Está en la página 1de 42

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

PROYECTO : "MEJORAMIENTO DE INFRAESTRUCTURA EN INSTITUTO SUPERIOR PEDAGOGICO HNO VICTORINO ELORZ GOICOECHEA - SULLANA - PIURA
PROPIETARIO : GOBIERNO REGIONAL DE PIURA FECHA : ENERO 2017

PLAZO DE EJECUCI
Item Descripcin Und Metrado Precio Parcial
MES 01 MES 02

ESTRUCTURAS
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 7.2und 1.00 1,400.58 1,400.58 1,400.58
01.02 CASETA PARA OFICINAS, ALMACEN Y GUARDIA und 1.00 7,184.22 7,184.22 7,184.22
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOund 1.00 5,296.08 5,296.08 2,648.04
01.04 FLETE TERRESTRE und 1.00 12,978.26 12,978.26 2,163.04 2,163.04
01.05 PLAN DE SEGURIDAD Y SALUD EN OBRA und 1.00 13,500.00 13,500.00 2,250.00 2,250.00
01.06 DEPOSITO PROVISIONAL PARA ALMACENAMIE und 12.00 55.08 660.96 220.32 220.32
01.07 ENERGIA ELECTRICA P/OBRA mes 6.00 350.00 2,100.00 350.00 350.00
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA DEL TERRENO MANUAL m2 2,304.73 0.81 1,866.83 1,866.83
02.02 TRAZO, NIVELES Y REPLANTEO INICIAL EN EDI m2 2,304.73 1.49 3,434.05 3,434.05
02.03 TRAZO Y REPLANTEO DE CERCO PERIMETRICO m 77.50 1.94 150.35 150.35
02.04 DEMOLICION DE CIMIENTOS CORRIDOS m3 67.57 192.99 13,040.33 9,128.23 3,912.10
02.05 DEMOLICION DE SOBRE CIMIENTOS DE CONCR m3 21.28 167.79 3,570.57 3,570.57
02.06 DEMOLICION DE COLUMNAS DE CONCRETO m3 12.43 156.79 1,948.90 1,948.90
02.07 DEMOLICION DE VIGAS DE CONCRETO m3 11.18 168.66 1,885.62 1,885.62
02.08 DEMOLICION DE MUROS DE LADRILLO KK DE S m2 545.92 27.02 14,750.76 14,750.76
02.09 DESMONTAJE DE SSHH, ELECTROBOMBA Y ACC.und 1.00 487.89 487.89 487.89
02.10 DEMOLICION DE PISOS, VEREDAS DE CS m2 1,376.49 7.42 10,213.56 10,213.56
02.11 DESMONTAJE DE GRUTA EXISTENTE und 1.00 355.97 355.97 355.97
02.12 DESMONTAJE DE PUERTAS Y VENTANAS und 28.00 23.73 664.44 664.44
02.13 DESMONTAJE DE APARATOS SANITARIOS und 2.00 19.78 39.56 39.56
02.14 DEMOLICION DE ESCALERA DE CONCRETO m3 2.03 194.47 394.77 394.77
02.15 DESMONTAJE Y RETIRO DE COBERTURA LIVIANAm2 1,035.75 17.56 18,187.77 18,187.77
02.16 DESMONTAJE Y RETIRO DE PORTONES Y REJAS m2 16.55 41.02 678.88 678.88
02.17 PICADO DE LOSA P/EMPOTRADO DE COLUMNASund 52.00 98.85 5,140.20 5,140.20
02.18 TALA Y RETIRO DE ARBOLES und 4.00 79.10 316.40 316.40
02.19 ACARREO MANUAL DE MATERIAL PRODUCTO DEm3 420.09 14.83 6,229.93 6,229.93
02.20 ELIMINACION DE MATERIAL EXCEDENTE A 5 K m3 420.09 18.52 7,780.07 7,780.07
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE TERRENO MANUAL HASTA NIVEL DE m3 85.84 47.46 4,073.97 4,073.97
03.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIE m3 442.40 47.46 20,996.30 10,498.15 10,498.15
03.03 RELLENO Y COMPACTACION CON MATERIAL DE m3 59.15 74.35 4,397.80 4,397.80
03.04 EXCAVACION MANUAL DE ZANJAS PARA SARDINm3 21.37 39.55 845.18 845.18
03.05 RELLENO MANUAL CON MATERIAL PROPIO ZA m3 293.55 24.57 7,212.52 7,212.52
03.06 REFINE, NIVELACION Y COMPACTACION DE FO m2 382.84 3.87 1,481.59 1,481.59
03.07 COLOCACION DE HORMIGON E=15 CM. EN PIS m2 1,422.32 17.71 25,189.29 12,594.65
03.08 CAMA DE HORMIGON COMPACTADO EN FONDOm3 53.38 103.30 5,514.15 2,757.08 2,757.08
03.09 RELLENO CON TIERRA DE CULTIVO m3 46.29 62.55 2,895.44
03.10 ACARREO MANUAL DE MATERIAL EXCEDENTE m3 266.89 14.83 3,957.98
03.11 ELIMINACION DE MATERIAL EXCEDENTE A 5 K m3 266.89 18.52 4,942.80
04 CONCRETO SIMPLE / SARDINELES PERALTADOS / GRADERIAS
04.01 CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO - m3 96.70 222.32 21,498.34 6,449.50 15,048.84
04.02 SOLADO PARA ZAPATAS, E = 10 CM. m2 352.99 21.97 7,755.19 2,326.56 5,428.63
04.03 FALSO PISO CONCRETO F'c=175 KG/CM2, E=4"m2 587.71 37.88 22,262.45 22,262.45
05 CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 CONCRETO EN ZAPATAS F'c=210 Kg/cm2 m3 58.33 405.17 23,633.57 4,726.71 18,906.86
05.01.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 321.00 30.05 9,646.05 1,929.21 7,716.84
05.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADkg 1,414.20 4.39 6,208.34 1,241.67 4,966.67
05.02 VIGA DE CIMENTACION
05.02.01 CONCRETO Fc = 210 kg/cm2 EN VIGAS DE m3 25.64 450.16 11,542.10 2,308.42 9,233.68
05.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DEm2 220.67 36.01 7,946.33 1,589.27 6,357.06
05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADkg 2,301.12 4.39 10,101.92 2,020.38 8,081.54
05.03 SOBRECIMIENTOS ARMADOS
05.03.01 CONCRETO F'c= 175 kG/CM2, P/SOBRECIM m3 48.38 403.52 19,522.30 19,522.30
05.03.02 ENCOFRADO Y DESENCOFRADO P/SOBRECIM m2 540.21 32.82 17,729.69 17,729.69
05.03.03 ACERO DE REFUERZO Fy=4,200 Kg/cm2 SO kg 2,820.00 4.39 12,379.80 12,379.80
05.04 COLUMNAS
05.04.01 CONCRETO EN COLUMNAS F'c=210 Kg/cm2 - m3 63.12 449.29 28,359.18 8,507.75
05.04.02 CONCRETO EN COLUMNAS f'c=175 kg/cm2 m3 22.13 444.63 9,839.66 2,951.90
05.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAm2 959.52 51.65 49,559.21 14,867.76
05.04.04 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
m2 156.14 112.24 17,525.15 17,525.15
05.04.05 ACERO FY= 4200 kg/cm2 GRADO 60 COLUM kg 13,200.74 4.39 57,951.25 17,385.38 40,565.88
05.05 VIGAS
05.05.01 CONCRETO EN VIGAS F'c=210 Kg/cm2 - 1er Pm3 68.13 438.30 29,861.38
05.05.02 CONCRETO EN VIGAS F'c=175 Kg/cm2 m3 4.80 413.94 1,986.91
05.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 444.25 48.84 21,697.17
05.05.04 ENCOFRADO Y DESENCOFRADO DE VIGAS CAm2 44.16 99.01 4,372.28
05.05.05 ACERO CORRUGADO FY= 4200 kg/cm2 GRADkg 6,641.51 4.55 30,218.87
05.06 LOSAS ALIGERADAS
05.06.01 CONCRETO EN LOSAS ALIGERADAS F'c=210 Km3 62.07 405.61 25,176.21
05.06.02 ENCOFRADO Y DESENCOFRADO DE LOSAS ALm2 767.48 56.58 43,424.02
05.06.03 ACERO FY= 4200 kg/cm2 GRADO 60 LOSA A kg 3,546.76 4.39 15,570.28
05.06.04 LADRILLO HUECO DE ARCILLA 15X30X30 PA und 5,982.09 3.01 18,006.09
05.07 LOSAS MACIZAS
05.07.01 CONCRETO EN LOSAS MACIZA F'c=210 Kg/c m3 0.82 405.61 332.60
05.07.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M m2 8.09 56.58 457.73
05.07.03 ACERO FY= 4200 kg/cm2 GRADO 60 LOSA M kg 34.60 4.39 151.89

