CALENDARIO DE AVANCE VALORIZADO

"RENOVACION DE PUENTE; EN EL(LA) EMP. PE 3N - INCHACA (PUENTE INCHACA) EN LA LOCALIDAD INCHACA, DISTRITO DE QUIRUVILCA, PROVINCIA
PROYECTO
SANTIAGO DE CHUCO, DEPARTAMENTO LA LIBERTAD” CUI 2529543
UBICACIÓN QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD
FECHA October-22
PLAZO DE EJECUCION 90 Días Calendarios
CLIENTE MUNICIPALIDAD DISTRITAL DE QUIRUVILCA CALENDARIO DE AVANCE VALORIZADO

MES N° 01 MES N° 02 MES N° 03


ITEM DESCRIPCIÓN UND. METRADO PRECIO (S/.) PARCIAL (S/.)
PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%)
01 OBRAS PROVISIONALES 3,212.73
01.01 CARTEL DE IDENTIFIACIÓN DE OBRA DE 3.60 X 2.40 M und 1.00 1,125.22 1,125.22 S/1,125.22 100.00% S/0.00 0.00% S/0.00 0.00%
01.02 CASETA DE GUARDIANÍA und 1.00 2,087.51 2,087.51 S/2,087.51 100.00% S/0.00 0.00% S/0.00 0.00%
02 TRABAJOS PRELIMINARES 26,379.35
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 22,080.00 22,080.00 S/7,194.61 32.58% S/7,690.78 34.83% S/7,194.61 32.58%
02.02 TRAZO NIVELACION Y REPLANTEO m2 654.27 4.53 2,963.84 S/2,963.84 100.00% S/0.00 0.00% S/0.00 0.00%
02.03 DESBROCE Y LIMPIEZA DE TERRENO ha 0.07 1,221.50 85.51 S/85.51 100.00% S/0.00 0.00% S/0.00 0.00%
02.04 MANTENIMIENTO DE TRÁNSITO TEMPORAL Y SEGURIDAD VIAL glb 1.00 1,250.00 1,250.00 S/411.93 32.95% S/440.34 35.23% S/397.73 31.82%
03 SEGURIDAD Y SALUD 4,440.24
03.01 EQUIPO DE PROTECCION INDIVIDUAL glb 1.00 2,117.50 2,117.50 S/713.76 33.71% S/737.56 34.83% S/666.18 31.46%
03.02 EQUIPO DE PROTECCION COLECTIVA glb 1.00 1,718.20 1,718.20 S/579.17 33.71% S/598.47 34.83% S/540.56 31.46%
03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 604.54 604.54 S/203.78 33.71% S/210.57 34.83% S/190.19 31.46%
04 SUBESTRUCTURA 342,115.62
04.01 OBRAS PROVISIONALES 598.85
04.01.01 CONFORMACION DE CAUCE Y DESVIO DE AGUA DE RIO m2 72.50 8.26 598.85 S/598.85 100.00% S/0.00 0.00% S/0.00 0.00%
04.02 MOVIMIENTO DE TIERRAS DE ESTRIBO Y ALETAS 59,700.98
04.02.01 EXCAVACION MANUAL DE TIERRAS EN TALUDES TERRENO NATURALES m3 448.94 43.62 19,582.76 S/19,582.76 100.00% S/0.00 0.00% S/0.00 0.00%
04.02.02 RELLENO CON MATERIAL PROPIO EN ZAPATAS m3 154.30 29.14 4,496.30 S/0.00 0.00% S/2,997.53 66.67% S/1,498.77 33.33%
04.02.03 RELLENO CON MATERIAL DE PRESTAMO EN ACCESOS m3 353.52 79.98 28,274.53 S/28,274.53 100.00% S/0.00 0.00% S/0.00 0.00%
04.02.04 ELIMINACION MATERIAL EXCEDENTE C/VOLQUETE D < 1KM m3 368.29 19.95 7,347.39 S/7,347.39 100.00% S/0.00 0.00% S/0.00 0.00%
04.03 MEJORAMIENTO DE SUELOS DE FUNDACION 8,075.67
04.03.01 MEJORAMIENTO CON PIEDRA DE RIO TM=8", 02 CAPAS H=0.20 m2 112.24 35.83 4,021.56 S/4,021.56 100.00% S/0.00 0.00% S/0.00 0.00%
04.03.02 MEJORAMIENTO CON MATERIAL GRANULAR H=0.20 m2 112.24 36.12 4,054.11 S/4,054.11 100.00% S/0.00 0.00% S/0.00 0.00%
04.04 OBRAS DE CONCRETO SIMPLE 14,455.07
