OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20

21 15,073,051.50 $ 118,522.02 $ 635,468.10 $ 1,560,417.59 $ 1,581,983.30 $ 1,546,522.09 $ 1,453,251.57 $ 1,507,109.45 $ 1,455,135.10 $ 1,167,673.22 $ 916,691.39 $ 742,497.41 $ 626,210.97 $ 494,946.47 $ 450,430.50 $ 349,637.49 $ 257,092.80 $ 148,116.21 $ 61,345.70
RECONSTRUCCION DE SISTEMAS HIDROSANITARIOS
22 PRADERA, PALMAR, LA AURORA
8,103,681.03
23 1 CIUDADELA LA PRADERA 5,926,101.07
24 2 ALCANTARILLADO SANITARIO 2,695,921.13
25 3 REPLANTEO Y NIVELACION DE TUBERIA ML 40,032.81 1.04 41,634.12 832.6824 1249.0236 1665.3648 2081.706 4579.7532 3747.0708 3747.0708 3747.0708 3747.0708 3330.7296 3330.7296 2914.3884 2498.0472 1665.3648 832.6824 832.6824 416.3412 416.3412
26 4 EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc. M3 49,780.80 4.39 218,537.71 4370.7542 6556.1313 8741.5084 10926.8855 24039.1481 19668.3939 19668.3939 19668.3939 19668.3939 17483.0168 17483.0168 15297.6397 13112.2626 8741.5084 4370.7542 4370.7542 2185.3771 2185.3771
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
27 5 M3 12,445.20 5.54 68,946.41 1378.9282 2068.3923 2757.8564 3447.3205 7584.1051 6205.1769 6205.1769 6205.1769 6205.1769 5515.7128 5515.7128 4826.2487 4136.7846 2757.8564 1378.9282 1378.9282 689.4641 689.4641
metálico y desalojo)
28 6 SUMIN. E INST. DE TUBERIA ESTRUCTURADA 160MM PVC ML 34,328.35 16.10 552,686.44 11053.7288 16580.5932 22107.4576 27634.322 60795.5084 49741.7796 49741.7796 49741.7796 49741.7796 44214.9152 44214.9152 38688.0508 33161.1864 22107.4576 11053.7288 11053.7288 5526.8644 5526.8644
29 7 SUMIN. E INST. DE TUBERIA ESTRUCTURADA 200MM PVC ML 2,491.38 23.88 59,494.15 1189.883 1784.8245 2379.766 2974.7075 6544.3565 5354.4735 5354.4735 5354.4735 5354.4735 4759.532 4759.532 4164.5905 3569.649 2379.766 1189.883 1189.883 594.9415 594.9415
30 8 SUMIN. E INST. DE TUBERIA ESTRUCTURADA 250MM PVC ML 431.73 26.34 11,371.77 227.4354 341.1531 454.8708 568.5885 1250.8947 1023.4593 1023.4593 1023.4593 1023.4593 909.7416 909.7416 796.0239 682.3062 454.8708 227.4354 227.4354 113.7177 113.7177
31 9 SUMIN. E INST. DE TUBERIA ESTRUCTURADA 300MM PVC ML 2,209.70 37.90 83,747.63 1674.9526 2512.4289 3349.9052 4187.3815 9212.2393 7537.2867 7537.2867 7537.2867 7537.2867 6699.8104 6699.8104 5862.3341 5024.8578 3349.9052 1674.9526 1674.9526 837.4763 837.4763
32 10 SUMIN. E INST. DE TUBERIA ESTRUCTURADA 400MM PVC ML 571.65 66.10 37,786.07 755.7214 1133.5821 1511.4428 1889.3035 4156.4677 3400.7463 3400.7463 3400.7463 3400.7463 3022.8856 3022.8856 2645.0249 2267.1642 1511.4428 755.7214 755.7214 377.8607 377.8607
33 11 RELLENO COMPACTADO CON VIBROAPISONADOR, M3 44,149.29 4.76 210,150.62 4203.0124 6304.5186 8406.0248 10507.531 23116.5682 18913.5558 18913.5558 18913.5558 18913.5558 16812.0496 16812.0496 14710.5434 12609.0372 8406.0248 4203.0124 4203.0124 2101.5062 2101.5062
RELLENO COMPACTADO CON VIBROAPISONADOR,
12 M3 3,786.39 15.81 59,862.83
34 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A 1197.2566 1795.8849 2394.5132 2993.1415 6584.9113 5387.6547 5387.6547 5387.6547 5387.6547 4789.0264 4789.0264 4190.3981 3591.7698 2394.5132 1197.2566 1197.2566 598.6283 598.6283
13 33,339.94
35 SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE m3 1,383.40 24.10 666.7988 1000.1982 1333.5976 1666.997 3667.3934 3000.5946 3000.5946 3000.5946 3000.5946 2667.1952 2667.1952 2333.7958 2000.3964 1333.5976 666.7988 666.7988 333.3994 333.3994
DESALOJO DE MATERIAL SOBRANTE A MAQUINA (INCLUYE
14 M3 379.85 4.72 1,792.87
36 TRANSPORTE A BOTADERO AUTORIZADO) 35.8574 53.7861 71.7148 89.6435 197.2157 161.3583 161.3583 161.3583 161.3583 143.4296 143.4296 125.5009 107.5722 71.7148 35.8574 35.8574 17.9287 17.9287
15 M3 921.33 22.93 21,126.10
37 SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC. 422.522 633.783 845.044 1056.305 2323.871 1901.349 1901.349 1901.349 1901.349 1690.088 1690.088 1478.827 1267.566 845.044 422.522 422.522 211.261 211.261
38 16 CAMA DE ARENA M3 10,064.52 14.34 144,325.22 2886.5044 4329.7566 5773.0088 7216.261 15875.7742 12989.2698 12989.2698 12989.2698 12989.2698 11546.0176 11546.0176 10102.7654 8659.5132 5773.0088 2886.5044 2886.5044 1443.2522 1443.2522
SUMINISTRO E INSTALACIÓN DE CAJA DOMICILIARIA DE
17 U 1,461.00 283.65 414,412.65
39 H.A. ESQUINA, H<2.50M (INC. TAPA) 8288.253 12432.3795 16576.506 20720.6325 45585.3915 37297.1385 37297.1385 37297.1385 37297.1385 33153.012 33153.012 29008.8855 24864.759 16576.506 8288.253 8288.253 4144.1265 4144.1265
SUMINISTRO E INSTALACION DE CAJA DOMICILIARIA PVC
18 U 2,189.00 271.83 595,035.87
40 (ALINEADA, CIEGA, o 90°), D=175MM CON TAPA DE HA 11900.7174 17851.0761 23801.4348 29751.7935 65453.9457 53553.2283 53553.2283 53553.2283 53553.2283 47602.8696 47602.8696 41652.5109 35702.1522 23801.4348 11900.7174 11900.7174 5950.3587 5950.3587
41 19 POZO DE REVISION DE TIPO I H 0,00 - 2,00 M CON TAPA U 39.00 1,524.04 59,437.56 1188.7512 1783.1268 2377.5024 2971.878 6538.1316 5349.3804 5349.3804 5349.3804 5349.3804 4755.0048 4755.0048 4160.6292 3566.2536 2377.5024 1188.7512 1188.7512 594.3756 594.3756
42 20 POZO DE REVISION DE TIPO II H 2,01 - 4,00 M CON TAPA U 13.00 2,086.04 27,118.52 542.3704 813.5556 1084.7408 1355.926 2983.0372 2440.6668 2440.6668 2440.6668 2440.6668 2169.4816 2169.4816 1898.2964 1627.1112 1084.7408 542.3704 542.3704 271.1852 271.1852
43 21 POZO DE REVISION DE TIPO III H 4,01 - 6,00 M CON TAPA U 19.00 2,900.77 55,114.63 1102.2926 1653.4389 2204.5852 2755.7315 6062.6093 4960.3167 4960.3167 4960.3167 4960.3167 4409.1704 4409.1704 3858.0241 3306.8778 2204.5852 1102.2926 1102.2926 551.1463 551.1463
44 22 Reposicion de Calzada, Aceras y Bordillos 883,169.70
45 23 CORTE Y RETIRO DE HORMIGON SIMPLE EN ACERA M2 27,462.68 3.58 98,316.39 1966.3278 2949.4917 3932.6556 4915.8195 10814.8029 8848.4751 8848.4751 8848.4751 8848.4751 7865.3112 7865.3112 6882.1473 5898.9834 3932.6556 1966.3278 1966.3278 983.1639 983.1639
46 24 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) M2 3,422.68 2.62 8,967.42 179.3484 269.0226 358.6968 448.371 986.4162 807.0678 807.0678 807.0678 807.0678 717.3936 717.3936 627.7194 538.0452 358.6968 179.3484 179.3484 89.6742 89.6742
47 25 CORTE Y RETIRO DE PAVIMENTO RÍGIDO EN VIA M2 2,852.23 3.98 11,351.88 227.0376 340.5564 454.0752 567.594 1248.7068 1021.6692 1021.6692 1021.6692 1021.6692 908.1504 908.1504 794.6316 681.1128 454.0752 227.0376 227.0376 113.5188 113.5188
48 26 REPOSICION DE ACERA E=8CM H.S. F´C =180 KG/CM2 M2 21,970.14 19.79 434,789.07 8695.7814 13043.6721 17391.5628 21739.4535 47826.7977 39131.0163 39131.0163 39131.0163 39131.0163 34783.1256 34783.1256 30435.2349 26087.3442 17391.5628 8695.7814 8695.7814 4347.8907 4347.8907
REPOSICIÓN DE PISO Y ACERAS CON HS Y MALLA
27 M2 5,492.54 28.54 156,757.09
49 ELECTROSOLDAD e=15cm 3135.1418 4702.7127 6270.2836 7837.8545 17243.2799 14108.1381 14108.1381 14108.1381 14108.1381 12540.5672 12540.5672 10972.9963 9405.4254 6270.2836 3135.1418 3135.1418 1567.5709 1567.5709
HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA
28 M2 2,852.23 48.29 137,734.19
50 e=20cm 2754.6838 4132.0257 5509.3676 6886.7095 15150.7609 12396.0771 12396.0771 12396.0771 12396.0771 11018.7352 11018.7352 9641.3933 8264.0514 5509.3676 2754.6838 2754.6838 1377.3419 1377.3419
29 REPOSICIÓN DE ASFALTO 2" (INC. TRANSPORTE A MANTA) M2 3,422.68 10.30 35,253.60
51 705.072 1057.608 1410.144 1762.68 3877.896 3172.824 3172.824 3172.824 3172.824 2820.288 2820.288 2467.752 2115.216 1410.144 705.072 705.072 352.536 352.536
52 30 AGUA POTABLE 1,461,511.87
53 31 REPLANTEO Y NIVELACION DE TUBERIA ML 50,017.69 1.04 52,018.40 1040.368 1560.552 2080.736 2600.92 5722.024 4681.656 4681.656 4681.656 4681.656 4161.472 4161.472 3641.288 3121.104 2080.736 1040.368 1040.368 520.184 520.184
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
32 M3 42,092.14 4.39 184,784.49
54 Desalojo) 3695.6898 5543.5347 7391.3796 9239.2245 20326.2939 16630.6041 16630.6041 16630.6041 16630.6041 14782.7592 14782.7592 12934.9143 11087.0694 7391.3796 3695.6898 3695.6898 1847.8449 1847.8449
SUMINISTRO E INST. DE TUBERIA P.V.C. UZ D=63mm x 1,00
33 ML 33,692.71 8.23 277,291.00
55 MPA (Incluye pruebas y desinfección) 5545.82 8318.73 11091.64 13864.55 30502.01 24956.19 24956.19 24956.19 24956.19 22183.28 22183.28 19410.37 16637.46 11091.64 5545.82 5545.82 2772.91 2772.91
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=90mm x
34 ML 13,191.74 11.20 147,747.49
56 1,00Mpa (Incluye pruebas y desinfección) 2954.9498 4432.4247 5909.8996 7387.3745 16252.2239 13297.2741 13297.2741 13297.2741 13297.2741 11819.7992 11819.7992 10342.3243 8864.8494 5909.8996 2954.9498 2954.9498 1477.4749 1477.4749
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=110mm x
35 ML 40.00 16.09 643.60
57 1,00Mpa (Incluye pruebas y desinfección) 12.872 19.308 25.744 32.18 70.796 57.924 57.924 57.924 57.924 51.488 51.488 45.052 38.616 25.744 12.872 12.872 6.436 6.436
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=160mm x
36 ML 999.75 30.86 30,852.29
58 1,00Mpa (Incluye pruebas y desinfección) 617.0458 925.5687 1234.0916 1542.6145 3393.7519 2776.7061 2776.7061 2776.7061 2776.7061 2468.1832 2468.1832 2159.6603 1851.1374 1234.0916 617.0458 617.0458 308.5229 308.5229
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=200mm x
37 ML 2,053.49 43.00 88,300.07
59 1,00Mpa (Incluye pruebas y desinfección) 1766.0014 2649.0021 3532.0028 4415.0035 9713.0077 7947.0063 7947.0063 7947.0063 7947.0063 7064.0056 7064.0056 6181.0049 5298.0042 3532.0028 1766.0014 1766.0014 883.0007 883.0007
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=250mm x
38 ML 40.00 57.29 2,291.60
60 1,00Mpa (Incluye pruebas y desinfección) 45.832 68.748 91.664 114.58 252.076 206.244 206.244 206.244 206.244 183.328 183.328 160.412 137.496 91.664 45.832 45.832 22.916 22.916
SUMIN, E INST. DE UNION DE REPARACION DE PVC UZ
39 U 30.00 16.80 504.00
61 63MM 10.08 15.12 20.16 25.2 55.44 45.36 45.36 45.36 45.36 40.32 40.32 35.28 30.24 20.16 10.08 10.08 5.04 5.04
SUMIN, E INST. DE UNION DE REPARACION DE PVC UZ
40 U 12.00 24.00 288.00
62 90MM 5.76 8.64 11.52 14.4 31.68 25.92 25.92 25.92 25.92 23.04 23.04 20.16 17.28 11.52 5.76 5.76 2.88 2.88
SUMIN, E INST. DE UNION DE REPARACION DE PVC UZ
41 U 8.00 28.80 230.40
63 110MM 4.608 6.912 9.216 11.52 25.344 20.736 20.736 20.736 20.736 18.432 18.432 16.128 13.824 9.216 4.608 4.608 2.304 2.304
SUMIN, E INST. DE UNION DE REPARACION DE PVC UZ
42 U 5.00 72.00 360.00
64 160MM 7.2 10.8 14.4 18 39.6 32.4 32.4 32.4 32.4 28.8 28.8 25.2 21.6 14.4 7.2 7.2 3.6 3.6
SUMIN, E INST. DE UNION DE REPARACION DE PVC UZ
43 U 1.00 108.00 108.00
65 200MM 2.16 3.24 4.32 5.4 11.88 9.72 9.72 9.72 9.72 8.64 8.64 7.56 6.48 4.32 2.16 2.16 1.08 1.08
SUMIN, E INST. DE UNION DE REPARACION DE PVC UZ
44 U 1.00 144.00 144.00
66 250MM 2.88 4.32 5.76 7.2 15.84 12.96 12.96 12.96 12.96 11.52 11.52 10.08 8.64 5.76 2.88 2.88 1.44 1.44
67 45 SUMIN, E INST. DE TEE DE PVC UZ 200MM U 2.00 215.85 431.70 8.634 12.951 17.268 21.585 47.487 38.853 38.853 38.853 38.853 34.536 34.536 30.219 25.902 17.268 8.634 8.634 4.317 4.317
68 46 SUMIN, E INST. DE TEE DE PVC UZ 160MM U 2.00 130.59 261.18 5.2236 7.8354 10.4472 13.059 28.7298 23.5062 23.5062 23.5062 23.5062 20.8944 20.8944 18.2826 15.6708 10.4472 5.2236 5.2236 2.6118 2.6118
69 47 SUMIN, E INST. DE TEE DE PVC UZ 110MM U 2.00 60.78 121.56 2.4312 3.6468 4.8624 6.078 13.3716 10.9404 10.9404 10.9404 10.9404 9.7248 9.7248 8.5092 7.2936 4.8624 2.4312 2.4312 1.2156 1.2156
70 48 SUMIN, E INST. DE TEE DE PVC UZ 90MM U 6.00 36.73 220.38 4.4076 6.6114 8.8152 11.019 24.2418 19.8342 19.8342 19.8342 19.8342 17.6304 17.6304 15.4266 13.2228 8.8152 4.4076 4.4076 2.2038 2.2038
71 49 SUMIN, E INST. DE TEE DE PVC UZ 63MM U 189.00 22.23 4,201.47 84.0294 126.0441 168.0588 210.0735 462.1617 378.1323 378.1323 378.1323 378.1323 336.1176 336.1176 294.1029 252.0882 168.0588 84.0294 84.0294 42.0147 42.0147
50 SUMIN, E INST. DE REDUCTOR DE PVC UZ 250MM-200MM U 1.00 108.34 108.34
72 2.1668 3.2502 4.3336 5.417 11.9174 9.7506 9.7506 9.7506 9.7506 8.6672 8.6672 7.5838 6.5004 4.3336 2.1668 2.1668 1.0834 1.0834
SUMIN, E INST. DE TEE REDUCTORA DE PVC UZ 200mm-
51 U 1.00 92.24 92.24
73 160MM 1.8448 2.7672 3.6896 4.612 10.1464 8.3016 8.3016 8.3016 8.3016 7.3792 7.3792 6.4568 5.5344 3.6896 1.8448 1.8448 0.9224 0.9224
52 SUMIN, E INST. DE REDUCTOR DE PVC UZ 200MM-90MM U 2.00 92.74 185.48
74 3.7096 5.5644 7.4192 9.274 20.4028 16.6932 16.6932 16.6932 16.6932 14.8384 14.8384 12.9836 11.1288 7.4192 3.7096 3.7096 1.8548 1.8548
53 SUMIN, E INST. DE REDUCTOR DE PVC UZ 160MM-110MM U 1.00 54.62 54.62
75 1.0924 1.6386 2.1848 2.731 6.0082 4.9158 4.9158 4.9158 4.9158 4.3696 4.3696 3.8234 3.2772 2.1848 1.0924 1.0924 0.5462 0.5462
54 SUMIN, E INST. DE REDUCTOR DE PVC UZ 160MM-63MM U 2.00 52.32 104.64
76 2.0928 3.1392 4.1856 5.232 11.5104 9.4176 9.4176 9.4176 9.4176 8.3712 8.3712 7.3248 6.2784 4.1856 2.0928 2.0928 1.0464 1.0464
55 SUMIN, E INST. DE REDUCTOR DE PVC UZ 110MM A 63MM U 11.00 45.93 505.23
77 10.1046 15.1569 20.2092 25.2615 55.5753 45.4707 45.4707 45.4707 45.4707 40.4184 40.4184 35.3661 30.3138 20.2092 10.1046 10.1046 5.0523 5.0523
56 SUMIN, E INST. DE REDUCTOR DE PVC UZ 90MM A 63MM U 8.00 25.87 206.96
78 4.1392 6.2088 8.2784 10.348 22.7656 18.6264 18.6264 18.6264 18.6264 16.5568 16.5568 14.4872 12.4176 8.2784 4.1392 4.1392 2.0696 2.0696
79 57 SUMIN, E INST. DE CODO DE PVC UZ 200MM x 90° U 1.00 128.77 128.77 2.5754 3.8631 5.1508 6.4385 14.1647 11.5893 11.5893 11.5893 11.5893 10.3016 10.3016 9.0139 7.7262 5.1508 2.5754 2.5754 1.2877 1.2877
80 58 SUMIN, E INST. DE CODO DE PVC UZ 200MM x 45° U 2.00 94.97 189.94 3.7988 5.6982 7.5976 9.497 20.8934 17.0946 17.0946 17.0946 17.0946 15.1952 15.1952 13.2958 11.3964 7.5976 3.7988 3.7988 1.8994 1.8994
81 59 SUMIN, E INST. DE CODO DE PVC UZ 90MM x 90° U 42.00 12.50 525.00 10.5 15.75 21 26.25 57.75 47.25 47.25 47.25 47.25 42 42 36.75 31.5 21 10.5 10.5 5.25 5.25
82 60 SUMIN, E INST. DE CODO DE PVC UZ 90MM x 45° U 33.00 12.35 407.55 8.151 12.2265 16.302 20.3775 44.8305 36.6795 36.6795 36.6795 36.6795 32.604 32.604 28.5285 24.453 16.302 8.151 8.151 4.0755 4.0755
83 61 SUMIN, E INST. DE CODO DE PVC UZ 63MM x 90° U 200.00 12.22 2,444.00 48.88 73.32 97.76 122.2 268.84 219.96 219.96 219.96 219.96 195.52 195.52 171.08 146.64 97.76 48.88 48.88 24.44 24.44
84 62 SUMIN, E INST. DE CODO DE PVC UZ 63MM x 45° U 16.00 11.10 177.60 3.552 5.328 7.104 8.88 19.536 15.984 15.984 15.984 15.984 14.208 14.208 12.432 10.656 7.104 3.552 3.552 1.776 1.776
85 63 SUMIN, E INST. DE CRUZ DE PVC UZ 90MM U 4.00 64.22 256.88 5.1376 7.7064 10.2752 12.844 28.2568 23.1192 23.1192 23.1192 23.1192 20.5504 20.5504 17.9816 15.4128 10.2752 5.1376 5.1376 2.5688 2.5688
86 64 SUMIN, E INST. DE CRUZ DE PVC UZ 63MM U 13.00 26.84 348.92 6.9784 10.4676 13.9568 17.446 38.3812 31.4028 31.4028 31.4028 31.4028 27.9136 27.9136 24.4244 20.9352 13.9568 6.9784 6.9784 3.4892 3.4892
87 65 SUMIN, E INST. DE TAPON DE PVC UZ 63MM U 8.00 9.25 74.00 1.48 2.22 2.96 3.7 8.14 6.66 6.66 6.66 6.66 5.92 5.92 5.18 4.44 2.96 1.48 1.48 0.74 0.74
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA
66 U 3.00 185.39 556.17
88 (INCLUYE CAJ.) D=63 mm 11.1234 16.6851 22.2468 27.8085 61.1787 50.0553 50.0553 50.0553 50.0553 44.4936 44.4936 38.9319 33.3702 22.2468 11.1234 11.1234 5.5617 5.5617
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA
67 U 5.00 238.28 1,191.40
89 (INCLUYE CAJ.) D=90 mm 23.828 35.742 47.656 59.57 131.054 107.226 107.226 107.226 107.226 95.312 95.312 83.398 71.484 47.656 23.828 23.828 11.914 11.914
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA
68 U 1.00 1,633.85 1,633.85
90 D=200 mm 32.677 49.0155 65.354 81.6925 179.7235 147.0465 147.0465 147.0465 147.0465 130.708 130.708 114.3695 98.031 65.354 32.677 32.677 16.3385 16.3385
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA
69 U 1.00 2,315.95 2,315.95
91 D=250 mm 46.319 69.4785 92.638 115.7975 254.7545 208.4355 208.4355 208.4355 208.4355 185.276 185.276 162.1165 138.957 92.638 46.319 46.319 23.1595 23.1595
CONSTRUCCION DE CAMARA DE VALVULA TIPO I CON
70 U 2.00 1,265.89 2,531.78
92 TAPA DE H.A. 50.6356 75.9534 101.2712 126.589 278.4958 227.8602 227.8602 227.8602 227.8602 202.5424 202.5424 177.2246 151.9068 101.2712 50.6356 50.6356 25.3178 25.3178
AQUISICIÓN E INSTALACIÓN DE GUIAS DOMICILIARIAS Ø
71 U 3,606.00 131.89 475,595.34
93 1/2 " 9511.9068 14267.8602 19023.8136 23779.767 52315.4874 42803.5806 42803.5806 42803.5806 42803.5806 38047.6272 38047.6272 33291.6738 28535.7204 19023.8136 9511.9068 9511.9068 4755.9534 4755.9534
HORMIGON SIMPLE f'c= 180 Kg/cm2 PARA ANCLAJES (INC.
72 M3 54.27 219.35 11,904.12
94 ENCOFRADO) 238.0824 357.1236 476.1648 595.206 1309.4532 1071.3708 1071.3708 1071.3708 1071.3708 952.3296 952.3296 833.2884 714.2472 476.1648 238.0824 238.0824 119.0412 119.0412
95 73 CAMA DE ARENA M3 8,549.20 14.34 122,595.53 2451.9106 3677.8659 4903.8212 6129.7765 13485.5083 11033.5977 11033.5977 11033.5977 11033.5977 9807.6424 9807.6424 8581.6871 7355.7318 4903.8212 2451.9106 2451.9106 1225.9553 1225.9553
RELLENO COMPACTADO CON VIBROAPISONADOR,
74 M3 9,586.96 4.76 45,633.93
96 MATERIAL DE SITIO 912.6786 1369.0179 1825.3572 2281.6965 5019.7323 4107.0537 4107.0537 4107.0537 4107.0537 3650.7144 3650.7144 3194.3751 2738.0358 1825.3572 912.6786 912.6786 456.3393 456.3393
DESALOJO DE MATERIAL SOBRANTE A MAQUINA (INCLUYE
75 M3 200.00 4.72 944.00
97 TRANSPORTE A BOTADERO AUTORIZADO) 18.88 28.32 37.76 47.2 103.84 84.96 84.96 84.96 84.96 75.52 75.52 66.08 56.64 37.76 18.88 18.88 9.44 9.44
98 76 Reposicion de Calzada, Aceras y Bordillos 885,498.37
99 77 CORTE Y RETIRO DE HORMIGON SIMPLE EN ACERA M2 32,819.12 3.58 117,492.45 2349.849 3524.7735 4699.698 5874.6225 12924.1695 10574.3205 10574.3205 10574.3205 10574.3205 9399.396 9399.396 8224.4715 7049.547 4699.698 2349.849 2349.849 1174.9245 1174.9245
100 78 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) M2 1,879.94 2.62 4,925.44 98.5088 147.7632 197.0176 246.272 541.7984 443.2896 443.2896 443.2896 443.2896 394.0352 394.0352 344.7808 295.5264 197.0176 98.5088 98.5088 49.2544 49.2544
101 79 CORTE Y RETIRO DE PAVIMENTO RÍGIDO EN VIA M2 1,253.30 3.98 4,988.13 99.7626 149.6439 199.5252 249.4065 548.6943 448.9317 448.9317 448.9317 448.9317 399.0504 399.0504 349.1691 299.2878 199.5252 99.7626 99.7626 49.8813 49.8813
102 80 REPOSICION DE ACERA E=8CM H.S. F´C =180 KG/CM2 M2 29,537.21 19.79 584,541.39 11690.8278 17536.2417 23381.6556 29227.0695 64299.5529 52608.7251 52608.7251 52608.7251 52608.7251 46763.3112 46763.3112 40917.8973 35072.4834 23381.6556 11690.8278 11690.8278 5845.4139 5845.4139
REPOSICIÓN DE PISO Y ACERAS CON HS Y MALLA
81 M2 3,281.91 28.54 93,665.71
103 ELECTROSOLDAD e=15cm 1873.3142 2809.9713 3746.6284 4683.2855 10303.2281 8429.9139 8429.9139 8429.9139 8429.9139 7493.2568 7493.2568 6556.5997 5619.9426 3746.6284 1873.3142 1873.3142 936.6571 936.6571
HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA
82 M2 1,253.30 48.29 60,521.86
104 e=20cm 1210.4372 1815.6558 2420.8744 3026.093 6657.4046 5446.9674 5446.9674 5446.9674 5446.9674 4841.7488 4841.7488 4236.5302 3631.3116 2420.8744 1210.4372 1210.4372 605.2186 605.2186
83 REPOSICIÓN DE ASFALTO 2" (INC. TRANSPORTE A MANTA) M2 1,879.94 10.30 19,363.38
105 387.2676 580.9014 774.5352 968.169 2129.9718 1742.7042 1742.7042 1742.7042 1742.7042 1549.0704 1549.0704 1355.4366 1161.8028 774.5352 387.2676 387.2676 193.6338 193.6338
106 84 CIUDADELA LA AURORA 859,663.90
107 85 ALCANTARILLADO SANITARIO 375,406.77
108 86 REPLANTEO Y NIVELACION DE TUBERIA ML 5,785.65 1.04 6,017.08 300.854 902.562 1444.0992 1203.416 902.562 902.562 300.854 60.1708
109 87 Excavación a mano (Inc. Desalojo) M3 683.73 11.09 7,582.57 379.1285 1137.3855 1819.8168 1516.514 1137.3855 1137.3855 379.1285 75.8257

