Está en la página 1de 11

CALCULO DE COTAS DE BUZONES

Pendiente (S) Prof. Media


BUZON COTA TAPA COTA FONDO Distancia Prof. Buzon
(0/00) del tramo
BN1 43.85 43.05 0.8
6.4 28 0.96
B1 43.99 42.87 1.12
24.3 42 1.11
B2 42.95 41.85 1.1
16.9 42 1.1
B3 42.24 41.14 1.1
6.4 42 1.29
B5 42.35 40.87 1.48
6.4 22 1.42
B6 42.09 40.73 1.36
22.8 18 1.23
B7 41.42 40.32 1.1
5.6 57 1.075
B18 41.05 40 1.05
12.9 58 1.075
B19 40.35 39.25 1.1
7.0 57 1.415
B20 40.58 38.85 1.73

BN2 42.6 41.8 0.8


28.8 17 0.9
B4 42.31 41.31 1
10.9 53 1.18
B6 42.09 40.73 1.36

B28 43.58 42.48 1.1


46.9 26 1.445
B8 43.05 41.26 1.79
6.4 25 1.735
B10 42.78 41.10 1.68
9.3 73 1.59
B11 41.92 40.42 1.50

B12 42.19 40.91 1.28


6.5 31 1.275
B14 41.98 40.71 1.27
15.0 16 1.455
B15 41.57 40.47 1.64 (*)
6.7 27 1.79
B16 41.69 39.75 1.94
6.6 35 1.885
B17 41.35 39.52 1.83
11.0 61 1.78
B20 40.58 38.85 1.73
(*) la tuberia llega a 40.47, la cota de fondo del buzon es 39.93

B11 41.92 40.42 1.5


6.7 30 1.39
B27 41.5 40.22 1.28
6.4 45 1.46
B15 41.57 39.93 1.64

BN8 42.74 41.94 0.8


17.1 28 1.05
B9 42.76 41.46 1.3
6.5 31 1.545
B8 43.05 41.26 1.79
CALCULO DE COTAS DE BUZONES

Pendiente (S) Prof. Media


BUZON COTA TAPA COTA FONDO Distancia Prof. Buzon
(0/00) del tramo
BN7 42.85 42.05 0.8
18.6 14 0.8
BN6 42.59 41.79 0.8
8.7 23 0.95
BN5 42.69 41.59 1.1
13.0 10 1.2
B9 42.76 41.46 1.3

BN4 42.47 41.67 0.8


6.7 12 0.95
BN5 42.69 41.59 1.1

B23 43.19 42 1.19


9.7 60 1.145
B13 42.52 41.42 1.10
25.0 76 1.465
B17 41.35 39.52 1.83
11.0 61 1.78
B20 40.58 38.85 1.73

B13 42.52 41.42 1.1


13.1 39 1.19
B12 42.19 40.91 1.28
12.9 38 1.39
B11 41.92 40.42 1.5

B3 42.24 41.14 1.1


12.0 60 1.3
B11 41.92 40.42 1.5
CALCULO DE COTAS DE BUZONES

BUZON COTA TAPA COTA FONDO Prof. Buzon


BN1 43.85 43.05 0.80
BN2 42.60 41.80 0.80
BN4 42.47 41.67 0.80
BN5 42.69 41.59 1.10
BN6 42.59 41.79 0.80
BN7 42.85 42.05 0.80
BN8 42.74 41.94 0.80
B1 43.99 42.87 1.12
B2 42.95 41.85 1.10
B3 42.24 41.14 1.10
B4 42.31 41.31 1.00
B5 42.35 40.87 1.48
B6 42.09 40.73 1.36
B7 41.42 40.32 1.10
B8 43.05 41.26 1.79
B9 42.76 41.46 1.30
B10 42.78 41.10 1.68
B11 41.92 40.42 1.50
B12 42.19 40.91 1.28
B13 42.52 41.42 1.10
B14 41.98 40.71 1.27
B15 41.57 39.93 1.64
B16 41.69 39.75 1.94
B17 41.35 39.52 1.83
B18 41.05 40.00 1.05
B19 40.35 39.25 1.10
B20 40.58 38.85 1.73
B23 43.19 42.00 1.19
B27 41.50 40.22 1.28
B28 43.58 42.48 1.10
B21 39.53 38.42 1.11
B22 38.61 37.61 1.00
B24 37.15 35.68 1.47
B25 36.36 35.20 1.16
B26 35.71 34.71 1.00
Metrado de Excavacion para Redes de Desague