04.04.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES m3 22.45 289.18 6,492.09 S/6,492.09 100.00% S/0.00 0.00% S/0.00 0.00%
04.04.02 MAMPOSTERIA DE PIEDRA CON HORMIGON 1:6 EN LECHO DE RIO m3 23.50 338.85 7,962.98 S/0.00 0.00% S/0.00 0.00% S/7,962.98 100.00%
04.05 OBRAS DE CONCRETO ARMADO 256,501.95
04.05.01 ZAPATA DE ESTRIBOS Y ALETAS 95,915.00
04.05.01.01 ENCOFRADO Y DESENCOFRADO NORMAL DE ZAPATAS m2 56.78 61.75 3,506.17 S/0.00 0.00% S/3,506.17 100.00% S/0.00 0.00%
04.05.01.02 CONCRETO F'C=280 KG/CM2 EN ZAPATAS m3 84.18 506.79 42,661.58 S/0.00 0.00% S/42,661.58 100.00% S/0.00 0.00%
04.05.01.03 ACERO FY= 4200 KG/CM2 EN ZAPATAS kg 7,934.17 6.27 49,747.25 S/24,873.63 50.00% S/24,873.62 50.00% S/0.00 0.00%
04.05.02 ESTRIBOS 73,596.95
CALENDARIO DE AVANCE VALORIZADO
"RENOVACION DE PUENTE; EN EL(LA) EMP. PE 3N - INCHACA (PUENTE INCHACA) EN LA LOCALIDAD INCHACA, DISTRITO DE QUIRUVILCA, PROVINCIA
PROYECTO
SANTIAGO DE CHUCO, DEPARTAMENTO LA LIBERTAD” CUI 2529543
UBICACIÓN QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD
FECHA October-22
PLAZO DE EJECUCION 90 Días Calendarios
CLIENTE MUNICIPALIDAD DISTRITAL DE QUIRUVILCA CALENDARIO DE AVANCE VALORIZADO

MES N° 01 MES N° 02 MES N° 03


ITEM DESCRIPCIÓN UND. METRADO PRECIO (S/.) PARCIAL (S/.)
PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%)
ENCOFRADO Y DESENCOFRADO CARAVISTA CON PANELES Y
04.05.02.01 m2 143.64 120.29 17,278.46 S/0.00 0.00% S/17,278.46 100.00% S/0.00 0.00%
BASTIDORES DE ESTRIBO
04.05.02.02 CONCRETO F'C=280 KG/CM2 EN ESTRIBO m3 45.60 506.79 23,109.62 S/0.00 0.00% S/23,109.62 100.00% S/0.00 0.00%
04.05.02.03 ACERO FY= 4200 KG/CM2 EN ESTRIBO kg 5,268.97 6.27 33,036.44 S/0.00 0.00% S/33,036.44 100.00% S/0.00 0.00%
04.05.02.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 156.75 1.10 172.43 S/0.00 0.00% S/172.43 100.00% S/0.00 0.00%
04.05.03 ALETAS 86,990.00
ENCOFRADO Y DESENCOFRADO CARAVISTA CON PANELES Y
04.05.03.01 m2 206.10 120.29 24,791.77 S/0.00 0.00% S/24,791.77 100.00% S/0.00 0.00%
BASTIDORES DE ALETAS
04.05.03.02 CONCRETO F'C=210 KG/CM2 EN ALETAS m3 66.78 405.99 27,112.01 S/0.00 0.00% S/27,112.01 100.00% S/0.00 0.00%
04.05.03.03 ACERO FY= 4200 KG/CM2 EN ALETAS kg 5,555.72 6.27 34,834.36 S/0.00 0.00% S/34,834.36 100.00% S/0.00 0.00%
04.05.03.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 228.96 1.10 251.86 S/0.00 0.00% S/251.86 100.00% S/0.00 0.00%
CALENDARIO DE AVANCE VALORIZADO
"RENOVACION DE PUENTE; EN EL(LA) EMP. PE 3N - INCHACA (PUENTE INCHACA) EN LA LOCALIDAD INCHACA, DISTRITO DE QUIRUVILCA, PROVINCIA
PROYECTO
SANTIAGO DE CHUCO, DEPARTAMENTO LA LIBERTAD” CUI 2529543
UBICACIÓN QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD
FECHA October-22
PLAZO DE EJECUCION 90 Días Calendarios
CLIENTE MUNICIPALIDAD DISTRITAL DE QUIRUVILCA CALENDARIO DE AVANCE VALORIZADO

MES N° 01 MES N° 02 MES N° 03


ITEM DESCRIPCIÓN UND. METRADO PRECIO (S/.) PARCIAL (S/.)
PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%)
04.06 SISTEMA DE DRENAJE DE ESTRIBOS 206.18
04.06.01 TUBERIA DE DRENAJE PVC SAL Ø 2" m 26.00 7.93 206.18 S/0.00 0.00% S/206.18 100.00% S/0.00 0.00%
04.08 JUNTAS DE DILATACION DE ACERO EN ESTRIBO Y LOSA 2,576.92
04.08.01 JUNTAS DE DILATACION DE ACERO m 18.40 140.05 2,576.92 S/0.00 0.00% S/2,576.92 100.00% S/0.00 0.00%
05 SUPERESTRUCTURA 78,444.14
05.01 ESTRUCTURA VIGA LOSA 65,052.99
05.01.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE PUENTE m2 49.56 132.51 6,567.20 S/0.00 0.00% S/0.00 0.00% S/6,567.20 100.00%
05.01.02 ENCOFRADO Y DESENCOFRADO DE VIGAS Y DIAFRAGMAS m2 59.62 126.52 7,543.12 S/0.00 0.00% S/0.00 0.00% S/7,543.12 100.00%
05.01.03 CONCRETO F'C=280 KG/CM2 (VIGAS, DIAFRAGMAS Y LOSA) m3 22.43 529.89 11,885.43 S/0.00 0.00% S/0.00 0.00% S/11,885.43 100.00%
05.01.04 ACERO fy=4200 kg/cm2 kg 6,210.07 6.27 38,937.14 S/0.00 0.00% S/0.00 0.00% S/38,937.14 100.00%
05.01.05 CURADO DE CONCRETO CON ADITIVO CURADOR m2 109.18 1.10 120.10 S/0.00 0.00% S/0.00 0.00% S/120.10 100.00%
05.02 LOSA DE APROXIMACIÓN 4,323.67
05.02.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.40 74.29 475.46 S/0.00 0.00% S/0.00 0.00% S/475.46 100.00%
05.02.02 CONCRETO F'C=280 KG/CM2 EN LOSA DE APROXIMACIÓN m3 7.20 529.89 3,815.21 S/0.00 0.00% S/0.00 0.00% S/3,815.21 100.00%
05.02.03 CURADO DE CONCRETO CON ADITIVO CURADOR m2 30.00 1.10 33.00 S/0.00 0.00% S/0.00 0.00% S/33.00 100.00%
05.03 VARIOS 9,067.48
05.03.01 BARANDAS FºGº 3" PINTADO CON ESMALTE m 30.00 132.63 3,978.90 S/0.00 0.00% S/0.00 0.00% S/3,978.90 100.00%
05.03.02 APOYO MOVIL (NEOPRENE) und 2.00 2,297.82 4,595.64 S/0.00 0.00% S/0.00 0.00% S/4,595.64 100.00%
05.03.03 TUBERIA DE DESAGUE PVC SAL 3" m 10.00 12.05 120.50 S/0.00 0.00% S/0.00 0.00% S/120.50 100.00%
