Mina Justa Project

DETAILED DESIGN - WBS


Marcobre Doc No. - TBC
Ausenco Doc No. - 101946-WBS-0001

PREPARED CHECKED APPROVED


REVISION DESCRIPTION
BY DATE BY DATE BY DATE
A Issued for Review MJW 4/5/2017
Project: Mina Justa
Client: Marcobre
Location: Peru
Rev C
Date : 17 October 2017
Desc: Definitive Estimate Phase
Doc No: 101946-WBS-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
2 2000 SULFIDE CONCENTRATOR / CONCENTRADORA DE SULFURO
21 2100 CRUSHING & CRUSHED ORE HANDLING / CHANCADO Y MANEJO DE MINERAL CHANCADO
212 2120 STOCKPILE AND RECLAIM / PILA DE ALMACENAMIENTO Y RECUPERACIÓN
213 2130 SECONDARY CRUSHING CIRCUIT / CIRCUITO DE CHANCADO SECUNDARIO
214 2140 TERTIARY CRUSHING CIRCUIT / CIRCUITO DE CHANCADO TERCIARIO
215 2150 _SPARE_
216 2160 _SPARE_
217 2170 _SPARE_
218 2180 _SPARE_
219 2190 _SPARE_
22 2200 CONCENTRATOR / CONCENTRADORA
221 2210 _SPARE_
222 2220 PRIMARY GRINDING / MOLIENDA PRIMARIA
224 2240 FLOTATION / FLOTACIÓN
225 2250 REGRINDING / REMOLIENDA
226 2260 CONCENTRATE THICKENING, STORAGE, FILTRATION, AND LOAD OUT / ESPESADO
227 2270 TAILINGS THICKENING AND PUMPING / ESPESADO Y BOMBEADO DE RELAVES
228 2280 REAGENTS / REACTIVOS
229 2290 _SPARE_
23 2300 CONCENTRATOR UTILITIES / SERVICIOS BÁSICOS DE CONCENTRADORA
231 2310 WATER SERVICES / SERVICIOS DE AGUA
232 2320 AIR SERVICES / SERVICIOS DE AGUA
237 2370 ELECTRICAL DISTRIBUTION & SUBSTATIONS / DISTRIBUCIÓN ELÉCTRICA Y SUBE
238 2380 PROCESS CONTROL SYSTEM / SISTEMA DE CONTROL DE PROCESOS
239 2390 COMMUNICATIONS, IT AND COMPUTING / COMUNICACIONES, TECNOLOGÍA INFOR
24 2400 CONCENTRATOR FACILITIES / INSTALACIONES DE CONCENTRADORA
241 2410 BUILDINGS / EDIFICIOS
243 2430 _SPARE_
244 2440 _SPARE_
245 2450 _SPARE_
25 2500 TAILINGS STORAGE FACILITY / INSTALACIONES DE ALMACENAMIENTO DE RELAVES
251 2510 TAILINGS STORAGE FACILITY (TSF) / INSTALACIONES DE ALMACENAMIENTO DE R
252 2520 TSF SEEPAGE MONITORING / MONITOREO DE FILTRACIÓN DE TSF
253 2530 TSF ACCESS ROADS / VÍAS DE ACCESO AL TSF
254 2540 _SPARE_
255 2550 _SPARE_
256 2560 _SPARE_
26 2600 _SPARE_
27 2700 _SPARE_
28 2800 _SPARE_
29 2900 CONCENTRATOR SITE EARTHWORKS AND DRAINAGE / MOVIMIENTO DE TIERRAS DE SITIO DE C
291 2910 SITE DEVELOPMENT / DESARROLLO DEL SITIO
292 2920 BULK EARTHWORKS / MOVIMIENTO DE TIERRAS MASIVO
293 2930 FILL AND TRIM SITE TO FINAL GRADE / RELLENO Y CORTE EN SITIO A NIVELACIÓN
294 2940 SITE DRAINS / DRENAJES EN SITIO
295 2950 INTERNAL PLANT SITE ROADS / VÍAS INTERNAS DE PLANTA EN SITIO
296 2960 _SPARE_
297 2970 _SPARE_
298 2980 _SPARE_
299 2990 _SPARE_
3 3000 OXIDE PLANT / PLANTA DE ÓXIDO
31 3100 CRUSHING & ORE HANDLING / CHANCADO Y MANEJO DE MINERAL
311 3110 PRIMARY CRUSHING / CHANCADO PRIMARIO
312 3120 STOCKPILE AND RECLAIM / PILA
313 3130 SECONDARY SCREENING & CRUSHING / ZARANDEO Y CHANCADO SECUNDARIO
314 3140 TERTIARY SCREENING AND CRUSHING / ZARANDEO Y CHANCADO TERCIARIOS
315 3150 _SPARE_
316 3160 FINE ORE PRODUCT / PRODUCTO DE MINERAL FINO
317 3170 _SPARE_
318 3180 _SPARE_
319 3190 _SPARE_
32 3200 PRE-TREATMENT, VATS AND PONDS / PRETRATAMIENTO, BATEAS Y POZAS
321 3210 PRE TREATMENT / PRETRATAMIENTO

432988949.xlsx 08/12/2019
Project: Mina Justa
Client: Marcobre
Location: Peru
Rev C
Date : 17 October 2017
Desc: Definitive Estimate Phase
Doc No: 101946-WBS-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
322 3220 VAT FEED / ALIMENTADOR DE BATEAS
323 3230 RIPIOS DISPOSAL / DISPOSICIÓN DE RIPIOS
324 3240 VATS / BATEAS
325 3250 PONDS / POZAS
326 3260 CLARIFICATION / CLARIFICACIÓN
33 3300 SX/EW PLANT / PLANTA DE EXTRACCIÓN SOLVENTE/ELECTRODEPOSICIÓN
331 3310 _SPARE_
332 3320 SOLVENT EXTRACTION / EXTRACCIÓN SOLVENTE
333 3330 ELECTROWINNING / ELECTRODEPOSICIÓN
334 3340 _SPARE_
335 3350 REAGENTS / REACTIVOS
336 3360 _SPARE_
337 3370 _SPARE_
338 3380 _SPARE_
339 3390 _SPARE_
34 3400 _SPARE_
35 3500 OXIDE PLANT UTILITIES / SERVICIOS BÁSICOS DE PLANTA DE ÓXIDO
351 3510 WATER SERVICES / SERVICIOS DE AGUA
352 3520 AIR SERVICES / SERVICIOS DE AIRE
355 3550 FIRE DETECTION AND PROTECTION / DETECCIÓN Y PROTECCIÓN CONTRA INCEN
356 3560 ELECTRICAL DISTRIBUTION & SUBSTATIONS / DISTRIBUCIÓN ELÉCTRICA Y SUBE
357 3570 _SPARE_
358 3580 PROCESS CONTROL SYSTEM / SISTEMA DE CONTROL DE PROCESOS
359 3590 COMMUNICATIONS, IT AND COMPUTING / COMUNICACIONES, TECNOLOGÍA INFOR
36 3600 _SPARE_
37 3700 OXIDE PLANT FACILITIES / INSTALACIONES DE PLANTA DE ÓXIDO
371 3710 BUILDINGS / EDIFICIOS
372 3720 _SPARE_
373 3730 _SPARE_
374 3740 _SPARE_
375 3750 _SPARE_
38 3800 RIPIOS WASTE FACILITY / INSTALACIONES DE RESIDUOS DE RIPIOS
381 3810 Oxide Ripios Disposal / Disposición de Ripios de Óxido
382 3820 _SPARE_
383 3830 _SPARE_
384 3840 _SPARE_
385 3850 _SPARE_

432988949.xlsx 08/12/2019
sn
g
T
fe
ro
tr
i
fa
r
a
yc
Ai
lS
NCL ic
tr
KP e
y
C
Ce o
cn
r
RH ir
h
n
a
e
GMI g
cn
,g
Mt
e
W
w
SCOPE OF dicR aSERVICES
n
slh
a
e
Lvl 4 Scope Owner a flm
m
n
irp
ATOR / CONCENTRADORA DE SULFURO Ausenco o
g
o
lv
n
SHED ORE HANDLING / CHANCADO Y MANEJO DE MINERAL CHANCADO Ausenco ie
mw
g
e
TOCKPILE AND RECLAIM / PILA DE ALMACENAMIENTO Y RECUPERACIÓN kd
e
d
ECONDARY CRUSHING CIRCUIT / CIRCUITO DE CHANCADO SECUNDARIO fT
re
R
N
a
lt
o
ERTIARY CRUSHING CIRCUIT / CIRCUITO DE CHANCADO TERCIARIO e
M
ird
yh
m
lie
o
isc1
fv
8
n
th
a
T
e
/cg
ra
a
d
s8
in
i
/lb
g
Ausenco lT
1
M
e
u
iia
6
ta
in
RIMARY GRINDING / MOLIENDA PRIMARIA yn
i…g
la
so
ig
cn
n
e
h
R
ONCENTRATE THICKENING, STORAGE, FILTRATION, AND LOAD OUT / ESPESADO, ALMACENAMIENTO, FILTRACIÓN Y DESCARGA DE CONCENTRADO g
m
N
a
AILINGS THICKENING AND PUMPING / ESPESADO Y BOMBEADO DE RELAVES se
e
S
n
t
n
g
u
S
tre
1
u
UTILITIES / SERVICIOS BÁSICOS DE CONCENTRADORA Ausenco 3
d
n
b
F
1
ATER SERVICES / SERVICIOS DE AGUA sa
D
f0
R SERVICES / SERVICIOS DE AGUA tW
ce
r1
a
a
LECTRICAL DISTRIBUTION & SUBSTATIONS / DISTRIBUCIÓN ELÉCTRICA Y SUBESTACIONES liA
6
to
tl
ROCESS CONTROL SYSTEM / SISTEMA DE CONTROL DE PROCESOS e
m
re
ii
OMMUNICATIONS, IT AND COMPUTING / COMUNICACIONES, TECNOLOGÍA INFORMÁTICA Y COMPUTACIÓN te
r
o
ta
e
T
FACILITIES / INSTALACIONES DE CONCENTRADORA Ausenco n
yd
M
N
F
a
S
7
d
d
N
/d
u
7
2
S
/6
ee
6
//6
GE FACILITY / INSTALACIONES DE ALMACENAMIENTO DE RELAVES Knight Piesold d 2
1
t6
//
AILINGS STORAGE FACILITY (TSF) / INSTALACIONES DE ALMACENAMIENTO DE RELAVES (TSF) 6
o
t/1
9
SF SEEPAGE MONITORING / MONITOREO DE FILTRACIÓN DE TSF 6
o
/1
SF ACCESS ROADS / VÍAS DE ACCESO AL TSF i6
1
n
a
6
tl
ri
o
g
d
n
u
cw
ti
SITE EARTHWORKS AND DRAINAGE / MOVIMIENTO DE TIERRAS DE SITIO DE CONCENTRADORA Y DRENAJE Ausenco it
TE DEVELOPMENT / DESARROLLO DEL SITIO n
h
ULK EARTHWORKS / MOVIMIENTO DE TIERRAS MASIVO
LL AND TRIM SITE TO FINAL GRADE / RELLENO Y CORTE EN SITIO A NIVELACIÓN FINAL o
R
fe
TE DRAINS / DRENAJES EN SITIO
v
NTERNAL PLANT SITE ROADS / VÍAS INTERNAS DE PLANTA EN SITIO H
P
0
G
R
P
F
2
D
Ausenco
s7
HANDLING / CHANCADO Y MANEJO DE MINERAL Ausenco 0
RIMARY CRUSHING / CHANCADO PRIMARIO 2
N
STOCKPILE AND RECLAIM / PILA DE ALMACENAMIENTO Y RECUPERACIÓN 1
S
7
ECONDARY SCREENING & CRUSHING / ZARANDEO Y CHANCADO SECUNDARIOS SECONDARY & TERTIARY SC
2
ERTIARY SCREENING AND CRUSHING / ZARANDEO Y CHANCADO TERCIARIOS TERTIARY SCREENING & QU
N
8
M
/
NE ORE PRODUCT / PRODUCTO DE MINERAL FINO SCREENING PRODUCT
0
9
/
2
0
VATS AND PONDS / PRETRATAMIENTO, BATEAS Y POZAS Ausenco 1
RE TREATMENT / PRETRATAMIENTO 5

432988949.xlsx 08/12/2019
Je
itn
u
h
lte
n
e
h
e
cR
2
e
tR
0
2
rve
1
0
iv5
1
0
c:
5
a
0
:lP
S
AP F
u
S
D
sF
g
u
NCL su
D
g
g
b
se
KP g
sN
se
tS
CN ts
a
S
t2
tk
RH
i8
2
e
GMI ko
/
8
e
e
/0
n
Mp e
9
s0
i
p
SCOPE OF /9in2SERVICES
u
/
g
n
0
Lvl 4 Scope Owner n 2
g
1
d
0
u
AT FEED / ALIMENTADOR DE BATEAS 5
e
1
n
u
IPIOS DISPOSAL / DISPOSICIÓN DE RIPIOS r5
d
n
NEW
e
d
g
rNEW
e
e
rNEW
n
g
LANTA DE EXTRACCIÓN SOLVENTE/ELECTRODEPOSICIÓN Ausenco e
e
g
rn
e
a
OLVENT EXTRACTION / EXTRACCIÓN SOLVENTE e
n
lr
LECTROWINNING / ELECTRODEPOSICIÓN e
ra
il
a
n
lf
i
rn
ia
f
n
sr
ft
a
rr
sa
LITIES / SERVICIOS BÁSICOS DE PLANTA DE ÓXIDO Ausenco u
ts
ATER SERVICES / SERVICIOS DE AGUA cr
tt
R SERVICES / SERVICIOS DE AIRE ru
u
RE DETECTION AND PROTECTION / DETECCIÓN Y PROTECCIÓN CONTRA INCENDIOS A / CO cu
rt
LECTRICAL DISTRIBUTION & SUBSTATIONS / DISTRIBUCIÓN ELÉCTRICA Y SUBESTACIONES ce
u
t
r
u
ROCESS CONTROL SYSTEM / SISTEMA DE CONTROL DE PROCESOS re
OMMUNICATIONS, IT AND COMPUTING / COMUNICACIONES, TECNOLOGÍA INFORMÁTICA Y COMPUTACIÓN e

CILITIES / INSTALACIONES DE PLANTA DE ÓXIDO Ausenco


A / CO

CILITY / INSTALACIONES DE RESIDUOS DE RIPIOS Ausenco


xide Ripios Disposal / Disposición de Ripios de Óxido

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
0 0000
11 0110 _SPARE_
12 0120 _SPARE_
13 0130 _SPARE_
14 0140 _SPARE_
15 0150 _SPARE_
16 0160 _SPARE_
17 0170 _SPARE_
18 0180 _SPARE_
19 0190 _SPARE_
1 1000
11 1100 MINE
111 1110 PRE-STRIP
1111 1111
112 1120 MINE MATERIAL HAULAGE
1121 1121
1122 1122
113 1130 _SPARE_
114 1140 _SPARE_
115 1150 _SPARE_
119 1190 MINE SUSTAINING CAPITAL
1191 1191
12 1200 HAUL AND ACCESS ROADS
121 1210 Haul Road - Main
1211 1211
122 1220 Haul Road - Waste
1221 1221
123 1230 Haul Road - Tailings Area
1231 1231
124 1240 Haul Road - MIA
1241 1241
125 1250 Haul Road - Ripios Dump
1251 1251
126 1260 Secondary Roads
1261 1261
127 1270 _SPARE_
128 1280 _SPARE_
129 1290 _SPARE_
13 1300 MINE UTILITIES
131 1310 WATER SERVICES
1311 1311
1312 1312
1313 1313
1314 1314
1315 1315
1316 1316

