Está en la página 1de 36

PLANILLA DE METRADOS

Obra:
LACION DE CERCO PERIMETRICO EN EL CAMAL COMUNAL EN EL CENTRO POBLADO QUILLCACCASA del

Prop.: MUNICIPALIDAD DISTRITAL DE COTARUSE


Dpto.: APURIMAC Provincia: AYMARAES


ITEM DESCRIPCION UND Nº ELEM.
VECES
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA
1.00 1.00
01.02 OBRAS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 1.00
01.02.02 TRAZO Y REPLANTEO PRELIMINAR M2 1.00 1.00

MOVIMIENTO DE TIERRAS
EXCAVACION EN TERRENO NORMAL PARA POSTES DE FIERRO GALVANOZADO M3
58.00

OBRAS DE CONCRETO
CONCRETO PARA CIMIENTOS :1:10 CEMENTO HORMIGON M3
58.00

ENCOFRADO DE DADOS H:0.30m M2


58.00

COLOCACION DE TUBOS GALVANIZADO


COLOCACION Y EMPOTRADO DE TUBOS GALVANIZADOS DE 2 1/2" UND
58.00

TENDIDO DE MALLA OLIMPICA N° 10 ML


180.00

PINTURAS
PINTURA EN MALLA OLIMPICA Y TUBO GALVANIZADO M2
1.00 1.00

PINTURA EN PUERTAS M2
4.00 1.00
1.00 1.00
1.00 1.00
PUERTAS
PUERTAS CON PLANCHA METALICA M2
1.00 1.00

PUERTAS CON MALLA OLIMPICA Y TUBO GALVANIZADO M2


4.00 1.00

02.00.00 MODULO DE AREA DE AISLAMIENTO, AREA INCIERRO, AREA DE DESCANSO


02.01.00 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION PARA CIMIENTOS TERRENO NORMAL M3
EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G M3 4 1.00
EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G M3 4 1.00
EJE 1-1, EJE 2-2, EJE 3-3 4 1.00
EJE 1-1, EJE 2-2, EJE 3-4 2 1.00
EJE 1-1, EJE 2-2, EJE 3-5 2 1.00
EJE 1-1, EJE 2-2, EJE 3-6 2 1.00
EJE 1-1, EJE 2-2, EJE 3-7 2 1.00

02.01.02 EXCAVACION PARA ZAPATAS DE 1.00 M PROF. M3


Z-1 M3 1.30 24.00

02.01.03 RELLENO CON MATERIAL PROPIO M3


EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G M3 4 1.00
EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G M3 4 1.00
EJE 1-1, EJE 2-2, EJE 3-3 M3 4 1.00
EJE 1-1, EJE 2-2, EJE 3-4 M3 2 1.00
EJE 1-1, EJE 2-2, EJE 3-5 M3 2 1.00
EJE 1-1, EJE 2-2, EJE 3-6 2 1.00
EJE 1-1, EJE 2-2, EJE 3-7 2 1.00

02.01.04 ELIMINACIÓN DE MATERIAL EXCEDENTE M3 1.00 1.00

02.02.00 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADO DE CONCRETO fc=140 KG/CM2 H=2" M2
Z-1 M3 24.00 1.00

02.02.02 CONCRETO CICLOPEO PARA CIMIENTACION 1:10 + 30% P.G. M3


EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G 4 1.00
EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G 4 1.00
EJE 1-1, EJE 2-2, EJE 3-3 4 1.00
EJE 1-1, EJE 2-2, EJE 3-4 2 1.00
EJE 1-1, EJE 2-2, EJE 3-5 2 1.00
EJE 1-1, EJE 2-2, EJE 3-6 2 1.00
EJE 1-1, EJE 2-2, EJE 3-7 2 1.00

02.02.03 CONCRETO SOBRE CIMIENTOS fc=175 Kg/cm2 + 25% P.M M3


EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G M3 4 1.00
EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G 4 1.00
EJE 1-1, EJE 2-2, EJE 3-3 4 1.00
EJE 1-1, EJE 2-2, EJE 3-4 2 1.00
EJE 1-1, EJE 2-2, EJE 3-5 2 1.00
EJE 1-1, EJE 2-2, EJE 3-6 2 1.00
EJE 1-1, EJE 2-2, EJE 3-7 2 1.00

