Está en la página 1de 1

CALCULO DE LA CURVA ALTITUD-AREA-VOLUMEN

Cuadro N° 7.1
PROY ECTO “CONSTRUCCION DE LA PRESA HIDRAULICA CAY RAMAY O, DISTRITO DE TAMBILLO, PROVINCIA DE HUAMANGA – AY ACUCHO”.

AREA
VOLUMEN
COTA m. ALTURA m. AREA m2 ACUMULADA VOLUMEN m3
ACUMULADO m3
m2
3,788 0 480.06 480.06 0.00 0.00
3,790 2 3,705.66 4,185.72 4,185.72 4,185.72
3,792 4 9,313.54 13,499.26 13,019.20 17,204.92
3,794 6 18,546.82 32,046.08 27,860.35 45,065.28
3,796 8 32,510.75 64,556.83 51,057.57 96,122.84
3,798 10 51,930.75 116,487.58 84,441.50 180,564.34
3,800 12 76,755.50 193,243.07 128,686.24 309,250.59
3,802 14 106,794.81 300,037.88 183,550.30 492,800.89
3,804 16 142,744.72 442,782.60 249,539.53 742,340.42
3,806 18 185,336.22 628,118.82 328,080.94 1,070,421.36
3,808 20 235,212.08 863,330.90 420,548.30 1,490,969.66

CUADRO DE NIVELAS CARACTERISTICOS DEL EMBALSE

VOL.
DESCRIPCION COTA ALTURA VOLUMEN
ALMACENADO

NAMIN 20,082.23 3792.00 3,806.18 3,163,401.47


NAMO 3,163,401.47 3806.18 3,808.00 4,448,926.03

m= 707342.84
b= -2689112603

CUADRO NAME
NAMO 3,806.18 3,163,401.47
3,806.28 3,234,135.75
3,806.38 3,304,870.04
AREA (m2) 3,806.48 3,375,604.32
1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 -
3,810 3,806.58 3,446,338.60
3,806.68 3,517,072.89
3,805 3,806.78 3,587,807.17
3,806.88 3,658,541.45
3,806.98 3,729,275.74
3,800
3,807.08 3,800,010.02
ALTURA (msnm)

ALTURA (msnm)

3,807.18 3,870,744.31
3,795
3,807.28 3,941,478.59
3,807.38 4,012,212.87
3,790
3,807.48 4,082,947.16
3,807.58 4,153,681.44
3,785 3,807.68 4,224,415.73
3,807.78 4,295,150.01
3,780 3,807.88 4,365,884.29
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
3,807.98 4,436,618.58
VOLUMEN (MMC)
3,808.08 4,507,352.86
3,808.18 4,578,087.14

Fuente: Elaboración Propia

También podría gustarte