“MEJORAMIENTO DEL PAVIMENTO DE LA CALLE BOTTO BERNALES, DISTRITO MAZAMARI - SATIPO - JUNÍN"
SUB TOTAL
IGV
TOTAL PRESUPUESTO
SUPERVISION 142,131.58
PRESUPUESTO TOTAL
RI - SATIPO - JUNÍN"
Parcial (S/.)
3,229,727.49
31,808.86
1,408.86
3,600.00
25,000.00
1,800.00
166,569.40
58,519.60
93,049.80
15,000.00
470,918.42
182,861.72
95,756.52
192,300.18
2,560,430.81
423,459.25
92,407.97
32,151.77
29,880.56
269,018.95
134,602.29
134,602.29
1,952,396.59
7,783.42
26,070.36
1,850,754.78
67,788.03
49,972.68
49,972.68
1,142,373.05
85,432.67
58,519.60
12,782.67
14,130.40
172,425.00
93,663.35
78,761.65
190,655.87
20,967.81
36,622.26
4,331.27
13,216.62
115,517.91
239,435.53
75,211.57
2,720.27
161,503.69
441,463.77
313,312.41
5,562.11
73,270.30
28,329.04
20,989.91
12,960.21
12,960.21
253,798.24
127,676.08
65,585.86
57,223.86
4,866.36
17,393.68
3,623.42
13,492.92
277.34
3,044.84
188.72
2,342.52
513.60
20,931.92
1,223.46
187.60
896.56
3,585.68
6,437.47
8,601.15
84,751.72
3,146.04
18,117.12
34,280.36
28,418.54
789.66
98,806.79
17,234.13
37,330.47
31,941.00
8,830.00
3,471.19
97,743.57
97,743.57
83,102.67
4,436.16
953.96
44,769.24
5,303.76
27,639.55
14,640.90
14,640.90
54,289.65
3,000.00
7,500.00
1,500.00
12,100.00
5,000.00
4,099.65
21,090.00
41,100.00
14,100.00
27,000.00
3,000.00
3,000.00
27,136.66
3,896.97
10,593.35
8,099.64
4,546.70
6,550.00
6,550.00
4,954,525.45
384,140.98
346,816.78
5,685,483.21
1,023,386.98
6,708,870.19
149,238.16
6,858,108.35
GASTOS PERSONAL DE OBRA
EDER POMA - TOPOGRAFICO
SANEAMIENTO - IOAR
CONEXIONES DOMICILIARIAS DE AGUA Y DESAGUE ( AVANCE),
AVANZAR APROVECHANDO LOS TRABAJOS REALIZADOS , ALBERT
NECESITA ADELANTO
FACTURAS 1,000,000.00 ADEL. MAT.
FACTURAS 400,000.00
FACTURAS 154,000.00
- CANTERA EL MIRADOR
ADEL. MAT.
60 70 4200
PAVIMENTO RIGIDO
OBRAS PRELIMINARES
Mano de Obra
OFICIAL HH 0.50 4.0000 16.50
PEON HH 2.00 16.0000 14.84
Materiales
CLAVOS PARA MADERA C/C 3" kg 2.0000 3.28
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.4000 18.86
MATERIAL PARA GIGANTOGRAFIA GLB 1.0000 650.00
HORMIGON m3 0.3000 40.00
ESTRUCTURA DE MADERA und 1.0000 200.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 303.44
Materiales
ALQUILER DE LOCAL P/ALMACEN + OF. DE 300 M2 MES 1.0000 600.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 600.00
Materiales
Equipos
HERRAMIENTAS MANUALES %MO 0.0000 0.00
TRABAJOS PRELIMINARES
Mano de Obra
TOPOGRAFO hh 1.0000 0.0145 20.10
PEON hh 2.0000 0.0291 14.84
CAPATAZ hh 0.2500 0.0036 21.00
Materiales
YESO EN BOLSAS DE 25 KG. BOL 0.002 12.3
CORDEL m 0.1 0.5
WINCHA und 0.0001 75
MADERA EUCALIPTO p2 0.01 2.71
PINTURA ESMALTE gln 0.0002 33
CLAVOS C/C 1/2" kg 0.002 3.39
Equipos
MIRA Y JALON HE 1.0000 0.0145 6.50
HERRAMIENTAS MANUALES %MO 3.0000 0.80
TEODOLITO hm 1.0000 0.0145 9.00
NIVEL TOPOGRAFICO hm 1.0000 0.0145 6.70
Mano de Obra
OPERARIO HH 1.00 0.0320 20.1
PEON hh 1.0000 0.0320 14.84
CAPATAZ hh 1.0000 0.0320 21.00
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 1.79
Mano de Obra
OFICIAL HH 0.50 4.0000 16.50
PEON HH 2.00 16.0000 14.84
Materiales
CINTA DE SEGURIDAD rll 10.0000 36.90
CARTELES DE DESVIO und 10.0000 50.85
CABALLETE PARA DESVIO pza 12.0000 33.90
POSTES DE MADERA CON BASE DE
CEMENTO
und 10.0000 18.47
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 303.44
MOVIMIENTO DE TIERRAS
Mano de Obra
OPERARIO HH 0.1000 0.0057 20.10
OFICIAL HH 1.0000 0.0571 16.50
PEON HH 2.0000 0.1143 14.84
CAPATAZ HH 0.5000 0.0286 21.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 3.35
TRACTOR CAT D6D Hm 1.0000 0.0571 160.00
Mano de Obra
OPERARIO HH 1.0000 0.0059 24.50
PEON HH 2.0000 0.0119 18.16
CAPATAZ HH 0.5000 0.0030 16.39
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.41
CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0059 120.00
MOTOBOMBA 10 HP 4" Hm 1.0000 0.0059 14.00
RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0059 180.00
MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0059 190.00
Mano de Obra
OPERARIO HH 1.0000 0.0615 20.10
PEON HH 1.0000 0.0615 14.84
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 2.15
VOLQUETE 15 M3 Hm 1.0000 0.0615 105.00
CARGADOR FRONTAL S/LLANTAS 125-155 HP 3Y3. Hm 1.0000 0.0615 160.00
PAVIMENTOS
Mano de Obra
OPERARIO HH 1.0000 0.0064 20.10
OFICIAL HH 1.0000 0.0064 16.50
PEON HH 3.0000 0.0192 14.84
CAPATAZ HH 0.5000 0.0032 21.00
Materiales
MATERIAL OVER P/ BASE PUESTO EN OBRA m3 1.0000 10.50
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.59
CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0064 120.00
MOTOBOMBA 10 HP 4" Hm 1.0000 0.0064 14.00
RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0064 180.00
MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0064 190.00
partida CARGUIO (AGREGADOS) RENDIMIENTO= 750 M3/DIA
Rendimiento 800.00 M3/DIA Costo unitario directo por :GLB
Mano de Obra
OPERARIO HH 1.0000 0.0100 20.10
PEON HH 1.0000 0.0100 14.84
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.35
VOLQUETE 15 M3 Hm 3.0000 0.0300 105.00
CARGADOR FRONTAL S/LLANTAS 125-155 HP 3Y3. Hm 1.0000 0.0100 20.10
Mano de Obra
OPERARIO HH 1.0000 0.0062 20.10
OFICIAL HH 1.0000 0.0062 16.50
PEON HH 3.0000 0.0185 14.84
CAPATAZ HH 0.5000 0.0031 21.00
Materiales
MATERIAL DE CANTERA P/ BASE PUESTO EN OBRA m3 0.2050 37.50
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.56
CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0062 120.00
RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0062 180.00
MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0062 190.00
ENCOFRADO Y DESENCOFRADO
Mano de Obra
OPERARIO HH 1.0000 0.2286 20.10
OFICIAL HH 1.0000 0.2286 16.50
PEON HH 1.0000 0.2286 14.84
CAPATAZ HH 0.2000 0.0457 21.00
Materiales
ALAMBRE NEGRO N°8 kg 0.2000 3.28
MADERA TORNILLO p2 3.5000 4.92
MADERA EUCALIPTO p2 1.1000 2.71
CLAVOS C/C 2 1/2" kg 0.1500 3.39
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 12.72
CONCRETO SIMPLE
Mano de Obra
OPERARIO hh 1.0000 0.0296 20.10
PEON hh 1.0000 0.0296 16.50
CAPATAZ hh 0.1000 0.0030 21.00
Materiales
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0500 2.55
ALAMBRE NEGRO RECOCIDO # 16 kg 0.0200 6.00
DISCOS DE CORTE pza 0.0600 17.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 1.15
Mano de Obra
OPERARIO hh 1.0000 0.0267 20.10
PEON hh 1.0000 0.0267 16.50
CAPATAZ hh 0.1000 0.0027 21.00
Materiales
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0000 2.55
ALAMBRE NEGRO RECOCIDO # 16 kg 0.0200 6.00
TUBO Fe 1" APROX kg 1.0000 2.55
DISCOS DE CORTE pza 0.0100 17.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 1.03
Mano de Obra
CAPATAZ hh 0.1000 0.0133 21.00
OPERARIO hh 1.0000 0.1333 20.10
PEON hh 4.0000 0.5333 16.50
OPERADOR EQUIPO hh 1.0000 0.1333 14.84
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 225.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
SERVICIO DE ACOPLE DE TUBERIA m3 0.3000 20.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 13.74
Mano de Obra
PEON hh 1.0000 0.0267 16.50
CAPATAZ hh 0.1000 0.0027 21.00
Materiales
CURADOR QUIMICO P/CONCRETO-CURADOR MEMBRANIL gln 0.0400 50.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 2.00
JUNTAS DE DILATACION
Mano de Obra
PEON hh 1.0000 0.0533 16.39
CAPATAZ hh 0.1000 0.0053 0.00
Materiales
ARENA FINA m3 0.0030 57.40
ASFALTO RC-250 gln 0.1500 18.04
PETROLEO gln 0.0600 13.22
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 3.67
VEREDA DE CONCRETO
OBRAS PRELIMINARES
CONEXIONES DOMICILIARIAS
Mano de Obra
OPERARIO hh 1.0000 1.0000 20.10
PEON hh 1.0000 1.0000 14.84
CAPATAZ hh 0.2500 0.2500 21.00
Materiales
CAJA DE REGISTRO PORTAMEDIDOR DE AGUA und 1.0000 60.00
PEGAMENTO PVC gln 0.0500 100.00
TUBO PVC PRESION Ø 1/2"x 5.00 m. pza 2.1000 14.00
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 40.19
Mano de Obra
OPERARIO hh 1.0000 1.6000 20.10
PEON hh 1.0000 1.6000 14.84
CAPATAZ hh 0.2500 0.4000 21.00
Materiales
CAJA DE REGISTRO 12" x 24" und 1.0000 25.00
PEGAMENTO PVC gln 0.1700 100.00
TUBO PVC Ø 6" x 5m pza 1.5000 140.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 64.30
MOVIMIENTO DE TIERRAS
Mano de Obra
PEON HH 2.0000 1.0667 16.50
CAPATAZ HH 0.2000 0.1067 21.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 19.84
Mano de Obra
OPERARIO HH 1.0000 0.0062 20.10
PEON HH 2.0000 0.0123 16.50
CAPATAZ HH 0.5000 0.0031 21.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.39
CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0062 120.00
MOTOBOMBA 10 HP 4" Hm 1.0000 0.0062 14.00
RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0062 180.00
MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0062 190.00
Mano de Obra
OPERARIO HH 0.10 0.1600 20.10
PEON HH 1.00 1.6000 14.84
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 26.96
Mano de Obra
OPERARIO HH 1.0000 0.0444 20.10
PEON HH 3.0000 0.1333 16.50
CAPATAZ HH 0.5000 0.0222 21.00
Materiales
MATERIAL P/ BASE PUESTO EN OBRA -AFIRMADO m3 0.1300 37.50
AGUA gln 0.0500 1.30
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 3.56
COMPACTADOR VIBR. TIPO PLANCHA 7 HP Hm 1.0000 0.0444 12.50
CONCRETO SIMPLE
Mano de Obra
OPERARIO hh 2.0000 0.8000 20.10
OFICIAL hh 2.0000 0.8000 16.50