05.08.01 CONCRETO EN ESCALERA, F'c=210 Kg/cm2 m3 3.28 405.61 1,330.40


05.08.02 ENCOFRADO Y DESENCOFRADO DE ESCALER m2 21.96 94.72 2,080.05
05.08.03 ACERO FY= 4200 kg/cm2 GRADO 60 ESCALE kg 121.87 4.39 535.01
05.09 GARGOLAS
05.09.01 GARGOLAS DE CONCRETO ARMADO SEGUN und 12.00 104.43 1,253.16
06 MUROS Y TABIQUES DE ALBAILERIA
06.01 MURO DE CABEZA LADRILLO K.K. MAQ. 18 HUEm2 404.79 98.71 39,956.82 11,987.05
06.02 MURO DE SOGA LADRILLO K.K. MAQ. 18 HUECOm2 631.87 65.50 41,387.49 12,416.25
06.03 MURO DE CANTO LADRILLO K.K. MAQUINADO 1m2 15.65 31.08 486.40
06.04 ACERO DE REFUERZO HORIZONTAL EN MUROS kg 248.40 3.79 941.44 282.43
07 ESTRUCTURA METALICA Y COBERTURA
07.01 TECHO PARABOLICO
07.01.01 TIJERAL T-1 C/ANG. 1 1/2"X1 1/2"X3/16" + m 173.04 239.64 41,467.31
07.01.02 VIGUETA DE FIERRO CORRUGADO D=1/2" - m 438.10 35.45 15,530.65
07.01.03 TENSOR DE ACERO LISO D=5/8" m 165.69 19.93 3,302.20
07.01.04 TEMPLADORES Y CRUZ DE SAN ANDRES DE Am 177.84 19.13 3,402.08
07.01.05 APOYO FIJO DE ARCO und 7.00 242.21 1,695.47
07.01.06 APOYO MOVIL DE ARCO und 7.00 253.81 1,776.67
07.01.07 TIJERALES METALICOS PARABOLICO (MONTAJEund 7.00 1,104.39 7,730.73
07.01.08 VIGUETAS METALICAS (MONTAJE) m 438.10 15.68 6,869.41
07.01.09 COBERTURA CON CALAMINON Cu 06 PERALTEm2 811.14 96.63 78,380.46
07.02 ESTRUCTURA METALICA Y COBERTURA SUM
07.02.01 VIGA METALICA VM-01 D/TUB. CUAD. 75 MM. und 4.00 1,832.03 7,328.12
07.02.02 CORREAS DE ACERO LAC 75X75 MM E=3.00 m 224.00 46.64 10,447.36
07.02.03 TIJERALES METALICOS (MONTAJE) und 4.00 388.58 1,554.32
07.02.04 APOYO FIJO DE ARCO und 4.00 171.97 687.88
07.02.05 APOYO MOVIL DE ARCO und 4.00 159.02 636.08
07.02.06 COBERTURA CON CALAMINON TR 4 PERALTE m2 354.38 72.33 25,632.31
07.02.07 CUMBRERA DE CALAMINON TR 4 m 21.63 30.95 669.45
07.03 ESTRUCTURAS METALICA Y COBERTURA AULA EXTERIOR
07.03.01 VIGA METALICA VM-02 D/TUB. CUAD. 75 MM. und 2.00 1,144.98 2,289.96
07.03.02 CORREAS DE ACERO LAC 75X75 MM E=3.00 m 77.22 46.64 3,601.54
07.03.03 TIJERALES METALICOS (MONTAJE) und 2.00 388.58 777.16
07.03.04 APOYO FIJO DE ARCO und 2.00 171.97 343.94
07.03.05 APOYO MOVIL DE ARCO und 2.00 159.02 318.04
07.03.06 COBERTURA CON CALAMINON TR 4 PERALTE m2 130.50 72.33 9,439.07
07.03.07 CUMBRERA DE CALAMINON TR 4 m 12.87 30.95 398.33
07.04 CERCOS METALICO CON PARANTES DE FIERRO
07.04.01 PARANTE DE F N 2" e=3.00 mm Hp=3.00und 8.00 86.13 689.04
07.04.02 MALLA ELECTROSOLDADA GALVANIZADA COCm2 15.63 78.00 1,219.14

ARQUITECTURA
01 REVOQUES , ENLUCIDOS Y MOLDURA
01.01 TARRAJEO EN INTERIORES Y EXTERIORES (1 er pm2 1,098.49 25.73 28,264.15
01.02 TARRAJEO MUROS EXTERIORES C:A 1:5, E=1.5 C
m2 134.90 25.84 3,485.82
01.03 TARRAJEO DE COLUMNAS/ INC. BRUADO m2 647.03 29.83 19,300.90
01.04 TARRAJEO DE COLUMNAS EXT. A PARTIR DEL 2Dm2 199.95 29.88 5,974.51
01.05 TARRAJEO DE VIGAS / INC. BRUADO m2 359.78 29.07 10,458.80
01.06 TARRAJEO DE VIGAS EXT. A PARTIR DE 2DO PIS m2 87.40 32.64 2,852.74
01.07 VESTIDURA DE DERRAMES m 468.50 11.60 5,434.60
01.08 VESTIDURA DE DERRAMES CON BORDES BOLEAD
m 6.88 14.78 101.69
01.09 BRUAS DE 1 X 1 cm m 838.33 6.74 5,650.34
01.10 TARRAJEO DE SOBRECIMIENTOS C:A 1:5, E=1.5m2 45.72 25.50 1,165.86
01.11 IMPERMEABILIZACION DE TECHO m2 725.66 39.97 29,004.63
01.12 REVESTIMIENTO CON CEMENTO FROTACHADO, m2 45.60 39.43 1,798.01
01.13 CONTRAZOCALO CEMENTO FROTACHADO S/COL
m 17.00 8.98 152.66
01.14 TARRAJEO PRIMARIO RAYADO m2 105.36 21.77 2,293.69
01.15 ACABADO EN DESCANSO CEMENTO FROTACHA m2 7.70 33.93 261.26
02 CIELO RASOS
02.01 CIELO RASO C:A 1:4 X 1.5 CM. m2 713.76 36.33 25,930.90
02.02 VESTIDURA DE SUPERFICIE DE FONDO ESCAL m2 20.58 37.77 777.31
03 PISOS Y PAVIMENTOS
03.01 PISO DE CEMENTO PULIDO Y BRUADO DE 2" m2 523.76 15.62 8,181.13
03.02 CONTRAPISO 1:4, E=2 CM.PARA PISO DE CEME m2 329.69 28.36 9,350.01
03.03 VEREDA DE CONCRETO F'c=175 Kg/Cm2, E=1 m2 475.09 58.59 27,835.52
03.04 CANALETAS DE CS A=0.40 M. fc=175 kg/cm2m 20.95 454.70 9,525.97
03.05 SARDINEL DE VEREDA DE CONCRETO F'c=175 m3 43.68 368.51 16,096.52
03.06 ENCOFRADO Y DESENCOFRADO DE SARDINELES
m2 145.60 30.25 4,404.40
03.07 PISO CERAMICO 30 X 30 CM. m2 329.69 62.33 20,549.58
04 ZOCALOS Y CONTRAZOCALOS
04.01 CONTRAZOCALO S/COLOREAR H=0.20 M.,MZ. 1:
m 260.05 12.17 3,164.81
04.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.10 m 310.42 11.52 3,576.04
04.03 ZOCALO DE CERAMICA DE 20 X 30 CM H=1.50 -m2 105.27 57.32 6,034.08
04.04 CONTRAZOCALO CERAMICO, H=10 CM. m 73.27 18.03 1,321.06
04.05 RODOPLAST DE PVC 9.5 MM m 129.39 11.35 1,468.58
05 CARPINTERIA DE MADERA
05.01 PUERTA CONTRAPLACADA 50 mm C/TRIPLAY 4 m2 38.48 236.29 9,092.44
05.02 JUNTAS SELLADORAS CON SILICONA E=1 CM.E m 62.70 9.37 587.50
05.03 PUERTA DE MELAMINNE DE 18 MM. EN SSHH m2 7.20 111.35 801.72
05.04 REJA DE MADERA H=1.20 M. und 2.00 145.00 290.00
06 CARPINTERIA METALICA
06.01 MAMPARA CON PERFIL DE ALUMINIO NEGRO Y m2 9.41 845.80 7,958.98
06.02 PUERTA DE FIERRO SEGUN DETALLES m2 24.92 417.69 10,408.83
06.03 VENTANA METALICA TIPO REJA m2 142.66 183.67 26,202.36
06.04 REJILLA METALICA m 20.95 163.51 3,425.53
06.05 CANTONERA DE FIERRO EN ESCALERA m 43.20 23.30 1,006.56
06.06 PASAMANOS DE TUBO DE FG 2" EN ESCALER m 12.80 84.88 1,086.46
06.07 PUERTA DE INGRESO PRINCIPAL C/PERFILES DE m2 9.36 834.22 7,808.30
06.08 BARANDA METALICA DE TUBOS DE FN 2" Y 1",m 34.00 84.88 2,885.92
06.09 TAPA METALICA DE 0.60 X 0.60 m und 1.00 120.27 120.27
07 CERRAJERIA
07.01 BISAGRA DE ACERO ALUMINIZADA DE 4" PESA und 97.00 13.80 1,338.60
07.02 CERRADURA DE TRES GOLPES C/TIRADOR EN P und 14.00 100.39 1,405.46
07.03 CERRADURA DE PERILLA EN PUERTA und 21.00 97.00 2,037.00
07.04 CERROJO SIMPLE und 4.00 13.68 54.72
07.05 CANDADOS DE 60 MM. und 1.00 64.88 64.88
08 VIDRIOS
08.01 VIDRIO DE 6 MM. CON PROTECTOR DE 4 MICRAp2 1,565.40 11.61 18,174.29
09 PINTURAS
09.01 PINTURA LATEX EN CIELO RASO Y VIGAS (2 MAm2 1,181.67 11.60 13,707.37
09.02 PINTURA LATEX EN MUROS Y COLUMNAS (2 MA m2 2,280.16 9.60 21,889.54
09.03 BARNIZ EN CARPINTERIA DE MADERA m2 56.44 19.12 1,079.13
09.04 PINTURA ANTICORROSIVA Y ESMALTE EN CARPm2 155.46 14.93 2,321.02
09.05 PINTURA ESMALTE EN CONTRAZOCALOS m2 86.86 11.52 1,000.63
10 VARIOS, LIMPIEZA Y JARDINERIA
10.01 JUNTA DE DILATACION CON JEBE MICROPOROS m 250.60 9.33 2,338.10
10.02 JUNTA DE DILATACION ASFALTICA E=1" m 518.00 4.83 2,501.94
10.03 JUNTA DE CONSTRUCCION CON TEKNOPORT, E m 3.44 7.15 24.60
10.04 MESA DE CONCRETO ARMADO REVESTIDO CONm 17.50 407.26 7,127.05
10.05 CURADO CON ADITIVO QUIMICO EN CONCRETOm2 3,657.26 2.42 8,850.57
10.06 CONSTRUCCION DE GRUTA SEGN DETALLES und 1.00 2,054.69 2,054.69
10.07 SUMINISTRO E INSTALACION DE ESCALERA METund 1.00 7,500.00 7,500.00
10.08 LIMPIEZA PERMANENTE Y FINAL DE OBRA m2 2,304.73 0.60 1,382.84
11 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTAL
11.01 SUMINISTRO DE DEPOSITO PARA RESIDUOS SO und 6.00 55.20 331.20 331.20
11.02 CAPACITACION AMBIENTAL mes 1.00 6,650.00 6,650.00
11.03 SUMINISTRO E INSTALACION DE BAOS QUIMI mes 6.00 540.00 3,240.00 540.00 540.00

