LOTE 915.38 M²
34
029 PLANOS TECNICOS Y RECORD, BITACORA, ESPECS Y COPIAS GLBL 10 200,000 2,000,000 0.56% $ 1,900,000.00
35 030 MATRIZ DE RIESGOS, MANUAL DEL CONTRATISTA, SISOMA GLBL 1 3,000,000 3,000,000 0.84% $ 2,850,000.00
36 031 SECUENCIA DE OPERACIONES GLBL 1 4,000,000 4,000,000 1.12% $ 3,800,000.00
5 PRECIO % PRESUP.
CLAVE ESPECIFICACION ORIGINAL UNIDAD CANTIDAD UNITARIO COSTO TOTAL VARIANTE FACTIBLE
6 001 LICENCIAS PERMISOS AUTORIZACIONES M2 2746.14 $ 3,000.00 $ 8,238,420.00 1.420% $ 7,826,499.00
7 002 POLIZAS DE SEGUROS M2 2746.14 $ 4,000.00 $ 10,984,560.00 1.893% $ 10,435,332.00
8 003 TRANSPORTE DE ACUERDO A PMT VIAJES 435.00 $ 900,000.00 $ 391,500,000.00 67.457% $ 371,925,000.00
9 004 DISPOSICION BOTADERO SOACHA AUTORIZADO CAR M3 6525.00 $ 25,000.00 $ 163,125,000.00 28.107% $ 154,968,750.00
10 005 PMT M3 435.00 $ 15,000.00 $ 6,525,000.00 1.124% $ 6,198,750.00
11
12 TOTAL $ 580,372,980.00 100.000% $ 551,354,331.00
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB
1
2 PROYECTO FRANCISCO EL HOMBRE ASIA - AMÉRICA SAS
3 Febrero 8 de 2019 Ing. Alfonso Rincón Cuervo
4 EXCAVACIÓN / RELLENO Director Administrativo
% PRESUP. VARIANTE
5 CLAVE ESPECIFICACION ORIGINAL UNIDAD CANTIDAD PRECIO UNITARIO COSTO
TOTAL FACTIBLE MOTONIV RETRO EXCAV VOLQUETA COMPACT AGUA DIESEL LAMINAS 3M PLUMA 350 K TROMPO 4BULT TROMPO DIA POCERA MARTILLO PLUMA DIA
6 001 CERCA TEMPORAL GARITA DE ENTRADA M² 2746.14 $ 3,000.00 $ 8,238,420.00 1.195% $ 7,826,499.00 SOTANO 915.38 $ 120,000.00 $ 100,000.00 $ 150,000.00 $ 65,000.00 $ 65,000.00 $ 9,700.00 $ 4,000,000.00 $ 1,350,000.00 $ 165,000.00 $ 35,000.00 $ 25,000.00 $ 140,000.00
7 002 DESPALME 20 CMS DE PROFUNDIDAD M² 2746.14 $ 4,000.00 $ 10,984,560.00 1.593% $ 10,435,332.00 PISO 1 686.54 16 16 $ 816,000.00 POSTES 3M TABLA BURRA REPISAS LISTONES ESTACAS 50 PLANCHON SUPERBOARD
8 003 REPLANTEO GENERAL LINDEROS EDIFICIOS VÍAS TANQUES GARITAS M² 2746.14 $ 7,500.00 $ 20,596,050.00 2.986% $ 19,566,247.50 PISO 2 745.80 16 16 $ 816,000.00 $ 7,000 $ 7,000 $ 15,000 $ 1,700 $ 500 $ 20,000 $ 37,500
9 004 EXCAVACION EN MATERIAL TIPO II CON MÁQUINA M³ 4725.00 $ 80,000.00 $ 378,000,000.00 54.810% $ 359,100,000.00 PISO 3 745.80 $ 60,000.00 CONDUIT 1/2 CONDUIT 1 TUBERIA 3" Tuberia 4" POLISOMBRA 2M INTERRUPTOR TOMA
10 005 EXCAVACION EN MATERIAL TIPO II CON HERRAMIENTA MANUAL M³ 175.00 $ 110,000.00 $ 19,250,000.00 2.791% $ 18,287,500.00 PISO 4 0.00 $ 60,000.00 $ 1,600 $ 3,200 $ 19,000 $ 22,000 $ 1,600 $ 9,000 $ 8,500
11 006 RELLENO Y COMPACTACIÓN DE LA SUBBASE TORRE 1 M³ 2746.14 $ 6,000.00 $ 16,476,840.00 2.389% $ 15,652,998.00 PISO 5 0.00 16 16 24 24 $ 2,040,000.00 CLAVOS LIBRA PLASTICO NEGRO 3M SIKA ACELERA LLAVES 1/2 TUBERIA 1/2 TUBERIA 1 PVC/LIMPIADOR 1/4
12 007 PREPARACIÓN E INSTALACIÓN ACCESO COMPARTIDO DESDE LA VÍA GLBL 1.00 $ 14,000,000.00 $ 14,000,000.00 2.030% $ 13,300,000.00 PISO 6 0.00 16 16 24 24 $ 2,040,000.00 CLAVOS LIBRA PLASTICO NEGRO 3M SIKA ACELERA LLAVES 1/2 TUBERIA 1/2 TUBERIA 1 PVC/LIMPIADOR 1/4
13 008 NIVELACIÓN EXTERIOR PARA DESAGUE NATURAL M³ 7350.00 $ 6,000.00 $ 44,100,000.00 6.394% $ 41,895,000.00 PISO 7 0.00 $ - $ 3,500 $ 3,700 $ 32,000 $ 12,000 $ 6,500 $ 10,000 $ 19,000
EXCAVACIÓN ZANJAS DE ENTRADA E INSTALACIÓN ACOMETIDAS PÁRA AGUAS
14 009
NEGRAS Y POTABLE
M³ 2746.14 $ 1,500.00 $ 4,119,210.00 0.597% $ 3,913,249.50 $ 8,000.00 ARENAS MIXTOS ARENA PEÑA MANGUERA 1/2 RECEB0B200 CAL XYPEX SIKA GLN
15 010 REMOCIÓN, RELLENO Y BASURA M² 2746.14 $ 3,500.00 $ 9,611,490.00 1.394% $ 9,130,915.50 3,093.52 $ 8,000.00 ARENAS MIXTOS ARENA PEÑA MANGUERA 1/2 RECEB0B200 CAL XYPEX SIKA GLN