PEON hh 8.0000 3.2000 14.84
CAPATAZ hh 0.1500 0.0600 21.00
OPERADOR EQUIPO hh 1.0000 0.4000 20.10
Materiales
ARENA GRUESA m3 0.5200 32.80
PIEDRA CHANCADA DE 1/2" - 3/4" Huso 67 m3 0.5300 57.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 8.0000 18.00
GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.1364 12.00
ACEITE MOTOR GASOLINA SAE 30W gal 0.0045 38.00
GRASA MULTIPLE EP lb 0.0091 11.00
REGLA DE MADERA p2 0.0600 3.50
AGUA m3 0.1800 6.02
Equipos
MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11-12P3 hm 1.0000 0.4000 25.00
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.4000 15.00
HERRAMIENTAS MANUALES %MO 5.0000 0.17
Mano de Obra
OPERARIO HH 1.00 0.2000 20.10
PEON HH 0.25 0.0500 14.84
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 4.76
ALCANTARILLA DE CONCRETO AR
Mano de Obra
OPERARIO HH 0.10 0.1600 20.10
PEON HH 1.00 1.6000 14.84
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 26.96
Mano de Obra
OPERARIO hh 1.0000 0.0800 20.10
PEON hh 8.0000 0.6400 14.84
CAPATAZ hh 0.2000 0.0160 21.00
OPERADOR EQUIPO hh 1.0000 0.0800 20.10
Materiales
HORMIGON m3 0.0700 40.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1855 18.00
GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0300 12.00
ACEITE MOTOR GASOLINA SAE 30W gal 0.0010 38.00
GRASA MULTIPLE EP lb 0.0020 11.00
AGUA m3 0.0081 6.02
Equipos
MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11-12P3 hm 1.0000 0.0800 30.00
HERRAMIENTAS MANUALES %MO 3.0000 13.05
JARDINERIA
Mano de Obra
OPERARIO HH 1.00 0.0800 20.10
PEON HH 2.00 0.1600 14.84
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 3.98
Mano de Obra
OPERARIO HH 0.50 0.0800 20.10
PEON HH 2.00 0.3200 14.84
Materiales
TIERRA DE CHACRA m3 0.2000 20.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 6.36
Mano de Obra
OPERARIO HH 1.00 0.0800 20.10
PEON HH 0.50 0.0400 14.84
Materiales
GRASS SEMILLA Kg 0.1000 40.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 2.20
Mano de Obra
PEON HH 1.00 0.2286 14.84
Materiales
ARBOLES ORNAMENTALES Und 1.0000 40.00
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 3.39
SEÑALIZACION Y SEGURIDAD V
SEÑALIZACION
SEÑALIZACION HORIZONTAL
Mano de Obra
OPERARIO hh 1.0000 0.3200 20.10
PEON hh 0.5000 0.1600 14.84
Materiales
CINTA ADHESIVA 1/2" und 0.0400 1.70
DISOLVENTE gln 0.0200 28.70
PINTURA PARA TRAFICO gln 0.1000 55.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 8.81
Mano de Obra
OPERARIO hh 1.0000 0.2667 20.10
PEON hh 1.0000 0.2667 14.84
Materiales
DISOLVENTE gln 0.0020 28.70
PINTURA PARA TRAFICO gln 0.0070 55.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 9.32
Mano de Obra
OPERARIO hh 1.0000 0.3200 20.10
PEON hh 3.0000 0.9600 14.84
Materiales
CINTA ADHESIVA 1/2" und 0.0600 1.70
DISOLVENTE gln 0.0150 28.70
PINTURA PARA TRAFICO gln 0.1000 55.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 20.68
Mano de Obra
OPERARIO hh 0.5000 0.8000 20.10
PEON hh 1.0000 1.6000 14.84
CAPATAZ hh 0.2000 0.3200 21.00
Materiales
CARTELES DE SEÑALIZACION Glb 1.0000 340.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 39.82
Mano de Obra
OPERARIO hh 1.0000 0.0400 20.10
PEON hh 1.0000 0.0400 14.84
Materiales
CINTA ADHESIVA 1/2" und 0.0300 1.70
DISOLVENTE gln 0.0100 28.70
PINTURA PARA TRAFICO gln 0.0400 55.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 1.40
SEGURIDAD Y SALUD
Mano de Obra
OPERARIO HH 0.00 0.0000 146.77
PEON HH 1.00 8.0000 0.00
Materiales
PROTECTOR DE OIDOS und 1.0000 3.00
CASCO DE PROTECCION und 1.0000 5.00
GUANTES DE CUERO PAR 0.2500 5.00
GUANTES DE JEBE PAR 0.2500 5.00
ANTEOJOS DE SEGURIDAD und 1.0000 4.00
SOMBRERO DE TELA TIPO ZAFARI pza 1.0000 32.80
BOTAS DE JEBE PAR 0.2000 25.00
ROPA DE TRABAJO (CONJUNTO) pza 1.0000 55.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.00
Mano de Obra
OPERARIO HH 1.00 8.0000 20.10
PEON HH 2.00 16.0000 14.84
Materiales
CINTA DE SEGURIDAD rll 20.0000 36.90
CAMILLA FEL und 1.0000 350.00
ESTACION DE SEGURIDAD und 1.0000 250.00
EXTINTORES und 1.0000 250.00
BOTIQUIN DE PRIMEROS AUXILIOS und 1.0000 150.00
POSTES DE MADERA CON BASE DE CEMENTO und 40.0000 18.47
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 398.24
Mano de Obra
PEON HH 0.30 2.4000 14.84
Materiales
CARTELES DE DESVIO und 10.0000 35.00
CABALLETE PARA DESVIO pza 10.0000 35.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 35.62
Mano de Obra
OPERARIO HH 1.00 8.0000 20.10
PEON HH 1.00 8.0000 14.84
Materiales
MASCARILLA N95 DE 4 CAPAS CJA 10.0000 123.90
RESPIRADOR CON DOBLE FILTRO (ANTIGASES) UND 10.0000 118.00
DESINF. VIRUCIDAS - AMONIO CUATERNARIO 5G GALON 5.0000 177.00
GUANTES DE SEGURIDAD DOC 6.0000 100.00
GUANTES DE NITRILO X100 UNIDADES CAJA 3.0000 82.60
CARETA FACIAL DE ACRILICO UND 30.0000 25.00
LENTES SEG. C/ REPUESTO ANTI EMPAÑANTE UND 30.0000 21.24
MANDIL IMPERMEABLE DE PROTECCIÓN UND 30.0000 35.40
PULVERIZADOR MARCA JACTÓ DE 20 LT. UND 1.0000 389.40
PULVERIZADOR PLÁSTICO 1 LITRO CAPACIDAD UND 2.0000 7.08
OXIMENTRO UND 1.0000 100.00
PISTOLA PAA MEDIR TEMPERATURA UND 1.0000 100.00
EXAMENES COVID UND 60.0000 100.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 279.52
VARIOS
Mano de Obra
OPERARIO HH 2.00 5.3333 20.10
PEON HH 1.00 2.6667 14.84
Materiales
HIDRANTE HIERRO DUCTIL TIPO POSTE CUERPO SECO110MM Glb 1.0000 1,650.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 146.77
Mano de Obra
OPERARIO HH 0.50 2.0000 20.10
PEON HH 0.20 0.8000 14.84
Materiales
TACHO DE BASURA METALICO PARA PARQUE Glb 1.0000 220.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 52.07
MOVIMIENTO DE TIERRAS Y DEMOLI
Mano de Obra
OPERARIO HH 0.10 0.1600 20.10
PEON HH 1.00 1.6000 14.84
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 26.96
Mano de Obra
OPERARIO HH 0.10 0.0533 20.10
PEON HH 1.00 0.5333 14.84
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 8.99
Mano de Obra
OPERARIO HH 0.10 0.0200 20.10
PEON HH 2.00 0.4000 14.84
OPERADOR EQUIPO hh 1.0000 0.2000 20.10
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 10.36
COMPACTADOR VIBR. TIPO PLANCHA 4 HP HM 1.00 0.2000 19.00
Materiales
Materiales
AFIRMADO M3 0.2200 45.00
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 15.97
COMPACTADOR VIBR. TIPO PLANCHA 4 HP HM 1.00 0.2286 19.00
Mano de Obra
CAPATAZ hh 0.2000 0.0160 24.50
OPERARIO hh 2.0000 0.1600 22.95
OFICIAL hh 1.0000 0.0800 18.16
PEON hh 8.0000 0.6400 16.39
OPERADOR EQUIPO hh 1.0000 0.0800 22.95
Materiales
HORMIGON m3 0.0700 40.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1855 17.00
GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0300 12.00
ACEITE MOTOR GASOLINA SAE 30W gal 0.0010 38.00
GRASA MULTIPLE EP lb 0.0020 11.00
AGUA m3 0.0081 6.02
Equipos
MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11-12P3 hm 1.0000 0.0800 30.00
HERRAMIENTAS MANUALES %MO 5.0000 17.84
Mano de Obra
CAPATAZ hh 0.2000 0.0145 24.50
OPERARIO hh 2.0000 0.1455 22.95
PEON hh 5.0000 0.3636 16.39
OPERADOR EQUIPO hh 1.0000 0.0727 22.95
Materiales
HORMIGON m3 0.1300 40.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.6280 17.00
GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0273 12.00
ACEITE MOTOR GASOLINA SAE 30W gal 0.0009 38.00
GRASA MULTIPLE EP lb 0.0018 11.00
REGLA DE MADERA p2 0.0600 3.50
AGUA m3 0.0162 6.02
Equipos
MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11-12P3 hm 1.0000 0.0800 30.00
HERRAMIENTAS MANUALES %MO 5.0000 11.32
Mano de Obra
CAPATAZ hh 0.2000 0.0762 24.50
OPERARIO hh 2.0000 0.7619 22.95
OFICIAL hh 1.0000 0.3810 18.16
PEON hh 8.0000 3.0476 16.39
OPERADOR EQUIPO hh 1.0000 0.3810 22.95
Materiales
ARENA GRUESA m3 0.5300 50.00
PIEDRA CHANCADA DE 1/2" - 3/4" Huso 67 m3 0.5300 55.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 9.2000 17.00
GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.1364 12.00
ACEITE MOTOR GASOLINA SAE 30W gal 0.0045 38.00
GRASA MULTIPLE EP lb 0.0091 11.00
REGLA DE MADERA p2 0.0600 3.50
AGUA m3 0.1800 6.02
Equipos
MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11-12P3 hm 1.0000 0.3636 30.00
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 5.0000 0.17
Mano de Obra
CAPATAZ hh 0.2000 0.0229 24.50
OPERARIO hh 1.0000 0.1143 22.95
PEON hh 4.0000 0.4571 16.39
OPERADOR EQUIPO hh 1.0000 0.1143 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO DE BOMBA m3 1.0000 30.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1000 17.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 5.0000 13.30
Mano de Obra
CAPATAZ hh 0.1000 0.0032 24.50
OPERARIO hh 1.0000 0.0320 22.95
PEON hh 1.0000 0.0320 16.39
Materiales
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0500 2.55
ALAMBRE NEGRO RECOCIDO # 16 kg 0.0200 6.00
DISCOS DE CORTE pza 0.0500 18.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 1.34
Mano de Obra
CAPATAZ hh 0.1000 0.0114 24.50
OPERARIO hh 2.0000 0.2286 22.95
PEON hh 4.0000 0.4571 16.39
OPERADOR EQUIPO hh 1.0000 0.1143 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO DE BOMBA m3 1.0000 30.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1000 17.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 5.0000 15.64
Mano de Obra