INSTALACIONES ELECTRICAS

01 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION MANUAL DE ZANJAS TERRENO N m 310.00 7.42 2,300.20 2,300.20
01.02 REFINE DE ZANJAS INCLUYE CAMA Y CINTA SE m 310.00 9.13 2,830.30 2,830.30
01.03 RELLENO Y COMPACTACION CON MATERIAL PROm 310.00 10.06 3,118.60 3,118.60
02 CONDUCTORES, DUCTOS Y ACCESORIOS
02.01 SUMINISTRO DE MATERIALES PARA CONDUCTO und 1.00 42,978.00 42,978.00
02.02 TUBERIA PVC SEL Y SAP ELECTRICA (SUMINIST und 1.00 7,223.77 7,223.77
02.03 ACCESORIOS (SUMINISTRO) und 1.00 3,434.52 3,434.52
02.04 INSTALACION DE CONDUCTORES Y ACCESORIOm 6,689.00 3.57 23,879.73
03 ARTEFACTOS DE ILUMINACION
03.01 SUMINISTRO E INSTALACION DE LUMINARIAS und 1.00 30,305.89 30,305.89
03.02 SUMINISTRO E INSTALACION DE INTERUPTORE und 1.00 5,981.35 5,981.35
04 INTERRUPTORES TERMOMAGNETICOS MONOFASICOS Y TRIFASICOS
04.01 INTERRUPTOR TERMOMAGNETICO TRIFASICO und 1.00 3,158.45 3,158.45
04.02 INTERRUPTOR TERMOMAGNETICO MONOFASIC und 1.00 1,544.91 1,544.91
04.03 INTERRUPTOR DIFERENCIAL und 1.00 4,051.29 4,051.29
05 AUDIO, VOZ Y DATA
05.01 SUMINISTRO E INSTALACION DE TOMAS DE REDpto 8.00 62.26 498.08
05.02 SUMINISTRO E INSTALACION DE SWITCH DE BOpto 2.00 948.74 1,897.48
05.03 SUMINISTRO E INSTALACION DE CABLE UTP CA m 629.00 4.43 2,786.47
05.04 SUMINISTRO E INSTALACION DE CABLE UTP TE m 171.00 3.28 560.88
05.05 SUMINISTRO E INSTAL. EQUIPO NVR DE 16 CAMA
und 1.00 2,142.10 2,142.10
05.06 SUMINISTRO E INSTAL.CAMARAS DOMO IP 3Mp und
Ful 4.00 1,052.21 4,208.84
05.07 SUMINISTRO E INSTALACION DE ACCESORIOS Pund 1.00 3,235.45 3,235.45
06 TABLERO GENERAL DE DISTRIBUCION
06.01 TABLERO ELECTRICO TRIFASICO und 1.00 439.48 439.48
06.02 TABLERO ELECTRICO MONOFASICO und 1.00 1,918.48 1,918.48
07 VENTILADORES
07.01 SUMINISTRO E INSTALACION DE VENTILADORE und 4.00 263.90 1,055.60
08 POSTES DE FG Y CONCRETO
08.01 POSTE DE F N DE 4 M und 4.00 353.03 1,412.12
09 PUESTA A TIERRA
09.01 INSTALACION DE POZO DE CONEXION A TIERRAund 6.00 869.38 5,216.28
10 VARIOS
10.01 BUZON DE PASO und 6.00 316.37 1,898.22
10.02 CONDUIT FLEXIBLE DE 2O MM (EN ELECTROBO m 8.00 29.68 237.44
10.03 MURETE P/TABLERO DE BOMBAS und 1.00 694.61 694.61
11 PRUEBAS Y PUESTA EN SERVICIO
11.01 PRUEBA Y PUESTA EN SERVICIO DE LAS INSTA und 1.00 1,500.00 1,500.00

INSTALACIONES SANITARIAS
01 TRABAJOS PRELIMINARES
01.01 TRAZO DE NIVELES Y REPLANTEO DE REDES D m 293.39 1.94 569.18 569.18
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION DE ZANJA MANUAL P/RED DE AG m3 92.44 39.55 3,656.00
02.02 RELLENO DE ZANJAS CON MATERIAL PROPIO m3 92.44 23.63 2,184.36
02.03 CAMA DE APOYO E = 10 CM. CON MATERIAL P m2 131.12 2.97 389.43
02.04 ACARREO MANUAL DE MATERIAL EXCEDENTE m3 20.27 14.83 300.60
02.05 ELIMINACION DE MATERIAL EXCEDENTE Dp=05m3 20.27 18.52 375.40
03 RED DE AGUA EXTERIOR N.T.P. 399.16
03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 1m 94.19 9.04 851.48
03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC 3m 35.43 5.65 200.18
03.03 SUMINISTRO E INSTALACION DE TUBERIA PVC 1m 26.10 5.03 131.28
03.04 SUMINISTRO E INSTALACION DE ACCESORIOS und 1.00 450.99 450.99
03.05 SUMINISTRO E INSTALACION DE VALVULA CHECund 1.00 54.80 54.80
03.06 SUMINISTRO E INSTALACION DE VALVULA COMPund 2.00 89.04 178.08
03.07 GRIFO DE RIEGO DE 1/2" P/JARDINES . SUMINI und 2.00 117.21 234.42
03.08 PRUEBA HIDRAULICA Y DESINFECCION DE TUB m 155.72 2.31 359.71
03.09 CAJA BY PASS CONCRETO F'c = 175 kG/CM2, 0.und 1.00 515.18 515.18
03.10 CONEXION A RED DE AGUA EXISTENTE und 1.00 555.38 555.38
04 RED DE ALCANTARILLADO EXTERIOR N.T.P. 4435
04.01 TUBERIA PVC UF S 20 DN 6", SUMINISTRO E IN m 25.15 28.96 728.34
04.02 TUBERIA PVC UF S 20 DN 4", SUMINISTRO E IN m 112.52 12.23 1,376.12
04.03 CAJAS DE REGISTRO DE DESAGUE 10" x 24" H und 13.00 155.30 2,018.90
04.04 CAJAS DE REGISTRO DE DESAGUE 12" x 24" H und 3.00 183.95 551.85
04.05 PRUEBA HIDRAULICA EN RED DE ALCANTARIL m 137.67 2.06 283.60
04.06 CONEXION DE DESAGUE A RED EXISTENTE und 1.00 295.67 295.67
05 APARATOS Y ACCESORIOS SANITARIOS
05.01 INODORO NACIONAL BABY INTEGRADO (SUMINIund 6.00 273.01 1,638.06
05.02 INODORO TANQUE BAJO BLANCO (SUMINISTRO)und 8.00 322.30 2,578.40
05.03 LAVATORIO NACIONAL OVALIN BLANCO (SUMIN und 14.00 92.40 1,293.60
05.04 PAPELERA DE LOSA Y BARRA PLASTICA COLOR und 8.00 17.09 136.72
05.05 DISPENSADOR DE JABON CROMADO und 10.00 10.24 102.40
05.06 URINARIO NACIONAL DE LOSA DE PICO, BLAN und 7.00 258.45 1,809.15
05.07 LAVADERO DE ACERO INOXIDABLE UNA POZA und 1.00 152.60 152.60
05.08 COLOCACION DE ACCESORIOS SANITARIOS und 53.00 69.42 3,679.26
05.09 GRIFERIA (SUMINISTRO E INSTALACION) und 1.00 2,669.63 2,669.63
06 SISTEMA DE DESAGUE
06.01 SALIDA DE DESAGUE Y VENTILACION
06.01.01 SALIDAS DE PVC SAL P/DESAGUE DE 4" Y 2" pto 36.00 57.12 2,056.32
06.01.02 SALIDA VENTILACION DE PVC-SAL 2" pto 10.00 74.47 744.70
06.01.03 REGISTRO DE BRONCE CROMADO DE 4", PROund 7.00 35.92 251.44
06.01.04 SUMIDERO DE BRONCE ROSCADO 2", PROVI und 10.00 59.28 592.80
06.01.05 ACCESORIOS DE RED DE DESAGUE und 1.00 395.19 395.19
07 SISTEMA DE AGUA FRIA Y CONTRAINCENDIO
07.01 SISTEMA DE AGUA FRIA
07.01.01 SALIDA DE AGUA FRIA TUBERIA PVC SAP 1/2" pto 36.00 49.32 1,775.52
07.02 VALVULAS DE CONTROL Y ACCESORIOS
07.02.01 VALVULA COMPUERTA DE BRONCE DE 1/2" und 11.00 73.80 811.80
08 VARIOS
08.01 EMPALME DE DESFOGUE DE CANALETA PLUVIALund 2.00 103.41 206.82

