5 Calculo de FLte y Movilizacion Quimina
5 Calculo de FLte y Movilizacion Quimina
2,
0297020ACERO DE REFUERZO FY=4200 GRADO 60 kg 37,271.36 2.97 110,695.92
5303270ADITIVO ACELERANTE FRAGUA gln 660.92 34.90 23,065.99
0501000AFIRMADO m3 10,127.94 8.47 85,783.68
0205200ALAMBRE N° 8 kg 6,603.90 3.39 22,387.22
0200070ALAMBRE NEGRO RECOCIDO # 16 kg 2,075.40 3.39 7,035.61
0200080ALAMBRE NEGRO RECOCIDO # 8 kg 508.50 3.39 1,723.80
0914240ALCANTARILLA METALICA D=24" C=14 m 214.10 197.50 42,283.76
0912360ALCANTARILLA METALICA D=36" C=12 m 41.48 268.50 11,136.04
3054010ALQUILER DE 09 BAÑOS PORTATILES mes 4.00 1,525.41 6,101.64
5902400APOYO FIJO (Incluye materiales P/ Inst.) und 2.00 1,990.25 3,980.50
5902400APOYO MOVIL (Incluye materiales P/ Inst.) und 2.00 1,990.25 3,980.50
0400000ARENA FINA m3 3.82 122.88 469.11
0501040ARENA GRUESA m3 449.74 84.75 38,115.26
3008100BARRENO 5' X 1/8" und 16.38 278.24 4,557.85
1015930BIODIGESTOR und 3.00 2,118.64 6,355.92
5601990CALAMINA 0.22mx1.80m pln 900.00 25.42 22,878.00
4812010CAMION CISTERNA 4X2 (AGUA) 3,000 GAL. (Inc Combusthm 322.97 47.67 15,396.21
4804340CAMION VOLQUETE 15 M3 hm 2,213.67 135.59 300,152.04
4804320CAMION VOLQUETE 15 M3. hm 37.84 135.59 5,130.33
CAPACITACIÓN DEL PERSONAL DE CONTINGENCIAS GLB 1.00 2,542.37 2,542.37
CAPACITACION Y SENSIBILIZACION EN MANTENIMIENTGLB 1.00 2,542.37 2,542.37
4904100CARGADOR S/LLANTAS 125-155 HP 3 YD3. (Inc. Combusthm 404.53 161.02 65,137.81
0701030CARTEL DE OBRA TIPO GIGANTOGRAFIA S/DISEÑO und 2.00 254.23 508.46
2100000CEMENTO PORTLAND TIPO I (42.5KG) BOL 9,756.11 21.19 206,732.06
3902480CILINDRO VACIO CERRADO und 9.00 127.12 1,144.08
0213210CLAVOS PARA CALAMINA kg 300.00 4.29 1,287.00
0213210CLAVOS PARA MADERA C/C (PROMEDIO) kg 1,100.65 3.81 4,193.48
0201050CLAVOS PARA MADERA C/C 3" kg 332.41 3.81 1,266.50
4903010COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 1,213.64 12.71 15,425.40
4901320COMPRESORA ELECTRICA INCLUIDO SOPLETE hm 1.15 21.18 24.25
4902080COMPRESORA NEUMATICA 87 HP 250-330 PCM hm 108.66 82.45 8,958.98
4850010CORTADORA DE PAVIMENTO hm 7.53 10.62 79.97
2800220DINAMITA kg 323.75 17.64 5,710.90
3902140DISCO DE CORTE PARA CONCRETO 20" pza 0.08 798.41 60.12
DISEÑO DE MEZCLA DE CONCRETO und 16.00 211.86 3,389.76
3024000DISOLVENTE PARA PINTURA EPOXICO gln 0.64 54.30 34.68
3024000DISOLVENTE PARA PINTURA ESMALTE POLIURETANO gln 0.53 75.20 40.18
3024010DISOLVENTE PARA PINTURA IMPRIMANTE gln 0.31 65.30 20.44
4895020EQUIPO DE ARENADO hm 1.92 58.50 112.29
4895020EQUIPO DE PINTURA AIRLESS hm 14.39 68.00 978.66
4401000ESTACA DE MADERA p2 392.62 2.20 863.77