CAPATAZ hh 0.1000 0.0267 24.50
OPERARIO hh 1.0000 0.2667 22.95
PEON hh 4.0000 1.0667 16.39
OPERADOR EQUIPO hh 1.0000 0.2667 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 280 kg/cm2 m3 1.0500 220.00
SERVICIO DE BOMBA m3 1.0000 30.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 30.38
Mano de Obra
CAPATAZ hh 0.1000 0.0267 24.50
OPERARIO hh 1.0000 0.2667 22.95
PEON hh 4.0000 1.0667 16.39
OPERADOR EQUIPO hh 1.0000 0.2667 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 280 kg/cm2 m3 1.0500 245.00
SERVICIO DE BOMBA m3 1.0000 30.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 5.0000 30.38
Mano de Obra
CAPATAZ hh 0.1000 0.0267 24.50
OPERARIO hh 1.0000 0.2667 22.95
PEON hh 4.0000 1.0667 16.39
OPERADOR EQUIPO hh 1.0000 0.2667 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 5.0000 30.38
Mano de Obra
CAPATAZ hh 0.1000 0.0267 24.50
OPERARIO hh 1.0000 0.2667 22.95
PEON hh 4.0000 1.0667 16.39
OPERADOR EQUIPO hh 1.0000 0.2667 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 30.38
Mano de Obra
CAPATAZ hh 0.1000 0.0133 24.50
OPERARIO hh 1.0000 0.1333 22.95
PEON hh 4.0000 0.5333 16.39
OPERADOR EQUIPO hh 1.0000 0.1333 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 15.19
Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA LOSAS MACIZAS
Rendimiento 60.00 Costo
M3/DIAunitario directo por : M2
Mano de Obra
CAPATAZ hh 0.1000 0.0133 24.50
OPERARIO hh 1.0000 0.1333 22.95
PEON hh 4.0000 0.5333 16.39
OPERADOR EQUIPO hh 1.0000 0.1333 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
SERVICIO DE ACOPLE DE TUBERIA m3 0.3000 20.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 15.19
Mano de Obra
CAPATAZ hh 0.1000 0.0133 24.50
OPERARIO hh 2.0000 0.2667 22.95
PEON hh 4.0000 0.5333 16.39
OPERADOR EQUIPO hh 1.0000 0.1333 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
SERVICIO DE ACOPLE DE TUBERIA m3 0.3000 20.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 18.25
Mano de Obra
CAPATAZ hh 0.1000 0.0005 24.50
OPERARIO hh 1.0000 0.0046 22.95
PEON hh 8.0000 0.0366 16.39
Materiales
LADRILLO ARCILLA HUECO 15 15x30x30cm mll 0.0010 1,800.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 0.72
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 36.50
Mano de Obra
CAPATAZ hh 0.1000 0.0267 24.50
OPERARIO hh 2.0000 0.5333 22.95
PEON hh 4.0000 1.0667 16.39
OPERADOR EQUIPO hh 1.0000 0.2667 22.95
Materiales
CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= 210 kg/cm2 m3 1.0500 220.00
SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
Equipos
VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1 0.3636 10.00
HERRAMIENTAS MANUALES %MO 3.0000 36.50
CAPATAZ 24.5
OPERARIO 22.95
PEON 16.39
OP DEQ. 22.95
OFICIAL 18.16
PAVIMENTO RIGIDO
OBRAS PRELIMINARES
Mano de Obra
66.00 OFICIAL HH 0.5000 4.8000 16.50
237.44 PEON HH 2.0000 19.2000 14.84
303.44
Materiales
6.56 CLAVOS PARA MADERA C/C 3" kg 2.0000 3.28
7.54 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.4000 18.86
650.00 MATERIAL PARA GIGANTOGRAFIA GLB 1.0000 650.00
12.00 HORMIGON m3 0.3000 40.00
200.00 ESTRUCTURA DE MADERA und 1.0000 200.00
876.10
Equipos
9.10 HERRAMIENTAS MANUALES %MO 3.0000 364.13
9.10
Materiales
600.00 ALQUILER DE LOCAL P/ALMACEN + OF. DE 300 M MES 1.0000 600.00
600.00
Equipos
18.00 HERRAMIENTAS MANUALES %MO 3.0000 600.00
18.00
Materiales
ALQUILER DE LOCAL P/ALMACEN + OF. DE 300
8,000.00 MES 1.0000 8,000.00
M2
8,000.00
Equipos
0.00 HERRAMIENTAS MANUALES %MO 0.0000 8,000.00
0.00
TRABAJOS PRELIMINARES
Mano de Obra
0.29 TOPOGRAFO hh 1.0000 0.0189 20.10
0.43 PEON hh 2.0000 0.0378 14.84
0.08 CAPATAZ hh 0.2500 0.0047 21.00
0.80
Materiales
0.02 YESO EN BOLSAS DE 25 KG. BOL 0.0020 12.30
0.05 CORDEL m 0.1000 0.50
0.01 WINCHA und 0.0001 75.00
0.03 MADERA EUCALIPTO p2 0.0100 2.71
0.01 PINTURA ESMALTE gln 0.0002 33.00
0.01 CLAVOS C/C 1/2" kg 0.0020 3.39
0.12
Equipos
0.09 MIRA Y JALON HE 1.0000 0.0145 6.50
0.02 HERRAMIENTAS MANUALES %MO 1.04
0.13 TEODOLITO hm 1.0000 0.0145 9.00
0.10 NIVEL TOPOGRAFICO hm 1.0000 0.0145 6.70
0.35
Mano de Obra
0.64 OPERARIO HH 1.0000 0.0416 20.10
0.47 PEON hh 1.0000 0.0416 14.84
0.67 CAPATAZ hh 1.0000 0.0416 21.00
1.79
Equipos
0.09 HERRAMIENTAS MANUALES %MO 5.0000 2.33
0.09
Mano de Obra
66.00 OFICIAL HH 0.5000 4.8000 16.50
237.44 PEON HH 2.0000 19.2000 14.84
303.44
Materiales
369.00 CINTA DE SEGURIDAD rll 10.0000 36.90
508.50 CARTELES DE DESVIO und 10.0000 50.85
406.80 CABALLETE PARA DESVIO pza 12.0000 33.90
184.70 POSTES DE MADERA CON BASE DE CEMENTO und 10.0000 18.47
1,469.00
Equipos
9.10 HERRAMIENTAS MANUALES %MO 3.0000 364.13
9.10
MOVIMIENTO DE TIERRAS
Mano de Obra
0.11 OPERARIO HH 0.1000 0.0069 20.10
0.94 OFICIAL HH 1.0000 0.0686 16.50
1.70 PEON HH 2.0000 0.1371 14.84
0.60 CAPATAZ HH 0.5000 0.0343 21.00
3.35
Equipos
0.10 HERRAMIENTAS MANUALES %MO 3.0000 4.02
9.14 TRACTOR CAT D6D Hm 1.0000 0.0686 160.00
9.24
Mano de Obra
0.15 OPERARIO HH 1.0000 0.0068 24.50
0.22 PEON HH 2.0000 0.0136 18.16
0.05 CAPATAZ HH 0.5000 0.0034 16.39
0.41
Equipos
0.01 HERRAMIENTAS MANUALES %MO 3.0000 0.47
0.71 CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0068 120.00
0.08 MOTOBOMBA 10 HP 4" Hm 1.0000 0.0068 14.00
1.07 RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0068 180.00
1.13 MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0068 190.00
3.00
Mano de Obra
1.24 OPERARIO HH 1.0000 0.0738 20.10
0.91 PEON HH 1.0000 0.0738 14.84
2.15
Equipos
0.06 HERRAMIENTAS MANUALES %MO 3.0000 2.58
6.46 VOLQUETE 15 M3 Hm 1.0000 0.0738 105.00
9.85 CARGADOR FRONTAL S/LLANTAS 125-155 HP 3Y3. Hm 1.0000 0.0738 160.00
16.37
PAVIMENTOS
Mano de Obra
0.13 OPERARIO HH 1.0000 0.0074 20.10
0.11 OFICIAL HH 1.0000 0.0074 16.50
0.28 PEON HH 3.0000 0.0221 14.84
0.07 CAPATAZ HH 0.5000 0.0037 21.00
0.59
Materiales
10.50 MATERIAL OVER P/ BASE PUESTO EN OBRA m3 1.0000 10.50
10.50
Equipos
0.02 HERRAMIENTAS MANUALES %MO 3.0000 0.67
0.77 CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0074 120.00
0.09 MOTOBOMBA 10 HP 4" Hm 1.0000 0.0074 14.00
1.15 RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0074 180.00
1.22 MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0074 190.00
3.24
NTO= 750 M3/DIA partida CARGUIO (AGREGADOS) RENDIMIENTO= 750 M3/DIA
3.71 Rendimiento 761.90 M3/DIA Costo unitario directo por :GLB
Mano de Obra
0.20 OPERARIO HH 1.0000 0.0105 20.10
0.15 PEON HH 1.0000 0.0105 14.84
0.35
Equipos
0.01 HERRAMIENTAS MANUALES %MO 3.0000 0.37
3.15 VOLQUETE 15 M3 Hm 3.0000 0.0315 105.00
0.20 CARGADOR FRONTAL S/LLANTAS 125-155 HP 3Y3. Hm 1.0000 0.0105 20.10
3.36
Mano de Obra
0.12 OPERARIO HH 1.0000 0.0062 20.10
0.10 OFICIAL HH 1.0000 0.0062 16.50
0.27 PEON HH 3.0000 0.0185 14.84
0.06 CAPATAZ HH 0.5000 0.0031 21.00
0.56
Materiales
7.69 MATERIAL DE CANTERA P/ BASE PUESTO EN OBR m3 0.2050 37.50
7.69
Equipos
0.02 HERRAMIENTAS MANUALES %MO 3.0000 0.56
0.74 CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0062 120.00
1.11 RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0062 180.00
1.17 MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0062 190.00
3.03
Mano de Obra
4.59 OPERARIO HH 1.0000 0.2743 20.10
3.77 OFICIAL HH 1.0000 0.2743 16.50
3.39 PEON HH 1.0000 0.2743 14.84
0.96 CAPATAZ HH 0.2000 0.0549 21.00
12.72
Materiales
0.66 ALAMBRE NEGRO N°8 kg 0.2000 3.28
17.22 MADERA TORNILLO p2 3.5000 4.92
2.98 MADERA EUCALIPTO p2 1.1000 2.71
0.51 CLAVOS C/C 2 1/2" kg 0.1500 3.39
21.37
Equipos
0.38 HERRAMIENTAS MANUALES %MO 3.0000 15.26
0.38
Mano de Obra
0.60 OPERARIO hh 1.0000 0.0356 20.10
0.49 PEON hh 1.0000 0.0356 16.50
0.06 CAPATAZ hh 0.2000 0.0071 21.00
1.15
Materiales
2.68 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0500 2.55
0.12 ALAMBRE NEGRO RECOCIDO # 16 kg 0.0200 6.00
1.02 DISCOS DE CORTE pza 0.0600 17.00
3.82
Equipos
0.03 HERRAMIENTAS MANUALES %MO 3.0000 1.30
0.03
Mano de Obra
0.54 OPERARIO hh 1.0000 0.0293 20.10
0.44 PEON hh 1.0000 0.0293 16.50
0.06 CAPATAZ hh 0.2000 0.0059 21.00
1.03
Materiales
2.55 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0000 2.55
0.12 ALAMBRE NEGRO RECOCIDO # 16 kg 0.0200 6.00
2.55 ALAMBRE NEGRO RECOCIDO # 16 kg 1.0000 2.55
0.17 DISCOS DE CORTE pza 0.0100 17.00
5.39
Equipos
0.03 HERRAMIENTAS MANUALES %MO 3.0000 1.07
0.03
ARA LOSAS MACIZAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA LOSAS MACIZAS
290.04 Rendimiento 46.15 M2/DIA Costo unitario directo por : M3
Mano de Obra
0.28 CAPATAZ hh 0.1000 0.0173 21.00
2.68 OPERARIO hh 1.0000 0.1733 20.10
8.80 PEON hh 4.0000 0.6933 16.50
1.98 OPERADOR EQUIPO hh 1.0000 0.1733 14.84
13.74
Materiales
236.25 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 225.00
30.00 SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
6.00 SERVICIO DE ACOPLE DE TUBERIA m3 0.3000 20.00
272.25
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
0.41 HERRAMIENTAS MANUALES %MO 3.0000 17.86
4.05
Mano de Obra
0.44 PEON hh 1.0000 0.0320 16.50
0.06 CAPATAZ hh 0.1000 0.0032 21.00
0.50
Materiales
2.00 CURADOR QUIMICO P/CONCRETO-CURADOR MEM gln 0.0400 50.00
2.00
Equipos
0.06 HERRAMIENTAS MANUALES %MO 3.0000 2.00
0.06
Mano de Obra
0.87 PEON hh 1.0000 0.0640 16.39
0.00 CAPATAZ hh 0.1000 0.0064 0.00
0.87
Materiales
