Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Diseño Agronomico
Diseño Agronomico
PROYECTO INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO POR ASPERSION PARA EL GGE MIRAFLORES, DISTRITO DE SAPALLANGA, PROVINCIA DE HUANCAYO, REGION JUN
ENTIDAD PROGRAMA SUBSECTORIAL DE IRRIGACIONES - PSI - SIERRA
UBICACIN SAPALLANGA - HUANCAYO - JUNIN
LUGAR MIRAFLORES
M E S E S Total Promedio
Aos
Ene. Feb. Mar. Abr. May, Jun, Jul, Ago, Set. Oct. Nov. Dic. Anual Anual
1985 77.00 161.50 80.50 55.60 19.10 5.60 9.60 10.10 89.70 76.10 89.10 136.90 810.8 67.6
1986 157.00 223.80 157.60 126.70 11.30 0.00 6.40 20.70 40.90 32.80 35.60 77.80 890.6 74.2
1987 156.00 146.70 68.10 72.60 14.20 15.30 11.70 6.00 39.90 33.80 41.30 118.10 723.7 60.3
1988 209.40 128.80 87.70 53.60 25.50 1.00 1.00 8.60 27.00 68.70 29.80 161.50 802.6 66.9
1989 96.40 188.80 145.00 88.80 19.00 15.00 0.30 17.20 13.50 122.70 45.10 40.60 792.4 66.0
1990 119.00 135.40 100.20 41.00 19.90 62.90 9.90 21.50 60.90 74.80 132.90 95.20 873.6 72.8
1991 70.90 54.20 162.90 81.80 34.20 16.60 1.30 0.00 57.20 57.20 65.10 38.50 639.9 53.3
1992 77.40 102.20 86.00 23.10 12.20 11.70 3.90 14.60 0.90 52.30 40.30 63.80 488.4 40.7
1993 139.70 144.50 107.10 102.80 18.50 1.00 3.60 24.90 31.60 65.70 109.00 133.50 881.9 73.5
1994 121.00 197.90 128.00 90.70 28.20 1.50 1.30 16.90 16.50 58.60 61.70 111.60 833.9 69.5
1995 68.90 131.30 125.30 19.60 26.80 2.60 9.20 16.50 36.50 76.00 56.00 98.30 667.0 55.6
1996 121.30 113.80 105.20 37.70 4.60 1.30 0.00 16.30 22.70 58.70 32.20 86.00 599.8 50.0
1997 103.90 137.90 70.60 37.50 2.90 0.30 1.30 18.20 46.60 34.40 74.90 125.50 654.0 54.5
1998 153.40 125.90 61.30 81.60 1.80 3.90 0.00 35.00 33.90 93.50 56.60 79.30 726.2 60.5
1999 113.30 148.70 75.50 59.70 6.60 22.60 8.10 7.90 62.80 51.20 82.60 76.80 715.8 59.7
2000 106.90 141.70 111.60 16.10 16.30 3.80 10.00 36.40 17.60 68.80 31.70 114.80 675.7 56.3
2001 166.00 92.30 161.00 26.10 15.80 1.50 18.60 5.90 62.70 104.90 57.70 115.80 828.3 69.0
2002 95.60 149.20 115.80 28.40 12.30 4.40 31.00 11.70 66.20 71.70 93.90 133.30 813.5 67.8
2003 127.70 111.60 133.60 99.60 26.00 2.60 1.50 22.30 31.20 37.70 65.70 116.30 775.8 64.7
2004 52.10 159.60 51.10 35.90 16.60 9.00 15.00 7.30 44.60 49.50 95.90 81.40 618.0 51.5
Sum Tot 2332.90 2795.80 2134.10 1178.90 331.80 182.60 143.70 318.00 802.90 1289.10 1297.10 2005.00 14811.9
Promed 116.65 139.79 106.71 58.95 16.59 9.13 7.19 15.90 40.15 64.46 64.86 100.25 740.595
SumX^2 548.78 646.25 499.95 298.77 83.49 74.31 46.76 81.98 202.91 306.03 315.47 469.97 3,345.30
SD 39.09 37.57 34.21 32.26 8.78 14.24 7.79 9.36 21.69 23.58 28.47 32.34 107.95
PP!.75% 90.276 114.451 83.631 37.186 10.666 0.000 1.928 9.586 25.514 48.548 45.654 78.438 667.785
M E S E S Promedio
Aos
Ene, Feb. Mar. Abr. May, Jun, Jul, Ago, Set. Oct. Nov. Dic. Anual
1994 12.05 11.92 12.00 12.00 10.78 9.49 9.82 10.57 12.52 13.35 14.02 13.97 11.9
1995 13.18 13.05 12.46 12.44 10.97 10.65 11.13 12.12 12.65 13.77 13.80 13.41 12.5
1996 12.57 12.25 12.37 12.44 11.65 10.03 9.80 12.17 12.98 13.96 13.88 12.84 12.2
1997 12.90 12.16 12.31 12.08 11.69 10.00 10.06 11.39 13.11 14.42 14.16 14.16 12.4
1998 13.78 14.08 13.67 13.96 12.35 11.23 10.03 12.27 13.15 13.69 13.74 13.05 12.9
1999 12.64 11.80 12.06 11.67 11.18 9.80 9.47 10.71 12.06 12.60 13.89 12.93 11.7
2000 12.16 11.77 11.23 11.32 11.56 11.25 10.24 11.63 12.87 12.56 14.29 13.18 12.0
2001 11.78 12.31 11.93 11.28 11.38 9.75 10.57 10.45 12.37 13.07 13.79 13.39 11.8
2002 13.07 12.27 12.55 12.17 11.59 10.38 10.47 11.34 12.53 13.53 13.07 13.57 12.2
2003 13.36 12.70 12.32 11.93 11.53 10.40 9.84 11.07 12.26 13.96 14.08 13.24 12.2
2004 13.68 12.61 12.19 12.08 11.65 9.90 10.45 10.77 12.05 13.49 13.95 13.12 12.2
2005 13.18 13.32 12.99 13.03 11.56 9.99 10.02 11.08 12.92 13.00 14.09 13.13 12.4