16 011 EXCAVACION EN MATERIAL TIPO II CON MÁQUINA FALLOS Y BASURA M² 945.00 $ 18,000.00 $ 17,010,000.00 2.466% $ 16,159,500.00
RELLENO Y COMPACTADO DE FALLOS CON RECEBO COMÚN TRATADO CEMENTO
17 012
3X1
M² 945.00 $ 30,000.00 $ 28,350,000.00 4.111% $ 26,932,500.00 945.00
RELLENO Y COMPACTADO DE LA CAJA CON RECEBO COMÚN TRATADO CEMENTO
18 013
3X1
M³ 1256.85 $ 50,000.00 $ 62,842,500.00 9.112% $ 59,700,375.00 5.00
19 014 MEJORAMIENTO Y RELLENO DE RAJON DE LA CAJA CON RAJON M³ 1256.85 $ 30,000.00 $ 37,705,500.00 5.467% $ 35,820,225.00 4725.00
20 015 MURO DE CONTENCIÓN CONTRA LINDERO PROYECTO VECINO M³ 7350.00 $ 2,500.00 $ 18,375,000.00 2.664% $ 17,456,250.00 8 8 $ 408,000.00 $ 95,000 $ 90,000 $ 55,000 $ 1,700 $ 17,000 $ 28,000 $ 29,000
21 8 $ 204,000.00 MALLA ELECTRO BLOQUE FAROL ALAMBRE HIERRO KILO RECEBO COMUN PROYECTO RAJON PROYECTO CEMENTO PROYECTO
22 TOTAL $ 689,659,570.00 100.000% $ 655,176,591.50
23 COMPACTACION 95% PROCTOR
PROYECTO FRANCISCO EL HOMBRE
COSTOS TOTAL
EXCAVACIÓN / RELLENO
CONSTRUCCIÓN
$ 655,176,591.50 $ 358,467,100.60
MODALIDADES M²
1 CERCA TEMPORAL GARITA DE ENTRADA 1.19% $ 7,826,499 $ 134,400.00 $ 102,000.00 $ 71,400.00 $ 630,000.00
Días 1 1 1.5 5
Personal 1 1 0 2
2 DESPALME 20 CMS DE PROFUNDIDAD 1.59% $ 10,435,332 $ 806,400.00 $ 1,020,000.00 $ 95,200.00 $ 252,000.00
Días 6 5 2 4
Personal 1 2 1 1
3 REPLANTEO GENERAL LINDEROS EDIFICIOS VIAS TANQUES GARITAS 2.99% $ 19,566,248 $ 268,800.00 $ 1,020,000.00 $ 95,200.00 $ 945,000.00
Días 2 5 2 5
Personal 1 2 1 3
4 EXCAVACION EN MATERIAL TIPO II CON MAQUINA 54.81% $ 359,100,000 $ 1,344,000.00 $ 1,836,000.00 $ 190,400.00 $ 756,000.00
Días 10 9 4 12
Personal 1 2 1 1
5 EXCAVACION EN MATERIAL TIPO II CON HERRAMIENTA MANUAL 2.79% $ 18,287,500 $ 134,400.00 $ 204,000.00 $ 47,600.00 $ 315,000.00
Días 1 1 1 5
Personal 1 2 1 1
6 RELLENO Y COMPACTADO DE LA SUBBASE TORRE 1 2.39% $ 15,652,998 $ 1,612,800.00 $ 2,448,000.00 $ 95,200.00 $ 3,780,000.00
Días 12 12 2 12
Personal 1 2 1 5
7 PREPARACION E INSTALACION ACCESO COMPARTIDO DESDE LA VIA 2.03% $ 13,300,000 $ 1,612,800.00 $ 1,224,000.00 $ 190,400.00 $ 756,000.00
Días 12 12 4 12
Personal 1 1 1 1
8 NIVELACION EXTERIOR PARA DESAGUE NATURAL 6.39% $ 41,895,000 $ 134,400.00 $ 204,000.00 $ 47,600.00 $ 63,000.00
Días 1 1 1 1
Personal 1 2 1 1
9 EXCAVACION ZANJAS DE ENTRADA E INSTALACION ACOMETIDAS AGUAS NEGRAS Y POTABLE 0.60% $ 3,913,250 $ 134,400.00 $ 204,000.00 $ 47,600.00 $ 1,260,000.00
Días 1 2 1 10
Personal 1 1 1 2
10 REMOCION, RELLENO Y BASURA 1.39% $ 9,130,916 $ 1,344,000.00 $ 1,020,000.00 $ 47,600.00 $ 1,260,000.00
Días 10 10 1 10
Personal 1 1 1 2
11 2.47% $ 16,159,500 $ 268,800.00 $ 408,000.00 $ 47,600.00 $ 441,000.00
EXCAVACION EN MATERIAL TIPO II CON MAQUINA FALLOS Y BASURA
2 4 1 7
Personal 1 1 1 1
12 RELLENO Y COMPACTADO DE FALLOS CON RECEBO COMUN TRATADO CEMENTO 3X1 4.11% $ 26,932,500 $ 134,400.00 $ 816,000.00 $ 47,600.00 $ 630,000.00
Días 1 4 1 10
Personal 1 2 1 1
13 RELLENO Y COMPACTADO DE LA CAJA CON RECEBO COMUN TRATADO CEMENTO 3X1 9.11% $ 59,700,375 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 252,000.00
Días 1 1 1 4
Personal 1 1 1 1
14 MEJORAMIENTO Y RELLENO DE RAJON DE LA CAJA CON RAJON 5.47% $ 35,820,225 $ 403,200.00 $ 408,000.00 $ 47,600.00 $ 252,000.00
Días 3 4 1 4
Personal 1 1 1 1
15 MURO DE CONTENSION CONTRA LINDERO PROYECTO VECINO 2.66% $ 17,456,250 $ 806,400.00 $ 10,200,000.00 $ 95,200.00 $ 693,000.00
Días 6 20 2 11
Personal 1 5 1 1
100.00% $ 655,176,592 $4,300,800.00 $4,488,000.00 $595,000.00 $5,544,000.00
PROFESIONAL TECNICA CLERICAL FISICA
MANO DE OBRA POR HORA PLANOS COPIAS
COMUNICACIONES AIU CUADRO COMPARATIVO
ANCHO 12,93