02.02.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.50 m M2


EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G 4
EJE A-A,EJE B-B,EJE C-C, EJE D-D, EJE,E-E, EJE F-F, EJE G-G 4
EJE 1-1, EJE 2-2, EJE 3-3 4
EJE 1-1, EJE 2-2, EJE 3-4 2
EJE 1-1, EJE 2-2, EJE 3-5 2
EJE 1-1, EJE 2-2, EJE 3-6 2
EJE 1-1, EJE 2-2, EJE 3-7 2

02.02.05 CONCRETO FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON e=0.10m M2


CORRAL DE AISLAMIENTO M2 1.00 1.00
CORRAL DE INCERRO
CORRAL DE RECEPCION Y DESCANZO

02.02.05 CONCRETO EN VEREDA MEZCLA 1:8 CEMENTO-HORMIGON e=0.10m M3


VEREDA FRONTAL

02.03.00 OBRAS DE CONCRETO ARMADO


02.03.01 CONCRETO EN ZAPATAS DE Fc= 175Kg/CM2 M3
Z-1 M3 24.00 1.00

02.03.02 ACERO CORRUGADO FY=4200 Kg/cm2 GRADO 60 EN ZAPATAS KG 1.00 VER HOJA DE METRADO
ACERO CORRUGADO FY=4200 Kg/cm2 GRADO 60 EN ZAPATAS DE
1/2" KG 211.00

02.03.03 CONCRETO COLUMNAS fc=210 Kg/cm2 M3


C-1 M3 6.00 1.00
C-2 8.00 1.00
C-3 8.00 1.00

02.03.04 ACERO CORRUGADO FY=4200 Kg/cm2 GRADO 60 EN COLUMNAS KG VER HOJA DE METRADO
ACERO CORRUGADO FY=4200 Kg/cm2 GRADO 60 EN COLUMNAS DE 1/2" KG 222.00
ACERO CORRUGADO FY=4200 Kg/cm2 GRADO 60 EN COLUMNAS DE 3/8" KG 185.00
02.03.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS M2 M2
C-1 6.00 1.00
C-2 8.00 1.00
C-3 8.00 1.00

02.03.06 CONCRETO VIGAS FC=210KG/CM2 M3


EJE A,B,D,E,F M3 5.00 1.00

02.03.07 ACERO CORRUGADO FY=420 Kg/cm2 GRADO 60 EN VIGAS KG VER HOJA DE METRADO
ACERO CORRUGADO FY=420 Kg/cm2 GRADO 60 EN VIGAS DE 1/2" 269.04
ACERO CORRUGADO FY=420 Kg/cm2 GRADO 60 EN VIGAS DE 3/8" 257.52

02.03.08 ENCOFRADO Y DESENCOFRADO EN VIGAS M2 1.00


EJE A,B,D,E,F 5.00 1.00

02.05.00 MUROS Y TABIQUES


02.05.01 MURO DE CABEZA LADRILLO K.K. MACIZO 0.14x0.09x0.24 cm M2 m2
M2 1.00 1.00

02.06.00 REVOQUES ENLUCIDOS Y MOLDURAS


02.06.01 TARRAJEO MUROS INTERIORES M2 m2
M2 1.00 1.00

02.06.02 TARRAJEO DE VIGAS Y/O COLUMNAS M2 m2

COLUMNAS M2 1.00 13.00


VIGAS M2 1.00 2.00

02.06.03 TARRAJEO MUROS EXTERIORES M2 m2


M2 1.00 1.00

02.07.00 PISOS Y PAVIMENTOS


02.07.01 CONTRAPISO DE 2" M2 M2
CORRAL DE RECEPCION Y DESCANZO M2 1.00 1.00
CORRAL DE INCIERRO M2 1.00 1.00
CORRAL DE AISLAMIENTO 1.00 1.00

02.07.04 VEREDA DE CONCRETO A=200 h=0.15 fc=210 Kg/cm2 M2 M2


M2 1.00 1.00

02.08.00 ZOCALOS Y CONTRAZOCALOS


02.08.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.30m M
ML
INTERIOR M 12.00 1.00
6.00 1.00
EXTERIOR M 2.00 1.00