1 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
88 M3 6,837.28 4.39 30,015.66
110 Desalojo) 1500.783 4502.349 7203.7584 6003.132 4502.349 4502.349 1500.783 300.1566
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
89 M3 1,025.59 9.32 9,558.50
111 metálico y desalojo) 477.925 1433.775 2294.04 1911.7 1433.775 1433.775 477.925 95.585
DESALOJO DE MATERIAL SOBRANTE A MAQUINA (INCLUYE
90 M3 120.00 4.72 566.40
112 TRANSPORTE A BOTADERO AUTORIZADO) 28.32 84.96 135.936 113.28 84.96 84.96 28.32 5.664
SUMIN. E INST. DE TUBERIA ESTRUCTURADA 160MM PARA
91 ML 5,498.76 16.10 88,530.04
113 (INCLUYE PRUEBAS) 4426.502 13279.506 21247.2096 17706.008 13279.506 13279.506 4426.502 885.3004
SUMIN. E INST. DE TUBERIA ESTRUCTURADA 200MM PVC
92 ML 43.42 23.88 1,036.87
114 (INCLUYE PRUEBAS) 51.8435 155.5305 248.8488 207.374 155.5305 155.5305 51.8435 10.3687
SUMIN. E INST. DE TUBERIA ESTRUCTURADA 250MM PVC
93 ML 243.47 26.34 6,413.00
115 (INCLUYE PRUEBAS) 320.65 961.95 1539.12 1282.6 961.95 961.95 320.65 64.13
RELLENO COMPACTADO CON VIBROAPISONADOR,
94 M3 6,288.93 4.76 29,935.31
116 MATERIAL DE SITIO 1496.7655 4490.2965 7184.4744 5987.062 4490.2965 4490.2965 1496.7655 299.3531
RELLENO COMPACTADO CON VIBROAPISONADOR,
95 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A M3 453.33 15.81 7,167.15
117 MANTA) 358.3575 1075.0725 1720.116 1433.43 1075.0725 1075.0725 358.3575 71.6715
SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC.
96 TRANSPORTE A MANTA, TENDIDO CONFORMACIÓN Y M3 45.47 22.93 1,042.63
COMPACTACIÓN)
118 52.1315 156.3945 250.2312 208.526 156.3945 156.3945 52.1315 10.4263
119 97 CAMA DE ARENA M3 1,406.90 14.34 20,174.95 1008.7475 3026.2425 4841.988 4034.99 3026.2425 3026.2425 1008.7475 201.7495
SUMINISTRO E INSTALACION DE CAJA DOMICILIARIA PVC
98 (ALINEADA, CIEGA, o 90°), D=175MM CON TAPA DE HA U 422.98 271.83 114,978.65
120 (INCLUYE MARCO Y CONTRAMARCO) 5748.9325 17246.7975 27594.876 22995.73 17246.7975 17246.7975 5748.9325 1149.7865
SUMINISTRO E INSTALACIÓN DE CAJA DOMICILIARIA DE
99 U 127.00 283.65 36,023.55
121 H.A. ESQUINA, H<2.50M (INC. TAPA) 1801.1775 5403.5325 8645.652 7204.71 5403.5325 5403.5325 1801.1775 360.2355
POZO DE REVISION DE TIPO I H 0,00 - 2,00 M CON TAPA
100 U 8.00 1,524.04 12,192.32
122 DE H.D. 609.616 1828.848 2926.1568 2438.464 1828.848 1828.848 609.616 121.9232
POZO DE REVISION DE TIPO II H 2,01 - 4,00 M CON TAPA
101 U 2.00 2,086.04 4,172.08
123 DE H.D. 208.604 625.812 1001.2992 834.416 625.812 625.812 208.604 41.7208
124 102 Reposicion de Calzada, Aceras y Bordillos 97,460.90
125 103 CORTE Y RETIRO DE HORMIGON SIMPLE EN ACERA M2 3,271.76 3.58 11,712.90 585.645 1756.935 2811.096 2342.58 1756.935 1756.935 585.645 117.129
126 104 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) M2 643.11 2.62 1,684.95 84.2475 252.7425 404.388 336.99 252.7425 252.7425 84.2475 16.8495
127 105 CORTE Y RETIRO DE PAVIMENTO RÍGIDO EN VIA M2 215.41 3.98 857.33 42.8665 128.5995 205.7592 171.466 128.5995 128.5995 42.8665 8.5733
128 106 REPOSICION DE ACERA E=8CM H.S. F´C =180 KG/CM2 M2 3,108.17 19.79 61,510.68 3075.534 9226.602 14762.5632 12302.136 9226.602 9226.602 3075.534 615.1068
REPOSICIÓN DE PISO Y ACERAS CON HS Y MALLA
107 M2 163.59 28.54 4,668.86
129 ELECTROSOLDAD e=15cm 233.443 700.329 1120.5264 933.772 700.329 700.329 233.443 46.6886
130 108 HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA M2 215.41 48.29 10,402.15 520.1075 1560.3225 2496.516 2080.43 1560.3225 1560.3225 520.1075 104.0215
109 REPOSICIÓN DE ASFALTO 2" (INC. TRANSPORTE A MANTA) M2 643.11 10.30 6,624.03
131 331.2015 993.6045 1589.7672 1324.806 993.6045 993.6045 331.2015 66.2403
132 110 AGUA POTABLE 237,640.31
133 111 REPLANTEO Y NIVELACION DE TUBERIA ML 8,508.14 1.04 8,848.47 442.4235 1327.2705 2123.6328 1769.694 1327.2705 1327.2705 442.4235 88.4847
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
112 M3 6,880.79 4.39 30,206.67
134 Desalojo) 1510.3335 4531.0005 7249.6008 6041.334 4531.0005 4531.0005 1510.3335 302.0667
SUMINISTRO E INST. DE TUBERIA P.V.C. UZ D=63mm x 1,00
113 M 6,393.95 8.23 52,622.21
135 MPA (Incluye pruebas y desinfección) 2631.1105 7893.3315 12629.3304 10524.442 7893.3315 7893.3315 2631.1105 526.2221
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=90mm x
114 ML 1,959.19 11.20 21,942.93
136 1,00Mpa (Incluye pruebas y desinfección) 1097.1465 3291.4395 5266.3032 4388.586 3291.4395 3291.4395 1097.1465 219.4293
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=110mm x
115 ML 155.00 16.09 2,493.95
137 1,00Mpa (Incluye pruebas y desinfección) 124.6975 374.0925 598.548 498.79 374.0925 374.0925 124.6975 24.9395
138 116 SUMIN, E INST. DE TEE DE PVC UZ 110MM U 13.00 60.78 790.14 39.507 118.521 189.6336 158.028 118.521 118.521 39.507 7.9014
117 SUMIN, E INST. DE REDUCTOR DE PVC UZ 110MM A 90MM U 2.00 30.98 61.96
139 3.098 9.294 14.8704 12.392 9.294 9.294 3.098 0.6196
118 SUMIN, E INST. DE REDUCTOR DE PVC UZ 110MM A 63MM U 11.00 45.93 505.23
140 25.2615 75.7845 121.2552 101.046 75.7845 75.7845 25.2615 5.0523
141 119 SUMIN, E INST. DE TEE DE PVC UZ 90MM U 8.00 36.73 293.84 14.692 44.076 70.5216 58.768 44.076 44.076 14.692 2.9384
142 120 SUMIN, E INST. DE CRUZ DE PVC UZ 90MM U 3.00 64.22 192.66 9.633 28.899 46.2384 38.532 28.899 28.899 9.633 1.9266
121 SUMIN, E INST. DE REDUCTOR DE PVC UZ 90MM A 63MM U 16.00 25.87 413.92
143 20.696 62.088 99.3408 82.784 62.088 62.088 20.696 4.1392
144 122 SUMIN, E INST. DE TEE DE PVC UZ 63MM U 82.00 22.23 1,822.86 91.143 273.429 437.4864 364.572 273.429 273.429 91.143 18.2286
145 123 SUMIN, E INST. DE CRUZ DE PVC UZ 63MM U 4.00 26.84 107.36 5.368 16.104 25.7664 21.472 16.104 16.104 5.368 1.0736
146 124 SUMIN, E INST. DE CODO DE PVC UZ 63MM x 90° U 18.00 12.22 219.96 10.998 32.994 52.7904 43.992 32.994 32.994 10.998 2.1996
147 125 SUMIN, E INST. DE CODO DE PVC UZ 63MM x 45° U 16.00 11.10 177.60 8.88 26.64 42.624 35.52 26.64 26.64 8.88 1.776
148 126 SUMIN, E INST. DE TAPON DE PVC UZ 63MM U 8.00 9.25 74.00 3.7 11.1 17.76 14.8 11.1 11.1 3.7 0.74
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA
127 U 1.00 284.28 284.28
149 (INCLUYE CAJ.) D=110 mm 14.214 42.642 68.2272 56.856 42.642 42.642 14.214 2.8428
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA
128 U 2.00 238.28 476.56
150 (INCLUYE CAJ.) D=90 mm 23.828 71.484 114.3744 95.312 71.484 71.484 23.828 4.7656
AQUISICIÓN E INSTALACIÓN DE GUIAS DOMICILIARIAS Ø
129 U 654.00 131.89 86,256.06
151 1/2 " 4312.803 12938.409 20701.4544 17251.212 12938.409 12938.409 4312.803 862.5606
HORMIGON SIMPLE f'c= 180 Kg/cm2 PARA ANCLAJES (INC.
130 M3 16.02 219.35 3,513.99
152 ENCOFRADO) 175.6995 527.0985 843.3576 702.798 527.0985 527.0985 175.6995 35.1399
153 131 CAMA DE ARENA M3 1,406.69 14.34 20,171.93 1008.5965 3025.7895 4841.2632 4034.386 3025.7895 3025.7895 1008.5965 201.7193
RELLENO COMPACTADO CON VIBROAPISONADOR,
132 M3 839.57 4.76 3,996.35
154 MATERIAL DE SITIO 199.8175 599.4525 959.124 799.27 599.4525 599.4525 199.8175 39.9635
DESALOJO DE MATERIAL SOBRANTE A MAQUINA (INCLUYE
133 M3 459.19 4.72 2,167.38
155 TRANSPORTE A BOTADERO AUTORIZADO) 108.369 325.107 520.1712 433.476 325.107 325.107 108.369 21.6738
156 134 Reposicion de Calzada, Aceras y Bordillos 149,155.92
135 CORTE Y RETIRO DE HORMIGON SIMPLE EN ACERA M2 4,764.56 3.58 17,057.12
157 852.856 2558.568 4093.7088 3411.424 2558.568 2558.568 852.856 170.5712
158 136 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) M2 893.35 2.62 2,340.58 117.029 351.087 561.7392 468.116 351.087 351.087 117.029 23.4058
159 137 CORTE Y RETIRO DE PAVIMENTO RÍGIDO EN VIA M2 382.87 3.98 1,523.82 76.191 228.573 365.7168 304.764 228.573 228.573 76.191 15.2382
160 138 REPOSICION DE ACERA E=8CM H.S. F´C =180 KG/CM2 M2 4,049.88 19.79 80,147.13 4007.3565 12022.0695 19235.3112 16029.426 12022.0695 12022.0695 4007.3565 801.4713
REPOSICIÓN DE PISO Y ACERAS CON HS Y MALLA
139 M2 714.68 28.54 20,396.97
161 ELECTROSOLDAD e=15cm 1019.8485 3059.5455 4895.2728 4079.394 3059.5455 3059.5455 1019.8485 203.9697
HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA
140 M2 382.87 48.29 18,488.79
162 e=20cm 924.4395 2773.3185 4437.3096 3697.758 2773.3185 2773.3185 924.4395 184.8879
141 REPOSICIÓN DE ASFALTO 2" (INC. TRANSPORTE A MANTA) M2 893.35 10.30 9,201.51
163 460.0755 1380.2265 2208.3624 1840.302 1380.2265 1380.2265 460.0755 92.0151
164 142 CIUDADELA EL PALMAR 1,317,916.06
165 143 ALCANTARILLADO SANITARIO 691,092.48
166 144 REPLANTEO Y NIVELACION DE TUBERIA ML 10,002.01 1.04 10,402.09 208.0418 832.1672 936.1881 1560.3135 1560.3135 1144.2299 832.1672 832.1672 728.1463 520.1045 520.1045 728.1463
167 145 Excavación a mano (Inc. Desalojo) M3 2,334.51 11.09 25,889.72 517.7944 2071.1776 2330.0748 3883.458 3883.458 2847.8692 2071.1776 2071.1776 1812.2804 1294.486 1294.486 1812.2804
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
146 M3 10,894.38 4.39 47,826.33
168 Desalojo) 956.5266 3826.1064 4304.3697 7173.9495 7173.9495 5260.8963 3826.1064 3826.1064 3347.8431 2391.3165 2391.3165 3347.8431
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
147 M3 2,334.51 9.32 21,757.63
169 metálico y desalojo) 435.1526 1740.6104 1958.1867 3263.6445 3263.6445 2393.3393 1740.6104 1740.6104 1523.0341 1087.8815 1087.8815 1523.0341
SUMIN. E INST. DE TUBERIA ESTRUCTURADA 160MM PVC
148 ML 8,188.73 16.10 131,838.55
170 (INCLUYE PRUEBAS) 2636.771 10547.084 11865.4695 19775.7825 19775.7825 14502.2405 10547.084 10547.084 9228.6985 6591.9275 6591.9275 9228.6985
SUMIN. E INST. DE TUBERIA ESTRUCTURADA 200MM PVC
149 ML 1,813.28 26.34 47,761.80
171 (INCLUYE PRUEBAS) 955.236 3820.944 4298.562 7164.27 7164.27 5253.798 3820.944 3820.944 3343.326 2388.09 2388.09 3343.326
RELLENO COMPACTADO CON VIBROAPISONADOR,
150 M3 10,965.37 4.76 52,195.16
172 MATERIAL DE SITIO 1043.9032 4175.6128 4697.5644 7829.274 7829.274 5741.4676 4175.6128 4175.6128 3653.6612 2609.758 2609.758 3653.6612
RELLENO COMPACTADO CON VIBROAPISONADOR,
151 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A M3 990.27 15.81 15,656.17
173 MANTA) 313.1234 1252.4936 1409.0553 2348.4255 2348.4255 1722.1787 1252.4936 1252.4936 1095.9319 782.8085 782.8085 1095.9319
DESALOJO DE MATERIAL SOBRANTE A MAQUINA (INCLUYE
152 M3 300.00 4.72 1,416.00
174 TRANSPORTE A BOTADERO AUTORIZADO) 28.32 113.28 127.44 212.4 212.4 155.76 113.28 113.28 99.12 70.8 70.8 99.12
SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC.
153 TRANSPORTE A MANTA, TENDIDO CONFORMACIÓN Y M3 271.99 22.93 6,236.73
COMPACTACIÓN)
175 124.7346 498.9384 561.3057 935.5095 935.5095 686.0403 498.9384 498.9384 436.5711 311.8365 311.8365 436.5711
176 154 CAMA DE ARENA M3 2,454.88 14.34 35,202.98 704.0596 2816.2384 3168.2682 5280.447 5280.447 3872.3278 2816.2384 2816.2384 2464.2086 1760.149 1760.149 2464.2086
HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA
155 M2 181.33 48.29 8,756.43
177 e=20cm 175.1286 700.5144 788.0787 1313.4645 1313.4645 963.2073 700.5144 700.5144 612.9501 437.8215 437.8215 612.9501
SUMINISTRO E INSTALACION DE CAJA DOMICILIARIA PVC
156 (ALINEADA, CIEGA, o 90°), D=175MM CON TAPA DE HA U 630.00 271.83 171,252.90
178 (INCLUYE MARCO Y CONTRAMARCO) 3425.058 13700.232 15412.761 25687.935 25687.935 18837.819 13700.232 13700.232 11987.703 8562.645 8562.645 11987.703
SUMINISTRO E INSTALACIÓN DE CAJA DOMICILIARIA DE
157 U 232.00 283.65 65,806.80
179 H.A. ESQUINA, H<2.50M (INC. TAPA) 1316.136 5264.544 5922.612 9871.02 9871.02 7238.748 5264.544 5264.544 4606.476 3290.34 3290.34 4606.476
POZO DE REVISION DE TIPO I H 0,00 - 2,00 M CON TAPA
158 U 24.00 1,524.04 36,576.96
180 DE H.D. 731.5392 2926.1568 3291.9264 5486.544 5486.544 4023.4656 2926.1568 2926.1568 2560.3872 1828.848 1828.848 2560.3872
POZO DE REVISION DE TIPO II H 2,01 - 4,00 M CON TAPA
159 U 6.00 2,086.04 12,516.24
181 DE H.D. 250.3248 1001.2992 1126.4616 1877.436 1877.436 1376.7864 1001.2992 1001.2992 876.1368 625.812 625.812 876.1368
182 160 Reposicion de Calzada, Aceras y Bordillos 171,497.47
161 CORTE Y RETIRO DE HORMIGON SIMPLE EN ACERA M2 5,240.79 3.58 18,762.03
183 375.2406 1500.9624 1688.5827 2814.3045 2814.3045 2063.8233 1500.9624 1500.9624 1313.3421 938.1015 938.1015 1313.3421
184 162 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) M2 2,778.95 2.62 7,280.85 145.617 582.468 655.2765 1092.1275 1092.1275 800.8935 582.468 582.468 509.6595 364.0425 364.0425 509.6595
185 163 CORTE Y RETIRO DE PAVIMENTO RÍGIDO EN VIA M2 163.20 3.98 649.54 12.9908 51.9632 58.4586 97.431 97.431 71.4494 51.9632 51.9632 45.4678 32.477 32.477 45.4678
186 164 REPOSICION DE ACERA E=8CM H.S. F´C =180 KG/CM2 M2 4,716.71 19.79 93,343.69 1866.8738 7467.4952 8400.9321 14001.5535 14001.5535 10267.8059 7467.4952 7467.4952 6534.0583 4667.1845 4667.1845 6534.0583