18 744 0.75 0.6 60 0 60 0 0 3 D1-15 11.61 0.4 0.4 1.95048 4BE-VY 11 0.4 0.4 1.8144
19 0.4 158.33664 0 158.33664 0 0 4 E1-15 12.93 0.4 0.4 2.17224 5HK-MO-PS- 15 0.4 0.4 2.4696
20 297.6 37.2 72.48 $ 560,000 5 F6-11 4.6 0.4 0.4 0.7728 6CG-UX 13 0.4 0.4 2.184
VIGA
21 PANTALLAS PERIMETRA INTERIORES $ 97,535,370 6 G1-15 12.93 0.4 0.4 2.1722 7DE-FU-VW 28.5 0.4 0.4 4.788
L
22 Varillas Alambre Espirales 7 H5-11 5.8 0.4 0.4 0.9744 8AD-EF-UV-WZ 13.4 0.4 0.4 2.2512
23 $ 24,900,000 150 700 4700 8 I1-15 12.93 0.4 0.4 2.1722 9=7 28.5 0.4 0.4 4.788
24 $ 40,000 3500 3500 9 J1-15 12.93 0.4 0.4 2.1722 10=6 13 0.4 0.4 2.184
25 Perforación 10 K3-12 8.74 0.4 0.4 1.4683 11=5 14.7 0.4 0.4 2.4696
26 $ 82,600,000 1400 11 L1-4,L12-15 5.8 0.4 0.4 0.9744 12=4 10.8 0.4 0.4 1.8144
27 $ 59,000 12 M2-14 9.01 0.4 0.4 1.5137 13=3 12.9 0.4 0.4 2.1672
28 $ 205,035,370 13 N1-7 5.86 0.4 0.4 0.9845 14=2 8.2 0.4 0.4 1.3776
29 14 O=M 9.01 0.4 0.4 1.5137 15BL-O'Y 37.32 0.4 0.4 6.2698
30 perimeter circle 1.88496 1.25664 1.5708 1.88496 15 ESPESOR 0,20 O'=L 5.8 0.4 0.4 0.9744
31 cubic volume 2.968812 P=K 8.74 0.4 0.4 1.4683
32 0.753984 TOTALES CIMENTACION Q=J 12.93 0.4 0.4 2.1722
33 R=I 12.93 0.4 0.4 2.1722
34 METROS CUBICOS DE CONCRETO 3000 177.4 $ 392,000.00 $ 69,529,990.99 S=H 5.8 0.4 0.4 0.9744
35 26.1754533463 BULTOS DE CEMENTO 8 X M3 1419 $ 27,500.00 $ 39,021,933.72 T=G 12.93 0.4 0.4 2.1722
36 MIXTO FINO DE 1/2" M3 115.3 $ 84,000.00 $ 9,684,534.46 U=F 4.6 0.4 0.4 0.7728
37 ARENA DE POZO GRIS M3 97.55 $ 90,000.00 $ 8,779,935.09 V=E 12.93 0.4 0.4 2.1722
38 MANO DE OBRA CIMENTACION 177.4 $ 168,000.00 $ 29,798,567.57 W=D 11.61 0.4 0.4 1.9505
39 REPLANTEO 4000 $ 560.00 $ 2,240,000.00 X=C 6.72 0.4 0.4 1.129
40 RESEBO SELECCIONADO 1097 $ 39,000.00 $ 42,792,750.00 Y=B 5.8 0.4 0.4 0.9744
41 COMPACTACION PATECABRA Y AGUA 40 $ 84,000.00 $ 3,360,000.00
42 COMPACTACION PATECABRA Y AGUA 40 $ 84,000.00 $ 3,360,000.00
43 EXCAVACION MANUAL ZANJAS PARA VIGAS 14 $ 56,000.00 $ 784,000.00 Z=A 7.92 0.4 0.4 1.3306
44 EQUIPO DE 14 PERSONAS AMARRE FLEJES CASTILLOS Y ARMADO 56 $ 56,000.00 $ 3,136,000.00 196.32 32.982 114.096906 180.32 30.294
45 EQUIPO DE 14 PERSONAS VACIADO 14 $ 56,000.00 $ 784,000.00
46 TOTALES PILOTES
47 METROS CUBICOS DE CONCRETO 3000 158.3 $ 392,000.00
48 BULTOS DE CEMENTO 8 X M3 1267 $ 31,000.00 $ 39,267,486.72
49 MIXTO FINO DE 1/2" M3 102.9 $ 84,000.00 $ 8,645,180.54
50 ARENA DE POZO GRIS M3 87.09 $ 90,000.00 $ 7,837,663.68
51 MANO DE OBRA Y EQUIP0 2730 $ 34,000.00 $ 92,820,000.00
52 130 21 2730 $ 292,312,051.78
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200 CONCRE
201
202
TO
203 MEZCLA
204
205 DO IN
206 SITU
207
TIENE
208 GRAN
209 VARIABIL
210
211
IDAD,
212 BUENA
213
214 TRAZABI
215 LIDAD,
216
MAS
217 INTENSIV
218 O EN
219
220 MANO DE
221
222
OBRA,
223
MAYOR
224
TRASIEG
O,
225
DESPER
TO
DICIO Y
MEZCLA
RIESGO
DO IN
SITU
CEMEX
ARGOS O
TREMIX
ES
GARANTI
ZADO,
226 POCO
VARIABL
E,
TRAZABL
E,
CONSTA
NTE, SIN
CONTAMI
NACION
Y/O
SOBREC
227
228
229
230
231
232
233
234
PRECIOS
BASADO
S EN
MERCAD
O
NACIONA
L CON
235
PRODUC
TO
NACIONA
L,
ACERIAS
PAZ DEL
RIO Y/O
HOMECE
NTER
236
237
238
239
240
CIMENTACIÓN
Febrero 8 de 2019 MANO DE OBRA POR HORA
Ing. Alfonso Rincón Cuervo PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
Días 12 12 6 12 62.00 12
Personal 2 4 2 12 1 5
Días 12 12 6 12 60.00 12
Personal 2 4 1 10 1 5
Días 12 12 6 12 120.00 12
Personal 2 4 1 10 1 5
CIMENTACION DE CONCRETO F'C=200KG/CM2 DE 25
6 CMS DE ESPESOR X 546 M2, INCLUYE CIMBRA, 25.06% $ 299,250,000 $ 3,225,600.00 $ 2,448,000.00 $ 285,600.00 $ 7,560,000.00 $ 315,000,000.00 $ 2,688,000.00
ARMADO, COLADO Y CURADO.