02.10.00 CARPINTERIA METALICA


02.10.01 PUERTA METALICA DOBLE HOJA SEGÚN DISEÑO M2
PUERTA PRINCIPAL M2 1.00 1.00
PUERTA INGRESO DE ANIMALES M2 1.00 1.00

02.11.00 CERRAJERIA
02.11.02 CERRADURA PARA PUERTA INGRESO UND 1.00 4.00

02.13.00 PINTURAS
02.13.01 PINTURA LATEX EN MUROS EXTERIORES M2 M2
M2 1.00 1.00

02.13.02 PINTURA LATEX EN MUROS INTERIORES M2 M2


M2 1.00 1.00

02.13.03 PINTURA LATEX EN COLUMNAS Y VIGAS M2 M2


COLUMNAS M2 1.00 8.00
VIGAS M2 1.00 2.00

02.13.05 PINTURA ESMALTE EN VENTANAS Y PUERTAS METALICAS M2


PUERTA PRINCIPAL M2 1.00 1.00
PUERTA INGRESO DE ANIMALES M2 1.00 1.00

02.14.00 INSTALACIONES ELECTRICAS


02.14.01 SALIDA DE TECHO CON CABLE AWG TW 2.5 MM (14) + D PVC SEL 16 MM (5/8 PTO 1.00 6.00

02.14.02 SALIDA DE PARED CON CABLE AWG TW 2.5 MM (14)+D PVC SEL 16MM(5/8) PTO 1.00 6.00

02.14.03 SALIDA PARA CENTRO DE LUZ C/INTERRUPTOR DE CONMUTACION PTO 1.00 6.00

02.14.04 SALIDA PARA TOMACORRIENTE BIPOLARE DOBLE CON PVC PTO 1.00 6.00

02.14.05 TABLERO DE DISTRIBUCION CAJA METALICA CON 6 POLOS PZA 1.00 1.00

02.14.06 INTERRUPTOR TERMOMAGNETICO MONOFASICO DE 2 X 30A PZA 1.00 6.00

02.14.07 POZO-CONEXIÓN A TIERRA EN SISTEMA ALUMB. TOMACORR. UND 1.00 1.00

02.14.8 FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALLA UND 1.00 6.00

02.15.00 INSTALACIONES SANITARIAS


INSTALACION DE TUBERIA PARA SISTEMA DE AGUA FRIA
02.15.01 EXCAVACION DE ZANJA A MANO EN TERRENO NORMAL M3
1.00
02.15.02 REFINE Y NIVELACION DE FONDO DE ZANJA M
1.00
02.15.03 CAMA DE APOYO CON MATERIAL SELECCIONADO M3
1.00
02.15.04 RELLENO CON MATERIAL PROPIO M3
1.00
02.115.05 PROVIVION E INSTALACION DE TUBERIA PVC SAP DE 1" M
1.00
02.15.01 SISTEMA DE AGUA FRIA
02.15.01.01 SALIDA DE AGUA FRIA TUBERIA DE PVC C-10 O 1/2" PTO 3.00 1.00

