Está en la página 1de 5

1. Cálculo de las Unidades de Gasto (U.G.

) por nivel

1er nivel:

1 G.R. = 2

½ Baño = 4

1 L.C. = 3

1 L.R. = 3

= 12 U.G.

2do nivel:

2x ¾ Baño = 2x6

= 12 U.G.

3er nivel:

¾ Baño = 6

2 L.R. = 2x3

= 12 U.G.

Total = 36 U.G. <> 0.85 lt/seg

2. Cálculo Hidráulico por Tramos

TRAMO A-B:

36 U.G. <> 0.85 lt/seg


𝑄
→ Ø = 1” → V = 1.974x m/s
𝐷2
L = 8.92m V = 1.68 m/s

S = 0.1215

Hf = SxL

Hfl = 0.996M

L.E.:

1 codo 45°x1” = 1 x 0.477

5 codo 90°x1” = 5 x 1.023

1 Valv. Comp 1” = 1 x 0.216

1 TEE 1”x1” = 1 X 2.045

= 7.853
Hfa = 0.1215X 7.853 = 0.954

Hf = Hfl + Hpa = 1.95

PB = PA – 1.95 – 1.2 = PA – 3.15

PB = 20 – 3.15 = 16.85M

TRAMO B-C:

34 U.G. <> 0.82 lt/seg


𝑄
→ Ø = 1” → V = 1.974x m/s
𝐷2
V = 1.62 m/s

L = 3.95m S = 0.113654

Hf = SxL

Hfl = 0.45M

L.E.:

1 TEE 1”x1” = 1 X 2.045

= 2.045M

Hfa = 0.113654 x 2.045 = 0.23M

PC = PB – 0.45 – 0.23

PC = 16.85 – 0.45 – 0.23 = 16.17M

TRAMO C-D:

30 U.G. <> 0.75 lt/seg


𝑄
→ Ø = 1” → V = 1.974x m/s
𝐷2
L = 1.65m V = 1.48 m/s

S = 0.09636

Hf = SxL

Hfl = 0.16M

L.E.:

1 TEE 1”x1” = 1 X 2.045

= 2.045M

Hfa = 0.09636 x 2.045 = 0.954

PD = PC – 0.16 – 0.20

PB = 16.17 – 0.16 – 0.20 = 15.81M


TRAMO D-E:

24 U.G. <> 0.61 lt/seg


𝑄
→ Ø = 3/4” → V = 1.974x 2 m/s
𝐷
L = 4.03M V = 2.14 m/s

S = 0.2669

Hf = SxL

Hfl = 0.44M

L.E.:

1 codo 90°x3/4” = 1 x 0.777

1 TEE 3/4”x3/4” = 1 X 1.654

1 Reducción 1”x3/4” = 1 x 0.216

= 2.647

Hfa = 0.2669 x 2.647 = 0.71M

PE = PD – 0.44 – 0.71 – 2.7

PE = 15.81 – 0.44 – 0.71 – 2.7 = 11.96M

TRAMO E-F:

12 U.G. <> 0.38 lt/seg


𝑄
→ Ø = 3/4” → V = 1.974x 2 m/s
𝐷
L = 2.7M V = 1.33 m/s

S = 0.111

Hf = SxL

Hfl = 0.3M

L.E.:

1 codo 90°x3/4” = 1 x 0.777

= 0.777M

Hfa = 0.111 x 0.777 = 0.09M

Hf =0.3 + 0.09 = 0.39M

PE = PD – 0.39– 2.7

PE = 11.96 – 0.39 – 2.7 = 8.87M


TRAMO F-G:

12 U.G. <> 0.38 lt/seg


𝑄
→ Ø = 3/4” → V = 1.974x 2 m/s
𝐷
L = 5.1M V = 1.33 m/s

S = 0.111

Hf = SxL

Hfl = 0.57M

L.E.:

1 codo 90°x3/4” = 1 x 0.777

1 TEE 3/4”x3/4” = 1 X 1.654

= 2.431M

Hfa = 0.111 x 2.431 = 0.27M

PG = PF – 0.57 – 0.27

PE = 8.87 – 0.57 – 0.27 = 8.03M

TRAMO G-H:

6 U.G. <> 0.25 lt/seg


𝑄
→ Ø = 3/4” → V = 1.974x 2 m/s
𝐷
L = 5.01M V = 0.88m/s

S = 0.051247

Hf = SxL

Hfl = 0.26M

L.E.:

2 codo 90°x3/4” = 2 x 0.777

1 TEE 3/4”x3/4” = 1 X 1.654

= 3.208M

Hfa = 0.051247 x 3.208 = 0.16M

PH = PG – 0.26 – 0.16

PH = 8.03 – 0.26 – 0.16 = 7.61M

TRAMO H-I:

3 U.G. <> 0.12 lt/seg


𝑄
→ Ø = 1/2” → V = 1.974x m/s
𝐷2
L = 1.75M V = 0.95m/s

S = 0.095

Hf = SxL

Hfl = 0.17M

L.E.:

3 codo 90°x1/2” = 3 x 0.532

1 RED 3/4”x1/2” = 1 X 0.164

= 1.76M

Hfa = 0.095 x 1.76 = 0.17M

PI = PH – 0.17 – 0.17 – 1

PI = 6.27M > 2MCA OK! SI CUMPLE