Días 12 12 6 12 300.00 12
Personal 2 2 1 10 1 4
100.00% $ 1,194,053,041 $22,579,200.00 $28,764,000.00 $2,665,600.00 $78,624,000.00 $1,256,897,938.27 $521,248,000.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
PLANOS COPIAS
COMUNICACIONES AIU
SUBTOTAL SUBTOTAL SUBTOTAL TOTAL
1% 10%
$ 56,000.00 1% 10%
300
1
320
1
620
1
545
1
185
1
$110,320,000.00 $2,442,518,095.00 $1,103,200.00 $244,251,809.50 $2,687,873,104.50
EQUIPO SUBTOTAL PLANOS COPIAS COMUNICACIONES
A B C D E
1
2 PROYECTO FRANCISCO EL HOMBRE
3 Febrero 8 de 2019
4 MAMPOSTERIA
5 CLAVE ESPECIFICACION ORIGINAL UNIDAD CANTIDAD
ANTEPECHO DE FACHADA DE 12 X 14 X
1 33 CM ASENTADO CON MORTERO 5.88% $ 11,200,500 $ 2,688,000.00 $ 2,040,000.00 $ 856,800.00 $ 7,560,000.00 $ 11,790,000.00 $ 1,400,000.00
CEMENTO ARENA EN PROPORCION 1:4
Días 20 20 18 60 524.00 25
Personal 1 1 1 2 1 1
ANTEPECHO INTERNOS DE 12 X 14 X 33
2 CM ASENTADO CON MORTERO 7.34% $ 13,979,250 $ 2,688,000.00 $ 2,040,000.00 $ 856,800.00 $ 7,560,000.00 $ 14,715,000.00 $ 1,400,000.00
CEMENTO ARENA EN PROPORCION 1:4
Días 20 20 18 60 654.00 25
Personal 1 1 1 2 1 1
CHUTS DE 12 X 14 X 33 CM ASENTADO
3 CON MORTERO CEMENTO ARENA EN 1.12% $ 2,128,000 $ 537,600.00 $ 408,000.00 $ 95,200.00 $ 630,000.00 $ 2,240,000.00 $ 672,000.00
PROPORCION 1:4
Días 4 4 2 5 80.00 6
Personal 1 1 1 2 1 2
MUROS INTERIORES DE 12 X 14 X 33 CM
4 ASENTADO CON MORTERO CEMENTO 4.07% $ 7,752,000 $ 1,209,600.00 $ 1,836,000.00 $ 428,400.00 $ 1,134,000.00 $ 8,160,000.00 $ 1,120,000.00
ARENA EN PROPORCION 1:4
Días 9 9 9 9 480.00 1
Personal 1 2 1 2 1 1
ESACALERA DE CONCRETO DE 3M DE
LARGO X 1,8 DE ANCHO INCLUYE
5 13.57% $ 25,840,000 $ 2,688,000.00 $ 4,080,000.00 $ 952,000.00 $ 12,600,000.00 $ 27,200,000.00 $ 1,512,000.00
FORJADO DE ESCALONES CON TABIQUE
COMUN Y CONCRETO
Días 20 20 20 20 1600.00 1
Personal 1 2 1 10 1 1
MUROS ESCALERAS A PRUEBA DE
6 FUEGO, DOVELAS Y REFUERZO 2.28% $ 4,349,100 $ 940,800.00 $ 714,000.00 $ 333,200.00 $ 1,260,000.00 $ 4,578,000.00 $ 224,000.00
VARILLA#4 GRAFIL 6MM
Días 7 7 7 10 163.50 4
Personal 1 1 1 2 1 1
7 RELLENO LIGERO DE AZOTEA PARA 2.93% $ 5,586,000 $ 672,000.00 $ 510,000.00 $ 238,000.00 $ 1,575,000.00 $ 5,880,000.00 $ 1,120,000.00
PENDIENTES PLUVIALES CON
CONCRETO SIMPLE 5 5 5 5 490.00 1
Personal 1 1 1 5 1 1
EMPASTADO CON MORTERO CEMENTO
8 ARENA PROPORCION 1:5 PARA DAR 1.78% $ 3,388,840 $ 1,344,000.00 $ 1,020,000.00 $ 476,000.00 $ 378,000.00 $ 3,567,200.00 $ 560,000.00
NIVEL A PISOS.
Días 10 10 10 3 490.00 1
Personal 1 1 1 2 1 1
SUMINISTRO E INSTALACIÓN DE MESON
9 DE ACERO INOXIDABLE DE 1,5 X 0,6 10.77% $ 20,520,000 $ 1,344,000.00 $ 1,020,000.00 $ 47,600.00 $ 630,000.00 $ 21,600,000.00 $ 560,000.00
MTS.
Días 10 10 1 10 96.00 1
Personal 1 1 1 1 1 1
SUMINISTRO E INSTALACIÓN DE COMBO
10 LAVADERO LAVAPLATOS EN GRANITO 11.79% $ 22,443,750 $ 1,344,000.00 $ 1,020,000.00 $ 190,400.00 $ 630,000.00 $ 23,625,000.00 $ 560,000.00
1,3 X 0,6 MTS,
Días 10 10 4 10 105.00 1
Personal 1 1 1 1 1 1
SUMINISTRO E INSTALACIÓN DE
11 3.93% $ 7,481,250 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 1,260,000.00 $ 7,875,000.00 $ 60,000.00
AZULEJO
Días 10 10 2 10 350.00 12000
Personal 1 1 1 2 1 5
IMPERMEABILIZACION DE LOSA DE
12 2.05% $ 3,910,200 $ 1,344,000.00 $ 1,020,000.00 $ 95,200.00 $ 1,260,000.00 $ 4,116,000.00 $ 224,000.00
AZOTEA A BASE DE SISTEMA EN FRIO
Días 10 10 2 10 490.00 4
Personal 1 1 1 2 1 1
SUMINISTRO E INSTALACION DE
13 MOLDURAS DE CONCRETO DE 15 A 20 2.41% $ 4,596,480 $ 1,344,000.00 $ 1,020,000.00 $ 238,000.00 $ 1,890,000.00 $ 4,838,400.00 $ 280,000.00
CM DE ANCHO
Días 10 10 5 10 576.00 5
Personal 1 1 1 3 1 1
SUMINISTRO E INSTALACION DE
14 MOLDURAS DE CONCRETO DE 10 A 15 1.15% $ 2,188,800 $ 940,800.00 $ 714,000.00 $ 190,400.00 $ 630,000.00 $ 2,304,000.00 $ 280,000.00
CM DE ANCHO
Días 7 7 4 5 288.00 5
Personal 1 1 1 2 1 1
MAMPARA DE MEDIDORES DE ENERGIA
15 0.84% $ 1,596,000 $ 134,400.00 $ 408,000.00 $ 238,000.00 $ 630,000.00 $ 1,680,000.00 $ 56,000.00
ELECTRICA
Días 1 4 5 10 2.00 1
Personal 1 1 1 1 1 1
PLACA DE CONCRETO PARA MUELLES
16 4.45% $ 8,481,600 $ 2,016,000.00 $ 1,530,000.00 $ 95,200.00 $ 5,670,000.00 $ 8,928,000.00 $ 280,000.00
DE BAÑO DE 1.5 M X 1.6 M
Días 15 15 2 30 144.00 5
Personal 1 1 1 3 1 1
SOBREPISOS EN COCINA, CLOSETS,
17 VESTIDORES. INCLUYE CIMBRA, 3.66% $ 6,976,800 $ 1,344,000.00 $ 1,020,000.00 $ 238,000.00 $ 3,780,000.00 $ 7,344,000.00 $ 560,000.00
RELLENO Y COLADO.