ESTACION TOTAL hh 100.18 12.71 1,273.24
4340320ESTRUCTURA TIPO BANDERA (E-1), DE TUBO REDONDO und 30.00 880.00 26,400.00
4904330EXCABADORA SOBRE ORUGA 115-165 HP0.75-1.6 Y3 hm 132.80 254.23 33,761.03
2702110FULMINANTE und 2,158.32 1.69 3,647.55
5301020GRASA lb 339.67 3.48 1,182.06
3701010HERRAMIENTAS MANUALES %MO 0.00 19,729.13
3800000HORMIGON m3 48.15 80.50 3,875.82
3090050IMPRIMANTE PARA SELLANTE DE JUNTAS kg 0.30 24.58 7.39
3065060JUNTA DE DILATACIÓN PREFABRICADO m 10.29 440.68 4,534.60
4357500MADERA EUCALIPTO ROLLIZO 3" X 3 m und 8.00 16.95 135.60
4391110 MADERA PARA ENCOFRADO p2 75,485.37 3.38 255,140.56
4357500MADERA TORNILLO DE 2" X 2" X 12" und 4.00 18.25 73.00
4310040MADERA TORNILLO PARA ENCOFRADOS INCLUYE CO p2 1,950.00 5.08 9,906.00
4906040MARTILLO NEUMATICO DE 25 Kg. hm 93.45 16.95 1,583.90
0501160MATERIAL DE RELLENO CLASIFICADO m3 743.40 8.47 6,296.60
0530700MATERIAL DE RESPALDO 3/8" PARA JUNTA 6 mm m 75.30 0.50 37.65
2700010MECHA NARANJA m 2,158.32 1.18 2,546.82
4801110 MEZCLADORA DE CONCRETO DE 9 -11P3 hm 290.09 16.95 4,916.95
4808000MOTOBOMBA 10 HP 4" (Inc. Combustible) hm 81.33 16.95 1,378.58
4909000MOTONIVELADORA DE 125 HP (Inc. Combustible) hm 581.60 186.44 108,433.88
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA GLB 1.00 96,413.60 96,413.60
4701030OFICIAL hh 5,262.46 15.90 83,673.07
4701020OPERARIO hh 10,580.22 19.18 202,928.66
4701040PEON hh 25,551.22 14.30 365,382.45
0503070PIEDRA CHANCADA DE 1/2" m3 338.11 93.22 31,518.33
0500040PIEDRA CHANCADA DE 3/4" m3 0.31 122.88 37.82
0502210PIEDRA GRANDE m3 740.28 55.08 40,774.46
0500090PIEDRA GRANDE DE 8" m3 53.89 55.08 2,968.28
5445990PINTURA DE RESINA EPOXICA gln 2.13 110.76 235.92
5445990PINTURA DE POLIURETANO ALIFATICA, AMERSHIEL O gln 1.43 172.40 247.19
5411900PINTURA ESMALTE gln 11.11 32.20 357.59
5411010PINTURA ESMALTE SINTETICO gln 0.61 45.20 27.65
5483010PINTURA IMPRIMANTE gln 27.17 24.58 667.89
5445990PINTURA IMPRIMANTE A BASE DE ZINC INORGANICO gln 1.57 219.83 344.06
5445010PINTURA PARA TRAFICO gln 0.83 44.71 36.97
9301020PLANTAS NATIVAS und 20,559.72 1.27 26,110.84
4340320POSTE PARA SEÑALES VERTICALES DE CONCRETO ARM und 41.00 165.00 6,765.00
3914160POSTES KILOMETRICOS (inc. colocacion) GLB 15.00 140.00 2,100.00
PRISMAS hh 66.78 8.47 565.66
3990040PRUEBA DE DENSIDAD DE CAMPO und 13.00 59.32 771.16
3915000PRUEBAS DE CALIDAD DE CONCRETO ROTURA und 16.00 21.19 339.04
3915050PRUEBAS PROCTOR MODIFICADO DE CAMPO und 13.00 296.61 3,855.93
4316520REGLA DE MADERA p2 6.09 2.27 13.82
RESPONSABLE DE SEGURIDAD OCUPACIONAL GLB 1.00 2,542.37 2,542.37