05.03.04 DOWELLS - SISTEMA DE ANCLAJE APOYO FIJO und 2.00 186.22 372.44 S/0.00 0.00% S/0.00 0.00% S/372.44 100.00%
06 ESTRUCTURA PARA FALSO PUENTE 15,376.38
06.01 MOVIMIENTO DE TIERRAS 2,494.91
06.01.01 EXCAVACIÓN PARA ESTRUCTURAS EN MATERIAL CONGLOMERADO m3 12.15 192.23 2,335.59 S/0.00 0.00% S/2,335.59 100.00% S/0.00 0.00%
06.01.02 NIVELACIÓN Y COMPACTACIÓN EN ZONA DE QUEBRADA m2 42.60 3.74 159.32 S/0.00 0.00% S/159.32 100.00% S/0.00 0.00%
06.02 FALSO PUENTE 12,881.47
06.02.01 DADO DE CONCRETO F'C=175 KG/CM2 m3 24.30 297.10 7,219.53 S/0.00 0.00% S/7,219.53 100.00% S/0.00 0.00%
06.02.02 FALSO PUENTE DE MADERA MENOR DE 3M DE ALTURA m2 49.20 115.08 5,661.94 S/0.00 0.00% S/0.00 0.00% S/5,661.94 100.00%
07 SEGURIDAD VIAL 3,485.23
07.01 SEÑALIZACION HORIZONTAL 341.95
07.01.01 PINTURA LATERAL DE CALZADA m 30.00 9.29 278.70 S/0.00 0.00% S/0.00 0.00% S/278.70 100.00%
07.01.02 PINTURA DE SÍMBOLO m2 2.50 25.30 63.25 S/0.00 0.00% S/0.00 0.00% S/63.25 100.00%
07.02 SEÑALIZACION VERTICAL 3,143.28
07.02.01 SEÑALIZACIONES INFORMATIVAS und 2.00 543.07 1,086.14 S/0.00 0.00% S/0.00 0.00% S/1,086.14 100.00%
07.02.02 SEÑALIZACIONES REGLAMENTARIAS und 2.00 522.26 1,044.52 S/0.00 0.00% S/0.00 0.00% S/1,044.52 100.00%
07.02.03 SEÑALIZACIONES PREVENTIVAS und 2.00 506.31 1,012.62 S/0.00 0.00% S/0.00 0.00% S/1,012.62 100.00%
CALENDARIO DE AVANCE VALORIZADO
"RENOVACION DE PUENTE; EN EL(LA) EMP. PE 3N - INCHACA (PUENTE INCHACA) EN LA LOCALIDAD INCHACA, DISTRITO DE QUIRUVILCA, PROVINCIA
PROYECTO
SANTIAGO DE CHUCO, DEPARTAMENTO LA LIBERTAD” CUI 2529543
UBICACIÓN QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD
FECHA October-22
PLAZO DE EJECUCION 90 Días Calendarios
CLIENTE MUNICIPALIDAD DISTRITAL DE QUIRUVILCA CALENDARIO DE AVANCE VALORIZADO

MES N° 01 MES N° 02 MES N° 03


ITEM DESCRIPCIÓN UND. METRADO PRECIO (S/.) PARCIAL (S/.)
PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%) PRECIO (S/.) AVANCE (%)
08 MITIGACION DE IMPACTO AMBIENTAL 25,000.00
08.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 25,000.00 25,000.00 S/8,238.64 32.95% S/8,806.81 35.23% S/7,954.55 31.82%
09 FLETE 125,988.29
09.01 FLETE TERRESTRE glb 1.00 125,988.29 125,988.29 S/48,715.47 38.67% S/52,075.16 41.33% S/25,197.66 20.00%
10 PLAN DE CIERRE 2,728.31
10.01 LIMPIEZA FINAL DE OBRA m2 654.27 4.17 2,728.31 S/0.00 0.00% S/0.00 0.00% S/2,728.31 100.00%
11 PLAN DE VIGILANCIA Y CONTROL DE PLAN COVID-19 16,314.18
11.01 PLAN DE VIGILANCIA Y CONTROL DE PLAN COVID-19 glb 1.00 16,314.18 16,314.18 S/5,499.16 33.71% S/5,682.47 34.83% S/5,132.55 31.46%
COSTO DIRECTO S/643,484.47 S/173,063.52 S/323,365.55 S/147,055.40
GASTOS GENERALES (10%) S/64,348.45 S/17,306.35 S/32,336.56 S/14,705.54
UTILIDAD (5%) S/32,174.22 S/8,653.18 S/16,168.27 S/7,352.77
======================== ========== ========== ==========
SUB TOTAL S/740,007.14 S/199,023.05 S/371,870.38 S/169,113.71
IMPUESTO (IGV 18%) S/133,201.29 S/35,824.15 S/66,936.67 S/30,440.47
======================== ========== ========== ==========
PRESUPUESTO TOTAL S/873,208.43 S/234,847.20 S/438,807.05 S/199,554.18
AVANCE POR MES 26.89% 50.25% 22.86%
AVANCE ACUMULADO 26.89% 77.14% 100.00%
noviembre diciembre enero
387039.32 1,090,932.87 504920.12
6425.46 0 0
1125.22 0 0
2087.51 0 0
19251.41 17319.44 16187.86
7194.61 7690.78 7194.61
2963.84 0 0
85.51 0 0
411.93 440.34 397.73
2993.42 3093.2 2793.86
713.76 737.56 666.18
579.17 598.47 540.56
203.78 210.57 190.19
233462.49 906440.14 142946.19
1197.7 0 0
598.85 0 0
75105.01 41554.41 2742.54
19582.76 0 0
0 2997.53 1498.77
28274.53 0 0
7347.39 0 0
16151.34 0 0
4021.56 0 0
4054.11 0 0
7180.43 7112.81 14616.9
6492.09 0 0
0 0 7962.98
51547.04 717958.82 0
40859.46 150970.55 0
0 3506.17 0
0 42661.58 0
24873.63 24873.62 0
0 147193.9 0
0 17278.46 0
0 23109.62 0
0 33036.44 0
0 172.43 0
0 173980 0
0 24791.77 0
0 27112.01 0
0 34834.36 0
0 251.86 0
0 412.36 0
0 206.18 0
0 5153.84 0
0 2576.92 0
0 0 235332.42
0 0 130105.98
0 0 6567.2
0 0 7543.12
0 0 11885.43
0 0 38937.14
0 0 120.1
0 0 8647.34
0 0 475.46
0 0 3815.21
0 0 33
0 0 18134.96
0 0 3978.9
0 0 4595.64
0 0 120.5
0 0 372.44
0 30951.19 15177.96
0 4989.82 0
0 2335.59 0
0 159.32 0
0 13660.27 12102.68
0 7219.53 0
0 0 5661.94
0 0 10455.69
0 0 683.9
0 0 278.7
0 0 63.25
0 0 6286.56
0 0 1086.14
0 0 1044.52
0 0 1012.62
16477.28 17613.64 15909.1
8238.64 8806.81 7954.55
97430.94 104150.32 50395.32
48715.47 52075.16 25197.66