Días 10 10 5 30 432.00 10
Personal 1 1 1 2 1 1
18 FORJADO DE BARANDALES 6.45% $ 12,289,200 $ 672,000.00 $ 510,000.00 $ 95,200.00 $ 1,260,000.00 $ 12,936,000.00 $ 280,000.00
Días 5 5 2 10 154.00 5
Personal 1 1 1 2 1 1
PRETILES DE AZOTEA. EN PROMEDIO
19 1.74% $ 3,306,000 $ 672,000.00 $ 510,000.00 $ 47,600.00 $ 2,268,000.00 $ 3,480,000.00 $ 560,000.00
0.60 MT.
Días 5 5 1 12 12.00 5
Personal 1 1 1 3 1 2
FORJADO DE CHAFLANES EN JUNTAS
DE LOSAS Y MUROS EN
20 0.70% $ 1,330,000 $ 268,800.00 $ 204,000.00 $ 47,600.00 $ 630,000.00 $ 1,400,000.00 $ 280,000.00
AZOTEAS.INCLUYE, PREPARACION DE
MEZCLA, FORJADO Y LIMPIEZA.
Días 2 2 1 10 1.00 5
Personal 1 1 1 1 1 1
PERFILADO DE HUECOS PARA
21 PUERTAS, VENTANAS, CANCELES, 0.89% $ 1,696,320 $ 1,612,800.00 $ 2,448,000.00 $ 428,400.00 $ 15,120,000.00 $ 1,785,600.00 $ 672,000.00
ARCOS, MURETES.
Días 12 12 9 30 288.00 12
Personal 1 2 1 8 1 1
TANQUES ALMACENAMIENTO AGUA
POTABLE 20X3X5 MTS CONCRETO
22 8.38% $ 15,960,000 $ 4,032,000.00 $ 3,060,000.00 $ 238,000.00 $ 33,075,000.00 $ 16,800,000.00 $ 392,000.00
REFORZADO, EXCAVACION, ARMADO Y
COLADO
Días 30 30 5 35 2.00 7
Personal 1 1 1 15 1 1
23 PULIMIENTO EXTERIOR 1.81% $ 3,442,800 $ 2,016,000.00 $ 3,060,000.00 $ 190,400.00 $ 16,065,000.00 $ 3,624,000.00 $ 896,000.00
Días 15 15 4 17 906.00 16
Personal 1 2 1 15 1 1
100.00% $ 190,442,890 $30,294,000.00 $6,664,000.00 $117,495,000.00 $200,466,200.00 $13,948,000.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
PLANOS
COPIAS
POR HORA AIU CUADRO COMPARATIVO
COMUNICACIO
SUBTOTAL NES
SUBTOTAL SUBTOTAL TOTAL
1% 10%
11 006 TRATAMIENTO ESPECIAL TORRE DEL ELEVADOR M2 40.00 $ 60,000.00 $ 2,400,000.00 2.037% $ 2,280,000.00
Días 10 10 7 10 825.00 10
Personal 1 1 1 6 1 4
Recubrimiento impermeable cementoso IMPERSEAL 510 Verde
2 de un solo componente para uso exclusivo de superficies 28.25% $ 31,620,750 $ 940,800.00 $ 1,224,000.00 $ 333,200.00 $ 1,575,000.00 $ 33,285,000.00 $ 2,016,000.00
elastoméricas.