0.17 ARENA FINA m3 0.0030 57.40
2.71 ASFALTO RC-250 gln 0.1500 18.04
0.79 PETROLEO gln 0.0600 13.22
3.67
Equipos
0.11 HERRAMIENTAS MANUALES %MO 3.0000 3.67
0.11
VEREDA DE CONCRETO
OBRAS PRELIMINARES
CONEXIONES DOMICILIARIAS
Mano de Obra
20.10 OPERARIO hh 1.0000 1.1429 20.10
14.84 PEON hh 1.0000 1.1429 14.84
5.25 CAPATAZ hh 0.2500 0.2857 21.00
40.19
Materiales
60.00 CAJA DE REGISTRO PORTAMEDIDOR DE AGUA und 1.0000 60.00
5.00 PEGAMENTO PVC gln 0.0500 100.00
29.40 TUBO PVC PRESION Ø 1/2"x 5.00 m. pza 2.1000 14.00
94.40
Equipos
2.01 HERRAMIENTAS MANUALES %MO 5.0000 45.93
2.01
R.NORMAL 5.00 - 10.00 M Partida CONEXION DE DESAGUE TUBO PVC 6" TERR.NORMAL 5.00 - 10.00 M
318.23 Rendimiento 5.00 UND/DIACosto unitario directo por : UND
Mano de Obra
32.16 OPERARIO hh 1.0000 1.6000 20.10
23.74 PEON hh 1.0000 1.6000 14.84
8.40 CAPATAZ hh 0.2500 0.4000 21.00
64.30
Materiales
25.00 CAJA DE REGISTRO 12" x 24" und 1.0000 25.00
17.00 PEGAMENTO PVC gln 0.1700 100.00
210.00 TUBO PVC Ø 6" x 5m pza 1.5000 140.00
252.00
Equipos
1.93 HERRAMIENTAS MANUALES %MO 3.0000 64.30
1.93
MOVIMIENTO DE TIERRAS
Mano de Obra
17.60 PEON HH 2.0000 1.2800 16.50
2.24 CAPATAZ HH 0.2000 0.1280 21.00
19.84
Equipos
0.60 HERRAMIENTAS MANUALES %MO 3.0000 23.81
0.60
Mano de Obra
0.12 OPERARIO HH 1.0000 0.0071 20.10
0.20 PEON HH 2.0000 0.0142 16.50
0.06 CAPATAZ HH 0.5000 0.0035 21.00
0.39
Equipos
0.01 HERRAMIENTAS MANUALES %MO 3.0000 0.45
0.74 CAMION CISTERNA DE AGUA 2000 GLNS 122 HP Hm 1.0000 0.0071 120.00
0.09 MOTOBOMBA 10 HP 4" Hm 1.0000 0.0071 14.00
1.11 RODILLO LISO VIB AUTO 125 HP Hm 1.0000 0.0071 180.00
1.17 MOTONIVELADORA 125 HP CUCHARA 3.66 ML Hm 1.0000 0.0071 190.00
3.11
Mano de Obra
3.22 OPERARIO HH 0.1000 0.1840 20.10
23.74 PEON HH 1.0000 1.8400 14.84
26.96
Equipos
0.81 HERRAMIENTAS MANUALES %MO 3.0000 31.00
0.81
Mano de Obra
0.89 OPERARIO HH 1.0000 0.0533 20.10
2.20 PEON HH 3.0000 0.1600 16.50
0.47 CAPATAZ HH 0.5000 0.0267 21.00
3.56
Materiales
4.88 MATERIAL P/ BASE PUESTO EN OBRA -AFIRMADO m3 0.1300 37.50
0.07 AGUA gln 0.0500 1.30
4.94
Equipos
0.11 HERRAMIENTAS MANUALES %MO 3.0000 4.27
0.56 COMPACTADOR VIBR. TIPO PLANCHA 7 HP Hm 1.0000 0.0533 12.50
0.66
CONCRETO SIMPLE
Mano de Obra
16.08 OPERARIO hh 2.0000 0.9600 20.10
13.20 OFICIAL hh 2.0000 0.9600 16.50
47.49 PEON hh 8.0000 3.8400 14.84
1.26 CAPATAZ hh 0.1500 0.0720 21.00
8.04 OPERADOR EQUIPO hh 1.0000 0.4800 20.10
86.07
Materiales
17.06 ARENA GRUESA m3 0.5200 32.80
30.21 PIEDRA CHANCADA DE 1/2" - 3/4" Huso 67 m3 0.5300 57.00
144.00 CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 8.0000 18.00
1.64 GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.1364 12.00
0.17 ACEITE MOTOR GASOLINA SAE 30W gal 0.0045 38.00
0.10 GRASA MULTIPLE EP lb 0.0091 11.00
0.21 REGLA DE MADERA p2 0.0600 3.50
1.08 AGUA m3 0.1800 6.02
194.47
Equipos
10.00 MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11- hm 1.0000 0.4800 25.00
6.00 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.4800 15.00
0.01 HERRAMIENTAS MANUALES %MO 5.0000 0.17
16.01
Mano de Obra
4.02 OPERARIO HH 1.0000 0.2400 20.10
0.74 PEON HH 0.2500 0.0600 14.84
4.76
Equipos
0.14 HERRAMIENTAS MANUALES %MO 3.0000 5.71
0.14
Mano de Obra
3.22 OPERARIO HH 0.1000 0.1600 20.10
23.74 PEON HH 1.0000 1.6000 14.84
26.96
Equipos
0.81 HERRAMIENTAS MANUALES %MO 3.0000 26.96
0.81
Mano de Obra
1.61 OPERARIO hh 1.0000 0.0960 20.10
9.50 PEON hh 8.0000 0.7680 14.84
0.34 CAPATAZ hh 0.2000 0.0192 21.00
1.61 OPERADOR EQUIPO hh 1.0000 0.0960 20.10
13.05
Materiales
2.80 HORMIGON m3 0.0700 40.00
3.34 CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1855 18.00
0.36 GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0300 12.00
0.04 ACEITE MOTOR GASOLINA SAE 30W gal 0.0010 38.00
0.02 GRASA MULTIPLE EP lb 0.0020 11.00
0.05 AGUA m3 0.0081 6.02
6.61
Equipos
2.40 MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11- hm 1.0000 0.0800 30.00
0.39 HERRAMIENTAS MANUALES %MO 3.0000 15.66
2.79
JARDINERIA
Mano de Obra
1.61 OPERARIO HH 1.0000 0.0960 20.10
2.37 PEON HH 2.0000 0.1920 14.84
3.98
Equipos
0.20 HERRAMIENTAS MANUALES %MO 3.0000 4.78
0.20
Mano de Obra
1.61 OPERARIO HH 0.5000 0.0960 20.10
4.75 PEON HH 2.0000 0.3840 14.84
6.36
Materiales
4.00 TIERRA DE CHACRA m3 0.2000 20.00
4.00
Equipos
0.19 HERRAMIENTAS MANUALES %MO 3.0000 7.63
0.19
Mano de Obra
1.61 OPERARIO HH 1.0000 0.0960 20.10
0.59 PEON HH 0.5000 0.0480 14.84
2.20
Materiales
4.00 GRASS SEMILLA Kg 0.1000 40.00
4.00
Equipos
0.07 HERRAMIENTAS MANUALES %MO 3.0000 2.64
0.07
Mano de Obra
3.39 PEON HH 1.0000 0.2286 14.84
3.39
Materiales
40.00 ARBOLES ORNAMENTALES Und 1.0000 40.00
40.00
Equipos
0.17 HERRAMIENTAS MANUALES %MO 5.0000 3.39
0.17
Mano de Obra
6.43 OPERARIO hh 1.0000 0.3680 20.10
2.37 PEON hh 0.5000 0.1840 14.84
8.81
Materiales
0.07 CINTA ADHESIVA 1/2" und 0.0400 1.70
0.57 DISOLVENTE gln 0.0200 28.70
5.50 PINTURA PARA TRAFICO gln 0.1000 55.00
6.14
Equipos
0.26 HERRAMIENTAS MANUALES %MO 3.0000 10.13
0.26
Mano de Obra
5.36 OPERARIO hh 1.0000 0.3067 20.10
3.96 PEON hh 1.0000 0.3067 14.84
9.32
Materiales
0.06 DISOLVENTE gln 0.0020 28.70
0.39 PINTURA PARA TRAFICO gln 0.0070 55.00
0.44
Equipos
0.28 HERRAMIENTAS MANUALES %MO 3.0000 10.71
0.28
Mano de Obra
6.43 OPERARIO hh 1.0000 0.3680 20.10
14.25 PEON hh 3.0000 1.1040 14.84
20.68
Materiales
0.10 CINTA ADHESIVA 1/2" und 0.0600 1.70
0.43 DISOLVENTE gln 0.0150 28.70
5.50 PINTURA PARA TRAFICO gln 0.1000 55.00
6.03
Equipos
0.62 HERRAMIENTAS MANUALES %MO 3.0000 23.78
0.62
Mano de Obra
16.08 OPERARIO hh 0.5000 0.8000 20.10
23.74 PEON hh 1.0000 1.6000 14.84
6.72 CAPATAZ hh 0.2000 0.3200 21.00
39.82
Materiales
340.00 CARTELES DE SEÑALIZACION Glb 1.0000 340.00
340.00
Equipos
1.19 HERRAMIENTAS MANUALES %MO 3.0000 39.82
1.19
Mano de Obra
0.80 OPERARIO hh 1.0000 0.0480 20.10
0.59 PEON hh 1.0000 0.0480 14.84
1.40
Materiales
0.05 CINTA ADHESIVA 1/2" und 0.0300 1.70
0.29 DISOLVENTE gln 0.0100 28.70
2.20 PINTURA PARA TRAFICO gln 0.0400 55.00
2.54
Equipos
0.04 HERRAMIENTAS MANUALES %MO 3.0000 1.68
0.04
SEGURIDAD Y SALUD
Mano de Obra
0.00 OPERARIO HH 0.0000 0.0000 146.77
0.00 PEON HH 1.0000 8.0000 0.00
0.00
Materiales
3.00 PROTECTOR DE OIDOS und 1.0000 3.00
5.00 CASCO DE PROTECCION und 1.0000 5.00
1.25 GUANTES DE CUERO PAR 0.2500 5.00
1.25 GUANTES DE JEBE PAR 0.2500 5.00
4.00 ANTEOJOS DE SEGURIDAD und 1.0000 4.00
32.80 SOMBRERO DE TELA TIPO ZAFARI pza 1.0000 32.80
5.00 BOTAS DE JEBE PAR 0.2000 25.00
55.00 ROPA DE TRABAJO (CONJUNTO) pza 1.0000 55.00
107.30
Equipos
0.00 HERRAMIENTAS MANUALES %MO 3.0000 0.00
0.00
Mano de Obra
160.80 OPERARIO HH 1.0000 8.0000 20.10
237.44 PEON HH 2.0000 16.0000 14.84
398.24
Materiales
738.00 CINTA DE SEGURIDAD rll 20.0000 36.90
350.00 CAMILLA FEL und 1.0000 350.00
250.00 ESTACION DE SEGURIDAD und 1.0000 250.00
250.00 EXTINTORES und 1.0000 250.00
150.00 BOTIQUIN DE PRIMEROS AUXILIOS und 1.0000 150.00
738.80 POSTES DE MADERA CON BASE DE CEMENTO und 40.0000 18.47
2,476.80
Equipos
11.95 HERRAMIENTAS MANUALES %MO 3.0000 398.24
11.95
Mano de Obra
35.62 PEON HH 0.3000 2.4000 14.84
35.62
Materiales
350.00 CARTELES DE DESVIO und 10.0000 35.00
350.00 CABALLETE PARA DESVIO pza 10.0000 35.00
700.00
Equipos
1.07 HERRAMIENTAS MANUALES %MO 3.0000 35.62
1.07
Mano de Obra
160.80 OPERARIO HH 1.0000 8.0000 20.10
118.72 PEON HH 1.0000 8.0000 14.84
279.52
Materiales
1,239.00 MASCARILLA N95 DE 4 CAPAS CJA 10.0000 123.90
1,180.00 RESPIRADOR CON DOBLE FILTRO (ANTIGASES) UND 10.0000 118.00
885.00 DESINF. VIRUCIDAS - AMONIO CUATERNARIO 5G GALON 5.0000 177.00
600.00 GUANTES DE SEGURIDAD DOC 6.0000 100.00
247.80 GUANTES DE NITRILO X100 UNIDADES CAJA 3.0000 82.60
750.00 CARETA FACIAL DE ACRILICO UND 30.0000 25.00
637.20 LENTES SEG. C/ REPUESTO ANTI EMPAÑANTE UND 30.0000 21.24
1,062.00 MANDIL IMPERMEABLE DE PROTECCIÓN UND 30.0000 35.40
389.40 PULVERIZADOR MARCA JACTÓ DE 20 LT. UND 1.0000 389.40
14.16 PULVERIZADOR PLÁSTICO 1 LITRO CAPACIDAD UND 2.0000 7.08
100.00 OXIMENTRO UND 1.0000 100.00
100.00 PISTOLA PAA MEDIR TEMPERATURA UND 1.0000 100.00
6,000.00 EXAMENES COVID UND 60.0000 100.00
13,204.56
Equipos
8.39 HERRAMIENTAS MANUALES %MO 3.0000 279.52
8.39
VARIOS
Mano de Obra
107.20 OPERARIO HH 2.0000 5.3333 20.10
39.57 PEON HH 1.0000 2.6667 14.84
146.77
Materiales
1,650.00 HIDRANTE HIERRO DUCTIL TIPO POSTE CUERPO Glb 1.0000 1,650.00
1,650.00
Equipos
4.40 HERRAMIENTAS MANUALES %MO 3.0000 146.77
4.40
Mano de Obra
40.20 OPERARIO HH 0.5000 2.0000 20.10
11.87 PEON HH 0.2000 0.8000 14.84
52.07
Materiales
220.00 TACHO DE BASURA METALICO PARA PARQUE Glb 1.0000 220.00
220.00
Equipos
1.56 HERRAMIENTAS MANUALES %MO 3.0000 52.07
1.56
OPERARIO 20.1
OFICIAL 16.5
PEON 14.84
CAPATAZ 21
VIMIENTO DE TIERRAS Y DEMOLICIONES
Mano de Obra
3.22 OPERARIO HH 0.1000 0.1920 20.10
23.74 PEON HH 1.0000 1.9200 14.84
26.96
Equipos
0.81 HERRAMIENTAS MANUALES %MO 3.0000 32.35
0.81
Mano de Obra
1.07 OPERARIO HH 0.1000 0.0640 20.10
7.91 PEON HH 1.0000 0.6400 14.84
8.99
Equipos
0.27 HERRAMIENTAS MANUALES %MO 3.0000 10.78
0.27
Mano de Obra
0.40 OPERARIO HH 0.1000 0.0240 20.10
5.94 PEON HH 2.0000 0.4800 14.84
4.02 OPERADOR EQUIPO hh 1.0000 0.2400 20.10
10.36