COSTO DIRECTO S/. 1683465.39 152,851.43 323,546.25


GASTOS GENERALES (10%) 168346.54 15,285.14 32,354.62
UTILIDAD (10%) 168346.54 15,285.14 32,354.62
SUBTOTAL 2020158.47 183,421.71 388,255.50
IGV 18% 363628.52 33,015.91 69,885.99
TOTAL PRESUPUESTO S/. TOTAL DEL PRESUPUESTO 2383786.99 216,437.62 458,141.48

EQUIPAMIENTO
01 EQUIPAMIENTO
01.01 COMPUTADORA PERSONAL, INC. LICENCIA Y ANT
und 33.00 4,220.00 139,260.00
01.02 ECRAN DE PARED ENROLLABLE (T-53) und 1.00 700.00 700.00
01.03 AIRE ACONDICIONADO, (AA3) und 2.00 3,800.00 7,600.00
01.04 PROYECTOR MULTIMEDIA, (PM5) und 1.00 2,500.00 2,500.00
01.05 VENTILADOR DE PIE, (VT3) und 2.00 155.00 310.00
01.06 COCINA DE 4 HORNILLAS CON HORNO, (CC2) und 1.00 890.00 890.00
01.07 EQUIPO DE SONIDO, (T-6) und 1.00 1,320.00 1,320.00
01.08 IMPRESORA MULTIFUNCIONAL, (T-110) und 1.00 3,800.00 3,800.00
01.09 TELEVISOR LED SMART TV DE 42" INC. RACK, (Tund 1.00 1,500.00 1,500.00
01.10 CONGELADORA, (CC5) und 1.00 1,420.00 1,420.00
01.11 INSTALACION DE EQUIPOS und 1.00 4,647.69 4,647.69
02 MOBILIARIO
02.01 MESA DE MADERA DE 1.20X2.40M, SEGUN DIS und 2.00 920.00 1,840.00
02.02 SILLA METALICA APILABLE (SL) und 171.00 105.00 17,955.00
02.03 ESCRITORIO ESTANDAR (M22) und 32.00 530.00 16,960.00
02.04 PAPELERA DE PLASTICO (M3) und 14.00 50.00 700.00
02.05 SILLA METALICA GIRATORIA RODABLE (M-39) und 4.00 250.00 1,000.00
02.06 PAPELERA METALICA DE PISO (M2) und 13.00 90.00 1,170.00
02.07 PIZARRA ACRILICA DE 2.50X1.50M P/ADOSAR Aund 2.00 350.00 700.00
02.08 ESCRITORIO EJECUTIVO, SEGUN DISEO (ES) und 2.00 990.00 1,980.00
02.09 BANCOS DE MADERA, SEGUN DISEO (BB3) und 4.00 70.00 280.00
02.10 LIBRERO DE MADERA, SEGUN DISEO (B1) und 1.00 690.00 690.00
02.11 ESTANTE METALICO, (ST) und 16.00 250.00 4,000.00
02.12 BANDEJA ACRILICA DOBLE PARA ESCRITOTIO (Mund 1.00 35.00 35.00
02.13 SILLA DE MADERA PARA NIOS, (S3) und 54.00 85.00 4,590.00
02.14 MESA DE MADERA PARA NIOS, (MM) und 9.00 530.00 4,770.00
02.15 ESTANTE DE MADERA, SEGUN DISEO (SM) und 15.00 590.00 8,850.00
02.16 ESCRITORIO PARA PROFESOR (AL2) und 7.00 530.00 3,710.00
02.17 MATERIAL DIDACTICO PARA NIOS, (MD2) und 3.00 1,500.00 4,500.00
02.18 CARPETA UNIPERSONAL, SEGUN DISEO (CU) und 140.00 105.00 14,700.00
02.19 PISO MICROPOROSO, (PF3) und 3.00 600.00 1,800.00
02.20 SILLA DE MADERA PARA PROFESOR, (SM5) und 7.00 125.00 875.00
02.21 PIZARRA ACRILICA DE 3.50X1.50M, P/ADOSAR Aund 4.00 500.00 2,000.00
02.22 CAMILLA METALICA, (CM2) und 1.00 600.00 600.00
02.23 SILLON SEMICONFORTABLE, (M-46) und 4.00 320.00 1,280.00
02.24 VITRINA METALICA PARA LIBROS, (VTL) und 4.00 500.00 2,000.00
02.25 VITRINA DE MADERA P/ANUNCIOS C/PUERTA COund 1.00 300.00 300.00
02.26 BIOMBO METALICO, (BM1) und 1.00 350.00 350.00
02.27 CASA DE PLASTICO DE 1.10X1.10M, (CA) und 2.00 700.00 1,400.00
02.28 BALANCIN DE PLASTICO, (BL) und 2.00 130.00 260.00
02.29 RESBALADERA DE PLASTICO, (RT) und 2.00 250.00 500.00
02.30 CASTILLO PATIO CENTRAL (MODELO SANTA CLAund 1.00 26,121.36 26,121.36
02.31 INSTALACION DE MOBILIARIO und 1.00 3,170.75 3,170.75

COSTO DIRECTO S/. COSTO DIRECTO 293034.80 0.00 0.00


GASTOS GENERALES (5.00%) 14651.74 0.00 0.00
SUBTOTAL 307686.54 0.00 0.00
IGV 18% IGV 18% 55383.58 0.00 0.00
TOTAL PRESUPUESTO S/. TOTAL DEL PRESUPUESTO 363070.12 0.00 0.00

VALOR REFERENCIAL TOTAL ### ### ###


% DE AVANCE 7.88 16.68
ANA - PIURA

PLAZO DE EJECUCION = 06 MESES = 180 D.C AVANCE DE OBRA


MES 03 MES 04 MES 05 MES 06 MES 01 MES 02 MES 03 MES 04 MES 05

100.00 0.00 0.00 0.00 0.00


100.00 0.00 0.00 0.00 0.00
2,648.04 50.00 0.00 0.00 0.00 0.00
2,163.04 2,163.04 2,163.04 2,163.04 16.67 16.67 16.67 16.67 16.67
2,250.00 2,250.00 2,250.00 2,250.00 16.67 16.67 16.67 16.67 16.67
220.32 33.33 33.33 33.33 0.00 0.00
350.00 350.00 350.00 350.00 16.67 16.67 16.67 16.67 16.67

100 0.00 0.00 0.00 0.00


100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
70 30.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
0 100.00 0.00 0.00 0.00
0 100.00 0.00 0.00 0.00

100 0.00 0.00 0.00 0.00


50 50.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00
0 100.00 0.00 0.00 0.00
0 100.00 0.00 0.00 0.00
12,594.65 0 50.00 50.00 0.00 0.00
50 50.00 0.00 0.00 0.00
2,895.44 0 0.00 0.00 0.00 0.00
3,957.98 0 0.00 100.00 0.00 0.00
4,942.80 0 0.00 100.00 0.00 0.00

30 70.00 0.00 0.00 0.00


30 70.00 0.00 0.00 0.00
0 100.00 0.00 0.00 0.00

20 80.00 0.00 0.00 0.00


20 80.00 0.00 0.00 0.00
20 80.00 0.00 0.00 0.00

20 80.00 0.00 0.00 0.00


20 80.00 0.00 0.00 0.00
20 80.00 0.00 0.00 0.00

0 100.00 0.00 0.00 0.00


0 100.00 0.00 0.00 0.00
0 100.00 0.00 0.00 0.00

19,851.43 0 30.00 70.00 0.00 0.00


6,887.76 0 30.00 70.00 0.00 0.00
34,691.45 0 30.00 70.00 0.00 0.00
0 100.00 0.00 0.00 0.00
30 70.00 0.00 0.00 0.00

23,889.10 5,972.28 0 0.00 80.00 20.00 0.00


1,589.53 397.38 0 0.00 80.00 20.00 0.00
17,357.74 4,339.43 0 0.00 80.00 20.00 0.00
3,497.82 874.46 0 0.00 80.00 20.00 0.00
24,175.10 6,043.77 0 0.00 80.00 20.00 0.00

20,140.97 5,035.24 0 0.00 80.00 20.00 0.00


34,739.22 8,684.80 0 0.00 80.00 20.00 0.00
12,456.22 3,114.06 0 0.00 80.00 20.00 0.00
14,404.87 3,601.22 0 0.00 80.00 20.00 0.00

332.60 0 0.00 0.00 100.00 0.00


457.73 0 0.00 0.00 100.00 0.00
151.89 0 0.00 0.00 100.00 0.00

1,330.40 0 0.00 0.00 100.00 0.00


624.02 1,456.04 0 0.00 30.00 70.00 0.00
535.01 0 0.00 100.00 0.00 0.00

626.58 626.58 0 0.00 0.00 50.00 50.00

19,978.41 7,991.36 0 30.00 50.00 20.00 0.00


20,693.75 8,277.50 0 30.00 50.00 20.00 0.00
486.40 0 0.00 100.00 0.00 0.00
470.72 188.29 0 30.00 50.00 20.00 0.00
29,027.12 12,440.19 0 0.00 0.00 70.00 30.00
10,871.46 4,659.20 0 0.00 0.00 70.00 30.00
2,311.54 990.66 0 0.00 0.00 70.00 30.00
2,381.46 1,020.62 0 0.00 0.00 70.00 30.00
1,186.83 508.64 0 0.00 0.00 70.00 30.00
1,243.67 533.00 0 0.00 0.00 70.00 30.00
5,411.51 2,319.22 0 0.00 0.00 70.00 30.00
4,808.59 2,060.82 0 0.00 0.00 70.00 30.00
54,866.32 23,514.14 0 0.00 0.00 70.00 30.00

