05 COMPOSTERAS 61,974.

40

05.01 OBRAS PRELIMINARES 2,468.82

05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 866.25 1.02 883.58

05.01.02 TRAZO Y REPLANTEO PRELIMINAR m 866.25 1.83 1,585.24

05.02 MOVIMIENTO DE TIERRAS 8,142.04

05.02.01 EXCAVACION DE ZANJAS HASTA H=1.00M, PARA CIMIENTO DE COLUMNA m3 11.20 30.57 342.38

05.02.02 BASE DE AFIRMADO COMPACTADO E=0.10 M m3 866.25 8.81 7,631.66

05.02.03 ELIMINACION DE MATERIAL EXCEDENTE DM=5 km m3 14.00 12.00 168.00

05.03 OBRAS DE CONCRETO SIMPLE 3,550.44

05.03.01 CONCRETO EN CIMIENTO CORRIDO C:H 1:10 + 30% P.G m3 5.68 277.85 1,578.19

05.03.02 CONCRETO fc=140kg/cm2, EN MURO e=0.15; H=0.50m (PROMEDIO) m3 2.13 325.94 694.25

05.03.03 ENCOFRADO Y DESENCOFRADO DE MURO HASTA 0.50 M m2 28.40 45.00 1,278.00

05.04 OBRAS DE CONCRETO ARMADO 47,813.10

05.04.01 COLUMNAS 21,031.63

05.04.01.01 CONCRETO EN COLUMNAS f'c= 175 kg/cm2 m3 3.53 312.25 1,102.24

05.04.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 302.40 45.00 13,608.00

05.04.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 EN COLUMNAS kg 1,470.09 4.30 6,321.39

05.04.02 PISOS Y PAVIMENTOS 11,036.03

05.04.02.01 PISO DE CONCRETO E=2" SEMIPULIDO BRUÑADO m2 866.25 12.74 11,036.03

05.04.03 COBERTURAS 15,745.44

05.04.03.01 COBERTURA CON CALAMINA GALVANIZADA m2 300.00 20.80 6,240.00

05.04.03.02 TIJERALES DE MADERA TORNILLO und 7.00 552.14 3,864.98

05.04.03.03 CORREA DE MADERA EUCALIPTO 3"x2" m 375.00 3.51 1,316.25

05.04.03.04 CORREA DE MADERA EUCALIPTO 2"x1" m 1,757.81 2.46 4,324.21