2006 12.56 12.50 12.18 12.25 10.32 10.73 9.29 11.41 12.36 13.17 13.13 14.03 12.0
2007 13.81 13.04 12.45 12.35 11.41 10.03 10.48 11.45 12.07 13.35 14.13 13.41 12.3
2008 12.52 11.99 11.52 12.17 10.75 10.13 10.02 11.64 12.40 13.06 14.26 13.53 12.0
2009 12.34 9.99 9.10 12.12 13.18 10.42 10.41 11.77 13.24 13.80 14.00 13.25 12.0
2010 12.99 13.56 13.47 13.17 12.04 11.06 10.64 11.39 13.22 13.62 14.26 13.11 12.7
Sum Tot 218.57 211.33 206.79 208.47 195.59 175.25 172.74 193.22 214.77 228.40 236.53 227.32 207.4138
Promed 12.86 12.43 12.16 12.26 11.51 10.31 10.16 11.37 12.63 13.44 13.91 13.37 12.20
TEMPERATURA MEDIA C
13.5
13.0
C
12.5
12.0
11.5
11.0
94 95 96 9 7 98 99 00 01 0
AOS
2 03 04 05 06 07 08 09 10
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20
Fuente: Estacin Huayao - Chupaca - Junin
M E S E S Promedio
Aos
Ene, Feb. Mar. Abr. May, Jun, Jul, Ago, Set. Oct. Nov. Dic. Anual
1984 69.88 75.87 72.59 66.86 61.82 60.10 55.30 56.15 55.77 63.81 61.91 62.41 63.5
1985 66.26 73.82 69.15 66.73 63.11 56.65 53.66 55.32 63.41 56.99 58.62 66.78 62.5
1986 74.65 76.89 77.97 72.41 62.60 58.11 59.76 59.33 61.61 56.98 55.04 62.34 64.8
1987 72.01 71.98 67.62 64.07 59.35 56.08 53.89 52.78 54.23 54.04 57.74 63.98 60.6
1988 70.32 68.80 69.87 69.89 60.92 52.90 49.82 49.03 53.64 56.47 52.84 60.37 59.6
1989 70.07 67.86 71.26 64.59 58.03 57.82 50.72 54.54 50.17 55.08 49.88 48.53 58.2
1990 64.84 56.58 60.61 55.79 55.51 57.84 49.86 49.46 51.08 56.42 55.84 54.09 55.7
1991 54.90 56.90 63.88 57.00 53.82 50.73 44.49 45.72 49.24 53.86 54.00 46.36 52.6
1992 56.98 55.99 60.41 54.18 49.16 52.34 46.78 50.00 42.09 49.56 43.89 44.10 50.5
1993 57.51 59.76 63.88 62.91 55.30 45.41 48.77 44.51 52.87 55.20 59.61 55.1
1994 62.29 63.89 62.54 59.07 50.76 46.63 44.35 45.98 48.39 46.09 49.38 53.03 52.7
1995 58.85 59.61 64.18 55.05 48.31 45.72 46.37 44.04 46.20 47.42 46.79 48.39 50.9
1996 57.47 61.20 61.74 55.78 48.25 43.61 44.39 46.06 46.51 46.74 44.64 54.82 50.9
1997 57.11 61.46 58.41 52.44 47.76 44.68 43.20 47.85 45.94 48.06 51.96 56.31 51.3
1998 61.53 60.08 61.77 53.07 44.61 48.47 45.04 47.37 40.51 56.13 55.75 62.74 53.1
1999 65.59 71.64 69.33 72.10 64.37 60.96 58.92 56.35 62.34 61.92 59.08 68.58 64.3
2000 73.23 74.70 76.57 67.25 60.82 53.56 47.03 53.83 54.12 62.33 49.59 57.34 60.9
2001 72.63 69.49 72.99 67.05 59.42 56.92 55.84 53.81 58.05 61.74 62.62 63.48 62.8
2002 62.76 68.05 67.32 63.13 59.68 57.55 58.19 57.24 59.43 63.18 64.40 64.79 62.1
2003 64.34 66.13 67.00 61.90 57.74 54.43 54.68 55.98 54.05 57.63 58.48 66.94 59.9
2004 61.53 66.26 66.85 59.57 56.08 56.52 55.76 57.34 57.85 59.65 58.80 63.32 60.0
Sum Tot 1354.75 1386.96 1405.94 1300.84 1177.42 1117.03 1066.82 1082.69 1054.63 1166.97 1146.45 1228.31 1211.99
Promed 64.51 66.05 66.95 61.94 56.07 53.19 50.80 51.56 52.73 55.57 54.59 58.49 57.71
70.0
60.0
50.0
40.0
30.0
20.0
10.0
0.0
84 85 86 87 88 89 90 91 92 93 9
AOS
4 95 96 97 98 99 00 01 02 03 04
19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 20 20 20 20 20
Fuente: Estacin Huayao - Chupaca - Junin
M E S E S Promedio
Aos
Ene, Feb. Mar. Abr. May, Jun, Jul, Ago, Set. Oct. Nov. Dic. Anual
1984 1.80 1.80 1.50 1.50 1.10 1.20 1.50 2.20 2.00 1.50 2.10 1.10 1.6
1985 1.70 1.40 1.20 7.00 1.00 1.10 9.00 1.00 1.80 1.40 1.80 1.40 2.5
1986 1.10 1.50 1.20 9.00 1.10 1.30 1.40 1.50 1.60 1.50 1.70 1.60 2.0
1987 1.40 9.00 9.00 6.00 9.00 8.00 1.20 9.00 1.40 1.40 1.30 1.20 4.8
1988 8.00 8.00 8.00 1.10 9.00 7.00 1.00 1.00 1.30 1.00 1.30 9.00 4.6
1989 1.00 1.10 6.00 8.00 1.00 6.00 1.00 9.00 1.10 1.20 1.00 1.10 3.1
1990 1.00 8.00 6.00 8.00 8.00 6.00 9.00 1.00 7.00 8.00 7.00 9.00 6.5
1991 9.00 8.00 7.00 7.00 5.00 0.00 6.00 6.00 1.10 1.00 9.00 1.00 5.0
1992 8.00 1.00 0.00 7.00 6.00 8.00 9.00 1.10 1.40 1.20 1.20 1.40 3.8