5,129.68 2,198.44 0 0.00 0.00 70.00 30.00


7,313.15 3,134.21 0 0.00 0.00 70.00 30.00
1,088.02 466.30 0 0.00 0.00 70.00 30.00
481.52 206.36 0 0.00 0.00 70.00 30.00
445.26 190.82 0 0.00 0.00 70.00 30.00
17,942.62 7,689.69 0 0.00 0.00 70.00 30.00
468.62 200.84 0 0.00 0.00 70.00 30.00

1,602.97 686.99 0 0.00 0.00 70.00 30.00


2,521.08 1,080.46 0 0.00 0.00 70.00 30.00
544.01 233.15 0 0.00 0.00 70.00 30.00
240.76 103.18 0 0.00 0.00 70.00 30.00
222.63 95.41 0 0.00 0.00 70.00 30.00
6,607.35 2,831.72 0 0.00 0.00 70.00 30.00
278.83 119.50 0 0.00 0.00 70.00 30.00

689.04 0 0.00 0.00 0.00 0.00


1,219.14 0 0.00 0.00 0.00 0.00
14,132.08 14,132.08 0 0.00 0.00 50.00 50.00
1,742.91 1,742.91 0 0.00 0.00 50.00 50.00
9,650.45 9,650.45 0 0.00 0.00 50.00 50.00
2,987.26 2,987.26 0 0.00 0.00 50.00 50.00
5,229.40 5,229.40 0 0.00 0.00 50.00 50.00
1,426.37 1,426.37 0 0.00 0.00 50.00 50.00
2,717.30 2,717.30 0 0.00 0.00 50.00 50.00
50.85 50.85 0 0.00 0.00 50.00 50.00
2,825.17 2,825.17 0 0.00 0.00 50.00 50.00
582.93 582.93 0 0.00 0.00 50.00 50.00
14,502.32 14,502.32 0 0.00 0.00 50.00 50.00
899.01 899.01 0 0.00 0.00 50.00 50.00
76.33 76.33 0 0.00 0.00 50.00 50.00
1,146.85 1,146.85 0 0.00 0.00 50.00 50.00
130.63 130.63 0 0.00 0.00 50.00 50.00

25,930.90 0 0.00 0.00 0.00 100.00


777.31 0 0.00 0.00 0.00 100.00

8,181.13 0 0.00 0.00 0.00 100.00


9,350.01 0 0.00 0.00 0.00 100.00
27,835.52 0 0.00 0.00 0.00 100.00
9,525.97 0 0.00 0.00 0.00 100.00
16,096.52 0 0.00 0.00 0.00 100.00
4,404.40 0 0.00 0.00 0.00 100.00
10,274.79 10,274.79 0 0.00 0.00 0.00 50.00

3,164.81 0 0.00 0.00 0.00 0.00


3,576.04 0 0.00 0.00 0.00 0.00
6,034.08 0 0.00 0.00 0.00 0.00
1,321.06 0 0.00 0.00 0.00 0.00
1,468.58 0 0.00 0.00 0.00 0.00
4,546.22 4,546.22 0 0.00 0.00 50.00 50.00
293.75 293.75 0 0.00 0.00 50.00 50.00
400.86 400.86 0 0.00 0.00 50.00 50.00
145.00 145.00 0 0.00 0.00 50.00 50.00

7,958.98 0 0.00 0.00 0.00 100.00


5,204.42 5,204.42 0 0.00 0.00 0.00 50.00
13,101.18 13,101.18 0 0.00 0.00 0.00 50.00
1,712.77 1,712.77 0 0.00 0.00 0.00 50.00
1,006.56 0 0.00 0.00 0.00 100.00
1,086.46 0 0.00 0.00 0.00 100.00
7,808.30 0 0.00 0.00 0.00 100.00
2,885.92 0 0.00 0.00 0.00 100.00
120.27 0 0.00 0.00 0.00 0.00

669.30 669.30 0 0.00 0.00 0.00 50.00


702.73 702.73 0 0.00 0.00 0.00 50.00
2,037.00 0 0.00 0.00 0.00 0.00
54.72 0 0.00 0.00 0.00 0.00
64.88 0 0.00 0.00 0.00 0.00

18,174.29 0 0.00 0.00 0.00 0.00

13,707.37 0 0.00 0.00 0.00 0.00


21,889.54 0 0.00 0.00 0.00 0.00
1,079.13 0 0.00 0.00 0.00 0.00
2,321.02 0 0.00 0.00 0.00 0.00
1,000.63 0 0.00 0.00 0.00 0.00

1,169.05 1,169.05 0 0.00 50.00 50.00 0.00


2,501.94 0 0.00 0.00 0.00 0.00
24.60 0 0.00 0.00 100.00 0.00
7,127.05 0 0.00 0.00 0.00 100.00
2,950.19 2,950.19 2,950.19 0 0.00 33.33 33.33 33.33
2,054.69 0 0.00 0.00 0.00 0.00
7,500.00 0 0.00 0.00 0.00 0.00
1,382.84 0 0.00 0.00 0.00 0.00

100 0.00 0.00 0.00 0.00


6,650.00 0 0.00 0.00 0.00 100.00
540.00 540.00 540.00 540.00 16.666666667 16.67 16.67 16.67 16.67

0 100.00 0.00 0.00 0.00


0 100.00 0.00 0.00 0.00
0 100.00 0.00 0.00 0.00

21,489.00 21,489.00 0 0.00 50.00 50.00 0.00


3,611.89 3,611.89 0 0.00 50.00 50.00 0.00
1,717.26 1,717.26 0 0.00 50.00 50.00 0.00
11,939.87 11,939.87 0 0.00 50.00 50.00 0.00

30,305.89 0 0.00 0.00 0.00 0.00


5,981.35 0 0.00 0.00 0.00 0.00

3,158.45 0 0.00 0.00 0.00 0.00


1,544.91 0 0.00 0.00 0.00 0.00
4,051.29 0 0.00 0.00 0.00 0.00

498.08 0 0.00 0.00 0.00 0.00


1,897.48 0 0.00 0.00 0.00 0.00
2,786.47 0 0.00 0.00 0.00 0.00
560.88 0 0.00 0.00 0.00 0.00
2,142.10 0 0.00 0.00 0.00 0.00
4,208.84 0 0.00 0.00 0.00 0.00
3,235.45 0 0.00 0.00 0.00 0.00

439.48 0 0.00 0.00 0.00 100.00


1,918.48 0 0.00 0.00 0.00 100.00

1,055.60 0 0.00 0.00 0.00 0.00

1,412.12 0 0.00 0.00 0.00 0.00

5,216.28 0 0.00 0.00 0.00 0.00

1,898.22 0 0.00 0.00 0.00 0.00


237.44 0 0.00 0.00 0.00 0.00
694.61 0 0.00 0.00 0.00 0.00

1,500.00 0 0.00 0.00 0.00 0.00

0 100.00 0.00 0.00 0.00

3,656.00 0 0.00 100.00 0.00 0.00


2,184.36 0 0.00 100.00 0.00 0.00
389.43 0 0.00 100.00 0.00 0.00
300.60 0 0.00 100.00 0.00 0.00
375.40 0 0.00 100.00 0.00 0.00

851.48 0 0.00 100.00 0.00 0.00


200.18 0 0.00 100.00 0.00 0.00
131.28 0 0.00 100.00 0.00 0.00
450.99 0 0.00 100.00 0.00 0.00
54.80 0 0.00 100.00 0.00 0.00
178.08 0 0.00 100.00 0.00 0.00
234.42 0 0.00 100.00 0.00 0.00
359.71 0 0.00 100.00 0.00 0.00
515.18 0 0.00 100.00 0.00 0.00
555.38 0 0.00 100.00 0.00 0.00

728.34 0 0.00 100.00 0.00 0.00


1,376.12 0 0.00 100.00 0.00 0.00
2,018.90 0 0.00 100.00 0.00 0.00
551.85 0 0.00 100.00 0.00 0.00
283.60 0 0.00 100.00 0.00 0.00
295.67 0 0.00 100.00 0.00 0.00

1,638.06 0 0.00 0.00 0.00 100.00


2,578.40 0 0.00 0.00 0.00 100.00
1,293.60 0 0.00 0.00 0.00 100.00
136.72 0 0.00 0.00 0.00 100.00
102.40 0 0.00 0.00 0.00 100.00
1,809.15 0 0.00 0.00 0.00 100.00
152.60 0 0.00 0.00 0.00 100.00
3,679.26 0 0.00 0.00 0.00 100.00
2,669.63 0 0.00 0.00 0.00 100.00

1,028.16 1,028.16 0 0.00 50.00 50.00 0.00


372.35 372.35 0 0.00 50.00 50.00 0.00
125.72 125.72 0 0.00 50.00 50.00 0.00
296.40 296.40 0 0.00 50.00 50.00 0.00
197.60 197.60 0 0.00 50.00 50.00 0.00

887.76 887.76 0 0.00 50.00 50.00 0.00


811.80 0 0.00 0.00 0.00 100.00

206.82 0 0.00 0.00 0.00 0.00

344,965.30 330,468.54 325,168.83 206,465.05 9.0795704053 19.22 20.49 19.63 19.32


34,496.53 33,046.85 32,516.88 20,646.51 9.0795703513 19.22 20.49 19.63 19.32
34,496.53 33,046.85 32,516.88 20,646.51 9.0795703513 19.22 20.49 19.63 19.32
413,958.36 396,562.25 390,202.59 247,758.06 9.0795703963 19.22 20.49 19.63 19.32
74,512.50 71,381.21 70,236.47 44,596.45 9.0795703963 19.22 20.49 19.63 19.32
488,470.86 467,943.46 460,439.06 292,354.52 9.0795704153 19.22 20.49 19.63 19.32

