15 0% 100% 2.15 0% 100% 2.14935 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.97 0.00 0.97
339 1T-43ERC-TE9 PLANTA DE AIRE TEMPLADOR LIVIANA 1 2.149 2.149 2.15 0% 100% 2.15 0% 100% 2.14935 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.97 0.00 0.97
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA - CAJON DE ESCALERAS

PESO TOTAL O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACUMULADO ACUM.
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. ACTUAL (%) ACTUAL (Tn.) TOTAL (Tn.)
(Kg) ANTERIOR (%) ANTERIOR (Tn.)

5% 30% 10% 15% 25% 10% 5%


4,528.15 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 2,037.67 0 2037.67
1210 5T-43ERE-ES-1 ESCALERA ESCALERA LIVIANA 1 133.97 133.97 133.9685811 0% 100% 133.9685811 0% 100% 133.9685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 60.29 0.00 60.29
1211 5T-43ERE-ES-2 ESCALERA ESCALERA LIVIANA 1 133.97 133.97 133.9685811 0% 100% 133.9685811 0% 100% 133.9685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 60.29 0.00 60.29
1212 5T-43ERE-ES-3 ESCALERA ESCALERA LIVIANA 1 134.17 134.17 134.1685811 0% 100% 134.1685811 0% 100% 134.1685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 60.38 0.00 60.38
1213 5T-43ERE-ES-4 ESCALERA ESCALERA LIVIANA 1 134.17 134.17 134.1685811 0% 100% 134.1685811 0% 100% 134.1685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 60.38 0.00 60.38
1214 5T-43ERE-ES-5 ESCALERA ESCALERA LIVIANA 1 107.57 107.57 107.5685811 0% 100% 107.5685811 0% 100% 107.5685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 48.41 0.00 48.41
1215 5T-43ERE-ES-6 ESCALERA ESCALERA LIVIANA 1 133.97 133.97 133.9685811 0% 100% 133.9685811 0% 100% 133.9685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 60.29 0.00 60.29
1216 5T-43ERE-ES-7 ESCALERA ESCALERA LIVIANA 1 107.57 107.57 107.5685811 0% 100% 107.5685811 0% 100% 107.5685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 48.41 0.00 48.41
1217 5T-43ERE-ES-8 ESCALERA ESCALERA LIVIANA 1 133.97 133.97 133.9685811 0% 100% 133.9685811 0% 100% 133.9685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 60.29 0.00 60.29
1218 5T-43ERE-AR-2 ESCALERA ARRIOSTRE LIVIANA 3 16.67 50.01 50.00574324 0% 100% 50.00574324 0% 100% 50.00574324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 22.50 0.00 22.50
1219 5T-43ERE-AR-5 ESCALERA ARRIOSTRE LIVIANA 1 15.37 15.37 15.36858108 0% 100% 15.36858108 0% 100% 15.36858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.92 0.00 6.92
1220 5T-43ERD-AR1 TECHO ARRIOSTRE LIVIANA 1 39.97 39.97 39.96858108 0% 100% 39.96858108 0% 100% 39.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.99 0.00 17.99
1221 5T-43ERD-AR3 TECHO ARRIOSTRE LIVIANA 1 41.57 41.57 41.56858108 0% 100% 41.56858108 0% 100% 41.56858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.71 0.00 18.71
1222 5T-43ERD-AR4 TECHO ARRIOSTRE LIVIANA 1 39.97 39.97 39.96858108 0% 100% 39.96858108 0% 100% 39.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.99 0.00 17.99
1223 5T-43ERD-AR6 TECHO ARRIOSTRE LIVIANA 1 41.57 41.57 41.56858108 0% 100% 41.56858108 0% 100% 41.56858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.71 0.00 18.71
1224 5T-43ERD-CO1 TECHO COLUMNA LIVIANA 1 111.37 111.37 111.3685811 0% 100% 111.3685811 0% 100% 111.3685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 50.12 0.00 50.12
1225 5T-43ERD-CO2 TECHO COLUMNA LIVIANA 1 111.37 111.37 111.3685811 0% 100% 111.3685811 0% 100% 111.3685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 50.12 0.00 50.12
1226 5T-43ERD-CO3 TECHO COLUMNA LIVIANA 1 112.97 112.97 112.9685811 0% 100% 112.9685811 0% 100% 112.9685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 50.84 0.00 50.84
1227 5T-43ERD-CO4 TECHO COLUMNA LIVIANA 1 111.37 111.37 111.3685811 0% 100% 111.3685811 0% 100% 111.3685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 50.12 0.00 50.12
1228 5T-43ERD-VG1 TECHO VIGA LIVIANA 1 98.37 98.37 98.36858108 0% 100% 98.36858108 0% 100% 98.36858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 44.27 0.00 44.27
1229 5T-43ERD-VG2 TECHO VIGA LIVIANA 1 79.47 79.47 79.46858108 0% 100% 79.46858108 0% 100% 79.46858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 35.76 0.00 35.76
1230 5T-43ERD-VG3 TECHO VIGA LIVIANA 1 129.87 129.87 129.8685811 0% 100% 129.8685811 0% 100% 129.8685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 58.44 0.00 58.44
1231 5T-43ERD-VG4 TECHO VIGA LIVIANA 1 128.27 128.27 128.2685811 0% 100% 128.2685811 0% 100% 128.2685811 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 57.72 0.00 57.72
1232 5T-43ERD-VG5 TECHO VIGA LIVIANA 1 98.37 98.37 98.36858108 0% 100% 98.36858108 0% 100% 98.36858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 44.27 0.00 44.27
1233 5T-43ERE-VG-1 ESCALERA VIGA LIVIANA 3 41.27 123.81 123.8057432 0% 100% 123.8057432 0% 100% 123.8057432 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 55.71 0.00 55.71
1234 5T-43ERE-VG-2 ESCALERA VIGA LIVIANA 4 41.27 165.07 165.0743243 0% 100% 165.0743243 0% 100% 165.0743243 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 74.28 0.00 74.28
1242 5T-43ERE-CN-1 ESCALERA CONECTOR LIVIANA 3 15.97 47.91 47.90574324 0% 100% 47.90574324 0% 100% 47.90574324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.56 0.00 21.56
1243 5T-43ERE-CN-2 ESCALERA CONECTOR LIVIANA 3 16.67 50.01 50.00574324 0% 100% 50.00574324 0% 100% 50.00574324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 22.50 0.00 22.50
1244 5T-43ERE-CN-3 ESCALERA CONECTOR LIVIANA 2 15.97 31.94 31.93716216 0% 100% 31.93716216 0% 100% 31.93716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 14.37 0.00 14.37
1245 5T-43ERE-CN-4 ESCALERA CONECTOR LIVIANA 2 16.77 33.54 33.53716216 0% 100% 33.53716216 0% 100% 33.53716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.09 0.00 15.09
1246 5T-43ERE-CN-5 ESCALERA CONECTOR LIVIANA 2 16.67 33.34 33.33716216 0% 100% 33.33716216 0% 100% 33.33716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.00 0.00 15.00
1247 5T-43ERE-CN-6 ESCALERA CONECTOR LIVIANA 2 16.77 33.54 33.53716216 0% 100% 33.53716216 0% 100% 33.53716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.09 0.00 15.09
1248 5T-43ERE-CN-7 ESCALERA CONECTOR LIVIANA 2 16.77 33.54 33.53716216 0% 100% 33.53716216 0% 100% 33.53716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.09 0.00 15.09
1249 5T-43ERE-CN-8 ESCALERA CONECTOR LIVIANA 2 16.67 33.34 33.33716216 0% 100% 33.33716216 0% 100% 33.33716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.00 0.00 15.00
1250 5T-43ERE-CN-9 ESCALERA CONECTOR LIVIANA 1 16.77 16.77 16.76858108 0% 100% 16.76858108 0% 100% 16.76858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.55 0.00 7.55
1251 5T-43ERE-CN-10 ESCALERA CONECTOR LIVIANA 1 15.97 15.97 15.96858108 0% 100% 15.96858108 0% 100% 15.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.19 0.00 7.19
1252 5T-43ERE-AR-1 ESCALERA ARRIOSTRE LIVIANA 3 15.37 46.11 46.10574324 0% 100% 46.10574324 0% 100% 46.10574324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.75 0.00 20.75
1253 5T-43ERE-AR-3 ESCALERA ARRIOSTRE LIVIANA 3 15.37 46.11 46.10574324 0% 100% 46.10574324 0% 100% 46.10574324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.75 0.00 20.75
1254 5T-43ERE-AR-4 ESCALERA ARRIOSTRE LIVIANA 4 16.47 65.87 65.87432432 0% 100% 65.87432432 0% 100% 65.87432432 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.64 0.00 29.64
1255 5T-43ERD-AR2 TECHO ARRIOSTRE LIVIANA 1 80.37 80.37 80.36858108 0% 100% 80.36858108 0% 100% 80.36858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.17 0.00 36.17
1256 5T-43ERD-AR5 TECHO ARRIOSTRE LIVIANA 1 80.37 80.37 80.36858108 0% 100% 80.36858108 0% 100% 80.36858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.17 0.00 36.17
1257 5T-43ERE-IN-1 ESCALERA INSERTO LIVIANA 6 14.17 85.01 85.01148649 0% 100% 85.01148649 0% 100% 85.01148649 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 38.26 0.00 38.26
1258 5T-43ERE-IN-2 ESCALERA INSERTO LIVIANA 1 20.97 20.97 20.96858108 0% 100% 20.96858108 0% 100% 20.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.44 0.00 9.44
1259 5T-43ERE-IN-3 ESCALERA INSERTO LIVIANA 2 20.97 41.94 41.93716216 0% 100% 41.93716216 0% 100% 41.93716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.87 0.00 18.87
1260 5T-43ERE-IN-4 ESCALERA INSERTO LIVIANA 2 14.17 28.34 28.33716216 0% 100% 28.33716216 0% 100% 28.33716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.75 0.00 12.75
1266 5T-43ERD-TE11 TECHO ANGULO LIVIANA 1 10.17 10.17 10.16858108 0% 100% 10.16858108 0% 100% 10.16858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.58 0.00 4.58
1403 5T-43ERD-CS1 TECHO COSTANERA LIVIANA 2 26.87 53.74 53.73716216 0% 100% 53.73716216 0% 100% 53.73716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.18 0.00 24.18
1404 5T-43ERD-CS2 TECHO COSTANERA LIVIANA 2 26.87 53.74 53.73716216 0% 100% 53.73716216 0% 100% 53.73716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.18 0.00 24.18
1405 5T-43ERD-CS3 TECHO COSTANERA LIVIANA 2 26.87 53.74 53.73716216 0% 100% 53.73716216 0% 100% 53.73716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.18 0.00 24.18
1406 5T-43ERD-CS4 TECHO COSTANERA LIVIANA 2 26.87 53.74 53.73716216 0% 100% 53.73716216 0% 100% 53.73716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.18 0.00 24.18
1407 5T-43ERD-CS5 TECHO COSTANERA LIVIANA 1 28.57 28.57 28.56858108 0% 100% 28.56858108 0% 100% 28.56858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.86 0.00 12.86
1408 5T-43ERD-CS6 TECHO COSTANERA LIVIANA 2 28.57 57.14 57.13716216 0% 100% 57.13716216 0% 100% 57.13716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 25.71 0.00 25.71
1409 5T-43ERD-CS7 TECHO COSTANERA LIVIANA 1 26.87 26.87 26.86858108 0% 100% 26.86858108 0% 100% 26.86858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.09 0.00 12.09
1410 5T-43ERD-CS8 TECHO COSTANERA LIVIANA 1 26.87 26.87 26.86858108 0% 100% 26.86858108 0% 100% 26.86858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.09 0.00 12.09
1411 5T-43ERD-CS9 TECHO COSTANERA LIVIANA 1 21.67 21.67 21.66858108 0% 100% 21.66858108 0% 100% 21.66858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.75 0.00 9.75
1412 5T-43ERD-CS10 TECHO COSTANERA LIVIANA 1 35.87 35.87 35.86858108 0% 100% 35.86858108 0% 100% 35.86858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.14 0.00 16.14
1413 5T-43ERD-CS11 TECHO COSTANERA LIVIANA 2 35.87 71.74 71.73716216 0% 100% 71.73716216 0% 100% 71.73716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 32.28 0.00 32.28
1414 5T-43ERD-CS12 TECHO COSTANERA LIVIANA 1 13.37 13.37 13.36858108 0% 100% 13.36858108 0% 100% 13.36858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.02 0.00 6.02
1415 5T-43ERD-CS13 TECHO COSTANERA LIVIANA 1 21.17 21.17 21.16858108 0% 100% 21.16858108 0% 100% 21.16858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.53 0.00 9.53
1416 5T-43ERD-CS14 TECHO COSTANERA LIVIANA 3 9.87 29.61 29.60574324 0% 100% 29.60574324 0% 100% 29.60574324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 13.32 0.00 13.32
1417 5T-43ERD-CS15 TECHO COSTANERA LIVIANA 1 26.87 26.87 26.86858108 0% 100% 26.86858108 0% 100% 26.86858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.09 0.00 12.09
1418 5T-43ERD-CS16 TECHO COSTANERA LIVIANA 2 19.47 38.94 38.93716216 0% 100% 38.93716216 0% 100% 38.93716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.52 0.00 17.52
1419 5T-43ERD-CS17 TECHO COSTANERA LIVIANA 1 26.87 26.87 26.86858108 0% 100% 26.86858108 0% 100% 26.86858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.09 0.00 12.09
1420 5T-43ERD-CS18 TECHO COSTANERA LIVIANA 2 19.47 38.94 38.93716216 0% 100% 38.93716216 0% 100% 38.93716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.52 0.00 17.52
1421 5T-43ERD-CS19 TECHO COSTANERA LIVIANA 1 26.87 26.87 26.86858108 0% 100% 26.86858108 0% 100% 26.86858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.09 0.00 12.09
1422 5T-43ERD-CS20 TECHO COSTANERA LIVIANA 1 26.87 26.87 26.86858108 0% 100% 26.86858108 0% 100% 26.86858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.09 0.00 12.09
1423 5T-43ERD-CS21 TECHO COSTANERA LIVIANA 2 26.87 53.74 53.73716216 0% 100% 53.73716216 0% 100% 53.73716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.18 0.00 24.18
1451 5T-43ERD-IN-1 TECHO INSERTO LIVIANA 16 9.97 159.50 159.4972973 0% 100% 159.4972973 0% 100% 159.4972973 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 71.77 0.00 71.77
1504 5T-43ERD-TE1 TECHO TEMPLADOR LIVIANA 1 8.47 8.47 8.468581081 0% 100% 8.468581081 0% 100% 8.468581081 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.81 0.00 3.81
1505 5T-43ERD-TE2 TECHO TEMPLADOR LIVIANA 11 8.87 97.55 97.55439189 0% 100% 97.55439189 0% 100% 97.55439189 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 43.90 0.00 43.90
1506 5T-43ERD-TE3 TECHO TEMPLADOR LIVIANA 3 9.07 27.21 27.20574324 0% 100% 27.20574324 0% 100% 27.20574324 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.24 0.00 12.24
1507 5T-43ERD-TE4 TECHO TEMPLADOR LIVIANA 1 9.07 9.07 9.068581081 0% 100% 9.068581081 0% 100% 9.068581081 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.08 0.00 4.08
ESTRUCTURA - CAJON DE ESCALERAS

PESO TOTAL O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACUMULADO ACUM.
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. ACTUAL (%) ACTUAL (Tn.) TOTAL (Tn.)
(Kg) ANTERIOR (%) ANTERIOR (Tn.)

5% 30% 10% 15% 25% 10% 5%


4,528.15 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 2,037.67 0 2037.67
1508 5T-43ERD-TE5 TECHO TEMPLADOR LIVIANA 1 8.57 8.57 8.568581081 0% 100% 8.568581081 0% 100% 8.568581081 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.86 0.00 3.86
1509 5T-43ERD-TE6 TECHO TEMPLADOR LIVIANA 2 8.47 16.94 16.93716216 0% 100% 16.93716216 0% 100% 16.93716216 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.62 0.00 7.62
1510 5T-43ERD-TE7 TECHO TEMPLADOR LIVIANA 1 8.87 8.87 8.868581081 0% 100% 8.868581081 0% 100% 8.868581081 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.99 0.00 3.99
1511 5T-43ERD-TE8 TECHO TEMPLADOR LIVIANA 1 12.97 12.97 12.96858108 0% 100% 12.96858108 0% 100% 12.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.84 0.00 5.84
1512 5T-43ERD-TE9 TECHO TEMPLADOR LIVIANA 1 12.97 12.97 12.96858108 0% 100% 12.96858108 0% 100% 12.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.84 0.00 5.84
1513 5T-43ERD-TE10 TECHO TEMPLADOR LIVIANA 1 12.97 12.97 12.96858108 0% 100% 12.96858108 0% 100% 12.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.84 0.00 5.84
1514 5T-43ERD-TE12 TECHO TEMPLADOR LIVIANA 1 12.97 12.97 12.96858108 0% 100% 12.96858108 0% 100% 12.96858108 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.84 0.00 5.84
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
BARANDAS- CAJON DE ESCALERAS

ACUMU ACUM.
LONGIT
LEVANTAMIENTO LADO ACTUA ANTERI ACTUA TOTAL
ESTRUCTUR DESCRIPCI PESO UD O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS
ITEM N° PLANO TIPO CANT. OBSERVACIONES ANTERI L (%) OR L (Tn.) (Tn.)
A ÓN UNIT. TOTAL
OR (%) (Tn.)
(Kg)
5% 30% 10% 15% 25% 10% 5%
29.15 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 13.12 0.00 13.12
1 5T-43ERE-BA-1 ESCALERA BARANDA LIVIANA 1 5.01 5.01 5.01 0% 100% 5.01 0% 100% 5.01 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 2.25 0.00 2.25
2 5T-43ERE-BA-2 ESCALERA BARANDA LIVIANA 1 2.93 2.93 2.93 0% 100% 2.93 0% 100% 2.93 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.32 0.00 1.32
3 5T-43ERE-BA-3 ESCALERA BARANDA LIVIANA 1 2.92 2.92 2.92 0% 100% 2.92 0% 100% 2.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.31 0.00 1.31
4 5T-43ERE-BA-4 ESCALERA BARANDA LIVIANA 1 3.95 3.95 3.95 0% 100% 3.95 0% 100% 3.95 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.78 0.00 1.78
5 5T-43ERE-BA-5 ESCALERA BARANDA LIVIANA 1 3.95 3.95 3.95 0% 100% 3.95 0% 100% 3.95 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.78 0.00 1.78
6 5T-43ERE-BA-6 ESCALERA BARANDA LIVIANA 1 2.95 2.95 2.95 0% 100% 2.95 0% 100% 2.95 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.33 0.00 1.33
7 5T-43ERE-BA-7 ESCALERA BARANDA LIVIANA 1 4.02 4.02 4.02 0% 100% 4.02 0% 100% 4.02 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.81 0.00 1.81
8 5T-43ERE-BA-8 ESCALERA BARANDA LIVIANA 1 3.42 3.42 3.42 0% 100% 3.42 0% 100% 3.42 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0% 1.54 0.00 1.54