1993 1.30 1.00 8.00 5.00 0.00 6.00 5.00 9.00 2.08 8.00 8.00 7.00 5.0
1994 1.00 9.00 8.00 8.00 0.00 6.00 9.00 9.00 1.40 1.40 0.90 1.10 4.6
1995 1.10 9.00 7.00 6.00 0.00 5.00 9.00 1.10 1.30 1.20 1.20 1.10 3.6
1996 9.00 1.00 8.00 8.00 8.00 4.63 1.00 1.00 1.20 1.40 1.30 1.00 3.8
1997 1.10 5.00 8.00 1.00 8.00 9.00 1.10 9.00 1.00 1.20 1.50 1.50 4.0
1998 8.00 9.00 1.10 1.00 4.09 4.95 4.59 4.35 1.83 2.24 2.81 2.75 3.9
1999 3.63 4.92 5.33 1.70 1.30 1.60 2.10 2.30 2.30 2.20 2.40 2.75 2.7
2000 3.63 2.00 1.60 1.60 1.60 2.10 2.20 2.10 2.50 2.40 2.80 2.50 2.3
2001 2.10 1.80 2.10 1.80 1.80 2.00 1.90 2.50 2.20 2.30 2.30 2.20 2.1
2002 2.40 1.60 1.80 1.70 1.60 1.90 2.10 2.20 2.20 2.40 2.20 2.00 2.0
2003 2.00 1.90 2.20 1.90 1.80 1.80 2.30 2.40 2.30 2.10 2.60 2.00 2.1
2004 2.30 2.30 1.70 1.60 2.00 1.90 2.20 2.60 2.20 2.50 2.40 2.20 2.2
Sum Tot 70.57 88.32 94.73 93.90 71.39 85.48 81.59 79.35 41.21 47.54 56.81 54.90 72.15
Promed 3.36 4.21 4.51 4.47 3.40 4.07 3.89 3.78 1.96 2.26 2.71 2.61 3.44
6.0
5.0
4.0
3.0
2.0
1.0
0.0
84 85 86 87 88 89 90 91 92 93 9
AOS
4 95 96 97 98 99 00 01 02 03 04
19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 20 20 20 20 20
Fuente: Estacin Huayao - Chupaca - Junin
M E S E S Promedio
Aos
Ene, Feb. Mar. Abr. May, Jun, Jul, Ago, Set. Oct. Nov. Dic. Anual
1984 137.40 112.40 117.00 168.10 234.50 211.90 263.90 246.60 226.30 147.50 163.80 182.20 184.3
1985 183.10 101.10 140.10 152.90 201.00 223.50 263.30 212.20 199.70 259.40 196.70 167.60 191.7
1986 140.80 103.80 92.90 152.50 270.00 269.80 247.20 235.90 184.20 229.60 220.90 164.80 192.7
1987 133.10 167.60 216.30 204.10 238.40 261.30 265.00 277.20 194.80 206.90 139.00 162.60 205.5
1988 112.80 157.10 136.90 133.80 220.20 267.80 286.10 276.20 211.20 200.30 186.00 147.10 194.6
1989 110.90 109.40 118.70 179.10 223.20 218.70 264.20 217.90 191.70 177.10 223.70 228.50 188.6
1990 131.20 192.50 172.10 205.80 216.10 182.30 252.60 236.10 196.50 156.10 172.90 155.80 189.2
1991 185.90 151.40 122.10 193.00 247.70 261.40 260.30 225.50 200.00 131.40 165.00 218.70 196.9
1992 172.80 160.00 181.30 229.90 281.00 202.00 273.40 230.50 227.80 189.70 229.10 234.30 217.7
1993 140.40 146.50 157.30 159.90 245.10 279.80 256.40 251.00 181.00 192.20 150.70 152.90 192.8
1994 137.50 134.40 178.40 183.90 122.90 259.40 265.40 280.60 205.80 236.40 222.70 211.10 203.2
1995 192.60 171.70 178.20 224.90 261.20 255.50 281.10 283.80 215.50 232.80 220.20 217.60 227.9
1996 162.20 158.60 169.70 181.60 226.20 272.80 289.30 232.70 228.80 217.70 218.20 185.30 211.9
1997 163.70 152.70 204.40 233.50 259.10 286.60 301.70 217.00 228.20 229.20 205.10 191.40 222.7
1998 170.70 166.70 184.20 242.80 295.40 262.40 310.80 263.30 245.30 219.60 230.20 162.30 229.5
1999 167.90 128.80 137.00 181.30 253.90 261.80 281.40 303.00 220.00 202.50 243.40 155.20 211.4
2000 147.30 149.20 138.20 203.60 258.30 273.40 270.70 260.20 233.40 212.40 254.70 206.70 217.3
2001 141.20 156.00 170.30 232.60 249.90 242.70 246.50 287.80 213.40 215.90 197.60 239.20 216.1
2002 223.30 134.80 176.80 184.50 243.10 249.80 241.50 255.30 200.60 216.80 190.30 190.70 209.0
2003 164.10 157.20 175.40 221.30 246.90 272.80 294.10 247.00 242.50 258.60 261.30 173.80 226.3
2004 232.10 161.30 167.30 238.20 275.10 245.40 253.60 253.00 198.40 205.80 228.70 155.00 217.8
Sum Tot 3351.00 3073.20 3334.60 4107.30 5069.20 5261.10 5668.50 5292.80 4445.10 4337.90 4320.20 3902.80 4346.98
Promed 159.57 146.34 158.79 195.59 241.39 250.53 269.93 252.04 211.67 206.57 205.72 185.85 207.00
Das 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
Horas/Da 5.15 5.23 5.12 6.52 7.79 8.35 8.71 8.13 7.06 6.66 6.86 6.00
150.0
100.0
50.0
0.0
84 85 86 987 988 989 990 991 992 993 AOS
94 995 996 997 998 999 000 001 002 003 004
19 19 19 1 1 1 1 1 1 1 19 1 1 1 1 1 2 2 2 2 2
Fuente: Estacin Huayao - Chupaca - Junin
