Está en la página 1de 6

SALDO POR EJECUTAR DE VALORIZACION SALDO FINAL EN LA LIQUIDACION

% GENEREAL DE % QUE
ITEM DESCRIPCION UND QUEDARA
OBRA PENDIENTE % QUE AL FINAL
METRADO VALORIZAR % POR PARTIDA QUEDARA AL
PENDIENTE FINAL
METRADO
01 VEREDAS DE CONCRETO
01.01 OBRAS PROVISIONALES
01.01.03 SERVICIOS HIGIENICOS PORTATILES DISAL MES 2.00 S/1,260.00 66.67% 0.09% 3.00 S/ 1,890.00 100.00% 0.14%
01.02 OBRAS PRELIMINARES
01.02.04 REUBICACION DE POSTES DE LUZ UND 3.00 S/12,749.43 100.00% 0.92% 3.00 S/ 12,749.43 100.00% 0.92%
01.03 MOVIMIENTO DE TIERRAS
AFIRMADO COMPACTADO PARA VEREDAS, MARTILLOS
01.03.05
Y RAMPAS
M3 63.81 S/11,673.12 19.36% 0.84% 63.81 S/ 11,673.12 19.36% 0.84%
01.04 CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO PARA VEREDAS Y
01.04.01
RAMPAS
M2 147.42 S/7,521.68 15.86% 0.54% 147.42 S/ 7,521.68 15.86% 0.54%
VEREDAS DE CONCRETO F'c=175 kg/cm2 E=4" INCLUYE
01.04.03
PASTA 1:2 C:A 1.5 CM.
M2 27.95 S/1,530.18 1.52% 0.11% 0.00 S/ - 0.00% 0.00%
UÑA PARA VEREDAS Y MARTILLOS DE CONCRETO 0.64 S/191.27 1.30% 0.01% 0.53 S/ 158.17 1.07% 0.01%
01.04.04 M3
F`c=175 kg/cm2
MARTILLO DE CONCRETO F`c=175 kg/cm2 INCLUYE
01.04.05 PASTA 1:2 C:A 1.5 CM BRUÑADO Y ACABADO M2 29.40 S/1,941.90 46.05% 0.14% 29.40 S/ 1,941.90 46.05% 0.14%
SEMIPULIDO
RAMPA DE CONCRETO F`c=175 kg/cm2 INCLUYE
01.04.06
PULIDO Y BRUÑADO
M2 9.92 S/525.50 49.33% 0.04% 7.06 S/ 374.16 35.12% 0.03%
01.05 VARIOS
JUNTAS ASFALTICAS EN VEREDAS, MARTILLOS Y
01.05.01
SARDINELES
M 21.00 S/164.81 2.48% 0.01% 0.00 S/ - 0.00% 0.00%
CURADO DE VEREDAS, MARTILLOS, RAMPAS Y
01.05.02
SARDINELES
M2 27.95 S/58.61 1.29% 0.00% 0.00 S/ - 0.00% 0.00%
02 PAVIMENTACION
02.04 SARDINELES SUMERGIDOS
02.04.01 TRAZO Y REPLANTEO EN SARDINEL SUMERGIDO M 143.48 S/144.63 11.02% 0.01% 134.71 S/ 135.79 10.35% 0.01%
02.04.02 EXCAVACION DE ZANJA PARA SARDINEL SUMERGIDO M 143.48 S/263.43 11.02% 0.02% 134.71 S/ 247.33 10.35% 0.02%
ACARREO DE MATERIAL EXCEDENTE (PROVENIENTE
02.04.03 M3 6.73 S/61.72 11.03% 0.00% 6.31 S/ 57.91 10.35% 0.00%
DE EXVACION DE SARDINEL SUMERGIDO D=30 M).
02.04.04 ELIMINACION DE MATERIAL EXCEDENTE M3 6.73 S/203.21 11.03% 0.01% 6.31 S/ 190.68 10.35% 0.01%
ENCOFRADO Y DESENCOFRADO DE SARDINELES
02.04.05
SUMERGIDO
M2 71.74 S/3,029.44 11.02% 0.22% 67.36 S/ 2,844.27 10.35% 0.21%
CONCRETO EN SARDINELES SUMERGIDOS F`c=175
02.04.06 M 143.48 S/3,873.96 11.02% 0.28% 134.71 S/ 3,637.17 10.35% 0.26%
kg/cm2 (15x25 CM) INCLUYE SEMIPULIDO
02.04.07 PINTURA EN SARDINELES SUMERGIDOS M 120.81 S/829.60 9.45% 0.06% 117.56 S/ 807.28 9.20% 0.06%
02.06 SEÑALIZACION
02.06.02 PINTURA LINEAL DISCONTINUA E=0.10 M. M 65.43 S/776.72 11.78% 0.06% 65.43 S/ 776.72 11.78% 0.06%
02.06.03 PINTURA DE SIMBOLOS LETRAS Y SEÑALES M2 83.15 S/1,843.19 28.11% 0.13% 83.15 S/ 1,843.19 28.11% 0.13%
03 MURO DE CONTENCION
03.02 MOVIMIENTO DE TIERRAS
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE M3 0.00 S/0.00 0.00% 0.00% 0.00 S/ - 0.00% 0.00%
03.04 CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO CARA VISTA PARA
03.04.01
MURO DE CONTENCION
M2 35.15 S/2,992.99 33.27% 0.22% 35.15 S/ 2,992.99 33.27% 0.22%
03.05 VARIOS
CONSTRUCCION DE MURETE DE CONCRETO ARMADO
03.05.02 DE 1.40X0.50X0.12M P COLOCACION DE PLACA UND 1.00 S/875.15 100.00% 0.06% 0.00 S/ - 0.00% 0.00%
RECORDATORIA
HABILITACION Y COLOCACION DE PLACA
03.05.03
RECORDATORIA DE 0.45X0.50 M
GLB 1.00 S/398.31 100.00% 0.03% 0.00 S/ - 0.00% 0.00%
04 AREAS VERDES
04.01 SEMBRADO DE GRASS AMERICANO
04.01.01 CORTE MANUAL EN MATERIAL SUELTO H=10 CM M3 9.28 S/291.65 46.03% 0.02% 8.46 S/ 265.91 41.96% 0.02%
04.01.02 ACARREO DE MATERIAL PROVENIENTE DE CORTE M3 11.60 S/106.38 46.03% 0.01% 10.58 S/ 96.99 41.96% 0.01%
04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 11.60 S/350.26 46.03% 0.03% 10.58 S/ 319.35 41.96% 0.02%
PREPARACION DE TERRENO PARA SEMBRADO DE M2 92.79 S/714.02 46.03% 0.05% 84.59 S/ 650.92 41.96% 0.05%
04.01.04
GRASS AMERICANO EN BLOQUE
04.01.05 INSTALACION DE GRASS AMERICANO EN BLOQUE M2 92.79 S/1,184.19 46.03% 0.09% 84.59 S/ 1,079.54 41.96% 0.08%
S/55,555.34 COSTO DIRECTO S/52,254.49
S/5,555.53 GASTOS GENERALES 4.01% S/5,225.45 3.77%
S/5,555.53 UTILIDAD S/5,225.45
S/66,666.41 SUB TOTAL S/62,705.39
S/11,999.95 IGV S/11,286.97
S/78,666.37 PRESUPUESTO TOTAL S/73,992.36