2 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
REPOSICIÓN DE PISO Y ACERAS CON HS Y MALLA
165 M2 524.08 28.54 14,957.24
187 ELECTROSOLDAD e=15cm 299.1448 1196.5792 1346.1516 2243.586 2243.586 1645.2964 1196.5792 1196.5792 1047.0068 747.862 747.862 1047.0068
HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA
166 M2 163.20 48.29 7,880.93
188 e=20cm 157.6186 630.4744 709.2837 1182.1395 1182.1395 866.9023 630.4744 630.4744 551.6651 394.0465 394.0465 551.6651
167 REPOSICIÓN DE ASFALTO 2" (INC. TRANSPORTE A MANTA) M2 2,778.95 10.30 28,623.19
189 572.4638 2289.8552 2576.0871 4293.4785 4293.4785 3148.5509 2289.8552 2289.8552 2003.6233 1431.1595 1431.1595 2003.6233
190 168 AGUA POTABLE 281,405.26
191 169 REPLANTEO Y NIVELACION DE TUBERIA ML 9,887.71 1.04 10,283.22 205.6644 822.6576 925.4898 1542.483 1542.483 1131.1542 822.6576 822.6576 719.8254 514.161 514.161 719.8254
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
170 M3 7,983.60 4.39 35,048.00
192 Desalojo) 700.96 2803.84 3154.32 5257.2 5257.2 3855.28 2803.84 2803.84 2453.36 1752.4 1752.4 2453.36
SUMINISTRO E INST. DE TUBERIA P.V.C. UZ D=63mm x 1,00
171 M 7,440.12 8.23 61,232.19
193 MPA (Incluye pruebas y desinfección) 1224.6438 4898.5752 5510.8971 9184.8285 9184.8285 6735.5409 4898.5752 4898.5752 4286.2533 3061.6095 3061.6095 4286.2533
SUMINISTRO E INST. DE TUBERÍA P.V.C. UZ D=90mm x
172 ML 2,447.59 11.20 27,413.01
194 1,00Mpa (Incluye pruebas y desinfección) 548.2602 2193.0408 2467.1709 4111.9515 4111.9515 3015.4311 2193.0408 2193.0408 1918.9107 1370.6505 1370.6505 1918.9107
195 173 SUMIN, E INST. DE TEE DE PVC UZ 90MM U 146.00 36.73 5,362.58 107.2516 429.0064 482.6322 804.387 804.387 589.8838 429.0064 429.0064 375.3806 268.129 268.129 375.3806
196 174 SUMIN, E INST. DE CODO DE PVC UZ 90MM x 90° U 42.00 12.50 525.00 10.5 42 47.25 78.75 78.75 57.75 42 42 36.75 26.25 26.25 36.75
197 175 SUMIN, E INST. DE CODO DE PVC UZ 90MM x 45° U 33.00 12.35 407.55 8.151 32.604 36.6795 61.1325 61.1325 44.8305 32.604 32.604 28.5285 20.3775 20.3775 28.5285
198 176 SUMIN, E INST. DE CODO DE PVC UZ 90MM x 22,5 ° U 28.00 12.10 338.80 6.776 27.104 30.492 50.82 50.82 37.268 27.104 27.104 23.716 16.94 16.94 23.716
177 SUMIN, E INST. DE REDUCTOR DE PVC UZ 90MM A 63MM U 30.00 25.87 776.10
199 15.522 62.088 69.849 116.415 116.415 85.371 62.088 62.088 54.327 38.805 38.805 54.327
200 178 SUMIN, E INST. DE TEE DE PVC UZ 63MM U 25.00 22.23 555.75 11.115 44.46 50.0175 83.3625 83.3625 61.1325 44.46 44.46 38.9025 27.7875 27.7875 38.9025
201 179 SUMIN, E INST. DE CRUZ DE PVC UZ 63MM U 3.00 26.84 80.52 1.6104 6.4416 7.2468 12.078 12.078 8.8572 6.4416 6.4416 5.6364 4.026 4.026 5.6364
202 180 SUMIN, E INST. DE CODO DE PVC UZ 63MM x 90° U 78.00 12.22 953.16 19.0632 76.2528 85.7844 142.974 142.974 104.8476 76.2528 76.2528 66.7212 47.658 47.658 66.7212
203 181 SUMIN, E INST. DE TAPON DE PVC UZ 63MM U 20.00 9.25 185.00 3.7 14.8 16.65 27.75 27.75 20.35 14.8 14.8 12.95 9.25 9.25 12.95
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA
182 U 7.00 238.28 1,667.96
204 (INCLUYE CAJ.) D=90 mm 33.3592 133.4368 150.1164 250.194 250.194 183.4756 133.4368 133.4368 116.7572 83.398 83.398 116.7572
AQUISICIÓN E INSTALACIÓN DE GUIAS DOMICILIARIAS Ø
183 U 761.00 131.89 100,368.29
205 1/2 " 2007.3658 8029.4632 9033.1461 15055.2435 15055.2435 11040.5119 8029.4632 8029.4632 7025.7803 5018.4145 5018.4145 7025.7803
HORMIGON SIMPLE f'c= 180 Kg/cm2 PARA ANCLAJES (INC.
184 M3 36.45 219.35 7,995.31
206 ENCOFRADO) 159.9062 639.6248 719.5779 1199.2965 1199.2965 879.4841 639.6248 639.6248 559.6717 399.7655 399.7655 559.6717
207 185 CAMA DE ARENA M3 1,630.99 14.34 23,388.40 467.768 1871.072 2104.956 3508.26 3508.26 2572.724 1871.072 1871.072 1637.188 1169.42 1169.42 1637.188
RELLENO COMPACTADO CON VIBROAPISONADOR,
186 M3 914.37 4.76 4,352.40
208 MATERIAL DE SITIO 87.048 348.192 391.716 652.86 652.86 478.764 348.192 348.192 304.668 217.62 217.62 304.668
DESALOJO DE MATERIAL SOBRANTE A MAQUINA (INCLUYE
187 M3 100.00 4.72 472.00
209 TRANSPORTE A BOTADERO AUTORIZADO) 9.44 37.76 42.48 70.8 70.8 51.92 37.76 37.76 33.04 23.6 23.6 33.04
210 188 Reposicion de Calzada, Aceras y Bordillos 173,920.85
189 CORTE Y RETIRO DE HORMIGON SIMPLE EN ACERA M2 5,537.12 3.58 19,822.89
211 396.4578 1585.8312 1784.0601 2973.4335 2973.4335 2180.5179 1585.8312 1585.8312 1387.6023 991.1445 991.1445 1387.6023
212 190 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) M2 830.57 2.62 2,176.09 43.5218 174.0872 195.8481 326.4135 326.4135 239.3699 174.0872 174.0872 152.3263 108.8045 108.8045 152.3263
213 191 CORTE Y RETIRO DE PAVIMENTO RÍGIDO EN VIA M2 553.71 3.98 2,203.77 44.0754 176.3016 198.3393 330.5655 330.5655 242.4147 176.3016 176.3016 154.2639 110.1885 110.1885 154.2639
214 192 REPOSICION DE ACERA E=8CM H.S. F´C =180 KG/CM2 M2 4,983.41 19.79 98,621.68 1972.4336 7889.7344 8875.9512 14793.252 14793.252 10848.3848 7889.7344 7889.7344 6903.5176 4931.084 4931.084 6903.5176
REPOSICIÓN DE PISO Y ACERAS CON HS Y MALLA
193 M2 553.71 28.54 15,802.88
215 ELECTROSOLDAD e=15cm 316.0576 1264.2304 1422.2592 2370.432 2370.432 1738.3168 1264.2304 1264.2304 1106.2016 790.144 790.144 1106.2016
HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA
194 M2 553.71 48.29 26,738.66
216 e=20cm 534.7732 2139.0928 2406.4794 4010.799 4010.799 2941.2526 2139.0928 2139.0928 1871.7062 1336.933 1336.933 1871.7062
195 REPOSICIÓN DE ASFALTO 2" (INC. TRANSPORTE A MANTA) M2 830.57 10.30 8,554.87
217 171.0974 684.3896 769.9383 1283.2305 1283.2305 941.0357 684.3896 684.3896 598.8409 427.7435 427.7435 598.8409
218 196
PRECIO
197 DESCRIPCION UNIDAD CANTIDAD UNITARI PRECIO TOTAL
219 O
220 198 SISTEMA DE AALL LOS ESTEROS TARQUI 2,293,283.69
221 199 COLECTOR AVENIDA 105 275,180.87
222 200 REPLANTEO Y NIVELACION DE TUBERIA M 459.64 1.04 478.03 23.9015 38.2424 71.7045 143.409 143.409 57.3636
223 201 SUMIN. E INST. TUBERIA PVC 875MM S5 PLUS M 169.76 339.21 57,584.29 2879.2145 4606.7432 8637.6435 17275.287 17275.287 6910.1148
SUM. E INST. DE TUBERIA DE HORMIGON ARMADO
202 ML 188.38 707.23 133,227.99
224 D=1000MM. 6661.3995 10658.2392 19984.1985 39968.397 39968.397 15987.3588
REJILLAS DE HIERRO DUCTIL PARA SUMIDEROS DE
203 U 40.00 150.03 6,001.20
225 CALZADA 300.06 480.096 900.18 1800.36 1800.36 720.144
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
204 M3 1,458.83 4.39 6,404.26
226 Desalojo) 320.213 512.3408 960.639 1921.278 1921.278 768.5112
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
205 M3 561.09 9.32 5,229.36
227 metálico y desalojo) 261.468 418.3488 784.404 1568.808 1568.808 627.5232
EXCAVACION A MAQUINA DE 4.01 - 6,00 m (Inc. entibado
206 m3 224.44 10.51 2,358.86
228 metálico y desalojo) 117.943 188.7088 353.829 707.658 707.658 283.0632
RELLENO COMPACTADO CON VIBROAPISONADOR,
207 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A M3 148.91 15.81 2,354.27
229 MANTA) 117.7135 188.3416 353.1405 706.281 706.281 282.5124
SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE
208 (INC. TRANSPORTE A MANTA, TENDIDO m3 148.91 24.10 3,588.73
CONFORMACIÓN Y COMPACTACIÓN)
230 179.4365 287.0984 538.3095 1076.619 1076.619 430.6476
DESALOJO DE MATERIAL SOBRANTE A MAQUINA
209 M3 40.00 4.72 188.80
231 (INCLUYE TRANSPORTE A BOTADERO AUTORIZADO) 9.44 15.104 28.32 56.64 56.64 22.656
SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC.
210 TRANSPORTE A MANTA, TENDIDO CONFORMACIÓN Y M3 100.47 22.93 2,303.78
COMPACTACIÓN)
232 115.189 184.3024 345.567 691.134 691.134 276.4536
233 211 CAMA DE ARENA M3 368.30 14.34 5,281.42 264.071 422.5136 792.213 1584.426 1584.426 633.7704
234 212 HORMIGON SIMPLE F'c = 280 kg/cm2 PARA CAMARAS M3 40.00 267.28 10,691.20 534.56 855.296 1603.68 3207.36 3207.36 1282.944
235 213 HORMIGON SIMPLE F'c = 210 kg/cm2 PARA M3 4.05 247.34 1,001.73 50.0865 80.1384 150.2595 300.519 300.519 120.2076
236 214 HORMIGON PARA CABEZAL DE DESCARGA F´c= 240 M3 25.00 304.15 7,603.75 380.1875 608.3 1140.5625 2281.125 2281.125 912.45
237 215 ENCAUZADORES DE FLUJO (ROMPEVELOCIDADES) ML 216.00 96.15 20,768.40 1038.42 1661.472 3115.26 6230.52 6230.52 2492.208
238 216 LIMPIEZA DE COLECTORES EXISTENTES ML 120.00 52.69 6,322.80 316.14 505.824 948.42 1896.84 1896.84 758.736
239 217 ACERO DE REFUERZO EN BARRAS kg 2,400.00 1.58 3,792.00 189.6 303.36 568.8 1137.6 1137.6 455.04
240 218 COLECTOR DEL RIO BURRO / JOCAY 198,237.00
241 219 REPLANTEO Y NIVELACION DE TUBERIA M 457.11 1.04 475.39 47.539 95.078 142.617 95.078 71.3085 23.7695
242 220 SUMIN. E INST. TUBERIA PVC 540MM S5 PLUS M 177.11 116.85 20,695.30 2069.53 4139.06 6208.59 4139.06 3104.295 1034.765
243 221 SUMIN. E INST. TUBERIA PVC 650MM S5 PLUS M 186.16 157.29 29,281.11 2928.111 5856.222 8784.333 5856.222 4392.1665 1464.0555
244 222 SUMIN. E INST. TUBERIA PVC 875MM S5 PLUS M 93.84 339.21 31,831.47 3183.147 6366.294 9549.441 6366.294 4774.7205 1591.5735
REJILLAS DE HIERRO DUCTIL PARA SUMIDEROS DE
223 U 80.00 150.03 12,002.40
245 CALZADA 1200.24 2400.48 3600.72 2400.48 1800.36 600.12
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
224 M3 1,411.68 4.39 6,197.28
246 Desalojo) 619.728 1239.456 1859.184 1239.456 929.592 309.864
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
225 M3 588.20 9.32 5,482.02
247 metálico y desalojo) 548.202 1096.404 1644.606 1096.404 822.303 274.101
248 226 EXCAVACION A MAQUINA DE 4.01 - 6,00 m (Inc. entibado m3 352.92 10.51 3,709.19 370.919 741.838 1112.757 741.838 556.3785 185.4595
RELLENO COMPACTADO CON VIBROAPISONADOR,
227 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A M3 156.55 15.81 2,475.06
249 MANTA) 247.506 495.012 742.518 495.012 371.259 123.753
SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE
228 (INC. TRANSPORTE A MANTA, TENDIDO m3 156.55 24.10 3,772.86
CONFORMACIÓN Y COMPACTACIÓN)
250 377.286 754.572 1131.858 754.572 565.929 188.643
DESALOJO DE MATERIAL SOBRANTE A MAQUINA
229 M3 40.00 4.72 188.80
251 (INCLUYE TRANSPORTE A BOTADERO AUTORIZADO) 18.88 37.76 56.64 37.76 28.32 9.44
SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC.
230 TRANSPORTE A MANTA, TENDIDO CONFORMACIÓN Y M3 103.47 22.93 2,372.57
COMPACTACIÓN)
252 237.257 474.514 711.771 474.514 355.8855 118.6285
253 231 CAMA DE ARENA M3 319.96 14.34 4,588.23 458.823 917.646 1376.469 917.646 688.2345 229.4115
254 232 HORMIGON SIMPLE F'c = 280 kg/cm2 PARA CAMARAS M3 80.00 267.28 21,382.40 2138.24 4276.48 6414.72 4276.48 3207.36 1069.12
255 233 HORMIGON SIMPLE F'c = 210 kg/cm2 PARA M3 18.00 247.34 4,452.12 445.212 890.424 1335.636 890.424 667.818 222.606
256 234 ENCAUZADORES DE FLUJO (ROMPEVELOCIDADES) ML 240.00 96.15 23,076.00 2307.6 4615.2 6922.8 4615.2 3461.4 1153.8
257 235 LIMPIEZA DE COLECTORES EXISTENTES ML 120.00 52.69 6,322.80 632.28 1264.56 1896.84 1264.56 948.42 316.14
258 236 ACERO DE REFUERZO EN BARRAS kg 4,800.00 1.58 7,584.00 758.4 1516.8 2275.2 1516.8 1137.6 379.2
259 237 MURO DE GAVION M3 36.00 63.00 2,268.00 226.8 453.6 680.4 453.6 340.2 113.4
260 238 DESARMADA DE GAVION M3 120.00 21.00 2,520.00 252 504 756 504 378 126
261 239 ARMADA DE GAVION M3 120.00 63.00 7,560.00 756 1512 2268 1512 1134 378
262 240 DESCARGA EN CALLE 106 (7-T) 605,462.81
263 241 REPLANTEO Y NIVELACION DE TUBERIA M 383.95 1.04 399.31 79.862 159.724 75.8689 35.9379 27.9517 19.9655
264 242 SUM. E INST. DE TUBERIA DE HORMIGON ARMADO ML 383.95 1,201.78 461,423.43 92284.686 184569.372 87670.4517 41528.1087 32299.6401 23071.1715