VARIABLES METEREOLOGICAS
VARIABLES M E S E S PROM
METEOROLOGICOS Enero Febr. Marz. Abril Mayo Junio Julio Agost Set. Octub. Nov. Dic. ANUAL
T Media C 12.86 12.43 12.16 12.26 11.51 10.31 10.16 11.37 12.63 13.44 13.91 13.37 12.20
Humedad Relativa % 64.51 66.05 66.95 61.94 56.07 53.19 50.80 51.56 52.73 55.57 54.59 58.49 57.70
Prec Efectiva al 75% 90.28 114.45 83.63 37.19 10.67 0.00 1.93 9.59 25.51 48.55 45.65 78.44 45.49
Evaporacin(mm) 158.00 133.60 154.20 149.50 149.50 141.30 162.10 164.30 179.80 176.00 174.40 171.60 159.53
Viento (m/seg) 3.36 4.21 4.51 4.47 3.40 4.07 3.89 3.78 1.96 2.26 2.71 2.61 3.44
Altitud del Proyecto 3300 m.s.n.m
M E S E S PROM
Enero Febr. Marz. Abril Mayo Junio Julio Agost Set. Octub. Nov. Dic. ANUAL
T Med Mensual C 12.86 12.43 12.16 12.26 11.51 10.31 10.16 11.37 12.63 13.44 13.91 13.37 12.20
T Med Mensual F 55.14 54.38 53.90 54.07 52.71 50.56 50.29 52.46 54.74 56.18 57.04 56.07 53.96
Factor ETP MF Lat (m 2.63 2.29 2.35 2.00 1.80 1.61 1.72 1.95 2.17 2.48 2.52 2.64 2.18
Humedad Relativa % 64.51 66.05 66.95 61.94 56.07 53.19 50.80 51.56 52.73 55.57 54.59 58.49 57.70
CH Coefcte Humedad A 0.99 0.97 0.95 1.02 1.00 1.00 1.00 1.00 1.00 1.11 1.12 1.07 1.02
Para May de 64%, Men=1
CE Correccin x Eleva 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07
CE=1,0+0,04E/2000
ETo: Evap Potencial ( 152.59 128.51 128.85 118.17 101.08 86.66 92.15 109.04 126.57 164.15 171.41 168.95 129.01
CULTIVO M E S E S CULTIVO
DE BASE Has Ene, Feb. Mar. Abr. May, Jun, Jul, Ago, Set. Oct. Nov. Dic. Has ROTACION
Pasto Natural
RayGrass 2.50 CG CG CG CG CG CG CG CG CG CG CG CG
Alcachofa 2.82 CG CG CG CG CG CG CG CG CG CG CG CG
CULTIVO M E S E S CULTIVO
DE BASE Has Ene, Feb. Mar. Abr. May, Jun, Jul, Ago, Set. Oct. Nov. Dic. Has ROTACION
Pasto Natural
RayGrass 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
Alcachofa 2.82 2.82 2.82 2.82 2.82 2.82 2.82 2.82 2.82 2.82 2.82 2.82 2.82
Total 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 2.5
CULTIVO M E S E S CULTIVO
BASE Has Enero Febr. Marz. Abril Mayo Junio Julio Agost Set. Octub. Nov. Dic. Has ROTACION
Pasto Natural
RayGrass 2.50 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Alcachofa 2.82 1.00 0.65 0.68 0.62 0.55 0.95 0.90 0.65 0.35 0.68 0.64 1.00
Total 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 2.5
CULTIVO BASE CULTIVO ROTACION PREPARACION DE TERRENO Y/O SIEMBRA
FACTORES Total ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
das/mes 31 28 31 30 31 30 31 31 30 31 30 31
Frecuencia
1 1 1 1 1 1 1 1 1 1 1 1
(segn perfil)
dotacin 31 28 31 30 31 30 31 31 30 31 30 31
Area
cult./
7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82 7.82
mes
(Has)
kc Ponderado 0.962 0.864 0.805 0.831 0.304 0.304 0.304 0.304 0.304 0.000 0.112 0.863
ETo (mm/dia) 4.92 4.59 4.16 3.94 3.26 2.89 2.97 3.52 4.22 5.30 5.71 5.45
ETc(mm/dia) UC 4.73 3.97 3.34 3.27 0.99 0.88 0.90 1.07 1.28 0.00 0.64 4.70
Precip. Efectiva (m 90.28 114.45 83.63 37.19 10.67 0.00 1.93 9.59 25.51 48.55 45.65 78.44
Dn(mm/mes) 56.46 0.00 20.05 61.02 20.03 26.32 26.06 23.53 12.93 0.00 0.00 67.29
Efic.Riego (%) 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00
Db(mm/mes) 75.28 0.00 26.73 81.35 26.71 35.09 34.75 31.38 17.23 0.00 0.00 89.71
Db(m3/Ha) 752.81 0.00 267.32 813.55 267.11 350.92 347.47 313.76 172.35 0.00 0.00 897.15
NHoras de riego/dia 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Db(m3) 5886.95 0.00 ### ### ### ### ### ### ### 0.00 0.00 7015.70
Db(cm3) 0.01 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01
Caudal (l/s) 6.59 0.00 2.34 7.36 2.34 3.18 3.04 2.75 1.56 0.00 0.00 7.86
Mod.Riego(l/s/Ha) 0.84 0.00 0.30 0.94 0.30 0.41 0.39 0.35 0.20 0.00 0.00 1.00
OFERTA DE AGUA
DESCRIPCION ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGOS. SET. OCT. NOV DIC.