1.39%
1.34% PARTIDAS QUE QUEDARAN TAL Y COMO ESTAN (PARTIDAS QUE YA NO SE REALIZARAN Y PARTIDAS YA REALIZADAS PERO NO LLEGAN AL 100%)
0.78%
1.07% PARTIDAS QUE AUN FALTAN POR VALORIZAR CIERTA CANTIDAD, SE SUPONIA QUE LO RESTANTE SE VALORIZARIA EN LA LIQUIDACION
1384573.5100 1.60%
1.60%

PARTIDAS DE METRADOS ERRADOS, CABE INDICAR QUE EL INFORME DADO POR EL SUPERVISOR INDICA LA "DEVOLUCION DE LO VALORIZADO DE MÀS" Y SU
PORCENTAJE DE 1.76 NO SERA IGUAL A LO OBTENIDO EN LA VALORIZACION.
POSTES DE LUZ ( POR DEFINIR DEDUCCION)

ITEM DESCRIPCION UNID METRADO VALORIZAR % POR PARTIDA % DE OBRA


PENDIENTE

01 VEREDAS DE CONCRETO
01.02 OBRAS PRELIMINARES
01.02.04 REUBICACION DE POSTES DE LUZ UND 3.00 S/12,749.43 100.00% 0.92%
S/12,749.43 COSTO DIRECTO
S/1,274.94 GASTOS GENERALES
S/1,274.94 UTILIDAD
S/15,299.31 SUB TOTAL
S/2,753.88 IGV