Equipos
0.31 HERRAMIENTAS MANUALES %MO 3.0000 12.43
3.80 COMPACTADOR VIBR. TIPO PLANCHA 4 HP HM 1.00 0.2400 19.00
4.11
RIAL GRNULAR (E=20 cm) partida RELLENO Y COMPACTACION TERRENO C/MATERIAL GRNULAR (E=20 cm)
31.01 Rendimiento 29.17 M2/DIA Costo unitario directo por : M2
Materiales
CAPATA 24.5
OPERAR 22.95
OFICIAL 18.16
PEON 16.39
LIMA MAZAMARI
Mano de Obra
0.39 CAPATAZ hh 0.2000 0.0208 24.50
3.67 OPERARIO hh 2.0000 0.2080 22.95
1.45 OFICIAL hh 1.0000 0.1040 18.16
10.49 PEON hh 8.0000 0.8320 16.39
1.84 OPERADOR EQUIPO hh 1.0000 0.1040 22.95
17.84
Materiales
2.80 HORMIGON m3 0.0700 40.00
3.15 CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1855 17.00
0.36 GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0300 12.00
0.04 ACEITE MOTOR GASOLINA SAE 30W gal 0.0010 38.00
0.02 GRASA MULTIPLE EP lb 0.0020 11.00
0.05 AGUA m3 0.0081 6.02
6.42
Equipos
2.40 MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11- hm 1.0000 0.0800 30.00
0.89 HERRAMIENTAS MANUALES %MO 5.0000 23.20
3.29
F´c=80 Kg/cm2) Partida FALSOPISO DE 4" CON MEZC.1:6 C:H ( F´c=80 Kg/cm2)
30.85 Rendimiento 84.62 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.36 CAPATAZ hh 0.2000 0.0189 24.50
3.34 OPERARIO hh 2.0000 0.1891 22.95
5.96 PEON hh 5.0000 0.4727 16.39
1.67 OPERADOR EQUIPO hh 1.0000 0.0945 22.95
11.32
Materiales
5.20 HORMIGON m3 0.1300 40.00
10.68 CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.6280 18.50
0.33 GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0273 12.00
0.03 ACEITE MOTOR GASOLINA SAE 30W gal 0.0009 38.00
0.02 GRASA MULTIPLE EP lb 0.0018 11.00
0.21 REGLA DE MADERA p2 0.0600 3.50
0.10 AGUA m3 0.0162 5.68
16.57
Equipos
2.40 MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11- hm 1.0000 0.0800 30.00
0.57 HERRAMIENTAS MANUALES %MO 5.0000 14.72
2.97
TRA TERRENO Partida CONCRETO F'C 210 KG/CM2 LOSA CONTRA TERRENO
314.77 Rendimiento 16.15 Costo
M3/DIA
unitario directo por : M2
Mano de Obra
1.87 CAPATAZ hh 0.2000 0.0990 24.50
17.49 OPERARIO hh 2.0000 0.9905 22.95
6.92 OFICIAL hh 1.0000 0.4952 18.16
49.95 PEON hh 8.0000 3.9619 16.39
8.74 OPERADOR EQUIPO hh 1.0000 0.4952 22.95
84.96
Materiales
26.50 ARENA GRUESA m3 0.5300 50.00
29.15 PIEDRA CHANCADA DE 1/2" - 3/4" Huso 67 m3 0.5300 55.00
156.40 CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 9.2000 17.00
1.64 GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.1364 12.00
0.17 ACEITE MOTOR GASOLINA SAE 30W gal 0.0045 38.00
0.10 GRASA MULTIPLE EP lb 0.0091 11.00
0.21 REGLA DE MADERA p2 0.0600 3.50
1.08 AGUA m3 0.1800 6.02
215.25
Equipos
10.91 MEZCLADORA DE CONCRETO T.TAMBOR 23HP 11- hm 1.0000 0.0800 30.00
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
0.01 HERRAMIENTAS MANUALES %MO 5.0000 0.17
14.55
M2 PARA ZAPATAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA ZAPATAS
280.30 Rendimiento 50.00 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.56 CAPATAZ hh 0.2000 0.0320 24.50
2.62 OPERARIO hh 1.0000 0.1600 22.95
7.49 PEON hh 4.0000 0.6400 16.39
2.62 OPERADOR EQUIPO hh 1.0000 0.1600 22.95
13.30
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO DE BOMBA m3 1.0000 30.00
1.70 CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1000 17.00
262.70
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
0.66 HERRAMIENTAS MANUALES %MO 5.0000 18.62
4.30
Mano de Obra
0.08 CAPATAZ hh 0.2000 0.0083 24.50
0.73 OPERARIO hh 1.0000 0.0416 22.95
0.52 PEON hh 1.0000 0.0416 16.39
1.34
Materiales
2.68 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0500 2.55
0.12 ALAMBRE NEGRO RECOCIDO # 16 kg 0.0200 6.00
0.90 DISCOS DE CORTE pza 0.0500 18.00
3.70
Equipos
0.04 HERRAMIENTAS MANUALES %MO 3.0000 1.84
0.04
A CIMIENTOS DE MUROS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA CIMIENTOS DE MUROS
282.76 Rendimiento 53.85 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.28 CAPATAZ hh 0.2000 0.0297 24.50
5.25 OPERARIO hh 2.0000 0.2971 22.95
7.49 PEON hh 4.0000 0.5943 16.39
2.62 OPERADOR EQUIPO hh 1.0000 0.1486 22.95
15.64
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO DE BOMBA m3 1.0000 30.00
1.70 CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1000 17.00
262.70
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 8.50
0.78 HERRAMIENTAS MANUALES %MO 5.0000 20.70
4.42
ARA MUROS ARMADOS Partida CONCRETO PREMEZCLADO F'C 280 KG/CM2 PARA MUROS ARMADOS
295.92 Rendimiento 23.08 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.65 CAPATAZ hh 0.2000 0.0693 24.50
6.12 OPERARIO hh 1.0000 0.3467 22.95
17.48 PEON hh 4.0000 1.3867 16.39
6.12 OPERADOR EQUIPO hh 1.0000 0.3467 22.95
30.38
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO DE BOMBA m3 1.0000 30.00
261.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 8.50
0.91 HERRAMIENTAS MANUALES %MO 3.0000 40.34
4.55
ARA MUROS ARMADOS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA MUROS ARMADOS
322.78 Rendimiento 23.08 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.65 CAPATAZ hh 0.2000 0.0693 24.50
6.12 OPERARIO hh 1.0000 0.3467 22.95
17.48 PEON hh 4.0000 1.3867 16.39
6.12 OPERADOR EQUIPO hh 1.0000 0.3467 22.95
30.38
Materiales
257.25 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 245.00
30.00 SERVICIO DE BOMBA m3 1.0000 30.00
287.25
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 8.50
1.52 HERRAMIENTAS MANUALES %MO 5.0000 40.34
5.15
M2 PARA `PLACAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA `PLACAS
296.53 Rendimiento 23.08 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.65 CAPATAZ hh 0.1000 0.0347 24.50
6.12 OPERARIO hh 1.0000 0.3467 22.95
17.48 PEON hh 4.0000 1.3867 16.39
6.12 OPERADOR EQUIPO hh 1.0000 0.3467 22.95
30.38
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
261.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
1.52 HERRAMIENTAS MANUALES %MO 5.0000 39.49
5.15
2 PARA COLUMNAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA COLUMNAS
295.92 Rendimiento 23.08 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.65 CAPATAZ hh 0.1000 0.0347 24.50
6.12 OPERARIO hh 1.0000 0.3467 22.95
17.48 PEON hh 4.0000 1.3867 16.39
6.12 OPERADOR EQUIPO hh 1.0000 0.3467 22.95
30.38
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
261.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
0.91 HERRAMIENTAS MANUALES %MO 3.0000 39.49
4.55
CM2 PARA VIGAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA VIGAS
280.28 Rendimiento 46.15 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.33 CAPATAZ hh 0.1000 0.0173 24.50
3.06 OPERARIO hh 1.0000 0.1733 22.95
8.74 PEON hh 4.0000 0.6933 16.39
3.06 OPERADOR EQUIPO hh 1.0000 0.1733 22.95
15.19
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
261.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
0.46 HERRAMIENTAS MANUALES %MO 3.0000 19.74
4.09
ARA LOSAS MACIZAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA LOSAS MACIZAS
286.28 Rendimiento 46.15 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.33 CAPATAZ hh 0.1000 0.0173 24.50
3.06 OPERARIO hh 1.0000 0.1733 22.95
8.74 PEON hh 4.0000 0.6933 16.39
3.06 OPERADOR EQUIPO hh 1.0000 0.1733 22.95
15.19
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
6.00 SERVICIO DE ACOPLE DE TUBERIA m3 0.3000 20.00
267.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
0.46 HERRAMIENTAS MANUALES %MO 3.0000 19.74
4.09
RA LOSAS ALIGERADAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA LOSAS ALIGERADAS
289.43 Rendimiento 46.15 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.33 CAPATAZ hh 0.1000 0.0173 24.50
6.12 OPERARIO hh 2.0000 0.3467 22.95
8.74 PEON hh 4.0000 0.6933 16.39
3.06 OPERADOR EQUIPO hh 1.0000 0.1733 22.95
18.25
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
6.00 SERVICIO DE ACOPLE DE TUBERIA m3 0.3000 20.00
267.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
0.55 HERRAMIENTAS MANUALES %MO 3.0000 23.72
4.18
Mano de Obra
0.01 CAPATAZ hh 0.1000 0.0006 24.50
0.10 OPERARIO hh 1.0000 0.0059 22.95
0.60 PEON hh 8.0000 0.0475 16.39
0.72
Materiales
1.80 LADRILLO ARCILLA HUECO 15 15x30x30cm m3 0.0010 1,800.00
1.80
Equipos
0.02 HERRAMIENTAS MANUALES %MO 3.0000 0.93
0.02
2 PARA ESCALERAS Partida CONCRETO PREMEZCLADO F'C 210 KG/CM2 PARA ESCALERAS
302.23 Rendimiento 23.08 Costo
M2/DIA
unitario directo por : M2
261.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1.0000 0.3636 10.00
1.09 HERRAMIENTAS MANUALES %MO 3.0000 47.44
4.73
TERNAS SUBTERRANEAS Partida CONCRETO PREMEZCLADO F'C 210 kg/cm2 - CISTERNAS SUBTERRANEAS
302.23 Rendimiento 23.08 Costo
M2/DIA
unitario directo por : M2
Mano de Obra
0.65 CAPATAZ hh 0.1000 0.0347 24.50
12.24 OPERARIO hh 2.0000 0.6933 22.95
17.48 PEON hh 4.0000 1.3867 16.39
6.12 OPERADOR EQUIPO hh 1.0000 0.3467 22.95
36.50
Materiales
231.00 CONCRETO PRE-MEZCLADO C/CEMENTO TIPO I F'C= m3 1.0500 220.00
30.00 SERVICIO BOMBA TELESCOPICA m3 1.0000 30.00
261.00
Equipos
3.64 VIBRADOR DE CONCRETO 4HP, 2.40 plg hm 1 0.3636 10.00
1.09 HERRAMIENTAS MANUALES %MO 3.0000 47.44
4.73
UEL.H=1.40 M.
1,251.16
Parcial
79.20
284.93
364.13
6.56
7.54
650.00
12.00
200.00
876.10
10.92
10.92
UEL.H=1.40 M.
618.00
Parcial
600.00
600.00
18.00
18.00
UEL.H=1.40 M.
