ITEM DESCRIPCION/PARTIDA UND METRADO PRECIO PARCIAL 4 5 21 37 39 47 48 49

01.01 EXCAVACION HASTA NIVEL DE SUB RSANTE M2 12 4.47 53.64 2.52 51.12 53.64
01.02 PREPARACION DE SUB RASANTE CON PLANCHA COMP, M2 13 2.26 29.38 0.52 18.46 10.4 29.38
01.03 RELLENO CON MATERIAL PROPIO HASTA .30M M2 14 4.04 56.56 0.98 0 35.42 20.16 56.56
01.04 ELIMINACION DE MATERIAL EXCEDENTE M3 15 38.74 581.1 24.00 76.5 480.6 581.10
01.05 CONCRETO EN VEREDAS F'C=175KG/CM2 E=0.15 M2 16 34.62 553.92 28.48 29.12 333.92 5.28 4.96 104.16 24.00 24.00 553.92
COSTO DIRECTO 1274.60
GASTOS GENETRALES Y UTILIDAD (12%) 152.95 152.95
28.48 29.12 333.92 33.3 157.91 285.66 504.6 54.56
1.995 2.040 23.391 2.333 11.062 20.011 35.347 3.822
0.020 0.020 0.234 0.023 0.111 0.200 0.353 0.038
SUB TOTAL 1427.55
IGV (19%) 271.23 K= 0.200 Jr + 0.111 Gur
TOTAL PRESUPUESTO 1698.78 Jo Guo

8 liniohihñfgj
ANALISIS DE PRECIOS UNITARIOS bmkbxfx zsd
EXCAVACION HASTA NIVEL DE SUB RSANTE PRECIO 4.47
REND 13.33 M2/DIA UND M2 nvcbnsa
IU RECURSO UND CUAD CANT PRECIO PARCIAL
MANO DE OBRA
47 CAPATAZ HH 0.1 0.060 11.00 0.66 2.88
47 PEON HH 1 0.600 6.00 3.60
4.26
EQUIPO Y HERRAMIENTAS
37 HERRAMIENTAS MANUALES %MO 5.00 4.26 0.21
0.21

8 ANALISIS DE PRECIOS UNITARIOS


PREPARACION DE SUB RASANTE CON PLANCHA COMP, PRECIO 2.26
REND 120 M2/DIA UND M2
IU RECURSO UND CUAD CANT PRECIO PARCIAL 1.51
MANO DE OBRA 16
47 CAPATAZ HH 0.1 0.007 11.00 0.08 24.16
47 PEON HH 2 0.133 6.00 0.80
47 OFICIAL HH 1 0.067 8.00 0.54
1.42
EQUIPO Y HERRAMIENTAS
37 HERRAMIENTAS MANUALES %MO 5.00 0.80 0.04 960.03
49 PLANCHA COMPACTADORA HM 1 0.067 12.00 0.80 115.2036
0.84

8 ANALISIS DE PRECIOS UNITARIOS


RELLENO CON MATERIAL PROPIO HASTA .30M PRECIO 4.04
REND 66.67 M2/DIA UND M2
IU RECURSO UND CUAD CANT PRECIO PARCIAL
MANO DE OBRA
47 CAPATAZ HH 0.1 0.012 11.00 0.13
47 PEON HH 2 0.240 6.00 1.44
47 OFICIAL HH 1 0.120 8.00 0.96
2.53
MATERIALES
39 AGUA M3 0.000 10.00 0.00
0.00
EQUIPO Y HERRAMIENTAS
37 HERRAMIENTAS MANUALES %MO 5.00 1.44 0.07
49 PLANCHA COMPACTADORA HM 1 0.120 12.00 1.44
1.51

ANALISIS DE PRECIOS UNITARIOS


ELIMINACION DE MATERIAL EXCEDENTE PRECIO 38.74
8 REND 30 M3/DIA UND M2
IU RECURSO UND CUAD CANT PRECIO PARCIAL
MANO DE OBRA
47 CAPATAZ HH 0.1 0.027 11.00 0.30
47 PEON HH 3 0.800 6.00 4.80
5.10
EQUIPO Y HERRAMIENTAS
37 HERRAMIENTAS MANUALES %MAQ 5.00 32.04 1.6
48 CAMION VOLQUETE HM 1 0.267 120.00 32.04
33.64

ANALISIS DE PRECIOS UNITARIOS


CONCRETO EN VEREDAS F'C=175KG/CM2 E=0.15 PRECIO 34.62
8 REND 80 M2/DIA UND M2
IU RECURSO UND CUAD CANT PRECIO PARCIAL
MANO DE OBRA
47 CAPATAZ HH 0.1 0.010 11.00 0.11
47 PEON HH 9 0.900 6.00 5.40
47 OPERARIO HH 1 0.100 10.00 1.00
6.51
MATERIALES
04 ARENA GRUESA M3 0.089 20.00 1.78
05 PIEDRA CHANCADA M3 0.091 20.00 1.82
21 CEMENTO PORTLAND TIPO I BLS 1.391 15.00 20.87
39 AGUA M3 0.031 10.00 0.31
24.78

EQUIPO Y HERRAMIENTAS
37 HERRAMIENTAS MANUALES %MAQ 5.00 6.51 0.33
49 VIBRADOR DE CONCRETO HM 1 0.100 15.00 1.50
48 MAQUINA MEZCLADORA DE CONCRETO HM 1 0.100 15.00 1.50
3.33

8.43
0.15
1.1
1.39095