4906520RETROEXCAVADORA S/O 75-110 HP,.50-1.3Y3 hm 254.47 144.06 36,658.73
4903130RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T. (Inc Combushm 441.85 135.59 59,909.84
5461010SELLANTE ELASTICO DE POLIURETANO gln 0.50 20.26 10.22
3065040SELLO DE NEOPRENO m 10.29 67.80 697.66
4340320SEÑALES EN BASE DE FIBRA DE VIDRIO 4MM, CON REFU und 33.00 178.00 5,874.00
4340320SEÑALES EN BASE DE FIBRA DE VIDRIO 4MM, CON REFU und 8.00 195.00 1,560.00
4340020SEÑALES INFORMATIVAS VARIOS COSTO x M2 SEGUN m2 80.97 375.00 30,363.75
SERVICIO DE EMPRESA OPERADORA DE RESIDUOS S GLB 3.00 847.46 2,542.38
SERVICIO DE MECANICA und 1.00 2,500.00 2,500.00
5303250SOLVENTE XILOL gln 3.54 28.45 100.83
SUB CONTRATO DE MONITOREO DE LA CALIDAD DEL pto 4.00 1,915.30 7,661.20
SUB CONTRATO DE MONITOREO DE LA CALIDAD DEL pto 4.00 2,458.30 9,833.20
SUB CONTRATO DE MONITOREO DE RUIDO pto 4.00 1,983.30 7,933.20
SUMINISTRO E INSTALACION DE BARANDA POR METRO GLB 32.20 610.00 19,642.00
5303270THINER gln 0.64 24.34 15.67
4904340TRACTOR DE ORUGAS DE 190-240 HP (Inc. Combustiblehm 473.21 262.71 124,318.13
3201010TRANSPORTE DE MATERIALES GLB 1.00 293,739.66 293,739.66
7301300TUBO PVC SAL 3" m 18.17 7.20 130.79
4907040VIBRADOR DE CONCRETO 4 HP 2.40" hm 274.21 10.68 2,928.59
3754050WINCHA DE 50 MTRS. und 41.99 12.71 533.67
3002010YESO DE 28 Kg BOL 90.00 16.95 1,525.50
4908120ZARANDA METALICA 2 1/2" hm 122.50 42.37 5,190.32
Presupuestado S/.2 Incidencia % SIncid. Acum. %Indice Unificado
110,768.57 02
23,066.12 30
85,749.92 05
22,387.22 02
6,917.99 02
1,721.07 02
42,284.78 09
11,136.24 09
6,101.64 30
3,980.50 29
3,980.50 29
469.44 04
38,115.98 05
4,556.24 30
6,355.92 10
22,878.00 56
15,384.44 48
300,198.71 48
5,129.98 48
2,542.37 39
2,542.37 47
65,161.05 49
508.46 72
206,731.60 21
1,144.08 39
1,287.00 02
4,193.48 02
1,274.50 02
15,427.42 49
24.28 49
8,964.69 49
79.82 48
5,714.22 28
60.24 39
3,389.76 29
34.72 30
40.12 30
20.51 30
112.26 48
978.66 48
852.09 44
1,263.44 49
26,400.00 02
33,819.03 49
3,652.86 27
1,175.41 53
19,729.13 37
3,875.82 38
7.53 30
4,534.56 30
135.60 43
255,149.54 43
73.00 43
9,906.00 43
1,584.44 49
6,294.12 05
37.65 03
2,546.82 27
4,915.22 48
1,382.33 48
108,420.24 49
96,413.60 88
83,793.26 47
203,036.75 47
365,701.14 47
31,519.18 05
37.82 05
40,774.46 05
2,968.32 05
235.85 30
247.18 30
357.96 54
27.63 55
667.49 54
344.15 29
36.63 54
26,110.84 39
6,765.00 02
2,100.00 39
569.39 49
771.16 39
339.04 39
3,855.93 39
14.31 43
2,542.37 39
36,661.00 49
59,724.10 49
10.54 54
697.66 30
5,874.00 60
1,560.00 60
30,363.75 43
2,542.38 37
2,500.00 39