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
1317 1317
1318 1318
1319 1319
132 1320 AIR SERVICES
1321 1321
1322 1322
1323 1323
1324 1324
1325 1325
133 1330 WASTE TREATMENT AND MANAGEMENT
1331 1331
1332 1332
1333 1333
134 1340 FUEL & LUBRICANTS STORAGE & DISPENSING
1341 1341
1342 1342
1343 1343
1344 1344
136 1360 DUST SUPPRESSION
1361 1361
137 1370 ELECTRICAL DISTRIBUTION
1371 1371
1372 1372
1373 1373
1374 1374
138 1380 INFORMATION & COMMUNICATIONS
1381 1381
1382 1382
14 1400 MINE FACILITIES
141 1410 BUILDINGS
1411 1411
1412 1412
1413 1413
1414 1414
1415 1415
1416 1416
1417 1417
1418 1418
142 1420 _SPARE_
143 1430 EXPLOSIVES
1431 1431
1432 1432
1433 1433
1434 1434
1435 1435
1436 1436
145 1450 _SPARE_
146 1460 _SPARE_
147 1470 _SPARE_
148 1480 _SPARE_
149 1490 _SPARE_
15 1500 MINE FLEET
151 1510 MAJOR MINE EQUUIPMENT
152 1520 MINOR EQUIPMENT - MAINTENANCE
153 1530 MINOR EQUIPMENT - MINE OPERATIONS
154 1540 COMPUTER HARDWARE & SOFTWARE
1541 1541
1542 1542
155 1550 _SPARE_
156 1560 _SPARE_
157 1570 _SPARE_
158 1580 _SPARE_
159 1590 _SPARE_
16 1600 MINE MAINTANENCE FACILITY
161 1610 MINE MAINTANENCE ADMINISTRATION
1611 1611

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
1612 1612
1613 1613
1614 1614
1615 1615
162 1620 MINE MAINTANENCE WORKSHOPS
1621 1621
1622 1622
1623 1623
1624 1624
1625 1625
1626 1626
1627 1627
1628 1628
163 1630 MINE MAINTANENCE SERVICES
1631 1631
1632 1632
1633 1633
1634 1634
1635 1635
1636 1636
17 1700 SURFACE STOCKPILES
171 1710 STOCKPILE PLATFORM EARTHWORKS
1711 1711
172 1720 _SPARE_
173 1730 _SPARE_
174 1740 _SPARE_
175 1750 _SPARE_
19 1900 MINE SITE EARTHWORKS AND DRAINAGE
191 1910 Mine Utilities Earthworks
1911 1911
192 1920 Mine Facilities Earthworks
1921 1921
1922 1922
1923 1923
193 1930 Mine Maintenance Facilities Earthworks
1931 1931
194 1940 _SPARE_
195 1950 _SPARE_
2 2000
21 2100 CRUSHING & CRUSHED ORE HANDLING

211 2110 PRIMARY CRUSHING

2111 2111
2112 2112
2113 2113
2114 2114
2119 2119
212 2120 STOCKPILE AND RECLAIM
2121 2121
2122 2122
2123 2123
2125 2125
2129 2129
213 2130 SECONDARY CRUSHING CIRCUIT
2131 2131
2132 2132
2133 2133
2134 2134
2135 2135
2139 2139
214 2140 TERTIARY CRUSHING CIRCUIT
2141 2141
2142 2142
2143 2143
2144 2144

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
2145 2145
2146 2146
2147 2147
2148 2148
2149 2149
215 2150 _SPARE_
216 2160 _SPARE_
217 2170 _SPARE_
218 2180 _SPARE_
219 2190 _SPARE_
22 2200 CONCENTRATOR
221 2210 _SPARE_
222 2220 PRIMARY GRINDING

2221 2221

2222 2222
2223 2223
2224 2224
2229 2229
224 2240 FLOTATION
2241 2241
2242 2242
2243 2243
2244 2244
2245 2245
2246 2246
2247 2247
2248 2248
2249 2249
225 2250 REGRINDING
2251 2251
2252 2252
2253 2253
2254 2254
2255 2255
2259 2259

226 2260 CONCENTRATE THICKENING, STORAGE, FILTRATION, AND LOAD OUT

2261 2261
2262 2262
2263 2263
2264 2264
2265 2265
2269 2269

227 2270 TAILINGS THICKENING AND PUMPING

2271 2271

2272 2272
2273 2273
2275 2275
2276 2276
2279 2279

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE

228 2280 REAGENTS

2281 2281
2282 2282
2283 2283
2284 2284
2285 2285
2286 2286
2287 2287
2289 2289
229 2290 _SPARE_

23 2300 CONCENTRATOR UTILITIES

231 2310 WATER SERVICES

2311 2311

2312 2312
2313 2313
2314 2314

2315 2315

2316 2316
2319 2319
232 2320 AIR SERVICES
2321 2321
2322 2322
2323 2323
2324 2324
2329 2329
237 2370 ELECTRICAL DISTRIBUTION & SUBSTATIONS

2371 2371

2372 2372
2373 2373
2374 2374
2375 2375
2376 2376
2377 2377
2378 2378
2379 2379
238 2380 PROCESS CONTROL SYSTEM
2381 2381
2382 2382
2389 2389
239 2390 COMMUNICATIONS, IT AND COMPUTING
2391 2391

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
2399 2399
24 2400 CONCENTRATOR FACILITIES
241 2410 BUILDINGS
2411 2411
2412 2412
2413 2413
2414 2414
2415 2415
2416 2416
2417 2417
2419 2419
243 2430 _SPARE_
244 2440 _SPARE_
245 2450 _SPARE_
25 2500 TAILINGS STORAGE FACILITY
251 2510 TAILINGS STORAGE FACILITY (TSF)

2511 2511

2512 2512

2513 2513

2514 2514

2519 2519
252 2520 TSF SEEPAGE MONITORING

2521 2521

253 2530 TSF ACCESS ROADS


2531 2531
2532 2532
2533 2533
2534 2534
2535 2535
2536 2536
2539 2539
254 2540 _SPARE_
2541 2541
255 2550 _SPARE_
256 2560 _SPARE_
26 2600 _SPARE_
27 2700 _SPARE_
28 2800 _SPARE_
29 2900 CONCENTRATOR SITE EARTHWORKS AND DRAINAGE
291 2910 SITE DEVELOPMENT
2911 2911
2912 2912
292 2920 BULK EARTHWORKS
2921 2921

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
2922 2922
293 2930 FILL AND TRIM SITE TO FINAL GRADE
2931 2931
2932 2932
294 2940 SITE DRAINS
2941 2941
2942 2942
295 2950 INTERNAL PLANT SITE ROADS
2951 2951
2952 2952
296 2960 _SPARE_
297 2970 _SPARE_
298 2980 _SPARE_
299 2990 _SPARE_
3 3000

31 3100 CRUSHING & ORE HANDLING

311 3110 PRIMARY CRUSHING


3111 3111
3112 3112
3113 3113
3114 3114
3115 3115

3116 3116
3119 3119

312 3120 STOCKPILE AND RECLAIM

3121 3121
3122 3122
3123 3123
3129 3129

313 3130 SECONDARY SCREENING & CRUSHING

3131 3131

3132 3132
3133 3133
3134 3134
3135 3135
3136 3136
3137 3137

3138 3138

3139 3139

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE

314 3140 TERTIARY SCREENING AND CRUSHING

3141 3141
3142 3142
3143 3143
3144 3144
3145 3145
3146 3146
3147 3147
3148 3148

3149 3149

315 3150 _SPARE_

3151 3151
3152 3152
3153 3153
3154 3154
3155 3155
3156 3156
3157 3157

3158 3158

3159 3159

316 3160 FINE ORE PRODUCT

3161 3161
3162 3162
3163 3163
3164 3164
3165 3165
3166 3166
3167 3167
3168 3168

3169 3169

317 3170 _SPARE_


318 3180 _SPARE_
319 3190 _SPARE_
32 3200 PRE-TREATMENT, VATS AND PONDS
321 3210 PRE TREATMENT

3211 3211

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE

3219 3219

322 3220 VAT FEED

3221 3221

3229 3229

323 3230 RIPIOS DISPOSAL

3231 3231

3232 3232

3233 3233

3239 3239
324 3240 VATS

3241 3241

3242 3242

325 3250 PONDS

3251 3251

3252 3252

3253 3253

3254 3254

3255 3255

3256 3256

326 3260 CLARIFICATION

3261 3261

3262 3262

33 3300 SX/EW PLANT


331 3310 _SPARE_

3311 3311

3312 3312
3313 3313

3314 3314

3315 3315

3316 3316

3317 3317

3318 3318

3319 3319

332 3320 SOLVENT EXTRACTION

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE

3321 3321

3322 3322
3323 3323
3324 3324
3325 3325
3329 3329

333 3330 ELECTROWINNING

3331 3331

3332 3332
3333 3333

3334 3334

3335 3335
3336 3336
3337 3337
3339 3339
334 3340 _SPARE_

335 3350 REAGENTS

3351 3351
3352 3352
3353 3353
3354 3354
3355 3355
3356 3356
3359 3359
336 3360 _SPARE_
337 3370 _SPARE_
338 3380 _SPARE_
339 3390 _SPARE_
34 3400 _SPARE_

35 3500 OXIDE PLANT UTILITIES

351 3510 WATER SERVICES


3511 3511
3512 3512
3513 3513

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
3514 3514
3515 3515
3516 3516
3519 3519
352 3520 AIR SERVICES
3521 3521
3522 3522
3523 3523
3523 3523
3529 3529
355 3550 FIRE DETECTION AND PROTECTION
3551 3551
3552 3552

356 3560 ELECTRICAL DISTRIBUTION & SUBSTATIONS

3561 3561
3562 3562
3563 3563
3564 3564
3565 3565
3566 3566
3567 3567
3568 3568
3569 3569
357 3570 _SPARE_

358 3580 PROCESS CONTROL SYSTEM

3581 3581
3582 3582

359 3590 COMMUNICATIONS, IT AND COMPUTING

3591 3591
36 3600 _SPARE_

37 3700 OXIDE PLANT FACILITIES

371 3710 BUILDINGS


3711 3711
3712 3712
3713 3713
3714 3714
3715 3715
3716 3716
3717 3717
3718 3718
3719 3719
372 3720 _SPARE_
373 3730 _SPARE_
374 3740 _SPARE_
375 3750 _SPARE_

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
38 3800 RIPIOS WASTE FACILITY
381 3810 Oxide Ripios Disposal
3811 3811
3812 3812
3813 3813
3814 3814
382 3820 _SPARE_
383 3830 _SPARE_
384 3840 _SPARE_
385 3850 _SPARE_
39 3900 OXIDE PLANT SITE EARTHWORKS AND DRAINAGE
391 3910 SITE DEVELOPMENT
3911 3911
3912 3912
392 3920 BULK EARTHWORKS
3921 3921
3922 3922
393 3930 FILL AND TRIM SITE TO FINAL GRADE
3931 3931
3932 3932
394 3940 SITE DRAINS
3941 3941
3942 3942
395 3950 INTERNAL PLANT SITE ROADS
3951 3951
3952 3952
4 4000
41 4100 ON-SITE WATER STORAGE, TREATMENT, AND DISTRIBUTION
411 4110 PROCESS WATER

4111 4111

4112 4112

4113 4113

4114 4114

4115 4115

4119 4119
412 4120 SEA WATER
4121 4121
4122 4122
4129 4129

413 4130 DESALINATION PLANT

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE

4131 4131

4139 4139

43 4300 ON-SITE GENERAL UTILITIES

431 4310 WATER SERVICES


4311 4311
4312 4312
4313 4313
4314 4314
4315 4315
4316 4316
4319 4319
432 4320 AIR SERVICES
4321 4321
4322 4322
4323 4323
4329 4329
433 4330 WASTE TREATMENT AND MANAGEMENT
4331 4331
4333 4333
4339 4339
434 4340 FUEL & LUBRICANTS STORAGE & DISPENSING
4341 4341
4342 4342
4343 4343
4344 4344
4345 4345
435 4350 FIRE DETECTION AND PROTECTION
4351 4351
4352 4352
436 4360 _SPARE_
437 4370 ELECTRICAL DISTRIBUTION & SUBSTATIONS
4371 4371
4372 4372
4373 4373
4374 4374
4379 4379
438 4380 PROCESS CONTROL SYSTEM
4381 4381
4382 4382
439 4390 COMMUNICATIONS, IT AND COMPUTING
4391 4391
4392 4392

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
4393 4393
4394 4394
4395 4395
4396 4396
4399 4399
44 4400 ON-SITE GENERAL FACILITIES
441 4410 BUILDINGS
4411 4411
4412 4412
4413 4413
4414 4414
4415 4415
4416 4416
4417 4417
4418 4418
4419 4419
442 4420 _SPARE_
443 4430 WEIGHBRIDGE
4431 4431
4432 4432
444 4440 _SPARE_
445 4450 SITE FENCING
4451 4451
4452 4452
446 4460 _SPARE_
447 4470 _SPARE_
448 4480 _SPARE_
449 4490 _SPARE_
45 4500 ON-SITE PERMANENT ACCOMODATION CAMP
451 4510 EARTHWORKS, CIVILS AND DRAINAGE
4511 4511
4512 4512
452 4520 ACCOMMODATION
4521 4521
453 4530 AMENITIES
4531 4531
4532 4532
4533 4533
4539 4539
454 4540 ELECTRICAL WORKS
4541 4541
4542 4542
455 4550 EARTHING AND LIGHTNING PROTECTION
4551 4551
4552 4552
456 4560 SEWERAGE TREATMENT AND DISPOSAL (ACCOMMODATION SITE)
4561 4561

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
4569 4569
457 4570 _SPARE_
458 4580 _SPARE_
459 4590 _SPARE_

46 4600 ON-SITE ACCESS ROADS

461 4610 Entrance Access Road (From Public Road)


4611 4611
462 4620 INPLANT ROADS
4621 4621
463 4630 _SPARE_
464 4640 _SPARE_
465 4650 _SPARE_

47 4700 HV SWITCHYARD AND ON-SITE POWER DISTRIBUTION

471 4710 RECEIVAL YARD AND MAIN TRANSFORMERS


4711 4711
4712 4712
4713 4713
4714 4714
4715 4715
4719 4719
472 4720 POWER CONDITIONING EQUIPMENT
4721 4721
4722 4722
473 4730 _SPARE_
474 4740 _SPARE_
4741 4741
4742 4742
475 4750 HV DISTRIBUTION
4751 4751
4752 4752
476 4760 MV DISTRIBUTION (includes remote substations and pole transformers)

4761 4761

477 4770 EMERGENCY POWER GENERATION


4771 4771
478 4780 _SPARE_
479 4790 _SPARE_
48 4800 SEWERAGE AND WASTE MANAGEMENT
481 4810 SEWERAGE TREATMENT AND DISPOSAL (PLANT SITE)
4811 4811
4812 4812
482 4820 _SPARE_
483 4830 OIL WASTE MANAGEMENT
4831 4831
4832 4832
484 4840 CHEMICAL WASTE DISPOSAL

