Está en la página 1de 7

% que pasa

TAMIZ mm
1 2 3
1 25.4 100 100 100
3/4 19.05 92.01 93.67 92.93
1/2 12.7 57.97 60.38 60.75
3/8 9.525 39.59 39 40.44
1/4 6.35 15.22 16.59 15.83
4 4.75 4.79 5.29 4.39
10 2
20 0.85
40 0.425
60 0.18
80 0.105
100 0.1405
200 0.074

100 10
% que pasa
%RET PROMEDIO % RET PROM
1 2 3
0.00 100.00 100.00
7.13 92.87 100.00
40.30 59.70 100.00
60.32 39.68 100.00
84.12 15.88 100 100 100 0.00 100.00
95.18 4.82 99.61 99.37 99.53 0.50 99.50
77 74.59 71.86 25.52 74.48
49.08 46.06 44.68 53.39 46.61
28.55 26.46 25.37 73.21 26.79
17.91 14.57 7.51 86.67 13.33
12.51 7.98 4.54 91.66 8.34
8.19 6.69 3.25 93.96 6.04
3.14 1.32 0.86 98.23 1.77

120.00

100.00

80.00

60.00

40.00

20.00

0.00
10 1 0.1 0.01
%GRAVA 0.5
%GRAVA 0.52 %ARENA 0.44
%ARENA 0.48 %CEMENTO 0.06
EETT MAC 1
MEZCLA G+A %PASA CEMENTO MEZCLA G+A+C
MIN MAX
100.00 100.00 100.00 100.00 100.00
96.29 100.00 96.44 80.00 100.00
79.04 100.00 79.85 67.00 85.00
68.63 100.00 69.84 60.00 77.00
56.26 100.00 57.94
50.27 100.00 52.19 43.00 54.00
35.75 100.00 38.77
22.37 100.00 26.51 29.00 45.00
12.86 100.00 17.79 14.00 25.00
6.40 100.00 11.87
4.00 100.00 9.67 8.00 17.00
2.90 100.00 8.66
0.85 100.00 6.78 4.00 8.00

00

00

0
EETT MAC 1
mm
MIN MAX
25.4 100.00 100.00
19.05 80.00 100.00
12.7 67.00 85.00
9.525 60.00 77.00
4.75 43.00 54.00
0.85 29.00 45.00
0.425 14.00 25.00
0.105 8.00 17.00
0.074 4.00 8.00
DISEÑO DE MEZCLAS PARA BRIQUETAS (PROBETAS)

Wtotal 1200

Cemento asfaltico 4.00%


%restante 96.00%
%grava 50.00% 48.00%
%arena 44.00% 42.24%
%filler 6.00% 5.76%
TOTAL 100.00% 100.00%

PESOS DE AGREGADOS PARA % DE CEMENTO ASFÁLTICO


GRAVA ARENA
TAMIZ %RET % RET MEZCLA PESO %RET
1 0.00 0.00 0
3/4 7.13 3.42 41.07
1/2 33.17 15.92 191.06
3/8 20.02 9.61 115.32
1/4 23.80 11.42 137.09
4 11.06 5.31 63.71 0.50
10 4.82 2.31 27.76 25.52
20 53.39
40 73.21
60 86.67
80 91.66
100 93.96
200 98.23
FONDO
48.00 576.00
BETAS)

LABORATORIO SEPARAR EN BOLSAS GRAVA


4
4.5
5
5.5
6
6.5
7
TRAER HOJA TECNICA DEL C

SFÁLTICO
ARENA CEMENTO
% RET MEZCLA PESO %RET% RET MEZCLAPESO
EPARAR EN BOLSAS GRAVAS CON LOS PESOS PARA CADA TAMIZ
3 BOLSAS POR CADA UNO

RAER HOJA TECNICA DEL CEMENTO