8,000.00
Parcial
8,000.00
8,000.00
0.00
0.00
TEO
1.49
Parcial
0.38
0.56
0.10
1.04
0.02
0.05
0.01
0.03
0.01
0.01
0.12
0.09
0.00
0.13
0.10
0.32
ENERAL
2.44
Parcial
0.84
0.62
0.87
2.33
0.12
0.12
DESVIACIONES
1,844.05
Parcial
79.20
284.93
364.13
369.00
508.50
406.80
184.70
1,469.00
10.92
10.92
VEL DE SUBRASANTE
15.12
Parcial
0.14
1.13
2.04
0.72
4.02
0.12
10.97
11.09
ASANTE
3.92
Parcial
0.17
0.25
0.06
0.47
0.01
0.82
0.10
1.23
1.29
3.45
CON VOLQUETE 15 M3
22.23
Parcial
1.48
1.10
2.58
0.08
7.75
11.82
19.65
0.20 M.
14.90
Parcial
0.15
0.12
0.33
0.08
0.67
10.50
10.50
0.02
0.88
0.10
1.32
1.40
3.73
NTO= 750 M3/DIA
3.90
Parcial
0.21
0.16
0.37
0.01
3.31
0.21
3.53
0M
11.28
Parcial
0.12
0.10
0.27
0.06
0.56
7.69
7.69
0.02
0.74
1.11
1.17
3.03
O DE LOSAS
37.08
Parcial
5.51
4.53
4.07
1.15
15.26
0.66
17.22
2.98
0.51
21.37
0.46
0.46
M2
5.16
Parcial
0.71
0.59
0.15
1.30
2.68
0.12
1.02
3.82
0.04
0.04
E CONCRETO
6.50
Parcial
0.59
0.48
0.12
1.07
2.55
0.12
2.55
0.17
5.39
0.03
0.03
Parcial
0.36
3.48
11.44
2.57
17.86
236.25
30.00
6.00
272.25
3.64
0.54
4.17
CRETO
2.66
Parcial
0.53
0.07
0.60
2.00
2.00
0.06
0.06
S
4.83
Parcial
1.05
0.00
1.05
0.17
2.71
0.79
3.67
0.11
0.11
5.00-10.00 M
142.63
Parcial
22.97
16.96
6.00
45.93
60.00
5.00
29.40
94.40
2.30
2.30
Parcial
32.16
23.74
8.40
64.30
25.00
17.00
210.00
252.00
1.93
1.93
UAL
24.52
Parcial
21.12
2.69
23.81
0.71
0.71
NA DE CORTE
4.03
Parcial
0.14
0.23
0.07
0.45
0.01
0.85
0.10
1.27
1.34
3.58
DE VEREDA
31.93
Parcial
3.70
27.31
31.00
0.93
0.93
REDAS
10.01
Parcial
1.07
2.64
0.56
4.27
4.88
0.07
4.94
0.13
0.67
0.79
75 KG/CM2
316.96
Parcial
19.30
15.84
56.99
1.51
9.65
103.28
17.06
30.21
144.00
1.64
0.17
0.10
0.21
1.08
194.47
12.00
7.20
0.01
19.21
5.89
Parcial
A
27.77
Parcial
3.22
23.74
26.96
0.81
0.81
ZCLA 1:10
25.14
Parcial
1.93
11.40
0.40
1.93
15.66
2.80
3.34
0.36
0.04
0.02
0.05
6.61
2.40
0.47
2.87
RRENO
4.92
Parcial
1.93
2.85
4.78
0.14
0.14
E CHACRA E=20 CM
11.86
Parcial
1.93
5.70
7.63
4.00
4.00
0.23
0.23
o y colocacion)
6.72
Parcial
1.93
0.71
2.64
4.00
4.00
0.08
0.08
ES
43.56
Parcial
3.39
3.39
40.00
40.00
0.17
0.17
NAL
16.57
Parcial
7.40
2.73
10.13
0.07
0.57
5.50
6.14
0.30
0.30
UA E=0.10 m
11.48
Parcial
6.16
4.55
10.71
0.06
0.39
0.44
0.32
0.32
OLOS
30.53
Parcial
7.40
16.38
23.78
0.10
0.43
5.50
6.03
0.71
0.71
381.02
Parcial
16.08
23.74
6.72
39.82
340.00
340.00
1.19
1.19
NEL
4.27
Parcial
0.96
0.71
1.68
0.05
0.29
2.20
2.54
0.05
0.05
VIDUAL
107.30
Parcial
0.00
0.00
0.00
3.00
5.00
1.25
1.25
4.00
32.80
5.00
55.00
107.30
0.00
0.00
ECTIVA
2,886.99
Parcial
160.80
237.44
398.24
738.00
350.00
250.00
250.00
150.00
738.80
2,476.80
11.95
11.95
E LA EJECUCION
736.68
Parcial
Parcial
160.80
118.72
279.52
1,239.00
1,180.00
885.00
600.00
247.80
750.00
637.20
1,062.00
389.40
14.16
100.00
100.00
6,000.00
13,204.56
8.39
8.39
E
1,801.18
Parcial
107.20
39.57
146.77
1,650.00
1,650.00
4.40
4.40
ASURA
273.63
Parcial
40.20
11.87
52.07
220.00
220.00
1.56
1.56
UEL.H=1.40 M.
33.32
Parcial
3.86
28.49
32.35
0.97
0.97
ANCLADO
11.11
Parcial
1.29
9.50
10.78
0.32
0.32
ROPIO P/ NIVELACIÓN
17.36
Parcial
0.48
7.12
4.82
12.43
0.37
4.56
4.93
Parcial
5.51
8.14
5.51
19.17
11.00
11.00
0.96
5.21
6.17
LADO
33.18
Parcial
0.51
4.77
1.89
13.64
2.39
23.20
2.80
3.15
0.36
0.04
0.02
0.05
6.42
2.40
1.16
3.56
F´c=80 Kg/cm2)
35.36
Parcial
0.46
4.34
7.75
2.17
14.72
5.20
11.62
0.33
0.03
0.02
0.21
0.09
17.50
2.40
0.74
3.14
TRA TERRENO
331.75
Parcial
2.43
22.73
8.99
64.94
11.37
110.45
26.50
29.15
156.40
1.64
0.17
0.10
0.21
1.08
215.25
2.40
3.64
0.01
6.04
M2 PARA ZAPATAS
285.88
Parcial
0.78
3.67
10.49
3.67
18.62
231.00
30.00
1.70
262.70
3.64
0.93
4.57
APATAS
5.59
Parcial
0.20
0.95
0.68
1.84
2.68
0.12
0.90
3.70
0.06
0.06
A CIMIENTOS DE MUROS
287.52
Parcial
0.73
6.82
9.74
3.41
20.70
231.00
30.00
1.70
262.70
3.09
1.03
4.13
RA MUROS ARMADOS
305.64
Parcial
1.70
7.96
22.73
7.96
40.34
231.00
30.00
261.00
3.09
1.21
4.30
RA MUROS ARMADOS
332.70
Parcial
1.70
7.96
22.73
7.96
40.34
257.25
30.00
287.25
3.09
2.02
5.11
M2 PARA `PLACAS
306.10
Parcial
0.85
7.96
22.73
7.96
39.49
231.00
30.00
261.00
3.64
1.97
5.61
2 PARA COLUMNAS
305.31
Parcial
0.85
7.96
22.73
7.96
39.49
231.00
30.00
261.00
3.64
1.18
4.82
M2 PARA VIGAS
284.97
Parcial
0.42
3.98
11.36
3.98
19.74
231.00
30.00
261.00
3.64
0.59
4.23
Parcial
0.42
3.98
11.36
3.98
19.74
231.00
30.00
6.00
267.00
3.64
0.59
4.23
RA LOSAS ALIGERADAS
295.07
Parcial
0.42
7.96
11.36
3.98
23.72
231.00
30.00
6.00
267.00
3.64
0.71
4.35
5X30X30 CM
2.76
Parcial
0.01
0.14
0.78
0.93
1.80
1.80
0.03
0.03
PARA ESCALERAS
313.50
Parcial
0.85
15.91
22.73
7.96
47.44
231.00
30.00
261.00
3.64
1.42
5.06
ERNAS SUBTERRANEAS
313.50
Parcial
0.85
15.91
22.73
7.96
47.44
231.00
30.00
261.00
3.64
1.42
5.06
MUROS Y TABIQUERIA
Mano de Obra
CAPATAZ HH 0.10 0.0229 24.50
OPERARIO HH 5.00 1.1429 22.95
PEON HH 1.00 0.2286 16.39
OPERADOR EQUIPO hh 1.00 0.2286 22.95
Materiales
BLOQUETA KING BLOCK 9X19X39 UND 12.7000 1.10
CLAVOS DE 2 A 4" KG 0.0250 6.00
ARENA FINA M3 0.0200 47.00
ARENA GRUESA M3 0.0300 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.2500 17.00
REGLA DE ALUMINIO PZA 0.0250 30.00
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.5000 3.20
SIKADUR 32 KG 0.1500 48.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 35.78
ANDAMIO METALICO HM 0.50 0.1143 3.50
DISCO DE CORTE DIAMANTADO PZA 1.00 0.0750 115.00
Mano de Obra
CAPATAZ HH 0.10 0.0267 24.50
OPERARIO HH 5.00 1.3333 22.95
PEON HH 1.00 0.2667 16.39
OPERADOR EQUIPO hh 1.00 0.2667 22.95
Materiales
BLOQUETA KING BLOCK 14X19X39 UND 12.7000 2.00
CLAVOS DE 2 A 4" KG 0.0250 6.00
ARENA FINA M3 0.0200 47.00
ARENA GRUESA M3 0.0650 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.6000 17.00
REGLA DE ALUMINIO PZA 0.0250 30.00
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.5000 3.20
SIKADUR 32 KG 0.1500 48.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 41.74
ANDAMIO METALICO HM 0.50 0.1333 3.50
DISCO DE CORTE DIAMANTADO PZA 1.00 0.0500 115.00
Mano de Obra
OPERARIO hh 1.0000 1.3333 22.95
PEON hh 0.5000 0.6667 16.39
Materiales
ARENA GRUESA m3 0.0106 50.00
PIEDRA CHANCADA DE 1/2" - 3/4" Huso 67 m3 0.0106 55.00
CEMENTO PORTLAND TIPO I (BLS.:42.5 kg) bls 0.1840 17.00
GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0027 12.00
REGLA DE MADERA p2 0.0012 3.50
AGUA m3 0.0036 6.02
ENCOFRADO Und 1.0000 20.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 41.53
Partida TARRAJEO MURO y COLUMNA INTERIOR FROTACHADO C/MORTERO 1:5 C:A E=1.5CM
Rendimiento 14.00 M2/DIA
Mano de Obra
CAPATAZ HH 0.10 0.0571 24.50
OPERARIO HH 1.00 0.5714 22.95
PEON HH 0.33 0.1886 16.39
Materiales
CLAVOS DE 2 A 4" KG 0.0250 6.00
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.1500 17.00
REGLA DE ALUMINIO PZA 0.0250 30.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 17.60
ANDAMIO METALICO HM 0.50 0.2857 3.50
Mano de Obra
CAPATAZ HH 0.10 0.0667 24.50
OPERARIO HH 1.00 0.6667 22.95
PEON HH 0.33 0.2200 16.39
Materiales
CLAVOS DE 2 A 4" KG 0.0250 6.00
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.1500 17.00
REGLA DE ALUMINIO PZA 0.0250 30.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 20.54
ANDAMIO METALICO HM 0.75 0.5000 3.50
Mano de Obra
OPERARIO HH 1.00 0.2286 22.95
PEON HH 0.30 0.0686 16.39
Materiales
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.0550 17.00
MADERA PARA REGLAS P2 0.6000 2.90
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 6.37
AMOLADORA hm 1.0000 0.0750 10.00
DISCO DE COPA Und 1.0000 0.0750 15.00
Materiales
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.0550 17.00
MADERA PARA REGLAS P2 0.6000 2.90
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 8.92
AMOLADORA hm 1.0000 0.0750 10.00
DISCO DE COPA Und 1.0000 0.0750 15.00
Mano de Obra
CAPATAZ HH 0.10 0.0533 24.50
OPERARIO HH 1.00 0.5333 22.95
PEON HH 0.30 0.1600 16.39
Materiales
CLAVOS DE 2 A 4" KG 0.0220 6.00
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.1200 17.00
ADITIVO IMPERMEABILIZANTE GLN 0.0850 24.00
REGLA DE ALUMINIO PZA 0.0250 30.00
Equipos
HERRAMIENTAS MANUALES %MO 5.0000 16.17
Mano de Obra
CAPATAZ HH 0.10 0.0667 24.50
OPERARIO HH 1.00 0.6667 22.95