3 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
REJILLAS DE HIERRO DUCTIL PARA SUMIDEROS DE
243 U 56.00 150.03 8,401.68
265 CALZADA 1680.336 3360.672 1596.3192 756.1512 588.1176 420.084
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
244 M3 2,488.00 4.39 10,922.32
266 Desalojo) 2184.464 4368.928 2075.2408 983.0088 764.5624 546.116
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
245 M3 663.47 9.32 6,183.54
267 metálico y desalojo) 1236.708 2473.416 1174.8726 556.5186 432.8478 309.177
EXCAVACION A MAQUINA DE 4.01 - 6,00 m (Inc. entibado
246 m3 165.87 10.51 1,743.29
268 metálico y desalojo) 348.658 697.316 331.2251 156.8961 122.0303 87.1645
RELLENO COMPACTADO CON VIBROAPISONADOR,
247 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A M3 218.85 15.81 3,460.02
269 MANTA) 692.004 1384.008 657.4038 311.4018 242.2014 173.001
SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE
248 (INC. TRANSPORTE A MANTA, TENDIDO m3 218.85 24.10 5,274.29
CONFORMACIÓN Y COMPACTACIÓN)
270 1054.858 2109.716 1002.1151 474.6861 369.2003 263.7145
DESALOJO DE MATERIAL SOBRANTE A MAQUINA
249 M3 40.00 4.72 188.80
271 (INCLUYE TRANSPORTE A BOTADERO AUTORIZADO) 37.76 75.52 35.872 16.992 13.216 9.44
SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC.
250 TRANSPORTE A MANTA, TENDIDO CONFORMACIÓN Y M3 145.90 22.93 3,345.49
COMPACTACIÓN)
272 669.098 1338.196 635.6431 301.0941 234.1843 167.2745
273 251 CAMA DE ARENA M3 706.47 14.34 10,130.78 2026.156 4052.312 1924.8482 911.7702 709.1546 506.539
274 252 HORMIGON SIMPLE F'c = 280 kg/cm2 PARA CAMARAS M3 56.00 267.28 14,967.68 2993.536 5987.072 2843.8592 1347.0912 1047.7376 748.384
275 253 HORMIGON SIMPLE F'c = 210 kg/cm2 PARA M3 25.20 247.34 6,232.97 1246.594 2493.188 1184.2643 560.9673 436.3079 311.6485
276 254 HORMIGON PARA CABEZAL DE DESCARGA F´c= 240 M3 158.40 304.15 48,177.36 9635.472 19270.944 9153.6984 4335.9624 3372.4152 2408.868
277 255 ENCAUZADORES DE FLUJO (ROMPEVELOCIDADES) ML 135.00 96.15 12,980.25 2596.05 5192.1 2466.2475 1168.2225 908.6175 649.0125
278 256 LIMPIEZA DE COLECTORES EXISTENTES ML 120.00 52.69 6,322.80 1264.56 2529.12 1201.332 569.052 442.596 316.14
279 257 ACERO DE REFUERZO EN BARRAS kg 3,360.00 1.58 5,308.80 1061.76 2123.52 1008.672 477.792 371.616 265.44
280 258 COLECTOR CALLE 110 - AV. 108 (5-T) 991,405.88
281 259 REPLANTEO Y NIVELACION DE TUBERIA M 1,162.61 1.04 1,209.11 181.3665 120.911 60.4555 60.4555 60.4555 60.4555 181.3665 181.3665 181.3665 120.911
282 260 SUMIN. E INST. TUBERIA PVC 540MM S5 PLUS M 370.82 116.85 43,330.32 6499.548 4333.032 2166.516 2166.516 2166.516 2166.516 6499.548 6499.548 6499.548 4333.032
283 261 SUMIN. E INST. TUBERIA PVC 875MM S5 PLUS M 57.38 339.21 19,463.87 2919.5805 1946.387 973.1935 973.1935 973.1935 973.1935 2919.5805 2919.5805 2919.5805 1946.387
284 262 SUM. E INST. DE TUBERIA DE HORMIGON ARMADO ML 112.97 707.23 79,895.77 11984.3655 7989.577 3994.7885 3994.7885 3994.7885 3994.7885 11984.3655 11984.3655 11984.3655 7989.577
285 263 SUM. E INST. DE TUBERIA DE HORMIGON ARMADO ML 212.64 755.24 160,594.23 24089.1345 16059.423 8029.7115 8029.7115 8029.7115 8029.7115 24089.1345 24089.1345 24089.1345 16059.423
SUM. E INST. DE TUBERIA DE HORMIGON ARMADO
264 ML 46.47 985.24 45,784.10
286 D=1400MM. 6867.615 4578.41 2289.205 2289.205 2289.205 2289.205 6867.615 6867.615 6867.615 4578.41
SUM. E INST. DE TUBERIA DE HORMIGON ARMADO
265 ML 232.87 1,160.24 270,185.09
287 D=1500MM. 40527.7635 27018.509 13509.2545 13509.2545 13509.2545 13509.2545 40527.7635 40527.7635 40527.7635 27018.509
SUM. E INST. DE TUBERIA DE HORMIGON ARMADO
266 ML 129.46 1,201.78 155,582.44
288 D=1600MM. 23337.366 15558.244 7779.122 7779.122 7779.122 7779.122 23337.366 23337.366 23337.366 15558.244
REJILLAS DE HIERRO DUCTIL PARA SUMIDEROS DE
267 U 144.00 150.03 21,604.32
289 CALZADA 3240.648 2160.432 1080.216 1080.216 1080.216 1080.216 3240.648 3240.648 3240.648 2160.432
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
268 M3 5,077.25 4.39 22,289.13
290 Desalojo) 3343.3695 2228.913 1114.4565 1114.4565 1114.4565 1114.4565 3343.3695 3343.3695 3343.3695 2228.913
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
269 M3 1,562.23 9.32 14,559.98
291 metálico y desalojo) 2183.997 1455.998 727.999 727.999 727.999 727.999 2183.997 2183.997 2183.997 1455.998
EXCAVACION A MAQUINA DE 4.01 - 6,00 m (Inc. entibado
270 m3 1,171.67 10.51 12,314.25
292 metálico y desalojo) 1847.1375 1231.425 615.7125 615.7125 615.7125 615.7125 1847.1375 1847.1375 1847.1375 1231.425
RELLENO COMPACTADO CON VIBROAPISONADOR,
271 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A M3 518.76 15.81 8,201.60
293 MANTA) 1230.24 820.16 410.08 410.08 410.08 410.08 1230.24 1230.24 1230.24 820.16
SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE
272 (INC. TRANSPORTE A MANTA, TENDIDO m3 518.76 24.10 12,502.12
CONFORMACIÓN Y COMPACTACIÓN)
294 1875.318 1250.212 625.106 625.106 625.106 625.106 1875.318 1875.318 1875.318 1250.212
DESALOJO DE MATERIAL SOBRANTE A MAQUINA
273 M3 40.00 4.72 188.80
295 (INCLUYE TRANSPORTE A BOTADERO AUTORIZADO) 28.32 18.88 9.44 9.44 9.44 9.44 28.32 28.32 28.32 18.88
SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC.
274 TRANSPORTE A MANTA, TENDIDO CONFORMACIÓN Y M3 345.79 22.93 7,928.96
COMPACTACIÓN)
296 792.896 1823.6608 1585.792 1189.344 792.896 555.0272 396.448 396.448 396.448
297 275 CAMA DE ARENA M3 1,397.07 14.34 20,033.98 2003.398 4607.8154 4006.796 3005.097 2003.398 1402.3786 1001.699 1001.699 1001.699
298 276 HORMIGON SIMPLE F'c = 280 kg/cm2 PARA CAMARAS M3 136.00 267.28 36,350.08 3635.008 8360.5184 7270.016 5452.512 3635.008 2544.5056 1817.504 1817.504 1817.504
299 277 HORMIGON SIMPLE F'c = 210 kg/cm2 PARA M3 64.80 247.34 16,027.63 1602.763 3686.3549 3205.526 2404.1445 1602.763 1121.9341 801.3815 801.3815 801.3815
300 278 HORMIGON PARA CABEZAL DE DESCARGA F´c= 240 M3 19.10 304.15 5,809.27 580.927 1336.1321 1161.854 871.3905 580.927 406.6489 290.4635 290.4635 290.4635
301 279 ENCAUZADORES DE FLUJO (ROMPEVELOCIDADES) ML 24.00 96.15 2,307.60 230.76 530.748 461.52 346.14 230.76 161.532 115.38 115.38 115.38
302 280 LIMPIEZA DE COLECTORES EXISTENTES ML 120.00 52.69 6,322.80 632.28 1454.244 1264.56 948.42 632.28 442.596 316.14 316.14 316.14
303 281 HORMIGON SIMPLE F'c = 210 kg/cm2 PARA M3 64.80 247.34 16,027.63 1602.763 3686.3549 3205.526 2404.1445 1602.763 1121.9341 801.3815 801.3815 801.3815
304 282 ACERO DE REFUERZO EN BARRAS kg 8,160.00 1.58 12,892.80 1289.28 2965.344 2578.56 1933.92 1289.28 902.496 644.64 644.64 644.64
305 304 Reparaciones de Acometidas 14,528.55
ACOMETIDA DE AAPP DOMICILIARIA (INCL. COLLARIN Ø
305 U 70.00 107.87 7,550.90
306 63MM TUBERIA 1/2" Y ACCESORIOS) 75.509 377.545 528.563 755.09 755.09 679.581 679.581 679.581 679.581 604.072 528.563 528.563 377.545 226.527 75.509
307 306 REPARACIÓN DE ACOMETIDA DE AAPP 1/2" U 220.00 19.45 4,279.00 42.79 213.95 299.53 427.9 427.9 385.11 385.11 385.11 385.11 342.32 299.53 299.53 213.95 128.37 42.79
308 307 REPARACION ACOMETIDA AAPP 3/4" U 45.00 23.98 1,079.10 10.791 53.955 75.537 107.91 107.91 97.119 97.119 97.119 97.119 86.328 75.537 75.537 53.955 32.373 10.791
REPARACIÓN DE ACOMETIDA DOMICILIARIAS DE AA.PP
308 U 22.00 13.79 303.38
309 Ø 1" 3.0338 15.169 21.2366 30.338 30.338 27.3042 27.3042 27.3042 27.3042 24.2704 21.2366 21.2366 15.169 9.1014 3.0338
REPARACION DE ACOMETIDA DE AGUA POTABLE Ø 63
309 U 18.00 13.79 248.22
310 MM 2.4822 12.411 17.3754 24.822 24.822 22.3398 22.3398 22.3398 22.3398 19.8576 17.3754 17.3754 12.411 7.4466 2.4822
REPARACIÓN DE ACOMETIDA DE AASS CON TUBERIA DE
310 U 12.00 12.83 153.96
311 PVC 110MM 1.5396 7.698 10.7772 15.396 15.396 13.8564 13.8564 13.8564 13.8564 12.3168 10.7772 10.7772 7.698 4.6188 1.5396
REPARACIÓN DE ACOMETIDA DE AASS CON TUBERIA DE
311 U 8.00 95.75 766.00
312 PVC 160MM 7.66 38.3 53.62 76.6 76.6 68.94 68.94 68.94 68.94 61.28 53.62 53.62 38.3 22.98 7.66
REPARACIÓN DE ACOMETIDA DE AASS CON TUBERIA DE
312 U 3.00 49.33 147.99
313 PVC 200MM DESAGUE(INCL. MATERIAL) 1.4799 7.3995 10.3593 14.799 14.799 13.3191 13.3191 13.3191 13.3191 11.8392 10.3593 10.3593 7.3995 4.4397 1.4799
314 313 Reposicion de Calzada, Aceras y Bordillos 208,468.58
315 314 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) M2 4,102.15 2.62 10,747.63 107.4763 537.3815 752.3341 1074.763 1074.763 967.2867 967.2867 967.2867 967.2867 859.8104 752.3341 752.3341 537.3815 107.4763 107.4763 107.4763 107.4763
316 315 CORTE Y RETIRO DE PAVIMENTO RÍGIDO EN VIA M2 1,758.07 3.98 6,997.12 69.9712 349.856 489.7984 699.712 699.712 629.7408 629.7408 629.7408 629.7408 559.7696 489.7984 489.7984 349.856 69.9712 69.9712 69.9712 69.9712
HORMIGON SIMPLE DE F'c=280 Kg/Cm² EN LOSA Y VIA
316 M2 2,637.10 48.29 127,345.56
317 e=20cm 1273.4556 6367.278 8914.1892 12734.556 12734.556 11461.1004 11461.1004 11461.1004 11461.1004 10187.6448 8914.1892 8914.1892 6367.278 1273.4556 1273.4556 1273.4556 1273.4556
317 REPOSICIÓN DE ASFALTO 2" (INC. TRANSPORTE A MANTA) M2 6,153.23 10.30 63,378.27
318 633.7827 3168.9135 4436.4789 6337.827 6337.827 5704.0443 5704.0443 5704.0443 5704.0443 5070.2616 4436.4789 4436.4789 3168.9135 633.7827 633.7827 633.7827 633.7827
319 318
320 319 Descripcion Unidad Cantidad P.Unitario P.Total

