Liquidación de Obra
Liquidación de Obra
xxxxxxxxxxxx
xxxxxxxxxxxx
Obras
Proceso : xxxxxxxxxxxxxxxxxx
Obra : xxxxxxxxxxxxxxxxxx
Contratista : xxxxxxxxxxxxxxxxxx
Ubicación :
Distrito : xxx
Provincia : xxx
Departamento: xxx
Contiene:
xxxxxxxxxxxxxxxxxx
P.U. PARCIAL VAL 01 - MAY 12 VAL 02 - JUN 12 VAL 03 - JUL 12 VAL 04 - AGO 12
ITEM DESCRIPCION UND METRADO
S/. S/. METRADO S/. METRADO S/. METRADO S/. METRADO S/.
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 49,821.93 49,821.93 0.50 24,910.97 0.25 12,455.48 0.10 4,982.19 0.15 7,473.29
01.02 TOPOGRAFIA Y GEOREFERENCIACION GLB 1.00 19,260.92 19,260.92 0.75 14,445.69 0.15 2,889.14 0.10 1,926.09 - -
02.01 CORTE EN MATERIAL SUELTO m3 43,810.78 5.16 226,063.62 7,047.71 36,366.18 33,854.02 174,686.74 2,909.05 15,010.70 - -
02.02 CORTE EN ROCA SUELTA m3 6,930.43 11.60 80,392.99 2,289.31 26,556.00 3,887.08 45,090.13 754.04 8,746.86 - -
02.03 CORTE EN ROCA FIJA m3 6,143.97 19.80 121,650.61 2,179.66 43,157.27 3,175.03 62,865.59 789.28 15,627.74 - -
02.04 RELLENO CON MATERIAL DE PRESTAMO m3 3,307.61 16.80 55,567.85 312.30 5,246.64 2,316.86 38,923.25 678.45 11,397.96 - -
02.05 PERFILADO Y COMPACTACION SUB-RASANTE EN ZONAS DE CORTE m2 70,099.13 0.94 65,893.18 3,765.08 3,539.18 59,448.04 55,881.16 6,886.01 6,472.85 - -
03.02 ESCARIFICADO DE AFIRMADO EXISTENTE m2 27,905.22 0.58 16,185.03 - - - - 22,443.45 13,017.20 5,461.77 3,167.83
03.03 PERFILADO Y COMPACTACION DE AFIRMADO EXISTENTE m2 8,987.84 0.94 8,448.57 - - - - 8,865.76 8,333.81 122.08 114.76
04.01 TRANSPORTE DE MATERIAL AFIRMADO D<1 KM m3-km 14,947.19 5.56 83,106.38 - - 2,004.50 11,145.02 11,987.58 66,650.94 955.11 5,310.41
04.02 TRANSPORTE DE MATERIAL AFIRMADO D>1 KM m3-km 44,273.10 1.25 55,341.38 - - 6,598.45 8,248.06 35,240.18 44,050.23 2,434.47 3,043.09
04.03 TRANSPORTE DE MATERIAL DE PRESTAMO D<1 KM m3-km 2,829.07 5.56 15,729.63 109.79 610.43 2,241.66 12,463.63 477.62 2,655.57 - -
04.04 TRANSPORTE DE MATERIAL DE PRESTAMO D>1 KM m3-km 4,655.12 1.25 5,818.90 449.86 562.33 3,896.79 4,870.99 308.47 385.59 - -
04.05 TRANSPORTE DE MATERIAL EXCEDENTE D<1 KM m3-km 17,943.27 2.50 44,858.18 4,374.78 10,936.95 11,438.10 28,595.25 2,130.39 5,325.98 - -
05.01 ALCANTARILLAS TIPO MARCO DE 1.00 x 1.00 M 42,244.65 6,962.60 18,312.01 16,970.03 -
05.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3 186.60 38.83 7,245.68 56.21 2,182.63 49.71 1,930.24 80.68 3,132.80 - -
05.01.02 RELLENO PARA ESTRUCTURAS CON MATERIAL PROPIO m3 50.60 26.77 1,354.56 - - 31.92 854.50 18.68 500.06 - -
05.01.04 CONCRETO F'C=100 KG/CM2 m3 1.73 186.11 321.97 0.49 91.19 0.52 96.78 0.72 134.00 - -
05.01.05 CONCRETO F'C=175 KG/CM2 m3 27.54 339.81 9,358.37 - - 18.36 6,238.91 9.18 3,119.46 - -
05.01.06 CONCRETO F'C=210 KG/CM2 m3 19.21 379.35 7,287.31 - - 11.47 4,351.14 7.74 2,936.17 - -
05.01.07 ACERO DE REFUERZO FY= 4200 KG/CM2 kg 1,138.33 4.85 5,520.90 335.69 1,628.10 352.38 1,709.04 450.26 2,183.76 - -
05.01.08 ENCOFRADO Y DESENCOFRADO m2 222.40 45.33 10,081.39 67.52 3,060.68 69.08 3,131.40 85.80 3,889.31 - -
05.03.01 LIMPIEZA DE ALCANTARILLAS und 30.00 42.65 1,279.50 - - 11.00 469.15 19.00 810.35 - -