Volumen (m3)
Profundidad Profindidad
Tramo Longitud (m) Ancho (m) Excav. Sobre
media (m) sobre el N.F.
agua
BN1 - B1 28.00 0.96 0.96 0.80 21.50
B1 - B2 42.00 1.11 1.00 0.80 33.60
B2 - B3 42.00 1.10 1.00 0.80 33.60
B3 - B5 42.00 1.29 1.00 0.80 33.60
B5 - B6 22.00 1.42 1.00 0.80 17.60
B6 - B7 18.00 1.23 1.00 0.80 14.40
B7 - B18 57.00 1.08 1.00 0.80 45.60
B18 - B19 58.00 1.08 1.00 0.80 46.40
B19 - B20 57.00 1.42 1.00 0.80 45.60

BN2 - B4 17.00 0.90 0.90 0.80 12.24


B4 - B6 53.00 1.18 1.00 0.80 42.40

B28 - B8 26.00 1.45 1.00 0.80 20.80


B8 - B10 25.00 1.74 1.00 0.80 20.00
B10 - B11 73.00 1.59 0.90 0.80 52.56

B12 - B14 31.00 1.28 1.00 0.80 24.80


B14 - B15 16.00 1.46 1.00 0.80 12.80
B15 - B16 27.00 1.79 1.00 0.80 21.60
B16 - B17 35.00 1.89 1.00 0.80 28.00
B17 - B20 61.00 1.78 1.00 0.80 48.80

B11 - B27 30.00 1.39 0.90 0.80 21.60


B27 - B15 45.00 1.46 0.90 0.80 32.40

BN8 - B9 25.00 1.05 1.00 0.80 20.00


B9 - B8 31.00 1.55 1.00 0.80 24.80

BN7 - BN6 14.00 0.80 0.80 0.80 8.96


BN6 - BN5 23.00 0.95 0.95 0.80 17.48
BN5 - B9 10.00 1.20 1.00 0.80 8.00

BN4 - BN5 12.00 0.95 0.95 0.80 9.12

1.15 B23 - B13 60.00 1.60 1.10 0.80 52.80


1.47 B13 - B17 76.00 2.00 1.50 0.80 91.20
1.78 B17 - B20 61.00 1.80 1.00 0.80 48.80

B13 - B12 39.00 1.19 1.10 0.80 34.32


B12 - B11 38.00 1.39 1.10 0.80 33.44

B3 - B11 60.00 1.30 1.00 0.80 48.00

B20 - B21 66.00 1.42 1.00 0.80 52.80


B21 - B22 66.00 1.06 0.85 0.80 44.88
B22 - C.R. 68.00 0.78 0.65 0.80 35.36
B24 - B25 75.00 1.32 0.50 0.80 30.00
B25 - B26 75.00 1.08 0.50 0.80 30.00
B26 - DESC. 20.00 0.50 0.50 0.80 8.00

1,681.28 Volumen a excavar (m3) = 1,227.86 men a excavar bajo ag

168.13 esponjamiento (10%) = 122.79

1,849.41 Volumen Total sobre agua = 1,350.65


s de Desague

Volumen
Profindidad
N.F. (m3) Excav.
bajo el N.F.
bajo agua
1.00 0.00 0.00
1.00 0.11 3.70
1.00 0.10 3.36
1.00 0.29 9.74
1.00 0.42 7.39
1.00 0.23 3.31
1.00 0.08 3.42
1.00 0.08 3.48
1.00 0.42 18.92

1.00 0.00 0.00


1.00 0.18 7.63

1.00 0.45 9.26


1.00 0.74 14.70
0.90 0.69 40.30

1.00 0.28 6.82


1.00 0.46 5.82
1.00 0.79 17.06
1.00 0.89 24.78
1.00 0.78 38.06

0.90 0.49 11.76


0.90 0.56 20.16

1.00 0.05 1.00


1.00 0.55 13.52

1.00 0.00 0.00


1.00 0.00 0.00
1.00 0.20 1.60

1.00 0.00 0.00 Rellenar con material de prestamo


altura Vol Relleno (m3)
1.10 0.50 24.00 0.45 21.60
1.50 0.50 30.40 0.53 32.22
1.00 0.80 39.04 0.02 0.98
54.80
1.10 0.09 2.81
1.10 0.29 8.82