Días 7 6 7 5 951.00 12
Personal 1 2 1 5 1 3
3 CANALES Y BAJANTES 10.93% $ 12,236,000 $ 403,200.00 $ 510,000.00 $ 95,200.00 $ 7,560,000.00 $ 12,880,000.00 $ 2,016,000.00
Días 3 5 2 20 368.00 12
Personal 1 1 1 6 1 3
4 SIFONES REBOSADEROS 1.15% $ 1,282,500 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 315,000.00 $ 1,350,000.00 $ 56,000.00
Días 1 1 1 5 18.00 1
Personal 1 1 1 1 1 1
FLASHINGS METÁLICOS ASEGURADOS EN PARAPETOS
5 EXTERIOR PERIMETRAL 5.12% $ 5,728,500 $ 268,800.00 $ 204,000.00 $ 47,600.00 $ 1,260,000.00 $ 6,030,000.00 $ 168,000.00
Días 2 2 1 10 134.00 3
Personal 1 1 1 2 1 1
6 TRATAMIENTO ESPECIAL TORRE DEL ELEVADOR 2.04% $ 2,280,000 $ 403,200.00 $ 306,000.00 $ 47,600.00 $ 630,000.00 $ 2,400,000.00 $ 56,000.00
Días 3 3 1 10 40.00 1
Personal 1 1 1 1 1 1
100.00% $111,929,000.00 $3,494,400.00 $3,366,000.00 $904,400.00 $15,120,000.00 $117,820,000.00 $6,552,000.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
A POR HORA PLANOS COPIAS
COMUNICACIONES AIU CUADRO COMPARATIVO
1% 10%
$ 56,000.00 1% 10%
Días 5 5 2 10 160.00 5
Personal 1 1 1 2 1 1
Acometida parcial en 2X8 AWG THNN + 1X10 AWG desnudo, 21
19 metros lineales 0.15% $ 319,200 $ 1,008,000.00 $ 1,071,000.00 $ 47,600.00 $ 2,835,000.00 $ 188,160.00 $ 1,680,000.00
31 Bombillos 100 Amps instalados 0.06% $ 133,000 $ 1,008,000.00 $ 2,448,000.00 $ 428,400.00 $ 7,560,000.00 $ 84,000.00 $ 5,880,000.00
Días 15.00 7.5 12 9 15 100.00 15
Personal 1 2 1 8 1 7
37 Braker monopolar de 20A 0.04% $ 83,448 $ 67,200.00 $ 102,000.00 $ 23,800.00 $ 630,000.00 $ 47,040.00 $ 56,000.00
42 Acometida parcial en 2X8 AWG THNN + 1X10 AWG desnudo 0.11% $ 240,350 $ 2,688.00 $ 5,100.00 $ 2,380.00 $ 18,900.00 $ 28,000.00 $ 16,800.00
Días 1.00 0.02 0.05 0.05 0.3 25.00 0.3
Personal 1 1 1 1 1 1
43 Caja de paso en mampostería tipo CS 274 en cimentación 0.52% $ 1,117,200 $ 2,688.00 $ 5,100.00 $ 2,380.00 $ 18,900.00 $ 616,000.00 $ 16,800.00
Días 1.00 0.02 0.05 0.05 0.3 2.00 0.3
Personal 1 1 1 1 1 1
Caja de paso metalica con tres compartimentos cada uno de
44 20X20X15 cms en cimentación 0.65% $ 1,383,200 $ 6,720.00 $ 10,200.00 $ 9,520.00 $ 31,500.00 $ 336,000.00 $ 28,000.00
49 Cable 60 pares para uso interior, para telefonía 0.72% $ 1,532,160 $ 5,376.00 $ 5,100.00 $ 1,428.00 $ 44,100.00 $ 716,800.00 $ 16,800.00
50 Cable 50 pares para uso interior, para citofonía 0.68% $ 1,447,040 $ 5.00 $ 0.50 $ 0.05 $ 1.00 $ 627,200.00 $ 15,680.00
55 Caja para breaker industrial, ascensor. 0.03% $ 63,840 $ 26,880.00 $ 20,400.00 $ 0.20 $ 25,200.00 $ 33,600.00 $ 1.00
58 Breaker enchufable de 1X20, ascensor. 0.01% $ 25,565 $ 26,880.00 $ 20,400.00 $ 35,700.00 $ 25,200.00 $ 11,760.00 $ 56,000.00
1% 10%
1 INSTALACIONES TUBERIA CPVC RDE 9 0.89% $ 3,452,359 $ 134,400.00 $ 306,000.00 $ 47,600.00 $ 693,000.00 $ 0.00
Días 15.00 1 3 1 11 3
Personal 1 1 1 1 1
2 INSTALACIONES CODOS PVCP 3" 0.08% $ 300,000 $ 33,600.00 $ 25,500.00 $ 14,280.00 $ 236,250.00 $ 0.00
3 INSTALACIONES TEE PVCP 3" 0.08% $ 300,000 $ 33,600.00 $ 25,500.00 $ 14,280.00 $ 236,250.00 $ 0.00
4 INSTALACIONES UNIONES PVCP 3" 0.04% $ 150,000 $ 13,440.00 $ 30,600.00 $ 9,520.00 $ 100,800.00 $ 0.00
5 INSTALACIONES TAPON SOLDADO PVCP 3" 0.08% $ 300,000 $ 33,600.00 $ 25,500.00 $ 14,280.00 $ 236,250.00 $ 0.00
6 INSTALACIONES COLLAR DERIVACION 3"x1/2" 0.04% $ 150,000 $ 13,440.00 $ 30,600.00 $ 9,520.00 $ 100,800.00 $ 0.00
9 APLICACIÓN LIMPIADOR PVC 0.08% $ 300,000 $ 33,600.00 $ 25,500.00 $ 14,280.00 $ 236,250.00 $ 0.00
10 INSTALACIONES TUBERIA PVCP RDE 11 3/4" 2.36% $ 9,100,000 $ 940,800.00 $ 892,500.00 $ 183,260.00 $ 6,615,000.00 $ 0.00
11 INSTALACIONES TUBERIA PVCP RDE 9 1/2" 1.07% $ 4,120,000 $ 504,000.00 $ 765,000.00 $ 71,400.00 $ 2,835,000.00 $ 0.00
12 INSTALACIONES CODO PVCP 3/4" 0.54% $ 2,100,000 $ 201,600.00 $ 229,500.00 $ 57,120.00 $ 1,890,000.00 $ 0.00
13 INSTALACIONES TEE REDUCIDA PVCP 3/4"x1/2" 0.36% $ 1,400,000 $ 201,600.00 $ 382,500.00 $ 78,540.00 $ 945,000.00 $ 0.00
14 INSTALACIONES TEE PVCP 3/4" 0.15% $ 560,000 $ 100,800.00 $ 127,500.00 $ 16,660.00 $ 315,000.00 $ 0.00
16 INSTALACIONES UNION PVCP 3/4" 0.07% $ 280,000 $ 67,200.00 $ 102,000.00 $ 47,600.00 $ 630,000.00 $ 0.00
17 INSTALACIONES TAPON SOLDADO 3/4" 0.07% $ 280,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 630,000.00 $ 0.00
Días 10.00 1 1 1 10 10
Personal 1 1 1 1 1
18 INSTALACIONES CAJILLAS DE CUATRO MEDIDORES 0.39% $ 1,500,000 $ 672,000.00 $ 510,000.00 $ 95,200.00 $ 1,260,000.00 $ 0.00
Días 5 5 2 10 160
Personal 1 1 1 2 1
19 APLICACIÓN SOLDADURA PVC 0.16% $ 600,000 $ 1,008,000.00 $ 1,071,000.00 $ 47,600.00 $ 2,835,000.00 $ 0.00
20 APLICACIÓN LIMPIADOR PVC 0.08% $ 300,000 $ 1,008,000.00 $ 1,071,000.00 $ 47,600.00 $ 2,835,000.00 $ 0.00
1% 10%
4.5
1
2
1
2
1
1
1
2
1
1
1
$ 0.00 $ 154,360.00 $ 1,543.60 $ 15,436.00 $ 171,339.60
1
1
$ 0.00 $ 581,380.00 $ 5,813.80 $ 58,138.00 $ 645,331.80
5.00
1
2
1
8.75
1
15.00
2
6
1
4.5
1
2.5
1
$ 0.00 $ 1,001,720.00 $ 10,017.20 $ 100,172.00 $ 1,111,909.20
2.5
1
5
1
5
1
5
1
$ 0.00 $ 4,961,600.00 $ 49,616.00 $ 496,160.00 $ 5,507,376.00
15
2
15
2
#REF! #REF! #REF! #REF! $37,187,752.80
EQUIPO SUBTOTAL SUBTOTAL SUBTOTAL TOTAL
PROYECTO FRANCISCO EL HOMBRE ASIA - AMÉRICA SAS
Febrero 8 de 2019 Ing. Alfonso Rincón Cuervo
ORNAMENTACIÓN Director Administrativo
PRECIO % PRESUP.