05.04.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3 79.04 38.83 3,069.12 - - 54.58 2,119.34 24.46 949.78 - -
05.04.02 CONCRETO CICLOPEO F'C=175 KG/CM2 + 30% P.M. m3 72.75 195.83 14,246.63 - - 49.21 9,636.79 23.54 4,609.84 - -
05.04.03 AFIRMADO PARA BADEN m3 5.86 34.81 203.99 - - 3.80 132.28 2.06 71.71 - -
05.04.04 ENCOFRADO Y DESENCOFRADO m2 28.60 45.33 1,296.44 - - 18.82 853.11 9.78 443.33 - -
3 de 12
VALORIZACIONES MENSUALES RECALCULADAS - CONTRATO PRINCIPAL
OBRA REHABILITACION DEL CAMINO VECINAL: xxxxxxxxxxxxxxxxxxxxxxxxxx (L= 19.208 KM)
ENTIDAD xxxxxxxxxxxxxxxx
CONTRAT. CONSORCIO LIBERTAD
P.U. PARCIAL VAL 01 - MAY 12 VAL 02 - JUN 12 VAL 03 - JUL 12 VAL 04 - AGO 12
ITEM DESCRIPCION UND METRADO
S/. S/. METRADO S/. METRADO S/. METRADO S/. METRADO S/.
06.05 PINTADO DE BARANDAS METALICAS EN PUENTES m 137.50 14.87 2,044.63 - - - - 137.50 2,044.63 - -
07.01 SEÑALIZACION AMBIENTAL und 26.00 471.71 12,264.46 10.00 4,717.10 - - 16.00 7,547.36 - -
07.02 RESTAURACION DE AREA DE CAMPAMENTOS Y PATIO DE MAQUINAS ha 0.25 8,595.43 2,148.86 - - - - - - 0.25 2,148.86
07.04 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN EL DME m3 56,885.18 1.00 56,885.18 - - - - - - 56,885.18 56,885.18
4 de 12
FACTORES DE REAJUSTE
UBICACIÓN CUSCO
VALOR REFERENCIAL S/. 2,222,136.77 (CON IGV) S/. 1,883,166.75 (SIN IGV)
PRESUPUESTO CONTRATADO S/. 1,999,923.11 (CON IGV) S/. 1,694,850.09 (SIN IGV)
0.007
FORMULA 01:
COD. Coeficiente Incidencia I.U BASE Mar-12 Jun-12 Jul-12 Aug-12 Sep-12
SIMBOLO ELEMENTO
IU % AGOSTO 2011 Indice Coef. Indice Coef. Indice Coef. Indice Coef. Indice Coef.
M MANO DE OBRA INC. LEYES SOCIALES 047 0.126 100.00% 448.29 448.25 0.126 470.79 0.132 470.79 0.132 470.75 0.132 470.79 0.132
ACERO DE CONSTRUCCION CORRUGADO 003 11.475% 564.91 501.65 486.71 475.24 431.43 429.12
CMA CEMENTO PORTLAND TIPO I 021 0.061 73.771% 410.96 410.96 0.061 410.96 0.061 410.96 0.061 410.96 0.060 410.96 0.060
MADERA NACIONAL PARA ENCOF. Y CARPINT. 043 14.754% 779.71 839.99 848.21 849.00 847.06 846.43
MAQUINARIA Y EQUIPO NACIONAL 048 7.061% 330.79 328.00 328.79 328.55 325.98 325.11
MM 0.609 0.609 0.600 0.601 0.603 0.603
MAQUINARIA Y EQUIPO IMPORTADO 049 92.939% 238.59 239.00 234.94 235.34 236.25 236.24
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 039 0.204 100.00% 366.50 375.16 0.209 377.16 0.210 377.50 0.210 379.42 0.211 381.48 0.212
FACTOR ( K ) K AGOSTO 2011 = 1.000 K MAR. = 1.005 K MAY. = 1.003 K JUN. = 1.004 K JUL. = 1.006 K AGO. = 1.007
RECALCULO DE REINTEGROS DEL MES
( Con los K del mes posterior a la Valorización)
UBICACIÓN CUSCO
VALOR REFERENCIAL S/. 2,222,136.77 (CON IGV) S/. 1,883,166.75 (SIN IGV)
PRESUPUESTO CONTRATADO S/. 1,999,923.11 (CON IGV) S/. 1,694,850.09 (SIN IGV)
FORMULA UNICA
Val. Programada Val. Ejecutada Reaj. Programada Reaj. Ejecutada Reaj. Autorizado
K-1
Val. Nº Fecha
(mes siguiente)
Mes Acumulado Mes Acumulado Mes Acumulado Mes Acumulado
UBICACIÓN CUSCO
VALOR REFERENCIAL S/. 2,222,136.77 (CON IGV)
VALOR REFERENCIAL (SIN IGV) S/. 1,883,166.75 (SIN IGV)
PRESUPUESTO CONTRATADO S/. 1,999,923.11 (CON IGV)
PRESUPUESTO CONTRATADO (SIN IGV) S/. 1,694,850.09 (SIN IGV)
V (formulas) K Ka De =V*(A/C)*( K / Ka - 1)
TOTALES #DIV/0!