139,260.00 0 0.00 0.00 0.00 0.00


700.00 0 0.00 0.00 0.00 0.00
7,600.00 0 0.00 0.00 0.00 0.00
2,500.00 0 0.00 0.00 0.00 0.00
310.00 0 0.00 0.00 0.00 0.00
890.00 0 0.00 0.00 0.00 0.00
1,320.00 0 0.00 0.00 0.00 0.00
3,800.00 0 0.00 0.00 0.00 0.00
1,500.00 0 0.00 0.00 0.00 0.00
1,420.00 0 0.00 0.00 0.00 0.00
4,647.69 0 0.00 0.00 0.00 0.00

920.00 920.00 0 0.00 0.00 0.00 50.00


8,977.50 8,977.50 0 0.00 0.00 0.00 50.00
8,480.00 8,480.00 0 0.00 0.00 0.00 50.00
350.00 350.00 0 0.00 0.00 0.00 50.00
500.00 500.00 0 0.00 0.00 0.00 50.00
585.00 585.00 0 0.00 0.00 0.00 50.00
350.00 350.00 0 0.00 0.00 0.00 50.00
990.00 990.00 0 0.00 0.00 0.00 50.00
140.00 140.00 0 0.00 0.00 0.00 50.00
345.00 345.00 0 0.00 0.00 0.00 50.00
2,000.00 2,000.00 0 0.00 0.00 0.00 50.00
17.50 17.50 0 0.00 0.00 0.00 50.00
2,295.00 2,295.00 0 0.00 0.00 0.00 50.00
2,385.00 2,385.00 0 0.00 0.00 0.00 50.00
4,425.00 4,425.00 0 0.00 0.00 0.00 50.00
1,855.00 1,855.00 0 0.00 0.00 0.00 50.00
2,250.00 2,250.00 0 0.00 0.00 0.00 50.00
7,350.00 7,350.00 0 0.00 0.00 0.00 50.00
900.00 900.00 0 0.00 0.00 0.00 50.00
437.50 437.50 0 0.00 0.00 0.00 50.00
1,000.00 1,000.00 0 0.00 0.00 0.00 50.00
300.00 300.00 0 0.00 0.00 0.00 50.00
640.00 640.00 0 0.00 0.00 0.00 50.00
1,000.00 1,000.00 0 0.00 0.00 0.00 50.00
150.00 150.00 0 0.00 0.00 0.00 50.00
175.00 175.00 0 0.00 0.00 0.00 50.00
700.00 700.00 0 0.00 0.00 0.00 50.00
130.00 130.00 0 0.00 0.00 0.00 50.00
250.00 250.00 0 0.00 0.00 0.00 50.00
13,060.68 13,060.68 0 0.00 0.00 0.00 50.00
3,170.75 0 0.00 0.00 0.00 0.00

0.00 0.00 62,958.18 230,076.62


0.00 0.00 3147.91 11503.83
0.00 0.00 66106.09 241580.45
0.00 0.00 11,899.10 43,484.48
0.00 0.00 78,005.19 285,064.93

### ### ### ###


17.78 17.04 19.60 21.02
MES 06

0.00
0.00
50.00
16.67
16.67
0.00
16.67

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
50.00

100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00

0.00
50.00
50.00
50.00
0.00
0.00
0.00
0.00
100.00

50.00
50.00
100.00
100.00
100.00

100.00

100.00
100.00
100.00
100.00
100.00

0.00
100.00
0.00
0.00
0.00
100.00
100.00
100.00

0.00
0.00
16.67

0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00
100.00

100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00

0.00
0.00

100.00

100.00

100.00

100.00
100.00
100.00

100.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

100.00

12.26
12.26
12.26
12.26
12.26
12.26

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
100.00
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

PROYECTO : "MEJORAMIENTO DE INFRAESTRUCTURA EN INSTITUTO SUPERIOR PEDAGOGICO HNO VICTORINO ELORZ GOICOECHEA - SULLANA - PIURA
PROPIETARIO : GOBIERNO REGIONAL DE PIURA FECHA : ENERO 2017

Item Descripcin Und Metrado AVANCE DE OBRA


MES 01 MES 02 MES 03 MES 04 MES 05 MES 06

ESTRUCTURAS
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 7.20x3.60 M. und 1 100.0 0.0 0.0 0.0 0.0 0.0
01.02 CASETA PARA OFICINAS, ALMACEN Y GUARDIANIA und 1 100.0 0.0 0.0 0.0 0.0 0.0
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS und 1 50.0 0.0 0.0 0.0 0.0 50.0
01.04 FLETE TERRESTRE und 1 16.7 16.7 16.7 16.7 16.7 16.7
01.05 PLAN DE SEGURIDAD Y SALUD EN OBRA und 1 16.7 16.7 16.7 16.7 16.7 16.7
01.06 DEPOSITO PROVISIONAL PARA ALMACENAMIENTO DE AGUA und 12 33.3 33.3 33.3 0.0 0.0 0.0
01.07 ENERGIA ELECTRICA P/OBRA mes 6 16.7 16.7 16.7 16.7 16.7 16.7
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA DEL TERRENO MANUAL m2 2304.73 100.0 0.0 0.0 0.0 0.0 0.0
02.02 TRAZO, NIVELES Y REPLANTEO INICIAL EN EDIFICACIONES m2 2304.73 100.0 0.0 0.0 0.0 0.0 0.0
02.03 TRAZO Y REPLANTEO DE CERCO PERIMETRICO m 77.5 100.0 0.0 0.0 0.0 0.0 0.0
02.04 DEMOLICION DE CIMIENTOS CORRIDOS m3 67.57 70.0 30.0 0.0 0.0 0.0 0.0
02.05 DEMOLICION DE SOBRE CIMIENTOS DE CONCRETO m3 21.28 100.0 0.0 0.0 0.0 0.0 0.0
02.06 DEMOLICION DE COLUMNAS DE CONCRETO m3 12.43 100.0 0.0 0.0 0.0 0.0 0.0
02.07 DEMOLICION DE VIGAS DE CONCRETO m3 11.18 100.0 0.0 0.0 0.0 0.0 0.0
02.08 DEMOLICION DE MUROS DE LADRILLO KK DE SOGA m2 545.92 100.0 0.0 0.0 0.0 0.0 0.0
02.09 DESMONTAJE DE SSHH, ELECTROBOMBA Y ACC. und 1 100.0 0.0 0.0 0.0 0.0 0.0
02.10 DEMOLICION DE PISOS, VEREDAS DE CS m2 1376.49 100.0 0.0 0.0 0.0 0.0 0.0
02.11 DESMONTAJE DE GRUTA EXISTENTE und 1 100.0 0.0 0.0 0.0 0.0 0.0
02.12 DESMONTAJE DE PUERTAS Y VENTANAS und 28 100.0 0.0 0.0 0.0 0.0 0.0
02.13 DESMONTAJE DE APARATOS SANITARIOS und 2 100.0 0.0 0.0 0.0 0.0 0.0
02.14 DEMOLICION DE ESCALERA DE CONCRETO m3 2.03 100.0 0.0 0.0 0.0 0.0 0.0
02.15 DESMONTAJE Y RETIRO DE COBERTURA LIVIANA m2 1035.75 100.0 0.0 0.0 0.0 0.0 0.0
02.16 DESMONTAJE Y RETIRO DE PORTONES Y REJAS METALICAS m2 16.55 100.0 0.0 0.0 0.0 0.0 0.0
02.17 PICADO DE LOSA P/EMPOTRADO DE COLUMNAS C/ADITIVO EPOXICO und 52 100.0 0.0 0.0 0.0 0.0 0.0
02.18 TALA Y RETIRO DE ARBOLES und 4 100.0 0.0 0.0 0.0 0.0 0.0
02.19 ACARREO MANUAL DE MATERIAL PRODUCTO DE LAS DEMOLICIONES m3 420.09 0.0 100.0 0.0 0.0 0.0 0.0
02.20 ELIMINACION DE MATERIAL EXCEDENTE A 5 Km. DE LA OBRA m3 420.09 0.0 100.0 0.0 0.0 0.0 0.0
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE TERRENO MANUAL HASTA NIVEL DE SUB RASANTE m3 85.84 100.0 0.0 0.0 0.0 0.0 0.0
03.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS EN TERRENO NORMAL m3 442.4 50.0 50.0 0.0 0.0 0.0 0.0
03.03 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO (HORMIGON) m3 59.15 100.0 0.0 0.0 0.0 0.0 0.0
03.04 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES, UAS DE VEREDA m3 21.37 100.0 0.0 0.0 0.0 0.0 0.0
03.05 RELLENO MANUAL CON MATERIAL PROPIO ZARANDEADO Y COMPACTADO m3 293.55 0.0 100.0 0.0 0.0 0.0 0.0
03.06 REFINE, NIVELACION Y COMPACTACION DE FONDO DE CIMENTACION m2 382.84 0.0 100.0 0.0 0.0 0.0 0.0
03.07 COLOCACION DE HORMIGON E=15 CM. EN PISOS Y VEREDAS m2 1422.32 0.0 50.0 50.0 0.0 0.0 0.0
03.08 CAMA DE HORMIGON COMPACTADO EN FONDO DE CIMENTACION m3 53.38 50.0 50.0 0.0 0.0 0.0 0.0
03.09 RELLENO CON TIERRA DE CULTIVO m3 46.29 0.0 0.0 0.0 0.0 0.0 100.0
03.10 ACARREO MANUAL DE MATERIAL EXCEDENTE m3 266.89 0.0 0.0 100.0 0.0 0.0 0.0
03.11 ELIMINACION DE MATERIAL EXCEDENTE A 5 Km. DE LA OBRA m3 266.89 0.0 0.0 100.0 0.0 0.0 0.0
04 CONCRETO SIMPLE / SARDINELES PERALTADOS / GRADERIAS
04.01 CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO - HORMIGON + 30% P.G. m3 96.7 30.0 70.0 0.0 0.0 0.0 0.0
04.02 SOLADO PARA ZAPATAS, E = 10 CM. m2 352.99 30.0 70.0 0.0 0.0 0.0 0.0
04.03 FALSO PISO CONCRETO F'c=175 KG/CM2, E=4" m2 587.71 0.0 100.0 0.0 0.0 0.0 0.0
05 CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 CONCRETO EN ZAPATAS F'c=210 Kg/cm2 m3 58.33 20.0 80.0 0.0 0.0 0.0 0.0
05.01.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 321 20.0 80.0 0.0 0.0 0.0 0.0
05.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 P/ZAPATAS kg 1414.2 20.0 80.0 0.0 0.0 0.0 0.0
05.02 VIGA DE CIMENTACION
05.02.01 CONCRETO Fc = 210 kg/cm2 EN VIGAS DE CIMENTACION m3 25.64 20.0 80.0 0.0 0.0 0.0 0.0
05.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 220.67 20.0 80.0 0.0 0.0 0.0 0.0
05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 P/VIGAS DE CIMENTACION kg 2301.12 20.0 80.0 0.0 0.0 0.0 0.0
05.03 SOBRECIMIENTOS ARMADOS
05.03.01 CONCRETO F'c= 175 kG/CM2, P/SOBRECIMIENTOS ARMADOS m3 48.38 0.0 100.0 0.0 0.0 0.0 0.0
05.03.02 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTO ARMADOS m2 540.21 0.0 100.0 0.0 0.0 0.0 0.0
05.03.03 ACERO DE REFUERZO Fy=4,200 Kg/cm2 SOBRECIMIENTOS ARMADOS kg 2820 0.0 100.0 0.0 0.0 0.0 0.0
05.04 COLUMNAS
05.04.01 CONCRETO EN COLUMNAS F'c=210 Kg/cm2 - 1er PISO m3 63.12 0.0 30.0 70.0 0.0 0.0 0.0
05.04.02 CONCRETO EN COLUMNAS f'c=175 kg/cm2 m3 22.13 0.0 30.0 70.0 0.0 0.0 0.0
05.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 959.52 0.0 30.0 70.0 0.0 0.0 0.0
05.04.04 ENCOFRADO Y DESENCOFRADO DE COLUMNAS CIRCULARES / CARAVISTA m2 156.14 0.0 100.0 0.0 0.0 0.0 0.0
05.04.05 ACERO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 13200.74 30.0 70.0 0.0 0.0 0.0 0.0
05.05 VIGAS
05.05.01 CONCRETO EN VIGAS F'c=210 Kg/cm2 - 1er PISO m3 68.13 0.0 0.0 80.0 20.0 0.0 0.0
05.05.02 CONCRETO EN VIGAS F'c=175 Kg/cm2 m3 4.8 0.0 0.0 80.0 20.0 0.0 0.0
05.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 444.25 0.0 0.0 80.0 20.0 0.0 0.0
05.05.04 ENCOFRADO Y DESENCOFRADO DE VIGAS CARAVISTA CON ADITIVO PLASTIFICANTE m2 44.16 0.0 0.0 80.0 20.0 0.0 0.0
05.05.05 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN VIGAS kg 6641.51 0.0 0.0 80.0 20.0 0.0 0.0
05.06 LOSAS ALIGERADAS
05.06.01 CONCRETO EN LOSAS ALIGERADAS F'c=210 Kg/cm2 - 1er PISO m3 62.07 0.0 0.0 80.0 20.0 0.0 0.0
05.06.02 ENCOFRADO Y DESENCOFRADO DE LOSAS ALIGERADAS PRIMER PISO m2 767.48 0.0 0.0 80.0 20.0 0.0 0.0
05.06.03 ACERO FY= 4200 kg/cm2 GRADO 60 LOSA ALIGERADA kg 3546.76 0.0 0.0 80.0 20.0 0.0 0.0
05.06.04 LADRILLO HUECO DE ARCILLA 15X30X30 PARA TECHO ALIGERADO und 5982.09 0.0 0.0 80.0 20.0 0.0 0.0
05.07 LOSAS MACIZAS
05.07.01 CONCRETO EN LOSAS MACIZA F'c=210 Kg/cm2 m3 0.82 0.0 0.0 0.0 100.0 0.0 0.0
05.07.02 ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZA m2 8.09 0.0 0.0 0.0 100.0 0.0 0.0
05.07.03 ACERO FY= 4200 kg/cm2 GRADO 60 LOSA MACIZA kg 34.6 0.0 0.0 0.0 100.0 0.0 0.0