0 0 5456.62
0 0 2728.31
10998.32 11364.94 10265.1
5499.16 5682.47 5132.55
10998.32 11364.94 10265.1
5499.16 5682.47 5132.55

S/10,815.02
1 2 3
387039,32 1090932,87 504920,12
OBRAS PROVISIONALES 6425,46 0 0
CARTEL DE IDENTIFIACIÓN DE OBRA DE 3.60 X 2.40 M 1125,22 0 0
CASETA DE GUARDIANÍA 2087,51 0 0
TRABAJOS PRELIMINARES 19251,41 17319,44 16187,86
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 7194,61 7690,78 7194,61
TRAZO NIVELACION Y REPLANTEO 2963,84 0 0
DESBROCE Y LIMPIEZA DE TERRENO 85,51 0 0
MANTENIMIENTO DE TRÁNSITO TEMPORAL Y SEGURIDAD VIAL 411,93 440,34 397,73
SEGURIDAD Y SALUD 2993,42 3093,2 2793,86
EQUIPO DE PROTECCION INDIVIDUAL 713,76 737,56 666,18
EQUIPO DE PROTECCION COLECTIVA 579,17 598,47 540,56
SEÑALIZACION TEMPORAL DE SEGURIDAD 203,78 210,57 190,19
SUBESTRUCTURA 233462,49 906440,14 142946,19
OBRAS PROVISIONALES 1197,7 0 0
CONFORMACION DE CAUCE Y DESVIO DE AGUA DE RIO 598,85 0 0
MOVIMIENTO DE TIERRAS DE ESTRIBO Y ALETAS 75105,01 41554,41 2742,54
EXCAVACION MANUAL DE TIERRAS EN TALUDES TERRENO NATURALES 19582,76 0 0
RELLENO CON MATERIAL PROPIO EN ZAPATAS 0 2997,53 1498,77
RELLENO CON MATERIAL DE PRESTAMO EN ACCESOS 28274,53 0 0
ELIMINACION MATERIAL EXCEDENTE C/VOLQUETE D < 1KM 7347,39 0 0
MEJORAMIENTO DE SUELOS DE FUNDACION 16151,34 0 0
MEJORAMIENTO CON PIEDRA DE RIO TM=8", 02 CAPAS H=0.20 4021,56 0 0
MEJORAMIENTO CON MATERIAL GRANULAR H=0.20 4054,11 0 0
OBRAS DE CONCRETO SIMPLE 7180,43 7112,81 14616,9
CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES 6492,09 0 0
MAMPOSTERIA DE PIEDRA CON HORMIGON 1:6 EN LECHO DE RIO 0 0 7962,98
OBRAS DE CONCRETO ARMADO 51547,04 717958,82 0
ZAPATA DE ESTRIBOS Y ALETAS 40859,46 150970,55 0
ENCOFRADO Y DESENCOFRADO NORMAL DE ZAPATAS 0 3506,17 0
CONCRETO F'C=280 KG/CM2 EN ZAPATAS 0 42661,58 0
ACERO FY= 4200 KG/CM2 EN ZAPATAS 24873,63 24873,62 0
ESTRIBOS 0 147193,9 0
ENCOFRADO Y DESENCOFRADO CARAVISTA CON PANELES Y BASTIDORES D 0 17278,46 0
CONCRETO F'C=280 KG/CM2 EN ESTRIBO 0 23109,62 0
ACERO FY= 4200 KG/CM2 EN ESTRIBO 0 33036,44 0
CURADO DE CONCRETO CON ADITIVO CURADOR 0 172,43 0
ALETAS 0 173980 0
ENCOFRADO Y DESENCOFRADO CARAVISTA CON PANELES Y BASTIDORES DE0 24791,77 0
CONCRETO F'C=210 KG/CM2 EN ALETAS 0 27112,01 0
ACERO FY= 4200 KG/CM2 EN ALETAS 0 34834,36 0
CURADO DE CONCRETO CON ADITIVO CURADOR 0 251,86 0
SISTEMA DE DRENAJE DE ESTRIBOS 0 412,36 0
TUBERIA DE DRENAJE PVC SAL Ø 2" 0 206,18 0
APARATOS DE APOYO 0 5153,84 0
APOYO MOVIL 0 2576,92 0
JUNTAS DE DILATACION DE ACERO EN ESTRIBO Y LOSA 0 0 235332,42