CLAVE ESPECIFICACION ORIGINAL UNIDAD CANTIDAD IMPORTE
UNITARIO TOTAL
VARIANTE FACTIBLE
$ 61,408,000.00
$ 9,424,000.00
$ 30,400,000.00
$ 19,152,000.00
$ 17,765,000.00
$ 4,503,000.00
$ 2,660,000.00
$ 23,750,000.00
$ 169,062,000.00
ORNAMENTACIÓN
Febrero 8 de 2019 MANO DE OBRA POR HORA
Ing. Alfonso Rincón Cuervo PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
Días 15 15 6 15 160.00 8
Personal 1 1 1 2 1 3
PUERTA PRINCIPAL CAL 18 CON ALUMINIO ANODIZADO
4 DURANODIC Y ACRILICO OPALINO DE 2X0.8 MTS, 11.33% $ 19,152,000 $ 672,000.00 $ 612,000.00 $ 285,600.00 $ 945,000.00 $ 20,160,000.00 $ 0.00
PASADOR, CHAPA Y 2 LLAVES
Días 5 6 6 15 80.00 5
Personal 1 1 1 1 1 1
Días 4 4 4 10 11.00 2
Personal 1 1 1 2 1 3
6 PUERTA PASILLO CALIBRE 18 2.66% $ 4,503,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 315,000.00 $ 4,740,000.00 $ 0.00
Días 1 1 1 5 12.00 2
Personal 1 1 1 1 1 1
PUERTA CONTRA INCENDIOS DOBLE CHAPA HORIZONTAL
7 Y BRAZO HIDRAHULICO FRENTE EDIFICIO
1.57% $ 2,660,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 315,000.00 $ 2,800,000.00 $ 0.00
Días 1 1 1 5 1.00 2
Personal 1 1 1 1 1 1
PASAMANOS ESCALERAS DE INCENDIO Y PASAMANOS DE
8 BALCON
14.05% $ 23,750,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 315,000.00 $ 25,000,000.00 $ 0.00
Días 1 1 1 5 200.00 2
Personal 1 1 1 1 1 1
100.00% $ 169,062,000 $4,435,200.00 $3,468,000.00 $1,475,600.00 $9,765,000.00 $177,960,000.00 $0.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
RA POR HORA PLANOS COPIAS
COMUNICACIONES AIU CUADRO COMPARATIVO
1% 10%
$ 162,991,500.00
$ 162,336,000.00
$ 16,530,000.00
$ 55,575,000.00
$ 1,596,000.00
$ 177,412,500.00
$ 576,441,000.00
PROYECTO FRANCISCO EL HOMBRE
VIDRIOS MANO DE OBRA POR HORA
Ing. Alfonso Rincón Cuervo PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
Días 10 10 3 20 301.00 5
Personal 1 1 1 6 1 1
Días 3 3 1 4 356.00 3
Personal 1 1 1 3 1 1
Días 3 3 1 4 58.00 3
Personal 1 1 1 3 1 1
Días 7 7 2 8 150.00 3
Personal 1 1 1 3 1 1
5 CRYSTAL ESPEJO DE 3MM DIMENSIONES DE 0,5X1 M 0.28% $ 1,596,000 $ 2,688,000.00 $ 6,120,000.00 $ 47,600.00 $ 9,072,000.00 $ 1,680,000 $ 180,000.00
Días 20 20 1 12 28.00 3
Personal 1 3 1 12 1 1
6 CRISTALERIA ZONAS COMUNES 30.78% $ 177,412,500 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 186,750,000 $ 0.00
Días 20 20 1 12 1245.00 3
Personal 1 3 1 12 1 1
100% $ 576,441,000 $5,779,200.00 $8,466,000.00 $380,800.00 $19,656,000.00 $606,780,000.00 $1,020,000.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
O DE OBRA POR HORA PLANOS COPIAS
COMUNICACIONES AIU
SUBTOTAL SUBTOTAL SUBTOTAL TOTAL
1% 10%
Días 5 5 3 20 456.00 5
Personal 1 1 1 3 1 1
CIELO RASO SUSPENDIDO EN REJILLA METALICA
4 CALIBRE 22, DRYWALL DE 1/4" 46.06% $ 130,625,000 $ 940,800.00 $ 714,000.00 $ 190,400.00 $ 1,512,000.00 $ 137,500,000.00 $ 0.00
Días 7 7 4 8 2750.00 6
Personal 1 1 1 3 1 1
SUMINISTRO Y COLOCACION DE PUERTAS 120 CMS
5 CONTRAINCENDIO NSR-2010 12.06% $ 34,200,000 $ 806,400.00 $ 714,000.00 $ 285,600.00 $ 1,008,000.00 $ 36,000,000.00 $ 0.00
Días 6 7 6 8 12.00 3
Personal 1 1 1 2 1 1
100.00% $ 283,613,000 $3,494,400.00 $2,754,000.00 $809,200.00 $16,380,000.00 $298,540,000.00 $0.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
PLANOS COPIAS
COMUNICACIONES AIU
SUBTOTAL SUBTOTAL SUBTOTAL TOTAL
1% 10%
$ 0.00
001 SUMINISTRO Y APLICACIÓN DE PINTURA VINILICA EN LOSAS M2 250.00 $ 18,000.00 $ 4,500,000.00 7.65% $ 4,275,000.00
002 SUMINISTRO Y APLICACIÓN DE PINTURA VINILICA EN PASILLOS M2 1500.00 $ 18,000.00 $ 27,000,000.00 45.87% $ 25,650,000.00
$ 55,917,000.00 $ 358,467,100.60
MODALIDADES m2
SUMINISTRO Y APLICACIÓN DE PINTURA VINILICA