(b) DISPONIB. RIEGO ( 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
(c) DISP. DIAS POR MES 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
(d) N HORAS DISP (dia 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
(e) CAUDAL (l/S) 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
VOLUMEN MENSUAL
9374.40 8467.20 ### ### ### ### ### ### ### ### ### 9374.40
(M3/MES)
DESCRIPCION ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGOS. SET. OCT. NOV DIC.
VOL. MENSUAL DEMAN 5886.95 0.00 2090.41 6361.93 2088.83 2744.19 2717.21 2453.58 1347.76 0.00 0.00 7015.70
VOL. MENSUAL OFERTA 9374.40 8467.20 9374.40 9072.00 9374.40 9072.00 9374.40 9374.40 9072.00 9374.40 9072.00 9374.40
BALANCE DEM-OFE ( 3487.45 8467.20 ### ### ### ### ### ### ### ### ### 2358.70
( - ) SUPERAVIT
( + ) DEFICIT
10000.00
10000.00
9000.00 9000.00 BALANCE
8000.00 8000.00
7000.00 7000.00
6000.00
5000.00 6000.00
4000.00 DEMANDA 5000.00
3000.00 OFERTA 4000.00
2000.00 BALANCE
1000.00 3000.00
0.00 2000.00
OFERTA
1000.00
ENE.
FEB.
MAR.
ABR.
DEMANDA
MAY.
JUN.
0.00
JUL.
AGOS.
SET.
OCT.
0 2 4 6 8 10 12 14
NOV
DIC.
SELECCIN DEL ASPERSOR
PROYECTO INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO POR ASPERSION PARA EL GGE MIRAFLORES, DISTRITO DE SAPALLANGA, PROVINCIA DE HUANCAY
ENTIDAD PROGRAMA SUBSECTORIAL DE IRRIGACIONES - PSI - SIERRA
UBICACIN SAPALLANGA - HUANCAYO - JUNIN
LUGAR MIRAFLORES
ASPERSOR FORMULAS
ETc ETo.Kc
A.Lb Qam Ib.Ea.El
Ln ( cc pmp).Da.Pr. f Q
Ln Ln Ir.Trd Trc
Ea.El.Lb
Lb Ir Qa Ia.Ea.El Qa
Ef ETc
PARAMETROS DE DISEO ASPERSOR No. 1
Evapotranspiracin mxima ETo = 5.71 mm/da Codigo Marca Modelo (") Boq.(mm) Hamin(m)Hamax(m) Qamin(m3/h)
Qamax(m3/h)Dmin(m) Dmax(m)
Precipitacin media Pp= 3.11 mm 29 VYRSA VYR-33AF 3/4 4.00 25.00 50.00 0.98 1.36 28.00 31.80
Coeficiente de los cultivos Kc = 0.96 Espaciamiento entre aspersores Eam = 17.94 m Ea < Eam OK!
Profundidad radicular efectiva (Alcachof Pr = 60 cm Espaciamiento entre laterales Elm = 19.44 m El < Elm OK!
Agua facilmente aprovechable (Agotami f= 40 % Tiempo de riego (calculado) Trc = 9.34 hr Trc < Tr OK!
Tiempo de riego por posicion (asumido) Tr = 6 hr Numero de posiciones por dia Np = 2 Qamin < Qa < Qamax OK!
Velocidad del viento v= 3.44 m/s ASPERSOR No. 2
Clima No. = 4 Humedo o frio Codigo Marca Modelo (") Boq.(mm) Hamin(m)Hamax(m) Qamin(m3/h)
Qamax(m3/h)Dmin(m) Dmax(m)
Textura No. 3 SaL Franco Arenoso 37 VYRSA VYR-70 3/4 4.80x3.20 30.00 40.00 2.18 2.52 30.00 32.00
Hum. del suelo a capacidad de campo cc 16.00 % Espaciamiento entre aspersores Eam = 18.60 m Ea < Eam OK!
Hum. del suelo en el punto de marchite pmp 7.00 % Espaciamiento entre laterales Elm = 20.15 m El < Elm OK!
Densidad Aparente Da = 1.35 gr/cm3 Tiempo de riego (calculado) Trc = 5.42 hr Trc < Tr OK!
Velocidad de infiltracin basica Ib = 25.00 mm/hr Numero de posiciones por dia Np = 2 Qamin < Qa < Qamax Elegir otro Aspersor
Area Irrigable A= 7.82 Ha
DATOS DE CALCULO DEL ASPERSOR ASPERSOR No. 3
Evapotranspiracin Etc = 5.49 mm/da Codigo Marca Modelo (") Boq.(mm) Hamin(m)Hamax(m) Qamin(m3/h)
Qamax(m3/h)Dmin(m) Dmax(m)
Lamina neta de riego Ln = 29.16 mm 50 VYRSA VYR-65 1 6.30x2.40 35.00 60.00 2.24 7.84 32.00 48.00
Eficiencia de riego Ef = 80 % Espaciamiento entre aspersores Eam = 24.00 m Ea < Eam OK!
Lamina bruta Lb = 36.45 mm Espaciamiento entre laterales Elm = 26.00 m El < Elm OK!
Frecuencia o Intervalo de riego Ir = 5.31 das Tiempo de riego (calculado) Trc = 2.90 hr Trc < Tr OK!
Ajustado Ir = 6 das Lb = 41.21 mm Numero de posiciones por dia Np = 2 Qamin < Qa < Qamax Elegir otro Aspersor
Tiempo de operacin por dia Trd = 12 hr ASPERSOR No. 4
Capacidad del sistema Q= 12.43 l/s Codigo Marca Modelo (") Boq.(mm) Hamin(m)Hamax(m) Qamin(m3/h)
Qamax(m3/h)Dmin(m) Dmax(m)
DESCARGA DEL ASPERSOR
Velocidad de aplicacin del aspersor Ia = 3.43 mm/hr 52 VYRSA VYR-86 1 6.35x4.36 35.00 56.00 4.28 5.44 40.80 46.00
Verificacion: Ib > Ia OK! Espaciamiento entre aspersores Eam = 26.04 m Ea < Eam OK!