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
4841 4841
4842 4842
485 4850 SITE WASTE LANDFILL
4851 4851
4852 4852
486 4860 _SPARE_
487 4870 _SPARE_
488 4880 _SPARE_
489 4890 _SPARE_
49 4900 MOBILE VEHICLES FLEET (OPERATIONS)
491 4910 LIGHT VEHICLES
4911 4911
4912 4912
492 4920 MOBILE CRANES
4921 4921
4922 4922
493 4930 FORKLIFTS, EWP, TRUCKS
4931 4931
4932 4932
494 4940 FELS, DOZERS, GRADERS AND BACKHOES (excludes mining fleet)
4941 4941
4942 4942
495 4950 PEOPLE MOVING
4951 4951
4952 4952
4951 4951
496 4960 SERVICE VEHICLES
4961 4961
4962 4962
497 4970 PLANT EQUIPMENT
4971 4971
498 4980 SUSTAINING CAPITAL
4981 4981
499 4990 _SPARE_
5 5000
51 5100 SEA WATER SUPPLY
511 5110 SEA WATER PUMP STATION
5111 5111
512 5120 SEA WATER PIPELINE
5121 5121
513 5130 SEA WATER DRAINAGE PONDS
5131 5131
5132 5132
5139 5139
514 5140 SEA WATER TERMINAL STATION
5141 5141

515 5150 _SPARE_

516 5160 _SPARE_


52 5200 POWER SUPPLY

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE

521 5210 TRANSMISSION LINES

5211 5211
5212 5212
522 5220 POROMA SUBSTATION
5221 5221
5222 5222
5223 5223
5224 5224
5229 5229
524 5240 _SPARE_
525 5250 _SPARE_
53 5300 OFF-SITE ACCESS ROADS
531 5310 SEA WATER SYSTEM ACCESS ROAD
532 5320 _SPARE_
55 5500 OFFSHORE ACID PORT
551 5510 TRESTLE ABUTMENT & ACCESS
5511 5511
5512 5512
5513 5513
552 5520 TRESTLE
5521 5521
553 5530 SERVICE PLATFORM (Inc. Seawater Pumps)
5531 5531
554 5540 SPREAD MOORING BUOY SYSTEM
5541 5541
555 5550 SULPHURIC ACID SYSTEM
5551 5551
5552 5552
556 5560 SEA WATER INTAKE
5561 5561
5562 5562
5563 5563
56 5600 ONSHORE ACID PORT
561 5610 SULPHURIC ACID STORAGE
5611 5611
5612 5612
562 5620 ACID PORT ACCESS ROADS
5621 5621
5622 5622
5623 5623
5629 5629
563 5630 SULPHURIC ACID BULK EARTHWORKS
5631 5631
564 5640 SPARE
57 5700 PORT INFRASTRUCTURE - UTILITIES & FACILITIES
571 5710 ACID PORT BUILDINGS
5711 5711
5712 5712
5713 5713
5714 5714

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
5719 5719
572 5720 ACID PORT GENERAL UTILITIES
5721 5721
5722 5722
5723 5723
5724 5724
5725 5725
5726 5726
5729 5729
58 5800 PORT POWER SUPPLY
581 5810 TRANSMISSION LINES
5811 5811
5812 5812
582 5820 PORT POWER & COMMUNICATIONS
5821 5821
5822 5822
5823 5823
5829 5829
59 5900 _SPARE_
6 6000

61 6100 MOBILISATION / DEMOBILISATION OF TEMPORATY FACILITIES

611 6110 LABOUR


612 6120 MATERIALS
613 6130 FURNITURE AND FITTINGS
614 6140 VEHICLES
615 6150 PLANT AND EQUIPMENT
62 6200 SITE ESTABLISHMENT
621 6210 CONSTRUCTION SEDIMENT PONDS
6211 6211
6212 6212
622 6220 CONSTRUCTION ROADS
6221 6221
623 6230 TEMPORARY LAYDOWN AREAS
6231 6231
6232 6232
624 6240 INFORMATION & COMMUNICATIONS
6241 6241
625 6250 TEMPORARY PARKING
626 6260 SURVEYING
6261 6261
63 6300 TEMPORARY FACILITIES
631 6310 BUILDINGS AND FACILITIES
6311 6311
6312 6312
6313 6313

6314 6314

6315 6315
634 6340 SITE SECURITY
6341 6341

635 6350 EMERGENCY & MEDICAL

6351 6351
636 6360 PLANT AND EQUIPMENT

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
6361 6361
6362 6362
6363 6363
637 6370 MAINTENANCE / OPERATIONS
6371 6371
6372 6372
6373 6373
6374 6374
638 6380 BATCH PLANTS
6381 6381
6382 6382
639 6390 ROUTE SURVEY
6391 6391
64 6400 TEMPORARY UTILITIES
641 6410 TEMPORARY POWER
6411 6411
642 6420 TEMPORARY WATER
6421 6421
643 6430 TEMPORARY COMMUNICATIONS
644 6440 TEMPORARY SEWERAGE TREATMENT
6441 6441
65 6500 QUARRIES
651 6510 QUARRIES
652 6520 _SPARE_
66 6600 _SPARE_
67 6700 _SPARE_
68 6800 _SPARE_
69 6900 _SPARE_
7 7000
71 7100 STUDIES
711 7110 OFFICE STUDIES
7111 7111
7112 7112
712 7120 FIELD STUDIES
7121 7121
7122 7122
7123 7123
7124 7124
7125 7125
7126 7126
7127 7127
72 7200 _SPARE_
73 7300 EPCM
731 7310 ENGINEERING & PROCUREMENT (EP)
7311 7311
7312 7312
7313 7313
7314 7314
7315 7315
7316 7316
732 7320 CONSTRUCTION MANAGEMENT (CM)
7321 7321
7322 7322
7323 7323
7324 7324
7325 7325

74 7400 VENDOR REPRESENTATIVES

741 7410 SULPHIDE VENDORS


7411 7411
742 7420 OXIDE VENDORS
7421 7421
7422 7422
7423 7423

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
743 7430 MINING MAINTENANCE FACILITY VENDORS
7431 7431
744 7440 ACID STORAGE VENDORS
7441 7441
745 7450 _SPARE_

75 7500 COMMISSIONING / OPERATIONS READINESS

751 7510 MODIFICATION SQUAD


7511 7511
752 7520 _SPARE_
753 7530 _SPARE_
754 7540 _SPARE_
755 7550 _SPARE_
76 7600 SPARES
761 7610 MECHANICAL & ELECTRICAL SPARES
7611 7611
7612 7612
77 7700 FIRST FILLS
771 7710 MECHANCIAL & ELECTRICAL FIRST FILLS
7711 7711
7712 7712
7713 7713
7714 7714
78 7800 _SPARE_
8 8000
81 8100 CONTINGENCY
811 8110 INITIAL CONTINGENCY
812 8120 SUSTAINING CONTINGENCY
813 8130 SCHEDULE CONTINGENCY
814 8140 CONTRACTOR LUMP SUM RISK
82 8200 CLIENT RESERVE
83 8300 ESCALATION
84 8400 FOREIGN EXCHANGE
85 8500 FINANCE
86 8600 _SPARE_
87 8700 _SPARE_
88 8800 _SPARE_
89 8900 _SPARE_
9 9000
91 9100 PROJECT MANAGEMENT
911 9110 STAFFING
9111 9111
9112 9112
9113 9113
9114 9114
9115 9115
912 9120 CONSULTING
9121 9121
9122 9122
9123 9123
9124 9124
9125 9125
913 9130 GENERAL EXPENSES
9131 9131
9132 9132
9133 9133
9134 9134
9135 9135
9136 9136
9137 9137
9138 9138
9139 9139
914 9140 IT COMMUNICATIONS

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
9141 9141
9142 9142
9143 9143
915 9150 _SPARE_
916 9160 _SPARE_
917 9170 _SPARE_
918 9180 _SPARE_
919 9190 _SPARE_
92 9200 PERMITTING, SOCIAL & ENVIRONMENTAL
921 9210 PERMITTING
9211 9211
9212 9212
9213 9213
9214 9214
922 9220 ENVIRONMENTAL
9221 9221
9222 9222
9223 9223
9224 9224
9225 9225
923 9230 COMMUNITY RELATIONS & COMMUNICATIONS
9231 9231
9232 9232
9233 9233
9234 9234
924 9240 _SPARE_
925 9250 _SPARE_
926 9260 _SPARE_
927 9270 _SPARE_
928 9280 _SPARE_
929 9290 _SPARE_
93 9300 SAFETY, HEALTH & SECURITY
931 9310 SAFETY AND HEALTH
9311 9311
9312 9312
9313 9313
9314 9314
9315 9315
932 9320 SECURITY
9321 9321
9322 9322
933 9330 _SPARE_
934 9340 _SPARE_
935 9350 _SPARE_
936 9360 _SPARE_
937 9370 _SPARE_
938 9380 _SPARE_
939 9390 _SPARE_
94 9400 INSURANCES
941 9410 INSURANCES
9411 9411
9412 9412
942 9420 _SPARE_
9421 9421
95 9500 START UP
951 9510 OPERATIONAL READINESS PROCESS
9511 9511
9512 9512
9513 9513
9514 9514
9515 9515
9516 9516
9517 9517
952 9520 OPERATIONAL READINESS MINE
9521 9521
9522 9522

432988949.xlsx 08/12/2019
Scope of Work and Services
Project: Mina Justa
Client: Marcobre

Location: Peru
Rev A
Date : 5/4/2017
Desc: Detailed Design
Doc No: 101946-WBS-0001

WBS Lvl 2 Lvl 3


PE
9523 9523
9524 9524
953 9530 OPERATIONAL READINESS G&A
9531 9531
9532 9532
9533 9533
9534 9534
9535 9535
9536 9536
9537 9537
9538 9538
9539 9539
954 9540 ADVISORY FOR LAND
9541 9541
96 9600 LAND
961 9610 LAND PURCHASE
962 9620 EASEMENTS
9621 9621
963 9630 LAND & MINING CONCESSION FEES
9631 9631
964 9640 ADVISORY FOR LAND
9641 9641
965 9650 ROYALTIES
9651 9651
97 9700 PRE-PRODUCTION COSTS
971 9710 PRE-PRODUCTION COSTS
972 9720 REVENUE
98 9800 FINANCING
981 9810 FINANCING COSTS
9811 9811
982 9820 CAPITALIZED INTEREST
9821 9821

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

NCL
NCL

Mine Pre Stripping

Waste Haulage to TSF


Waste Haulage to Ripios Dump

Sustaining Capital for Mine


NCL

Haul Road - Main

Haul Road - Waste

Haul Road - Tailings Area

Haul Road - MIA

Haul Road - Ripios Dump

Light Vehicles Roads

Sea Water
Process Water
Fire Water
Gland Water
Cooling Water
Potable Water

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Desalinated Water
_SPARE_
_SPARE_

High Pressure Air


Instrument Air
Blower Air
_SPARE_
_SPARE_
ASTE TREATMENT AND MANAGEMENT
Sewerage Treatment and Disposal
Temporary Solid / Liquid Waste Disposal
_SPARE_
UEL & LUBRICANTS STORAGE & DISPENSING
Bulk Fuel Storage
Truck Refuelling Facility
Lubricants
Temporary Refuelling Facilities

Dust Suppression Water

Mine Electrical Substation


General Light and Power to Buildings and Surrounds
Earthing and Lightning Protection
Electrical Supply for Shovels and Drills
NFORMATION & COMMUNICATIONS
Mine Wireless Network
Modular Mining Dispatch System
NCL / AUSENCO

Mine Lunch Room


Mine Parking
Mine Change House
Mine Dispatch and Offices
Mine Toilets
Mine Core Shed
Mine Meeting Rooms
Mine Hot Sit Change

Explosives Preparation
AN Storage
ANE Storage
Explosives Storage
Support Infrastructure
Explosives and Container Stores Security Office

NCL

INOR EQUIPMENT - MAINTENANCE


INOR EQUIPMENT - MINE OPERATIONS
OMPUTER HARDWARE & SOFTWARE
Computer Software
Computer Hardware

GMI
INE MAINTANENCE ADMINISTRATION
Mine Maintenance Offices

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Mine Maintenance Toilets
Mine Maintenance Change House
Mine Maintenance Lunch Room
Mine Maintenance Temporary Facilities
INE MAINTANENCE WORKSHOPS
Mine Truckshop
Mine Maintenance Warehouse & Tool Room
Heavy Equipment Tyre Change
Lubricant Storage & Distribution
Heavy Equipment Welding Area
Minor Equipment Workshop
Mine Electrical Cable Repair Shop
Vehicle Wash Down Facility

Compressed Air
Potable Water
De-Salinated Water
Saline Water
Fire Water
Electrical Substation & Control Room

TOCKPILE PLATFORM EARTHWORKS


Stockpile Platform Earthworks

Mine Utilities Earthworks

Mine Facilities Earthworks


Equipment Erection Platform
Multi Purpose Platform
ine Maintenance Facilities Earthworks
Mine Maintenance Facilities Earthworks

Ausenco
Ausenco

Primary Crushing Station


Discharge Conveyor
Primary Crusher Overland Conveyor 1
Primary Crusher Overland Conveyor 2
Primary Crushing General

Stockpile
Reclaim Tunnel & Feeders
Secondary Screen Feed Conveyor
Dust Suppression
Stockpile & Reclaim General

Secondary Screening Station


Secondary Screen Oversize Conveyor
Secondary Crushing Station
Secondary Screen Undersize Conveyor
Dust Suppression
Secondary Crushing General

Tertiary Crusher Feed Bin


Tertiary Crusher Feed Conveyor
Tertiary Crushing Station
Tertiary Crushing Discharge Conveyor

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Fine Ore Bin
Tertiary Screen Feed Conveyor
Tertiary Screening Station
Tertiary Screen Oversize Conveyor
Dust Suppression

Ausenco

Primary Grinding Mill Discharge

Primary Grinding Classification


Ball Mill
Ball Mill Media Feed System
Primary Grinding General

Conditioning
Rougher
Cleaner 1
Cleaner 2
_SPARE_
Cleaner Scalper
Cleaner Scavenger
Particle Size Monitoring (PSM) & On-Stream Analysis (OSA)
Flotation General

Regrind Mill Feed


Regrind Mill
Regrind Mill Discharge
Regrind Mill Classification
Ball Mill Media Feed System
Regrinding General

ONCENTRATE THICKENING, STORAGE, FILTRATION, AND LOAD OUT

Concentrate Thickening
Concentrate Storage & Filter Feed
Concentrate Filtration
Final Concentrate Storage
Concentrate Load Out
Cons. Thick. Storage, Filt. & Loadout General

AILINGS THICKENING AND PUMPING

Tailings Thickener

Tailings Pumping
Tailings Pipeline
_SPARE_
_SPARE_
Tails Thickening & Pumping General

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Lime
Collector
Frother
Promoter
_SPARE_
_SPARE_
Flocculent
Reagents General

Ausenco

Desalinated Water

Process Water
Fire Water
Gland Water

Cooling Water

Potable Water
Water General

Plant Air (High Pressure)


Instrument Air
Blower Air
Column Flotation Air
Air General
LECTRICAL DISTRIBUTION & SUBSTATIONS

Primary Crusher Substation

Sulfide Fine Crushing Substation


Sulfide Primary Grinding Substation
Sulfide Concentrator Substation
Overland Conveyor Transfer Point
_SPARE_
_SPARE_
_SPARE_
Electrical Distribution & Substations General

Process Control System


Process CCTV
Process Control System General
OMMUNICATIONS, IT AND COMPUTING
_SPARE_

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Comms. IT & Computing General