02.15.01.02 VALVULA COMPUERTA DE 1/2" UND 2.00 1.00

02.16.02 SISTEMA DE DESAGUE


02.16.02.01 SALIDAS DE DESAGUE DE PVC-SAL 4" PTO 3.00 1.00

02.16.02.02 SALIDAS DE DESAGUE DE PVC-SAL 2" PTO 4.00 1.00

02.16.02.03 REGISTRO DE BRONCE DE 2" UND 4.00 1.00

02.16.02.04 REGISTRO BRONCE DE 4" UND 4.00 1.00

02.16.02.05 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 2.00 1.00

02.16.02.06 TUBERIA DE DESAGUE PVC SAL 4" M 25.00 1.00

02.16.02.07 TUBERIA DE DESAGUE PVC SAL 2" M 30.00 1.00

02.18.00 SISTEMA DE EVACUACION DE AGUAS PLUVIALES


02.18.01 TUBERIA DE BAJADA Y DISTRIBUCION PVC SAL 3" P/LLUVIAS M 3.00 1.00

02.18.02 ABRAZADERA DE FIJACION DE TUBERIA DE 3" Und 3.00 1.00

02.18.03 CANALETA DE EVACUACIÓN PLUVIAL GALVANIZADA M 22.00 1.00

02.19.00 EUIPAMIENTO E IMPLEMENTACION

02.19.04 EQUIPAMIENTO CON BALANZA DIGITAL UND 1.00 1.00

02.20.00 FLETE TERRESTRE


02.20.01 FLETE TERRESTRE GLB 1.00 1.00
DOS
DO QUILLCACCASA del Distrito de COTARUSE AYMARAES REGION APURIMAC

Fecha: MARZO
AYMARAES Distrito: COTARUSE

DIMENSIONES SUB
TOTAL
AREA LARGO ANCHO ALTURA TOTAL

0.00 1.00
1.00

24.70 9.48 234.16 234.16


24.70 9.48 234.16 234.16

12.53
0.60 0.60 0.60 12.53

12.53
0.60 0.60 0.60 12.53

5.22
0.30 0.30 5.22

58.00
58.00

180.00
180.00

390.63
177.56 2.20 390.63

17.37
1.20 1.80 8.64
3.15 2.20 6.93
1.00 1.80 1.80
5.67
3.15 1.80 5.67

8.64
1.20 1.80 8.64

ESP. 15.58
1.30 2.41 0.40 0.60 3.01
1.30 2.04 0.40 0.60 2.55
1.30 1.88 0.40 0.60 2.35
1.30 3.25 0.40 0.60 2.03
1.30 3.15 0.40 0.60 1.97
1.30 2.25 0.40 0.60 1.40
1.30 3.65 0.40 0.60 2.28

37.44
1.00 1.00 1.20 37.44

4.48
1.30 2.41 0.40 0.15 0.75
1.30 2.04 0.40 0.15 0.64
1.30 1.88 0.40 0.15 0.59
1.30 3.25 0.40 0.15 0.51
1.30 3.15 0.40 0.15 0.49
1.30 2.25 0.40 0.15 0.35
1.30 3.65 0.40 0.15 0.57

40.00 ESPONJ. 0.25 10.00 10.00

24.00
1.00 1.00 24.00

8.79
1.10 2.41 0.40 0.40 1.70
1.10 2.04 0.40 0.40 1.44
1.10 1.88 0.40 0.40 1.32
1.10 3.25 0.40 0.40 1.14
1.10 3.15 0.40 0.40 1.11
1.10 2.25 0.40 0.40 0.79
1.10 3.65 0.40 0.40 1.28

11.92
1.10 3.16 0.40 0.40 2.22
1.10 3.16 0.40 0.40 2.22
1.10 3.00 0.40 0.40 2.11
1.10 4.28 0.40 0.40 1.51
1.10 3.15 0.40 0.40 1.11
1.10 4.78 0.40 0.40 1.68
1.10 3.00 0.40 0.40 1.06

27.08
3.16 0.40 5.06
3.16 0.40 5.06
3.00 0.40 4.80
4.28 0.40 3.42
3.15 0.40 2.52
4.78 0.40 3.82
3.00 0.40 2.40