Espaciamiento entre aspersores (asumi Ea = 16.00 m Espaciamiento entre laterales Elm = 28.21 m El < Elm OK!
Espaciamiento entre lineas (asumido) El = 18.00 m Tiempo de riego (calculado) Trc = 4.92 hr Trc < Tr OK!
Caudal de salida del aspersor Qa = 0.989 m3/h Numero de posiciones por dia Np = 2 Qamin < Qa < Qamax Elegir otro Aspersor
Caudal mximo del aspersor Qamax = 7.200 m3/h NOTA: LA SELECCIN DEL ASPERSOR DEPENDERA DE LA DISPONIBILIDAD EN EL MERCADO.
Coeficiente del Cultivo K c
Fuente : FAO
CALCULO DE LA LINEA DE RIEGO
INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO POR ASPERSION PARA EL GGE MIRAFLORES, DISTRITO DE
PROYECTO SAPALLANGA, PROVINCIA DE HUANCAYO, REGION JUNIN
ENTIDAD PROGRAMA SUBSECTORIAL DE IRRIGACIONES - PSI - SIERRA
UBICACI SAPALLANGA - HUANCAYO - JUNIN
LUGAR MIRAFLORES
FORMULAS
1
Q hf 1.852
100 4.87
Li Mr Qi
Na A D
Ea K .CSM C Li
Qi Na.Qa hf hfp
hfperm 0.20 Ha Hd
Q Hu
Ni 1 0.20 3 Hd
Hi Hi Ha hf He
Qi 4 2
Lm ( Ea / 2) 2 El 2 ( Na 1) Ea Hu Hi hf Hd He
DATOS VERIFICACIONES
Ancho medio entre lineas laterales: Li = 35.00 m Presion requerida en el hidrante Himin = 30.09 m
Capacidad del sistema Q= 12.43 l/s Perdida por friccion perd = 0.07 OK
Area irrigable A= 7.82 Has 30.09 m < Presion dinamica < 58.57 m
Altura mnima de carga del aspersor Hamin = 25.00 m Caudal en el aspersor Qa = 0.26 l/s
Altura mxima de carga del aspersor Hamax = 50.00 m Coeficiente de salidas multiples CSM = 0.54
PROYECT INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO POR ASPERSION PARA EL GGE MIRAFLORES, DISTRITO DE SAPALLANGA, PROVINCIA DE HUANCAYO, REGION JUNIN
ZONA DE ANCLAJE
ESPEJO DE AGUA
tubera de descarga 3 Pulg 14.00 m
BORDE LIBRE
13.20 m
12.60 m
12.60 m
Pendiente transversal a L del fondo 1%
9.00 m
FONDO
1%
Ancho del borde de anclaje 0.40 m 9.00
Longitud del Anclaje Subterraneo 0.60 m
Horas de Embalse 6.00 h
2.- DIMENSIONAMIENTO Y CAL. HIDRAULICOS
Volumen neto de diseo 302 m3
Largo del Fondo (L) 14.00 m 0.4 1.80 m
Ancho del Fondo (A) 9.00 m Salida .
Area del Fondo ( b ) 126.00 m2 ###
Area del Espejo de agua ( B ) 221.76 m2
Altura menor del agua ( h' ) 1.71 m (a reservorio lleno, debido al pendiente) Agua
Reduc.Volumen x pendiente (Vp) 5.82 m3 = Vol. Tronco de pirmide / 2
Volumen Neto calculado 303.13 m3 =h*(B+b+ B*b ) / 3 - Vp Fondo ###
Volumen Total (con borde libre) 372.33 m3 = (Tronco de pirmide) - Vp
Tiempo de embalse (en h y min) 6.01 H
Tiempo de descarga 10.72 H (en base al caudal de diseo)
Caudal mximo de descarga 17.62 l/s
Caudal de diseo 7.86 l/s OK
3.- AREA DE GEOMEMBRANA
Longitud de Talud 2.97 m
Area de Taludes 161.56 m2
Area de Anclajes 65.36 m2
Area neta geomembrana 352.92 m2
Autor: W. Rios E.
CALCULO DE CAPACIDAD DEL RESERVORIO
Equivalente
Caudal de la fuente = 14 l/s 50.4 m / h
Reservorio lleno 302.4 m
RESERVORIO
CAPACIDAD = 303 m
VISTA EN PERPECTIVA
19.00 m B
0.4 7.86 18.20 m 0.4
14.00 m
9.00 m
13.20 m
14.00 m
Vertedero de exedencias
A A
VISTA EN PLANTA B
2.97
14.00 m 2.10
CORTE A - A
Tubera de rebose
2.97
2.97
9.00 m
CORTE B - B
METRADO:
- BASE : 126 m
- PARED LATERAL : 128.05 m
- PARED LATERAL : 94.356 m
METRADO TOTAL: 348.41 m
TOTAL DE GEOMEMBR 349 m2
.
