PRESUPUESTO - CONSTRUCCION
12/22/2017
RELACION DE MATERIALES
PRIMER PISO
DESCRIPCION P.U CANT
Cemento Tipo I 42.5 Kg S/. 24.00 82 UND S/. 2,811.43
Pacasmayo
Arena Gruesa S/. 49.90 6 M3 S/. 427.71
Piedra Chancada 1/2" m3 S/. 61.00 6 M3 S/. 522.86
Topex
Barras de Acero 1/2" S/. 25.20 40 UND S/. 1,440.00
Aceros Arequipa
Barras de Acero 6 mm S/. 6.50 142 UND S/. 1,318.57
Aceros Arequipa
Ladrillo techo 12x30x30 cm S/. 1.80 850 UND S/. 2,185.71
Pirámide
S/. 1.00 200 GLB S/. 285.71
OTROS (alambre, tubos,adhesivos)
S/. 1.00 200 GLB S/. 428.57
TUBERIA DE DESAGUE Y ACCESORIOS
CABLEADO ELECTRICO S/. 1.00 200 GLB S/. 285.71
S/. 9,706.29
SEGUNDO PISO
MANO DE OBRA
S/. 18,612.27
S/. 13,600.98