05.08.01 CONCRETO EN ESCALERA, F'c=210 Kg/cm2 m3 3.28 0.0 0.0 0.0 100.0 0.0 0.0
05.08.02 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.96 0.0 0.0 30.0 70.0 0.0 0.0
05.08.03 ACERO FY= 4200 kg/cm2 GRADO 60 ESCALERA kg 121.87 0.0 0.0 100.0 0.0 0.0 0.0
05.09 GARGOLAS
05.09.01 GARGOLAS DE CONCRETO ARMADO SEGUN DISEO und 12 0.0 0.0 0.0 50.0 50.0 0.0
06 MUROS Y TABIQUES DE ALBAILERIA
06.01 MURO DE CABEZA LADRILLO K.K. MAQ. 18 HUECOS MERTERO 1:4 TIPO IV m2 404.79 0.0 30.0 50.0 20.0 0.0 0.0
06.02 MURO DE SOGA LADRILLO K.K. MAQ. 18 HUECOS MORTERO 1:4 TIPO IV m2 631.87 0.0 30.0 50.0 20.0 0.0 0.0
06.03 MURO DE CANTO LADRILLO K.K. MAQUINADO 18 H. MORTERO 1:4 m2 15.65 0.0 0.0 100.0 0.0 0.0 0.0
06.04 ACERO DE REFUERZO HORIZONTAL EN MUROS D=1/4" @ 2 HILADAS kg 248.4 0.0 30.0 50.0 20.0 0.0 0.0
07 ESTRUCTURA METALICA Y COBERTURA
07.01 TECHO PARABOLICO
07.01.01 TIJERAL T-1 C/ANG. 1 1/2"X1 1/2"X3/16" + FIERRO LISO DE 1/2" EN TECHO PARABOLICO m 173.04 0.0 0.0 0.0 70.0 30.0 0.0
07.01.02 VIGUETA DE FIERRO CORRUGADO D=1/2" - 3/8", 25X25 EN TECHO PARABOLICO m 438.1 0.0 0.0 0.0 70.0 30.0 0.0
07.01.03 TENSOR DE ACERO LISO D=5/8" m 165.69 0.0 0.0 0.0 70.0 30.0 0.0
07.01.04 TEMPLADORES Y CRUZ DE SAN ANDRES DE ACERO LISO D=1/2" m 177.84 0.0 0.0 0.0 70.0 30.0 0.0
07.01.05 APOYO FIJO DE ARCO und 7 0.0 0.0 0.0 70.0 30.0 0.0
07.01.06 APOYO MOVIL DE ARCO und 7 0.0 0.0 0.0 70.0 30.0 0.0
07.01.07 TIJERALES METALICOS PARABOLICO (MONTAJE) und 7 0.0 0.0 0.0 70.0 30.0 0.0
07.01.08 VIGUETAS METALICAS (MONTAJE) m 438.1 0.0 0.0 0.0 70.0 30.0 0.0
07.01.09 COBERTURA CON CALAMINON Cu 06 PERALTE =27 MM. INC. ANTICORROSIVO Y ESMALTE m2 811.14 0.0 0.0 0.0 70.0 30.0 0.0
07.02 ESTRUCTURA METALICA Y COBERTURA SUM
07.02.01 VIGA METALICA VM-01 D/TUB. CUAD. 75 MM. Y 50 MM. und 4 0.0 0.0 0.0 70.0 30.0 0.0
07.02.02 CORREAS DE ACERO LAC 75X75 MM E=3.00 MM m 224 0.0 0.0 0.0 70.0 30.0 0.0
07.02.03 TIJERALES METALICOS (MONTAJE) und 4 0.0 0.0 0.0 70.0 30.0 0.0
07.02.04 APOYO FIJO DE ARCO und 4 0.0 0.0 0.0 70.0 30.0 0.0
07.02.05 APOYO MOVIL DE ARCO und 4 0.0 0.0 0.0 70.0 30.0 0.0
07.02.06 COBERTURA CON CALAMINON TR 4 PERALTE =45 MM. INC. ANTICORROSIVO Y ESMALTE m2 354.38 0.0 0.0 0.0 70.0 30.0 0.0
07.02.07 CUMBRERA DE CALAMINON TR 4 m 21.63 0.0 0.0 0.0 70.0 30.0 0.0
07.03 ESTRUCTURAS METALICA Y COBERTURA AULA EXTERIOR
07.03.01 VIGA METALICA VM-02 D/TUB. CUAD. 75 MM. Y 50 MM. und 2 0.0 0.0 0.0 70.0 30.0 0.0
07.03.02 CORREAS DE ACERO LAC 75X75 MM E=3.00 MM m 77.22 0.0 0.0 0.0 70.0 30.0 0.0
07.03.03 TIJERALES METALICOS (MONTAJE) und 2 0.0 0.0 0.0 70.0 30.0 0.0
07.03.04 APOYO FIJO DE ARCO und 2 0.0 0.0 0.0 70.0 30.0 0.0
07.03.05 APOYO MOVIL DE ARCO und 2 0.0 0.0 0.0 70.0 30.0 0.0
07.03.06 COBERTURA CON CALAMINON TR 4 PERALTE =45 MM. INC. ANTICORROSIVO Y ESMALTE m2 130.5 0.0 0.0 0.0 70.0 30.0 0.0
07.03.07 CUMBRERA DE CALAMINON TR 4 m 12.87 0.0 0.0 0.0 70.0 30.0 0.0
07.04 CERCOS METALICO CON PARANTES DE FIERRO
07.04.01 PARANTE DE F N 2" e=3.00 mm Hp=3.00 m. und 8 0.0 0.0 0.0 0.0 0.0 100.0
07.04.02 MALLA ELECTROSOLDADA GALVANIZADA COCADA 2"X2" / ALAMBRE 10 m2 15.63 0.0 0.0 0.0 0.0 0.0 100.0