7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA LIVIANA - LAVADO DE CAMIONES
ACUMUL
ACUM.
PESO ADO
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%)ANTERIACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERI
OR (Tn.)
(Kg) OR (%)
5% 30% 10% 15% 25% 10% 5%
939.07 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 422.58 0.00 422.58
1 9T-43T9-D-1
LAVADO DE CAMIONES ANGULO LIVIANA 2 6.64 13.29 13.28612 0% 100% 13.28612 0% 100% 13.28612 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.98 0.00 5.98
2 9T-43T9-MI-1
LAVADO DE CAMIONES ANGULO LIVIANA 2 42.55 85.10 85.10495 0% 100% 85.10495 0% 100% 85.10495 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 38.30 0.00 38.30
3 9T-43T9-MI-2
LAVADO DE CAMIONES ANGULO LIVIANA 1 33.47 33.47 33.47363 0% 100% 33.47363 0% 100% 33.47363 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.06 0.00 15.06
4 9T-43T9-MI-3
LAVADO DE CAMIONES ANGULO LIVIANA 1 52.37 52.37 52.36944 0% 100% 52.36944 0% 100% 52.36944 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.57 0.00 23.57
5 9T-43T9-PM-1
LAVADO DE CAMIONES ANGULO LIVIANA 1 20.56 20.56 20.55657 0% 100% 20.55657 0% 100% 20.55657 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.25 0.00 9.25
6 9T-43T9-PM-2
LAVADO DE CAMIONES ANGULO LIVIANA 1 16.09 16.09 16.09096 0% 100% 16.09096 0% 100% 16.09096 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.24 0.00 7.24
7 9T-43T9-PM-3
LAVADO DE CAMIONES ANGULO LIVIANA 1 19.52 19.52 19.52321 0% 100% 19.52321 0% 100% 19.52321 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.79 0.00 8.79
8 9T-43T9-PM-4
LAVADO DE CAMIONES ANGULO LIVIANA 1 20.56 20.56 20.55657 0% 100% 20.55657 0% 100% 20.55657 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.25 0.00 9.25
9 9T-43T9-PM-5
LAVADO DE CAMIONES ANGULO LIVIANA 4 29.89 119.58 119.575 0% 100% 119.575 0% 100% 119.575 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 53.81 0.00 53.81
10 9T-43T9-PM-6
LAVADO DE CAMIONES ANGULO LIVIANA 2 19.30 38.60 38.60355 0% 100% 38.60355 0% 100% 38.60355 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.37 0.00 17.37
11 9T-43T9-PM-7
LAVADO DE CAMIONES ANGULO LIVIANA 2 29.71 59.42 59.41846 0% 100% 59.41846 0% 100% 59.41846 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 26.74 0.00 26.74
12 9T-43T9-PM-8
LAVADO DE CAMIONES ANGULO LIVIANA 1 22.00 22.00 21.9959 0% 100% 21.9959 0% 100% 21.9959 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.90 0.00 9.90
13 9T-43T9-PM-9
LAVADO DE CAMIONES ANGULO LIVIANA 1 17.64 17.64 17.64101 0% 100% 17.64101 0% 100% 17.64101 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.94 0.00 7.94
14 9T-43T9-PM-10
LAVADO DE CAMIONES ANGULO LIVIANA 1 6.16 6.16 6.163281 0% 100% 6.163281 0% 100% 6.163281 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.77 0.00 2.77
15 9T-43T9-CS-1
LAVADO DE CAMIONES COSTANERA LIVIANA 4 5.06 20.22 20.22442 0% 100% 20.22442 0% 100% 20.22442 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.10 0.00 9.10
16 9T-43T9-CS-2
LAVADO DE CAMIONES COSTANERA LIVIANA 4 5.06 20.22 20.22442 0% 100% 20.22442 0% 100% 20.22442 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.10 0.00 9.10
17 9T-43T9-GR-1
LAVADO DE CAMIONES GRATING LIVIANA 5 13.43 67.17 67.16869 0% 100% 67.16869 0% 100% 67.16869 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.23 0.00 30.23
18 9T-43T9-IN-1
LAVADO DE CAMIONES INSERTO LIVIANA 16 0.55 8.86 8.85741 0% 100% 8.85741 0% 100% 8.85741 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.99 0.00 3.99
19 9T-43T9-IN-2
LAVADO DE CAMIONES INSERTO LIVIANA 28 0.33 9.30 9.300281 0% 100% 9.300281 0% 100% 9.300281 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.19 0.00 4.19
20 9T-43T9-SP-1
LAVADO DE CAMIONES PLACA LIVIANA 1 3.06 3.06 3.063188 0% 100% 3.063188 0% 100% 3.063188 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.38 0.00 1.38
21 9T-43T9-SP-2
LAVADO DE CAMIONES PLACA LIVIANA 1 3.06 3.06 3.063188 0% 100% 3.063188 0% 100% 3.063188 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.38 0.00 1.38
22 9T-43T9-ES-1
LAVADO DE CAMIONES PLATINA LIVIANA 1 51.63 51.63 51.63132 0% 100% 51.63132 0% 100% 51.63132 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.23 0.00 23.23
23 9T-43T9-PO-1
LAVADO DE CAMIONES VIGA LIVIANA 1 47.20 47.20 47.20261 0% 100% 47.20261 0% 100% 47.20261 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.24 0.00 21.24
24 9T-43T9-PO-2
LAVADO DE CAMIONES VIGA LIVIANA 1 44.84 44.84 44.84064 0% 100% 44.84064 0% 100% 44.84064 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.18 0.00 20.18
25 9T-43T9-PO-3
LAVADO DE CAMIONES VIGA LIVIANA 1 56.02 56.02 56.02312 0% 100% 56.02312 0% 100% 56.02312 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 25.21 0.00 25.21
26 9T-43T9-VG-1
LAVADO DE CAMIONES VIGA LIVIANA 4 8.34 33.36 33.36291 0% 100% 33.36291 0% 100% 33.36291 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.01 0.00 15.01
27 9T-43T9-VG-2
LAVADO DE CAMIONES VIGA LIVIANA 4 8.30 33.22 33.21529 0% 100% 33.21529 0% 100% 33.21529 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 14.95 0.00 14.95
28 9T-43T9-VG-3
LAVADO DE CAMIONES VIGA LIVIANA 2 8.27 16.53 16.53383 0% 100% 16.53383 0% 100% 16.53383 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.44 0.00 7.44
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESCALERA - LAVADO DE CAMIONES

ACUMUL
PESO ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
ACTUAL (%)ANTERI ACTUAL (Tn.) TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURADESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERI
(Kg) OR (Tn.)
OR (%)
5% 30% 10% 15% 25% 10% 5%
139.3 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 62.69 0.00 62.69
1 9T-43T9-ES-1 L4X4X3/8 ANGULO LIVIANA 2 1.10 2.20 2.2 0% 100% 2.2 0% 100% 2.2 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.99 0.00 0.99
2 9T-43T9-ES-2 BARRA_LISA_Ø3/4"
PELDAÑO LIVIANA 14 0.90 12.60 12.6 0% 100% 12.6 0% 100% 12.6 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.67 0.00 5.67
3 9T-43T9-ES-3 PL9X120 PLACA LIVIANA 4 1.80 7.20 7.2 0% 100% 7.2 0% 100% 7.2 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.24 0.00 3.24
4 9T-43T9-ES-4 PL9X80 PLACA LIVIANA 2 1.30 2.60 2.6 0% 100% 2.6 0% 100% 2.6 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.17 0.00 1.17
5 9T-43T9-ES-5 PL9X76 PLATINA LIVIANA 1 27.90 27.90 27.9 0% 100% 27.9 0% 100% 27.9 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.56 0.00 12.56
6 9T-43T9-ES-6 PL9X76 PLATINA LIVIANA 1 27.90 27.90 27.9 0% 100% 27.9 0% 100% 27.9 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.56 0.00 12.56
7 9T-43T9-ES-7 PL6X32 PLATINA LIVIANA 1 4.50 4.50 4.5 0% 100% 4.5 0% 100% 4.5 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.03 0.00 2.03
8 9T-43T9-ES-8 PL6X32 PLATINA LIVIANA 2 4.50 9.00 9 0% 100% 9 0% 100% 9 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.05 0.00 4.05
9 9T-43T9-ES-9 PL6X64 PLATINA LIVIANA 2 7.10 14.20 14.2 0% 100% 14.2 0% 100% 14.2 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.39 0.00 6.39
10 9T-43T9-ES-10 PL6X64 PLATINA LIVIANA 1 7.60 7.60 7.6 0% 100% 7.6 0% 100% 7.6 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.42 0.00 3.42
11 9T-43T9-ES-11 PL6X64 PLATINA LIVIANA 1 5.60 5.60 5.6 0% 100% 5.6 0% 100% 5.6 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.52 0.00 2.52
12 9T-43T9-ES-12 PL6X32 PLATINA LIVIANA 4 4.50 18.00 18 0% 100% 18 0% 100% 18 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.10 0.00 8.10
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
BARANDAS - LAVADO DE CAMIONES

ACUMUL
ACUM.
PESO ADO
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%) ANTERIOACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERI
R (Tn.)
(Kg) OR (%)
5% 30% 10% 15% 25% 10% 5%
1.32 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 38% 0.00% 0.50 0.00 0.50
1 9T-43T9-SP-3 PIPE1-1/2SCH40 BARANDA LIVIANA 2 0.18 0.35 0.35 0% 100% 0.35 0% 100% 0.12 0% 35% 0% 0% 0% 0% 0% 0% 0% 0% 39% 0.00% 0.14 0.00 0.14
2 9T-43T9-SP-3 PIPE1-1/2SCH40 BARANDA LIVIANA 2 0.17 0.35 0.35 0% 100% 0.35 0% 100% 0.12 0% 35% 0% 0% 0% 0% 0% 0% 0% 0% 38% 0.00% 0.13 0.00 0.13
3 9T-43T9-SP-3 PIPE1-1/2SCH40 BARANDA LIVIANA 1 0.12 0.12 0.12 0% 100% 0.12 0% 100% 0.02 0% 12% 0% 0% 0% 0% 0% 0% 0% 0% 36% 0.00% 0.05 0.00 0.05
4 9T-43T9-SP-3 PIPE1-1/2SCH40 BARANDA LIVIANA 2 0.12 0.23 0.23 0% 100% 0.23 0% 100% 0.05 0% 23% 0% 0% 0% 0% 0% 0% 0% 0% 37% 0.00% 0.09 0.00 0.09
5 9T-43T9-SP-3 PIPE1-1/2SCH40 BARANDA LIVIANA 1 0.12 0.12 0.12 0% 100% 0.12 0% 100% 0.02 0% 12% 0% 0% 0% 0% 0% 0% 0% 0% 36% 0.00% 0.05 0.00 0.05
6 9T-43T9-SP-3 PIPE1-1/2SCH40 BARANDA LIVIANA 1 0.14 0.14 0.14 0% 100% 0.14 0% 100% 0.02 0% 14% 0% 0% 0% 0% 0% 0% 0% 0% 36% 0.00% 0.05 0.00 0.05
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA LIVIANA - TORRE DE TRANSFERENCIA N°01