TURNO DE RIEGO POR BENEFICIARIO - GGE MIRAFLORES - RESERVORIO 1
N CAUDAL DEL
LOTE AREA PERIMETRO CAUDAL CAUDAL
HIDRANTE BENEFICIARIO AREA (ha) ASPERSORE ASPERSOR CULTIVO TURNO OBSERVACIONES
N (m2) (ml) TOTAL (l/s) TOTAL (m3/hr)
S (l/s) RIEGO POR
50,51,52 13 Augusto Pea Paucar 9148.50 402.94 0.91 14.00 0.27 3.78 13.61 ALCACHOFA I
ASPERSION
TOTAL TURNO I 0.91 14.00 3.78 13.61
RIEGO POR
47,48,49 13 Augusto Pea Paucar 9148.50 402.94 0.91 15.00 0.27 4.05 14.58 ALCACHOFA II
ASPERSION
TOTAL TURNO II 0.91 15.00 4.05 14.58
RIEGO POR
42,43,44,45,46 12 Demetria Avila Condor 10678.11 442.6 1.07 23.00 0.27 6.21 22.36 ALCACHOFA III
ASPERSION
TOTAL TURNO III 1.07 23.00 6.21 22.36
RIEGO POR
42,43,44 12 Demetria Avila Condor 10678.11 442.6 1.07 12.00 0.27 3.24 11.66 ALCACHOFA IV
ASPERSION
40,41 14 Demetria Avila Condor 8087.00 554.08 0.81 8.00 0.27 2.16 7.78
TOTAL TURNO IV 1.88 20.00 5.40 19.44
RIEGO POR
37,38,39 14 Demetria Avila Condor 8087.00 554.08 0.81 21.00 0.27 5.67 20.41 ALCACHOFA V
ASPERSION
TOTAL TURNO V 0.81 21.00 5.67 20.41
RIEGO POR
1,2,3 1 Gregorio Ayre DE LA Cruz 4393.50 268.936 0.44 15.00 0.27 4.05 14.58 ALCACHOFA VI
ASPERSION
4,5 2 Selvina Vila Salvador 3561.00 255.85 0.36 10.00 0.27 2.70 9.72
TOTAL TURNO VI 0.80 25.00 6.75 24.30
RIEGO POR
6,7,8 3 Selvina Vila Salvador 4798.53 269.124 0.48 15.00 0.27 4.05 14.58 ALCACHOFA VII
ASPERSION
11 4 Antonia Aire de Rojas 1156.00 163.638 0.12 4.00 0.27 1.08 3.89
9,10 5 Celinda Ayre Rojas 1998.50 194.945 0.20 6.00 0.27 1.62 5.83
TOTAL TURNO VII 0.80 25.00 6.75 24.30
RIEGO POR
12,13,14,15 6 Esequiel Humberto Ayre Rojas 9201.50 452.96 0.92 20.00 0.27 5.40 19.44 ALCACHOFA VIII
ASPERSION
TOTAL TURNO VIII 0.92 20.00 5.40 19.44
RIEGO POR
16,17 6 Esequiel Humberto Ayre Rojas 9201.50 452.96 0.92 9.00 0.27 2.43 8.75 ALCACHOFA IX
ASPERSION
18,19,20 7 Antonia Aire de Rojas 4686.00 309.259 0.47 16.00 0.27 4.32 15.55
TOTAL TURNO IX 1.39 25.00 6.75 24.30
RIEGO POR
21 AL 24 9 Jaime walter Mendoza Ayre 10416.50 444.477 1.04 17.00 0.27 4.59 16.52 ALCACHOFA X
ASPERSION
TOTAL TURNO X 1.04 17.00 4.59 16.52
RIEGO POR
26 AL 28 9 Jaime walter Mendoza Ayre 10416.50 444.477 1.04 13.00 0.27 3.51 12.64 ALCACHOFA XI
ASPERSION
29,30 10 Celinda Ayre Rojas 2645.50 216.841 0.26 8.00 0.27 2.16 7.78
TOTAL TURNO XI 1.31 21.00 5.67 20.41
RIEGO POR
31 AL 36 11 Celinda Ayre Rojas 7459.80 378.77 0.75 24.00 0.27 6.48 23.33 ALCACHOFA XII
ASPERSION
TOTAL TURNO XII 0.75 24.00 6.48 23.33
TOTAL PROYECTO
RESERVORIO 1
Db CAPACIDAD
TR = CAUDAL
DOSIS DE
DE RIEGO DEL
TIEMPO DE
Pma TURNO AREA (HA)
(m3/Hr)
RIEGO
(mm)
ASPERSOR
(mm/Hr)
RIEGO
(Hr)
DIA N PRESION
TR =Tiempo de Riego (Hr) I 0.91 13.61 20.60 3.40 6.06 1.00 CARGA NATURAL
Db = Dosis bruta de riego (mm) II 0.91 14.58 20.60 3.40 6.06 1.00 CARGA NATURAL
Pma = Capacidad de Riego del Aspersor (mmHr) III 1.07 22.36 20.60 3.40 6.06 2.00 CARGA NATURAL
IV 1.88 19.44 20.60 3.40 6.06 2.00 CARGA NATURAL
V 0.81 20.41 20.60 3.40 6.06 3.00 CARGA NATURAL
VI 0.80 24.30 20.60 3.40 6.06 3.00 CARGA NATURAL
VII 0.80 24.30 20.60 3.40 6.06 4.00 CARGA NATURAL
VIII 0.92 19.44 20.60 3.40 6.06 4.00 CARGA NATURAL
IX 1.39 24.30 20.60 3.40 6.06 5.00 CARGA NATURAL
X 1.04 16.52 20.60 3.40 6.06 5.00 CARGA NATURAL
XI 1.31 20.41 20.60 3.40 6.06 6.00 CARGA NATURAL
XII 0.75 23.33 20.60 3.40 6.06 6.00 CARGA NATURAL
CANT
CAUDAL CAUDAL
HIDRANTE ASPERSOR TURNO
UNITARIO TOTAL
ES
50 4 0.27 1.08 1
51 5 0.27 1.35 1
52 5 0.27 1.35 1
47 5 0.27 1.35 2
48 5 0.27 1.35 2
49 5 0.27 1.35 2
42 5 0.27 1.35 3
43 5 0.27 1.35 3
44 5 0.27 1.35 3
45 5 0.27 1.35 3
46 3 0.27 0.81 3
40 4 0.27 1.08 4
41 4 0.27 1.08 4
42 4 0.27 1.08 4
43 4 0.27 1.08 4
44 4 0.27 1.08 4
37 7 0.27 1.89 5
38 7 0.27 1.89 5
39 7 0.27 1.89 5
1 5 0.27 1.35 6
2 5 0.27 1.35 6
3 5 0.27 1.35 6
4 5 0.27 1.35 6
5 5 0.27 1.35 6