Ausenco

_SPARE_
Concentrator Workshop / Warehouse / Office
Concentrator Reagent Storage
Concentrator Control Room
Concentrator Cribb Room
Crusher Control / Cribb Room
Concentrator Toilets
Buildings General

Knight Piesold
AILINGS STORAGE FACILITY (TSF)

Main Embankment Dam

Northern Saddle Dam

Dam Basin

Western Saddle Dam

Tailings Storage Facility General

TSF Seepage Monitoring System

Tailings pipeline Inspection Road - Section Initial


Tailings pipeline Inspection Road - Section South
Tailings pipeline Inspection Road - Section North
Border Access - Section West
Border Access - Section NorthWest
Border Access - Section North
TSF Access Roads General

_SPARE_

SITE EARTHWORKS AND DRAINAGE Ausenco

Site Development
_SPARE_

Bulk Earthworks

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Sulphide Crusher Pocket


LL AND TRIM SITE TO FINAL GRADE
Fill and Trim site to Final Grade
_SPARE_

Site Drains
_SPARE_

Internal Plant Site Roads


_SPARE_

Ausenco

Ausenco

Primary Crushing Station


Conveyors
Water services
Air services
_SPARE_

_SPARE_
Primary Crushing General

STOCKPILE AND RECLAIM

Stockpile
Reclaim Tunnel & Feeders
spare
Primary Crushing General

ECONDARY SCREENING & CRUSHING

Secondary Screening

Secondary Crushing
Conveyor
Dust Collection
_SPARE_
_SPARE_
_SPARE_

_SPARE_

Secondary Screening & Crushing General

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

ERTIARY SCREENING AND CRUSHING

Tertiary screening feed


Tertiary screening
Tertiary crushing feed
Tertiary crushing
Dust collection
_SPARE_
_SPARE_
_SPARE_

Tertiary Screening & Crushing General

_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_

_SPARE_

Crushing General

Fine ore product conveyor


_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_

Fine ore product general

Ausenco

Pre-treatment Drum

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

_SPARE_

Vat feed conveyors

_SPARE_

Vat Unloading

Ripios conveying

Ripios truck loading

Ripios Disposal General

Vats

_SPARE_

HG PLS pond

LG PLS pond

HG Raffinate pond

LG Raffinate pond

_SPARE_

_SPARE_

Clarifier

_SPARE_

Ausenco

_SPARE_

_SPARE_
_SPARE_

_SPARE_

_SPARE_

_SPARE_

_SPARE_

_SPARE_

_SPARE_

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Mixer Settlers

Loaded Organic Handling


Strong Electrolyte Handling
Crud Treatment
SX Event Pond
Solvent Extraction General

Electrolyte filtration and backwash

Heat exchangers and cooling tower


Electrowinning cells

Electrolyte circulation

Cathode handling
EW miscellaneous
Rectifiers
Electrowinning General

Sulfuric Acid
Diluent
Extractant
Flocculant
EW reagents
_SPARE_
Reagents General

Ausenco

Sea water
Desalinated water
Fire Water

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Gland Water
_SPARE_
Potable Water
Water Services General

Plant Air
_SPARE_
_SPARE_
_SPARE_
Air Services General
RE DETECTION AND PROTECTION
Fire Detection and Protection
_SPARE_

LECTRICAL DISTRIBUTION & SUBSTATIONS

Oxide Reclaim Substation


Oxide Fine Crushing & Screening Substation
Ponds, Clarifier, Drum, & Acid Unloading Substation
Electrowinning Substation
SX & Vats Substation
Ripios Substation
Water Services Substation
_SPARE_
Electrical Distribution & Substations General

Process Control System


Process CCTV

OMMUNICATIONS, IT AND COMPUTING

_SPARE_

Ausenco

Vat leach Crushing Control Room


Vat leach Toilets
Vat leach Reagent Storage
Vat leach Control Room
Vat leach Office / Cribb Room
SX/EW Control Room
SX/EW Area Offices
Primary Crusher Toilets
Buildings General

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Ausenco

Site Development
Bulk Earthworks
Fill and Trim site to Final Grade
Internal Plant Site Roads

E EARTHWORKS AND DRAINAGE Ausenco

Site Development
_SPARE_

Bulk Earthworks
Oxide Crusher Pocket
LL AND TRIM SITE TO FINAL GRADE
Fill and Trim site to Final Grade
_SPARE_

Site Drains
_SPARE_

Internal Plant Site Roads


_SPARE_
Ausenco
STORAGE, TREATMENT, AND DISTRIBUTION Ausenco

Process Water Pond

Process Water Pond Pumps

Process Water Pipeline to Mine

Process Water Pipeline to Concentrator

Process Water Pipeline to Vatleach-SX-EW

Process Water General

Sea Water Storage


Sea Water Pumps
Sea Water General

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Desalination Plant

Desalination Plant General

Ausenco

Raw Water (Sea Water)


Process Water
Fire Water
Gland Water
Cooling Water
Potable Water
Water Services General

Plant Air (High Pressure)


Instrument Air
Blower Air
Air Services General
ASTE TREATMENT AND MANAGEMENT
Sewerage
_SPARE_
Waste Treatment & Management General
UEL & LUBRICANTS STORAGE & DISPENSING
Fuel Storage
Fuel Dispensing
_SPARE_
_SPARE_
Lubricants
RE DETECTION AND PROTECTION
Fire Detection and Protection
_SPARE_

LECTRICAL DISTRIBUTION & SUBSTATIONS


Camp Area Substation
Admin & Services Substation
Diesel Storage Substation
Gate House Substation
Electrical Distribution & Substations General

Process Control System


Process CCTV
OMMUNICATIONS, IT AND COMPUTING
External Telecommunications
Internal Communications and Radio

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

LAN and WAN Systems


Hardware
Software
Installation and Support
Coms. IT & Computing General
Ausenco

Site Gatehouse
Site First Aid and Emergency Response
Site Administration
Site Main Change House and Toilets
Site Laboratory
Lunch and Dining Room
Site Main Workshop
Site Main Warehouse
Buildings General

Weighbridge
_SPARE_

Site Fencing
_SPARE_

Ausenco
ARTHWORKS, CIVILS AND DRAINAGE
Earthworks, Civil and Drainage
_SPARE_

Permanent Camp (Operations/Admin)

Amenities
Potable Water
Raw Water
Amenities General

Electrical Works
_SPARE_
ARTHING AND LIGHTNING PROTECTION
Earthing and Lightning Protection
_SPARE_
EWERAGE TREATMENT AND DISPOSAL (ACCOMMODATION SITE)
Sewerage Treatment and Disposal

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Sewerage Treatment and Disposal General

Ausenco

ntrance Access Road (From Public Road)


Entrance Access Road (From Public Road)

Oxide To Sulphide Road

AND ON-SITE POWER DISTRIBUTION Ausenco/Cesel

ECEIVAL YARD AND MAIN TRANSFORMERS


Receival Yard
Main Transformers
Main Electrical HV Sub-Station
Access Road
Internal Roads
Recival Yard & Main Transformers General
OWER CONDITIONING EQUIPMENT
Power Conditioning Equipment
_SPARE_

_SPARE_
_SPARE_

HV Distribution
Primary Crushing HV Substation
V DISTRIBUTION (includes remote substations and pole transformers)

MV Distribution

MERGENCY POWER GENERATION


Emergency Power Generation

Ausenco
EWERAGE TREATMENT AND DISPOSAL (PLANT SITE)
Sewerage Treatment and Disposal
_SPARE_

Oil Waste Management


_SPARE_

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Chemical Waste Management


_SPARE_

Site Waste Facility


_SPARE_

Ausenco

Light Vehicles
Emergency Vehicles

Mobile Cranes
_SPARE_

Forklifts, EWP, Trucks


_SPARE_
ELS, DOZERS, GRADERS AND BACKHOES (excludes mining fleet)
FELs, Dozers, Graders and Backhoes
_SPARE_

Small Buses
Large Buses
Vans

Service Trucks
Supply Vehicles

Compressors

Sustaining Capital for Plant & General / Admin

Ausenco

Sea Water Pump Station

Sea Water Pipeline

Drainage Pond 1
Drainage Pond 2
Sea Water Drainage Ponds General

Sea Water Terminal Station

Cesel

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

22.9kV Transmission Lines


Telecommunications & Digital Control

Main Electrical HV Sub-Station


Complimentary HV Sub-Station
Auxiliary Services
Telecommunications & Digital Control
Poroma Substation General

EA WATER SYSTEM ACCESS ROAD

Royal Haskoning

Trestle Abutment
Landside Service Platform
Access Road

Trestle
ERVICE PLATFORM (Inc. Seawater Pumps)
Marine Service Platform
PREAD MOORING BUOY SYSTEM
Spread Mooring Buoy System

Acid Hose & Hose Reel


Pumping & Fixed Piping

Sea Water Intake (inc. Seawater Pumps)


Intermediate Tank
Seawater Civil Support Infrastructure
Ausenco

Containment Berm & Access


Acid Transfer Station

Entrance Road
Perimeter Road
Trestle Access Road
Acid Port Access Roads General
ULPHURIC ACID BULK EARTHWORKS
Pad

UCTURE - UTILITIES & FACILITIES Ausenco

Office
Customs Building
Guard Shack
Truck Scale

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Acid Port Buildings General

Water Services
Air Services
Sewerage Treatment and Disposal
Waste Management
Security Fencing
Fire Protection
Acid Port General Utilities General
Ausenco

22.9 Kv Power Line


Marcona Substation Expansion
ORT POWER & COMMUNICATIONS
Acid Port Substation
Process Control System
Communications
Port Power & Comms. General

Ausenco

EMOBILISATION OF TEMPORATY FACILITIES Ausenco

Ausenco
ONSTRUCTION SEDIMENT PONDS
Construction Sediment Ponds
Temporary Sediment Ponds (Bulk Fill & Piping)

Pioneer Roads

Laydown Area A
Laydown Area B
NFORMATION & COMMUNICATIONS
Initial Communication & Data Links

Site Surveys
Ausenco

Construction Admin Buildings ( Temp)


Construction Warehouse ( Temp)
Pioneer Camp

Construction Camp

Temporary Fuel Supply

Temporary Fencing

Inductions & Medicals

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Tools & Equipment


Plant Hire
Safety Consumables

Construction Camp Catering


Cleaning Services
Transport of Personnel
General Waste Removal

Screening & Washing Plant


Concrete Plant

Bridge Structural Reinforcement


Ausenco

Construction Power (other than Contractors)

Construction Water

EMPORARY SEWERAGE TREATMENT


Temporary Sewage Treatment Plant
Marcobre

Ausenco

Feasibility (Plant & Infrastructure)


Feasibility (Mine & Geology)

Metallurgical
Geotechnical / geomechanical - plant & infr
Geotechnical / geomechanical - mine & geology
Topography
Hydrogeological
Drilling (Resources & Condemnation)
Other miscellaneous studies

Ausenco
NGINEERING & PROCUREMENT (EP)
Project Management & Services
Engineering
Drafting
Sub-Consultants
EP Expenses(incl travel)
Fee
ONSTRUCTION MANAGEMENT (CM)
Construction Management & Services
Commissioning and Management Services
Performance Testing
CM Expenses(incl travel)
Fee

Ausenco

Sulphide Vendors Allowance

Oxide Vendors Allowance


Vat Protection Lining Vendor
SXEW Services

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


INING MAINTENANCE FACILITY VENDORS
Vendor Representatives

Acid Storage Vendors Allowance

Ausenco

Modification Squad

Ausenco
ECHANICAL & ELECTRICAL SPARES
Commissioning Spares
Insurance Spares
Ausenco
ECHANCIAL & ELECTRICAL FIRST FILLS
Sulphide Construction First Fills
Sulphide Commissioning / Process First Fills
Oxide Construction First Fills
Oxide Commissioning / Process First Fills

Ausenco
Ausenco

Marcobre
Marcobre

Payroll
MINSUR charges (Intercompany)
Recruitment
Share services
Training

Technical Consulting
Peer Reviews
Management Consulting
Legal Fees
Audits

Office rent
General Expenses
Business travels
Subscriptions
Ex Pat benefits
Small tools
Vehicles
Geology Warehouse
Food & Lodging

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Software
Hardware
Communications services

Marcobre

Archaeology
Exploration Permits
Construction Permits
Operations Permits

Environmental studies
EIA (Env. Impact Assessment)
Environmental Monitoring
Environmental Commitments by EIA
Environmental Management
OMMUNITY RELATIONS & COMMUNICATIONS
Social Programs
Social Commitments by EIA
Communication Activities
Social Planning

Marcobre

PPE / Work clothing


Training courses
Health
Emergency Response
Safety Audit

Security Services
Security Systems

Marcobre

Insurances
_SPARE_

_SPARE_
Marcobre
PERATIONAL READINESS PROCESS
PLANT MANAGEMENT
SULFIDES PLANT
OXIDES PLANT
PLANT MAINTENANCE
METALLURGY
ENERGY
INFRASTRUCTURE

MINE OPERATIONS
MINE ENGINEERING

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr.
Bulks, etc. purchased under construction packages will fall under CM).
CM - Construction Management
OW - Owners Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


MINE MAINTENANCE
GEOLOGY

OPERATION MANAGEMENT
HEALTH AND SAFETY
ENVIRONMENT AND PERMITTING
SOCIAL RESPONSIBLITY
HUMAN RESOURCES
LOGISTICS, PROCUREMENT, CONTRACTS
IT & COMMUNICATIONS
SECURITY
FINANCE & COMMERCIALIZATION

Advisory for Lands


Marcobre

Easements
AND & MINING CONCESSION FEES
Land and mining concessions fees

Advisory for Lands

Royalties
Marcobre

Marcobre

_SPARE_

Capitalized Interest

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
0 0000 GENERAL
11 0110 _SPARE_
12 0120 _SPARE_
13 0130 _SPARE_
14 0140 _SPARE_
15 0150 _SPARE_
16 0160 _SPARE_
17 0170 _SPARE_
18 0180 _SPARE_
19 0190 _SPARE_
1 1000 MINE
11 1100 MINE
111 1110 PRE-STRIP
1111 1111
112 1120 MINE MATERIAL HAULAGE
1121 1121
1122 1122
113 1130 _SPARE_
114 1140 _SPARE_
115 1150 _SPARE_
119 1190 MNE SUSTAINING CAPITAL
1191 1191
12 1200 HAUL AND ACCESS ROADS
121 1210 Haul Road - Main
1211 1211
122 1220 Haul Road - Waste
1221 1221
123 1230 Haul Road - Tailings Area
1231 1231
124 1240 Haul Road - MIA
1241 1241
125 1250 Haul Road - Ripios Dump
1251 1251
126 1260 Secondary Roads
1261 1261
127 1270 _SPARE_
128 1280 _SPARE_
129 1290 _SPARE_
13 1300 MINE UTILITIES
131 1310 WATER SERVICES
1311 1311
1312 1312
1313 1313
1314 1314
1315 1315
1316 1316
1317 1317
1318 1318

