PRESIDENCIA MUNICIPAL DE IXMIQUILPAN

SECRETARIA DE OBRAS PÚBLICAS

FICHA TECNICA

LOCALIDAD: BOXHUADA IXMIQUILPAN FECHA: 15 DE FEBRERO 2018

EN ATENCION A LA SOLUCITUD DE PINTURA PARA EDIFICIO ESCOLAR EN LA COMUNIDAD DE


BOXHUADA, IXMIQUILPAN HIDALGO. LA CANTIDAD DE MATERIAL PARA ESTE APOYO CORRESPONDEN A
LAS SIGUIENTES:

MATERIALES UNIDAD CANTIDAD PU IMPORTE

PINTURA VINILICA MARCA COMEX, LINEA VINIMEX


LAVABLE EN MUROS (BLANCO) CUBETA 2 $1,887.00 $3,774.00
PINTURA VINILICA MARCA COMEX, LINEA VINIMEX
LAVABLE EN MUROS (AZUL) CUBETA 2 $1,887.00 $3,774.00

TOTAL= $7,548.00

QUEDANDO A SUS ORDENES PARA CUALQUIER ACLARACION


ATENTAMENTE

ING. EZEQUIEL PENCA MAYE


PRESIDENCIA MUNICIPAL DE IXMIQUILPAN
SECRETARIA DE OBRAS PÚBLICAS

FICHA TECNICA

LOCALIDAD: LA HUERTA CAPULA FECHA: 22 DE FEBRERO 2018

EN ATENCION A LA SOLUCITUD DE MATERIAL POR PARTE DE LA COMUNIDA DE LA HUERTA CAPULA,


IXMIQUILPAN HIDALGO, SOBRE LA REPARACION DE CAPILLA DE LA MISMA. LA CANTIDAD DE MATERIAL
PARA ESTE APOYO CORRESPONDEN A LOS SIGUIENTES:

MATERIALES UNIDAD CANTIDAD PU IMPORTE

CEMENTO TONELADA 8 $3,000.00 $24,000.00


GRAVA VIAJE 5 $1,680.00 $8,400.00
AREA VIAJE 5 $1,680.00 $8,400.00
VARILLA DEL No 4 TONELADA 1.5 $16,000.00 $24,000.00

TOTAL= $64,800.00

QUEDANDO A SUS ORDENES PARA CUALQUIER ACLARACION


ATENTAMENTE

ING. EZEQUIEL PENCA MAYE


PRESIDENCIA MUNICIPAL DE IXMIQUILPAN
SECRETARIA DE OBRAS PÚBLICAS

FICHA TECNICA

LOCALIDAD: SAN PEDRO CAPULA FECHA: 20 DE FEBRERO 2018

SE REALIZÓ LA VISITA DE CAMPO EN LA COMUNIDAD DE SAN PEDRO CAPULA, EN LA PRIMARIA


IGNACIO ZARAGOZA, EN DONDE SOLICITAN EL APOYO PARA LA REPOSICIÓN DE LÁMINA DETERIORADA
EN SU TECHADO DE CANCHA, OBRAS DE DRENAJE DE AGUAS PLUVIALES, INSTALACIÓN ELÉCTRICA EN EL
TECHADO, Y EXTENSIÓN DE LA ALTURA DE MURO ADYACENTE; EL ANÁLISIS TÉCNICO DE LOS
MATERIALES REQUERIDOS PARA SATISFACER ESTE APOYO ARROJA LAS SIGUIENTES CANTIDADES:

MATERIALES UNIDAD CANTIDAD PU IMPORTE


CUBIERTA
LAMINA R-101 CAL 26 PZA 39 $875.00 $34,125.00
PIJA PUNTA DE BROCA PZA 624 $1.40 $873.60
CANALON DE LAMINA GALVANIZADA CAL 24 PZA 7 $750.00 $5,250.00
TUBO PVC SANITARIO 4" Ø PZA 1 $200.00 $200.00
SILICON SELLADOR PZA 1 $65.00 $65.00
CODO 45 PVC SANITARIO 4" Ø PZA 2 $20.00 $40.00
CODO 90 PVC SANITARIO 4" Ø PZA 1 $20.00 $20.00
DRENAJE PLUVIAL Y MURO
CEMENTO BTOS 85 $160.00 $13,600.00
ARENA M3 6.845 $1,680.00
GRAVA M3 6.66 $1,680.00
BLOCK PZA 1,000.0 $9.00 $9,000.00
CALHIDRA BTOS 15 $55.00 $825.00
VARILLA # 3 PZA 20 $110.00 $2,200.00
ALAMBRON KG 71.47 $24.00 $1,715.28
ARMEX DE 10 X10 PZA 10 $160.00 $1,600.00
BALASTRA DE ADITIVOS METALICO DE 1000 W PZA 2 $1,375.66 $2,751.32
FOCO DE ADITIVO METALICO DE 1000 W PZA 2 $660.02 $1,320.04
TOTAL= $76,945.24

QUEDANDO A SUS ORDENES PARA CUALQUIER ACLARACION


ATENTAMENTE
ING. EZEQUIEL PENCA MAYE
0.30

DOBLE PARRILA
SUP. #3@15 E INF.
#3@20

2.00
0.28

0.25 0.8

0.28

1.2

PLANTA DE CONTRAFUERTE

2.00

V#3

0.20
0.20 V#3@20
0.20 V#3@15

1.20

ALSADO DE CONTRAFUERTE
PRESIDENCIA MUNICIPAL DE IXMIQUILPAN
SECRETARIA DE OBRAS PÚBLICAS

FICHA TECNICA

LOCALIDAD: SAN PEDRO CAPULA FECHA: 01 DE MARZO 2018

SE REALIZÓ LA VISITA DE CAMPO EN LA COMUNIDAD DE SAN PEDRO CAPULA, EN EL CAMPO DEPORTIVO, EN


ATENCIÓN AL APOYO DE MATERIAL PARA LA ELABORACIÓN DE CIMIENTO DE MAMPOSTERÍA PARA BARDA;
DEL ANÁLISIS TÉCNICO DE LOS MATERIALES REQUERIDOS PARA ESTE APOYO SE OBTIENE LAS SIGUIENTES
CANTIDADES:

MATERIALES UNIDAD CANTIDAD PU IMPORTE


CIMIENTO DE MAMPOSTERIA
PIEDRA VIAJE DE 7 M3 33 $2,100.00 $69,300.00
CEMENTO BTOS 312 $134.40 $41,932.80
CALHIDRA BTOS 302 $50.40 $15,220.80
ARENA VIAJE DE 7 M3 8 $1,680.00 $13,440.00
SUB TOTAL= $139,893.60
IVA $22,382.98
TOTAL= $162,276.58

QUEDANDO A SUS ORDENES PARA CUALQUIER ACLARACION


ATENTAMENTE

ING. EZEQUIEL PENCA MAYE


H B C
LONGITUD ALTURA BASE CORONA AREA VOL
TRAMO (M) (M) (M) (M) (M2) (M3)
1 10.20 1.10 0.40 0.30 0.385 3.927
2 5.10 0.90 0.40 0.30 0.315 1.6065
3 5.10 0.80 0.40 0.30 0.28 1.428
4 5.10 0.70 0.40 0.30 0.245 1.2495
5 5.10 0.50 0.40 0.30 0.175 0.8925
6 19.62 0.80 0.40 0.30 0.280 5.4936
7 5.25 1.00 0.40 0.30 0.350 1.8375
8 5.20 1.00 0.40 0.30 0.350 1.82
9 5.33 1.00 0.40 0.30 0.350 1.8655
10 4.10 1.10 0.50 0.30 0.440 1.804
11 4.80 1.10 0.50 0.30 0.440 2.112
12 10.20 1.20 0.50 0.30 0.480 4.896
13 6.50 1.20 0.60 0.30 0.540 3.51
14 5.60 1.20 0.60 0.30 0.540 3.024
15 5.10 0.90 0.60 0.30 0.405 2.0655
16 10.30 1.10 0.55 0.30 0.4675 4.8153
17 9.80 1.00 0.50 0.30 0.400 3.92
18 6.00 0.90 0.55 0.30 0.3825 2.295
19 6.00 1.10 0.50 0.30 0.440 2.64
20 28.15 1.30 0.60 0.30 0.585 16.468
21 50.00 1.40 0.60 0.40 0.700 35
22 30.50 1.30 0.60 0.40 0.65 19.825
23 19.50 0.80 0.50 0.40 0.36 7.02
24 6.90 0.80 0.50 0.40 0.36 2.484
25 15.10 1.10 0.40 0.30 0.385 5.8135
26 10.00 1.10 0.40 0.30 0.385 3.85
27 18.00 1.10 0.40 0.30 0.385 6.93
27 10.10 1.10 0.40 0.30 0.385 3.8885
VOL TOTAL= 152.48 M3
CANTIDAD DE MORTERO PARA PEGAR BLOCK