ACUMUL
ACUM.
PESO O.C. TRASLADO MONTAJE ADO ACTUAL
FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%) ANTERIOR TOTAL (Kg.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERIO (Kg.)
(Kg.)
(Kg) R (%)
5% 30% 10% 15% 25% 10% 5% 3388.352 750.367253 4138.743539
8,470.88 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 43.30% 43.30% 3667.80 0.00 3667.80
1 2T-43T1-PRT1 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.50 9.50 9.50 0% 100% 9.50 0% 100% 9.50 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.28 0.00 4.28
2 2T-43T1-PRT2 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.54 9.54 9.54 0% 100% 9.54 0% 100% 9.54 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.29 0.00 4.29
3 2T-43T1-PRT3 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.51 9.51 9.51 0% 100% 9.51 0% 100% 9.51 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.28 0.00 4.28
4 2T-43T1-PRT4 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.51 9.51 9.51 0% 100% 9.51 0% 100% 9.51 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.28 0.00 4.28
5 2T-43T1-PRT5 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 12.62 12.62 12.62 0% 100% 12.62 0% 100% 12.62 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.68 0.00 5.68
6 2T-43T1-PRT6 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 14.44 14.44 14.44 0% 100% 14.44 0% 100% 14.44 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 6.50 0.00 6.50
7 2T-43T1-PRT7 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 17.44 17.44 17.44 0% 100% 17.44 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 6.10 0.00 6.10
8 2T-43T1-PRT8 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 14.95 14.95 14.95 0% 100% 14.95 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 5.23 0.00 5.23
9 2T-43T1-PRT9 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 15.50 15.50 15.50 0% 100% 15.50 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 5.42 0.00 5.42
10 2T-43T1-PRT10 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 15.22 15.22 15.22 0% 100% 15.22 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 5.33 0.00 5.33
11 2T-43T1-PRT11 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 14.90 14.90 14.90 0% 100% 14.90 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 5.21 0.00 5.21
12 2T-43T1-PRT12 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.56 9.56 9.56 0% 100% 9.56 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 3.35 0.00 3.35
13 2T-43T1-PRT13 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 12.95 12.95 12.95 0% 100% 12.95 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 4.53 0.00 4.53
14 2T-43T1-PRT14 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 10.00 10.00 10.00 0% 100% 10.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 3.50 0.00 3.50
15 2T-43T1-PRT15 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.85 9.85 9.85 0% 100% 9.85 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 3.45 0.00 3.45
16 2T-43T1-PRT16 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 10.12 10.12 10.12 0% 100% 10.12 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 3.54 0.00 3.54
17 2T-43T1-PRT17 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 10.20 10.20 10.20 0% 100% 10.20 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 3.57 0.00 3.57
18 2T-43T1-PRT18 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 13.73 13.73 13.73 0% 100% 13.73 0% 100% 13.73 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 6.18 0.00 6.18
19 2T-43T1-PRT19 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 17.42 17.42 17.42 0% 100% 17.42 0% 100% 17.42 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 7.84 0.00 7.84
20 2T-43T1-PRT20 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 19.00 19.00 19.00 0% 100% 19.00 0% 100% 19.00 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 8.55 0.00 8.55
21 2T-43T1-PRT21 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 11.32 11.32 11.32 0% 100% 11.32 0% 100% 11.32 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.10 0.00 5.10
22 2T-43T1-PRT22 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 14.24 14.24 14.24 0% 100% 14.24 0% 100% 14.24 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 6.41 0.00 6.41
23 2T-43T1-PRT23 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 11.25 11.25 11.25 0% 100% 11.25 0% 100% 11.25 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.06 0.00 5.06
24 2T-43T1-PRT24 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 14.65 14.65 14.65 0% 100% 14.65 0% 100% 14.65 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 6.59 0.00 6.59
25 2T-43T1-PRT25 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 14.88 14.88 14.88 0% 100% 14.88 0% 100% 14.88 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 6.70 0.00 6.70
26 2T-43T1-PRT26 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.85 9.85 9.85 0% 100% 9.85 0% 100% 9.85 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.43 0.00 4.43
27 2T-43T1-PRT27 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 9.55 9.55 9.55 0% 100% 9.55 0% 100% 9.55 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.30 0.00 4.30
28 2T-43T1-PRT28 TORRE DE TRANSFERENCIA 1 CARTELA LIVIANA 1 10.24 10.24 10.24 0% 100% 10.24 0% 100% 10.24 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.61 0.00 4.61
29 2T-43T1-AR1 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 28.86 28.86 28.86 0% 100% 28.86 0% 100% 0% 28.8566 0% 100% 0% 0% 0% 0% 0% 0% 50.00% 0.00% 14.43 0.00 14.43
30 2T-43T1-AR2 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 28.85 28.85 28.85 0% 100% 28.85 0% 100% 0% 28.8543 0% 100% 0% 0% 0% 0% 0% 0% 50.00% 0.00% 14.43 0.00 14.43
31 2T-43T1-AR3 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 81.17 81.17 81.17 0% 100% 81.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 28.41 0.00 28.41
32 2T-43T1-AR4 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 81.17 81.17 81.17 0% 100% 81.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 28.41 0.00 28.41
33 2T-43T1-AR5 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 23.51 23.51 23.51 0% 100% 23.51 0% 100% 0% 23.5104 0% 100% 0% 0% 0% 0% 0% 0% 50.00% 0.00% 11.76 0.00 11.76
34 2T-43T1-AR6 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 23.51 23.51 23.51 0% 100% 23.51 0% 100% 0% 23.5116 0% 100% 0% 0% 0% 0% 0% 0% 50.00% 0.00% 11.76 0.00 11.76
35 2T-43T1-AR7 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 81.17 81.17 81.17 0% 100% 81.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 28.41 0.00 28.41
36 2T-43T1-AR8 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 81.17 81.17 81.17 0% 100% 81.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 28.41 0.00 28.41
37 2T-43T1-AR9 TORRE DE TRANSFERENCIA 1 ARRIOSTRE LIVIANA 1 28.82 28.82 28.82 0% 100% 28.82 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 10.09 0.00 10.09
38 2T-43T1-CO11 TORRE DE TRANSFERENCIA 1 CANAL U LIVIANA 1 39.25 39.25 39.25 0% 100% 39.25 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 13.74 0.00 13.74
39 2T-43T1-CO9 TORRE DE TRANSFERENCIA 1 TUBO LIVIANA 2 59.97 119.93 119.93 0% 100% 119.93 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 41.98 0.00 41.98
40 2T-43T1-CO10 TORRE DE TRANSFERENCIA 1 TUBO CUA. LIVIANA 1 87.09 87.09 87.09 0% 100% 87.09 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 30.48 0.00 30.48
41 2T-43T1-VI19 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 138.83 138.83 138.83 0% 100% 138.83 0% 100% 0% 138.826 0% 100% 0% 0% 0% 0% 0% 0% 50.00% 0.00% 69.41 0.00 69.41
42 2T-43T1-VI23 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 138.83 138.83 138.83 0% 100% 138.83 0% 100% 0% 138.826 0% 100% 138.826 0% 100% 0% 0% 0% 0% 75.00% 0.00% 104.12 0.00 104.12
43 2T-43T1-VI27 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 129.23 129.23 129.23 0% 100% 129.23 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 45.23 0.00 45.23
44 2T-43T1-PT1 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 128.79 128.79 128.79 0% 100% 128.79 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 45.08 0.00 45.08
45 2T-43T1-CO1 TORRE DE TRANSFERENCIA 1 COLUMNA LIVIANA 1 178.36 178.36 178.36 0% 100% 178.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 62.43 0.00 62.43
46 2T-43T1-ES3 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 133.65 133.65 133.65 0% 100% 133.65 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 46.78 0.00 46.78
47 2T-43T1-VI3 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 74.21 74.21 74.21 0% 100% 0% 0% 0% 74.2123 0% 100% 0% 0% 0% 0% 0% 0% 20.00% 0.00% 14.84 0.00 14.84
48 2T-43T1-VI13 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 90.21 90.21 90.21 0% 100% 90.21 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 31.57 0.00 31.57
49 2T-43T1-VI32 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 90.20 90.20 90.20 0% 100% 90.20 0% 100% 90.20 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 40.59 0.00 40.59
50 2T-43T1-VI4 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 172.95 172.95 172.95 0% 100% 89.00 0% 51% 172.95 100% 0% 0% 0% 0% 0% 0% 0% 0% 30.44% 0.00% 52.64 0.00 52.64
51 2T-43T1-VI5 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 77.39 77.39 77.39 0% 100% 77.39 0% 100% 77.39 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 34.83 0.00 34.83
52 2T-43T1-VI7 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 129.23 129.23 129.23 0% 100% 129.23 0% 100% 0% 129.227 0% 100% 0% 0% 0% 0% 0% 0% 50.00% 0.00% 64.61 0.00 64.61
53 2T-43T1-VI8 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 168.68 168.68 168.68 0% 100% 168.68 0% 100% 0% 168.676 0% 100% 0% 0% 0% 0% 0% 0% 50.00% 0.00% 84.34 0.00 84.34
54 2T-43T1-VI11 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 80.96 80.96 80.96 0% 100% 80.96 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 28.34 0.00 28.34
55 2T-43T1-VI12 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 44.00 44.00 44.00 0% 100% 44.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 15.40 0.00 15.40
56 2T-43T1-VI15 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 55.17 55.17 55.17 0% 100% 55.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 19.31 0.00 19.31
57 2T-43T1-VI16 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 180.84 180.84 180.84 0% 100% 180.84 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 63.30 0.00 63.30
58 2T-43T1-VI17 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 75.65 75.65 75.65 0% 100% 75.65 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 26.48 0.00 26.48
59 2T-43T1-VI29 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 220.65 220.65 220.65 0% 100% 220.65 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 77.23 0.00 77.23
60 2T-43T1-VI31 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 138.83 138.83 138.83 0% 100% 138.83 0% 100% 0% 138.825 0% 100% 111.357 0% 80% 0% 0% 0% 0% 70.05% 0.00% 97.25 0.00 97.25
61 2T-43T1-VI14 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 138.83 138.83 138.83 0% 100% 138.83 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 48.59 0.00 48.59
62 2T-43T1-VI25 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 44.05 44.05 44.05 0% 100% 44.05 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 15.42 0.00 15.42
63 2T-43T1-VI22 TORRE DE TRANSFERENCIA 1 PLACA LIVIANA 1 74.21 74.21 74.21 0% 100% 74.21 0% 100% 74.21 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 33.40 0.00 33.40
64 2T-43T1-VI18 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 2 44.01 88.03 88.03 0% 100% 88.03 0% 100% 88.03 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 39.61 0.00 39.61
65 2T-43T1-VI26 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 60.47 60.47 60.47 0% 100% 60.47 0% 100% 60.47 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 27.21 0.00 27.21
66 2T-43T1-BR1 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 37.89 37.89 37.89 0% 100% 37.89 0% 100% 37.89 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 17.05 0.00 17.05
67 2T-43T1-BR2 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 41.44 41.44 41.44 0% 100% 41.44 0% 100% 41.44 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 18.65 0.00 18.65
68 2T-43T1-BR3 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 31.97 31.97 31.97 0% 100% 31.97 0% 100% 31.97 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 14.39 0.00 14.39
69 2T-43T1-BR4 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 29.55 29.55 29.55 0% 100% 29.55 0% 100% 29.55 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 13.30 0.00 13.30
70 2T-43T1-BR5 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 39.38 39.38 39.38 0% 100% 39.38 0% 100% 39.38 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 17.72 0.00 17.72
71 2T-43T1-BR6 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 29.55 29.55 29.55 0% 100% 29.55 0% 100% 29.55 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 13.30 0.00 13.30
72 2T-43T1-BR7 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 2 62.95 125.90 125.90 0% 100% 125.90 0% 100% 125.90 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 56.65 0.00 56.65
73 2T-43T1-ES1 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 73.14 73.14 73.14 0% 100% 73.14 0% 100% 73.14 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 32.91 0.00 32.91
74 2T-43T1-ES2 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 73.14 73.14 73.14 0% 100% 73.14 0% 100% 73.14 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 32.91 0.00 32.91
75 2T-43T1-ES4 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 119.14 119.14 119.14 0% 100% 119.14 0% 100% 119.14 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 53.61 0.00 53.61
76 2T-43T1-ES5 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 119.14 119.14 119.14 0% 100% 119.14 0% 100% 119.14 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 53.61 0.00 53.61
77 2T-43T1-CO5 TORRE DE TRANSFERENCIA 1 COLUMNA LIVIANA 1 178.36 178.36 178.36 0% 100% 178.36 0% 100% 178.36 100% 178.358 0% 100% 178.358 0% 100% 0% 0% 0% 0% 85.00% 0.00% 151.60 0.00 151.60
78 2T-43T1-TE1 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 18 1.35 24.38 24.38 0% 100% 24.38 0% 100% 24.38 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 10.97 0.00 10.97
79 2T-43T1-TE2 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 3 1.26 3.78 3.78 0% 100% 3.78 0% 100% 3.78 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 1.70 0.00 1.70
80 2T-43T1-TE3 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 4 1.35 5.42 5.42 0% 100% 5.42 0% 100% 5.42 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 2.44 0.00 2.44
81 2T-43T1-TE4 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 0.75 1.50 1.50 0% 100% 1.50 0% 100% 1.50 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.67 0.00 0.67
82 2T-43T1-TE5 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 4 1.73 6.92 6.92 0% 100% 6.92 0% 100% 6.92 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.11 0.00 3.11
83 2T-43T1-TE6 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 1.82 3.65 3.65 0% 100% 3.65 0% 100% 3.65 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 1.64 0.00 1.64
84 2T-43T1-TE7 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 4 1.15 4.61 4.61 0% 100% 4.61 0% 100% 4.61 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 2.08 0.00 2.08
85 2T-43T1-TE8 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 0.71 1.42 1.42 0% 100% 1.42 0% 100% 1.42 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.64 0.00 0.64
86 2T-43T1-TE9 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 4 4.92 19.68 19.68 0% 100% 19.68 0% 100% 19.68 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 8.85 0.00 8.85
87 2T-43T1-TE10 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 4 4.98 19.93 19.93 0% 100% 19.93 0% 100% 19.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 8.97 0.00 8.97
88 2T-43T1-TE11 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 1 1.42 1.42 1.42 0% 100% 1.42 0% 100% 1.42 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.64 0.00 0.64
89 2T-43T1-TE12 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 7.96 15.92 15.92 0% 100% 15.92 0% 100% 15.92 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 7.16 0.00 7.16
90 2T-43T1-TE13 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 4 1.42 5.67 5.67 0% 100% 5.67 0% 100% 5.67 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 2.55 0.00 2.55
91 2T-43T1-TE14 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 0.75 1.50 1.50 0% 100% 1.50 0% 100% 1.50 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.67 0.00 0.67
92 2T-43T1-TE15 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 0.71 1.42 1.42 0% 100% 1.42 0% 100% 1.42 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.64 0.00 0.64
93 2T-43T1-TE16 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 1.82 3.65 3.65 0% 100% 3.65 0% 100% 3.65 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 1.64 0.00 1.64
94 2T-43T1-TE17 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 1 1.45 1.45 1.45 0% 100% 1.45 0% 100% 1.45 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.65 0.00 0.65
95 2T-43T1-TE18 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 1 1.26 1.26 1.26 0% 100% 1.26 0% 100% 1.26 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.57 0.00 0.57
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA LIVIANA - TORRE DE TRANSFERENCIA N°01

ACUMUL
ACUM.
PESO O.C. TRASLADO MONTAJE ADO ACTUAL
FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%) ANTERIOR TOTAL (Kg.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERIO (Kg.)
(Kg.)
(Kg) R (%)
5% 30% 10% 15% 25% 10% 5% 3388.352 750.367253 4138.743539
8,470.88 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 43.30% 43.30% 3667.80 0.00 3667.80
96 2T-43T1-TE19 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 2 8.06 16.13 16.13 0% 100% 16.13 0% 100% 16.13 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 7.26 0.00 7.26
97 2T-43T1-TE20 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 1 1.73 1.73 1.73 0% 100% 1.73 0% 100% 1.73 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.78 0.00 0.78
98 2T-43T1-TE21 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 1 1.73 1.73 1.73 0% 100% 1.73 0% 100% 1.73 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.78 0.00 0.78
99 2T-43T1-TE22 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 1 1.37 1.37 1.37 0% 100% 1.37 0% 100% 1.37 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.62 0.00 0.62
100 2T-43T1-TE23 TORRE DE TRANSFERENCIA 1 TEMPLADOR LIVIANA 1 1.43 1.43 1.43 0% 100% 1.43 0% 100% 1.43 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 0.64 0.00 0.64
101 2T-43T1-AR10 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 7.82 7.82 7.82 0% 100% 7.82 0% 100% 7.82 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.52 0.00 3.52
102 2T-43T1-AR11 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 6.24 6.24 6.24 0% 100% 6.24 0% 100% 6.24 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 2.81 0.00 2.81
103 2T-43T1-AR12 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 8.08 8.08 8.08 0% 100% 8.08 0% 100% 8.08 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.64 0.00 3.64
104 2T-43T1-AR13 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 3.77 3.77 3.77 0% 100% 3.77 0% 100% 3.77 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 1.70 0.00 1.70
105 2T-43T1-AR14 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 8.18 8.18 8.18 0% 100% 8.18 0% 100% 8.18 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.68 0.00 3.68
106 2T-43T1-AR15 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 8.67 8.67 8.67 0% 100% 8.67 0% 100% 8.67 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.90 0.00 3.90
107 2T-43T1-AR16 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 6.02 6.02 6.02 0% 100% 6.02 0% 100% 6.02 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 2.71 0.00 2.71
108 2T-43T1-AR17 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 7.21 7.21 7.21 0% 100% 7.21 0% 100% 7.21 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.24 0.00 3.24
109 2T-43T1-AR18 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 2 3.74 7.48 7.48 0% 100% 7.48 0% 100% 7.48 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.36 0.00 3.36
110 2T-43T1-AR19 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 5.82 5.82 5.82 0% 100% 5.82 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 2.04 0.00 2.04
111 2T-43T1-AR20 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 7.30 7.30 7.30 0% 100% 7.30 0% 100% 7.30 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.28 0.00 3.28
112 2T-43T1-AR21 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 9.35 9.35 9.35 0% 100% 9.35 0% 100% 9.35 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.21 0.00 4.21
113 2T-43T1-AR22 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 6.96 6.96 6.96 0% 100% 6.96 0% 100% 6.96 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 3.13 0.00 3.13
114 2T-43T1-AR23 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 6.53 6.53 6.53 0% 100% 6.53 0% 100% 6.53 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 2.94 0.00 2.94
115 2T-43T1-AR24 TORRE DE TRANSFERENCIA 1 ANGULO LIVIANA 1 9.07 9.07 9.07 0% 100% 9.07 0% 100% 9.07 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.08 0.00 4.08
116 2T-43T1-IN1 TORRE DE TRANSFERENCIA 1 INSERTO LIVIANA 16 2.51 40.15 40.15 0% 100% 40.15 0% 100% 40.15 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 18.07 0.00 18.07
117 2T-43T1-IN2 TORRE DE TRANSFERENCIA 1 INSERTO LIVIANA 16 4.98 79.74 79.74 0% 100% 79.74 0% 100% 79.74 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 35.88 0.00 35.88
118 2T-43T1-VI9 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 34.01 34.01 34.01 0% 100% 34.01 0% 100% 34.01 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 15.30 0.00 15.30
119 2T-43T1-VI10 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 34.01 34.01 34.01 0% 100% 34.01 0% 100% 34.01 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 15.30 0.00 15.30
120 2T-43T1-VI20 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 39.02 39.02 39.02 0% 100% 39.02 0% 100% 39.02 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 17.56 0.00 17.56
121 2T-43T1-VI21 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 180.85 180.85 180.85 0% 100% 180.85 0% 100% 180.85 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 81.38 0.00 81.38
122 2T-43T1-VI14 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 39.46 39.46 39.46 0% 100% 39.46 0% 100% 39.46 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 17.76 0.00 17.76
123 2T-43T1-VI28 TORRE DE TRANSFERENCIA 1 CANAL C LIVIANA 1 44.05 44.05 44.05 0% 100% 44.05 0% 100% 44.05 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 19.82 0.00 19.82
124 2TACS43 TORRE DE TRANSFERENCIA 1 CANAL U LIVIANA 1 45.15 45.15 45.15 0% 100% 45.15 0% 100% 45.15 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 20.32 0.00 20.32
125 2TACS44 TORRE DE TRANSFERENCIA 1 CANAL U LIVIANA 1 22.54 22.54 22.54 0% 100% 22.54 0% 100% 22.54 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 10.14 0.00 10.14
126 2TACS46 TORRE DE TRANSFERENCIA 1 CANAL U LIVIANA 1 42.67 42.67 42.67 0% 100% 42.67 0% 100% 42.67 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 19.20 0.00 19.20
127 2TACS47 TORRE DE TRANSFERENCIA 1 CANAL U LIVIANA 1 11.46 11.46 11.46 0% 100% 11.46 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 4.01 0.00 4.01
128 2TACS48 TORRE DE TRANSFERENCIA 1 CANAL U LIVIANA 1 22.54 22.54 22.54 0% 100% 22.54 0% 100% 22.54 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 10.14 0.00 10.14
129 2TACS52 TORRE DE TRANSFERENCIA 1 CANAL U LIVIANA 1 9.95 9.95 9.95 0% 100% 9.95 0% 100% 9.95 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 4.48 0.00 4.48
130 2T-43T1-CR1 TORRE DE TRANSFERENCIA 1 CORREA LIVIANA 2 51.49 102.98 102.98 0% 100% 102.98 0% 100% 102.98 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 46.34 0.00 46.34
131 2T-43T1-CR2 TORRE DE TRANSFERENCIA 1 CORREA LIVIANA 1 58.48 58.48 58.48 0% 100% 58.48 0% 100% 58.48 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 26.32 0.00 26.32
132 2T-43T1-CR3 TORRE DE TRANSFERENCIA 1 CORREA LIVIANA 2 46.94 93.88 93.88 0% 100% 93.88 0% 100% 93.88 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 42.25 0.00 42.25
133 2T-43T1-CR4 TORRE DE TRANSFERENCIA 1 CORREA LIVIANA 2 54.24 108.49 108.49 0% 100% 108.49 0% 100% 108.49 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 48.82 0.00 48.82
134 2T-43T1-CR5 TORRE DE TRANSFERENCIA 1 CORREA LIVIANA 1 58.48 58.48 58.48 0% 100% 58.48 0% 100% 58.48 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 26.32 0.00 26.32
135 2TACA1 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 13.32 13.32 13.32 0% 100% 13.32 0% 100% 13.32 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.99 0.00 5.99
136 2TACA2 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 13.03 26.06 26.06 0% 100% 26.06 0% 100% 26.06 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.73 0.00 11.73
137 2TACA3 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 13.64 13.64 13.64 0% 100% 13.64 0% 100% 13.64 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 6.14 0.00 6.14
138 2TACA4 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 13.03 26.06 26.06 0% 100% 26.06 0% 100% 26.06 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.73 0.00 11.73
139 2TACA5 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 13.32 13.32 13.32 0% 100% 13.32 0% 100% 13.32 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.99 0.00 5.99
140 2TACA6 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 13.64 13.64 13.64 0% 100% 13.64 0% 100% 13.64 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 6.14 0.00 6.14
141 2TACS1 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 24.01 48.02 48.02 0% 100% 48.02 0% 100% 48.02 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 21.61 0.00 21.61
142 2TACS2 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 6 24.01 144.07 144.07 0% 100% 144.07 0% 100% 144.07 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 64.83 0.00 64.83
143 2TACS3 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.01 24.01 24.01 0% 100% 24.01 0% 100% 24.01 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 10.80 0.00 10.80
144 2TACS4 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 5 9.49 47.46 47.46 0% 100% 47.46 0% 100% 47.46 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 21.36 0.00 21.36
145 2TACS5 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 45.67 45.67 45.67 0% 100% 45.67 0% 100% 45.67 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 20.55 0.00 20.55
146 2TACS6 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 45.67 91.33 91.33 0% 100% 91.33 0% 100% 91.33 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 41.10 0.00 41.10
147 2TACS7 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 50.58 50.58 50.58 0% 100% 50.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 17.70 0.00 17.70
148 2TACS8 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 50.58 50.58 50.58 0% 100% 50.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 17.70 0.00 17.70
149 2TACS9 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.64 46.64 46.64 0% 100% 46.64 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 16.32 0.00 16.32
150 2TACS10 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 48.13 48.13 48.13 0% 100% 48.13 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 16.84 0.00 16.84
151 2TACS11 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 50.58 101.17 101.17 0% 100% 101.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 35.41 0.00 35.41
152 2TACS12 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.92 46.92 46.92 0% 100% 46.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 16.42 0.00 16.42
153 2TACS13 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 30.99 30.99 30.99 0% 100% 30.99 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 10.85 0.00 10.85
154 2TACS14 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.92 46.92 46.92 0% 100% 46.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 16.42 0.00 16.42
155 2TACS15 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 50.58 50.58 50.58 0% 100% 50.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 17.70 0.00 17.70
156 2TACS16 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.93 24.93 24.93 0% 100% 24.93 0% 100% 24.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.22 0.00 11.22
157 2TACS17 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.93 24.93 24.93 0% 100% 24.93 0% 100% 24.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.22 0.00 11.22
158 2TACS18 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.93 24.93 24.93 0% 100% 24.93 0% 100% 24.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.22 0.00 11.22
159 2TACS19 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.92 46.92 46.92 0% 100% 46.92 0% 100% 46.92 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 21.11 0.00 21.11
160 2TACS20 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 43.96 43.96 43.96 0% 100% 43.96 0% 100% 43.96 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 19.78 0.00 19.78
161 2TACS21 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 50.58 50.58 50.58 0% 100% 50.58 0% 100% 50.58 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 22.76 0.00 22.76
162 2TACS22 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 16.36 32.71 32.71 0% 100% 32.71 0% 100% 32.71 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 14.72 0.00 14.72
163 2TACS23 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 5 4.92 24.58 24.58 0% 100% 24.58 0% 100% 24.58 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.06 0.00 11.06
164 2TACS24 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.92 46.92 46.92 0% 100% 46.92 0% 100% 46.92 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 21.11 0.00 21.11
165 2TACS25 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.01 24.01 24.01 0% 100% 24.01 0% 100% 24.01 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 10.80 0.00 10.80
166 2TACS26 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.92 46.92 46.92 0% 100% 46.92 0% 100% 46.92 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 21.11 0.00 21.11
167 2TACS27 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.93 46.93 46.93 0% 100% 46.93 0% 100% 46.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 21.12 0.00 21.12
168 2TACS28 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 47.03 47.03 47.03 0% 100% 47.03 0% 100% 47.03 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 21.16 0.00 21.16
169 2TACS29 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 45.67 45.67 45.67 0% 100% 45.67 0% 100% 45.67 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 20.55 0.00 20.55
170 2TACS30 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 45.67 91.33 91.33 0% 100% 91.33 0% 100% 91.33 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 41.10 0.00 41.10
171 2TACS31 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 46.64 46.64 46.64 0% 100% 46.64 0% 100% 46.64 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 20.99 0.00 20.99
172 2TACS32 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.93 24.93 24.93 0% 100% 24.93 0% 100% 24.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.22 0.00 11.22
173 2TACS33 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.93 24.93 24.93 0% 100% 24.93 0% 100% 24.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.22 0.00 11.22
174 2TACS34 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 24.93 24.93 24.93 0% 100% 24.93 0% 100% 24.93 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.22 0.00 11.22
175 2TACS35 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 50.58 50.58 50.58 0% 100% 50.58 0% 100% 50.58 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 22.76 0.00 22.76
176 2TACS36 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 50.58 50.58 50.58 0% 100% 50.58 0% 100% 50.58 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 22.76 0.00 22.76
177 2TACS37 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 43.96 43.96 43.96 0% 100% 43.96 0% 100% 43.96 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 19.78 0.00 19.78
178 2TACS38 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 16.36 32.71 32.71 0% 100% 32.71 0% 100% 32.71 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 14.72 0.00 14.72
179 2TACS39 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 43.96 43.96 43.96 0% 100% 43.96 0% 100% 43.96 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 19.78 0.00 19.78
180 2TACS40 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 43.96 43.96 43.96 0% 100% 43.96 0% 100% 43.96 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 19.78 0.00 19.78
181 2TACS41 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 43.96 43.96 43.96 0% 100% 43.96 0% 100% 43.96 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 19.78 0.00 19.78
182 2TACS42 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 30.99 30.99 30.99 0% 100% 30.99 0% 100% 30.99 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 13.94 0.00 13.94
183 2TACS45 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 11.81 11.81 11.81 0% 100% 11.81 0% 100% 11.81 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.32 0.00 5.32
184 2TACS49 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 12.44 12.44 12.44 0% 100% 12.44 0% 100% 12.44 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.60 0.00 5.60
185 2TACS50 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 9.98 9.98 9.98 0% 100% 9.98 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 3.49 0.00 3.49
186 2TACS51 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 25.46 25.46 25.46 0% 100% 25.46 0% 100% 25.46 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 11.46 0.00 11.46
187 2TACS53 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 13.75 13.75 13.75 0% 100% 13.75 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 4.81 0.00 4.81
188 2TACS54 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 1 13.13 13.13 13.13 0% 100% 13.13 0% 100% 13.13 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00% 5.91 0.00 5.91
189 2TACS55 TORRE DE TRANSFERENCIA 1 COSTANERA LIVIANA 2 56.84 113.68 113.68 0% 100% 113.68 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35.00% 0.00% 39.79 0.00 39.79
190 2T-43T1-VI1 TORRE DE TRANSFERENCIA 1 VIGA LIVIANA 1 77.39 77.39 77.39 0% 100% 77.39 0% 100% 77.39 100% 77.393 0% 100% 0% 0% 0% 0% 0% 0% 60.00% 0.00% 46.44 0.00 46.44
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA LIVIANA - TORRE DE TRANSFERENCIA N°01