S/18,053.19 PRESUPUESTO
% SUB TOTAL TOTAL 0.92%

MENORES METRADOS A LA FECHA DE VALORIZACION Nº3

ITEM DESCRIPCION UNID METRADO VALORIZAR % POR PARTIDA % DE OBRA


PENDIENTE

01 VEREDAS DE CONCRETO
01.01 OBRAS PROVISIONALES
01.01.03 SERVICIOS HIGIENICOS PORTATILES DISAL MES 2.00 S/1,260.00 66.67% 0.09%
01.03 MOVIMIENTO DE TIERRAS
AFIRMADO COMPACTADO PARA VEREDAS, MARTILLOS
01.03.05
Y RAMPAS
M3 63.81 S/11,673.12 19.36% 0.84%
01.04 CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO PARA VEREDAS Y
01.04.01
RAMPAS
M2 147.42 S/7,521.68 15.86% 0.54%
MARTILLO DE CONCRETO F`c=175 kg/cm2 INCLUYE
01.04.05 PASTA 1:2 C:A 1.5 CM BRUÑADO Y ACABADO M2 29.40 S/1,941.90 46.05% 0.14%
SEMIPULIDO
02 PAVIMENTACION
02.06.02 PINTURA LINEAL DISCONTINUA E=0.10 M. M 65.43 S/776.72 11.78% 0.06%
02.06.03 PINTURA DE SIMBOLOS LETRAS Y SEÑALES M2 83.15 S/1,843.19 28.11% 0.13%
03 MURO DE CONTENCION
03.04 CONCRETO ARMADO

ENCOFRADO Y DESENCOFRADO CARA VISTA PARA


03.04.01
MURO DE CONTENCION
M2 35.15 S/2,992.99 33.27% 0.22%

S/28,009.59 COSTO DIRECTO


S/2,800.96 GASTOS GENERALES
S/2,800.96 UTILIDAD
S/33,611.51 SUB TOTAL
S/6,050.07 IGV
S/39,661.58 PRESUPUESTO
% SUB TOTAL TOTAL 2.02%

PARTIDAS POR VALORIZAR (A CONTEMPLARCE EN LA LIQUIDACION)

ITEM DESCRIPCION UNID METRADO VALORIZAR % POR PARTIDA % DE OBRA


PENDIENTE

01 VEREDAS DE CONCRETO
01.04 CONCRETO SIMPLE
VEREDAS DE CONCRETO F'c=175 kg/cm2 E=4" INCLUYE
01.04.03
PASTA 1:2 C:A 1.5 CM.
M2 27.95 S/1,530.18 1.52% 0.11%
UÑA PARA VEREDAS Y MARTILLOS DE CONCRETO
01.04.04
F`c=175 kg/cm2
M3 0.64 S/191.27 1.30% 0.01%
RAMPA DE CONCRETO F`c=175 kg/cm2 INCLUYE
01.04.06
PULIDO Y BRUÑADO
M2 9.92 S/525.50 49.33% 0.04%
01.05 VARIOS
JUNTAS ASFALTICAS EN VEREDAS, MARTILLOS Y
01.05.01
SARDINELES
M 21.00 S/164.81 2.48% 0.01%
CURADO DE VEREDAS, MARTILLOS, RAMPAS Y
01.05.02
SARDINELES
M2 27.95 S/58.61 1.29% 0.00%
02 PAVIMENTACION
02.04 SARDINELES SUMERGIDOS
02.04.01 TRAZO Y REPLANTEO EN SARDINEL SUMERGIDO M 143.48 S/144.63 11.02% 0.01%
02.04.02 EXCAVACION DE ZANJA PARA SARDINEL SUMERGIDO M 143.48 S/263.43 11.02% 0.02%
ACARREO DE MATERIAL EXCEDENTE (PROVENIENTE
02.04.03
DE EXVACION DE SARDINEL SUMERGIDO D=30 M).
M3 6.73 S/61.72 11.03% 0.00%
02.04.04 ELIMINACION DE MATERIAL EXCEDENTE M3 6.73 S/203.21 11.03% 0.01%
ENCOFRADO Y DESENCOFRADO DE SARDINELES
02.04.05
SUMERGIDO
M2 71.74 S/3,029.44 11.02% 0.22%
CONCRETO EN SARDINELES SUMERGIDOS F`c=175
02.04.06
kg/cm2 (15x25 CM) INCLUYE SEMIPULIDO
M 143.48 S/3,873.96 11.02% 0.28%
02.04.07 PINTURA EN SARDINELES SUMERGIDOS M 120.81 S/829.60 9.45% 0.06%
03 MURO DE CONTENCION