JUNTAS DE DILATACION DE ACERO 0 0 130105,98
SUPERESTRUCTURA 0 0 6567,2
ESTRUCTURA VIGA LOSA 0 0 7543,12
ENCOFRADO Y DESENCOFRADO DE LOSA DE PUENTE 0 0 11885,43
ENCOFRADO Y DESENCOFRADO DE VIGAS Y DIAFRAGMAS 0 0 38937,14
CONCRETO F'C=280 KG/CM2 (VIGAS, DIAFRAGMAS Y LOSA) 0 0 120,1
ACERO fy=4200 kg/cm2 0 0 8647,34
CURADO DE CONCRETO CON ADITIVO CURADOR 0 0 475,46
LOSA DE APROXIMACIÓN 0 0 3815,21
ENCOFRADO Y DESENCOFRADO NORMAL 0 0 33
CONCRETO F'C=280 KG/CM2 EN LOSA DE APROXIMACIÓN 0 0 18134,96
CURADO DE CONCRETO CON ADITIVO CURADOR 0 0 3978,9
VARIOS 0 0 4595,64
BARANDAS FºGº 3" PINTADO CON ESMALTE 0 0 120,5
APOYO MOVIL (NEOPRENE) 0 0 372,44
TUBERIA DE DESAGUE PVC SAL 3" 0 30951,19 15177,96
DOWELLS - SISTEMA DE ANCLAJE APOYO FIJO 0 4989,82 0
ESTRUCTURA PARA FALSO PUENTE 0 2335,59 0
MOVIMIENTO DE TIERRAS 0 159,32 0
EXCAVACIÓN PARA ESTRUCTURAS EN MATERIAL CONGLOMERADO 0 13660,27 12102,68
NIVELACIÓN Y COMPACTACIÓN EN ZONA DE QUEBRADA 0 7219,53 0
FALSO PUENTE 0 0 5661,94
DADO DE CONCRETO F'C=175 KG/CM2 0 0 10455,69
FALSO PUENTE DE MADERA MENOR DE 3M DE ALTURA 0 0 683,9
SEGURIDAD VIAL 0 0 278,7
SEÑALIZACION HORIZONTAL 0 0 63,25
PINTURA LATERAL DE CALZADA 0 0 6286,56
PINTURA DE SÍMBOLO 0 0 1086,14
SEÑALIZACION VERTICAL 0 0 1044,52
SEÑALIZACIONES INFORMATIVAS 0 0 1012,62
SEÑALIZACIONES REGLAMENTARIAS 16477,28 17613,64 15909,1
SEÑALIZACIONES PREVENTIVAS 8238,64 8806,81 7954,55
MITIGACION DE IMPACTO AMBIENTAL 97430,94 104150,32 50395,32
MITIGACION DEL IMPACTO AMBIENTAL 48715,47 52075,16 25197,66
FLETE 0 0 5456,62
FLETE TERRESTRE 0 0 2728,31
PLAN DE CIERRE 10998,32 11364,94 10265,1
LIMPIEZA FINAL DE OBRA 5499,16 5682,47 5132,55
PLAN DE VIGILANCIA Y CONTROL DE PLAN COVID-19 10998,32 11364,94 10265,1
PLAN DE VIGILANCIA Y CONTROL DE PLAN COVID-19 5499,16 5682,47 5132,55
387039,32 1090932,87 504920,12 387039.32 1090932.87 504920.12
6425,46 0 0
1125,22 0 0
2087,51 0 0
19251,41 17319,44 16187,86
7194,61 7690,78 7194,61
2963,84 0 0
85,51 0 0
411,93 440,34 397,73
2993,42 3093,2 2793,86
713,76 737,56 666,18
579,17 598,47 540,56
203,78 210,57 190,19
233462,49 906440,14 142946,19
1197,7 0 0
598,85 0 0
75105,01 41554,41 2742,54
19582,76 0 0
0 2997,53 1498,77
28274,53 0 0
7347,39 0 0
16151,34 0 0
4021,56 0 0
4054,11 0 0
7180,43 7112,81 14616,9
6492,09 0 0
0 0 7962,98
51547,04 717958,82 0
40859,46 150970,55 0
0 3506,17 0
0 42661,58 0
24873,63 24873,62 0
0 147193,9 0
0 17278,46 0
0 23109,62 0
0 33036,44 0
0 172,43 0
0 173980 0
0 24791,77 0
0 27112,01 0
0 34834,36 0
0 251,86 0
0 412,36 0