ACUMUL
ACUM.
PESO O.C. TRASLADO MONTAJE ADO ACTUAL
FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%) ANTERIOR TOTAL (Kg.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERIO (Kg.)
(Kg.)
(Kg) R (%)
5% 30% 10% 15% 25% 10% 5% 3388.352 750.367253 4138.743539
8,470.88 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 43.30% 43.30% 3667.80 0.00 3667.80
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA MEDIANA - TORRE DE TRANSFERENCIA N°01

ACUMUL
ACUM.
PESO O.C. TRASLADO MONTAJE ADO
FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%) ANTERI ACTUAL (Tn.) TOTAL (Tn.)
ITEM CÓDIGO DE PARTE ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERI
OR (Tn.)
(Kg) OR (%)
5% 30% 10% 15% 25% 10% 5%
3,170.42 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 70.27% 0.00% 2227.92 0.00 2227.92
1 2T-43T1-CO4 TORRE DE TRANSFERENCIA 1 COLUMNA MEDIANA 1 168.78 168.78 168.778 0% 100% 168.778 0% 100% 168.778 0% 100% 168.778 0% 100% 168.778 0% 100% 0% 0% 0% 0% 85% 0.0% 143.46 0.00 143.46
2 2T-43T1-CO8 TORRE DE TRANSFERENCIA 1 COLUMNA MEDIANA 1 168.78 168.78 168.778 0% 100% 168.778 0% 100% 168.778 0% 100% 168.778 0% 100% 168.778 0% 100% 0% 0% 0% 0% 85% 0.0% 143.46 0.00 143.46
3 2T-43T1-VI6 TORRE DE TRANSFERENCIA 1 VIGA MEDIANA 1 145.07 145.07 145.07 0% 100% 145.07 0% 100% 145.07 0% 100% 145.07 0% 100% 145.07 0% 100% 0% 0% 0% 0% 85% 0.0% 123.31 0.00 123.31
4 2T-43T1-VI24 TORRE DE TRANSFERENCIA 1 VIGA MEDIANA 1 235.63 235.63 235.631 0% 100% 235.631 0% 100% 235.631 0% 100% 235.631 0% 100% 235.631 0% 100% 0% 0% 0% 0% 85% 0.0% 200.29 0.00 200.29
5 2T-43T1-VI30 TORRE DE TRANSFERENCIA 1 VIGA MEDIANA 1 235.63 235.63 235.631 0% 100% 235.631 0% 100% 235.631 0% 100% 235.631 0% 100% 235.631 0% 100% 0% 0% 0% 0% 85% 0.0% 200.29 0.00 200.29
6 2T-43T1-VI2 TORRE DE TRANSFERENCIA 1 VIGA MEDIANA 1 128.75 128.75 128.747 0% 100% 128.747 0% 100% 128.75 0% 100% 128.747 0% 100% 128.747 0% 100% 0% 0% 0% 0% 85% 0.0% 109.44 0.00 109.44
7 2T-43T1-CO2 TORRE DE TRANSFERENCIA 1 COLUMNA MEDIANA 1 517.55 517.55 517.549 0% 100% 517.549 0% 100% 517.549 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.0% 232.90 0.00 232.90
8 2T-43T1-CO3 TORRE DE TRANSFERENCIA 1 COLUMNA MEDIANA 1 519.83 519.83 519.83 0% 100% 519.83 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.0% 181.94 0.00 181.94
9 2T-43T1-CO7 TORRE DE TRANSFERENCIA 1 COLUMNA MEDIANA 1 519.85 519.85 519.85 0% 100% 519.85 0% 100% 519.85 0% 100% 519.85 0% 100% 519.85 0% 100% 0% 0% 0% 0% 85% 0.0% 441.87 0.00 441.87
10 2T-43T1-CO6 TORRE DE TRANSFERENCIA 1 COLUMNA MEDIANA 1 530.56 530.56 530.556 0% 100% 530.556 0% 100% 530.556 0% 100% 530.556 0% 100% 530.556 0% 100% 0% 0% 0% 0% 85% 0.0% 450.97 0.00 450.97
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
BARANDAS- TORRE DE TRANSFERENCIA N°01

ACUMUL
ACUM.
PESO ADO
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%)ANTERIACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERI
OR (Tn.)
(Kg) OR (%)
5% 30% 10% 15% 25% 10% 5%
3.08 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 0.45 0.00% 1.39 0.00 1.39