160.71
7.43 6.83 50.75
7.95 6.83 54.30
8.15 6.83 55.66

5.78
24.10 2.40 0.10 5.78

14.40
1.00 1.00 0.60 14.40

VER HOJA DE METRADOS DE ACERO 0.00 211.00

211.00

3.43
0.25 0.25 3.81 1.43
0.25 0.25 2.20 1.10
0.25 0.25 1.80 0.90

VER HOJA DE METRADOS DE ACERO 0.00 407.00


222.00
185.00
54.86
1.00 3.81 22.86
1.00 2.20 17.60
1.00 1.80 14.40

2.66
7.08 0.25 0.30 2.66

VER HOJA DE METRADOS DE ACERO 0.00 526.56


269.04
257.52

13.93
7.08 0.85 13.93

60.00
60.00 60.00

144.00
80.00 1.80 144.00

135.78

0.85 3.60 39.78


120.00 0.40 96.00

135.20
52.00 2.60 135.20

167.10
55.70 55.70
55.70 55.70
55.70 55.70

57.84
24.10 2.40 57.84

208.78
8.15 97.80
6.83 40.98
35.00 70.00

11.61

3.500 2.70 9.45


1.200 1.80 2.16

4.00 4.00

144.00
80.00 1.80 144.00

354.60
98.50 3.60 354.60

120.48
0.85 3.60 24.48
120.00 0.40 96.00

11.61
3.500 2.70 9.45
1.200 1.80 2.16

6.00 6.00

6.00 6.00

6.00 6.00

6.00 6.00

1.00 1.00

6.00 6.00

1.00 1.00

6.00 6.00

40.00 0.40 0.60 9.60


40.00 40.00

40.00 0.40 0.18 2.88

40.00 0.40 0.50 8.00

40.00 0.00 0.00 140.00

3.00 3.00

2.00 2.00

3.00 3.00

4.00 4.00

4.00 4.00

4.00 4.00

2.00 2.00

25.00 25.00

30.00 30.00

7.08 21.24 21.24

3.00 3.00

22.00 22.00

1.00 1.00

1.00 1.00
RESUMEN DE METRADOS

PROY.
0

OBRA. DISTRITO DPTO.

DISTRITO 0 FECHA

Part. DESCRIPCIÓN Und

0.00 01.01
0.00 02.01
0.00 02.02 TRAZO Y REPLANTEO
0.00 0
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
0.00 0
0.00 0 0
0

FECHA
0

TOTAL

436.00

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

Err:509

Err:509
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509

Err:509

Err:509
Err:509
Err:509

Err:509
Err:509

Err:509

Err:509

Err:509

Err:509

0.00
METRADO DE ACERO
CALCULO DE ACERO PARA ZAPATAS

N° DESCRIPCION Nº DE N° DE N° DE ELEMENTO DEL FIERRO L


LONG.
ITEM COLUMNA VECES ELEM. VAR. DIAM.Ø" LONG. Ø 1/4" Ø 3/8"
TOTAL
0.15 LLENAR LLENAR LLENAR
Acero vertical TIPO C1 0.20

3.81
38.00 4.00 64.35 Ø 1/2" 3.81 579.12
0.20 0.15

Acero vertical TIPO C1

0.19 0.00 29.00 0.00 Ø 3/8" 0.90 0.00


0.15
0.19
Acero vertical TIPO C2 0.20

2.20
34.00 4.00 33.24 Ø 1/2" 2.20 299.20
0.20 0.15

Acero vertical TIPO C2 0.20

2.20 0.00 15.00 0.00 Ø 3/8" 0.90 0.00


0.20 0.15

Acero vertical TIPO C2 0.20

1.80 0.00 4.00 0.00 Ø 3/8" 1.80 0.00


0.20 0.15

Acero vertical TIPO C1

0.19 0.00 10.00 0.00 Ø 3/8" 0.90 0.00


0.15
0.19
Acero transversal (+)
1.50
21.00 12.00 42.00 Ø 1/2" 1.50 378.00

LONGITUD TOTAL EN METROS LINEALES 0.00 0.00


PESO UNITARIO DE ACERO POR DIAMETRO KG/ML 0.25 0.58
PESO TOTAL EN KG. 0.00 0.00
TOTAL DE VARILLAS DE ACERO 0.00 0.00
CALCULO DE ACERO VIGAS

N° DESCRIPCION Nº DE N° DE N° DE ELEMENTO DEL FIERRO L


LONG.
ITEM VIGAS VECES ELEM. VAR. DIAM.Ø" LONG. Ø 1/4" Ø 3/8"
TOTAL
LLENAR LLENAR LLENAR
1.00 1.00 55.56 Ø 5/8" 500.00 500.00
Acero tranversal (+ -)

0.20
7.08 5.00 4.00 15.33 Ø 1/2" 6.90 138.00
0.20

Acero tranversal (+ -)

0.20
2.00 4.00 13.97 Ø 1/2" 15.72 125.76
15.32 0.20

Estribos

0.32
8.00 28.00 24.89 Ø 3/8" 1.00 224.00 224.00
0.12

Estribos

0.32
10.00 22.00 24.44 Ø 3/8" 1.00 220.00 220.00

0.12

LONGITUD TOTAL EN METROS LINEALES 0.00 444.00


PESO UNITARIO DE ACERO POR DIAMETRO KG/ML 0.25 0.58
PESO TOTAL EN KG. 0.00 257.52
TOTAL DE VARILLAS DE ACERO 0.00 49.33
LONGITUD TOTAL