1.00 0.30 14.40

1.00 0.42 22.18


0.85 0.21 10.82
0.65 0.13 6.80
0.50 0.82 48.90
0.50 0.58 34.80
0.50 0.00 0.00

men a excavar bajo agua (m3) = 508.76 1,736.63

esponjamiento (10%) = 50.88

Volumen Total bajo agua= 559.64


Metrado de Excavacion para Redes de Desague

Volumen (m3)
Profundidad Profindidad
Tramo Longitud (m) Ancho (m) Excav. Sobre
media (m) sobre el N.F.
agua
BN1 - B1 28.00 0.96 0.96 0.80 21.50
B1 - B2 42.00 1.11 1.00 0.80 33.60
B2 - B3 42.00 1.10 1.00 0.80 33.60
B3 - B5 42.00 1.29 1.00 0.80 33.60
B5 - B6 22.00 1.42 1.00 0.80 17.60
B6 - B7 18.00 1.23 1.00 0.80 14.40
B7 - B18 57.00 1.08 1.00 0.80 45.60
B18 - B19 58.00 1.08 1.00 0.80 46.40
B19 - B20 57.00 1.42 1.00 0.80 45.60

BN2 - B4 17.00 0.90 0.90 0.80 12.24


B4 - B6 53.00 1.18 1.00 0.80 42.40

B28 - B8 26.00 1.45 1.00 0.80 20.80


B8 - B10 25.00 1.74 1.00 0.80 20.00
B10 - B11 73.00 1.59 0.90 0.80 52.56

B12 - B14 31.00 1.28 1.00 0.80 24.80


B14 - B15 16.00 1.46 1.00 0.80 12.80
B15 - B16 27.00 1.79 1.00 0.80 21.60
B16 - B17 35.00 1.89 1.00 0.80 28.00
B17 - B20 61.00 1.78 1.00 0.80 48.80

B11 - B27 30.00 1.39 0.90 0.80 21.60


B27 - B15 45.00 1.46 0.90 0.80 32.40

BN8 - B9 25.00 1.05 1.00 0.80 20.00


B9 - B8 31.00 1.55 1.00 0.80 24.80

BN7 - BN6 14.00 0.80 0.80 0.80 8.96


BN6 - BN5 23.00 0.95 0.95 0.80 17.48
BN5 - B9 10.00 1.20 1.00 0.80 8.00

BN4 - BN5 12.00 0.95 0.95 0.80 9.12

1.15 B23 - B13 60.00 1.60 1.10 0.80 52.80


1.47 B13 - B17 76.00 2.00 1.50 0.80 91.20
1.78 B17 - B20 61.00 1.80 1.00 0.80 48.80

B13 - B12 39.00 1.19 1.10 0.80 34.32


B12 - B11 38.00 1.39 1.10 0.80 33.44

B3 - B11 60.00 1.30 1.00 0.80 48.00

B20 - B21 66.00 1.42 1.00 0.80 52.80


B21 - B22 66.00 1.06 0.85 0.80 44.88
B22 - C.R. 68.00 0.78 0.65 0.80 35.36
B24 - B25 75.00 1.32 0.50 0.80 30.00
B25 - B26 75.00 1.08 0.50 0.80 30.00
B26 - DESC. 20.00 0.50 0.50 0.80 8.00

1,681.28 Volumen a excavar (m3) = 1,227.86 men a excavar bajo ag

168.13 esponjamiento (10%) = 122.79

1,849.41 Volumen Total sobre agua = 1,350.65


s de Desague

Volumen
Profindidad
N.F. (m3) Excav.
bajo el N.F.
bajo agua
1.00 0.00 0.00
1.00 0.11 3.70
1.00 0.10 3.36
1.00 0.29 9.74
1.00 0.42 7.39
1.00 0.23 3.31
1.00 0.08 3.42
1.00 0.08 3.48
1.00 0.42 18.92

1.00 0.00 0.00


1.00 0.18 7.63

1.00 0.45 9.26


1.00 0.74 14.70
0.90 0.69 40.30

1.00 0.28 6.82


1.00 0.46 5.82
1.00 0.79 17.06
1.00 0.89 24.78
1.00 0.78 38.06

0.90 0.49 11.76


0.90 0.56 20.16

1.00 0.05 1.00


1.00 0.55 13.52

1.00 0.00 0.00


1.00 0.00 0.00
1.00 0.20 1.60

1.00 0.00 0.00 Rellenar con material de prestamo


altura Vol Relleno (m3)
1.10 0.50 24.00 0.45 21.60
1.50 0.50 30.40 0.53 32.22
1.00 0.80 39.04 0.02 0.98
54.80
1.10 0.09 2.81
1.10 0.29 8.82

1.00 0.30 14.40

1.00 0.42 22.18


0.85 0.21 10.82
0.65 0.13 6.80
0.50 0.82 48.90
0.50 0.58 34.80
0.50 0.00 0.00

men a excavar bajo agua (m3) = 508.76 1,736.63

esponjamiento (10%) = 50.88

Volumen Total bajo agua= 559.64