1 2T-43T1-BR1 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 0.35 0.35 0.35 0% 100% 0.35 0% 100% 0.35 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.16 0.00 0.16
2 2T-43T1-BR2 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 0.38 0.38 0.38 0% 100% 0.38 0% 100% 0.38 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.17 0.00 0.17
3 2T-43T1-BR3 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 0.29 0.29 0.29 0% 100% 0.29 0% 100% 0.29 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.13 0.00 0.13
4 2T-43T1-BR4 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 0.27 0.27 0.27 0% 100% 0.27 0% 100% 0.27 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.12 0.00 0.12
5 2T-43T1-BR5 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 0.36 0.36 0.36 0% 100% 0.36 0% 100% 0.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.16 0.00 0.16
6 2T-43T1-BR6 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 1 0.27 0.27 0.27 0% 100% 0.27 0% 100% 0.27 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.12 0.00 0.12
7 2T-43T1-BR7 TORRE DE TRANSFERENCIA 1 BARANDA LIVIANA 2 0.58 1.16 1.16 0% 100% 1.16 0% 100% 1.16 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.52 0.00 0.52
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA LIVIANA- TORRE DE TRANSFERENCIA N°02 Y 03
ACUMUL
ACUM.
O.C. TRASLADO MONTAJE ADO
PESO PESO FABRICACIÓN PRE ENSAMBLE CAMINATAS LEVANTAMIENTO OBSERVACIONES ACTUAL (%) ANTERIACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. ANTERI
UNIT. TOTAL (Kg) OR (Tn.)
OR (%)
5% 30% 10% 15% 25% 10% 5%
15,926.57 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 40% 3.55% 6370.78 565.38 6936.01
1 3T-43T2-TE1 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 2 0.83 1.66 1.66 0% 100% 1.66 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.58 0.00 0.58
2 3T-43T2-TE2 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 6 1.90 11.41 11.41 0% 100% 11.41 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.99 0.00 3.99
3 3T-43T2-TE3 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 4 1.43 5.71 5.71 0% 100% 5.71 0% 100% 5.705977 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.57 0.00 2.57
4 3T-43T2-TE4 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 4 1.19 4.75 4.75 0% 100% 4.75 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 1.66 0.00 1.66
5 3T-43T2-TE5 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 3 0.95 2.85 2.85 0% 100% 2.85 0% 100% 2.852988 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.28 0.00 1.28
6 3T-43T2-TE6 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 2 1.07 2.14 2.14 0% 100% 2.14 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.75 0.00 0.75
7 3T-43T2-TE7 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 6 1.90 11.41 11.41 0% 100% 11.41 0% 100% 11.41195 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.14 0.00 5.14
8 3T-43T2-TE8 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 12 1.78 21.40 21.40 0% 100% 21.40 0% 100% 21.39741 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.63 0.00 9.63
9 3T-43T2-TE9 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 4 1.78 7.13 7.13 0% 100% 7.13 0% 100% 7.132471 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.21 0.00 3.21
10 3T-43T2-TE10 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 2 1.43 2.85 2.85 0% 100% 2.85 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 1.00 0.00 1.00
11 3T-43T2-TE11 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 2 1.19 2.38 2.38 0% 100% 2.38 0% 100% 2.37749 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.07 0.00 1.07
12 3T-43T2-TE12 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 3 1.90 5.71 5.71 0% 100% 5.71 0% 100% 5.705977 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.57 0.00 2.57
13 3T-43T2-TE13 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 1 11.17 11.17 11.17 0% 100% 11.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.91 0.00 3.91
14 3T-43T2-TE14 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 1 11.17 11.17 11.17 0% 100% 11.17 0% 100% 11.1742 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.03 0.00 5.03
15 3T-43T2-TE15 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 4 1.78 7.13 7.13 0% 100% 7.13 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 2.50 0.00 2.50
16 3T-43T2-TE16 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 3 2.02 6.06 6.06 0% 100% 6.06 0% 100% 6.0626 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.73 0.00 2.73
17 3T-43T2-TE17 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 6 1.78 10.70 10.70 0% 100% 10.70 0% 100% 10.69871 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.81 0.00 4.81
18 3T-43T2-TE18 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 2 0.95 1.90 1.90 0% 100% 1.90 0% 100% 1.901992 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.86 0.00 0.86
19 3T-43T2-TE19 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 2 1.66 3.33 3.33 0% 100% 3.33 0% 100% 3.328486 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.50 0.00 1.50
20 3T-43T2-TE20 TORRE DE TRANSFERENCIA 2 TEMPLADOR LIVIANA 2 8.92 17.83 17.83 0% 100% 17.83 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 6.24 0.00 6.24
21 3T-43T2-IN1 TORRE DE TRANSFERENCIA 2 INSERTO LIVIANA 36 5.94 213.97 213.97 0% 100% 213.97 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 74.89 0.00 74.89
22 3T-43T2-AR1 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 4 9.75 38.99 38.99 0% 100% 38.99 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 13.65 0.00 13.65
23 3T-43T2-AR2 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 2 9.75 19.50 19.50 0% 100% 19.50 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 6.82 0.00 6.82
24 3T-43T2-AR3 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 7.49 7.49 7.49 0% 100% 7.49 0% 100% 7.489095 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.37 0.00 3.37
25 3T-43T2-AR4 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 7.61 7.61 7.61 0% 100% 7.61 0% 100% 7.607969 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.42 0.00 3.42
26 3T-43T2-AR8 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 8.68 8.68 8.68 0% 100% 8.68 0% 100% 8.67784 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.91 0.00 3.91
27 3T-43T2-AR21 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 2 9.63 19.26 19.26 0% 100% 19.26 0% 100% 19.25767 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.67 0.00 8.67
28 3T-43T2-AR22 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 9.87 9.87 9.87 0% 100% 9.87 0% 100% 9.866585 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.44 0.00 4.44
29 3T-43T2-AR24 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 9.63 9.63 9.63 0% 100% 9.63 0% 100% 9.628836 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.33 0.00 4.33
30 3T-43T2-AR25 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 9.63 9.63 9.63 0% 100% 9.63 0% 100% 9.628836 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.33 0.00 4.33
31 3T-43T2-AR36 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 8.80 8.80 8.80 0% 100% 8.80 0% 100% 8.796714 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.96 0.00 3.96
32 3T-43T2-AR41 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 8.80 8.80 8.80 0% 100% 8.80 0% 100% 8.796714 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.96 0.00 3.96
33 3T-43T2-AR44 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 9.87 9.87 9.87 0% 100% 9.87 0% 100% 9.866585 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.44 0.00 4.44
34 3T-43T2-AR45 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 10.46 10.46 10.46 0% 100% 10.46 0% 100% 10.46096 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.71 0.00 4.71
35 3T-43T2-AR48 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 8.92 8.92 8.92 0% 100% 8.92 0% 100% 8.915589 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.01 0.00 4.01
36 3T-43T2-AR49 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 10.58 10.58 10.58 0% 100% 10.58 0% 100% 10.57983 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.76 0.00 4.76
37 3T-43T2-AR56 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 8.68 8.68 8.68 0% 100% 8.68 0% 100% 8.67784 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.91 0.00 3.91
38 3T-43T2-PRT1 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.36 12.36 12.36 0% 100% 12.36 0% 100% 12.36295 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.56 0.00 5.56
39 3T-43T2-PRT2 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 16.52 16.52 16.52 0% 100% 16.52 0% 100% 16.52356 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.44 0.00 7.44
40 3T-43T2-PRT3 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.27 9.27 9.27 0% 100% 9.27 0% 100% 9.272212 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.17 0.00 4.17
41 3T-43T2-PRT4 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.27 9.27 9.27 0% 100% 9.27 0% 100% 9.272212 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.17 0.00 4.17
42 3T-43T2-PRT5 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 10.10 10.10 10.10 0% 100% 10.10 0% 100% 10.10433 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.55 0.00 4.55
43 3T-43T2-PRT6 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.36 12.36 12.36 0% 100% 12.36 0% 100% 12.36295 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.56 0.00 5.56
44 3T-43T2-PRT7 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 13.08 13.08 13.08 0% 100% 13.08 0% 100% 13.0762 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.88 0.00 5.88
45 3T-43T2-PRT8 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.13 12.13 12.13 0% 100% 12.13 0% 100% 12.1252 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.46 0.00 5.46
46 3T-43T2-PRT9 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 11.89 11.89 11.89 0% 100% 11.89 0% 100% 11.88745 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.35 0.00 5.35
47 3T-43T2-PRT10 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 11.89 11.89 11.89 0% 100% 11.89 0% 100% 11.88745 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.35 0.00 5.35
48 3T-43T2-PRT11 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 10.58 10.58 10.58 0% 100% 10.58 0% 100% 10.57983 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.76 0.00 4.76
49 3T-43T2-PRT12 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.48 12.48 12.48 0% 100% 12.48 0% 100% 12.48182 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.62 0.00 5.62
50 3T-43T2-PRT13 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 10.10 10.10 10.10 0% 100% 10.10 0% 100% 10.10433 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.55 0.00 4.55
51 3T-43T2-PRT14 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.75 9.75 9.75 0% 100% 9.75 0% 100% 9.74771 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.39 0.00 4.39
52 3T-43T2-PRT15 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.99 9.99 9.99 0% 100% 9.99 0% 100% 9.985459 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.49 0.00 4.49
53 3T-43T2-PRT16 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.01 12.01 12.01 0% 100% 12.01 0% 100% 12.00633 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.40 0.00 5.40
54 3T-43T2-PRT17 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 10.22 10.22 10.22 0% 100% 10.22 0% 100% 10.22321 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.60 0.00 4.60
55 3T-43T2-PRT18 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.96 12.96 12.96 0% 100% 12.96 0% 100% 12.95732 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.83 0.00 5.83
56 3T-43T2-PRT19 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 13.91 13.91 13.91 0% 100% 13.91 0% 100% 13.90832 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.26 0.00 6.26
57 3T-43T2-PRT20 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.72 12.72 12.72 0% 100% 12.72 0% 100% 12.71957 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.72 0.00 5.72
58 3T-43T2-PRT21 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.72 12.72 12.72 0% 100% 12.72 0% 100% 12.71957 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.72 0.00 5.72
59 3T-43T2-PRT22 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 15.22 15.22 15.22 0% 100% 15.22 0% 100% 15.21594 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.85 0.00 6.85
60 3T-43T2-PRT23 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.72 12.72 12.72 0% 100% 12.72 0% 100% 12.71957 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.72 0.00 5.72
61 3T-43T2-PRT24 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 12.48 12.48 12.48 0% 100% 12.48 0% 100% 12.48182 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.62 0.00 5.62
62 3T-43T2-PRT25 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 13.55 13.55 13.55 0% 100% 13.55 0% 100% 13.55169 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.10 0.00 6.10
63 3T-43T2-PRT26 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 10.34 10.34 10.34 0% 100% 10.34 0% 100% 10.34208 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.65 0.00 4.65
64 3T-43T2-PRT27 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 10.82 10.82 10.82 0% 100% 10.82 0% 100% 10.81758 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.87 0.00 4.87
65 3T-43T2-PRT28 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.51 9.51 9.51 0% 100% 9.51 0% 100% 9.509961 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.28 0.00 4.28
66 3T-43T2-PRT29 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.39 9.39 9.39 0% 100% 9.39 0% 100% 9.391087 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.23 0.00 4.23
67 3T-43T2-PRT30 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.27 9.27 9.27 0% 100% 9.27 0% 100% 9.272212 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.17 0.00 4.17
68 3T-43T2-PRT31 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.39 9.39 9.39 0% 100% 9.39 0% 100% 9.391087 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.23 0.00 4.23
69 3T-43T2-PRT32 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.51 9.51 9.51 0% 100% 9.51 0% 100% 9.509961 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.28 0.00 4.28
70 3T-43T2-PRT33 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.87 9.87 9.87 0% 100% 9.87 0% 100% 9.866585 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.44 0.00 4.44
71 3T-43T2-PRT34 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 14.26 14.26 14.26 0% 100% 14.26 0% 100% 14.26494 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.42 0.00 6.42
72 3T-43T2-PRT35 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.27 9.27 9.27 0% 100% 9.27 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.25 0.00 3.25
73 3T-43T2-PRT36 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.27 9.27 9.27 0% 100% 9.27 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.25 0.00 3.25
74 3T-43T2-PRT37 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.51 9.51 9.51 0% 100% 9.51 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.33 0.00 3.33
75 3T-43T2-PRT38 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.63 9.63 9.63 0% 100% 9.63 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.37 0.00 3.37
76 3T-43T2-PRT39 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.39 9.39 9.39 0% 100% 9.39 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.29 0.00 3.29
77 3T-43T2-PRT40 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.39 9.39 9.39 0% 100% 9.39 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.29 0.00 3.29
78 3T-43T2-PRT41 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.87 9.87 9.87 0% 100% 9.87 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.45 0.00 3.45
79 3T-43T2-PRT42 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.63 9.63 9.63 0% 100% 9.63 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.37 0.00 3.37
Página 24
ESTRUCTURA LIVIANA- TORRE DE TRANSFERENCIA N°02 Y 03
ACUMUL
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
PESO PESO ACTUAL (%) ANTERIACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. ANTERI
UNIT. TOTAL (Kg) OR (Tn.)
OR (%)
5% 30% 10% 15% 25% 10% 5%
15,926.57 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 40% 3.55% 6370.78 565.38 6936.01
80 3T-43T2-PRT43 TORRE DE TRANSFERENCIA 2 CARTELA LIVIANA 1 9.39 9.39 9.39 0% 100% 9.39 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.29 0.00 3.29
81 3T-43T2-AR27 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 87.85 87.85 87.85 0% 100% 87.85 0% 100% 87.84827 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 39.53 0.00 39.53
82 3T-43T2-AR28 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 99.02 99.02 99.02 0% 100% 99.02 0% 100% 99.02247 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 44.56 0.00 44.56
83 3T-43T2-AR29 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 51.47 51.47 51.47 0% 100% 51.47 0% 100% 51.47267 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.16 0.00 23.16
84 3T-43T2-AR30 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 66.57 66.57 66.57 0% 100% 66.57 0% 100% 66.56973 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.96 0.00 29.96
85 3T-43T2-AR31 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 54.33 54.33 54.33 0% 100% 54.33 0% 100% 54.32565 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.45 0.00 24.45
86 3T-43T2-AR33 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 209.46 209.46 209.46 0% 100% 209.46 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 73.31 0.00 73.31
87 3T-43T2-AR34 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 167.61 167.61 167.61 0% 100% 167.61 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 58.66 0.00 58.66
88 3T-43T2-ES1 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 29.12 29.12 29.12 0% 100% 29.12 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 10.19 0.00 10.19
89 3T-43T2-ES2 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 28.29 28.29 28.29 0% 100% 28.29 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 9.90 0.00 9.90
90 3T-43T2-ES3 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 35.07 35.07 35.07 0% 100% 35.07 0% 100% 35.06798 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.78 0.00 15.78
91 3T-43T2-ES4 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 88.44 88.44 88.44 0% 100% 88.44 0% 100% 88.44264 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 39.80 0.00 39.80
92 3T-43T2-ES5 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 89.63 89.63 89.63 0% 100% 89.63 0% 100% 89.63139 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 40.33 0.00 40.33
93 3T-43T2-ES6 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 35.54 35.54 35.54 0% 100% 35.54 0% 100% 35.54348 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.99 0.00 15.99
94 3T-43T2-ES7 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 89.16 89.16 89.16 0% 100% 89.16 0% 100% 89.15589 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 40.12 0.00 40.12
95 3T-43T2-ES10 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 86.54 86.54 86.54 0% 100% 86.54 0% 100% 86.54065 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 38.94 0.00 38.94
96 3T-43T2-ES11 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 86.66 86.66 86.66 0% 100% 86.66 0% 100% 86.65952 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 39.00 0.00 39.00
97 3T-43T2-ES13 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 109.72 109.72 109.72 0% 100% 109.72 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 38.40 0.00 38.40
98 3T-43T2-ES14 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 86.54 86.54 86.54 0% 100% 86.54 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 30.29 0.00 30.29
99 3T-43T2-ES15 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 116.26 116.26 116.26 0% 100% 116.26 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 40.69 0.00 40.69
100 3T-43T2-ES16 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 116.26 116.26 116.26 0% 100% 116.26 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 40.69 0.00 40.69
101 3T-43T2-ES17 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 89.63 89.63 89.63 0% 100% 89.63 0% 100% 89.63139 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 40.33 0.00 40.33
102 3T-43T2-ES18 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 93.67 93.67 93.67 0% 100% 93.67 0% 100% 93.67312 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 42.15 0.00 42.15
103 3T-43T2-ES19 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 28.17 28.17 28.17 0% 100% 28.17 0% 100% 28.17326 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.68 0.00 12.68
104 3T-43T2-AR5 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 78.58 78.58 78.58 0% 100% 78.58 0% 100% 78.57606 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 35.36 0.00 35.36
105 3T-43T2-AR6 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 66.33 66.33 66.33 0% 100% 66.33 0% 100% 66.33198 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.85 0.00 29.85
106 3T-43T2-AR7 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 67.64 67.64 67.64 0% 100% 67.64 0% 100% 67.6396 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.44 0.00 30.44
107 3T-43T2-AR9 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 75.01 75.01 75.01 0% 100% 75.01 0% 100% 75.00982 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 33.75 0.00 33.75
108 3T-43T2-AR10 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 81.31 81.31 81.31 0% 100% 81.31 0% 100% 81.31017 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 36.59 0.00 36.59
109 3T-43T2-AR11 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 185.92 185.92 185.92 0% 100% 185.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 65.07 0.00 65.07
110 3T-43T2-AR12 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 176.53 176.53 176.53 0% 100% 176.53 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 61.79 0.00 61.79
111 3T-43T2-AR13 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 72.16 72.16 72.16 0% 100% 72.16 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 25.25 0.00 25.25
112 3T-43T2-AR14 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 74.77 74.77 74.77 0% 100% 74.77 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 26.17 0.00 26.17
113 3T-43T2-AR15 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 2 95.58 191.15 191.15 0% 100% 191.15 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 66.90 0.00 66.90
114 3T-43T2-AR16 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 90.82 90.82 90.82 0% 100% 90.82 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 31.79 0.00 31.79
115 3T-43T2-AR17 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 2 199.59 399.18 399.18 0% 100% 399.18 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 139.71 0.00 139.71
116 3T-43T2-AR18 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 195.31 195.31 195.31 0% 100% 195.31 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 68.36 0.00 68.36
117 3T-43T2-AR19 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 2 93.91 187.82 187.82 0% 100% 187.82 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 65.74 0.00 65.74
118 3T-43T2-AR20 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 74.30 74.30 74.30 0% 100% 74.30 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 26.00 0.00 26.00
119 3T-43T2-AR26 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 66.93 66.93 66.93 0% 100% 66.93 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 23.42 0.00 23.42
120 3T-43T2-AR35 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 121.01 121.01 121.01 0% 100% 121.01 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 42.35 0.00 42.35
121 3T-43T2-AR39 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 87.61 87.61 87.61 0% 100% 87.61 0% 100% 87.61052 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 39.42 0.00 39.42
122 3T-43T2-AR50 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 194.36 194.36 194.36 0% 100% 194.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 68.03 0.00 68.03
123 3T-43T2-AR58 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 143.24 143.24 143.24 0% 100% 143.24 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 50.14 0.00 50.14
124 3T-43T2-CS5 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 32.81 32.81 32.81 0% 100% 32.81 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 11.48 0.00 11.48
125 3T-43T2-CS6 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 32.81 32.81 32.81 0% 100% 32.81 0% 100% 32.80937 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 14.76 0.00 14.76
126 3T-43T2-CS7 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 32.81 32.81 32.81 0% 100% 32.81 0% 100% 32.80937 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 14.76 0.00 14.76
127 3T-43T2-CS8 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 42.44 42.44 42.44 0% 100% 42.44 0% 100% 42.4382 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 19.10 0.00 19.10
128 3T-43T2-CS9 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 42.44 42.44 42.44 0% 100% 42.44 0% 100% 42.4382 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 19.10 0.00 19.10
129 3T-43T2-CS12 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 42.20 42.20 42.20 0% 100% 42.20 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 14.77 0.00 14.77
130 3T-43T2-CS13 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 4 48.14 192.58 192.58 0% 100% 192.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 67.40 0.00 67.40
131 3T-43T2-CS14 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 2 36.49 72.99 72.99 0% 100% 72.99 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 25.55 0.00 25.55
132 3T-43T2-CS17 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 8 36.49 291.96 291.96 0% 100% 291.96 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 102.18 0.00 102.18
133 3T-43T2-CS18 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 30.08 30.08 30.08 0% 100% 30.08 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 10.53 0.00 10.53
134 3T-43T2-CS19 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 30.08 30.08 30.08 0% 100% 30.08 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 10.53 0.00 10.53
135 3T-43T2-CS20 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 2 39.59 79.17 79.17 0% 100% 79.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 27.71 0.00 27.71
136 3T-43T2-ES8 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 114.24 114.24 114.24 0% 100% 114.24 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 39.98 0.00 39.98
137 3T-43T2-ES9 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 109.72 109.72 109.72 0% 100% 109.72 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 38.40 0.00 38.40
138 3T-43T2-ES12 TORRE DE TRANSFERENCIA 2 ESCALERA LIVIANA 1 114.24 114.24 114.24 0% 100% 114.24 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 39.98 0.00 39.98
139 3T-43T2-AR32 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 224.20 224.20 224.20 0% 100% 224.20 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 78.47 0.00 78.47
140 3T-43T2-AR37 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 61.81 61.81 61.81 0% 100% 61.81 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 21.64 0.00 21.64
141 3T-43T2-AR38 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 84.40 84.40 84.40 0% 100% 84.40 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 29.54 0.00 29.54
142 3T-43T2-AR40 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 41.25 41.25 41.25 0% 100% 41.25 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 14.44 0.00 14.44
143 3T-43T2-AR42 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 56.23 56.23 56.23 0% 100% 56.23 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 19.68 0.00 19.68
144 3T-43T2-AR43 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 66.93 66.93 66.93 0% 100% 66.93 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 23.42 0.00 23.42
145 3T-43T2-AR46 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 55.99 55.99 55.99 0% 100% 55.99 0% 100% 55.9899 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 25.20 0.00 25.20
146 3T-43T2-AR47 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 90.82 90.82 90.82 0% 100% 90.82 0% 100% 90.82013 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 40.87 0.00 40.87
147 3T-43T2-AR51 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 60.63 60.63 60.63 0% 100% 60.63 0% 100% 60.626 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 27.28 0.00 27.28
148 3T-43T2-AR52 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 54.33 54.33 54.33 0% 100% 54.33 0% 100% 54.32565 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.45 0.00 24.45
149 3T-43T2-AR53 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 63.84 63.84 63.84 0% 100% 63.84 0% 100% 63.83562 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 28.73 0.00 28.73
150 3T-43T2-AR55 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 74.30 74.30 74.30 0% 100% 74.30 0% 100% 74.29657 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 33.43 0.00 33.43
151 3T-43T2-VG44 TORRE DE TRANSFERENCIA 2 CANAL C LIVIANA 1 33.76 33.76 33.76 0% 100% 33.76 0% 100% 33.76036 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.19 0.00 15.19
152 3T-43T2-VG46 TORRE DE TRANSFERENCIA 2 CANAL C LIVIANA 1 29.84 29.84 29.84 0% 100% 29.84 0% 100% 29.8375 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 13.43 0.00 13.43
153 3T-43T2-VG48 TORRE DE TRANSFERENCIA 2 CANAL C LIVIANA 1 29.72 29.72 29.72 0% 100% 29.72 0% 100% 29.71863 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 13.37 0.00 13.37
154 3T-43T2-VG51 TORRE DE TRANSFERENCIA 2 CANAL C LIVIANA 1 37.56 37.56 37.56 0% 100% 37.56 0% 100% 37.56435 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.90 0.00 16.90
155 3T-43T2-CS21 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 39.59 39.59 39.59 0% 100% 39.59 0% 100% 39.58521 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.81 0.00 17.81
156 3T-43T2-CS22 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 45.17 45.17 45.17 0% 100% 45.17 0% 100% 45.17232 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.33 0.00 20.33
157 3T-43T2-CS23 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 45.17 45.17 45.17 0% 100% 45.17 0% 100% 45.17232 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.33 0.00 20.33
158 3T-43T2-CS26 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 45.17 45.17 45.17 0% 100% 45.17 0% 100% 45.17232 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.33 0.00 20.33