0 206,18 0
0 5153,84 0
0 2576,92 0
0 0 235332,42
0 0 130105,98
0 0 6567,2
0 0 7543,12
0 0 11885,43
0 0 38937,14
0 0 120,1
0 0 8647,34
0 0 475,46
0 0 3815,21
0 0 33
0 0 18134,96
0 0 3978,9
0 0 4595,64
0 0 120,5
0 0 372,44
0 30951,19 15177,96
0 4989,82 0
0 2335,59 0
0 159,32 0
0 13660,27 12102,68
0 7219,53 0
0 0 5661,94
0 0 10455,69
0 0 683,9
0 0 278,7
0 0 63,25
0 0 6286,56
0 0 1086,14
0 0 1044,52
0 0 1012,62
16477,28 17613,64 15909,1
8238,64 8806,81 7954,55
97430,94 104150,32 50395,32
48715,47 52075,16 25197,66
0 0 5456,62
0 0 2728,31
10998,32 11364,94 10265,1
5499,16 5682,47 5132,55
10998,32 11364,94 10265,1
5499,16 5682,47 5132,55 10,815.02
Costo
0.00 0.00 10,305.33
#NAME? #REF! 811.65 S/380.707,66
1,982,892.31 #NAME? #REF! 4,293.68
#NAME? #REF! 3,250.00
#NAME? #REF! 1,950.00
#NAME? #REF! ###
#NAME? #REF! ###
#NAME? #REF! 5,495.36
#NAME? #REF! 5,495.36
#NAME? #REF! ###
#NAME? #REF! 25,442.31
#NAME? #REF! 5,193.57
#NAME? #REF! 37,539.73
#NAME? #REF! 77,934.18
#NAME? #REF! 8,744.26
#NAME? #REF! 9,158.51
#NAME? #REF! 26,692.27
#NAME? #REF! ###
#NAME? #REF! 49,451.07
#NAME? #REF! 208,347.26
#NAME? #REF! 44,294.23
#NAME? #REF! 5,230.66
#NAME? #REF! 5,929.66
#NAME? #REF! 7,426.17
#NAME? #REF! 5,040.98
#NAME? #REF! 2,385.19
#NAME? #REF! 12,188.76
#NAME? #REF! 5,760.56
#NAME? #REF! 5,165.62
#NAME? #REF! 601.03
#NAME? #REF! 661.55
#NAME? #REF! 44,669.81
#NAME? #REF! 31,598.45
#NAME? #REF! 13,071.36
#NAME? #REF! 34,645.92
#NAME? #REF! 34,645.92
#NAME? #REF! 16,807.50
#NAME? #REF! 9,090.00
#NAME? #REF! 7,717.50
#NAME? #REF! ###
#NAME? #REF! 729.58
#NAME? #REF! 729.58
#NAME? #REF! 26,025.82
#NAME? #REF! 4,105.88
#NAME? #REF! 9,790.95
#NAME? #REF! 9,158.51
#NAME? #REF! 2,970.48
#NAME? #REF! ###
#NAME? #REF! 108,332.09
#NAME? #REF! 143,768.95
#NAME? #REF! 805.36
#NAME? #REF! ###
#NAME? #REF! 634.13
#NAME? #REF! 634.13
#NAME? #REF! 81,144.07
#NAME? #REF! 11,426.94
#NAME? #REF! 44,308.66
#NAME? #REF! 9,158.51
#NAME? #REF! 16,249.96
#NAME? #REF! 19,227.77
#NAME? #REF! 19,227.77
#NAME? #REF! ###
#NAME? #REF! 136,518.71
#NAME? #REF! 74,195.29
#NAME? #REF! 183,900.07
#NAME? #REF! 2,756.31
#NAME? #REF! 1,247.95
#NAME? #REF! ###
#NAME? #REF! 16,444.67
#NAME? #REF! 16,444.67
#NAME? #REF! ###
#NAME? #REF! 110,936.46
#NAME? #REF! 3,297.09
#NAME? #REF! 79,019.86
#NAME? #REF! 180,250.72
#NAME? 182,813.52
#NAME? 245,259.95
#NAME? ###
#NAME? 93,969.57
#NAME? 683,185.16
#NAME? 16,190.46
#NAME? 16,190.46
#NAME? 25,842.01
#NAME? 12,686.59
#NAME? 5,568.16
#NAME? 7,587.26
#NAME? 96,938.95

S/0.00