100.42 53
7,661.20 37
9,833.20 37
7,933.20 37
19,642.00 39
15.65 53
124,403.03 49
293,739.66 32
130.79 73
2,930.89 49
532.25 37
1,529.72 30
5,208.66 49
Recurso Unidad Cantidad
ALAMBRE NEGRO RECOCIDO # 16 kg 2,075.4000
ALAMBRE NEGRO RECOCIDO # 8 kg 563.3400
CLAVOS PARA MADERA C/C 3" kg 359.8300
ALAMBRE N° 8 kg 6,603.9000
CLAVOS PARA CALAMINA kg 300.0000
CLAVOS PARA MADERA C/C (PROMEDIO) kg 1,100.6500
ACERO DE REFUERZO FY=4200 GRADO 60 kg 37,318.7500
MATERIAL DE RESPALDO 3/8" PARA JUNTA 6 mm m 89.3000
CARTEL DE OBRA TIPO GIGANTOGRAFIA S/DISEÑO und 2.0000
ALCANTARILLA METALICA D=36" C=12 m 41.4800
ALCANTARILLA METALICA D=24" C=14 m 214.1000
BIODIGESTOR und 3.0000
CEMENTO PORTLAND TIPO I (42.5KG) BOL 14,055.1900
MECHA NARANJA m 2,884.8900
FULMINANTE und 2,884.8900
DINAMITA kg 432.7300
YESO DE 28 Kg BOL 109.5500
BARRENO 5' X 1/8" und 25.7000
DISOLVENTE PARA PINTURA IMPRIMANTE gln 0.1600
DISOLVENTE PARA PINTURA EPOXICO gln 0.3200
DISOLVENTE PARA PINTURA ESMALTE POLIURETANO gln 0.2700
ALQUILER DE 09 BAÑOS PORTATILES mes 4.0000
JUNTA DE DILATACIÓN PREFABRICADO m 10.2900
SELLO DE NEOPRENO m 10.2900
IMPRIMANTE PARA SELLANTE DE JUNTAS kg 0.3600
TRANSPORTE DE MATERIALES. GLB 1.0000
CILINDRO VACIO CERRADO und 9.0000
DISCO DE CORTE PARA CONCRETO 20" pza 0.0900
POSTES KILOMETRICOS GLB 15.0000
PRUEBAS DE CALIDAD DE CONCRETO ROTURA und 16.0000
PRUEBAS PROCTOR MODIFICADO DE CAMPO und 13.0000
PRUEBA DE DENSIDAD DE CAMPO und 13.0000
MADERA TORNILLO PARA ENCOFRADOS INCLUYE p2 1,950.0000
CORTE
REGLA DE MADERA p2 6.0900
SEÑALES EN BASE DE FIBRA DE VIDRIO 4MM, CON und 8.0000
REFUERZO METALICO DE PLATINA 1 1/2"
POSTE PARA SEÑALES VERTICALES DE CONCRETO und 41.0000
ARMADO DE 3.10 M. DE ALTURA.
SEÑALES INFORMATIVAS VARIOS COSTO x M2 m2 80.9700
SEGUN COTIZACION
ESTRUCTURA TIPO BANDERA (E-1), DE TUBO und 30.0000
REDONDO FE. NE. Ø3" Y Ø2" EXTERIOR PARA
SEÑALES EN BASE DE FIBRA DE VIDRIO 4MM, CON und 33.0000
SEÑALES DE 180X60 CM
REFUERZO METALICO DE PLATINA 1 1/2" 0.75 x
MADERA TORNILLO DE 2" X 2" X 12" und 4.0000
0.80m
MADERA EUCALIPTO ROLLIZO 3" X 3 m und 8.0000
MADERA PARA ENCOFRADO p2 76,504.1100
ESTACA DE MADERA p2 400.4500
GRASA lb 442.3700
SOLVENTE XILOL gln 3.5400
THINER gln 0.6400
PINTURA ESMALTE gln 11.1100
PINTURA ESMALTE SINTETICO gln 0.6100
PINTURA PARA TRAFICO gln 0.8300
PINTURA IMPRIMANTE A BASE DE ZINC INORGANICO gln 0.7800
PINTURA DE RESINA EPOXICA gln 1.0600
PINTURA DE POLIURETANO ALIFATICA, AMERSHIEL O gln 0.7200
SIMILAR
SELLANTE ELASTICO DE POLIURETANO gln 0.6000
PINTURA IMPRIMANTE gln 27.1700
CALAMINA 0.22mx1.80m pln 900.0000