159 3T-43T2-CS28 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 45.17 45.17 45.17 0% 100% 45.17 0% 100% 45.17232 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.33 0.00 20.33
160 3T-43T2-CS30 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 2 45.17 90.34 90.34 0% 100% 90.34 0% 100% 90.34463 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 40.66 0.00 40.66
161 3T-43T2-CS34 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 25.44 25.44 25.44 0% 100% 25.44 0% 100% 25.43915 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.45 0.00 11.45
162 3T-43T2-CS35 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 25.44 25.44 25.44 0% 100% 25.44 0% 100% 25.43915 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.45 0.00 11.45
163 3T-43T2-CS36 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 24.13153 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 10.86 0.00 10.86
164 3T-43T2-CS39 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 2 24.13 48.26 48.26 0% 100% 48.26 0% 100% 48.26305 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.72 0.00 21.72
Página 25
ESTRUCTURA LIVIANA- TORRE DE TRANSFERENCIA N°02 Y 03
ACUMUL
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
PESO PESO ACTUAL (%) ANTERIACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. ANTERI
UNIT. TOTAL (Kg) OR (Tn.)
OR (%)
5% 30% 10% 15% 25% 10% 5%
15,926.57 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 40% 3.55% 6370.78 565.38 6936.01
165 3T-43T2-CS40 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 24.13153 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 10.86 0.00 10.86
166 3T-43T2-CS41 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 24.13153 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 10.86 0.00 10.86
167 3T-43T2-CS42 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 2 24.13 48.26 48.26 0% 100% 48.26 0% 100% 48.26305 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.72 0.00 21.72
168 3T-43T2-CS43 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 48.14 48.14 48.14 0% 100% 48.14 0% 100% 48.14418 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.66 0.00 21.66
169 3T-43T2-CS44 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 24.13153 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 10.86 0.00 10.86
170 3T-43T2-CS45 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 25.91 25.91 25.91 0% 100% 25.91 0% 100% 25.91464 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.66 0.00 11.66
171 3T-43T2-CS47 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 25.91 25.91 25.91 0% 100% 25.91 0% 100% 25.91464 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.66 0.00 11.66
172 3T-43T2-CS48 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 2 25.68 51.35 51.35 0% 100% 51.35 0% 100% 51.35379 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.11 0.00 23.11
173 3T-43T2-VG24 TORRE DE TRANSFERENCIA 2 CANAL C LIVIANA 1 28.17 28.17 28.17 0% 100% 28.17 0% 100% 28.17326 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.68 0.00 12.68
174 3T-43T2-VG34 TORRE DE TRANSFERENCIA 2 CANAL C LIVIANA 1 27.70 27.70 27.70 0% 100% 27.70 0% 100% 27.69776 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.46 0.00 12.46
175 3T-43T2-BR1 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 66.93 66.93 66.93 0% 100% 66.93 0% 100% 66.92635 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.12 0.00 30.12
176 3T-43T2-BR2 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 65.38 65.38 65.38 0% 100% 65.38 0% 100% 65.38098 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.42 0.00 29.42
177 3T-43T2-BR3 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 68.47 68.47 68.47 0% 100% 68.47 0% 100% 68.47172 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.81 0.00 30.81
178 3T-43T2-BR4 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 37.68 37.68 37.68 0% 100% 37.68 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 13.19 0.00 13.19
179 3T-43T2-BR5 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 40.18 40.18 40.18 0% 100% 40.18 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 14.06 0.00 14.06
180 3T-43T2-BR6 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 38.87 38.87 38.87 0% 100% 38.87 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 13.61 0.00 13.61
181 3T-43T2-BR7 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 33.05 33.05 33.05 0% 100% 33.05 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 11.57 0.00 11.57
182 3T-43T2-BR8 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 35.90 35.90 35.90 0% 100% 35.90 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 12.57 0.00 12.57
183 3T-43T2-BR9 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 36.61 36.61 36.61 0% 100% 36.61 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 12.81 0.00 12.81
184 3T-43T2-BR10 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 46.84 46.84 46.84 0% 100% 46.84 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.39 0.00 16.39
185 3T-43T2-BR11 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 67.52 67.52 67.52 0% 100% 67.52 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 23.63 0.00 23.63
186 3T-43T2-BR12 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 45.77 45.77 45.77 0% 100% 45.77 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.02 0.00 16.02
187 3T-43T2-BR13 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 46.72 46.72 46.72 0% 100% 46.72 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.35 0.00 16.35
188 3T-43T2-BR14 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 45.77 45.77 45.77 0% 100% 45.77 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.02 0.00 16.02
189 3T-43T2-BR15 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 46.84 46.84 46.84 0% 100% 46.84 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.39 0.00 16.39
190 3T-43T2-BR16 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 67.52 67.52 67.52 0% 100% 67.52 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 23.63 0.00 23.63
191 3T-43T2-BR17 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 46.72 46.72 46.72 0% 100% 46.72 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.35 0.00 16.35
192 3T-43T2-BR18 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 47.19 47.19 47.19 0% 100% 47.19 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.52 0.00 16.52
193 3T-43T2-BR19 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 44.58 44.58 44.58 0% 100% 44.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 15.60 0.00 15.60
194 3T-43T2-BR20 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 35.90 35.90 35.90 0% 100% 35.90 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 12.57 0.00 12.57
195 3T-43T2-BR21 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 32.81 32.81 32.81 0% 100% 32.81 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 11.48 0.00 11.48
196 3T-43T2-BR22 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 38.87 38.87 38.87 0% 100% 38.87 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 13.61 0.00 13.61
197 3T-43T2-BR23 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 35.19 35.19 35.19 0% 100% 35.19 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 12.32 0.00 12.32
198 3T-43T2-BR24 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 69.90 69.90 69.90 0% 100% 69.90 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 24.46 0.00 24.46
199 3T-43T2-BR25 TORRE DE TRANSFERENCIA 2 BARANDA LIVIANA 1 64.79 64.79 64.79 0% 100% 64.79 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 22.68 0.00 22.68
200 3T-43T2-CS1 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 6.66 6.66 6.66 0% 100% 6.66 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 2.33 0.00 2.33
201 4T-43T3-CS46 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 20.21 20.21 20.21 0% 100% 20.21 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 7.07 0.00 7.07
202 4T-43T3-CS47 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 20.21 20.21 20.21 0% 100% 20.21 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 7.07 0.00 7.07
203 4T-43T3-CS48 TORRE DE TRANSFERENCIA 2 ANGULO LIVIANA 1 24.96 24.96 24.96 0% 100% 24.96 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 8.74 0.00 8.74
204 3T-43T2-AR23 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 54.09 54.09 54.09 0% 100% 54.09 0% 100% 54.08791 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 24.34 0.00 24.34
205 3T-43T2-AR57 TORRE DE TRANSFERENCIA 2 ARRIOSTRE LIVIANA 1 121.01 121.01 121.01 0% 100% 121.01 0% 100% 121.0143 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 54.46 0.00 54.46
206 3T-43T2-CS2 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 12.96 12.96 12.96 0% 100% 12.96 0% 100% 12.95732 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.83 0.00 5.83
207 3T-43T2-CS3 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 26.51 26.51 26.51 0% 100% 26.51 0% 100% 26.50902 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.93 0.00 11.93
208 3T-43T2-CS4 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 6 11.17 67.05 67.05 0% 100% 67.05 0% 100% 67.04523 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.17 0.00 30.17
209 3T-43T2-CS10 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 42.08 42.08 42.08 0% 100% 42.08 0% 100% 42.08158 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.94 0.00 18.94
210 3T-43T2-CS11 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 42.08 42.08 42.08 0% 100% 42.08 0% 100% 42.08158 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.94 0.00 18.94
211 3T-43T2-CS15 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 14.98 14.98 14.98 0% 100% 14.98 0% 100% 14.97819 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.74 0.00 6.74
212 3T-43T2-CS16 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 25.80 25.80 25.80 0% 100% 25.80 0% 100% 25.79577 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 11.61 0.00 11.61
213 3T-43T2-CS24 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 39.70 39.70 39.70 0% 100% 39.70 0% 100% 39.70409 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.87 0.00 17.87
214 3T-43T2-CS25 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 39.70 39.70 39.70 0% 100% 39.70 0% 100% 39.70409 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.87 0.00 17.87
215 3T-43T2-CS27 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 30.55 30.55 30.55 0% 100% 30.55 0% 100% 30.55075 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 13.75 0.00 13.75
216 3T-43T2-CS29 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 45.17 45.17 45.17 0% 100% 45.17 0% 100% 45.17232 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.33 0.00 20.33
217 3T-43T2-CS31 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 4 45.17 180.69 180.69 0% 100% 180.69 0% 100% 180.6893 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 81.31 0.00 81.31
218 3T-43T2-CS32 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 45.17 45.17 45.17 0% 100% 45.17 0% 100% 45.17232 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 20.33 0.00 20.33
219 3T-43T2-CS33 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 45.17 45.17 45.17 0% 100% 45.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 15.81 0.00 15.81
220 3T-43T2-CS37 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 8.45 0.00 8.45
221 3T-43T2-CS38 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 8.45 0.00 8.45
222 3T-43T2-CS46 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 25.91 25.91 25.91 0% 100% 25.91 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 9.07 0.00 9.07
223 3T-43T2-CS49 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 8.45 0.00 8.45
224 3T-43T2-CS50 TORRE DE TRANSFERENCIA 2 COSTANERA LIVIANA 1 24.13 24.13 24.13 0% 100% 24.13 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 8.45 0.00 8.45
225 3T-43T2-GR1 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 58.25 58.25 58.25 0% 100% 58.25 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 20.39 0.00 20.39
226 3T-43T2-GR2 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 58.25 58.25 58.25 0% 100% 58.25 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 20.39 0.00 20.39
227 3T-43T2-GR3 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 44.58 44.58 44.58 0% 100% 44.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 15.60 0.00 15.60
228 3T-43T2-GR4 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 58.84 58.84 58.84 0% 100% 58.84 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 20.60 0.00 20.60
229 3T-43T2-GR5 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 62.17 62.17 62.17 0% 100% 62.17 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 21.76 0.00 21.76
230 3T-43T2-GR6 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 48.14 48.14 48.14 0% 100% 48.14 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 16.85 0.00 16.85
231 3T-43T2-GR7 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 42.20 42.20 42.20 0% 100% 42.20 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 14.77 0.00 14.77
232 3T-43T2-GR8 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 58.25 58.25 58.25 0% 100% 58.25 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 20.39 0.00 20.39
233 3T-43T2-GR9 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 56.94 56.94 56.94 0% 100% 56.94 0% 100% 56.94089 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 25.62 0.00 25.62
234 3T-43T2-GR10 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 57.89 57.89 57.89 0% 100% 57.89 0% 100% 57.89189 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 26.05 0.00 26.05
235 3T-43T2-GR11 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 37.56 37.56 37.56 0% 100% 37.56 0% 100% 37.56435 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.90 0.00 16.90
236 3T-43T2-GR12 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 36.97 36.97 36.97 0% 100% 36.97 0% 100% 36.96997 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.64 0.00 16.64
237 3T-43T2-GR13 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 57.77 57.77 57.77 0% 100% 57.77 0% 100% 57.77302 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 26.00 0.00 26.00
238 3T-43T2-GR14 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 65.38 65.38 65.38 0% 100% 65.38 0% 100% 65.38098 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.42 0.00 29.42
239 3T-43T2-GR15 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 65.98 65.98 65.98 0% 100% 65.98 0% 100% 65.97536 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.69 0.00 29.69
240 3T-43T2-GR16 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 52.42 52.42 52.42 0% 100% 52.42 0% 100% 52.42366 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 23.59 0.00 23.59
241 3T-43T2-GR17 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 58.25 58.25 58.25 0% 100% 58.25 0% 100% 58.24851 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 26.21 0.00 26.21
242 3T-43T2-GR18 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 2 10.94 21.87 21.87 0% 100% 21.87 0% 100% 21.87291 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.84 0.00 9.84
243 3T-43T2-GR19 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 11.89 11.89 11.89 0% 100% 11.89 0% 100% 11.88745 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.35 0.00 5.35
244 3T-43T2-GR20 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 14.98 14.98 14.98 0% 100% 14.98 0% 100% 14.97819 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.74 0.00 6.74
245 3T-43T2-GR21 TORRE DE TRANSFERENCIA 2 GRATING LIVIANA 1 10.82 10.82 10.82 0% 100% 10.82 0% 100% 10.81758 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.87 0.00 4.87
246 3T-43T2-PE1 TORRE DE TRANSFERENCIA 2 PELDAÑO LIVIANA 26 15.57 404.89 404.89 0% 100% 404.89 0% 100% 404.8866 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 182.20 0.00 182.20
247 3T-43T2-PE2 TORRE DE TRANSFERENCIA 2 PELDAÑO LIVIANA 15 15.57 233.59 233.59 0% 100% 233.59 0% 100% 233.5884 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 105.11 0.00 105.11
248 3T-43T2-PE3 TORRE DE TRANSFERENCIA 2 PELDAÑO LIVIANA 1 18.90 18.90 18.90 0% 100% 18.90 0% 100% 18.90105 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.51 0.00 8.51
249 3T-43T2-PE4 TORRE DE TRANSFERENCIA 2 PELDAÑO LIVIANA 1 18.07 18.07 18.07 0% 100% 18.07 0% 100% 18.06893 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.13 0.00 8.13
Página 26
ESTRUCTURA LIVIANA- TORRE DE TRANSFERENCIA N°02 Y 03
ACUMUL
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
PESO PESO ACTUAL (%) ANTERIACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. ANTERI
UNIT. TOTAL (Kg) OR (Tn.)
OR (%)
5% 30% 10% 15% 25% 10% 5%
15,926.57 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 40% 3.55% 6370.78 565.38 6936.01
250 3T-43T2-PE5 TORRE DE TRANSFERENCIA 2 PELDAÑO LIVIANA 1 18.43 18.43 18.43 0% 100% 18.43 0% 100% 18.42555 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.29 0.00 8.29
251 3T-43T2-VG5 TORRE DE TRANSFERENCIA 2 VIGA LIVIANA 1 48.14 48.14 48.14 0% 100% 48.14 0% 100% 48.14418 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 21.66 0.00 21.66
252 3T-43T2-VG10 TORRE DE TRANSFERENCIA 2 VIGA LIVIANA 1 34.59 34.59 34.59 0% 100% 34.59 0% 100% 34.59248 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.57 0.00 15.57
253 4T-43T3-AR1 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 75.01 75.01 75.01 0% 100% 75.01 0% 100% 75.00982 0% 100% 75.01 100% 100% 75.00982 100% 100% 0% 0% 0% 0% 45% 40.00% 33.75 30.00 63.76
254 4T-43T3-AR2 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 2 81.31 162.62 162.62 0% 100% 162.62 0% 100% 162.6203 0% 100% 162.62 100% 100% 162.6203 100% 100% 0% 0% 0% 0% 45% 40.00% 73.18 65.05 138.23
255 4T-43T3-AR3 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 78.34 78.34 78.34 0% 100% 78.34 0% 100% 78.33831 0% 100% 78.34 100% 100% 78.33831 100% 100% 0% 0% 0% 0% 45% 40.00% 35.25 31.34 66.59
256 4T-43T3-AR7 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 72.04 72.04 72.04 0% 100% 72.04 0% 100% 72.03796 0% 100% 72.04 100% 100% 72.03796 100% 100% 0% 0% 0% 0% 45% 40.00% 32.42 28.82 61.23
257 4T-43T3-AR8 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 2 74.77 149.54 149.54 0% 100% 149.54 0% 100% 149.5441 0% 100% 149.54 100% 100% 149.5441 100% 100% 0% 0% 0% 0% 45% 40.00% 67.29 59.82 127.11
258 4T-43T3-AR9 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 70.49 70.49 70.49 0% 100% 70.49 0% 100% 70.49259 0% 100% 70.49 100% 100% 70.49259 100% 100% 0% 0% 0% 0% 45% 40.00% 31.72 28.20 59.92
259 4T-43T3-AR10 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 75.01 75.01 75.01 0% 100% 75.01 0% 100% 75.00982 0% 100% 75.01 100% 100% 75.00982 100% 100% 0% 0% 0% 0% 45% 40.00% 33.75 30.00 63.76
260 4T-43T3-AR11 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 72.16 72.16 72.16 0% 100% 72.16 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 25.25 0.00 25.25
261 4T-43T3-AR4 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 2 185.92 371.84 371.84 0% 100% 371.84 0% 100% 0% 0% 371.8395 100% 100% 371.8395 100% 100% 0% 0% 0% 0% 35% 40.00% 130.14 148.74 278.88
262 4T-43T3-AR5 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 181.64 181.64 181.64 0% 100% 181.64 0% 100% 0% 0% 181.6403 100% 100% 181.6403 100% 100% 0% 0% 0% 0% 35% 40.00% 63.57 72.66 136.23
263 4T-43T3-AR6 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 176.53 176.53 176.53 0% 100% 176.53 0% 100% 0% 0% 176.5287 100% 100% 176.5287 100% 100% 0% 0% 0% 0% 35% 40.00% 61.79 70.61 132.40
264 4T-43T3-AR12 TORRE DE TRANSFERENCIA 3 ARRIOSTRE LIVIANA 1 176.53 176.53 176.53 0% 100% 176.53 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 61.79 0.00 61.79
265 4T-43T3-IN1 TORRE DE TRANSFERENCIA 3 INSERTO LIVIANA 16 5.94 95.10 95.10 0% 100% 95.10 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 33.28 0.00 33.28
266 4T-43T3-CS1 TORRE DE TRANSFERENCIA 3 ANGULO LIVIANA 1 21.52 21.52 21.52 0% 100% 21.52 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 7.53 0.00 7.53
267 4T-43T3-CS26 TORRE DE TRANSFERENCIA 3 ANGULO LIVIANA 1 20.09 20.09 20.09 0% 100% 20.09 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 7.03 0.00 7.03
268 4T-43T3-CS5 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 40.30 40.30 40.30 0% 100% 40.30 0% 100% 40.29846 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.13 0.00 18.13
269 4T-43T3-CS6 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 2 34.95 69.90 69.90 0% 100% 69.90 0% 100% 69.89822 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.45 0.00 31.45
270 4T-43T3-CS7 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 2 34.95 69.90 69.90 0% 100% 69.90 0% 100% 69.89822 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.45 0.00 31.45
271 4T-43T3-CS8 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 2 34.95 69.90 69.90 0% 100% 69.90 0% 100% 69.89822 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.45 0.00 31.45
272 4T-43T3-CS9 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 34.95 34.95 34.95 0% 100% 34.95 0% 100% 34.94911 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.73 0.00 15.73
273 4T-43T3-CS10 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 34.95 34.95 34.95 0% 100% 34.95 0% 100% 34.94911 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.73 0.00 15.73
274 4T-43T3-CS11 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 34.95 34.95 34.95 0% 100% 34.95 0% 100% 34.94911 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.73 0.00 15.73
275 4T-43T3-CS12 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 35.07 35.07 35.07 0% 100% 35.07 0% 100% 35.06798 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.78 0.00 15.78
276 4T-43T3-CS13 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 2 35.07 70.14 70.14 0% 100% 70.14 0% 100% 70.13596 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.56 0.00 31.56
277 4T-43T3-CS14 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 35.90 35.90 35.90 0% 100% 35.90 0% 100% 35.9001 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.16 0.00 16.16
278 4T-43T3-CS15 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 35.90 35.90 35.90 0% 100% 35.90 0% 100% 35.9001 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.16 0.00 16.16
279 4T-43T3-CS16 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 35.90 35.90 35.90 0% 100% 35.90 0% 100% 35.9001 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.16 0.00 16.16
280 4T-43T3-CS17 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 36.49 36.49 36.49 0% 100% 36.49 0% 100% 36.49448 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.42 0.00 16.42
281 4T-43T3-CS18 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 42.08 42.08 42.08 0% 100% 42.08 0% 100% 42.08158 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 18.94 0.00 18.94
282 4T-43T3-CS19 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 36.61 36.61 36.61 0% 100% 36.61 0% 100% 36.61335 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.48 0.00 16.48
283 4T-43T3-CS20 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 36.61 36.61 36.61 0% 100% 36.61 0% 100% 36.61335 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.48 0.00 16.48
284 4T-43T3-CS21 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 36.61 36.61 36.61 0% 100% 36.61 0% 100% 36.61335 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.48 0.00 16.48
285 4T-43T3-CS22 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 35.07 35.07 35.07 0% 100% 35.07 0% 100% 35.06798 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 15.78 0.00 15.78
286 4T-43T3-CS23 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 35.90 35.90 35.90 0% 100% 35.90 0% 100% 35.9001 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.16 0.00 16.16
287 4T-43T3-CS24 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 35.90 35.90 35.90 0% 100% 35.90 0% 100% 35.9001 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.16 0.00 16.16
288 4T-43T3-CS25 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 36.49 36.49 36.49 0% 100% 36.49 0% 100% 36.49448 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.42 0.00 16.42
289 4T-43T3-CS27 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 36.14 36.14 36.14 0% 100% 36.14 0% 100% 36.13785 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.26 0.00 16.26
290 4T-43T3-CS28 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 36.14 36.14 36.14 0% 100% 36.14 0% 100% 36.13785 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.26 0.00 16.26
291 4T-43T3-CS29 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 19.61 19.61 19.61 0% 100% 19.61 0% 100% 19.6143 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.83 0.00 8.83
292 4T-43T3-CS30 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 22.59 22.59 22.59 0% 100% 22.59 0% 100% 22.58616 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 10.16 0.00 10.16
293 4T-43T3-CS31 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 19.97 19.97 19.97 0% 100% 19.97 0% 100% 19.97092 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.99 0.00 8.99
294 4T-43T3-CS32 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 19.97 19.97 19.97 0% 100% 19.97 0% 100% 19.97092 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.99 0.00 8.99
295 4T-43T3-CS33 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 17.95 17.95 17.95 0% 100% 17.95 0% 100% 17.95005 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.08 0.00 8.08
296 4T-43T3-CS34 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 17.95 17.95 17.95 0% 100% 17.95 0% 100% 17.95005 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.08 0.00 8.08
297 4T-43T3-CS35 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 20.92 20.92 20.92 0% 100% 20.92 0% 100% 20.92191 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.41 0.00 9.41
298 4T-43T3-CS36 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 2 19.61 39.23 39.23 0% 100% 39.23 0% 100% 39.22859 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.65 0.00 17.65
299 4T-43T3-CS37 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 20.57 20.57 20.57 0% 100% 20.57 0% 100% 20.56529 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.25 0.00 9.25
300 4T-43T3-CS38 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 20.57 20.57 20.57 0% 100% 20.57 0% 100% 20.56529 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.25 0.00 9.25
301 4T-43T3-CS39 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 20.57 20.57 20.57 0% 100% 20.57 0% 100% 20.56529 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.25 0.00 9.25
302 4T-43T3-CS40 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 20.57 20.57 20.57 0% 100% 20.57 0% 100% 20.56529 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.25 0.00 9.25
303 4T-43T3-CS41 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 20.57 20.57 20.57 0% 100% 20.57 0% 100% 20.56529 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.25 0.00 9.25
304 4T-43T3-CS42 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 21.75 21.75 21.75 0% 100% 21.75 0% 100% 21.75404 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.79 0.00 9.79
305 4T-43T3-CS43 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 21.75 21.75 21.75 0% 100% 21.75 0% 100% 21.75404 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.79 0.00 9.79
306 4T-43T3-CS44 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 20.33 20.33 20.33 0% 100% 20.33 0% 100% 20.32754 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 9.15 0.00 9.15
307 4T-43T3-CS45 TORRE DE TRANSFERENCIA 3 COSTANERA LIVIANA 1 19.61 19.61 19.61 0% 100% 19.61 0% 100% 19.6143 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 8.83 0.00 8.83
308 4T-43T3-TE1 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 2 1.43 2.85 2.85 0% 100% 2.85 0% 100% 2.852988 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.28 0.00 1.28
309 4T-43T3-TE2 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 19 1.43 27.10 27.10 0% 100% 27.10 0% 100% 27.10339 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.20 0.00 12.20
310 4T-43T3-TE3 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 4 2.02 8.08 8.08 0% 100% 8.08 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 2.83 0.00 2.83
311 4T-43T3-TE4 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 8.56 8.56 8.56 0% 100% 8.56 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.00 0.00 3.00
312 4T-43T3-TE5 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 8.56 8.56 8.56 0% 100% 8.56 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.00 0.00 3.00
313 4T-43T3-TE6 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 8.92 8.92 8.92 0% 100% 8.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.12 0.00 3.12
314 4T-43T3-TE7 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 8.92 8.92 8.92 0% 100% 8.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 3.12 0.00 3.12
315 4T-43T3-TE8 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.78 1.78 1.78 0% 100% 1.78 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.62 0.00 0.62
316 4T-43T3-TE9 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 0.59 0.59 0.59 0% 100% 0.59 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.21 0.00 0.21
317 4T-43T3-TE10 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.78 1.78 1.78 0% 100% 1.78 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.62 0.00 0.62
318 4T-43T3-TE11 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 0.95 0.95 0.95 0% 100% 0.95 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.33 0.00 0.33
319 4T-43T3-TE12 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.31 1.31 1.31 0% 100% 1.31 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.46 0.00 0.46
320 4T-43T3-TE13 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.90 1.90 1.90 0% 100% 1.90 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.67 0.00 0.67
321 4T-43T3-TE14 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 2 7.13 14.26 14.26 0% 100% 14.26 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 4.99 0.00 4.99
322 4T-43T3-TE15 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.90 1.90 1.90 0% 100% 1.90 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.67 0.00 0.67
323 4T-43T3-TE16 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.66 1.66 1.66 0% 100% 1.66 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.58 0.00 0.58
324 4T-43T3-TE17 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.55 1.55 1.55 0% 100% 1.55 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.54 0.00 0.54
325 4T-43T3-TE18 TORRE DE TRANSFERENCIA 3 TEMPLADOR LIVIANA 1 1.66 1.66 1.66 0% 100% 1.66 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 0.58 0.00 0.58
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A

