Documentos de Académico
Documentos de Profesional
Documentos de Cultura
CONCRETO
SECTOR OPCION II
T-A 14.47 CONCRETO
T-B 15.81 * METRADO TOTAL 133.06
VERTICALES
T-C 11.44 * PROMEDIO DE SECTORES 33.27
T-D 11.19
T-A 8.98
T-B 8.57
VIGAS
T-C 8.87
T-D 8.04
T-A 12.66 SOBRAN 5.10 m
PARA TENER EL
T-B 13.99 PROMEDIO
LOSAS REQUERIDO.
T-C 8.36
T-D 10.78
ENCOFRADO
SECTOR OPCION II
EMCOFRADO T-A 135.21
1274.45 T-B 142.43
VERTICALES
318.61 T-C 120.50
T-D 101.94
T-A 47.05
T-B 53.78
VIGAS
T-C 54.80
T-D 43.78 SOBRAN 30.13 m
PARA TENER EL
T-A 166.48 PROMEDIO
REQUERIDO.
T-B 140.66
LOSAS
T-C 120.69
T-D 148.04
11
9.6
Da de obra 1 2 3 4 5 6 7 8 9 10 11 12
hh 105.60 105.60 105.60 105.60 105.60 105.60 105.60 105.60 105.60 105.60 105.60 105.60
hhacum 105.60 211.20 316.80 422.40 528.00 633.60 739.20 844.80 950.40 1,056.00 1,161.60 1,267.20
met 135.21 142.43 120.50 101.94 135.21 142.43 120.50 101.94 135.21 142.43 120.50 101.94
met acum 135.21 277.64 398.14 500.08 635.29 777.72 898.22 1,000.16 1,135.37 1,277.80 1,398.30 1,500.24
Ren diario 0.78 0.74 0.88 1.04 0.78 0.74 0.88 1.04 0.78 0.74 0.88 1.04
Ren. Acum. 0.78 0.76 0.80 0.84 0.83 0.81 0.82 0.84 0.84 0.83 0.83 0.84
Rend. Pres 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
O DE VIGAS
6
9.6
Da de obra 1 2 3 4 5 6 7 8 9 10 11 12
hh 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60
hhacum - 57.60 115.20 172.80 230.40 288.00 345.60 403.20 460.80 518.40 576.00 633.60
met 47.05 53.78 54.80 43.78 47.05 53.78 54.80 43.78 47.05 53.78 54.80
met acum - 47.05 100.83 155.63 199.41 246.46 300.24 355.04 398.82 445.87 499.65 554.45
Ren diario - 1.22 1.07 1.05 1.32 1.22 1.07 1.05 1.32 1.22 1.07 1.05
Ren. Acum. - 1.22 1.14 1.11 1.16 1.17 1.15 1.14 1.16 1.16 1.15 1.14
Rend. Pres 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60