REPOTENCIACIÓN DE LA ESTACION
320 1,963,352.79
DE BOMBEO MIRAFLORES
321
PRECIO
321 DESCRIPCION UNIDAD CANTIDAD UNITARI PRECIO TOTAL
322 O
REHABILITACION Y REPONTENCIACION DE SISTEMA
322 DE BOMBEO MIRAFLORES
323
324 323 LÍNEA DE IMPULSIÓN 971.40
325 324 PASAMUROS
Suministro e instalación de pasamuros para tubería acero al
325 414.56
326 carbono 250mm u 4.00 103.64 4.1456 41.456 62.184 82.912 62.184 41.456 41.456 33.1648 29.0192 12.4368 4.1456
Suministro e instalación de pasamuros para tubería acero al
326 556.84
327 carbono 450mm u 4.00 139.21 5.5684 55.684 83.526 111.368 83.526 55.684 55.684 44.5472 38.9788 16.7052 5.5684
328 327 SISTEMA DE DESBASTE 357,033.03
329 328 Tecle eléctrico de 5ton 20m de levante (Inc. trolley) u 1.00 19,369.73 19,369.73 3873.946 11621.838 3873.946
Suministro e instalación de criba para desbaste e=3mm,
329 u 1.00 20,082.95 20,082.95
330 Miraflores (Inc. riel de izaje y soportería) 4016.59 12049.77 4016.59
331 330 Acero estructural (A36) kg 639.90 2.70 1,727.73 345.546 1036.638 345.546
332 331 Contenedor de desechos 1100lt u 1.00 467.27 467.27 93.454 280.362 93.454
333 332 Suministro e Instalación de Cubierta metálica galvanizada m2 18.71 22.27 416.67 83.334 250.002 83.334
334 333 Resane de pisos con mortero autonivelante m2 170.66 54.65 9,326.57 1865.314 5595.942 1865.314
Hormigón premezclado f´c=280 kg/cm² con
334 impermeabilizante (inc. encofrado y aditivo inhibidor de m3 0.02 316.77 6.34
335 corrosión) (MANTA) 6.34
336 335 LOSA Y TAPA PARA CÁMARA DE DESBASTE
337 336 Hormigón premezclado f´c=280 kg/cm² con m3 4.08 316.77 1,292.42 12.9242 129.242 193.863 258.484 193.863 129.242 129.242 103.3936 90.4694 38.7726 12.9242

4 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
338 337 ACERO DE REFUERZO EN BARRAS kg 134.94 1.58 213.21 2.1321 21.321 31.9815 42.642 31.9815 21.321 21.321 17.0568 14.9247 6.3963 2.1321
Suministro e Instalación de Tapa de acero para cámara de
338 1,250.83
339 desbaste (Miraflores) u 1.00 1,250.83 12.5083 125.083 187.6245 250.166 187.6245 125.083 125.083 100.0664 87.5581 37.5249 12.5083
340 339 CIMENTACIÓN PARA VIGA PRINCIPAL 0.00
341 340 Excavación a mano (Inc. Desalojo) m3 8.61 11.09 95.48 0.9548 9.548 14.322 19.096 14.322 9.548 9.548 7.6384 6.6836 2.8644 0.9548
RELLENO COMPACTADO CON VIBROAPISONADOR,
341 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A 220.08
342 m3 13.92 15.81 2.2008 22.008 33.012 44.016 33.012 22.008 22.008 17.6064 15.4056 6.6024 2.2008
MANTA)
343 342 Hormigón premezclado para Replantillo f´c=180 kg/cm² m3 0.39 199.76 77.91 0.7791 7.791 11.6865 15.582 11.6865 7.791 7.791 6.2328 5.4537 2.3373 0.7791
344 343 Hormigón premezclado f´c=210 kg/cm², con m3 4.76 291.53 1,387.68 13.8768 138.768 208.152 277.536 208.152 138.768 138.768 111.0144 97.1376 41.6304 13.8768
345 344 ACERO DE REFUERZO EN BARRAS kg 398.11 1.58 629.01 6.2901 62.901 94.3515 125.802 94.3515 62.901 62.901 50.3208 44.0307 18.8703 6.2901
346 345 TRITURADORA 0.00
Suministro, instalación y montaje de unidad de triturado de
346 275,151.04
347 desechos sólidos capacidad 625 L/s (2250m3/h) u 2.00 137,575.52 2751.5104 27515.104 41272.656 55030.208 41272.656 27515.104 27515.104 22012.0832 19260.5728 8254.5312 2751.5104
348 347 ESTRUCTURA DE SOPORTE TRITURADORA 0.00
Fabricación y montaje de viga principal de soporte de
348 4,870.57
349 sistema de triturado de desechos sólidos u 1.00 4,870.57 48.7057 487.057 730.5855 974.114 730.5855 487.057 487.057 389.6456 340.9399 146.1171 48.7057
Fabricación y montaje de columnas de soporte de sistema
349 12,642.91
350 de triturado de desechos sólidos u 1.00 12,642.91 126.4291 1264.291 1896.4365 2528.582 1896.4365 1264.291 1264.291 1011.4328 885.0037 379.2873 126.4291
Fabricación y montaje de viga inferior de soporte de sistema
350 1,432.46
351 de triturado de desechos sólidos u 1.00 1,432.46 14.3246 143.246 214.869 286.492 214.869 143.246 143.246 114.5968 100.2722 42.9738 14.3246
Fabricación y montaje de base inferior de soporte de
351 6,372.17
352 sistema de triturado de desechos sólidos u 1.00 6,372.17 63.7217 637.217 955.8255 1274.434 955.8255 637.217 637.217 509.7736 446.0519 191.1651 63.7217
353 352 OBRA MECÁNICA 869,585.25
Suministro e instalación de bomba sumergible, capacidad
353 Q=179L/s TDH=65m incluye guías de izaje, tubos guía, u 4.00 148,285.56 593,142.24
354 cadenas, ganchos y argollas de izaje 118628.448 355885.344 118628.448
Suministro e instalación de tuberías de acero SCH 40 ASTM
354 m 19,668.88
355 A106 GR B 18" 56.00 351.23 196.6888 1966.888 2950.332 3933.776 2950.332 1966.888 1966.888 1573.5104 1376.8216 590.0664 196.6888
Suministro e instalación de tuberías de acero SCH 40 ASTM
355 m 10,935.84
356 A106 GR B 20" 16.00 683.49 109.3584 1093.584 1640.376 2187.168 1640.376 1093.584 1093.584 874.8672 765.5088 328.0752 109.3584
Suministro e instalación de válvula check bridada de H.D.
356 u 10,728.72
357 tipo swing 18" PN16 4.00 2,682.18 107.2872 1072.872 1609.308 2145.744 1609.308 1072.872 1072.872 858.2976 751.0104 321.8616 107.2872
Suministro e instalación de Codo 18" (DN450) de 90° de
357 u 11,591.72
358 acero al carbono 4.00 2,897.93 115.9172 1159.172 1738.758 2318.344 1738.758 1159.172 1159.172 927.3376 811.4204 347.7516 115.9172
Suministro e instalación de Codo 18" (DN450) de 45° de
358 u 11,572.52
359 acero al carbono 4.00 2,893.13 115.7252 1157.252 1735.878 2314.504 1735.878 1157.252 1157.252 925.8016 810.0764 347.1756 115.7252
Suministro e instalación de Yee reductora 20"x18" de acero
359 u 5,852.56
360 al carbono 8.00 731.57 58.5256 585.256 877.884 1170.512 877.884 585.256 585.256 468.2048 409.6792 175.5768 58.5256
Suministro e instalación de reductor concéntrico de 24”x20”
360 u 5,973.48
361 de acero al carbono 2.00 2,986.74 59.7348 597.348 896.022 1194.696 896.022 597.348 597.348 477.8784 418.1436 179.2044 59.7348
362 361 Suministro e instalación de Junta mecánica de 18" de H.D. u 4.00 2,767.37 11,069.48 110.6948 1106.948 1660.422 2213.896 1660.422 1106.948 1106.948 885.5584 774.8636 332.0844 110.6948
363 362 Suministro e instalación de Brida de 18" ANSI B16.5 u 52.00 345.97 17,990.44 179.9044 1799.044 2698.566 3598.088 2698.566 1799.044 1799.044 1439.2352 1259.3308 539.7132 179.9044
364 363 Suministro e instalación de Brida de 20" ANSI B16.5 u 34.00 546.03 18,565.02 185.6502 1856.502 2784.753 3713.004 2784.753 1856.502 1856.502 1485.2016 1299.5514 556.9506 185.6502
365 364 Suministro e instalación de brida ciega de 20" ANSI B16.5 u 2.00 642.73 1,285.46 12.8546 128.546 192.819 257.092 192.819 128.546 128.546 102.8368 89.9822 38.5638 12.8546
366 365 Suministro e instalación de Empaque espirometálico 18" u 35.00 47.09 1,648.15 16.4815 164.815 247.2225 329.63 247.2225 164.815 164.815 131.852 115.3705 49.4445 16.4815
367 366 Suministro e instalación de Empaque espirometálico 20" u 18.00 56.83 1,022.94 10.2294 102.294 153.441 204.588 153.441 102.294 102.294 81.8352 71.6058 30.6882 10.2294
Suministro e Instalación de Válvula Compuerta tipo guillotina
367 29,816.48
368 d=500mm u 4.00 7,454.12 298.1648 2981.648 4472.472 5963.296 4472.472 2981.648 2981.648 2385.3184 2087.1536 894.4944 298.1648
Suministro e Instalación de abrazadera de acero al carbono
368 1,233.36
369 para tuberia 450mm u 12.00 102.78 12.3336 123.336 185.004 246.672 185.004 123.336 123.336 98.6688 86.3352 37.0008 12.3336
370 369 Recubrimiento externo tubería de acero al carbono m2 150.00 205.47 30,820.50 308.205 3082.05 4623.075 6164.1 4623.075 3082.05 3082.05 2465.64 2157.435 924.615 308.205
371 370 Recubrimiento interno tubería de cero al carbono m2 134.00 292.83 39,239.22 392.3922 3923.922 5885.883 7847.844 5885.883 3923.922 3923.922 3139.1376 2746.7454 1177.1766 392.3922
372 371 Readecuación de puente grúa, estructura metálica kg 1,912.00 21.16 40,457.92 404.5792 4045.792 6068.688 8091.584 6068.688 4045.792 4045.792 3236.6336 2832.0544 1213.7376 404.5792
373 372 Readecuación de puente grúa, obras conexas u 36.00 193.62 6,970.32 69.7032 697.032 1045.548 1394.064 1045.548 697.032 697.032 557.6256 487.9224 209.1096 69.7032
374 373 OBRA ELÉCTRICA Y AUTOMATIZACIÓN 700,880.89
375 374 OBRA ELÉCTRICA
376 375 CENTRO DE TRANSFORMACION
Suministro e instalacion de transformador de 950 KVA (PAD
376 MOUTE) (Miraflores)(Incluye Acometida Y CONEXIÓN DE 53,683.36
377 MV) u 1.00 53,683.36 10736.672 32210.016 10736.672
378 377 SISTEMA DE EMERGENCIA 0.00
Suministro e instalacion de Generador Electrico 1000 KVA
378 271,607.16
379 (Miraflores) (Incluye tranferencia Automática) u 1.00 271,607.16 54321.432 162964.296 54321.432
380 379 TABLEROS DE DISTRIBUCION 0.00
381 380 Tablero de distribucion PD1 Y PD2 u 2.00 29,785.29 59,570.58 11914.116 35742.348 11914.116
382 381 Tablero de Control y Fuerza, PD1.1(ABC) Y PD2.2G u 4.00 37,968.34 151,873.36 30374.672 91124.016 30374.672
Alimentador con cable superflex (3F (3x500) +
382 8,200.00
383 1(350T)+1(350N) m. 20.00 410.00 1640 4920 1640
Manteniemto General de Tablero de Distribución General
383 1,000.00
384 (TDG) u. 1.00 1,000.00 200 600 200
Alimentador con cable superflex (3F (3x250) +
384 14,640.00
385 1(250T)+1(250N) m. 80.00 183.00 2928 8784 2928
386 385 SISTEMA DE PUESTA A TIERRA 0.00
Medicion al Sistema de puesta a tierra de estación de
386 u 2,691.08
bombeo (Miraflores) y compensar en caso de ser necesario
387 1.00 2,691.08 672.77 672.77 672.77 672.77
388 387 ACOMETIDAS EN BAJA TENSION 0.00
Reubicacion de alimentadores, instalacion de tableros y
388 U 5,065.75
389 cambio de alimentadores 1.00 5,065.75 1266.4375 1266.4375 1266.4375 1266.4375
Alimentador (3F-250 MCM AWG TTU, , T-1#1/0 MCM AWG
389 ml 3,700.20
390 TTU) (MIRAFLORES) 60.00 61.67 925.05 925.05 925.05 925.05
391 390 ALIMENTADOR DE BOMBAS 0.00
Alimentador a Bomba de 150 KW desde PD1.1 C a Bomba
391 128,849.40
392 3,4 y 5 (Miraflores) ml 540.00 238.61 32212.35 32212.35 32212.35 32212.35
393 392 REHABILITACIÓN DEL CARCAMO 31,278.52
394 393 Limpieza del cárcamo m2 653.82 1.14 745.35 74.535 74.535 74.535 111.8025 149.07 149.07 111.8025
395 394 Membrana impermeabilizante para tanque de agua residual m2 653.82 41.92 27,408.13 2740.813 2740.813 2740.813 4111.2195 5481.626 5481.626 4111.2195
Suministro e Instalación de Tapa de H.A. (2000x1000)mm
395 1,367.20
396 (Inc. Caucho) u 8.00 170.90 136.72 136.72 136.72 205.08 273.44 273.44 205.08
Suministro e Instalación de Tapa de H.A. (1000x1250)mm
396 1,270.10
397 (Inc. Caucho) u 10.00 127.01 127.01 127.01 127.01 190.515 254.02 254.02 190.515
398 397 DESAGUE DE CÁMARA DE VÁLVULA 0.00
399 398 Perforación a mano en muro de cárcamo m2 0.05 10.06 0.50 0.05 0.05 0.05 0.075 0.1 0.1 0.075
Suministro e Instalación de Tubería PVC/UE d = 50 mm 1.00
399 3.76
400 MPA (Inc. unión elastomérica) ml 0.80 4.70 0.376 0.376 0.376 0.564 0.752 0.752 0.564
Suministro e Instalación de Válvula Compuerta Vastago fijo o
400 483.48
401 ascendente extremos bridados d=50mm PN10 u 2.00 241.74 48.348 48.348 48.348 72.522 96.696 96.696 72.522
402 401 SONDEOS ELÉCTRICOS 550.00
403 402 Sondeos Eléctricos Verticales u 1.00 550.00 550.00 55 55 55 82.5 110 110 82.5
404 403 TRABAJOS EN CARCAMO 3,053.70
405 404 Alquiler de tapon multi-tamaño hora 18.00 9.91 178.38 17.838 17.838 17.838 26.757 35.676 35.676 26.757
406 405 Servicio de buzo táctico hora 18.00 102.02 1,836.36 183.636 183.636 183.636 275.454 367.272 367.272 275.454
407 406 Alquiler de bomba de achique 4HP hora 18.00 57.72 1,038.96 103.896 103.896 103.896 155.844 207.792 207.792 155.844
PRECIO
407 DESCRIPCION UNIDAD CANTIDAD UNITARI PRECIO TOTAL
408 O
REPOTENCIACIÓN DEL SISTEMA DE
408
409 BOMBEO LOS ESTEROS 2,712,733.98
410 409 SISTEMA DE BOMBEO LOS ESTEROS
411 410 LÍNEA DE IMPULSIÓN
412 411 OBRAS PRELIMINARES Y SUMINISTROS 128,935.16
413 412 REPLANTEO Y NIVELACION DE TUBERIA ML 25,564.75 1.04 26,587.34 1329.367 3988.101 6646.835 3988.101 3988.101 2658.734 1329.367 1329.367 1329.367
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
413 23,290.31
414 Desalojo) m3 5,305.31 4.39 1164.5155 3493.5465 5822.5775 3493.5465 3493.5465 2329.031 1164.5155 1164.5155 1164.5155
415 414 CAMA DE ARENA m3 2,184.90 14.34 31,331.47 1566.5735 4699.7205 7832.8675 4699.7205 4699.7205 3133.147 1566.5735 1566.5735 1566.5735

SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE


415 (INC. TRANSPORTE A MANTA, TENDIDO 18,034.27
CONFORMACIÓN Y COMPACTACIÓN)
416 m3 748.31 24.10 901.7135 2705.1405 4508.5675 2705.1405 2705.1405 1803.427 901.7135 901.7135 901.7135

5 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
SUMINISTRO E INSTALACIÓN DE MATERIAL BASE (INC.
416 TRANSPORTE A MANTA, TENDIDO CONFORMACIÓN Y 17,158.75
COMPACTACIÓN)
417 m3 748.31 22.93 857.9375 2573.8125 4289.6875 2573.8125 2573.8125 1715.875 857.9375 857.9375 857.9375
RELLENO COMPACTADO CON VIBROAPISONADOR,
417 857.43
418 MATERIAL DE SITIO m3 382.78 2.24 42.8715 128.6145 214.3575 128.6145 128.6145 85.743 42.8715 42.8715 42.8715
419 418 CORTE Y RETIRO DE PAVIMENTO FLEXIBLE (ASFALTO) m2 3,741.57 2.62 9,802.91 490.1455 1470.4365 2450.7275 1470.4365 1470.4365 980.291 490.1455 490.1455 490.1455
420 419 Suministro e instalación de planta ixora para cerca viva u 276.00 5.28 1,457.28 72.864 218.592 364.32 218.592 218.592 145.728 72.864 72.864 72.864
Suministro e instalación de árbol cananga odorata para
420 415.40
421 cerca viva u 10.00 41.54 20.77 62.31 103.85 62.31 62.31 41.54 20.77 20.77 20.77
422 421 Reposicion de Calzada, Aceras y Bordillos 80,630.83
423 422 Reposición de asfalto 3" (Inc. transporte a Manta) m2 3,741.57 18.64 69,742.86 3487.143 10461.429 17435.715 10461.429 10461.429 6974.286 3487.143 3487.143 3487.143
424 423 Imprimación de asfalto m2 3,741.57 2.91 10,887.97 544.3985 1633.1955 2721.9925 1633.1955 1633.1955 1088.797 544.3985 544.3985 544.3985
425 424 TUBERÍAS Y ACCESORIOS 1,151,722.37
Suministro e Instalación de Tubería PVC/UE d = 630 mm
425 1,050,928.90
426 1.00 MPA (Inc. unión elastomerica) (MANTA) ml 3,101.00 338.90 52546.445 157639.335 262732.225 157639.335 157639.335 105092.89 52546.445 52546.445 52546.445
427 426 Suministro e Instalación de Codo PVC/UE d = 630mmX22.5° u 20.00 833.45 16,669.00 833.45 2500.35 4167.25 2500.35 2500.35 1666.9 833.45 833.45 833.45
428 427 Suministro e Instalación de Codo PVC/UE d = 630mmX90° u 10.00 833.45 8,334.50 416.725 1250.175 2083.625 1250.175 1250.175 833.45 416.725 416.725 416.725
429 428 Suministro e Instalación de Reductor PVC/UE 630 a 400mm u 8.00 773.45 6,187.60 309.38 928.14 1546.9 928.14 928.14 618.76 309.38 309.38 309.38
430 429 Suministro e Instalación de Reductor PVC/UE 400 a 315mm u 8.00 485.45 3,883.60 194.18 582.54 970.9 582.54 582.54 388.36 194.18 194.18 194.18
431 430 Suministro e Instalación de Reductor PVC/UE 315 a 200mm u 8.00 149.45 1,195.60 59.78 179.34 298.9 179.34 179.34 119.56 59.78 59.78 59.78
432 431 Suministro e Instalación de Reductor PVC/UE 200 a 110mm u 8.00 86.74 693.92 34.696 104.088 173.48 104.088 104.088 69.392 34.696 34.696 34.696
433 432 Suministro e Instalación de Tee PVC/UE d = 630 mm u 8.00 327.05 2,616.40 130.82 392.46 654.1 392.46 392.46 261.64 130.82 130.82 130.82
Suministro e Instalación de Válvula de aire 4" Triple acción
433 23,102.40
434 para aguas residuales (Inc. accesorios) u 8.00 2,887.80 1155.12 3465.36 5775.6 3465.36 3465.36 2310.24 1155.12 1155.12 1155.12
435 434 HORMIGON SIMPLE f'c= 180 Kg/cm2 PARA ANCLAJES (INC. m3 130.20 219.35 28,559.37 1427.9685 4283.9055 7139.8425 4283.9055 4283.9055 2855.937 1427.9685 1427.9685 1427.9685
436 435 Cinta de peligro para tubería ml 43,414.00 0.22 9,551.08 477.554 1432.662 2387.77 1432.662 1432.662 955.108 477.554 477.554 477.554
437 436 CÁMARA DE DISIPACIÓN 4,978.81
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
437 252.29
438 metálico y desalojo) m3 27.07 9.32 12.6145 37.8435 63.0725 37.8435 37.8435 25.229 12.6145 12.6145 12.6145
RELLENO COMPACTADO CON VIBROAPISONADOR,
438 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A 40.00
439 m3 2.53 15.81 2 6 10 6 6 4 2 2 2
MANTA) premezclado para Replantillo f´c=180 kg/cm²
Hormigón
440 439 m3 0.50 199.76 99.88 4.994 14.982 24.97 14.982 14.982 9.988 4.994 4.994 4.994
(MANTA)
Hormigón premezclado f´c=210 kg/cm², con
440 impermeabilizante (inc. encofrado y aditivo inhibidor de 2,349.73
441 corrosión) (MANTA) m3 8.06 291.53 117.4865 352.4595 587.4325 352.4595 352.4595 234.973 117.4865 117.4865 117.4865
442 441 ACERO DE REFUERZO EN BARRAS kg 663.80 1.58 1,048.80 52.44 157.32 262.2 157.32 157.32 104.88 52.44 52.44 52.44
443 442 Demolición de paredes m2 3.12 5.62 17.53 0.8765 2.6295 4.3825 2.6295 2.6295 1.753 0.8765 0.8765 0.8765
444 443 Resane de paredes m2 2.93 13.69 40.11 2.0055 6.0165 10.0275 6.0165 6.0165 4.011 2.0055 2.0055 2.0055
Suministro e Instalación de pasamuro para tubería acero al
444 184.62
445 carbono 630 mm u 1.00 184.62 9.231 27.693 46.155 27.693 27.693 18.462 9.231 9.231 9.231
446 445 Suministro e Instalación de Union Mecánica 600mm u 1.00 945.85 945.85 47.2925 141.8775 236.4625 141.8775 141.8775 94.585 47.2925 47.2925 47.2925
447 446 ESTACIÓN DE BOMBEO 29,363.62
448 447 OBRAS PRELIMINARES
449 448 Replanteo de estructuras m2 75.00 1.36 102.00 5.1 15.3 25.5 15.3 15.3 10.2 5.1 5.1 5.1
449 Desmontaje de estructura existente metálica (Inc. desalojo) 283.45
450 m2 35.52 7.98 14.1725 42.5175 70.8625 42.5175 42.5175 28.345 14.1725 14.1725 14.1725
451 450 Demolición de hormigón armado (Inc. desalojo convencional) m3 3.01 22.31 67.15 3.3575 10.0725 16.7875 10.0725 10.0725 6.715 3.3575 3.3575 3.3575
452 451 CIMENTACIONES PARA GENERADOR ELÉCTRICO 0.00
453 452 Excavación a mano (Inc. Desalojo) m3 16.76 11.09 185.87 9.2935 27.8805 46.4675 27.8805 27.8805 18.587 9.2935 9.2935 9.2935
RELLENO COMPACTADO CON VIBROAPISONADOR,
453 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A 119.68
454 m3 7.57 15.81 5.984 17.952 29.92 17.952 17.952 11.968 5.984 5.984 5.984
MANTA) premezclado para Replantillo f´c=180 kg/cm²
Hormigón
455 454 m3 2.16 199.76 431.48 21.574 64.722 107.87 64.722 64.722 43.148 21.574 21.574 21.574
(MANTA) premezclado f´c=280 kg/cm² con
Hormigón
456 455 m3 14.50 316.77 4,593.17 229.6585 688.9755 1148.2925 688.9755 688.9755 459.317 229.6585 229.6585 229.6585
impermeabilizante (inc. encofrado y aditivo inhibidor de
457 456 ACERO DE REFUERZO EN BARRAS kg 2,135.16 1.58 3,373.55 168.6775 506.0325 843.3875 506.0325 506.0325 337.355 168.6775 168.6775 168.6775
458 457 Mortero de nivelación epoxico m3 0.16 12,928.24 2,068.52 103.426 310.278 517.13 310.278 310.278 206.852 103.426 103.426 103.426
459 458 SISTEMA DE VENTILACIÓN 0.00
Suministro e Instalación de Tubería PVC/UE d = 160 mm
459 316.22
460 1.00 MPA (Inc. unión elastomerica) ml 11.60 27.26 15.811 47.433 79.055 47.433 47.433 31.622 15.811 15.811 15.811
Suministro e Instalación de Tubería PVC/UE d = 110 mm
460 27.05
461 1.00 MPA (Inc. unión elastomerica) ml 2.25 12.02 1.3525 4.0575 6.7625 4.0575 4.0575 2.705 1.3525 1.3525 1.3525
462 461 Suministro e Instalación de Codo PVC/UE d = 160mmX90° u 6.00 56.74 340.44 17.022 51.066 85.11 51.066 51.066 34.044 17.022 17.022 17.022
Suministro e Instalación de Tee reductora PVC/UE 160 a
462 1,353.06
463 110mm PN10 u 9.00 150.34 67.653 202.959 338.265 202.959 202.959 135.306 67.653 67.653 67.653
Suministro e Instalación de abrazadera metálica para tuberia
463 125.16
464 160mm u 7.00 17.88 6.258 18.774 31.29 18.774 18.774 12.516 6.258 6.258 6.258
465 464 ELIMINADOR DE OLORES 0.00
Suministro e Instalación de Tubería PVC roscable d = 12.7
465 9.04
466 mm (420PSI) ml 4.00 2.26 0.452 1.356 2.26 1.356 1.356 0.904 0.452 0.452 0.452
466 Suministro e Instalación de Codo PVC roscable 12.7mmx90° 3.03
467 u 3.00 1.01 0.1515 0.4545 0.7575 0.4545 0.4545 0.303 0.1515 0.1515 0.1515
Suministro e Instalación de Aspersor 1" y reductor
467 893.45
468 concéntrico de PVC de 1"x1/2" u 1.00 893.45 44.6725 134.0175 223.3625 134.0175 134.0175 89.345 44.6725 44.6725 44.6725
Suministro e Instalación de Tanque de dosificación de cloro
468 231.78
469 1000lt (Inc. kit de 1/2") u 1.00 231.78 11.589 34.767 57.945 34.767 34.767 23.178 11.589 11.589 11.589
Suministro e Instalación de Bomba dosificadora de químico
110V (7 l/h @ 7 bar) – incluye kit de instalación (válvula de
469 617.46
pie, manguera flexible de succión, manguera flexible de
470 descarga, válvula de inyección) u 1.00 617.46 30.873 92.619 154.365 92.619 92.619 61.746 30.873 30.873 30.873
471 470 ACCESORIOS AGUAS LLUVIAS 0.00
Canal para aguas lluvias (Inc. accesorios) - Los Esteros
471 95.58
472 Doméstico ml 9.00 10.62 4.779 14.337 23.895 14.337 14.337 9.558 4.779 4.779 4.779
Bajante para aguas lluvias (Inc. accesorios) - Los Esteros
472 96.46
473 Doméstico ml 6.75 14.29 4.823 14.469 24.115 14.469 14.469 9.646 4.823 4.823 4.823
PASAMUROS, REJILLA Y TAPA CUBIERTA DEL
473 0.00
474 CÁRCAMO
Suministro e Instalación de pasamuro para tubería PVC 250
474 33.16
475 mm u 1.00 33.16 1.658 4.974 8.29 4.974 4.974 3.316 1.658 1.658 1.658
Suministro e Instalación de pasamuro para tubería PVC
475 82.72
476 315mm u 2.00 41.36 4.136 12.408 20.68 12.408 12.408 8.272 4.136 4.136 4.136
477 476 Acero estructural (A36) kg 583.08 2.70 1,574.32 78.716 236.148 393.58 236.148 236.148 157.432 78.716 78.716 78.716
Hormigón premezclado f´c=210 kg/cm², con
477 impermeabilizante (inc. encofrado y aditivo inhibidor de m3 8.25 291.53 2,405.12
478 corrosión) (MANTA) 120.256 360.768 601.28 360.768 360.768 240.512 120.256 120.256 120.256
Suministro e Instalación de Tapa en acero inoxidable
478 u 4.00 544.40 2,177.60
479 (4700x1400)mm 108.88 326.64 544.4 326.64 326.64 217.76 108.88 108.88 108.88
480 479 DESAGUE DE CÁMARA DE VÁLVULA 0.00
481 480 Perforación a mano en muro de cárcamo m2 0.05 10.06 0.50 0.025 0.075 0.125 0.075 0.075 0.05 0.025 0.025 0.025
Suministro e Instalación de Tubería PVC/UE d = 50 mm 1.00
481 1.88
482 MPA (Inc. unión elastomérica) ml 0.40 4.70 0.094 0.282 0.47 0.282 0.282 0.188 0.094 0.094 0.094
Suministro e Instalación de Válvula Compuerta Vastago fijo o
482 241.74
483 ascendente extremos bridados d=50mm PN10 u 1.00 241.74 12.087 36.261 60.435 36.261 36.261 24.174 12.087 12.087 12.087
484 483 ANCLAJE DE TUBERÍA DE IMPULSIÓN 0.00
485 484 ACERO DE REFUERZO EN BARRAS kg 74.83 1.58 118.23 5.9115 17.7345 29.5575 17.7345 17.7345 11.823 5.9115 5.9115 5.9115
HORMIGON SIMPLE f'c= 180 Kg/cm2 PARA ANCLAJES
486 485 m3 0.94 219.35 206.19 10.3095 30.9285 51.5475 30.9285 30.9285 20.619 10.3095 10.3095 10.3095
(INC. ENCOFRADO)
OBRAS DE LA EDIFICACIÓN DE LA ESTACIÓN Y
486 0.00
487 CASA OPERADOR
488 487 Pintura exterior m2 375.00 7.24 2,715.00 135.75 407.25 678.75 407.25 407.25 271.5 135.75 135.75 135.75
489 488 Pintura interior m2 375.00 6.52 2,445.00 122.25 366.75 611.25 366.75 366.75 244.5 122.25 122.25 122.25
490 489 Gabinetes para oficina u 1.00 120.91 120.91 72.546 48.364
491 490 Cama para dormitorio u 1.00 332.39 332.39 16.6195 49.8585 83.0975 49.8585 49.8585 33.239 16.6195 16.6195 16.6195
492 491 Mesa para escritorio (Inc. silla) u 1.00 319.32 319.32 191.592 127.728
493 492 Inodoro (inc. accesorios) u 1.00 160.03 160.03 8.0015 24.0045 40.0075 24.0045 24.0045 16.003 8.0015 8.0015 8.0015
494 493 Lavamanos de empotrar (inc. accesorios) u 1.00 183.79 183.79 110.274 73.516
495 494 Duchas (inc. accesorios) u 1.00 74.90 74.90 44.94 29.96
496 495 Suministro e instalación de planta ixora u 43.00 5.28 227.04 11.352 34.056 56.76 34.056 34.056 22.704 11.352 11.352 11.352
497 496 Mantenimiento Jardineria anual 1.00 520.58 520.58 312.348 208.232
498 497 Reposicion de acera e=8cm H.S. f´c =180 kg/cm2 (Manta) m2 8.25 10.86 89.60 4.48 13.44 22.4 13.44 13.44 8.96 4.48 4.48 4.48
499 498 Reposicion de Calzada, Aceras y Bordillos 8,275.39
500 499 HORMIGON SIMPLE F'c = 180 kg/cm2 BORDILLOS ml 3.20 24.34 77.89 3.8945 11.6835 19.4725 11.6835 11.6835 7.789 3.8945 3.8945 3.8945
501 500 Resane de pisos con mortero autonivelante m2 150.00 54.65 8,197.50 409.875 1229.625 2049.375 1229.625 1229.625 819.75 409.875 409.875 409.875
502 501 SISTEMA DE DESBASTE 1,022,582.08