APOYO FIJO (Incluye materiales P/ Inst.) und 2.0000
APOYO MOVIL (Incluye materiales P/ Inst.) und 2.0000
TUBO PVC SAL 3" m 18.1700
PLANTAS NATIVAS und 20,559.7200
DISEÑO DE MEZCLA DE CONCRETO und 16.0000
MOVILIZACION Y DESMOVILIZACION DE GLB 1.0000
MAQUINARIAS Y HERRAMENTAS PARA OBRA
TRASPORTADOS
N° DESCRIPCION DE LOS MATERIALES - UND CANTIDAD PESO UNIT.(KG)
EN CAMION (KG)
NUMERO DE VIAJES = 57 + 1 = 58
TRANSPORTE DE MATERIALES
TIPO DE TIEMPO
N° DESCRIPCION LONGITUD (Km) VELOCIDAD
CARRETERA (HORAS)
TIPO DE TIEMPO
N° DESCRIPCION LONGITUD (Km) VELOCIDAD
CARRETERA (HORAS)
PESO TRASPORTADOS
N° DESCRIPCION DE LOS MATERIALES - UND CANTIDAD
UNIT.(KG) EN CAMION (KG)
7 SEÑALES EN BASE DE FIBRA DE VIDRIO 4MM, CON REFUERZO METALICO DE PLATINA 1 1/2" 1 und 8.00 3 20.00
8 POSTE PARA SEÑALES VERTICALES DE CONCRETO ARMADO DE 3.10 M. DE ALTURA. und 41.00 15 615.00
10 ESTRUCTURA TIPO BANDERA (E-1), DE TUBO REDONDO FE. NE. Ø3" Y Ø2" EXTERIOR PARA und 30.00 25 750.00
11 SEÑALES EN BASE DE FIBRA DE VIDRIO 4MM, CON REFUERZO METALICO DE PLATINA 1 1/2" 0 und 33.00 2.5 82.50
PESO TOTAL DE LOS MATERIALES (KG) = 17,302.89
TRANSPORTE DE MATERIALES
TIEMPO
N° DESCRIPCION TIPO DE CARRETERA LONGITUD (Km) VELOCIDAD
(HORAS)
TRANSPORTE DE MATERIALES
OBSERVACIONES:
LOS PRECIOS DE LOS EQUIPOS DE TRANSPORTE COMO CAMA BAJA SE HAN TOMADO DE LA REVISTA COSTOS,
ASUMIENDO QUE NO SE CUENTA CON ESTOS EQUIPOS EL SEMITRAILER SE TOMO DE REFERENCIA PRECIOS MTC P/HORA.
2.0 EQUIPO AUTOTRANSPORTADO
COSTO EN SOLES
UNIDAD VEHÍCULO TIEMPO DE VIAJE
ALQ / HOR SUB TOTAL
IDA VUELTA
1.00 CAMION CISTERNA 2,000 GAL. 5.97 5.97 144.07 S/. 1,719.48
4.00 CAMION VOLQUETE 10 M3. 5.97 5.97 135.59 S/. 6,473.07
1.00 CAMIONETA PICK UP 5.97 5.97 40.00 S/. 477.40
1.00 RETROEXCAVADORA S/ORUGA 115-165 HP 0.40 0.40 144.06 S/. 114.33
2.00 CARGADOR S/LLANTAS 125-155 HP 3 YD3 0.40 0.40 161.02 S/. 255.57
1.00 MOTONIVELADORA DE 125 HP 0.40 0.40 186.44 S/. 147.96
1.00 RODILLO LISO VIBR AUTOP 70-100 HP 7-9 0.40 0.40 135.59 S/. 107.60
1.00 TRACTOR DE ORUGAS DE 190-240 HP 0.40 0.40 262.71 S/. 208.49
TOTAL S/. 9,503.89
RESUMEN
1.0 EQUIPO TRANSPORTADO S/. 104,264.16
2.0 EQUIPO AUTOTRANSPORTADO S/. 9,503.89
TOTAL MOVILIZACION Y DESMOVILIZACION CON IGV S/. 113,768.05
TOTAL MOVILIZACION Y DESMOVILIZACION SIN IGV S/. 96,413.60
PROVIAS
DESCENTRALIZADO
VEHÍCULO Nº Viajes
CAMIÓN SEMITRAYLER 0
CAMA BAJA 3
EQUIPO A TRANSPORTAR
PESO DE EQUIPOS NO MOVER
SE OBTIENE DE LA HOJA MOVILIZACION Y DESMOVILIZACION NO MOVER
AQUÍ DE ACUERDO AL PESO ESTIMAR LOS VIAJES QUE SERAN NECESARIOS PARA MOVILIZAR EL EQUIPO
NO MOVER
TIPO INSUMO UNIDAD