03.05 VARIOS

CONSTRUCCION DE MURETE DE CONCRETO ARMADO


03.05.02 DE 1.40X0.50X0.12M P COLOCACION DE PLACA UND 1.00 S/875.15 100.00% 0.06%
RECORDATORIA
HABILITACION Y COLOCACION DE PLACA
03.05.03
RECORDATORIA DE 0.45X0.50 M
GLB 1.00 S/398.31 100.00% 0.03%
04 AREAS VERDES
04.01 SEMBRADO DE GRASS AMERICANO
04.01.01 CORTE MANUAL EN MATERIAL SUELTO H=10 CM M3 9.28 S/291.65 46.03% 0.02%
04.01.02 ACARREO DE MATERIAL PROVENIENTE DE CORTE M3 11.60 S/106.38 46.03% 0.01%
04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 11.60 S/350.26 46.03% 0.03%
PREPARACION DE TERRENO PARA SEMBRADO DE
04.01.04
GRASS AMERICANO EN BLOQUE
M2 92.79 S/714.02 46.03% 0.05%
04.01.05 INSTALACION DE GRASS AMERICANO EN BLOQUE M2 92.79 S/1,184.19 46.03% 0.09%
S/14,796.33 COSTO DIRECTO
S/1,479.63 GASTOS GENERALES
S/1,479.63 UTILIDAD
S/17,755.59 SUB TOTAL
S/3,196.01 IGV
S/20,951.60 PRESUPUESTO
% SUB TOTAL TOTAL 1.07%

S/55,555.34 COSTO DIRECTO


S/5,555.53 GASTOS GENERALES
S/5,555.53 UTILIDAD
S/66,666.41 SUB TOTAL
S/11,999.95 IGV
S/78,666.37 PRESUPUESTO
% TOTAL TOTAL 4.01%

Estas partidas no se han realizados por trabajos pendientes por los postes.
POSTES DE LUZ (POR DEFINIR DEDUCCION)

% POR PARTIDA
ITEM DESCRIPCION UNID METRADO VALORIZAR PENDIENTE % DE OBRA

01 VEREDAS DE CONCRETO
01.02 OBRAS PRELIMINARES
01.02.04 REUBICACION DE POSTES DE LUZ UND 3.00 S/12,749.43 100.00% 0.92%
S/12,749.43 COSTO DIRECTO
S/1,274.94 GASTOS GENERALES
S/1,274.94 UTILIDAD
S/15,299.31 SUB TOTAL
S/2,753.88 IGV

S/18,053.19 PRESUPUESTO
% SUB TOTAL TOTAL 0.92%

MENORES METRADOS

ITEM DESCRIPCION UNID METRADO VALORIZAR % POR PARTIDA % DE OBRA


PENDIENTE

01 VEREDAS DE CONCRETO
01.01 OBRAS PROVISIONALES
01.01.03 SERVICIOS HIGIENICOS PORTATILES DISAL MES 3.00 S/ 1,890.00 100.00% 0.14%
01.03 MOVIMIENTO DE TIERRAS
AFIRMADO COMPACTADO PARA VEREDAS, MARTILLOS
01.03.05
Y RAMPAS
M3 63.81 S/11,673.12 19.36% 0.84%
01.04 CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO PARA VEREDAS Y
01.04.01
RAMPAS
M2 147.42 S/7,521.68 15.86% 0.54%
MARTILLO DE CONCRETO F`c=175 kg/cm2 INCLUYE
01.04.05 PASTA 1:2 C:A 1.5 CM BRUÑADO Y ACABADO M2 29.40 S/1,941.90 46.05% 0.14%
SEMIPULIDO
02 PAVIMENTACION
02.06.02 PINTURA LINEAL DISCONTINUA E=0.10 M. M 65.43 S/776.72 11.78% 0.06%
02.06.03 PINTURA DE SIMBOLOS LETRAS Y SEÑALES M2 83.15 S/1,843.19 28.11% 0.13%
03 MURO DE CONTENCION
03.04 CONCRETO ARMADO

ENCOFRADO Y DESENCOFRADO CARA VISTA PARA


03.04.01
MURO DE CONTENCION
M2 35.15 S/2,992.99 33.27% 0.22%

S/28,639.59 COSTO DIRECTO


S/2,863.96 GASTOS GENERALES
S/2,863.96 UTILIDAD
S/34,367.51 SUB TOTAL
S/6,186.15 IGV
S/40,553.66 PRESUPUESTO
% SUB TOTAL TOTAL 2.07%