ej/2 Bb p
Ausad x block 0.0861000 m2/pza
Axblock= 0.0800000 de un block
hb h Amortero= 0.0061000 m2/pza
Vol mortero= 0.0008540 m3/pza

B NO DE
ELEMENTO LARGO ANCHO ELEMENT AREA
(m) (m) (m2)
OS
MURO 39.1 2.076 1 81.172
DATOS CASTILLOS 2.076 0.25 13 6.747
hb= 0.20 m 39.1 0.15 1 5.865
DALAS
Bh= 0.40 m p= 0.14 m 20 0.15 1 3
ej= 0.02 m ej/2= 0.01 m A BLOCK 65.56
B= 0.41 m
h= 0.21 m pzas requeridas= 820
Vol mortero= 0.7003 m3

MORTEROS M1
MATERIAL REQUERIDO 0.70028
ARENA
No PROPORCION CEMENTO CEM BL CALHIDRA MORTE YESO CERNIDA ARENA AGUA CALHIDRA
(ton) (ton) (ton) R (ton) (ton) (m3) (m3) (m3) (TON)
1 1-3 0
2 1-4 0
3 1-5 0
4 1-6 0
5 1-7 0
6 1-8 0
7 1-9 0
8 1-10 0
9 1-4 0
10 1-5 0
11 1-6 0
12 1-7 0
13 1-8 0
14 1-2 0
15 1-3 0
16 1-4 0
17 1-5 0
18 1-6 0
19 1-7 0
20 1-8 0
21 1-2 0
22 1-3 0
23 1-4 0
24 1-5 0
25 1-6 0
26 1-1-4 0.3000 0.1500 1.0000 0.2800 0.105042
27 1-1-5 0.3100 0.1500 1.0200 0.2170 7.5477897
28 1-1-6 0
29 1-1-8 0
30 1-1-10 0
31 1-1-12 0
VOL DE MORTERO REQUERIDO
M1 M2 M3 M4 M5 M6 M7
0.70028 50.319 0 0 0 0 0
CALHIDRA CEMENTO ARENA AGUA
(TON) BULTOS (TON) BULTOS (M3) VIAJE
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0.105042 5 0.210084 5 0.70028 1
7.5477897 302 15.59877 312 51.32497 8
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
PESO
NOMENCLATURA DESCRIPCION MATERIAL CALIBRE LONGITUD
KG (kg/m) (kg/m2) (m)
D DIAGONAL TUBO ESTRUCTURAL DE 1 1/2 Ø C-30 2.613 0.995
PL PLACA PLACA DE ACERO A-36 DE 1/2 DE 5"X5" 1.27
CS CUERDA SUPERIOR PTR DE 2" CAL 14 2.85 14 1
CI CUERDA INFERIOR PTR DE 1 1/2" CAL 14 2.09 14 1
TOTAL KG/M2 DE
TRIDILOSA
TRIDILOSA AREA (M2) PESO (KG)
TECHADO AUGUSTO CESAR SANDINO JULIAN VILLAGRAN 157 3,782.09
TECHADO PRIM.ESCUELA SOR JUANA INEZ DE LA CRUZ EL NITH 158 3,806.18
CANTIDAD TOTAL

4 10.3997
3 3.810
2 5.700
2 4.180
AL KG/M2 DE
TRIDILOSA 24.090