6 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
503 502 PRELIMINARES Y SUMINISTRO
504 503 Tecle eléctrico de 3ton 20m de levante (Inc. trolley) u 1.00 15,354.86 15,354.86 767.743 2303.229 3838.715 2303.229 2303.229 1535.486 767.743 767.743 767.743
Suministro e instalación de criba e=3mm para desbaste "Los
504 3,306.55
505 Esteros" (Inc. riel de izaje y soportería) u 1.00 3,306.55 165.3275 495.9825 826.6375 495.9825 495.9825 330.655 165.3275 165.3275 165.3275
506 505 Acero estructural (A36) kg 734.20 2.70 1,982.34 99.117 297.351 495.585 297.351 297.351 198.234 99.117 99.117 99.117
507 506 Contenedor de desechos 1100lt u 1.00 467.27 467.27 23.3635 70.0905 116.8175 70.0905 70.0905 46.727 23.3635 23.3635 23.3635
508 507 Suministro e Instalación de Cubierta metálica galvanizada m2 15.00 22.27 334.05 16.7025 50.1075 83.5125 50.1075 50.1075 33.405 16.7025 16.7025 16.7025
Hormigón premezclado f´c=280 kg/cm² con
509 508 m3 0.02 316.77 6.34 0.317 0.951 1.585 0.951 0.951 0.634 0.317 0.317 0.317
impermeabilizante (inc. encofrado y aditivo inhibidor de
Suministro e Instalación de Tapa de acero para cámara de
509 496.38
510 desbaste (Esteros) u 1.00 496.38 24.819 74.457 124.095 74.457 74.457 49.638 24.819 24.819 24.819
511 510 TRITURADORA 0.00
Suministro, instalación y montaje de unidad de triturado de
511 275,151.04
512 desechos sólidos capacidad 625 L/s (2250m3/h) (Esteros) u 1.00 275,151.04 13757.552 41272.656 68787.76 41272.656 41272.656 27515.104 13757.552 13757.552 13757.552
513 512 ESTRUCTURA DE SOPORTE TRITURADORA 0.00
Fabricación y montaje de estructura para izaje del sistema
513 5,967.26
514 de triturado de desechos sólidos domésticos u 1.00 5,967.26 2386.904 2386.904 1193.452
Fabricación y montaje de rejilla plana de retención de sólidos
514 2,022.07
515 (Los Esteros) u 1.00 2,022.07 808.828 808.828 404.414
516 515 OBRA MECÁNICA 0.00
Suministro e instalación de bomba sumergible de TDH=34m,
516 Q=200 L/s incluye guías de izaje, tubos guía, cadenas, 386,323.41
517 ganchos y argollas de izaje u 3.00 128,774.47 19316.1705 57948.5115 96580.8525 57948.5115 57948.5115 38632.341 19316.1705 19316.1705 19316.1705
Suministro e instalación de tuberías de acero SCH40 ASTM
517 17,870.97
518 A106 GR B 12" m 39.00 458.23 893.5485 2680.6455 4467.7425 2680.6455 2680.6455 1787.097 893.5485 893.5485 893.5485
Suministro e instalación de tuberías de acero SCH40 ASTM
518 6,988.92
519 A106 GR B 20" m 6.00 1,164.82 349.446 1048.338 1747.23 1048.338 1048.338 698.892 349.446 349.446 349.446
Suministro e instalación de tuberías de acero SCH40 ASTM
519 2,453.43
520 A106 GR B 10" m 7.00 350.49 122.6715 368.0145 613.3575 368.0145 368.0145 245.343 122.6715 122.6715 122.6715
Suministro e instalación de válvula de compuerta vástago fijo
520 5,738.88
521 o ascendente extremos bridados H.D. 12" PN10 u 3.00 1,912.96 286.944 860.832 1434.72 860.832 860.832 573.888 286.944 286.944 286.944
Suministro e instalación de válvula de compuerta vástago fijo
521 4,587.69
522 o ascendente extremos bridados H.D. 10" PN10 u 3.00 1,529.23 229.3845 688.1535 1146.9225 688.1535 688.1535 458.769 229.3845 229.3845 229.3845
Suministro e instalación de válvula check bridada de H.D.
522 5,414.88
523 tipo swing 12" PN10 u 3.00 1,804.96 270.744 812.232 1353.72 812.232 812.232 541.488 270.744 270.744 270.744
Suministro e instalación de válvula de alivio bridada de H.D.
523 4,929.61
524 10" u 1.00 4,929.61 246.4805 739.4415 1232.4025 739.4415 739.4415 492.961 246.4805 246.4805 246.4805
Suministro e instalación de Codo 12" (DN315) de 90° de
524 3,546.90
525 acero al carbono u 6.00 591.15 177.345 532.035 886.725 532.035 532.035 354.69 177.345 177.345 177.345
Suministro e instalación de Codo 10" (DN250) de 90° de
525 3,690.40
526 acero al carbono u 5.00 738.08 184.52 553.56 922.6 553.56 553.56 369.04 184.52 184.52 184.52
Suministro e instalación de Tee recta de 10" de acero al
526 604.12
527 carbono u 2.00 302.06 30.206 90.618 151.03 90.618 90.618 60.412 30.206 30.206 30.206
Suministro e instalación de Tee reductora de 20"x12" de
527 4,366.02
528 acero al carbono u 3.00 1,455.34 218.301 654.903 1091.505 654.903 654.903 436.602 218.301 218.301 218.301
Suministro e instalación de Tee reductora de 20"x10" de
528 798.52
529 acero al carbono u 1.00 798.52 39.926 119.778 199.63 119.778 119.778 79.852 39.926 39.926 39.926
Suministro e instalación de Junta mecánica de 12" de hierro
529 7,183.50
530 ductil u 6.00 1,197.25 359.175 1077.525 1795.875 1077.525 1077.525 718.35 359.175 359.175 359.175
Suministro e instalación de Junta mecánica de 10" de hierro
530 984.20
531 ductil u 1.00 984.20 49.21 147.63 246.05 147.63 147.63 98.42 49.21 49.21 49.21
532 531 Suministro e instalación de Brida de 12" ANSI B16.5 u 58.00 186.89 10,839.62 541.981 1625.943 2709.905 1625.943 1625.943 1083.962 541.981 541.981 541.981
533 532 Suministro e instalación de Brida de 20" ANSI B16.5 u 9.00 472.19 4,249.71 212.4855 637.4565 1062.4275 637.4565 637.4565 424.971 212.4855 212.4855 212.4855
534 533 Suministro e instalación de Brida de 10" ANSI B16.5 u 38.00 137.82 5,237.16 261.858 785.574 1309.29 785.574 785.574 523.716 261.858 261.858 261.858
535 534 Suministro e instalación de Brida ciega de 20" ANSI B16.5 u 1.00 563.48 563.48 28.174 84.522 140.87 84.522 84.522 56.348 28.174 28.174 28.174
536 535 Suministro e instalación de Empaque espirometálico 12" u 40.00 48.81 1,952.40 97.62 292.86 488.1 292.86 292.86 195.24 97.62 97.62 97.62
537 536 Suministro e instalación de Empaque espirometálico 20" u 5.00 50.22 251.10 12.555 37.665 62.775 37.665 37.665 25.11 12.555 12.555 12.555
538 537 Suministro e instalación de Empaque espirometálico 10" u 18.00 35.77 643.86 32.193 96.579 160.965 96.579 96.579 64.386 32.193 32.193 32.193
Suministro, montaje, instalación y puesta en marcha de
538 45,497.74
539 Generador a diesel 300 kW u 2.00 22,748.87 2274.887 6824.661 11374.435 6824.661 6824.661 4549.774 2274.887 2274.887 2274.887
Suministro e instalación de tanque de diesel (Inc. Válvulas,
539 8,679.98
540 indicador de nivel y tubería) u 2.00 4,339.99 433.999 1301.997 2169.995 1301.997 1301.997 867.998 433.999 433.999 433.999
Suministro, instalación y puesta en marcha de sistema de
540 1,867.99
541 aire acondicionado 24000 BTU/h u 1.00 1,867.99 93.3995 280.1985 466.9975 280.1985 280.1985 186.799 93.3995 93.3995 93.3995
542 541 Recubrimiento externo de tubería m2 54.00 205.47 11,095.38 554.769 1664.307 2773.845 1664.307 1664.307 1109.538 554.769 554.769 554.769
543 542 Recubrimiento interno de tubería m2 49.70 292.83 14,553.65 727.6825 2183.0475 3638.4125 2183.0475 2183.0475 1455.365 727.6825 727.6825 727.6825
Suministro e Instalación de abrazadera de acero al carbono
543 13,314.48
544 para tuberia u 116.00 114.78 665.724 1997.172 3328.62 1997.172 1997.172 1331.448 665.724 665.724 665.724
Preparación previa a la instalación de grupo de bombeo #1
544 Primera Fase Estación Los Esteros Doméstico y tramo de u 1.00 21,754.29 21,754.29
545 descarga provisional 1087.7145 3263.1435 5438.5725 3263.1435 3263.1435 2175.429 1087.7145 1087.7145 1087.7145
546 545 AUTOMATIZACIÓN 0.00
547 546 INSTRUMENTOS 0.00
Suministro, Calibración e instalación de PI en descarga de
547 u 685.87
548 bombas en estación Esteros 1.00 685.87 34.2935 102.8805 171.4675 102.8805 102.8805 68.587 34.2935 34.2935 34.2935
Suministro, Calibración e instalación de PS en descarga de
548 u 1,105.87
549 bombas en estación Esteros 1.00 1,105.87 55.2935 165.8805 276.4675 165.8805 165.8805 110.587 55.2935 55.2935 55.2935
Suministro, Calibración e instalación de LT en cárcamo de
549 u 3,025.87
550 estación Esteros 1.00 3,025.87 151.2935 453.8805 756.4675 453.8805 453.8805 302.587 151.2935 151.2935 151.2935
551 550 CABLEADO DE FUERZA Y CONTROL 0.00
Suministro, Tendido de cable de control 3C#14AWG para el
551 ml 139.65
552 PS en descarga de bombas en estación Esteros 35.00 3.99 6.9825 20.9475 34.9125 20.9475 20.9475 13.965 6.9825 6.9825 6.9825
Suministro, Tendido de cable de instrumentación 1 PR #
552 ml 102.75
16AWG + SHLD para el LT en cárcamo de estación Esteros
553 25.00 4.11 5.1375 15.4125 25.6875 15.4125 15.4125 10.275 5.1375 5.1375 5.1375
554 553 RUTAS DE BANDEJAS Y CONDUITS 0.00
Suministro de bandejas portacables, tipo escalerilla, de 4” de
554 ml 30.00 1,121.70
555 ancho, 6” de altura para cables eléctricos de fuerza 37.39 56.085 168.255 280.425 168.255 168.255 112.17 56.085 56.085 56.085
Suministro e Instalación de bandejas portacables, tipo
555 escalerilla, de 4” de ancho, 6” de altura para cables ml 30.00 66.30
556 eléctricos de fuerza y de control 2.21 3.315 9.945 16.575 9.945 9.945 6.63 3.315 3.315 3.315
Suministro de conduit de 3/4” de diámetro para cables
556 ml 35.00 160.65
557 eléctricos, de instrumentación y de control 4.59 8.0325 24.0975 40.1625 24.0975 24.0975 16.065 8.0325 8.0325 8.0325
558 557 Instalación de conduit de 3/4" ml 35.00 2.91 101.85 5.0925 15.2775 25.4625 15.2775 15.2775 10.185 5.0925 5.0925 5.0925
Suministro de conduit de 1/2” de diámetro para cables
558 ml 25.00 111.00
559 eléctricos, de instrumentación y de control 4.44 5.55 16.65 27.75 16.65 16.65 11.1 5.55 5.55 5.55
560 559 Instalación de conduit de 1/2" ml 25.00 3.90 97.50 4.875 14.625 24.375 14.625 14.625 9.75 4.875 4.875 4.875
561 560 CERCHA METÁLICA PARA CRUCE DE RÍO 0.00
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
561 55.75
562 Desalojo) m3 12.70 4.39 2.7875 8.3625 13.9375 8.3625 8.3625 5.575 2.7875 2.7875 2.7875

SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE


562 (INC. TRANSPORTE A MANTA, TENDIDO 190.39
CONFORMACIÓN Y COMPACTACIÓN)
563 m3 7.90 24.10 9.5195 28.5585 47.5975 28.5585 28.5585 19.039 9.5195 9.5195 9.5195
Hormigón premezclado para Replantillo f´c=180 kg/cm²
564 563 m3 0.41 199.76 81.90 4.095 12.285 20.475 12.285 12.285 8.19 4.095 4.095 4.095
(MANTA) premezclado f´c=280 kg/cm² con
Hormigón
565 564 m3 4.53 316.77 1,434.97 71.7485 215.2455 358.7425 215.2455 215.2455 143.497 71.7485 71.7485 71.7485
impermeabilizante (inc. encofrado y aditivo inhibidor de
566 565 ACERO DE REFUERZO EN BARRAS kg 316.66 1.58 500.32 25.016 75.048 125.08 75.048 75.048 50.032 25.016 25.016 25.016
567 566 Acero A36 para soporte de tuberías (Bombeos Manta) kg 14,110.00 4.91 69,280.10 3464.005 10392.015 17320.025 10392.015 10392.015 6928.01 3464.005 3464.005 3464.005
568 567 CÁMARAS EN LÍNEA DE IMPULSIÓN 0.00
569 568 CÁMARA DE DESAGUE (5U) 0.00
EXCAVACION A MAQUINA DE 2,01 - 4,00 m (Inc. entibado
569 123.30
570 metálico y desalojo) m3 13.23 9.32 6.165 18.495 30.825 18.495 18.495 12.33 6.165 6.165 6.165
RELLENO COMPACTADO CON VIBROAPISONADOR,
570 44.24
571 MATERIAL DE SITIO m3 19.75 2.24 2.212 6.636 11.06 6.636 6.636 4.424 2.212 2.212 2.212
Suministro e Instalación de Piedra Bola de 100-250mm (Inc.
571 199.40
transporte a Manta, tendido conformación y compactación)
572 m3 18.90 10.55 9.97 29.91 49.85 29.91 29.91 19.94 9.97 9.97 9.97
Hormigón premezclado para Replantillo f´c=180 kg/cm²
573 572 m3 1.35 199.76 269.68 13.484 40.452 67.42 40.452 40.452 26.968 13.484 13.484 13.484
(MANTA)
Hormigón premezclado f´c=210 kg/cm², con
574 573 m3 15.40 291.53 4,489.56 224.478 673.434 1122.39 673.434 673.434 448.956 224.478 224.478 224.478
impermeabilizante (inc. encofrado y aditivo inhibidor de
575 574 ACERO DE REFUERZO EN BARRAS kg 2,769.30 1.58 4,375.49 218.7745 656.3235 1093.8725 656.3235 656.3235 437.549 218.7745 218.7745 218.7745
Suministro e Instalación de Tubería PVC/UE d = 200 mm
575 8,630.10
576 1.00 MPA (Inc. unión elastomerica) ml 223.00 38.70 431.505 1294.515 2157.525 1294.515 1294.515 863.01 431.505 431.505 431.505
577 576 Suministro e Instalación de Reductor PVC/UE 630 a 400mm u 5.00 773.45 3,867.25 193.3625 580.0875 966.8125 580.0875 580.0875 386.725 193.3625 193.3625 193.3625
578 577 Suministro e Instalación de Reductor PVC/UE 400 a 315mm u 5.00 485.45 2,427.25 121.3625 364.0875 606.8125 364.0875 364.0875 242.725 121.3625 121.3625 121.3625

7 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
579 578 Suministro e Instalación de Reductor PVC/UE 315 a 200mm u 5.00 149.45 747.25 37.3625 112.0875 186.8125 112.0875 112.0875 74.725 37.3625 37.3625 37.3625
580 579 Suministro e Instalación de Tee PVC/UE d = 200 mm u 5.00 158.74 793.70 39.685 119.055 198.425 119.055 119.055 79.37 39.685 39.685 39.685
581 580 Suministro e Instalación de brida PVC 200mm u 20.00 107.26 2,145.20 107.26 321.78 536.3 321.78 321.78 214.52 107.26 107.26 107.26
582 581 Suministro e Instalación de Unión de montaje 200mm u 5.00 628.36 3,141.80 157.09 471.27 785.45 471.27 471.27 314.18 157.09 157.09 157.09
Suministro e Instalación de Válvula Compuerta Vastago fijo o
582 4,364.65
583 ascendente extremos bridados d=200mm PN10 u 5.00 872.93 218.2325 654.6975 1091.1625 654.6975 654.6975 436.465 218.2325 218.2325 218.2325
HORMIGON SIMPLE f'c= 180 Kg/cm2 PARA ANCLAJES
584 583 m3 0.12 219.35 26.32 1.316 3.948 6.58 3.948 3.948 2.632 1.316 1.316 1.316
(INC. ENCOFRADO)
585 584 CÁMARA DE VÁLVULA DE AIRE (8U) 0.00
EXCAVACION A MAQUINA DE 0,00 A 2,00 m (Inc.
585 164.54
586 Desalojo) m3 37.48 4.39 8.227 24.681 41.135 24.681 24.681 16.454 8.227 8.227 8.227
RELLENO COMPACTADO CON VIBROAPISONADOR,
586 MATERIAL DE MEJORAMIENTO (INC. TRANSPORTE A 114.46
587 m3 7.24 15.81 5.723 17.169 28.615 17.169 17.169 11.446 5.723 5.723 5.723
MANTA)
Hormigón premezclado para Replantillo f´c=180 kg/cm²
588 587 m3 1.18 199.76 235.72 11.786 35.358 58.93 35.358 35.358 23.572 11.786 11.786 11.786
(MANTA)
Hormigón premezclado f´c=210 kg/cm², con
589 588 m3 10.40 291.53 3,031.91 151.5955 454.7865 757.9775 454.7865 454.7865 303.191 151.5955 151.5955 151.5955
impermeabilizante (inc. encofrado y aditivo inhibidor de
590 589 ACERO DE REFUERZO EN BARRAS kg 1,989.29 1.58 3,143.08 157.154 471.462 785.77 471.462 471.462 314.308 157.154 157.154 157.154
591 590 Puerta Metálica con plancha cribada u 8.00 97.43 779.44 38.972 116.916 194.86 116.916 116.916 77.944 38.972 38.972 38.972
592 591 Pared de bloque 9x19x39cm (Inc. transporte a Manta) m2 10.56 12.77 134.85 6.7425 20.2275 33.7125 20.2275 20.2275 13.485 6.7425 6.7425 6.7425
593 592 SISTEMA DE BOMBEO LOS ESTEROS 18,934.87
594 593 SISTEMA DE DESBASTE
595 594 Tecle Manual de 1ton 10m de levante (Inc. grúa hidráulica) u 1.00 2,351.12 2,351.12 117.556 352.668 587.78 352.668 352.668 235.112 117.556 117.556 117.556
Suministro e instalación de criba e=3mm para desbaste "Los
595 3,306.55
596 Esteros" (Inc. riel de izaje y soportería) u 1.00 3,306.55 165.3275 495.9825 826.6375 495.9825 495.9825 330.655 165.3275 165.3275 165.3275
597 596 Acero estructural (A36) kg 734.20 2.70 1,982.34 99.117 297.351 495.585 297.351 297.351 198.234 99.117 99.117 99.117
598 597 Contenedor de desechos 1100lt u 1.00 467.27 467.27 23.3635 70.0905 116.8175 70.0905 70.0905 46.727 23.3635 23.3635 23.3635
599 598 Suministro e Instalación de Cubierta metálica galvanizada m2 15.00 22.27 334.05 16.7025 50.1075 83.5125 50.1075 50.1075 33.405 16.7025 16.7025 16.7025
Hormigón premezclado f´c=280 kg/cm² con
600 599 m3 0.02 316.77 6.34 0.317 0.951 1.585 0.951 0.951 0.634 0.317 0.317 0.317
impermeabilizante (inc. encofrado y aditivo inhibidor de
601 600 CÁMARA DE DESBASTE 0.00
EXCAVACION A MAQUINA DE 4.01 - 6,00 m (Inc. entibado
601 269.58
602 metálico y desalojo) m3 25.65 10.51 13.479 40.437 67.395 40.437 40.437 26.958 13.479 13.479 13.479