Ø 1/2" Ø 5/8" Ø 3/4"


378.00

378.00 0.00 0.00


1.02 1.55 2.24
385.56 0.00 0.00
42.00 0.00 0.00
LONGITUD TOTAL

Ø 1/2" Ø 5/8" Ø 3/4"

138.00

125.76

263.76 0.00 0.00


1.02 1.55 2.24
269.04 0.00 0.00
29.31 0.00 0.00
PROYECTO:………………….. “INSTALACION DE CERCO PERIMETRICO Y AREA DE AISLAM

LOCALIDAD: PAMPAMARCA
DISTRITO: COTARUSE

TIEMPOS EN SEMANAS
ITEM DESCRIPCION PRESUPUESTO SEMANA 01
01 OBRAS PROVISIONALES 14762.66
375.66 163.91 701.72 701.72 701.72 1,961.62
02 TRABAJOS PRELIMINARES 211.75
211.75
03 MOVIMIENTO DE TIERRAS 819.57
163.91 163.91 163.91 163.91 163.91
Err:509 Err:509 3764.62
537.80 537.80 537.80 537.80
Err:509 Err:509 9966.72
1,423.82
Err:509 Err:509 13678.12

Err:509 Err:509 3739.31

Err:509 Err:509 3108.98

Err:509 Err:509 2080.78

Err:509 Err:509 1760.11

Err:509 Err:509 1533.70

Err:509 Err:509 444.83

Err:509 Err:509 1010.41

Err:509 Err:509 3725.53

Err:509 Err:509 358.02

Err:509 Err:509 737.70

Err:509 Err:509 159.45

Err:509 Err:509 350.68


Err:509 Err:509 400.00

Err:509 Err:509 621.58

Err:509 Err:509 1098.10

Err:509 Err:509 759.96

Err:509 Err:509 355.04

Err:509 Err:509 109.00

Err:509 Err:509 102.56

Err:509 Err:509 193.36

0.00 FLETE TERRESTRE 600.00


600.00
COSTO DIRECTO 33526.27 975.66 163.91 701.72 701.72 701.72 1961.62
GASTOS GENERALES 3352.63 97.57 16.39 70.17 70.17 70.17 196.16
EXPEDIENTE TECNICO 3000.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO TOTAL DE PROYECTO 39878.90 1,073.23 180.31 771.89 771.89 771.89 2,157.78
CRONOGRAMA DE EJECUCION FISICA Y FINANCIERO

TRICO Y AREA DE AISLAMIENTO DE CAMAL COMUNAL DE QUILLCACCASA, COMUNIDAD SAN MIGUEL DE MESTIZAS DEL DIS

TIEMPOS EN SEMANA TIEMPOS EN SEMANA TIEMPOS EN S


SEMANA 02 SEMANA 03 SEMANA

1,961.62 1,961.62 1,961.62 1,423.82 1,423.82 1,423.82

537.80 537.80 537.80

1,423.82 1,423.82 1,423.82 1,423.82 1,423.82 1,423.82

1,441.46 1,441.46 1,441.46 747.86 747.86 1,097.94 1,320.35 1,966.57

747.86 747.86 747.86 747.86 747.86

444.14

693.59 693.59 693.59

586.70 586.70 586.70

511.23 511.23 511.23

222.42 222.42

202.08

295.90 664.75 610.06 124.32 204.04 204.04 204.32 80.00 446.03 446.03 446.03

179.01 179.01

368.85 368.85

79.73 79.73
116.89 116.89 116.89

80.00 80.00 80.00 80.00 80.00

124.32 124.32 124.32 124.32 124.32

366.03 366.03 366.03

1961.62 1961.62 2257.52 2088.57 2033.88 2989.59 1645.50 1645.50 952.18 827.86 1543.97 1766.39 2412.61
196.16 196.16 225.75 208.86 203.39 298.96 164.55 164.55 95.22 82.79 154.40 176.64 241.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2,157.78 2,157.78 2,483.28 2,297.43 2,237.26 3,288.55 1,810.05 1,810.05 1,047.40 910.65 1,698.37 1,943.02 2,653.87
GUEL DE MESTIZAS DEL DISTRITO DE COTARUSE -AYDE LA LOCALIDAD DE PAMPAMARCA, COTARUSE - AYMARAES - APURIM
PROV. : AYMARAES
DPTO. : APURIMAC
FECHA : OCTUBRE 2015