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
1319 1319
132 1320 AIR SERVICES
1321 1321
1322 1322
1323 1323
1324 1324
1325 1325
133 1330 WASTE TREATMENT AND MANAGEMENT
1331 1331
1332 1332
1333 1333
134 1340 FUEL & LUBRICANTS STORAGE & DISPENSING
1341 1341
1342 1342
1343 1343
1344 1344
136 1360 DUST SUPPRESSION
1361 1361
137 1370 ELECTRICAL DISTRIBUTION
1371 1371
1372 1372
1373 1373
1374 1374
138 1380 INFORMATION & COMMUNICATIONS
1381 1381
1382 1382
14 1400 MINE FACILITIES
141 1410 BUILDINGS
1411 1411
1412 1412
1413 1413
1414 1414
1415 1415
1416 1416
1417 1417
1418 1418
142 1420 _SPARE_
143 1430 EXPLOSIVES
1431 1431
1432 1432
1433 1433
1434 1434
1435 1435
1436 1436
145 1450 _SPARE_
146 1460 _SPARE_
147 1470 _SPARE_
148 1480 _SPARE_
149 1490 _SPARE_
15 1500 MINE FLEET
151 1510 MAJOR MINE EQUUIPMENT
152 1520 MINOR EQUIPMENT - MAINTENANCE
153 1530 MINOR EQUIPMENT - MINE OPERATIONS
154 1540 COMPUTER HARDWARE & SOFTWARE
1541 1541
1542 1542
155 1550 _SPARE_
156 1560 _SPARE_
157 1570 _SPARE_
158 1580 _SPARE_
159 1590 _SPARE_
16 1600 MINE MAINTANENCE FACILITY
161 1610 MINE MAINTANENCE ADMINISTRATION
1611 1611
1612 1612
1613 1613
1614 1614

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
1615 1615
162 1620 MINE MAINTANENCE WORKSHOPS
1621 1621
1622 1622
1623 1623
1624 1624
1625 1625
1626 1626
1627 1627
1628 1628
163 1630 MINE MAINTANENCE SERVICES
1631 1631
1632 1632
1633 1633
1634 1634
1635 1635
1636 1636
17 1700 SURFACE STOCKPILES
171 1710 STOCKPILE PLATFORM EARTHWORKS
1711 1711
172 1720 _SPARE_
173 1730 _SPARE_
174 1740 _SPARE_
175 1750 _SPARE_
19 1900 MINE SITE EARTHWORKS AND DRAINAGE
191 1910 Mine Utilities Earthworks
1911 1911
192 1920 Mine Facilities Earthworks
1921 1921
1922 1922
1923 1923
193 1930 Mine Maintenance Facilities Earthworks
1931 1931
194 1940 _SPARE_
195 1950 _SPARE_
2 2000 SULPHIDE CONCENTRATOR
21 2100 CRUSHING & CRUSHED ORE HANDLING

211 2110 PRIMARY CRUSHING

2111 2111
2112 2112
2113 2113
2114 2114
2119 2119
212 2120 STOCKPILE AND RECLAIM
2121 2121
2122 2122
2123 2123
2125 2125
2129 2129
213 2130 SECONDARY CRUSHING CIRCUIT
2131 2131
2132 2132
2133 2133
2134 2134
2135 2135
2139 2139
214 2140 TERTIARY CRUSHING CIRCUIT
2141 2141
2142 2142
2143 2143
2144 2144
2145 2145
2146 2146
2147 2147
2148 2148

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
2149 2149
215 2150 _SPARE_
216 2160 _SPARE_
217 2170 _SPARE_
218 2180 _SPARE_
219 2190 _SPARE_
22 2200 CONCENTRATOR
221 2210 _SPARE_
222 2220 PRIMARY GRINDING

2221 2221

2222 2222
2223 2223
2224 2224
2229 2229
224 2240 FLOTATION
2241 2241
2242 2242
2243 2243
2244 2244
2245 2245
2246 2246
2247 2247
2248 2248
2249 2249
225 2250 REGRINDING
2251 2251
2252 2252
2253 2253
2254 2254
2255 2255
2259 2259

226 2260 CONCENTRATE THICKENING, STORAGE, FILTRATION, AND LOAD OUT

2261 2261
2262 2262
2263 2263
2264 2264
2265 2265
2269 2269

227 2270 TAILINGS THICKENING AND PUMPING

2271 2271

2272 2272
2273 2273
2275 2275
2276 2276
2279 2279
228 2280 REAGENTS

2281 2281
2282 2282
2283 2283

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
2284 2284
2285 2285
2286 2286
2287 2287
2289 2289
229 2290 _SPARE_

23 2300 CONCENTRATOR UTILITIES

231 2310 WATER SERVICES

2311 2311

2312 2312
2313 2313
2314 2314

2315 2315

2316 2316
2319 2319
232 2320 AIR SERVICES
2321 2321
2322 2322
2323 2323
2324 2324
2329 2329
237 2370 ELECTRICAL DISTRIBUTION & SUBSTATIONS

2371 2371

2372 2372
2373 2373
2374 2374
2375 2375
2376 2376
2377 2377
2378 2378
2379 2379
238 2380 PROCESS CONTROL SYSTEM
2381 2381
2382 2382
2389 2389
239 2390 COMMUNICATIONS, IT AND COMPUTING
2391 2391
2399 2399
24 2400 CONCENTRATOR FACILITIES
241 2410 BUILDINGS
2411 2411
2412 2412

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
2413 2413
2414 2414
2415 2415
2416 2416
2417 2417
2419 2419
243 2430 _SPARE_
244 2440 _SPARE_
245 2450 _SPARE_
25 2500 TAILINGS STORAGE FACILITY
251 2510 TAILINGS STORAGE FACILITY (TSF)

2511 2511

2512 2512

2513 2513

2514 2514

2519 2519
252 2520 TSF SEEPAGE MONITORING

2521 2521

253 2530 TSF ACCESS ROADS


2531 2531
2532 2532
2533 2533
2534 2534
2535 2535
2536 2536
2539 2539
254 2540 _SPARE_
2541 2541
255 2550 _SPARE_
256 2560 _SPARE_
26 2600 _SPARE_
27 2700 _SPARE_
28 2800 _SPARE_
29 2900 CONCENTRATOR SITE EARTHWORKS AND DRAINAGE
291 2910 SITE DEVELOPMENT
2911 2911
2912 2912
292 2920 BULK EARTHWORKS
2921 2921
2922 2922
293 2930 FILL AND TRIM SITE TO FINAL GRADE
2931 2931
2932 2932
294 2940 SITE DRAINS
2941 2941

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
2942 2942
295 2950 INTERNAL PLANT SITE ROADS
2951 2951
2952 2952
296 2960 _SPARE_
297 2970 _SPARE_
298 2980 _SPARE_
299 2990 _SPARE_
3 3000 OXIDE PLANT

31 3100 CRUSHING & ORE HANDLING

311 3110 PRIMARY CRUSHING


3111 3111
3112 3112
3113 3113
3114 3114
3115 3115

3116 3116
3119 3119

312 3120 STOCKPILE AND RECLAIM

3121 3121
3122 3122
3123 3123
3129 3129

313 3130 SECONDARY & TERTIARY SCREENING

3131 3131

3132 3132
3133 3133
3134 3134
3135 3135
3136 3136
3137 3137

3138 3138

3139 3139

314 3140 SECONDARY & TERTIARY CRUSHING

3141 3141
3142 3142
3143 3143
3144 3144

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
3145 3145
3146 3146
3147 3147
3148 3148

3149 3149

315 3150 _SPARE_

3151 3151
3152 3152
3153 3153
3154 3154
3155 3155
3156 3156
3157 3157

3158 3158

3159 3159

316 3160 SCREENING PRODUCT

3161 3161
3162 3162
3163 3163
3164 3164
3165 3165
3166 3166
3167 3167
3168 3168

3169 3169

317 3170 _SPARE_


318 3180 _SPARE_
319 3190 _SPARE_
32 3200 PRE TREATMENT & RIPIOS
321 3210 PRE TREATMENT

3211 3211

3219 3219

322 3220 VAT FEED

3221 3221

3229 3229

323 3230 RIPIOS DISPOSAL

3231 3231

3232 3232

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE

3233 3233

3239 3239
33 3300 VAT LEACHING SXEW PLANT
331 3310 VAT LEACHING

3311 3311

3312 3312
3313 3313

3314 3314

3315 3315

3316 3316

3317 3317

3318 3318

3319 3319

332 3320 SOLVENT EXTRACTION

3321 3321

3322 3322
3323 3323
3324 3324
3325 3325
3329 3329

333 3330 ELECTROWINNING

3331 3331

3332 3332
3333 3333

3334 3334

3335 3335
3336 3336
3339 3339
334 3340 _SPARE_

335 3350 REAGENTS

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
3351 3351
3352 3352
3353 3353
3354 3354
3355 3355
3356 3356
3359 3359
336 3360 _SPARE_
337 3370 _SPARE_
338 3380 _SPARE_
339 3390 _SPARE_
34 3400 _SPARE_

35 3500 OXIDE PLANT UTILITIES

351 3510 WATER SERVICES


3511 3511
3512 3512
3513 3513
3514 3514
3515 3515
3516 3516
3519 3519
352 3520 AIR SERVICES
3521 3521
3522 3522
3523 3523
3523 3523
3529 3529
355 3550 FIRE DETECTION AND PROTECTION
3551 3551
3552 3552

356 3560 ELECTRICAL DISTRIBUTION & SUBSTATIONS

3561 3561
3562 3562
3563 3563
3564 3564
3565 3565
3566 3566
3567 3567
3568 3568
3569 3569
357 3570 _SPARE_

358 3580 PROCESS CONTROL SYSTEM

3581 3581
3582 3582

359 3590 COMMUNICATIONS, IT AND COMPUTING

3591 3591

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
36 3600 _SPARE_

37 3700 OXIDE PLANT FACILITIES

371 3710 BUILDINGS


3711 3711
3712 3712
3713 3713
3714 3714
3715 3715
3716 3716
3717 3717
3718 3718
3719 3719
372 3720 _SPARE_
373 3730 _SPARE_
374 3740 _SPARE_
375 3750 _SPARE_
38 3800 RIPIOS WASTE FACILITY
381 3810 Oxide Ripios Disposal
3811 3811
3812 3812
3813 3813
3814 3814
382 3820 _SPARE_
383 3830 _SPARE_
384 3840 _SPARE_
385 3850 _SPARE_
39 3900 OXIDE PLANT SITE EARTHWORKS AND DRAINAGE
391 3910 SITE DEVELOPMENT
3911 3911
3912 3912
392 3920 BULK EARTHWORKS
3921 3921
3922 3922
393 3930 FILL AND TRIM SITE TO FINAL GRADE
3931 3931
3932 3932
394 3940 SITE DRAINS
3941 3941
3942 3942
395 3950 INTERNAL PLANT SITE ROADS
3951 3951
3952 3952
4 4000 ON-SITE INFRASTRUCTURE UTILITIES AND FACILITIES
41 4100 ON-SITE WATER STORAGE, TREATMENT, AND DISTRIBUTION
411 4110 PROCESS WATER

4111 4111

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE

4112 4112

4113 4113

4114 4114

4115 4115

4119 4119
412 4120 SEA WATER
4121 4121
4122 4122
4129 4129

413 4130 DESALINATION PLANT

4131 4131

4139 4139

43 4300 ON-SITE GENERAL UTILITIES

431 4310 WATER SERVICES


4311 4311
4312 4312
4313 4313
4314 4314
4315 4315
4316 4316
4319 4319
432 4320 AIR SERVICES
4321 4321
4322 4322
4323 4323
4329 4329
433 4330 WASTE TREATMENT AND MANAGEMENT
4331 4331
4333 4333
4339 4339
434 4340 FUEL & LUBRICANTS STORAGE & DISPENSING
4341 4341
4342 4342
4343 4343
4344 4344
4345 4345
435 4350 FIRE DETECTION AND PROTECTION
4351 4351
4352 4352
436 4360 _SPARE_
437 4370 ELECTRICAL DISTRIBUTION & SUBSTATIONS

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
4371 4371
4372 4372
4373 4373
4374 4374
4379 4379
438 4380 PROCESS CONTROL SYSTEM
4381 4381
4382 4382
439 4390 COMMUNICATIONS, IT AND COMPUTING
4391 4391
4392 4392
4393 4393
4394 4394
4395 4395
4396 4396
4399 4399
44 4400 ON-SITE GENERAL FACILITIES
441 4410 BUILDINGS
4411 4411
4412 4412
4413 4413
4414 4414
4415 4415
4416 4416
4417 4417
4418 4418
4419 4419
442 4420 _SPARE_
443 4430 WEIGHBRIDGE
4431 4431
4432 4432
444 4440 _SPARE_
445 4450 SITE FENCING
4451 4451
4452 4452
446 4460 _SPARE_
447 4470 _SPARE_
448 4480 _SPARE_
449 4490 _SPARE_
45 4500 ON-SITE PERMANENT ACCOMODATION CAMP
451 4510 EARTHWORKS, CIVILS AND DRAINAGE
4511 4511
4512 4512
452 4520 ACCOMMODATION
4521 4521
453 4530 AMENITIES
4531 4531
4532 4532

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
4533 4533
4539 4539
454 4540 ELECTRICAL WORKS
4541 4541
4542 4542
455 4550 EARTHING AND LIGHTNING PROTECTION
4551 4551
4552 4552
456 4560 SEWERAGE TREATMENT AND DISPOSAL (ACCOMMODATION SITE)
4561 4561
4569 4569
457 4570 _SPARE_
458 4580 _SPARE_
459 4590 _SPARE_

46 4600 ON-SITE ACCESS ROADS

461 4610 Entrance Access Road (From Public Road)


4611 4611
462 4620 INPLANT ROADS
4621 4621
463 4630 _SPARE_
464 4640 _SPARE_
465 4650 _SPARE_

47 4700 HV SWITCHYARD AND ON-SITE POWER DISTRIBUTION

471 4710 RECEIVAL YARD AND MAIN TRANSFORMERS


4711 4711
4712 4712
4713 4713
4714 4714
4715 4715
4719 4719
472 4720 POWER CONDITIONING EQUIPMENT
4721 4721
4722 4722
473 4730 _SPARE_
474 4740 _SPARE_
4741 4741
4742 4742
475 4750 HV DISTRIBUTION
4751 4751
4752 4752
476 4760 MV DISTRIBUTION (includes remote substations and pole transformers)

4761 4761

477 4770 EMERGENCY POWER GENERATION


4771 4771
478 4780 _SPARE_
479 4790 _SPARE_

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
48 4800 SEWERAGE AND WASTE MANAGEMENT
481 4810 SEWERAGE TREATMENT AND DISPOSAL (PLANT SITE)
4811 4811
4812 4812
482 4820 _SPARE_
483 4830 OIL WASTE MANAGEMENT
4831 4831
4832 4832
484 4840 CHEMICAL WASTE DISPOSAL
4841 4841
4842 4842
485 4850 SITE WASTE LANDFILL
4851 4851
4852 4852
486 4860 _SPARE_
487 4870 _SPARE_
488 4880 _SPARE_
489 4890 _SPARE_
49 4900 MOBILE VEHICLES FLEET (OPERATIONS)
491 4910 LIGHT VEHICLES
4911 4911
4912 4912
492 4920 MOBILE CRANES
4921 4921
4922 4922
493 4930 FORKLIFTS, EWP, TRUCKS
4931 4931
4932 4932
494 4940 FELS, DOZERS, GRADERS AND BACKHOES (excludes mining fleet)
4941 4941
4942 4942
495 4950 PEOPLE MOVING
4951 4951
4952 4952
4951 4951
496 4960 SERVICE VEHICLES
4961 4961
4962 4962
497 4970 PLANT EQUIPMENT
4971 4971
498 4980 SUSTAINING CAPITAL
4981 4981
499 4990 _SPARE_
5 5000 OFF-SITE INFRASTRUCTURE UTILITIES AND FACILITIES
51 5100 SEA WATER SUPPLY
511 5110 SEA WATER PUMP STATION
5111 5111
512 5120 SEA WATER PIPELINE
5121 5121
513 5130 SEA WATER DRAINAGE PONDS