Página 27
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA MEDIANA- TORRE DE TRANSFERENCIA N°02 Y 03

ACUMUL
ACUM.
PESO O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
ACTUAL (%)ANTERIACTUAL (Tn.)
TOTAL (Tn.)
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. ANTERI
TOTAL (Kg) OR (Tn.)
OR (%)
5% 30% 10% 15% 25% 10% 5%
13,898.94 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 40% 1.18% 5559.66 163.37 5722.94
1 3T-43T2-VG27 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.74 91.74 91.74 0% 100% 91.74 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.11 0.00 32.11
2 3T-43T2-VG35 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.84 91.84 91.84 0% 100% 91.84 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.14 0.00 32.14
3 3T-43T2-VG36 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 264.41 264.41 264.41 0% 100% 264.41 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 92.54 0.00 92.54
4 3T-43T2-VG41 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 164.33 164.33 164.33 0% 100% 164.33 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 57.52 0.00 57.52
5 3T-43T2-VG42 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 121.99 121.99 121.99 0% 100% 121.99 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 42.70 0.00 42.70
6 3T-43T2-VG43 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 154.07 154.07 154.07 0% 100% 154.07 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 53.92 0.00 53.92
7 3T-43T2-VG45 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 2 73.24 146.48 146.48 0% 100% 146.48 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 51.27 0.00 51.27
8 3T-43T2-VG47 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 73.24 73.24 73.24 0% 100% 73.24 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 25.63 0.00 25.63
9 3T-43T2-VG52 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 164.44 164.44 164.44 0% 100% 164.44 0% 100% 164.4402 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 74.00 0.00 74.00
10 3T-43T2-VG53 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 122.74 122.74 122.74 0% 100% 122.74 0% 100% 122.7421 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 55.23 0.00 55.23
11 3T-43T2-CO2 TORRE DE TRANSFERENCIA
COLUMNA
2 MEDIANA 1 219.61 219.61 219.61 0% 100% 219.61 0% 100% 219.61 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 98.82 0.00 98.82
12 3T-43T2-CO3 TORRE DE TRANSFERENCIA
COLUMNA
2 MEDIANA 1 239.50 239.50 239.50 0% 100% 239.50 0% 100% 239.4968 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 107.77 0.00 107.77
13 3T-43T2-CO9 TORRE DE TRANSFERENCIA
COLUMNA
2 MEDIANA 1 385.33 385.33 385.33 0% 100% 385.33 0% 100% 385.3332 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 173.40 0.00 173.40
14 3T-43T2-CO10 TORRE DE TRANSFERENCIA
COLUMNA
2 MEDIANA 1 385.33 385.33 385.33 0% 100% 385.33 0% 100% 385.3332 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 173.40 0.00 173.40
15 3T-43T2-VG12 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 186.3584 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 83.86 0.00 83.86
16 3T-43T2-VG13 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 186.3584 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 83.86 0.00 83.86
17 3T-43T2-VG16 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 436.33 436.33 436.33 0% 100% 436.33 0% 100% 436.3332 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 196.35 0.00 196.35
18 3T-43T2-VG17 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 186.3584 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 83.86 0.00 83.86
19 3T-43T2-VG18 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 186.3584 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 83.86 0.00 83.86
20 3T-43T2-VG20 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 197.05 197.05 197.05 0% 100% 197.05 0% 100% 197.0503 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 88.67 0.00 88.67
21 3T-43T2-VG28 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.74 91.74 91.74 0% 100% 91.74 0% 100% 91.73583 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 41.28 0.00 41.28
22 3T-43T2-VG54 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 157.60 157.60 157.60 0% 100% 157.60 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 55.16 0.00 55.16
23 3T-43T2-VG1 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.74 91.74 91.74 0% 100% 91.74 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.11 0.00 32.11
24 3T-43T2-VG2 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.74 91.74 91.74 0% 100% 91.74 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.11 0.00 32.11
25 3T-43T2-VG3 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 92.81 92.81 92.81 0% 100% 92.81 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.48 0.00 32.48
26 3T-43T2-VG4 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.74 91.74 91.74 0% 100% 91.74 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.11 0.00 32.11
27 3T-43T2-VG9 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 214.26 214.26 214.26 0% 100% 214.26 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 74.99 0.00 74.99
28 3T-43T2-VG32 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 192.03 192.03 192.03 0% 100% 192.03 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 67.21 0.00 67.21
29 3T-43T2-VG37 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 491.29 491.29 491.29 0% 100% 491.29 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 171.95 0.00 171.95
30 3T-43T2-VG39 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 227.31 227.31 227.31 0% 100% 227.31 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 79.56 0.00 79.56
31 3T-43T2-VG49 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 198.97 198.97 198.97 0% 100% 198.97 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 69.64 0.00 69.64
32 3T-43T2-VG50 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 190.85 190.85 190.85 0% 100% 190.85 0% 100% 190.849 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 85.88 0.00 85.88
33 3T-43T2-VG55 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 216.51 216.51 216.51 0% 100% 216.51 0% 100% 216.5094 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 97.43 0.00 97.43
34 3T-43T2-VG56 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 212.02 212.02 212.02 0% 100% 212.02 0% 100% 212.0188 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 95.41 0.00 95.41
35 3T-43T2-VG57 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 196.09 196.09 196.09 0% 100% 196.09 0% 100% 196.088 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 88.24 0.00 88.24
36 3T-43T2-VG33 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 2 165.62 331.23 331.23 0% 100% 331.23 0% 100% 331.2326 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 149.05 0.00 149.05
37 3T-43T2-VG6 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 141.99 141.99 141.99 0% 100% 141.99 0% 100% 141.9874 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 63.89 0.00 63.89
38 3T-43T2-VG7 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.42 91.42 91.42 0% 100% 91.42 0% 100% 91.41507 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 41.14 0.00 41.14
39 3T-43T2-VG8 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 86.92 86.92 86.92 0% 100% 86.92 0% 100% 86.92451 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 39.12 0.00 39.12
40 3T-43T2-VG11 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 186.3584 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 83.86 0.00 83.86
41 3T-43T2-VG14 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 165.62 165.62 165.62 0% 100% 165.62 0% 100% 165.6163 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 74.53 0.00 74.53
42 3T-43T2-VG15 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 208.28 208.28 208.28 0% 100% 208.28 0% 100% 208.2767 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 93.72 0.00 93.72
43 3T-43T2-VG19 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 65.23 0.00 65.23
44 3T-43T2-VG21 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 165.62 165.62 165.62 0% 100% 165.62 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 57.97 0.00 57.97
45 3T-43T2-VG22 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 198.97 198.97 198.97 0% 100% 198.97 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 69.64 0.00 69.64
46 3T-43T2-VG23 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 190.85 190.85 190.85 0% 100% 190.85 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 66.80 0.00 66.80
47 3T-43T2-VG25 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 92.81 92.81 92.81 0% 100% 92.81 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.48 0.00 32.48
48 3T-43T2-VG26 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 91.74 91.74 91.74 0% 100% 91.74 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 32.11 0.00 32.11
49 3T-43T2-VG29 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 42.98 42.98 42.98 0% 100% 42.98 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 15.04 0.00 15.04
50 3T-43T2-VG30 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 65.23 0.00 65.23
51 3T-43T2-VG31 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 65.23 0.00 65.23
52 3T-43T2-VG38 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 446.92 446.92 446.92 0% 100% 446.92 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 156.42 0.00 156.42
53 3T-43T2-VG40 TORRE DE TRANSFERENCIA
VIGA2 MEDIANA 1 186.36 186.36 186.36 0% 100% 186.36 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 65.23 0.00 65.23
54 4T-43T3-VG4 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 153.43 153.43 153.43 0% 100% 153.43 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 53.70 0.00 53.70
55 4T-43T3-VG5 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 132.58 132.58 132.58 0% 100% 132.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 46.40 0.00 46.40
56 4T-43T3-VG6 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 153.43 153.43 153.43 0% 100% 153.43 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 53.70 0.00 53.70
57 4T-43T3-VG7 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 132.58 132.58 132.58 0% 100% 132.58 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 46.40 0.00 46.40
58 4T-43T3-VG10 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 165.08 165.08 165.08 0% 100% 165.08 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 57.78 0.00 57.78
59 4T-43T3-VG12 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 165.08 165.08 165.08 0% 100% 165.08 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 57.78 0.00 57.78
60 4T-43T3-VG16 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 83.18 83.18 83.18 0% 100% 83.18 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 29.11 0.00 29.11
61 4T-43T3-VG18 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 83.18 83.18 83.18 0% 100% 83.18 0% 100% 83.18237 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 37.43 0.00 37.43
62 4T-43T3-CO5 TORRE DE TRANSFERENCIA
COLUMNA
3 MEDIANA 1 223.89 223.89 223.89 0% 100% 223.89 0% 100% 223.8867 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 100.75 0.00 100.75
63 4T-43T3-CO6 TORRE DE TRANSFERENCIA
COLUMNA
3 MEDIANA 1 211.59 211.59 211.59 0% 100% 211.59 0% 100% 211.5911 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 95.22 0.00 95.22
64 4T-43T3-CO1 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 442.53 442.53 442.53 0% 100% 442.53 0% 100% 442.5345 0% 100% 442.53 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 199.14 66.38 265.52
65 4T-43T3-VG1 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 208.28 208.28 208.28 0% 100% 208.28 0% 100% 0% 0% 208.28 100% 100% 0% 0% 0% 0% 0% 0% 35% 15.00% 72.90 31.24 104.14
66 4T-43T3-VG3 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 175.13 175.13 175.13 0% 100% 175.13 0% 100% 0% 0% 175.13 100% 100% 0% 0% 0% 0% 0% 0% 35% 15.00% 61.30 26.27 87.57
67 4T-43T3-VG8 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 208.28 208.28 208.28 0% 100% 208.28 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 72.90 0.00 72.90
68 4T-43T3-VG9 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 128.09 128.09 128.09 0% 100% 128.09 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 44.83 0.00 44.83
69 4T-43T3-VG14 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 117.61 117.61 117.61 0% 100% 117.61 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 41.16 0.00 41.16
70 4T-43T3-VG15 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 138.14 138.14 138.14 0% 100% 138.14 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 48.35 0.00 48.35
71 4T-43T3-VG17 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 76.34 76.34 76.34 0% 100% 76.34 0% 100% 54 0% 71% 0% 0% 0% 0% 0% 0% 0% 0% 42% 0.00% 32.12 0.00 32.12
72 4T-43T3-VG19 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 68.64 68.64 68.64 0% 100% 68.64 0% 100% 68.64149 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 30.89 0.00 30.89
73 4T-43T3-CS2 TORRE DE TRANSFERENCIA
COSTANERA
3 MEDIANA 2 32.50 65.01 65.01 0% 100% 65.01 0% 100% 65.00627 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 29.25 0.00 29.25
74 4T-43T3-CS3 TORRE DE TRANSFERENCIA
COSTANERA
3 MEDIANA 1 32.50 32.50 32.50 0% 100% 32.50 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 11.38 0.00 11.38
75 4T-43T3-CS4 TORRE DE TRANSFERENCIA
COSTANERA
3 MEDIANA 1 31.43 31.43 31.43 0% 100% 31.43 0% 100% 31.43395 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 14.15 0.00 14.15
76 4T-43T3-VG2 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 262.59 262.59 262.59 0% 100% 262.59 0% 100% 262.5911 0% 100% 262.5911 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 118.17 39.39 157.55
77 4T-43T3-VG11 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 246.34 246.34 246.34 0% 100% 246.34 0% 100% 246.3396 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 110.85 0.00 110.85
78 4T-43T3-VG13 TORRE DE TRANSFERENCIA
VIGA3 MEDIANA 1 246.34 246.34 246.34 0% 100% 246.34 0% 100% 246.3396 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 110.85 0.00 110.85
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
ESTRUCTURA PESADA- TORRE DE TRANSFERENCIA N°02 Y 03

ACUMUL
ACUM.
PESO ADO ACTUAL ACTUAL TOTAL
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ANTERI
ITEM N° PLANO ESTRUCTURA DESCRIPCIÓN TIPO CANT. PESO UNIT. TOTAL ANTERI (%) (Tn.) (Tn.)
OR (Tn.)
(Kg) OR (%)
5% 30% 10% 15% 25% 10% 5%
5395.17 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 40% 6.61% 2158.08 356.87 2514.95
1 3T-43T2-CO4 TORRE DE TRANSFERENCIA 2 COLUMNA PESADA 1 666.97 666.97 666.97 0% 100% 666.97 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 233.44 0.00 233.44
2 3T-43T2-CO6 TORRE DE TRANSFERENCIA 2 COLUMNA PESADA 1 619.43 619.43 619.43 0% 100% 619.43 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 216.80 0.00 216.80
3 3T-43T2-CO7 TORRE DE TRANSFERENCIA 2 COLUMNA PESADA 1 584.64 584.64 584.64 0% 100% 584.64 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 204.62 0.00 204.62
4 3T-43T2-CO8 TORRE DE TRANSFERENCIA 2 COLUMNA PESADA 1 628.27 628.27 628.27 0% 100% 628.27 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 35% 0.00% 219.90 0.00 219.90
5 3T-43T2-CO11 TORRE DE TRANSFERENCIA 2 COLUMNA PESADA 1 666.17 666.17 666.17 0% 100% 666.17 0% 100% 468 0% 70% 0% 0% 0% 0% 0% 0% 0% 0% 42% 0.00% 279.96 0.00 279.96
6 3T-43T2-CO1 TORRE DE TRANSFERENCIA 2 COLUMNA PESADA 1 438.91 438.91 438.91 0% 100% 438.91 0% 100% 438.9081 0% 100% 438.9081 100% 100% 438.9081 100% 100% 0% 0% 0% 0% 45% 40.00% 197.51 175.56 373.07
7 3T-43T2-CO5 TORRE DE TRANSFERENCIA 2 COLUMNA PESADA 1 417.43 417.43 417.43 0% 100% 417.43 0% 100% 417.4335 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 187.85 0.00 187.85
8 4T-43T3-CO2 TORRE DE TRANSFERENCIA 3 COLUMNA PESADA 1 470.95 470.95 470.95 0% 100% 470.95 0% 100% 470.9477 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 211.93 0.00 211.93
9 4T-43T3-CO3 TORRE DE TRANSFERENCIA 3 COLUMNA PESADA 1 453.26 453.26 453.26 0% 100% 453.26 0% 100% 453.2627 0% 100% 453.2627 100% 100% 453.2627 100% 100% 0% 0% 0% 0% 45% 40.00% 203.97 181.31 385.27
10 4T-43T3-CO4 TORRE DE TRANSFERENCIA 3 COLUMNA PESADA 1 449.13 449.13 449.13 0% 100% 449.13 0% 100% 449.1286 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 202.11 0.00 202.11
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
CERRAMIENTO - EDIFICIO DE RECEPCIÓN DE CAMIONES

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO ACTUA ACTUA
FABRICACIÓN PRE ENSAMBLE CAMINATAS ANTERI TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI L (%) L
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
1773.60 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 798.12 0.00 798.12
1 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 e=1.8m2
mm (altura
1597.80
de la plancha
1597.8 de 50 0% 100% 1597.8 0% 100% 1597.8 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 719.01 0.00 719.01
2 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO
m2 175.80
e=1.8 mm 175.8
(altura de la plancha de0%50 mm)
100% 175.8 0% 100% 175.8 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 79.11 0.00 79.11
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
COBERTURAS - EDIFICIO DE RECEPCIÓN DE CAMIONES

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO
FABRICACIÓN PRE ENSAMBLE CAMINATAS ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
874.70 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 393.62 0.00 393.62

1 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 e=1.8 m2


mm (altura
804.30
de la plancha
804.3de 50 mm) 0% 100% 804.3 0% 100% 804.3 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 361.94 0.00 361.94