SUMINISTRO E INSTALACIÓN DE MATERIAL SUB BASE


602 (INC. TRANSPORTE A MANTA, TENDIDO 57.36
CONFORMACIÓN Y COMPACTACIÓN)
603 m3 2.38 24.10 2.868 8.604 14.34 8.604 8.604 5.736 2.868 2.868 2.868
Hormigón premezclado para Replantillo f´c=180 kg/cm²
604 603 m3 0.24 199.76 47.94 2.397 7.191 11.985 7.191 7.191 4.794 2.397 2.397 2.397
(MANTA) premezclado f´c=280 kg/cm² con
Hormigón
605 604 m3 8.93 316.77 2,828.76 141.438 424.314 707.19 424.314 424.314 282.876 141.438 141.438 141.438
impermeabilizante (inc. encofrado y aditivo inhibidor de
606 605 ACERO DE REFUERZO EN BARRAS kg 843.70 1.58 1,333.05 66.6525 199.9575 333.2625 199.9575 199.9575 133.305 66.6525 66.6525 66.6525
Suministro e Instalación de Tapa de acero para cámara de
606 496.38
607 desbaste (Esteros) u 1.00 496.38 24.819 74.457 124.095 74.457 74.457 49.638 24.819 24.819 24.819
608 607 TRITURADORA 0.00
609 608 ESTRUCTURA DE SOPORTE TRITURADORA 0.00
Fabricación y montaje de estructura para izaje del sistema
609 3,432.06
610 de triturado de desechos sólidos industrial u 1.00 3,432.06 1372.824 1372.824 686.412
Fabricación y montaje de rejilla plana de retención de sólidos
610 2,022.07
611 (Los Esteros) u 1.00 2,022.07 808.828 808.828 404.414
612 611 DISEÑO ELÉCTRICO 246,120.55
613 612 RED SUBTERRANEA EN MEDIA TENSION
Acometida de ingreso a transformador PADMOUNTED (Los
613 3,849.80
614 Esteros) ml 20.00 192.49 192.49 577.47 962.45 577.47 577.47 384.98 192.49 192.49 192.49
615 614 CENTRO DE TRANSFORMACION 0.00
616 615 Transformador seco 30KVA (Los Esteros) u 1.00 1,939.38 1,939.38 96.969 290.907 484.845 290.907 290.907 193.938 96.969 96.969 96.969
Banco de Capacitores 140KVAR (3F#2/0 AWG TTU Cu,
616 6,501.53
617 N#2 AWG TTU Cu, T#40 AWG TTU) (Los Esteros) u 1.00 6,501.53 325.0765 975.2295 1625.3825 975.2295 975.2295 650.153 325.0765 325.0765 325.0765
618 617 TABLEROS DE DISTRIBUCION 0.00
619 618 Panel de Distribución General (Los Esteros) u 1.00 16,188.70 16,188.70 809.435 2428.305 4047.175 2428.305 2428.305 1618.87 809.435 809.435 809.435
Tablero de Distribución Control de Bombas PD1 (Los
619 29,824.38
620 Esteros) u 1.00 29,824.38 1491.219 4473.657 7456.095 4473.657 4473.657 2982.438 1491.219 1491.219 1491.219
621 620 Tablero de Distribución PD2 (Los Esteros) u 1.00 4,566.53 4,566.53 228.3265 684.9795 1141.6325 684.9795 684.9795 456.653 228.3265 228.3265 228.3265
Tablero de Servicios Auxiliares Cárcamo Nuevo PD1.2 (Los
621 2,946.57
622 Esteros) u 1.00 2,946.57 147.3285 441.9855 736.6425 441.9855 441.9855 294.657 147.3285 147.3285 147.3285
623 622 Tablero de Garita (Los Esteros) u 1.00 1,398.57 1,398.57 69.9285 209.7855 349.6425 209.7855 209.7855 139.857 69.9285 69.9285 69.9285
Tablero de Servicios Auxiliares Cárcamo Viejo PD2.2 a
623 1,482.69
624 PD2.3 y PD2.1 (Los Esteros) u 1.00 1,482.69 74.1345 222.4035 370.6725 222.4035 222.4035 148.269 74.1345 74.1345 74.1345
Tablero de Servicios Auxiliares Casa de Operador de PD2.3
624 1,422.69
625 (Los Esteros) u 1.00 1,422.69 71.1345 213.4035 355.6725 213.4035 213.4035 142.269 71.1345 71.1345 71.1345
626 625 SISTEMA DE PUESTA A TIERRA 0.00
Sistema de puesta a tierra de estación de bombeo (Los
626 2,397.23
627 Esteros) u 1.00 2,397.23 119.8615 359.5845 599.3075 359.5845 359.5845 239.723 119.8615 119.8615 119.8615
628 627 ACOMETIDAS EN BAJA TENSION 0.00
Alimentador TR01 a PDG(3F-2#250 MCM AWG TTU,
628 15,308.00
629 N#350 MCM AWG TTU Cu, T#250 MCM AWG TTU) (Los ml 40.00 382.70 765.4 2296.2 3827 2296.2 2296.2 1530.8 765.4 765.4 765.4
Alimentador PDG a PD1(3F-2#250 MCM AWG TTU, N#500
629 6,278.25
630 MCM AWG TTU Cu, T#250 MCM AWG TTU) (Los Esteros) ml 15.00 418.55 313.9125 941.7375 1569.5625 941.7375 941.7375 627.825 313.9125 313.9125 313.9125
Alimentador PDG a TR02 (2#2/0 AWG TTU, N#2 AWG TTU
630 2,945.60
631 Cu, T#4 AWG TTU) (Los Esteros) ml 20.00 147.28 147.28 441.84 736.4 441.84 441.84 294.56 147.28 147.28 147.28
Alimentador TR02 a PD2 (2F#2/0 AWG TTU, N#2 AWG
631 1,752.00
632 TTU Cu, T#4 AWG TTU) (Los Esteros) ml 25.00 70.08 87.6 262.8 438 262.8 262.8 175.2 87.6 87.6 87.6
Alimentador PD2 a PD1.2 (2F#2AWG TTU, N#4 AWG TTU,
632 879.12
633 T#6 AWG TTU) (Los Esteros) ml 12.00 73.26 43.956 131.868 219.78 131.868 131.868 87.912 43.956 43.956 43.956
Alimentador PD2 a PD2.2 (2F#4AWG TTU, N#6 AWG TTU
633 884.52
634 Cu, T#8 AWG TTU) (Los Esteros) ml 12.00 73.71 44.226 132.678 221.13 132.678 132.678 88.452 44.226 44.226 44.226
Alimentador PD2.2 a PD2.3 (2F#6AWG TTU, N#8 AWG
634 824.40
635 TTU, T#10 AWG TTU) (Los Esteros) ml 20.00 41.22 41.22 123.66 206.1 123.66 123.66 82.44 41.22 41.22 41.22
Alimentador PD1.2 a PD1.3 (2F#10AWG TTU, N#12 AWG
635 534.40
636 TTU, T#12 AWG TTU) (Los Esteros) ml 20.00 26.72 26.72 80.16 133.6 80.16 80.16 53.44 26.72 26.72 26.72
Alimentador GEN a PDG (3F-2#350 MCM AWG, N#350
636 11,784.30
637 MCM AWG, T#250 MCM AWG) ml 30.00 392.81 589.215 1767.645 2946.075 1767.645 1767.645 1178.43 589.215 589.215 589.215
638 637 CIRCUITOS DE ALUMBRADO INTERIOR 0.00
Circuito de Iluminación Tablero Servicios Auxiliares Tablero
638 2,504.80
639 PD1.2 (Los Esteros) pto 20.00 125.24 125.24 375.72 626.2 375.72 375.72 250.48 125.24 125.24 125.24
640 639 Iluminación interior PD1.3 (Los Esteros) pto 1.00 310.00 310.00 15.5 46.5 77.5 46.5 46.5 31 15.5 15.5 15.5
641 640 Alumbrado interior Cárcamo Viejo PD2.2 (Los Esteros) pto 8.00 144.82 1,158.56 57.928 173.784 289.64 173.784 173.784 115.856 57.928 57.928 57.928
642 641 Iluminacion interior Casa Operador (Los Esteros) pto 15.00 118.02 1,770.30 88.515 265.545 442.575 265.545 265.545 177.03 88.515 88.515 88.515
643 642 CIRCUITOS DE ALUMBRADO EXTERIOR 0.00
Circuito de Iluminación Tablero Servicios Auxiliares Tablero
643 1,127.16
644 PD1.2 (Los Esteros) pto 9.00 125.24 56.358 169.074 281.79 169.074 169.074 112.716 56.358 56.358 56.358
645 644 CIRCUITO DE TOMACORRIENTES 110 V 0.00
Circuito de Tomacorrientes Cárcamo nuevo Tablero PD1.2
645 712.04
646 (Los Esteros) pto 7.00 101.72 35.602 106.806 178.01 106.806 106.806 71.204 35.602 35.602 35.602
Circuito de Tomacorrientes Tablero de Garita PD1.3 (Los
646 210.26
647 Esteros) pto 1.00 210.26 10.513 31.539 52.565 31.539 31.539 21.026 10.513 10.513 10.513
Tablero de Servicios Auxiliares Casa Operador (Los
647 787.00
648 Esteros) u 10.00 78.70 39.35 118.05 196.75 118.05 118.05 78.7 39.35 39.35 39.35
649 648 ALIMENTADOR DE BOMBAS 0.00
Alimentador a Bomba de 65 KW desde PD1 (3 bombas)
649 20,673.60
650 (3#2 TTU, N 1#4 TTU, T 1#6 TTU) (Los Esteros) ml 30.00 689.12 1033.68 3101.04 5168.4 3101.04 3101.04 2067.36 1033.68 1033.68 1033.68
651 650 SISTEMA DE EMERGENCIA 0.00
GENERADOR DE 450 KVA 380/220 V( 3F-2# 350 MCM
651 AWG TTU Cu, N#350 MCM AWG TTU Cu,T#250 MCM 89,201.39
652 AWG TTU) u 1.00 89,201.39 4460.0695 13380.2085 22300.3475 13380.2085 13380.2085 8920.139 4460.0695 4460.0695 4460.0695
653 652 MEDICION 0.00
654 653 Tablero de Medición Indirecta (Los Esteros) u 1.00 609.98 609.98 30.499 91.497 152.495 91.497 91.497 60.998 30.499 30.499 30.499
655 654 OBRA CIVIL 0.00
Suministro e Instalación de Caja de paso de H.A.
655 2,741.70
656 900X900mm (Inc. Tapa) u 15.00 182.78 137.085 411.255 685.425 411.255 411.255 274.17 137.085 137.085 137.085
657 656 CAMA DE ARENA m3 49.60 14.34 711.26 35.563 106.689 177.815 106.689 106.689 71.126 35.563 35.563 35.563
PROTECCIÓN CONTRA DESCARGAS
657 0.00
658 ATMOSFÉRICAS
Suministro e instalación de pararrayos con radio de acción
658 9,893.84
659 72m (Los Esteros) u 2.00 4,946.92 494.692 1484.076 2473.46 1484.076 1484.076 989.384 494.692 494.692 494.692
CÁMARA DE VÁLVULA DE COMPUERTA (BY-
659
660 PASS) (1U) 17,586.60

8 DE 9
G H I J K L AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR

6
7
8

10

11
OBRA: "REHABILITACION Y REPOTENCIACION DE LOS SISTEMAS HIDROSANITARIOS DE DIVERSOS SECTORES DE LA CIUDAD MANTA"
12 UBICACIÓN: MANTA
13 PLAZO DE EJECUCION: EN MESES
14 FECHA: 1-nov-19
15 MONTO PREVISTO: $ 15,073,051.50
16

17 CRONOGRAMA VALORADO DE TRABAJO POR RUBROS


PRECIO
18 DESCRIPCION UNIDAD CANTIDAD PRECIO TOTAL TIEMPO EN MESES
UNIT.
19 MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
20
EXCAVACION A MAQUINA DE 4.01 - 6,00 m (Inc. entibado
660 928.03
661 metálico y desalojo) m3 88.30 10.51 46.4015 139.2045 232.0075 139.2045 139.2045 92.803 46.4015 46.4015 46.4015
Suministro e Instalación de Piedra Bola de 100-250mm (Inc.
661 101.17
transporte a Manta, tendido conformación y compactación)
662 m3 9.59 10.55 5.0585 15.1755 25.2925 15.1755 15.1755 10.117 5.0585 5.0585 5.0585
Hormigón premezclado para Replantillo f´c=180 kg/cm²
663 662 m3 0.68 199.76 135.84 6.792 20.376 33.96 20.376 20.376 13.584 6.792 6.792 6.792
(MANTA)
Hormigón premezclado f´c=280 kg/cm² con
664 663 m3 8.89 316.77 2,816.09 140.8045 422.4135 704.0225 422.4135 422.4135 281.609 140.8045 140.8045 140.8045
impermeabilizante (inc. encofrado y aditivo inhibidor de
665 664 ACERO DE REFUERZO EN BARRAS kg 1,328.18 1.58 2,098.52 104.926 314.778 524.63 314.778 314.778 209.852 104.926 104.926 104.926
Suministro e Instalación de Tubería PVC/UE d = 400 mm
665 6,843.89
666 1.00 MPA (Inc. unión elastomerica) ml 37.00 184.97 342.1945 1026.5835 1710.9725 1026.5835 1026.5835 684.389 342.1945 342.1945 342.1945
Suministro e Instalación de Válvula Compuerta Vastago fijo o
666 4,265.60
667 ascendente extremos bridados d=400mm PN10 u 1.00 4,265.60 213.28 639.84 1066.4 639.84 639.84 426.56 213.28 213.28 213.28
668 667 Suministro e Instalación de brida PVC 400mm u 2.00 198.73 397.46 19.873 59.619 99.365 59.619 59.619 39.746 19.873 19.873 19.873
669 668 SONDEOS ELÉCTRICOS 550.00
670 669 Sondeos Eléctricos Verticales u 1.00 550.00 550.00 27.5 82.5 137.5 82.5 82.5 55 27.5 27.5 27.5
671 670 SERVICIOS DE ALQUILER DE MAQUINARIA 3,053.70
672 671 Servicio de alquiler de tapon multi-tamaño hora 18.00 9.91 178.38 89.19 89.19
673 672 Servicio de buzo comercial hora 18.00 102.02 1,836.36 918.18 918.18
674 673 Servicio de alquiler de bomba de achique 4HP hora 18.00 57.72 1,038.96 519.48 519.48
675
676 TOTAL DE OBRA 15,073,051.50
677 INVERSION MENSUAL EN USD $ 118,522.02 $ 635,468.10 $ 1,560,417.59 $ 1,581,983.30 $ 1,546,522.09 $ 1,453,251.57 $ 1,507,109.45 $ 1,455,135.10 $ 1,167,673.22 $ 916,691.39 $ 742,497.41 $ 626,210.97 $ 494,946.47 $ 450,430.50 $ 349,637.49 $ 257,092.80 $ 148,116.21 $ 61,345.70
678 AVANCE PARCIAL EN % 0.79% 4.22% 10.35% 10.50% 10.26% 9.64% 10.00% 9.65% 7.75% 6.08% 4.93% 4.15% 3.28% 2.99% 2.32% 1.71% 0.98% 0.41%
679 INVERSION ACUMULADA EN USD $ 118,522.02 $ 753,990.12 $ 2,314,407.71 $ 3,896,391.01 $ 5,442,913.10 $ 6,896,164.67 $ 8,403,274.12 $ 9,858,409.22 $ 11,026,082.44 $ 11,942,773.83 $ 12,685,271.24 $ 13,311,482.21 $ 13,806,428.68 $ 14,256,859.18 $ 14,606,496.67 $ 14,863,589.47 $ 15,011,705.68 $ 15,073,051.50
680 AVANCE ACUMULADO EN % 0.79% 5.01% 15.36% 25.86% 36.12% 45.76% 55.76% 65.41% 73.16% 79.24% 84.17% 88.32% 91.60% 94.59% 96.91% 98.62% 99.60% 100.00%

681
682 Ing. Fabricio Alcivar R.
683 EPAM
684 Lugar: Manta
685 Fecha: Nov./2019