RECALCULO DE LA DEDUCCION DEL REAJUSTE QUE NO CORRESPONDEN POR EL ADELANTO DE MATERIALES
OBRA: REHABILITACION DEL CAMINO VECINAL: XXXXXXXXXXXXXXXXXXXX L= 19.208KM
FECHA DEL PRESUPUESTO BASE AGOSTO 2011
AREA GEOGRAFICA 2
INSPECTOR ING. EDUARDO MENDOZA DAVALOS
CONTRATISTA CORSORCIO LIBERTAD
UBICACIÓN ICA
VALOR REFERENCIAL S/. 2,222,136.77 (CON IGV) S/. 1,883,166.75 (SIN IGV)
PRESUPUESTO CONTRATADO S/. 1,999,923.11 (CON IGV) S/. 1,694,850.09 (SIN IGV)
2 Junio. 2012 582,668.18 0.007 10,434.85 471.480 486.71 564.91 12,111.42 4,078.68 4,078.68 -109.96
3 Julio. 2012 617,808.94 0.007 10,434.85 431.430 486.71 564.91 12,111.42 4,324.66 4,324.66 -423.20
4 Agosto. 2012 271,400.98 0.007 10,434.85 429.120 486.71 564.91 12,111.42 1,899.81 3,708.08 -378.02
2 Junio. 2012 582,668.18 0.045 76,267.75 410.960 410.96 410.96 76,267.75 26,220.07 26,220.07 0.00
3 Julio. 2012 617,808.94 0.045 76,267.75 410.960 410.96 410.96 76,267.75 27,801.40 27,801.40 0.00
4 Agosto. 2012 271,400.98 0.045 76,267.75 410.960 410.96 410.96 76,267.75 12,213.04 22,246.28 0.00
2 Junio. 2012 582,668.18 0.009 16,575.62 847.800 848.21 779.71 15,237.00 5,244.01 5,244.01 -2.76
3 Julio. 2012 617,808.94 0.009 16,575.62 847.060 848.21 779.71 15,237.00 5,560.28 5,560.28 -8.20
4 Agosto. 2012 271,400.98 0.009 16,575.62 846.430 848.21 779.71 15,237.00 2,442.61 4,432.71 -10.12
RECALCULO DE LA DEDUCCION DEL REAJUSTE QUE NO CORRESPONDEN POR EL ADELANTO DE MATERIALES
OBRA: REHABILITACION DEL CAMINO VECINAL: XXXXXXXXXXXXXXXXXXXX L= 19.208KM
FECHA DEL PRESUPUESTO BASE AGOSTO 2011
AREA GEOGRAFICA 2
INSPECTOR ING. EDUARDO MENDOZA DAVALOS
CONTRATISTA CORSORCIO LIBERTAD
UBICACIÓN ICA
VALOR REFERENCIAL S/. 2,222,136.77 (CON IGV) S/. 1,883,166.75 (SIN IGV)
PRESUPUESTO CONTRATADO S/. 1,999,923.11 (CON IGV) S/. 1,694,850.09 (SIN IGV)
2 Junio. 2012 582,668.18 0.204 79,849.33 377.500 377.16 366.50 77,592.48 118,864.31 118,864.31 110.27
3 Julio. 2012 617,808.94 0.204 79,849.33 379.420 377.16 366.50 77,592.48 126,033.02 126,033.02 777.17
4 Agosto. 2012 271,400.98 0.204 79,849.33 381.480 377.16 366.50 77,592.48 55,365.80 -167,304.85 -1972.05
CONTROL DE DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO No. 01 DE MATERIALES
1.2.1 PAGADO
Contrato Principal 1,686,235.99
MONTO PARCIAL (C) 1,686,235.99