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
5131 5131
5132 5132
5139 5139
514 5140 SEA WATER TERMINAL STATION
5141 5141

515 5150 _SPARE_

516 5160 _SPARE_


52 5200 POWER SUPPLY

521 5210 TRANSMISSION LINES

5211 5211
5212 5212
522 5220 POROMA SUBSTATION
5221 5221
5222 5222
5223 5223
5224 5224
5229 5229
524 5240 _SPARE_
525 5250 _SPARE_
53 5300 OFF-SITE ACCESS ROADS
531 5310 SEA WATER SYSTEM ACCESS ROAD
532 5320 _SPARE_
55 5500 OFFSHORE ACID PORT
551 5510 TRESTLE ABUTMENT & ACCESS
5511 5511
5512 5512
5513 5513
552 5520 TRESTLE
5521 5521
553 5530 SERVICE PLATFORM (Inc. Seawater Pumps)
5531 5531
554 5540 SPREAD MOORING BUOY SYSTEM
5541 5541
555 5550 SULPHURIC ACID SYSTEM
5551 5551
5552 5552
556 5560 SEA WATER INTAKE
5561 5561
5562 5562
5563 5563
56 5600 ONSHORE ACID PORT
561 5610 SULPHURIC ACID STORAGE
5611 5611
5612 5612
562 5620 ACID PORT ACCESS ROADS
5621 5621
5622 5622
5623 5623
5629 5629
563 5630 SULPHURIC ACID BULK EARTHWORKS

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
5631 5631
564 5640 SPARE
57 5700 PORT INFRASTRUCTURE - UTILITIES & FACILITIES
571 5710 ACID PORT BUILDINGS
5711 5711
5712 5712
5713 5713
5714 5714
5719 5719
572 5720 ACID PORT GENERAL UTILITIES
5721 5721
5722 5722
5723 5723
5724 5724
5725 5725
5726 5726
5729 5729
58 5800 PORT POWER SUPPLY
581 5810 TRANSMISSION LINES
5811 5811
5812 5812
582 5820 PORT POWER & COMMUNICATIONS
5821 5821
5822 5822
5823 5823
5829 5829
59 5900 _SPARE_
6 6000 PROJECT PRELIMINARIES

61 6100 MOBILISATION / DEMOBILISATION OF TEMPORATY FACILITIES

611 6110 LABOUR


612 6120 MATERIALS
613 6130 FURNITURE AND FITTINGS
614 6140 VEHICLES
615 6150 PLANT AND EQUIPMENT
62 6200 SITE ESTABLISHMENT
621 6210 CONSTRUCTION SEDIMENT PONDS
6211 6211
6212 6212
622 6220 CONSTRUCTION ROADS
6221 6221
623 6230 TEMPORARY LAYDOWN AREAS
6231 6231
6232 6232
624 6240 INFORMATION & COMMUNICATIONS
6241 6241
625 6250 TEMPORARY PARKING
626 6260 SURVEYING
6261 6261
63 6300 TEMPORARY FACILITIES
631 6310 BUILDINGS AND FACILITIES
6311 6311
6312 6312
6313 6313

6314 6314

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
6315 6315
634 6340 SITE SECURITY
6341 6341

635 6350 EMERGENCY & MEDICAL

6351 6351
636 6360 PLANT AND EQUIPMENT
6361 6361
6362 6362
6363 6363
637 6370 MAINTENANCE / OPERATIONS
6371 6371
6372 6372
6373 6373
6374 6374
638 6380 BATCH PLANTS
6381 6381
6382 6382
639 6390 ROUTE SURVEY
6391 6391
64 6400 TEMPORARY UTILITIES
641 6410 TEMPORARY POWER
6411 6411
642 6420 TEMPORARY WATER
6421 6421
643 6430 TEMPORARY COMMUNICATIONS
644 6440 TEMPORARY SEWERAGE TREATMENT
6441 6441
65 6500 QUARRIES
651 6510 QUARRIES
652 6520 _SPARE_
66 6600 _SPARE_
67 6700 _SPARE_
68 6800 _SPARE_
69 6900 _SPARE_
7 7000 INDIRECT COSTS
71 7100 STUDIES
711 7110 OFFICE STUDIES
7111 7111
7112 7112
712 7120 FIELD STUDIES
7121 7121
7122 7122
7123 7123
7124 7124
7125 7125
7126 7126
7127 7127
72 7200 _SPARE_
73 7300 EPCM
731 7310 ENGINEERING & PROCUREMENT (EP)
7311 7311
7312 7312
7313 7313
7314 7314
7315 7315
7316 7316
732 7320 CONSTRUCTION MANAGEMENT (CM)
7321 7321
7322 7322
7323 7323
7324 7324
7325 7325

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE

74 7400 VENDOR REPRESENTATIVES

741 7410 SULPHIDE VENDORS


7411 7411
742 7420 OXIDE VENDORS
7421 7421
7422 7422
7423 7423
743 7430 MINING MAINTENANCE FACILITY VENDORS
7431 7431
744 7440 ACID STORAGE VENDORS
7441 7441
745 7450 _SPARE_

75 7500 COMMISSIONING / OPERATIONS READINESS

751 7510 MODIFICATION SQUAD


7511 7511
752 7520 _SPARE_
753 7530 _SPARE_
754 7540 _SPARE_
755 7550 _SPARE_
76 7600 SPARES
761 7610 MECHANICAL & ELECTRICAL SPARES
7611 7611
7612 7612
77 7700 FIRST FILLS
771 7710 MECHANCIAL & ELECTRICAL FIRST FILLS
7711 7711
7712 7712
7713 7713
7714 7714
78 7800 _SPARE_
8 8000 PROVISIONS
81 8100 CONTINGENCY
811 8110 INITIAL CONTINGENCY
812 8120 SUSTAINING CONTINGENCY
813 8130 SCHEDULE CONTINGENCY
814 8140 CONTRACTOR LUMP SUM RISK
82 8200 CLIENT RESERVE
83 8300 ESCALATION
84 8400 FOREIGN EXCHANGE
85 8500 FINANCE
86 8600 _SPARE_
87 8700 _SPARE_
88 8800 _SPARE_
89 8900 _SPARE_
9 9000 OWNERS COSTS
91 9100 PROJECT MANAGEMENT
911 9110 STAFFING
9111 9111
9112 9112
9113 9113
9114 9114
9115 9115
912 9120 CONSULTING
9121 9121
9122 9122
9123 9123
9124 9124
9125 9125
913 9130 GENERAL EXPENSES
9131 9131
9132 9132

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
9133 9133
9134 9134
9135 9135
9136 9136
9137 9137
9138 9138
9139 9139
914 9140 IT COMMUNICATIONS
9141 9141
9142 9142
9143 9143
915 9150 _SPARE_
916 9160 _SPARE_
917 9170 _SPARE_
918 9180 _SPARE_
919 9190 _SPARE_
92 9200 PERMITTING, SOCIAL & ENVIRONMENTAL
921 9210 PERMITTING
9211 9211
9212 9212
9213 9213
9214 9214
922 9220 ENVIRONMENTAL
9221 9221
9222 9222
9223 9223
9224 9224
9225 9225
923 9230 COMMUNITY RELATIONS & COMMUNICATIONS
9231 9231
9232 9232
9233 9233
9234 9234
924 9240 _SPARE_
925 9250 _SPARE_
926 9260 _SPARE_
927 9270 _SPARE_
928 9280 _SPARE_
929 9290 _SPARE_
93 9300 SAFETY, HEALTH & SECURITY
931 9310 SAFETY AND HEALTH
9311 9311
9312 9312
9313 9313
9314 9314
9315 9315
932 9320 SECURITY
9321 9321
9322 9322
933 9330 _SPARE_
934 9340 _SPARE_
935 9350 _SPARE_
936 9360 _SPARE_
937 9370 _SPARE_
938 9380 _SPARE_
939 9390 _SPARE_
94 9400 INSURANCES
941 9410 INSURANCES
9411 9411
9412 9412
942 9420 _SPARE_
9421 9421
95 9500 START UP
951 9510 OPERATIONAL READINESS PROCESS
9511 9511
9512 9512
9513 9513

432988949.xlsx 08/12/2019
Scope of Work and Services

Project: Mina Justa


Client: Marcobre
Location:Peru
Rev K
Status at:31/03/2017
Descripti DPS
Doc: JU-001-04-0222-0000-00-1C-0001

WBS Lvl 1 Lvl 2 Lvl 3


PE
9514 9514
9515 9515
9516 9516
9517 9517
952 9520 OPERATIONAL READINESS MINE
9521 9521
9522 9522
9523 9523
9524 9524
953 9530 OPERATIONAL READINESS G&A
9531 9531
9532 9532
9533 9533
9534 9534
9535 9535
9536 9536
9537 9537
9538 9538
9539 9539
954 9540 ADVISORY FOR LAND
9541 9541
96 9600 LAND
961 9610 LAND PURCHASE
962 9620 EASEMENTS
9621 9621
963 9630 LAND & MINING CONCESSION FEES
9631 9631
964 9640 ADVISORY FOR LAND
9641 9641
965 9650 ROYALTIES
9651 9651
97 9700 PRE-PRODUCTION COSTS
971 9710 PRE-PRODUCTION COSTS
972 9720 REVENUE
98 9800 FINANCING
981 9810 FINANCING COSTS
9811 9811
982 9820 CAPITALIZED INTEREST
9821 9821

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

NCL
NCL

Mine Pre Stripping

Waste Haulage to TSF


Waste Haulage to Ripios Dump

ING CAPITAL
Sustaining Capital for Mine
NCL

Haul Road - Main

Haul Road - Waste

Haul Road - Tailings Area

Haul Road - MIA

Haul Road - Ripios Dump

Light Vehicles Roads

Raw Water (Sea Water)


Process Water
Fire Water
Gland Water
Cooling Water
Potable Water
_SPARE_
_SPARE_

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


_SPARE_

High Pressure Air


Instrument Air
Blower Air
_SPARE_
_SPARE_
TMENT AND MANAGEMENT
Sewerage Treatment and Disposal
Temporary Solid / Liquid Waste Disposal
_SPARE_
CANTS STORAGE & DISPENSING
Bulk Fuel Storage
Truck Refuelling Facility
Lubricants
Temporary Refueling Facilities

Dust Suppression Water


DISTRIBUTION
Mine Electrical Substation
General Light and Power to Buildings and Surrounds
Earthing and Lightning Protection
Electrical Supply for Shovels and Drills
N & COMMUNICATIONS
Mine Wireless Network
Modular Mining Dispatch System
NCL / AUSENCO

Mine Lunch Room


Mine Parking
Mine Change House
Mine Dispatch and Offices
Mine Toilets
Mine Core Shed
Mine Meeting Rooms
Mine Hot Sit Change

Explosives Preperation
AN Storage
ANE Storage
Explosives Storage
Support Infrastructure
Explosives and Container Stores Security Office

NCL
EQUUIPMENT
MENT - MAINTENANCE
MENT - MINE OPERATIONS
ARDWARE & SOFTWARE
Computer Software
Computer Hardware

GMI
NENCE ADMINISTRATION
Mine Maintanence Offices
Mine Maintanence Toilets
Mine Maintanence Change House
Mine Maintanence Lunch Room

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Mine Maintanence Temporary Facilities
NENCE WORKSHOPS
Mine Truckshop
Mine Maintanence Warehouse & Tool Room
Heavy Equipment Tyre Change
Lubricant Storage & Distribution
Heavy Equipment Welding Area
Minor Equipment Workshop
Mine Eelectrical Cable Repair Shop
Vehicle Wash Down Facility
NENCE SERVICES
Compressed Air
Potable Water
De-Salinated Water
Saline Water
Fire Water
Electrical Substation & Control Room

LATFORM EARTHWORKS
Stockpile Platform Earthworks

Mine Utilities Earthworks

Mine Facilities Earthworks


Equipment Erection Platform
Multi Purpose Platform
nce Facilities Earthworks
Mine Maintenance Facilities Earthworks

Ausenco
Ausenco

Primary Crushing Station


Discharge Conveyor
Primary Crusher Overland Conveyor 1
Primary Crusher Overland Conveyor 2
Primary Crushing General

Stockpile
Reclaim Tunnel & Feeders
Secondary Screen Feed Conveyor
Dust Suppression
Stockpile & Reclaim General
CRUSHING CIRCUIT
Secondary Screening Station
Secondary Screen Oversize Conveyor
Secondary Crushing Station
Secondary Screen Undersize Conveyor
Dust Suppression
Secondary Crushing General
USHING CIRCUIT
Tertiary Crusher Feed Bin
Tertiary Crusher Feed Conveyor
Tertiary Crushing Station
Tertiary Crushing Discharge Conveyor
Fine Ore Bin
Tertiary Screen Feed Conveyor
Tertiary Screening Station
Tertiary Screen Oversize Conveyor

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Dust Suppression

Ausenco

Primary Grinding Mill Discharge

Primary Grinding Classification


Ball Mill
Ball Mill Media Feed System
Primary Grinding General

Conditioning
Rougher
Cleaner 1
Cleaner 2
Cleaner 3
_SPARE_
Cleaner Scavenger
Particle Size Monitoring (PSM) & On-Stream Analysis (OSA)
Flotation General

Regrind Mill Feed


Regrind Mill
Regrind Mill Discharge
Regrind Mill Classification
Ball Mill Media Feed System
Regrinding General

TE THICKENING, STORAGE, FILTRATION, AND LOAD OUT

Concentrate Thickening
Concentrate Storage & Filter Feed
Concentrate Filtration
Final Concentrate Storage
Concentrate Load Out
Cons. Thick. Storage, Filt. & Loadout General

CKENING AND PUMPING

Tailings Thickener

Tailings Pumping
Tailings Pipeline
_SPARE_
_SPARE_
Tails Thickening & Pumping General

Lime
Collector
Frother

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Promoter
_SPARE_
_SPARE_
Flocculent
Reagents General

Ausenco

Raw Water (Sea Water)

Process Water
Fire Water
Gland Water

Cooling Water

Potable Water
Water General

Plant Air (High Pressure)


Instrument Air
Blower Air
Column Flotation Air
Air General
DISTRIBUTION & SUBSTATIONS

Primary Crusher Substation

Sulfide Fine Crushing Substation


Sulfide Primary Grinding Substation
Sulfide Concentrator Substation
Overland Conveyor Transfer Point
_SPARE_
_SPARE_
_SPARE_
Electrical Distribution & Substations Genaral
NTROL SYSTEM
Process Control System
Process CCTV
Process Control System General
IONS, IT AND COMPUTING
_SPARE_
Comms. IT & Computing General
Ausenco

_SPARE_
Concentrator Workshop / Warehouse / Office

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Concentrator Reagent Storage


Concentrator Control Room
Concentrator Cribb Room
Crusher Control / Cribb Room
Concentrator Toilets
Buildings General

Knight Piesold
RAGE FACILITY (TSF)

Main Embankment Dam

Northern Saddle Dam

Dam Basin

Western Saddle Dam

Tailings Storage Facility General


E MONITORING

TSF Seepage Monitoring System

Tailings pipeline Inspection Road - Section Initial


Tailings pipeline Inspection Road - Section South
Tailings pipeline Inspection Road - Section North
Border Access - Section West
Border Access - Section NorthWest
Border Access - Section North
TSF Access Roads General