PEON HH 0.30 0.2000 16.39
Materiales
CLAVOS DE 2 A 4" KG 0.0250 6.00
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.1500 17.00
REGLA DE ALUMINIO PZA 0.0250 30.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 20.21
ANDAMIO METALICO HM 0.35 0.2333 8.00
Mano de Obra
CAPATAZ HH 0.10 0.0800 24.50
OPERARIO HH 1.00 0.8000 22.95
PEON HH 0.30 0.2400 16.39
Materiales
CLAVOS DE 2 A 4" KG 0.0250 6.00
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.1500 17.00
REGLA DE ALUMINIO PZA 0.0250 30.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 24.25
ANDAMIO METALICO HM 0.35 0.2800 8.00
Mano de Obra
CAPATAZ HH 0.10 0.0800 24.50
OPERARIO HH 1.00 0.8000 22.95
PEON HH 0.30 0.2400 16.39
Materiales
CLAVOS DE 2 A 4" KG 0.0250 6.00
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.1500 17.00
REGLA DE ALUMINIO PZA 0.0250 30.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 24.25
ANDAMIO METALICO HM 0.35 0.2800 8.00
Mano de Obra
OPERARIO HH 1.00 0.4000 24.50
PEON HH 0.30 0.1200 16.39
Materiales
ARENA FINA M3 0.0160 47.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.0550 17.00
MADERA PARA REGLAS P2 0.6000 2.90
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 11.77
AMOLADORA hm 1.0000 0.0750 10.00
DISCO DE COPA Und 1.0000 0.0750 15.00
PISOS Y CONTRAPISOS
Mano de Obra
CAPATAZ HH 0.50 0.0400 20.63
OPERARIO HH 3.00 0.2400 17.19
OFICIAL HH 1.00 0.0800 14.57
PEON HH 6.00 0.4800 13.12
Materiales
ARENA FINA M3 0.0090 47.00
ARENA GRUESA M3 0.0600 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.4000 17.00
GASOLINA 84 OCTANOS GLN 0.0300 12.00
REGLA DE MADERA P2 0.0600 4.05
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 12.41
MEZCLADORA DE CONCRETO DE 11 P3-18 HP HM 1.00 0.1000 25.00
Mano de Obra
CAPATAZ HH 0.30 0.1600 20.63
OPERARIO HH 1.00 0.5333 17.19
PEON HH 1.00 0.5333 16.39
Materiales
ARENA FINA M3 0.0090 47.00
ARENA GRUESA M3 0.0600 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.5500 17.00
GASOLINA 84 OCTANOS GLN 0.0300 12.00
REGLA DE MADERA P2 0.0600 4.05
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 21.21
MEZCLADORA DE CONCRETO DE 11 P3-18 HP HM 1.00 0.1500 25.00
Mano de Obra
CAPATAZ HH 0.30 0.1200 24.50
OPERARIO HH 1.00 0.4000 22.95
PEON HH 1.00 0.4000 16.39
Materiales
ARENA FINA M3 0.0090 47.00
ARENA GRUESA M3 0.0600 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.5000 17.00
GASOLINA 84 OCTANOS GLN 0.0300 12.00
REGLA DE MADERA P2 0.0600 4.05
ADITIVO IMPERMEABILIZANTE GLN 0.1500 24.00
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 18.68
MEZCLADORA DE CONCRETO DE 11 P3-18 HP HM 1.00 0.1500 25.00
Mano de Obra
CAPATAZ HH 0.10 0.0400 24.50
OPERARIO HH 1.00 0.4000 22.95
PEON HH 0.50 0.2000 16.39
Materiales
ARENA FINA M3 0.0013 47.00
ARENA GRUESA M3 0.0950 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.7500 17.00
GASOLINA 84 OCTANOS GLN 0.0300 12.00
REGLA DE MADERA P2 0.0600 4.05
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 13.44
MEZCLADORA DE CONCRETO DE 11 P3-18 HP HM 1.00 0.1000 25.00
REVESTIMIENTO DE GRADAS DE E
Mano de Obra
CAPATAZ HH 0.10 0.0800 24.50
OPERARIO HH 1.00 0.8000 22.95
PEON HH 0.33 0.2640 16.39
Materiales
ARENA FINA M3 0.0140 47.00
ARENA GRUESA M3 0.0300 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.0350 17.00
GASOLINA 84 OCTANOS GLN 0.0300 12.00
REGLA DE MADERA P2 0.0600 4.05
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 24.65
MEZCLADORA DE CONCRETO DE 11 P3-18 HP HM 1.00 0.0750 25.00
Mano de Obra
CAPATAZ HH 0.30 0.1200 24.50
OPERARIO HH 1.00 0.4000 22.95
PEON HH 1.00 0.4000 16.39
Materiales
ARENA FINA M3 0.0090 47.00
ARENA GRUESA M3 0.0600 50.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.5500 17.00
GASOLINA 84 OCTANOS GLN 0.0300 12.00
REGLA DE MADERA P2 0.0600 4.05
Equipos
HERRAMIENTAS MANUALES %MO 3.0000 18.68
MEZCLADORA DE CONCRETO DE 11 P3-18 HP HM 1.00 0.1500 25.00
MUROS Y TABIQUERIA
Mano de Obra
0.56 CAPATAZ HH 0.10 0.0274 24.50
26.23 OPERARIO HH 5.00 1.3714 22.95
3.75 PEON HH 1.00 0.2743 16.39
5.25 OPERADOR EQUIPO HH 1.00 0.2743 22.95
35.78
Materiales
13.97 BLOQUETA KING BLOCK 9X19X39 HH 12.7000 1.10
0.15 CLAVOS DE 2 A 4" HH 0.0250 6.00
0.94 ARENA FINA HH 0.0200 47.00
1.50 ARENA GRUESA HH 0.0300 50.00
4.25 CEMENTO PORTLAND TIPO I (42.5KG) HH 0.2500 17.00
0.75 REGLA DE ALUMINIO HH 0.0250 30.00
1.60 ACERO CORRUGADO fy=4200 kg/cm2 GRADO HH 0.5000 3.20
7.20 SIKADUR 32 HH 0.1500 48.00
30.36
Equipos
1.07 HERRAMIENTAS MANUALES HH 3.0000 42.94
0.40 ANDAMIO METALICO HH 0.50 0.1143 3.50
8.63 DISCO DE CORTE DIAMANTADO HH 1.00 0.0750 115.00
10.10
Mano de Obra
0.65 CAPATAZ HH 0.10 0.0320 24.50
30.60 OPERARIO HH 5.00 1.6000 22.95
4.37 PEON HH 1.00 0.3200 16.39
6.12 OPERADOR EQUIPO HH 1.00 0.3200 22.95
41.74
Materiales
25.40 BLOQUETA KING BLOCK 14X19X39 HH 12.7000 2.00
0.15 CLAVOS DE 2 A 4" HH 0.0250 6.00
0.94 ARENA FINA HH 0.0200 47.00
3.25 ARENA GRUESA HH 0.0650 50.00
10.20 CEMENTO PORTLAND TIPO I (42.5KG) HH 0.6000 17.00
0.75 REGLA DE ALUMINIO HH 0.0250 30.00
1.60 ACERO CORRUGADO fy=4200 kg/cm2 GRADO HH 0.5000 3.20
7.20 SIKADUR 32 HH 0.1500 48.00
49.49
Equipos
1.25 HERRAMIENTAS MANUALES HH 3.0000 50.09
0.47 ANDAMIO METALICO HH 0.50 0.1333 3.50
5.75 DISCO DE CORTE DIAMANTADO HH 1.00 0.0500 115.00
7.47
Mano de Obra
30.60 OPERARIO hh 1.0000 1.6000 22.95
10.93 PEON hh 0.5000 0.8000 16.39
41.53
Materiales
0.53 ARENA GRUESA m3 0.0106 50.00
0.58 PIEDRA CHANCADA DE 1/2" - 3/4" Huso 6 m3 0.0106 55.00
3.13 CEMENTO PORTLAND TIPO I (BLS.:42.5 k bls 0.1840 17.00
0.03 GASOLINA 84 OCTANOS (GRIFO LIMA) gal 0.0027 12.00
0.00 REGLA DE MADERA p2 0.0012 3.50
0.02 AGUA m3 0.0036 6.02
20.00 AGUA m3 1.0000 20.00
24.30
Equipos
1.25 HERRAMIENTAS MANUALES %MO 3.0000 49.83
1.25
1:5 C:A E=1.5CM partida TARRAJEO MURO y COLUMNA INTERIOR FROTACHADO C/MORTERO 1:5 C:A E=1.5CM
23.34 Rendimient 11.67 M2/DIA Costo unitario directo por : M2
Mano de Obra
1.40 CAPATAZ HH 0.1000 0.0686 24.50
13.11 OPERARIO HH 1.0000 0.6857 22.95
3.09 PEON hh 0.3300 0.2263 16.39
17.60
Materiales
0.15 CLAVOS DE 2 A 4" KG 0.0250 6.00
0.75 ARENA FINA M3 0.0160 47.00
2.55 CEMENTO PORTLAND TIPO I (42.5KG BOL 0.1500 17.00
0.75 REGLA DE ALUMINIO PZA 0.0250 30.00
4.20
Equipos
0.53 HERRAMIENTAS MANUALES %MO 5.0000 21.13
1.00 ANDAMIO METALICO HM 0.0000 0.0000 19.00
1.53
A E=1.5CM partida TARRAJEO MURO EXTERIOR FROTACHADO C/MORTERO 1:5 C:A E=1.5CM
27.11 Rendimient 10.00 M2/DIA Costo unitario directo por : M2
Mano de Obra
1.63 CAPATAZ HH 0.1000 0.0800 24.50
15.30 OPERARIO HH 1.0000 0.8000 22.95
3.61 PEON HH 0.3300 0.2640 16.39
20.54
Materiales
0.15 CLAVOS DE 2 A 4" KG 0.0250 6.00
0.75 ARENA FINA M3 0.0160 47.00
2.55 CEMENTO PORTLAND TIPO I (42.5KG BOL 0.1500 17.00
0.75 REGLA DE ALUMINIO PZA 0.0250 30.00
4.20
Equipos
0.62 HERRAMIENTAS MANUALES %MO 3.0000 24.65
1.75 ANDAMIO METALICO HM 0.7500 0.6000 19.00
2.37
Mano de Obra
5.25 OPERARIO HH 1.0000 0.2743 22.95
1.12 PEON HH 0.3000 0.0823 16.39
6.37
Materiales
0.75 ARENA FINA M3 0.0160 47.00
0.94 CEMENTO PORTLAND TIPO I (42.5KG BOL 0.0550 17.00
1.74 MADERA PARA REGLAS P2 0.6000 2.90
3.43
Equipos
0.19 HERRAMIENTAS MANUALES %MO 3.0000 7.64
0.75 AMOLADORA hm 1.0000 0.0750 10.00
1.13 DISCO DE COPA Und 1.0000 0.0750 15.00
2.07
DO- EXTERIORES Partida TARRAJEO CON IMPERMEABILIZANTE , ACABADO EN CEMENTO PULIDO- EXTERIORES
22.69 Rendimiento 12.50 M2/DIA Costo unitario directo por : M2
Mano de Obra
1.31 CAPATAZ HH 0.1000 0.0640 24.50
12.24 OPERARIO HH 1.0000 0.6400 22.95
2.62 PEON HH 0.3000 0.1920 16.39
16.17
Materiales
0.13 CLAVOS DE 2 A 4" KG 0.0220 6.00
0.75 ARENA FINA M3 0.0160 47.00
2.04 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.1200 17.00
2.04 ADITIVO IMPERMEABILIZANTE GLN 0.0850 24.00
0.75 REGLA DE ALUMINIO PZA 0.0250 30.00
5.71
Equipos
0.81 HERRAMIENTAS MANUALES %MO 5.0000 19.40
0.81
5CM partida TARRAJEO MURO CIELO TRASO C/MORTERO 1:5 C:A E=1.5CM
26.89 Rendimient 10.00 M2/DIA Costo unitario directo por : M2
Mano de Obra
1.63 CAPATAZ HH 0.1000 0.0800 24.50
15.30 OPERARIO HH 1.0000 0.8000 22.95
3.28 PEON HH 0.3000 0.2400 16.39
20.21
Materiales
0.15 CLAVOS DE 2 A 4" KG 0.0250 6.00