2 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO


m2 70.40
e=1.8 mm (altura
70.4 de la plancha de0%
50 mm)
100% 70.4 0% 100% 70.4 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 31.68 0.00 31.68
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
CERRAMIENTO - PLANTA DE AIRE

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO
FABRICACIÓN PRE ENSAMBLE CAMINATAS ACTUAL (%) ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
64.20 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 28.89 0.00 28.89
1 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 e=1.8m2
mm (altura
55.80
de la plancha
55.8 de 50 0% 100% 55.8 0% 100% 55.8 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 25.11 0.00 25.11
2 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO
m2 8.40
e=1.8 mm (altura
8.4 de la plancha de0%50 mm)
100% 8.4 0% 100% 8.4 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.78 0.00 3.78
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
COBERTURAS - PLANTA DE AIRE

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO ACTUA
FABRICACIÓN PRE ENSAMBLE CAMINATAS ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI L (%)
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
34.20 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 15.39 0.00 15.39

1 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 e=1.8 m2


mm (altura
29.10
de la plancha
29.1de 50 mm) 0% 100% 29.1 0% 100% 29.1 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 13.10 0.00 13.10

2 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO


m2 e=1.8
5.10 mm (altura
5.1 de la plancha de0%
50 mm)
100% 5.1 0% 100% 5.1 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.30 0.00 2.30
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
CERRAMIENTO - CAJÓN DE ESCALERA

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO
FABRICACIÓN PRE ENSAMBLE CAMINATAS ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
41.60 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 18.72 0.00 18.72
1 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 e=1.8m2
mm (altura
37.40
de la plancha
37.4 de 50 0% 100% 37.4 0% 100% 37.4 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 16.83 0.00 16.83
2 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO
m2 4.20
e=1.8 mm (altura
4.2 de la plancha de0%50 mm)
100% 4.2 0% 100% 4.2 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.89 0.00 1.89
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
COBERTURAS - CAJÓN DE ESCALERA

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO
FABRICACIÓN PRE ENSAMBLE CAMINATAS ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
18.70 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 8.42 0.00 8.42

1 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 e=1.8 m2


mm (altura
14.20
de la plancha
14.2de 50 mm) 0% 100% 14.2 0% 100% 14.2 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 6.39 0.00 6.39

2 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO


m2 e=1.8
4.50 mm (altura
4.5 de la plancha de0%
50 mm)
100% 4.5 0% 100% 4.5 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 2.03 0.00 2.03
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
CERRAMIENTO - TORRE DE TRANSFERENCIA N°01

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO ACTUA
FABRICACIÓN PRE ENSAMBLE CAMINATAS ANTERIO ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI L (%)
R
OR (%)
5% 30% 10% 15% 25% 10% 5%
194.70 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 87.62 0.00 87.62
1 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 e=1.8m2
mm (altura
155.80
de la plancha
155.8 de 50 0% 100% 155.8 0% 100% 155.8 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 70.11 0.00 70.11
2 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO
m2 38.90
e=1.8 mm (altura
38.9 de la plancha de0%50 mm)
100% 38.9 0% 100% 38.9 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.51 0.00 17.51
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
COBERTURAS - TORRE DE TRANSFERENCIA N°01

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO ACTUA
FABRICACIÓN PRE ENSAMBLE CAMINATAS ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI L (%)
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
56.70 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 25.52 0.00 25.52

1 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 e=1.8 m2


mm (altura
49.00
de la plancha
49de 50 mm) 0% 100% 49 0% 100% 49 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 22.05 0.00 22.05

2 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO


m2 e=1.8
7.70 mm (altura
7.7 de la plancha de0%
50 mm)
100% 7.7 0% 100% 7.7 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.47 0.00 3.47
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
CERRAMIENTO - TORRE DE TRANSFERENCIA N°02 Y 03

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO ACTUA
FABRICACIÓN PRE ENSAMBLE CAMINATAS ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI L (%)
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
274.70 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 123.62 0.00 123.62
1 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 e=1.8m2
mm (altura
263.30
de la plancha
263.3 de 50 0% 100% 263.3 0% 100% 263.3 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 118.49 0.00 118.49
2 Cerramiento de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO
m2 11.40
e=1.8 mm (altura
11.4 de la plancha de0%50 mm)
100% 11.4 0% 100% 11.4 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.13 0.00 5.13
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
COBERTURAS - TORRE DE TRANSFERENCIA N°02 Y 03

ACUMU
LEVANTAMIENTO ACUM.
O.C. TRASLADO MONTAJE LADO ACTUA
FABRICACIÓN PRE ENSAMBLE CAMINATAS ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI L (%)
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
111.60 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 50.22 0.00 50.22

1 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 e=1.8 m2


mm (altura
83.90
de la plancha
83.9de 50 mm) 0% 100% 83.9 0% 100% 83.9 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 37.76 0.00 37.76

2 Cobertura de panel FRP ANTICORROSIVO TIPO MV4 TRASLÚCIDO


m2 27.70
e=1.8 mm (altura
27.7 de la plancha de0%
50 mm)
100% 27.7 0% 100% 27.7 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 12.47 0.00 12.47
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
EQUIPOS MECANICOS

ACUMUL
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
77.75 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 14% 0.39% 11.17 0.3 11.47
1 Tolva de recepción Unid. 1.00 1.00 0% 100% 1.00 0% 100% 1.00 0% 100% 1 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 0.45 0.15 0.60
2 Alimentador de faja Unid. 1.00 1.00 0% 100% 1.00 0% 100% 1.00 0% 100% 1 100% 100% 0% 0% 0% 0% 0% 0% 45% 15.00% 0.45 0.15 0.60
3 Faja transportadora Unid. 1.00 1.00 0% 100% 0.50 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 0.20 0.00 0.20
4 Faja transportadora Unid. 1.00 1.00 0% 100% 0.50 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 0.20 0.00 0.20
5 Faja transportadora Unid. 1.00 1.00 0% 100% 0.50 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 0.20 0.00 0.20
6 Detector de metáles Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
7 Colector de polvo Centralizado Unid. 1.00 1.00 0% 100% 0.50 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 0.20 0.00 0.20
8 Colector de polvo - insertable Unid. 1.00 1.00 0% 100% 0.50 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 0.20 0.00 0.20
9 Colector de polvo - insertable Unid. 1.00 1.00 0% 100% 0.50 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 0.20 0.00 0.20
10 Colector de polvo - insertable Unid. 1.00 1.00 0% 100% 0.50 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 0.20 0.00 0.20
11 Damper motorizado Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
12 Damper motorizado Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
13 Damper motorizado Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
14 Damper motorizado Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
15 Damper motorizado Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
16 Damper motorizado Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
17 Suministro de ductos y campanas Ton 13.20 0.00 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.00% 0.00 0.00 0.00
18 Planta de lavado de llantas (incluye bombas y tanques )Unid. 1.00 1.00 0% 100% 1.00 0% 100% 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.45 0.00 0.45
19 Sistema HVAC - Sala de control Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
20 Sistema HVAC - Sala eléctrica Unid. 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
21 Sistema de aire comprimido (incluye secador, filtros y tanque
glb 1.00 1.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0.00% 0.05 0.00 0.05
22 Galerias de fajas transportadoras Ton 39.60 39.60 0% 100% 19.80 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 20% 0.00% 7.92 0.00 7.92
23 Chutes de transferencia Ton 4.95 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.00% 0.00 0.00 0.00
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
EQUIPOS MECANICOS

ACUMUL
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
708.73 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 318.93 0.00 318.93
1 Ø2" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 10.01 10.01 0% 100% 10.01 0% 100% 10.01 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.50 0.00 4.50
2 Ø1½" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 283.47 283.47 0% 100% 283.47 0% 100% 283.47 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 127.56 0.00 127.56
3 Ø1" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 10.01 10.01 0% 100% 10.01 0% 100% 10.01 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.50 0.00 4.50
4 ؽ" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 8.80 8.8 0% 100% 8.8 0% 100% 8.8 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.96 0.00 3.96
5 Ø3" PIPE HDPE IPS, SDR 11, PE FOR BUTT FUSION, ASTM
m 7.37 7.37 0% 100% 7.37 0% 100% 7.37 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 3.32 0.00 3.32
6 Ø3" PIPE, S-STD, ASTM-A53-B TYPE S m 0.11 0.11 0% 100% 0.11 0% 100% 0.11 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.05 0.00 0.05
7 Ø3" PIPE, S-STD, PE, ASTM-A53-B TYPE S m 12.54 12.54 0% 100% 12.54 0% 100% 12.54 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 5.64 0.00 5.64
8 Ø2" PIPE HDPE IPS, SDR 11, PE FOR BUTT FUSION, ASTM
m 1.32 1.32 0% 100% 1.32 0% 100% 1.32 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.59 0.00 0.59
9 Ø2" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 38.39 38.39 0% 100% 38.39 0% 100% 38.39 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 17.28 0.00 17.28
10 Ø1½" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 1.43 1.43 0% 100% 1.43 0% 100% 1.43 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.64 0.00 0.64
11 Ø1" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 16.72 16.72 0% 100% 16.72 0% 100% 16.72 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 7.52 0.00 7.52
12 ؽ" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 1.65 1.65 0% 100% 1.65 0% 100% 1.65 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.74 0.00 0.74
13 Ø6" PIPE, S-STD, PE, ASTM-A53-B TYPE S m 3.96 3.96 0% 100% 3.96 0% 100% 3.96 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.78 0.00 1.78
14 Ø3" PIPE, S-STD, ASTM-A53-B TYPE S m 280.39 280.39 0% 100% 280.39 0% 100% 280.39 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 126.18 0.00 126.18
15 Ø2" PIPE, S-80, T&C, ASTM-A106-B, SMLS m 1.87 1.87 0% 100% 1.87 0% 100% 1.87 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 0.84 0.00 0.84
16 Ø3" PIPE HDPE IPS, SDR 11, PE FOR BUTT FUSION, ASTM
m 30.69 30.69 0% 100% 30.69 0% 100% 30.69 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 13.81 0.00 13.81
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
MALLA A TIERRA BAJO GRADIENTE - ELÉCTRICA

ACUMUL
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
1687.00 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total
7.3.1.1 Bandeja Metálica Tipo Escalerilla, fabricado según norma Und
VE-1, clase
24.00
20C, acabado en galvanizado
24.00 en100%
caliente según
100% norma ASTM A123.
24.00
Dimensiones
100% (A:600,
100%H:100, L:6000 mm),
24.00
espesor100%
2.5mm. Incluye
100% tapa a dos aguas, accesorios0%
de sujeción,
0%placas de empalme (eclisas) y0%
pernos de 0%
unión. 0% 0% 0% 0% 0% 45.00% 0.00 10.80 10.80
7.3.1.2 Bandeja Metálica Tipo Escalerilla, fabricado según norma Und
VE-1, clase
24.00
20C, acabado en galvanizado
24.00 en100%
caliente según
100% norma ASTM A123.
24.00
Dimensiones
100% (A:450,
100%H:100, L:6000 mm),
24.00
espesor100%
2.5mm. Incluye
100% tapa a dos aguas, accesorios0%
de sujeción,
0%placas de empalme (eclisas) y0%
pernos de 0%
unión. 0% 0% 0% 0% 0% 45.00% 0.00 10.80 10.80
7.3.1.3 Bandeja Metálica Tipo Escalerilla, fabricado según norma Und
VE-1, clase
68.00
20C, acabado en galvanizado
68.00 en100%
caliente según
100% norma ASTM A123.
68.00
Dimensiones
100% (A:300,
100%H:100, L: 6000 mm),
68.00
espesor100%
2.5mm. Incluye
100% tapa a dos aguas, accesorios0%
de sujeción,
0%placas de empalme (eclisas) y0%
pernos de0%
unión. 0% 0% 0% 0% 0% 45.00% 0.00 30.60 30.60
7.3.1.4 Bandeja Metálica Tipo Escalerilla, fabricado según norma Und
VE-1, clase
44.00
20C, acabado en galvanizado
44.00 en100%
caliente según
100% norma ASTM A123.
44.00
Dimensiones
100% (A:200,
100%H:100, L:6000mm),44.00
espesor 100%
2.5mm. Incluye
100%tapa a dos aguas, accesorios
44 100%
de sujeción,
100% placas de empalme (eclisas)
8 y18%
pernos de18%
unión. 0% 0% 0% 0% 0% 64.55% 0.00 28.40 28.40
7.3.1.5 Suministro e Instalación de Soportería para Bandejas Portacables,
Und Tipo
82.00Mensula de Dos Niveles
82.00en Estructura
100% Metalica.
100% Incluye accesorios
82.00de fijación
100% 100% 82.00 100% 100% 82 100% 100% 30 37% 37% 0% 0% 0% 0% 0% 69.15% 0.00 56.70 56.70
7.3.1.6 Suministro e Instalación de Soportería para Bandejas Portacables,
Und Tipo
160.00
Trapecio de Dos Niveles
160.00 en Estructura
100% Metalica.
100% Incluye accesorios
160.00de fijación
100% 100% 160.00 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00 72.00 72.00
7.5.2.1 Malla de tierra (incluye: cable cobre desnudo temple blandom2/0 AWG,
424.00
Tubo PVC SAP 1", Terminacion,
424.00 100%
soldadura100%
exotermica, molde, 424.00
etc)…aterramiento
100% de bandejas
100% 424.00 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 45.00% 0.00 190.80 190.80
8.6.1 Cable de comunicación PROFIBUS DP, 22AWG, trenzado,FOIL+BRAID,
m 193.00para instalación en
193.00
tuberías metálicas
100% y100%
bandejas, con aislamiento
193.00de Polietileno
100% (300 100%
V, 75° C, tensión 193.00
y temperatura
100%
nominales),
100%chaqueta de PVC, no propagador
0%de incendio
0% y retardante al fuego, resistente
0% a rayos0%
solares, resistente al contacto con
0% aceites 0%
y baja emisión de humo, Listado0%
UL 0% 0% 45.00% 0.00 86.85 86.85
8.6.4 Cable Ethernet de cobre tipo FTP Cat 6 apantallado 4 paresm23AWG,89.00
para instalación en tuberías
89.00 metálicas
100% y bandejas,
100% con aislamiento89.00
de Poliolefina
100%o polietileno
100% sin halogenos, blindaje
89.00 de100%
aluminio/poliester
100% (impedancia 100ohms, 20ºC),
0%chaqueta
0%LSZH (libre de halogeno), no propagador
0% de
0%incendio y retardante al fuego,0%
resistente0%
a rayos solares, resistente al contacto
0% con0%
aceites y baja
0% emisión
45.00%de humo,0.00 40.05 40.05
8.6.15 Cable de comunicación AS-Interface -flat clase 6, con conductor
m de340.00
cobre electrolítico recocido,
340.001x2C 100%
1.5mm² para
100%
instalación en tuberías
340.00
metálicas
100%
y bandejas,
100%con aislamiento termoplastico
340.00 100%
(TPE) (300
100%
V, 75° C, tensión y temperatura 0%
nominales),0%
chaqueta de termoplastico (TPE)
0%color Ral0%
1021, no propagador de incendio0%
y retardante
0% al fuego, resistente a rayos solares,
0% resistente
0% al contacto
0% 45.00%
con aceites y 0.00
baja emisión
153.00de humo,
153.00
Listado AS-i
8.7.1 Bandeja Metálica Tipo Ranurada, fabricado según norma VE-1,
m clase
239.00
20C, acabado en galvanizado
239.00 en100%
caliente según
100%norma ASTM A123.
239.00
Dimensiones
100% (AxHxL),
100%espesor 2.5mm.239.00
Incluye tapa
100%
a dos aguas,
100%accesorios de sujeción, placas0%
de empalme
0%(eclisas) y pernos de unión.200x100x6000
0% 0%mm 0% 0% 0% 0% 0% 45.00% 0.00 107.55 107.55

7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
MALLA A TIERRA BAJO GRADIENTE - ELÉCTRICA

ACUMUL
ACUM.
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS LEVANTAMIENTO OBSERVACIONES ADO
ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
1401.00 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total
1 Pozo a tierra con varilla sólida de cobre electrolítico Ø3/4"Und
x 2400mm,3.00
Sin caja de 3.00
registro con tapa de concreto
0% 100% 3.00 0% 100% 3.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 1.35 0.00 1.35
2 Pozo a tierra varilla sólida de cobre electrolítico Ø3/4" x 2400mm,
Und Con
9.00
caja de registro
9.00 con tapa de concreto
0% 100% 9.00 0% 100% 9.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 4.05 0.00 4.05
3 Malla de tierra (incluye: cable de cu desnudo temple blandom4/0 AWG,
507.00
dosificacion
507.00
quimico, topsoi, conectores,
0% soldadura
100% exotermica,
507.00 molde, etc) 0% 100% 507.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 228.15 0.00 228.15
4 Malla de tierra (incluye: cable de cu desnudo temple blandom2/0 AWG,
882.00
dosificacion
882.00
quimico, topsoi, conectores,
0% soldadura
100% exotermica,
882.00 molde, etc) 0% 100% 882.00 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 396.90 0.00 396.90
7. FIRMAS

RESIDENTE IMCO FECHA SUPERVISIÓN FECHA SUPERVISIÓN TISUR FECHA


NOMBRE: D NOMBRE: D NOMBRE: D

M M M
FIRMA: FIRMA: FIRMA:
A A A
PROYECTO:
RECEPCIÓN HUBBAY Y CONEXIÓN AL SISTEMA C-2
MALLA A TIERRA SOBRE GRADIENTE - ELÉCTRICA

ACUMU
ACUM.
LEVANTAMIENTO LADO
O.C. FABRICACIÓN TRASLADO PRE ENSAMBLE MONTAJE CAMINATAS ACTUAL (%)ANTERI ACTUAL TOTAL
ITEM EQUIPO UND. CANT. OBSERVACIONES ANTERI
OR
OR (%)
5% 30% 10% 15% 25% 10% 5%
874.00 Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total Σ Anterior Actual % Actual Σ Total 45% 0.00% 393.3 0 393.30
1 Malla de tierra (incluye: cable cobre desnudom.
temple 424.00
blando 2/0424.00
AWG, Tubo PVC SAP0%
1", Terminacion,
100% 424.00
soldadura exotermica,0%
molde,100%
etc)…aterramiento
424.00 de bandejas0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 190.80 0.00 190.80
2 Malla de tierra (incluye: cable THW-90 2/0 AWG,
m. Tubo
450.00
PVC SAP
450.00
1", Terminacion, soldadura
0% exotermica,
100% 450.00 molde, etc), para aterramiento
0% 100%de estructura
450.00 de nave, equipos,
0% escaleras,
100% etc 0% 0% 0% 0% 0% 0% 0% 0% 45% 0.00% 202.50 0.00 202.50