1 7.65% $ 4,275,000 $ 537,600.00 $ 408,000.00 $ 142,800.00 $ 2,520,000.00 $ 4,500,000.00 $ 0.00
EN LOSAS
Días 4 4 3 20 250.00 4
Personal 1 1 1 2 1 1
SUMINISTRO Y APLICACIÓN DE PINTURA VINILICA
2 45.87% $ 25,650,000 $ 1,612,800.00 $ 1,224,000.00 $ 238,000.00 $ 5,040,000.00 $ 27,000,000.00 $ 0.00
EN PASILLOS
Días 12 12 5 20 1500.00 12
Personal 1 1 1 4 1 1
SUMINISTRO Y APLICACIÓN DE PINTURA VINILICA
3 46.48% $ 25,992,000 $ 4,032,000.00 $ 3,060,000.00 $ 428,400.00 $ 17,640,000.00 $ 27,360,000.00 $ 0.00
EN MUROS INTERIORES
Días 30 30 9 28 912.00 30
Personal 1 1 1 10 1 3
100.00% $ 55,917,000 $6,182,400.00 $4,692,000.00 $809,200.00 $25,200,000.00 $58,860,000.00 $0.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
PLANOS COPIAS
POR HORA COMUNICACION AIU CUADRO COMPARATIVO
ES
SUBTOTAL SUBTOTAL SUBTOTAL TOTAL
1% 10%
$ 428,925,000.00
$ 2,565,000.00
$ 11,970,000.00
$ 4,750,000.00
$ 9,975,000.00
$ 1,425,000.00
$ 13,680,000.00
$ 4,218,000.00
$ 5,700,000.00
$ 1,539,000.00
$ 13,537,500.00
$ 2,736,000.00
$ 570,000.00
$ 587,622,500.00
PROYECTO FRANCISCO EL HOMBRE
Febrero 8 de 2019 MANO DE OBRA POR HORA
Ing. Alfonso Rincón Cuervo PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
1 TECHOS VERDES 14.64% $ 86,032,000 $ 537,600.00 $ 408,000.00 $ 47,600.00 $ 4,536,000.00 $ 90,560,000.00 $ 0.00
Días 4 4 1 12 566.00 1
Personal 1 1 1 6 1 1
2 PAREDES VERDES 72.99% $ 428,925,000 $ 403,200.00 $ 306,000.00 $ 47,600.00 $ 630,000.00 $ 451,500,000.00 $ 0.00
Días 3 3 1 5 903.00 1
Personal 1 1 1 2 1 1
3 MATERAS 0.44% $ 2,565,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 315,000.00 $ 2,700,000.00 $ 0.00
Días 1 1 1 1 6.00 1
Personal 1 1 1 5 1 1
4 PARED VERDE INTERIOR 2.04% $ 11,970,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 504,000.00 $ 12,600,000.00 $ 0.00
Días 1 1 1 4 36.00 1
Personal 1 1 1 2 1 1
5 FLORES Y CUBIERTAS 0.81% $ 4,750,000 $ 537,600.00 $ 408,000.00 $ 190,400.00 $ 1,575,000.00 $ 5,000,000.00 $ 0.00
Días 4 4 4 5 40.00 10
Personal 1 1 1 5 1 2
EQUIPO DE BOMBEO MICRO ASPERSOR SENSORES
6 HUMEDAD
1.70% $ 9,975,000 $ 537,600.00 $ 408,000.00 $ 190,400.00 $ 1,575,000.00 $ 10,500,000.00 $ 0.00
Días 4 4 4 5 3.00 10
Personal 1 1 1 5 1 2
7 EQUIPO MANUAL DE ASPERSION PARA INTERIORES 0.24% $ 1,425,000 $ 537,600.00 $ 408,000.00 $ 190,400.00 $ 252,000.00 $ 1,500,000.00 $ 0.00
Días 4 4 4 4 1.00 1
Personal 1 1 1 1 1 1
Días 3 3 1 5 180.00 1
Personal 1 1 1 2 1 1
9 TIERRA NEGRA 0.72% $ 4,218,000 $ 403,200.00 $ 204,000.00 $ 142,800.00 $ 1,575,000.00 $ 4,440,000.00 $ 0.00
Días 3 2 3 5 60.00 1
Personal 1 1 1 5 1 1
10 CESPED 0.97% $ 5,700,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 504,000.00 $ 6,000,000.00 $ 0.00
Días 1 1 1 4 750.00 1
Personal 1 1 1 2 1 1
11 ARBOLES 3" GRUESO 0.26% $ 1,539,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 504,000.00 $ 1,620,000.00 $ 0.00
Días 1 1 1 4 6.00 1
Personal 1 1 1 2 1 1
12 LUMINARIAS 2.30% $ 13,537,500 $ 537,600.00 $ 408,000.00 $ 190,400.00 $ 1,575,000.00 $ 14,250,000.00 $ 0.00
Días 4 4 4 5 10.00 10
Personal 1 1 1 5 1 2
13 JUEGOS 0.47% $ 2,736,000 $ 134,400.00 $ 102,000.00 $ 47,600.00 $ 504,000.00 $ 2,880,000.00 $ 0.00
Días 1 1 1 4 40.00 1
Personal 1 1 1 2 1 1
14 SILLAS 0.10% $ 570,000 $ 0.00 $ 0.00 $ 0.00 $ 63,000.00 $ 600,000.00 $ 0.00
Días 0 0 0 1 10.00 0
Personal 1 1 1 1 1 1
TOTALES 100.00% $ 587,622,500 $4,569,600.00 $3,366,000.00 $1,285,200.00 $14,742,000.00 $618,550,000.00 $0.00
PROFESIONAL TECNICA CLERICAL FISICA MATERIALES EQUIPO
PLANOS COPIAS
O DE OBRA POR HORA COMUNICACIONES AIU
SUBTOTAL SUBTOTAL SUBTOTAL TOTAL
1% 10%
VARIANTE
FACTIBLE
$ 132,050,000.00
$ 313,500,000.00
$ 445,550,000.00