TIEMPOS EN SEMANA TIEMPOS EN SEMANA


SEMANA 04 SEMANA 05

646.22 646.22 646.22 646.22 444.14 444.14

444.14 444.14 444.14 444.14 444.14 444.14

202.08 202.08 202.08 202.08


88.76 116.01 167.29 167.29 27.25 96.68 96.68

88.76 88.76 88.76 88.76

27.25 27.25 27.25 27.25

51.28 51.28

96.68 96.68

646.22 646.22 646.22 646.22 532.90 560.15 167.29 167.29 27.25 96.68 96.68
64.62 64.62 64.62 64.62 53.29 56.02 16.73 16.73 2.73 9.67 9.67
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
710.84 710.84 710.84 710.84 586.19 616.17 184.02 184.02 29.98 106.35 106.35
OTARUSE - AYMARAES - APURIMAC.
DESAGREGADO DEL PRESUPUESTO ANALITICO
GASTOS GENERALES

Proyecto
0

COMUNIDAD : : COTARUSE
Distrito : 0
Provincia : 0 0 0
Región : : OCTUBRE 2015

COEFICIENTE
COSTO COSTO
N° DESCRIPCION UNIDAD DE CANTIDAD
UNITARIO (S/.) PARCIAL (S/.)
PARTICIPACIÓN

1 DIRECCION TECNICA Y ADMINISTRATIVA


RESIDENTE DE OBRA MES 0.5 1 1500

2 MATERIALES DE ESCRITORIO
Combustible para movilidad gln 50 11.1325 556.63
Cuaderno de obra Und 1 25 25.00
Legalizacion de cuaderno de obra Und 1 10 10.00
Papel Bond A-4 de 80 gramos Mill 2 28 56.00
Usb de 8 GB Und 2 18 36.00
Archivadores Und 3 8 24.00
Papel carbón Und. 8 1.5 12.00
Lapicero Und. 50 0.5 25.00

3 ENSERES
Escoba sintetica con mango Und. 2 15 30.00
Recogedor de plastico Und. 2 9 18.00
Tacho de basura de plastico pequeño Und. 3 20 60.00
4 IMPLEMENTOS DE SEGURIDAD

TOTAL (S/.)
COSTO TOTAL
(S/.)

1500.00
1500.00

744.63
556.63
25.00
10.00
56.00
36.00
24.00
12.00
25.00

108.00
30.00
18.00
60.00
0.00

2352.63
CALCULO DE FLETE TERRESTRE

PROY. “INSTALACION DE CERCO PERIMETRICO Y AREA DE


AISLAMIENTO DE CAMAL COMUNAL DE QUILLCACCASA,
COMUNIDAD SAN MIGUEL DE MESTIZAS DEL DISTRITO
DE COTARUSE -AYDE LA LOCALIDAD DE PAMPAMARCA,
COTARUSE - AYMARAES - APURIMAC.

COMUNIDAD : PAMPAMARCA
DISTRITO : COTARUSE
FLETE CHALHUANCA - PAMPAMARCA
1.- DATOS GENERALES:

A.- POR PESO

MATERIALES UNIDAD CANTIDAD PESO.UNIT.


Cemento BL. 750.00 42.50
Fierro y Clavos KG 852.52 1.00
Madera P2 309.66 1.50
Teja de arcilla PZA 63.00 5.95
Bloquetas de concreto UND 994.29 1.00
Otros KG 2,800.00 1.00

PESO TOTAL

B.- POR VOLUMEN

2.- FLETE TERRESTRE:

UNIDAD DE TRANSPORTE
Unidad de transporte CANTIDAD
Capacidad del Camión (M3) 12.00
Costo por Viaje S/. 500.00
Capacidad del Camión (KG) 12,000.00
cantidad de viajes 1.00
Flete por KG 0.04
RE

PROV. : AYMARAES
DPTO. : APURIMAC
FECHA : OCTUBRE 2015

PESO.TOTAL
31,875.00
852.52
464.49
464.49
994.29
2,800.00

37,450.79