0.75 ARENA FINA M3 0.0160 47.00
2.55 CEMENTO PORTLAND TIPO I (42.5KG BOL 0.1500 17.00
0.75 REGLA DE ALUMINIO PZA 0.0250 30.00
4.20
Equipos
0.61 HERRAMIENTAS MANUALES %MO 3.0000 24.25
1.87 ANDAMIO METALICO HM 0.3500 0.2800 8.00
2.47
Mano de Obra
1.96 CAPATAZ HH 0.1000 0.0960 24.50
18.36 OPERARIO HH 1.0000 0.9600 22.95
3.93 PEON HH 0.3000 0.2880 16.39
24.25
Materiales
0.15 CLAVOS DE 2 A 4" KG 0.0250 6.00
0.75 ARENA FINA M3 0.0160 47.00
2.55 CEMENTO PORTLAND TIPO I (42.5KG BOL 0.1500 17.00
0.75 REGLA DE ALUMINIO PZA 0.0250 30.00
4.20
Equipos
0.73 HERRAMIENTAS MANUALES %MO 3.0000 29.10
2.24 ANDAMIO METALICO HM 0.3500 0.3360 8.00
2.97
Mano de Obra
1.96 CAPATAZ HH 0.1000 0.0960 24.50
18.36 OPERARIO HH 1.0000 0.9600 22.95
3.93 PEON HH 0.3000 0.2880 16.39
24.25
Materiales
0.15 CLAVOS DE 2 A 4" KG 0.0250 6.00
0.75 ARENA FINA M3 0.0160 47.00
2.55 CEMENTO PORTLAND TIPO I (42.5KG BOL 0.1500 17.00
0.75 REGLA DE ALUMINIO PZA 0.0250 30.00
4.20
Equipos
0.73 HERRAMIENTAS MANUALES %MO 3.0000 29.10
2.24 ANDAMIO METALICO HM 0.3500 0.3360 8.00
2.97
Mano de Obra
9.80 OPERARIO HH 1.0000 0.4800 24.50
1.97 PEON HH 0.3000 0.1440 16.39
11.77
Materiales
0.75 ARENA FINA M3 0.0160 47.00
0.94 CEMENTO PORTLAND TIPO I (42.5KG BOL 0.0550 17.00
1.74 MADERA PARA REGLAS P2 0.6000 2.90
3.43
Equipos
0.35 HERRAMIENTAS MANUALES %MO 3.0000 14.12
0.75 AMOLADORA hm 1.0000 0.0750 10.00
1.13 DISCO DE COPA Und 1.0000 0.0750 15.00
2.23
PISOS Y CONTRAPISOS
Mano de Obra
0.83 CAPATAZ HH 0.50 0.0480 20.63
4.13 OPERARIO HH 3.00 0.2880 17.19
1.17 OFICIAL HH 1.00 0.0960 14.57
6.30 PEON HH 6.00 0.5760 13.12
12.41 0
Materiales
0.42 ARENA FINA M3 0.0090 47.00
3.00 ARENA GRUESA M3 0.0600 50.00
6.80 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.4000 17.00
0.36 GASOLINA 84 OCTANOS GLN 0.0300 12.00
0.24 REGLA DE MADERA P2 0.0600 4.05
10.83 0
Equipos
0.37 HERRAMIENTAS MANUALES %MO 3.0000 12.41
2.50 MEZCLADORA DE CONCRETO DE 11 P3-18 H HM 1.00 0.1000 25.00
2.87 0
MEZCLA 1:4 partida PISOS DE CEMENTO PULIDO BRUÑADO@ 10 CM EN RAMPAS E=2" MEZCLA 1:4
38.97 Rendimient 12.50 M2/DIA Costo unitario directo por : M2
Mano de Obra
3.30 CAPATAZ HH 0.30 0.1920 20.63
9.17 OPERARIO HH 1.00 0.6400 17.19
8.74 PEON HH 1.00 0.6400 16.39
21.21 0
Materiales
0.42 ARENA FINA M3 0.0090 47.00
3.00 ARENA GRUESA M3 0.0600 50.00
9.35 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.5500 17.00
0.36 GASOLINA 84 OCTANOS GLN 0.0300 12.00
0.24 REGLA DE MADERA P2 0.0600 4.05
13.38 0
Equipos
0.64 HERRAMIENTAS MANUALES %MO 3.0000 21.21
3.75 MEZCLADORA DE CONCRETO DE 11 P3-18 H HM 1.00 0.1500 25.00
4.39 0
Mano de Obra
2.94 CAPATAZ HH 0.30 0.1440 24.50
9.18 OPERARIO HH 1.00 0.4800 22.95
6.56 PEON HH 1.00 0.4800 16.39
18.68 0
Materiales
0.42 ARENA FINA M3 0.0090 47.00
3.00 ARENA GRUESA M3 0.0600 50.00
8.50 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.5000 17.00
0.36 GASOLINA 84 OCTANOS GLN 0.0300 12.00
0.24 REGLA DE MADERA P2 0.0600 4.05
3.60 ADITIVO IMPERMEABILIZANTE GLN 0.1500 24.00
16.13 0
Equipos
0.56 HERRAMIENTAS MANUALES %MO 3.0000 18.68
3.75 MEZCLADORA DE CONCRETO DE 11 P3-18 H HM 1.00 0.1500 25.00
4.31 0
Mano de Obra
0.98 CAPATAZ HH 0.10 0.0480 24.50
9.18 OPERARIO HH 1.00 0.4800 22.95
3.28 PEON HH 0.50 0.2400 16.39
13.44 0
Materiales
0.06 ARENA FINA M3 0.0013 47.00
4.75 ARENA GRUESA M3 0.0950 50.00
12.75 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.7500 17.00
0.36 GASOLINA 84 OCTANOS GLN 0.0300 12.00
0.24 REGLA DE MADERA P2 0.0600 4.05
18.16 0
Equipos
0.40 HERRAMIENTAS MANUALES %MO 3.0000 13.44
2.50 MEZCLADORA DE CONCRETO DE 11 P3-18 H HM 1.00 0.1000 25.00
2.90 0
REVESTIMIENTO DE GRADAS DE ESCALERA
" MEZCLA 1:4 partida RECUBRIMIENTO DE PASOS Y CONTRAPASOS C/CEM. PULIDO E=2" MEZCLA 1:4
30.62 Rendimient 8.33 ML/DIA Costo unitario directo por : M2
Mano de Obra
1.96 CAPATAZ HH 0.10 0.0960 24.50
18.36 OPERARIO HH 1.00 0.9600 22.95
4.33 PEON HH 0.33 0.3168 16.39
24.65 0
Materiales
0.66 ARENA FINA M3 0.0140 47.00
1.50 ARENA GRUESA M3 0.0300 50.00
0.60 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.0350 17.00
0.36 GASOLINA 84 OCTANOS GLN 0.0300 12.00
0.24 REGLA DE MADERA P2 0.0600 4.05
3.36 0
Equipos
0.74 HERRAMIENTAS MANUALES %MO 3.0000 24.65
1.88 MEZCLADORA DE CONCRETO DE 11 P3-18 H HM 1.00 0.0750 25.00
2.61 0
EZCLA 1:2 partida REVESTIMIENTO DE DESCANSO EN CEMENTO PULIDO E=2" MEZCLA 1:2
36.36 Rendimient 16.67 M2/DIA Costo unitario directo por : M2
Mano de Obra
2.94 CAPATAZ HH 0.30 0.1440 24.50
9.18 OPERARIO HH 1.00 0.4800 22.95
6.56 PEON HH 1.00 0.4800 16.39
18.68 0
Materiales
0.42 ARENA FINA M3 0.0090 47.00
3.00 ARENA GRUESA M3 0.0600 50.00
9.35 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.5500 17.00
0.36 GASOLINA 84 OCTANOS GLN 0.0300 12.00
0.24 REGLA DE MADERA P2 0.0600 4.05
13.38 0
Equipos
0.56 HERRAMIENTAS MANUALES %MO 3.0000 18.68
3.75 MEZCLADORA DE CONCRETO DE 11 P3-18 H HM 1.00 0.1500 25.00
4.31 0
CAPATAZ 24.5
OPERARIO 22.95
PEON 16.39
OFICIAL 18.16
OLAQUEADO
83.61
Parcial
0.67
31.47
4.50
6.29
42.94
13.97
0.15
0.94
1.50
4.25
0.75
1.60
7.20
30.36
1.29
0.40 RESUMEN : para 1.00 m2 de muro
8.63 de ladrillo 0.09 x 0.19 x 0.39
10.31 Cemento/m3 0.19 bls 0.21
arena gruesa 0.02 m3 0.03
SOLAQUEADO acero H/V 3.26 ml 3.59
107.30 Ladrillo king b 12.50 und 13.75
Parcial
0.78
36.72
5.24
7.34
50.09 RESUMEN : para 1.00 m2 de muro
de ladrillo 0.14 x 0.19 x 0.39
25.40 Cemento/m3 0.48 bls 0.52
0.15 arena gruesa 0.06 m3 0.06
0.94 acero H/V 3.26 ml 3.59
3.25 Ladrillo king b 12.50 und 13.75
10.20
0.75
1.60
7.20
49.49
1.50
0.47
5.75
7.72
75.63
Parcial
36.72
13.11
49.83
0.53
0.58
3.13
0.03
0.00
0.02
20.00
24.30
1.49
1.49
Parcial
1.68
15.74
3.71
21.13
0.15
0.75
2.55
0.75
4.20
1.06
0.00
1.06
Parcial
1.96
18.36
4.33
24.65
0.15
0.75
2.55
0.75
4.20
0.74
11.40
12.14
DE CONCRETO
13.17
Parcial
6.29
1.35
7.64
0.75
0.94
1.74
3.43
0.23
0.75
1.13
2.10
S DE CONCRETO
16.32
Parcial
8.81
1.89
10.70
0.75
0.94
1.74
3.43
0.32
0.75
1.13
2.20
TO PULIDO- EXTERIORES
26.09
Parcial
1.57
14.69
3.15
19.40
0.13
0.75
2.04
2.04
0.75
5.71
0.97
0.97
C:A E=1.5CM
31.42
Parcial
1.96
18.36
3.93
24.25
0.15
0.75
2.55
0.75
4.20
0.73
2.24
2.97
Parcial
2.35
22.03
4.72
29.10
0.15
0.75
2.55
0.75
4.20
0.87
2.69
3.56
E=1.5CM
36.87
Parcial
2.35
22.03
4.72
29.10
0.15
0.75
2.55
0.75
4.20
0.87
2.69
3.56
E CONCRETO
19.85
Parcial
11.76
2.36
14.12
0.75
0.94
1.74
3.43
0.42
0.75
1.13
2.30
28.60
Parcial
0.99
4.95
1.40
7.56
14.90
0.42
3.00
6.80
0.36
0.24
10.83
0.37
2.50
2.87
Parcial
3.96
11.00
10.49
25.45
0.42
3.00
9.35
0.36
0.24
13.38
0.64
3.75
4.39
EABILIZADO
42.85
Parcial
3.53
11.02
7.87
22.41
0.42
3.00
8.50
0.36
0.24
3.60
16.13
0.56
3.75
4.31
ERA
37.19
Parcial
1.18
11.02
3.93
16.13
0.06
4.75
12.75
0.36
0.24
18.16
0.40
2.50
2.90
LIDO E=2" MEZCLA 1:4
35.55
Parcial
2.35
22.03
5.19
29.58
0.66
1.50
0.60
0.36
0.24
3.36
0.74
1.88
2.61
Parcial
3.53
11.02
7.87
22.41
0.42
3.00
9.35
0.36
0.24
13.38
0.56
3.75
4.31
PRESUPUESTO DE OBRA
UBICACIÓN Distrito
Provincia
Item Descripción Parcial (S/.)
01 PAVIMENTO RIGIDO 3,229,727.49
02 VEREDAS DE CONCRETO 1,142,373.05
03 OBRAS DE ARTE Y DRENAJE 253,798.24
05 SEÑALIZACION Y SEGURIDAD VIAL 97,743.57
06 SEGURIDAD Y SALUD 54,289.65
07 MITIGACION AMBIENTAL 41,100.00
08 MONITOREO ARQUEOLOGICO 3,000.00
09 VARIOS 27,136.66
10 FLETE 6,550.00
TOTAL COSTO DIRECTO 4,954,525.45
GASTOS GENERALES 8% 384,140.98
UTILIDAD 7% 346,816.78
SUB TOTAL 5,685,483.21
IGV 1,023,386.98
TOTAL PRESUPUESTO 6,708,870.19
SUPERVISION 149,238.16
PRESUPUESTO TOTAL 6,858,108.35
PRESUPUESTO DE OBRA
UBICACIÓN Distrito
Provincia
Item Descripción
01 PAVIMENTO RIGIDO
02 VEREDAS DE CONCRETO
03 OBRAS DE ARTE Y DRENAJE
05 SEÑALIZACION Y SEGURIDAD VIAL
06 SEGURIDAD Y SALUD
07 MITIGACION AMBIENTAL
08 MONITOREO ARQUEOLOGICO
09 VARIOS
10 FLETE
TOTAL COSTO DIRECTO
GASTOS GENERALES 8%
UTILIDAD 7%
SUB TOTAL
IGV
TOTAL PRESUPUESTO
SUPERVISION
PRESUPUESTO TOTAL
DISTRITO MAZAMARI -
Parcial (S/.)
3,229,727.49
1,142,373.05
253,798.24
97,743.57
54,289.65
41,100.00
3,000.00
27,136.66
6,550.00
4,855,718.66
388,457.49
339,900.31
5,584,076.46
1,005,133.76
6,589,210.22
149,238.16
6,738,448.38