6 5 0.27 1.35 7
7 5 0.27 1.35 7
8 5 0.27 1.35 7
9 3 0.27 0.81 7
10 4 0.27 1.08 7
11 4 0.27 1.08 7
12 5 0.27 1.35 8
13 5 0.27 1.35 8
14 6 0.27 1.62 8
15 4 0.27 1.08 8
16 4 0.27 1.08 9
17 5 0.27 1.35 9
18 4 0.27 1.08 9
19 6 0.27 1.62 9
20 6 0.27 1.62 9
21 4 0.27 1.08 10
22 4 0.27 1.08 10
23 4 0.27 1.08 10
24 5 0.27 1.35 10
26 4 0.27 1.08 11
27 4 0.27 1.08 11
28 5 0.27 1.35 11
29 4 0.27 1.08 11
30 4 0.27 1.08 11
31 4 0.27 1.08 12
32 4 0.27 1.08 12
33 4 0.27 1.08 12
34 4 0.27 1.08 12
35 4 0.27 1.08 12
36 4 0.27 1.08 12
******************** ********** ********** ********** **********
EPANET
Anlisis Hidraulico y de Calidad de Distribucion de Agua - Version 2.0
INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO POR ASPERSION PARA EL GGE MIRAFLORES, DISTRITO DE SAPALLANGA,
PROYECTO PROVINCIA DE HUANCAYO, REGION JUNIN
ENTIDAD PROGRAMA SUBSECTORIAL DE IRRIGACIONES - PSI - SIERRA
UBICACIN SAPALLANGA - HUANCAYO - JUNIN
LUGAR MIRAFLORES
CALCULOS
La altura de aguas (H) en el desarenador depende de la velocidad (V), PERFIL
el caudal (Q) y el ancho ( B ) del desarenador ; luego usando la
L = 1.18 * C * h * V / W = 1.90 m
DISEO DE LA CAPTACION
PROYECTO
ENTIDAD
UBICACIN
LUGAR
AFLORO
0 2 b
1 AFLORO
A A CANASTILLA
L DE SALIDA
0 h0 TUBERIA
TUBERA DE
1 2 DE SALIDA
REBOSE Y LIMPIA L
TUBERA DE
REBOSE Y LIMPIA
ho DONDE:
ho : Se recomienda valores entre 0.40 y 0.50m.
V2: Velocidad de salida.recommendable menor
a 0.60 m/s.
ho = 0.4 m.
Considerando: g = 9.81 m/seg2
V2 = 0.5 m/seg.
L= 1.27 m.
L
L = 1.30 m.
B .- CLCULO DEL ANCHO DE LA PANTALLA (b):
CLCULO DEL DIMETRO DE LA TUBERIA
DE INGRESO A LA CAPTACIN:
A = Qmax / Cd * V
Donde:
Cd: Coeficiente de descarga(0.6 - 0.8)
V : Velocidad de descarga 0.6m/seg.
Qmax. : Caudal mximo del manantial (m3/seg)
A : rea total de las tuberias de salida.
; Aasumido= 0.004560378 m2
b = ( 9 + 4 NA ) * D b= 1.88 m
1 .56 . V
2 Qmd
H= V=
2g Ac
Qmd = 0.002240 m3/seg V = 1.105735 m/seg
g = 9.81 m/seg2 H = 0.097214 m.
Ac = 0.0020 m2
CONDICIONES:
At = 2 Ac At
N ranura =
3 Dc < L < 6 Dc. rea de una ranura
At 0.50 * Dg * L
Donde :
At : rea total de las ranuras
Ag : rea de la granada.
At = 0.00203 m2
CLCULO DE L:
3*Dc = 15.24 cm
6*Dc = 30.48 cm
L = 0.15 m
0.1
Ag = 0.00004 m2
At = 0.00203 m2
0.5*Dg*L = 0.02394 m2
N ranuras = 57.91
Por lo tanto :
N ranuras = 58 Ranuras
FRMULA: Donde :
Q = Caudal mximo de la fuente en m3/seg
nQ 3 /8 S = Pendiente mnima (1 - 1.5 %) m/m
D=1 . 548[ ( ] n = coeficiente de rugosidad de manning
S D = dimetro de la tuberia en m.
Datos:
n= 0.01 PVC
S= 1 %
Q= 2.24 lt/seg (caudal maximo)
n*Q = 2E-05
S= 0.1
D= 0.07 m. 2.61 Pulg. Pulg. 3.00 Pulg.
DISEO CAMARA ROMPEPRESION - LINEA DE CONDUCCION
PROYECTO
ENTIDAD
UBICACIN
LUGAR
REBOSE
TUB. PVC 1" TAPA METALICA
VALVULA NIVEL DE
AGUA
ENTRADA SALIDA
TUB. PVC 1" TUB. PVC 1"
SALIDA
TUB. PVC 1"
A A
PLANTA
SECCION A-A
Para determinar la altura de la cmara rompe presion, es necesario conocer la carga requerida ( H ) para que el
gasto de salida pueda fluir. Este valor se determina mediante la ecuacion experimental de Bernoulli.
V = 0.4911822 m/seg
H = 0.0191828 m.
Por lo tanto H = 0.30 m.
Asumiendo :
B.L. = 0.40 m.
A= 0.15 m.
Ht = 0.90 m.
PROYECTO
ENTIDAD
UBICACIN
LUGAR
f 0. 54
Concreto 110 1 1" 1 2.54
Acero 120 1.5 1 1/2" 1.5 3.81
Asbesto cemento 140 2 2" 2 5.08
Donde: D : Diametro de la tuberia (Pulg) P.V.C 140 3 3" 2.5 6.35
Q : Caudal de diseo (l/s) 4 4" 3 7.62
hf : Perdida de carga unitaria (m/Km) 5 5" 4 10.16
C : Coeficiente de Hanzen -Williams (pie^1/2/seg) 6 6" 6 15.24
PROYECTO
ENTIDAD
UBICACIN
LUGAR
PARAMETROS DE DISEO
Presin Mnima (Hidrantes) : 12.00 mH20 Velocidad Mnima : 0.30 m.s.n.m
Presin Mxima : 50.00 mH20 Velocidad Mxima : 5.00 m.s.n.m
0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
ETP (mm/dia) - Etapa Inicial