_SPARE_

WORKS AND DRAINAGE Ausenco

Site Development
_SPARE_

Bulk Earthworks
Sulphide Crusher Pocket
M SITE TO FINAL GRADE
Fill and Trim site to Final Grade
_SPARE_

Site Drains

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

_SPARE_
ANT SITE ROADS
Internal Plant Site Roads
_SPARE_

Ausenco

Ausenco

Primary Crushing Station


Course Oxide Ore Stockpile Feed Conveyors (1-3)
Air & Water Services
_SPARE_
_SPARE_

Dust Suppression
Primary Crushing General

Stockpile
Reclaim Tunnel & Feeders
Dust Suppression
Stockpile & Reclaim General

& TERTIARY SCREENING

Secondary Screen Feed Conveyor

Secondary Screening
Secondary Screen Undersize Conveyors
Tertiary Screen Feed Conveyor
Tertiary Screen
_SPARE_
_SPARE_

Dust Suppression

Secondary & Tertiary Screening General

& TERTIARY CRUSHING

Secondary Crusher Feed Conveyor


Secondary Crushing
Tertiary Crusher Feed Conveyor
Tertiary Crushing

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

_SPARE_
_SPARE_
_SPARE_
Dust Suppression

Secondary & Tertiary Crushing General

_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_

_SPARE_

_SPARE_

_SPARE_
_SPARE_
_SPARE_
_SPARE_
_SPARE_
Fine Ore Product Conveyor
_SPARE_
Dust Collection

Screening Product General

Ausenco

Pre Treatment Drum

Pre Treatment Drum General

Vat Feed Conveyor No.2 & Trippers

Vat Feed General

Vat Unloading

Ripios Conveyor No.1

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Ripios Loading

Ripios Disposal General


Ausenco

Fine Ore Handling

Leaching Vats
_SPARE_

_SPARE_

PLS Clarification

PLS Ponds

Raffinate Ponds

_SPARE_

Vat Leaching General

Mixer Settlers

Loaded Organic Handling


Strong Electrolyte Handling
Crud Treatment
SX Event Pond
Solvent Extraction General

Electrowinning Cells

Tankhouse Crane
Cathode Washing

Cathode Stripping & Packaging

Electrolyte Handling
Water Heater
Electrowinning General

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Sulphuric Acid
Diluent
Extractant
Flocculant
Guar
Cobalt
Reagents General

Ausenco

Raw Water (Sea Water)


Process Water
Fire Water
Gland Water
Cooling Water
Potable Water
Water Services General

Plant Air (High Pressure)


Instrument Air
Blower Air
_SPARE_
Air Services General
ION AND PROTECTION
Fire Detection and Protection
_SPARE_

DISTRIBUTION & SUBSTATIONS

Oxide Reclaim Substation


Oxide Fine Crushing & Screening Substation
Ponds,Clarifier, Drum, & Acid Unloading Substation
Electrowinning Substation
SX & Vats Substation
Ripios Substation
Water Services Substation
_SPARE_
Electrical Distribution & Substations General

NTROL SYSTEM

Process Control System


Process CCTV

IONS, IT AND COMPUTING

_SPARE_

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Ausenco

Vat leach Crushing Control Room


Vat leach Toilets
Vat leach Reagent Storage
Vat leach Control Room
Vat leach Office / Cribb Room
SX/EW Control Room
SX/EW Area Offices
Primary Crusher Toilets
Buildings General

Ausenco

Site Development
Bulk Earthworks
Fill and Trim site to Final Grade
Internal Plant Site Roads

ORKS AND DRAINAGE Ausenco

Site Development
_SPARE_

Bulk Earthworks
Oxide Crusher Pocket
M SITE TO FINAL GRADE
Fill and Trim site to Final Grade
_SPARE_

Site Drains
_SPARE_
ANT SITE ROADS
Internal Plant Site Roads
_SPARE_
TIES AND FACILITIES Ausenco
REATMENT, AND DISTRIBUTION Ausenco

Process Water Pond

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Process Water Pond Pumps

Process Water Pipeline to Mine

Process Water Pipeline to Concentrator

Process Water Pipeline to Vatleach-SX-EW

Process Water General

Sea Water Storage


Sea Water Pumps
Sea Water General

Desalination Plant

Desalination Plant General

Ausenco

Raw Water (Sea Water)


Process Water
Fire Water
Gland Water
Cooling Water
Potable Water
Water Services General

Plant Air (High Pressure)


Instrument Air
Blower Air
Air Services General
TMENT AND MANAGEMENT
Sewerage
_SPARE_
Waste Treatment & Management General
CANTS STORAGE & DISPENSING
Fuel Storage
Fuel Dispensing
_SPARE_
_SPARE_
Lubricants
ION AND PROTECTION
Fire Detection and Protection
_SPARE_

DISTRIBUTION & SUBSTATIONS

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Camp Area Substation


Admin & Servcies Substation
Diesel Storage Substation
Gate House Substation
Electrical Distribution & Substations General
NTROL SYSTEM
Process Control System
Process CCTV
IONS, IT AND COMPUTING
External Telecommunications
Internal Communications and Radio
LAN and WAN Systems
Hardware
Software
Installation and Support
Coms. IT & Computing General
Ausenco

Site Gatehouse
Site First Aid and Emergency Response
Site Administration
Site Main Change House and Toilets
Site Laboratory
Lunch and Dining Room
Site Main Workshop
Site Main Warehouse
Buildings General

Weighbridge
_SPARE_

Site Fencing
_SPARE_

MODATION CAMP Ausenco


S, CIVILS AND DRAINAGE
Earthworks, Civil and Drainage
_SPARE_

Permanent Camp (Operations/Admin)

Amenities
Potable Water

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Raw Water
Amenities General

Electrical Works
_SPARE_
D LIGHTNING PROTECTION
Earthing and Lightning Protection
_SPARE_
REATMENT AND DISPOSAL (ACCOMMODATION SITE)
Sewerage Treatment and Disposal
Sewerage Treatment and Disposal General

Ausenco

ss Road (From Public Road)


Entrance Access Road (From Public Road)

Oxide To Sulphide Road

E POWER DISTRIBUTION Ausenco/Cesel

RD AND MAIN TRANSFORMERS


Receival Yard
Main Transformers
Main Electrical HV Sub-Station
Access Road
Internal Roads
Recival Yard & Main Transformers General
DITIONING EQUIPMENT
Power Conditioning Equipment
_SPARE_

_SPARE_
_SPARE_

HV Distribution
Primary Crushing HV Substation
TION (includes remote substations and pole transformers)

MV Distribution

POWER GENERATION
Emergency Power Generation

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Ausenco
REATMENT AND DISPOSAL (PLANT SITE)
Sewerage Treatment and Disposal
_SPARE_

ANAGEMENT
Oil Waste Management
_SPARE_
ASTE DISPOSAL
Chemical Waste Management
_SPARE_

Site Waste Facility


_SPARE_

Ausenco

Light Vehicles
Emergency Vehicles

Mobile Cranes
_SPARE_
WP, TRUCKS
Forklifts, EWP, Trucks
_SPARE_
S, GRADERS AND BACKHOES (excludes mining fleet)
FELs, Dozers, Graders and Backhoes
_SPARE_

Small Buses
Large Buses
Vans

Service Trucks
Supply Vehicles

Compressors

Sustaining Capital for Plant & General / Admin

LITIES AND FACILITIES


Ausenco
UMP STATION
Sea Water Pump Station

Sea Water Pipeline


RAINAGE PONDS

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Drainage Pond 1
Drainage Pond 2
Sea Water Drainage Ponds General
ERMINAL STATION
Sea Water Terminal Station

Cesel

22.9kV Transmission Lines


Telecommunications & Digital Control

Main Electrical HV Sub-Station


Complimentary HV Sub-Station
Auxillary Services
Telecommunications & Digital Control
Poroma Substation General

YSTEM ACCESS ROAD

Royal Haskoning
TMENT & ACCESS
Trestle Abutment
Landside Service Platform
Access Road

Trestle
TFORM (Inc. Seawater Pumps)
Marine Service Platform
RING BUOY SYSTEM
Spread Mooring Buoy System
CID SYSTEM
Acid Hose & Hose Reel
Pumping & Fixed Piping

Sea Water Intake (inc. Seawater Pumps)


Intermediate Tank
Seawater Civil Support Infrastructure
Ausenco
CID STORAGE
Containment Berm & Access
Acid Transfer Station
CCESS ROADS
Entrance Road
Perimeter Road
Trestle Access Road
Acid Port Access Roads General
CID BULK EARTHWORKS

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Pad

ILITIES & FACILITIES Ausenco

Office
Customs Building
Guard Shack
Truck Scale
Acid Port Buildings General
ENERAL UTILITIES
Water Services
Air Services
Sewerage Treatment and Disposal
Waste Management
Security Fencing
Fire Protection
Acid Port General Utilities General
Ausenco

22.9 Kv Power Line


Marcona Substation Expansion
& COMMUNICATIONS
Acid Port Substation
Process Control System
Communications
Port Power & Comms. General

Ausenco

TION OF TEMPORATY FACILITIES Ausenco

ND FITTINGS

Ausenco
ON SEDIMENT PONDS
Construction Sediment Ponds
Temporary Sediment Ponds (Bulk Fill & Piping)

Pioneer Roads
LAYDOWN AREAS
Laydown Area A
Laydown Area B
N & COMMUNICATIONS
Initial Communication & Data Links

Site Surveys
Ausenco
ND FACILITIES
Construction Admin Buildings ( Temp)
Construction Warehouse ( Temp)
Pioneer Camp

Construction Camp

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Temporary Fuel Supply

Temporary Fencing

Inductions & Medicals

Tools & Equipment


Plant Hire
Safety Consumables
E / OPERATIONS
Construction Camp Catering
Cleaning Services
Transport of Personnel
General Waste Removal

Screening & Washing Plant


Concrete Plant

Bridge Structural Reinforcement


Ausenco

Construction Power (other than Contractors)

Construction Water
COMMUNICATIONS
SEWERAGE TREATMENT
Temporary Sewage Treatment Plant
Marcobre

Ausenco

Feasibility (Plant & Infrastructure)


Feasibility (Mine & Geology)

Metallurgical
Geotechnical / geomechanical - plant & infr
Geotechnical / geomechanical - mine & geology
Topography
Hydrogeological
Drilling (Resources & Condemnation)
Other miscellaneous studies

Ausenco
G & PROCUREMENT (EP)
Project Management & Services
Engineering
Drafting
Sub-Consultants
EP Expenses(incl travel)
Fee
ON MANAGEMENT (CM)
Construction Management & Services
Commissioning and Management Services
Performance Testing
CM Expenses(incl travel)
Fee

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner

Ausenco

Sulphide Vendors Allowance

Oxide Vendors Allowance


Vat Protection Lining Vendor
SXEW Services
TENANCE FACILITY VENDORS
Vendor Representatives
GE VENDORS
Acid Storage Vendors Allowance

NS READINESS Ausenco

Modification Squad

Ausenco
& ELECTRICAL SPARES
Commissioning Spares
Insurance Spares
Ausenco
& ELECTRICAL FIRST FILLS
Sulphide Construction First Fills
Sulphide Commissioning / Process First Fills
Oxide Construction First Fills
Oxide Commissioning / Process First Fills

Ausenco
Ausenco

CONTINGENCY
ONTINGENCY
R LUMP SUM RISK

Marcobre
Marcobre

Payroll
MINSUR charges (Intercompany)
Recruitment
Share services
Training

Technical Consulting
Peer Reviews
Management Consulting
Legal Fees
Audits

Office rent
General Expenses

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


Business travels
Subscriptions
Ex Pat benefits
Small tools
Vehicles
Geology Warehouse
Food & Lodging

Software
Hardware
Communications services

Marcobre

Archaeology
Exploration Permits
Construction Permits
Operations Permits

Environmental studies
EIA (Env. Impact Assessment)
Environmental Monitoring
Environmental Commitments by EIA
Environmental Management
RELATIONS & COMMUNICATIONS
Social Programs
Social Commitments by EIA
Communication Activities
Social Planning

Marcobre

PPE / Work clothing


Training courses
Health
Emergency Response
Safety Audit

Security Services
Security Systems

Marcobre

Insurances
_SPARE_

_SPARE_
Marcobre
L READINESS PROCESS
PLANT MANAGEMENT
SULFIDES PLANT
OXIDES PLANT

432988949.xlsx 08/12/2019
E- Engineering; preliminary if going to D&S or D&C packages; also includes preparation of tenders
P- Procurement (covers mainly equipment purchase. Materials such as piping bulks, electr. & instr. Bulks, etc. purchased under construction
packages will fall under CM).
CM - Construction Management
OW - OwnerS Costs
QA / QC - Quality Assurance / Quality Control

Lvl 4 Scope Owner


PLANT MAINTENANCE
METALLURGY
ENERGY
INFRASTRUCTURE
L READINESS MINE
MINE OPERATIONS
MINE ENGINEERING
MINE MAINTENANCE
GEOLOGY
L READINESS G&A
OPERATION MANAGEMENT
HEALTH AND SAFETY
ENVIRONMENT AND PERMITTING
SOCIAL RESPONSIBLITY
HUMAN RESOURCES
LOGISTICS, PROCUREMENT, CONTRACTS
IT & COMMUNICATIONS
SECURITY
FINANCE & COMMERCIALIZATION

Advisory for Lands


Marcobre

Easements
G CONCESSION FEES
Land and mining concessions fees

Advisory for Lands

Royalties
Marcobre
TION COSTS

Marcobre

_SPARE_

Capitalized Interest

432988949.xlsx 08/12/2019
Scope of Work and Services

Est - Estimating Services


Project: Mina Justa E - Procurement
P Engineering; (covers mainly equipment purchase. Materials
Client: Marcobre such as piping bulks, electr. & instr. Bulks, etc. purchased
Location: Peru under construction Management
CM - Construction packages will fall under CM).
Rev C O - Not included in EPCM services ( Noted party is responcible )
Status at: 8/15/2016 QA / QC - Quality Assurance / Quality Control
Description: For Use

Ausenco Office
TEXT = to be revised
TEXT = Added Items
TEXT = Modified Items

WBS 1 2 3 4 EST

3000 OXIDE PLANT

3100 CRUSHING & ORE HANDLING

3110 PRIMARY CRUSHING


3111 Primary Crushing Station
3112 Course Oxide Ore Stockpile Feed Conveyors (1-3)
3113 Air & Water Services
3114 Oxide Course Ore Stockpile
3115 - SPARE -
3116 - SPARE -
3119 Dust Collection
3120 SECONDARY SCREENING / CRUSHING & TERTIARY CRUSHING

3121 Secondary Screen Feed Conveyor


3122 Secondary Screening
3123 Secondary Crushing
3124 Tertiary Crushing
3125 - SPARE -
3126 - SPARE -
3127 - SPARE -
3128 - SPARE -
3129 Dust Collection

3130 TERTIARY SCREENING & QUATERNARY CRUSHING

3131 Tertiary Screen Bin Feed Conveyor


3132 Tertiary Screen Feed Bin
3133 Tertiary Screening
3134 Tertiary Screen Transfer Conveyors
3135 Quaternary Crusher Bin Feed Conveyor
3136 Quaternary Crusher Bin Shuttle Conveyor
3137 Quaternary Crusher Feed Bin
3138 Quaternary Crushing
3139 Dust Collection