PARTIDAS DEFINITIVAS COMO MENOR METRADO


% POR PARTIDA
ITEM DESCRIPCION UNID METRADO VALORIZAR % DE OBRA
PENDIENTE

01 VEREDAS DE CONCRETO
01.04 CONCRETO SIMPLE
VEREDAS DE CONCRETO F'c=175 kg/cm2 E=4" INCLUYE
01.04.03
PASTA 1:2 C:A 1.5 CM.
M2 0.00 0.00 0.00 0.00
UÑA PARA VEREDAS Y MARTILLOS DE CONCRETO
01.04.04
F`c=175 kg/cm2
M3 0.53 S/158.17 0.00% 0.01%
RAMPA DE CONCRETO F`c=175 kg/cm2 INCLUYE
01.04.06
PULIDO Y BRUÑADO
M2 7.06 S/374.16 35.12% 0.03%
01.05 VARIOS
JUNTAS ASFALTICAS EN VEREDAS, MARTILLOS Y
01.05.01
SARDINELES
M 0.00 0.00 0.00 0.00
CURADO DE VEREDAS, MARTILLOS, RAMPAS Y
01.05.02
SARDINELES
M2 0.00 0.00 0.00 0.00
02 PAVIMENTACION
02.04 SARDINELES SUMERGIDOS
02.04.01 TRAZO Y REPLANTEO EN SARDINEL SUMERGIDO M 134.71 S/135.79 10.35% 0.01%
02.04.02 EXCAVACION DE ZANJA PARA SARDINEL SUMERGIDO M 134.71 S/247.33 10.35% 0.02%
ACARREO DE MATERIAL EXCEDENTE (PROVENIENTE
02.04.03
DE EXVACION DE SARDINEL SUMERGIDO D=30 M).
M3 6.31 S/57.91 10.35% 0.00%
02.04.04 ELIMINACION DE MATERIAL EXCEDENTE M3 6.31 S/190.68 10.35% 0.01%
ENCOFRADO Y DESENCOFRADO DE SARDINELES
02.04.05
SUMERGIDO
M2 67.36 S/2,844.27 10.35% 0.21%
CONCRETO EN SARDINELES SUMERGIDOS F`c=175
02.04.06
kg/cm2 (15x25 CM) INCLUYE SEMIPULIDO
M 134.71 S/3,637.17 10.35% 0.26%
02.04.07 PINTURA EN SARDINELES SUMERGIDOS M 117.56 S/807.28 9.20% 0.06%
03 MURO DE CONTENCION

03.05 VARIOS

CONSTRUCCION DE MURETE DE CONCRETO ARMADO


03.05.02 DE 1.40X0.50X0.12M P COLOCACION DE PLACA UND 0.00 0.00 0.00 0.00
RECORDATORIA
HABILITACION Y COLOCACION DE PLACA
03.05.03
RECORDATORIA DE 0.45X0.50 M
GLB 0.00 0.00 0.00 0.00
04 AREAS VERDES
04.01 SEMBRADO DE GRASS AMERICANO
04.01.01 CORTE MANUAL EN MATERIAL SUELTO H=10 CM M3 8.46 S/265.91 41.96% 0.02%
04.01.02 ACARREO DE MATERIAL PROVENIENTE DE CORTE M3 10.58 S/96.99 41.96% 0.01%
04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 10.58 S/319.35 41.96% 0.02%
PREPARACION DE TERRENO PARA SEMBRADO DE
04.01.04
GRASS AMERICANO EN BLOQUE
M2 84.59 S/650.92 41.96% 0.05%
04.01.05 INSTALACION DE GRASS AMERICANO EN BLOQUE M2 84.59 S/1,079.54 41.96% 0.08%
S/10,865.47 COSTO DIRECTO
S/1,086.55 GASTOS GENERALES
S/1,086.55 UTILIDAD
S/13,038.57 SUB TOTAL
S/2,346.94 IGV
S/15,385.51 PRESUPUESTO
% SUB TOTAL TOTAL 0.79%

S/52,254.49 COSTO DIRECTO


S/5,225.45 GASTOS GENERALES
S/5,225.45 UTILIDAD
S/62,705.39 SUB TOTAL
S/11,286.97 IGV
S/73,992.36 PRESUPUESTO
% TOTAL TOTAL 3.78%

También podría gustarte