3140 TERTIARY BIN & SCREENING & ORE HANDLING

3141 Tertiary Crushing Feed Conveyor


3142 Tertiary Screen Feed Bin
3143 Vib feeder & Screening 1
3144 Tertiary Screen to Quaternary Transfer Converor 1
3145 Vib feeder & Screening 2
3146 Tertiary Screen to Quaternary Transfer Converor 2
3147 - SPARE -
3148 - SPARE -
3149 Dust Collection
3160 QUATERNARY SCREENING
3161 Quaternary Screen Bin Feed Conveyor
3162 Quateranry Screen Bin Shuttle Conveyor
3163 Quateranry Screen Bin
3164 Quaternary Screening
3165 Quaternary Screen Transfer Conveyors
3166 Fine Ore Product Conveyor
3167 - SPARE -

432988949.xlsx 08/12/2019
Scope of Work and Services

Est - Estimating Services


Project: Mina Justa E - Procurement
P Engineering; (covers mainly equipment purchase. Materials
Client: Marcobre such as piping bulks, electr. & instr. Bulks, etc. purchased
Location: Peru under construction Management
CM - Construction packages will fall under CM).
Rev C O - Not included in EPCM services ( Noted party is responcible )
Status at: 8/15/2016 QA / QC - Quality Assurance / Quality Control
Description: For Use

Ausenco Office
TEXT = to be revised
TEXT = Added Items
TEXT = Modified Items

WBS 1 2 3 4 EST

3168 - SPARE -
3169 Dust Collection
3180 - SPARE -
3190 - SPARE -
3200 PRE TREATMENT & RIPIOS
3210 PRE TREATMENT
3211 Pre Treatment Drum
3220 VAT FEED
3221 Vat Feed Conveyor No.2 & Trippers
3230 RIPIOS DISPOSAL
3231 Vat Unloading
3232 Ripios Conveyor No.1
3233 Ripios Loading
3300 VAT LEACHING SXEW PLANT
3310 VAT LEACHING
3311 Fine Ore Handling
3312 Vat Leach Vats
3313 - SPARE -
3314 - SPARE -
3315 PLS Clarification

3316 PLS Pond

3317 Raffinate Pond


3318 - SPARE -
3319 - SPARE -
3320 SOLVENT EXTRACTION

3321 Mixer Settlers

3322 Loaded Organic Handling


3323 Strong Electrolyte Handling
3323 Crud Treatment
3324 - SPARE -
3330 ELECTROWINNING

3331 Electrowinning Cells

3332 Tankhouse Crane


3333 Cathode Washing

3331 Cathode Stripping & Packaging

3332 Electrolyte Handling


3333 Water Heater
3334 - SPARE -

432988949.xlsx 08/12/2019
Table 17.2 Table 17.22

Oxide Plant
Capital
Cost
Estimate –
Bare Cost Sulphide Plant Capital Cost Estimate – Bare Cost and Total Cost: Summarised by Area
and Total
Cost:
Summarise
d by Area

Area Area Description Bare Cost Accuracy Provision Total Cost Area Bare Cost Accuracy Provision Total Cost
Area Description
No. ($) (%) ($) (%) No. ($) (%) ($) (%)
Direct Costs Direct Costs
860
General Plant 11 055 834 11.4 1 261 807 12 317 641 1 General Plant 4 651 645 18.5 5 511 733
109 1 207 088
460
001 Crushing and Screening – General Areas 1 097 296 10 98 Water Supply 3 598 297 12.8 4 058 609
731 027 312
010 Primary Crushing 12 011 627 8.9 1 063 609 13 075 236 110 Sulphide Primary Crushing 15 066 043 14.3 2 157 212 17 223 255
501 5 900
011 Primary Stockpile and Reclaim 5 399 360 9.3 120 Sulphide Grinding 36 804 910 9.6 3 545 430 40 350 340
547 907
012 Secondary Screening/Crushing and Tertiary 20 287 527 6.1 1 228 564 21 516 091 130 Sulphide Flotation 17 230 211 15.2 2 615 714 19 845 925
013 Crushing 140 Sulphide Concentrate Thickening and Filtration 7 579 799 13.8 1 045 210 8 625 009
014 Tertiary Screening and Quaternary Crushing 22 968 439 6 1 387 639 24 356 078 160 Sulphide Tailings Thickening and Disposal 15 102 265 18.2 2 753 420 17 855 685
758
015 Quaternary Screening 10 418 274 7.3 11 176 473 170 Sulphide Reagents 2 444 480 16.9 414 113 2 858 593
199
020 Vat Leaching (Indec) 67 288 240 9.3 6 248 419 73 536 659 180 Sulphide Services 7 592 634 16.7 1 265 847 8 858 481
295
030 Solvent Extraction 18 772 003 11.2 2 094 912 20 866 915 188 Mobilisation and Demobilisation 2 136 838 13.8 2 432 082
244
318
040 Electrowinning 29 898 230 7.6 2 262 348 32 160 578 190 Temporary Facilities 2 125 302 15 2 444 097
246 2 638 485 79569 555
050 Reagents – Oxide 2 391 151 10.3 191 Commissioning 14.3
951
395 102
3 865 763
535 596
80 359
615
060 Services – Oxide 3 469 873 11.4 192 Vendor Representatives 15
997 870 528 732329 857
070 Infrastructure – Oxide 21 533 336 9.7 2 097 806 23 631 142 193 First Fills and Spares 3 681 004 19.9 4 413 103
099
315 3 265
079 Mobilisation and Demobilisation 2 949 703 10.7 Direct Costs – Subtotals 119 034 719 14 16 613 409 135 648 128
812 515
435 4 790
080 Temporary Facilities 4 354 608 10 EPCM 22 129 233 0 0 22 129 233
461 069
202 2 223
081 Commissioning – Oxide 2 020 961 10 Direct and Indirect Costs – Subtotals 141 163 952 11.8 16 613 409 157 777 361
096 057
105 1 164
082 Vendor Representatives 1 058 439 10 Owner’s Costs (BTL) 10 529 709 0 0 10 529 709
844 283
083 First Fills and Spares 11 512 650 10 1 151 265 12 663 915 Total 151 693 661 11 16 613 409 168 307 070
122 1 344
084 Loose Tools and Equipment 1 221 938 10
193 131
095 Power Supply 11 545 443 10 1 154 545 12 699 988
968 8 103
096 Plant Access Road 7 134 713 13.6
895 608
097 Construction Camp and Village 17 008 679 10 1 700 868 18 709 547
098 Water Supply 16 576 532 13.7 2 270 740 18 847 272
Mining:
- Equipment Purchases
- Excavator Bucket 117 438 536 0 0 117 438 536
200
- Dispatch and Fleet Management System 469 000 0 0 469 000
- Other Costs 1 200 000 0 0 1 200 000
4 042 966 5.6 224 776 4 267 742
Direct Costs – Subtotals 425 125 358 6.7 28 310 024 453 435 382
EPCM 51 080 140 10 5 108 014 56 188 154
Direct and Indirect Costs – Subtotals 476 205 498 7 33 418 038 509 623 536
Owner’s Costs (BTL) 37 242 013 0 0 37 242 013
Total 513 447 511 6.5 33 418 038 546 865 549

Table 17.10 Table 17.25


Oxide Plant Building Costs: Section 1 – GRD Minproc Process Plant (Bare Costs) Sulphide Plant Buildings: Bare Cost
Earthworks Concrete Steelwork Electrical Buildings Earthworks Concrete Steelwork Electrical Buildings
Area Description Total Area Description Total
1 2 3 7 9 1 2 3 7 9
Section 1: GRD Minproc - Process Plant GRD Minproc – Process Plant
162 Primary Crusher 2 057 1 095 116 3 269
10 C331-001, Crushing and Screening Substation 162 114 110
114 Building 291 915 574 780

Transportable
175 Substation – 116 116
11 C331-001, Transportable Substations Primary Crushing 175 705 110
705 Sulphide 054 054
crushing area
5 5
12 Sub station – air
12
11 Primary Crusher Control Room Cabin 11 110 conditioning 8 8
114
4 system 4 4
5 5
Transportable
2 058 3 273 Substation – 116 116
11 Primary Crusher Building 1 095 915 118 824 120
364 103 Sulphide pebble 054 054
crushing area

Transportable
7 15 461 461
11 Primary Crushing – Substation 8 374 120 Substation –
152 526 808 808
Grinding area
Mill Building incl.
1 13 61 732 1 164 1 958
11 Primary Crushing – Substation – Transformer Bays 11 694 120 drive-in sump
652 346 470 904 599 973
and access ramp

Sub station – air


185 11 11
13 C331-001, Transportable Substations Secondary Screening 185 446 120 conditioning
446 689 689
system

Transportable
7 23 461 461
13 Secondary Crushing Substation 9 990 5 845 130 Substation –
502 336 808 808
Flotation Area
5 5
Substation – air
1 13
13 Secondary Crushing Substation – Transformer Bays 11 694 130 conditioning 8 8
652 346
system 4 4
5 5
167 Concentrate filter 155 157 314
14 C331-001, Tertiary Screening Substation 167 959 140 5
959 building 763 586 921
7
7 17 Concentrate 282 251 536
14 Tertiary Crushing Substation 9 990 140 6
502 491 storage 685 239 603
7
Transportable
1 13 Substation – Tails 163 163
14 Tertiary Crushing Substation – Transformer Bays 11 694 140
652 346 thickening 921 921
substation
5 5
Substation – air
116
15 C331-001, Transportable Substation Quatenary Screening 116 054 140 conditioning 8 8
054
system 4 4
5 5
6 18 100 228 330
15 Quarternary Crushing Substation 6 730 5 845 170 Reagent Building 8
303 878 850 288 966
2
Transportable
1 9 substation – 272 272
15 Quarternary Crushing Substation – Transformer Bays 8 870 180
101 971 Sulphide HV 371 371
substation
5 5
Sub station – air
116
30 C331-001, Transportable Substations Solvent Extraction 116 054 180 conditioning 4 4
054
system 8 8
9 9
6 18 Administration 323 323
30 Solvent Extraction Area Substation 6 730 5 845 180
303 878 building 785 785

Administration
1 9 building – 150 150
30 Solvent Extraction Area Substation – Transformer Bays 8 870 180
101 971 furniture and fit 150 150
out
116 410 410
40 C331-001, Transportable Substations Electrowinning 116 054 180 Control room
054 473 473
Control room –
94 1 360 2 219 144 144
40 Electrowinning Building 763 990 180 furniture and fit
810 706 506 300 300
out
6 13 Primary Crusher 10 13
40 Electrowinning Area Substation 6 730 180 2
303 034 Substation 382 627
4
1 9
40 Electrowinning Area Substation – Transformer Bays 8 870
101 971
162
40 C331-002, Transportable Substations Oxide Process 162 114
114
7 15
40 Oxide Process Area Substation 8 374
152 526
5
40 Oxide Process Area Substation – Transformer Bays ### 4 612
163
116
40 Substation – Rectiformer A 116 054
054
116
40 Substation – Rectiformer B 116 054
054
116
60 C331-001, Services Oxide Substation 116 054
054
6 18
60 Services Area Substation 6 730 5 845
303 878
1 9
60 Services Area Substation – Transformer Bays 8 870
101 12 971
2 163 1 534 7 281
Total 1 998 727 1 573 042 11
085 052 019
4
Phase 2A WBS Area / Facility Opportunity
10110 Mining Equipment Optimise mining fleet - is stockpiling strategy workable? (heard in kick-off discussions)
10120 Mining Infrastructure Use minimalist approach to mining infrastructure (workshops and offices are containerised and sprung structures rather than permanent facilities)
20000 Process Plant
21000 Oxides Process Plant
21010 General Plant Optimise layout of plant
21020 Crushing & Screening 3 stage crushing?
Shared crushing facilities with sulfide plant?
21030 Primary Crushing see above
21040 Primary Stockpile & Reclaim Phu Kham but with Armco style tunnel including feeder area
21050 Secondary Screening /
Crushing & Tertiary Crushing
21060 Tertiary Screening & Possibly not required if vibrocones are used?
Quaternary Crushing
21070 Quaternary Screening Possibly not required if vibrocones are used?
21080 Vat Leaching Optimise layout, materials of construction and quantities
21090 Solvent Extraction Base on either a vertical package or MMS style plant
21100 Electrowinning Base on either a vertical package or MMS style plant
21110 Reagents - Oxide Optimise acid supply cost (capex and opex)
21120 Services - Oxide Simplify as much as practical
22000 Sulfides Process Plant
22010 General Plant Base on Phu Kham style layout
22020 Sulfide Crushing Determine optimum comminution circuit
22030 Sulphide Grinding Determine optimum comminution circuit
22040 Sulphide Flotation Base on Phu Kham style layout
22050 Sulphide Concentrate Base on Phu Kham style layout
Thickening and Filtration
22060 Sulphide Tailings Thickening Base on Phu Kham style layout
and Disposal
22070 Sulphide Reagents Base on Phu Kham style layout
22080 Sulphide Services (+ allowance Base on Phu Kham style layout
for fresh water pond)

23000 Plant Infrastructure


23010 Plant Infrastructure
30000 Residue Disposal
31100 Ripios and Waste Dumps Trucking v's conveying of ripios
32100 Tailings Storage Facilitiy Consider range of options to optimse tailings and water costs
40000 General Infrastructure
Camp Pre-Fabricated (Quoted) Consider second-hand options from other projects / suppliers

Camp Furniture and equipment


(Provision)
Camp Earthmoving Minimise - retain natural terain where possible
Camp Refubrishement after
construction (Provision)
Access Road Optimise design and cost
Earthworks Minimise and use a mid range contractor such as San Martin or equivalent?
Electrical
Power Supply Grid supply - confirm cost vis reputable contractor
Expansion Works in Poroma Confirm scope and cost
Sub-Station
Power Tranmission Line Grid supply - confirm cost vis reputable contractor
Estimate
Mina Justa Sub-station Cost All substations are prefabricated and FAT tested off site
Estimate
Power Supply to Fresh Water Confirm scope and cost
Line (from Jahuay)
Power Supply to Seawater Line Confirm scope and cost

Water Supply
Seawater Supply line Confirm scope and cost
Fresh Water Line (from Jahuay) Confirm scope and cost. HDPE line with earth mound stabilsation

Telecomunication
Telecomunication System (from
SNCL)
Fire Protection
SX Fire Fighting System Discuss with insurers - consider fire strategy based on safety
General Site Fire Fighting Use Phu Kham concepts
System (Provision for Pumping
Station & Diesel Backup
System, distribution piping
system to plant, conveyors and
infrastructure)
Sanitary Landfill
Provision Allowance
TOTAL DIRECT COST
50000 Other Costs
51000 Indirect Cost + Owner
51100 EPCM Base on contracting strategy and benchmark data
51200 Mechanical Freigths Oxides + Move to direct costs
Sulphides (23.5% Equip Ex
work?)
51300 Electrical & Instrumentation Move to direct costs
Freigths (27% Mechanical
Cost?)
51400 Mobilisation & Demobilisation Factor
51500 Temporary Facilities (10% DC?) Factor
51600 Commissioning Allowance based on scope
51700 Vendor Representatives (2% Base on contracting strategy and benchmark data
DC?)
51800 First Fills (Calculated for Factor
Oxides, 2% equip for
sulphides?)
51900 Spares (4% equip?) Factor
Mine Indirect TBA
52000 Owners Cost
52100 Owners Cost (MARCOBRE Ensure sufficient for operational readiness and start-up
Input)
53000 Contingency
53100 Contingencia Except Mine TBA
53100 Contingencia Mine 10% (Mine TBA
Equipment cost + Indirect ?)

TOTAL INSTALLED
COST