ARQUITECTURA
01 REVOQUES , ENLUCIDOS Y MOLDURA
01.01 TARRAJEO EN INTERIORES Y EXTERIORES (1 er piso), MEZCLA 1:5, E=1.5 CM. m2 1098.49 0.0 0.0 0.0 50.0 50.0 0.0
01.02 TARRAJEO MUROS EXTERIORES C:A 1:5, E=1.5 CM.(2do.NIVEL), Hprom.=3.00 - 6.00 M. m2 134.9 0.0 0.0 0.0 50.0 50.0 0.0
01.03 TARRAJEO DE COLUMNAS/ INC. BRUADO m2 647.03 0.0 0.0 0.0 50.0 50.0 0.0
01.04 TARRAJEO DE COLUMNAS EXT. A PARTIR DEL 2DO PISO / INC. BRUADO m2 199.95 0.0 0.0 0.0 50.0 50.0 0.0
01.05 TARRAJEO DE VIGAS / INC. BRUADO m2 359.78 0.0 0.0 0.0 50.0 50.0 0.0
01.06 TARRAJEO DE VIGAS EXT. A PARTIR DE 2DO PISO / INC. BRUADO m2 87.4 0.0 0.0 0.0 50.0 50.0 0.0
01.07 VESTIDURA DE DERRAMES m 468.5 0.0 0.0 0.0 50.0 50.0 0.0
01.08 VESTIDURA DE DERRAMES CON BORDES BOLEADOS, C:A 1:2 m 6.88 0.0 0.0 0.0 50.0 50.0 0.0
01.09 BRUAS DE 1 X 1 cm m 838.33 0.0 0.0 0.0 50.0 50.0 0.0
01.10 TARRAJEO DE SOBRECIMIENTOS C:A 1:5, E=1.5 CM. m2 45.72 0.0 0.0 0.0 50.0 50.0 0.0
01.11 IMPERMEABILIZACION DE TECHO m2 725.66 0.0 0.0 0.0 50.0 50.0 0.0
01.12 REVESTIMIENTO CON CEMENTO FROTACHADO, PASO Y CONTRAPASO EN ESCALERA m2 45.6 0.0 0.0 0.0 50.0 50.0 0.0
01.13 CONTRAZOCALO CEMENTO FROTACHADO S/COLOREAR, Hp=16.67 CM. EN ESCALERA m 17 0.0 0.0 0.0 50.0 50.0 0.0
01.14 TARRAJEO PRIMARIO RAYADO m2 105.36 0.0 0.0 0.0 50.0 50.0 0.0
01.15 ACABADO EN DESCANSO CEMENTO FROTACHADO Y BRUADO m2 7.7 0.0 0.0 0.0 50.0 50.0 0.0
02 CIELO RASOS
02.01 CIELO RASO C:A 1:4 X 1.5 CM. m2 713.76 0.0 0.0 0.0 0.0 100.0 0.0
02.02 VESTIDURA DE SUPERFICIE DE FONDO ESCALERAS CON CEMENTO ARENA m2 20.58 0.0 0.0 0.0 0.0 100.0 0.0
03 PISOS Y PAVIMENTOS
03.01 PISO DE CEMENTO PULIDO Y BRUADO DE 2" S/COLOREAR m2 523.76 0.0 0.0 0.0 0.0 100.0 0.0
03.02 CONTRAPISO 1:4, E=2 CM.PARA PISO DE CEMENTO Y CERAMICO m2 329.69 0.0 0.0 0.0 0.0 100.0 0.0
03.03 VEREDA DE CONCRETO F'c=175 Kg/Cm2, E=10CM.,ACABADO Y BRUADO INC. ENCOFRADO m2 475.09 0.0 0.0 0.0 0.0 100.0 0.0
03.04 CANALETAS DE CS A=0.40 M. fc=175 kg/cm2 m 20.95 0.0 0.0 0.0 0.0 100.0 0.0
03.05 SARDINEL DE VEREDA DE CONCRETO F'c=175 Kg/Cm2, P/UA DE VEREDA, LOSA Y SARDINEL m3 43.68 0.0 0.0 0.0 0.0 100.0 0.0
03.06 ENCOFRADO Y DESENCOFRADO DE SARDINELES P/UA DE VEREDA Y SARDINELES m2 145.6 0.0 0.0 0.0 0.0 100.0 0.0
03.07 PISO CERAMICO 30 X 30 CM. m2 329.69 0.0 0.0 0.0 0.0 50.0 50.0
04 ZOCALOS Y CONTRAZOCALOS
04.01 CONTRAZOCALO S/COLOREAR H=0.20 M.,MZ. 1:2, E=1.5 CM. m 260.05 0.0 0.0 0.0 0.0 0.0 100.0
04.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.10 m m 310.42 0.0 0.0 0.0 0.0 0.0 100.0
04.03 ZOCALO DE CERAMICA DE 20 X 30 CM H=1.50 - 1.80 M. m2 105.27 0.0 0.0 0.0 0.0 0.0 100.0
04.04 CONTRAZOCALO CERAMICO, H=10 CM. m 73.27 0.0 0.0 0.0 0.0 0.0 100.0
04.05 RODOPLAST DE PVC 9.5 MM m 129.39 0.0 0.0 0.0 0.0 0.0 100.0
05 CARPINTERIA DE MADERA
05.01 PUERTA CONTRAPLACADA 50 mm C/TRIPLAY 4 mm INC. MARCO CEDRO 2"X3" m2 38.48 0.0 0.0 0.0 50.0 50.0 0.0
05.02 JUNTAS SELLADORAS CON SILICONA E=1 CM.EN CARP. DE MADERA m 62.7 0.0 0.0 0.0 50.0 50.0 0.0
05.03 PUERTA DE MELAMINNE DE 18 MM. EN SSHH m2 7.2 0.0 0.0 0.0 50.0 50.0 0.0
05.04 REJA DE MADERA H=1.20 M. und 2 0.0 0.0 0.0 50.0 50.0 0.0
06 CARPINTERIA METALICA
06.01 MAMPARA CON PERFIL DE ALUMINIO NEGRO Y VIDRIO PAVONADO DE 8 MM. m2 9.41 0.0 0.0 0.0 0.0 100.0 0.0
06.02 PUERTA DE FIERRO SEGUN DETALLES m2 24.92 0.0 0.0 0.0 0.0 50.0 50.0
06.03 VENTANA METALICA TIPO REJA m2 142.66 0.0 0.0 0.0 0.0 50.0 50.0
06.04 REJILLA METALICA m 20.95 0.0 0.0 0.0 0.0 50.0 50.0
06.05 CANTONERA DE FIERRO EN ESCALERA m 43.2 0.0 0.0 0.0 0.0 100.0 0.0
06.06 PASAMANOS DE TUBO DE FG 2" EN ESCALERA m 12.8 0.0 0.0 0.0 0.0 100.0 0.0
06.07 PUERTA DE INGRESO PRINCIPAL C/PERFILES DE 3/16" m2 9.36 0.0 0.0 0.0 0.0 100.0 0.0
06.08 BARANDA METALICA DE TUBOS DE FN 2" Y 1", EN EXTERIOR m 34 0.0 0.0 0.0 0.0 100.0 0.0
06.09 TAPA METALICA DE 0.60 X 0.60 m und 1 0.0 0.0 0.0 0.0 0.0 100.0
07 CERRAJERIA
07.01 BISAGRA DE ACERO ALUMINIZADA DE 4" PESADA EN PUERTA und 97 0.0 0.0 0.0 0.0 50.0 50.0
07.02 CERRADURA DE TRES GOLPES C/TIRADOR EN PUERTA und 14 0.0 0.0 0.0 0.0 50.0 50.0
07.03 CERRADURA DE PERILLA EN PUERTA und 21 0.0 0.0 0.0 0.0 0.0 100.0
07.04 CERROJO SIMPLE und 4 0.0 0.0 0.0 0.0 0.0 100.0
07.05 CANDADOS DE 60 MM. und 1 0.0 0.0 0.0 0.0 0.0 100.0
08 VIDRIOS
08.01 VIDRIO DE 6 MM. CON PROTECTOR DE 4 MICRAS p2 1565.4 0.0 0.0 0.0 0.0 0.0 100.0
09 PINTURAS
09.01 PINTURA LATEX EN CIELO RASO Y VIGAS (2 MANOS) m2 1181.67 0.0 0.0 0.0 0.0 0.0 100.0
09.02 PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 2280.16 0.0 0.0 0.0 0.0 0.0 100.0
09.03 BARNIZ EN CARPINTERIA DE MADERA m2 56.44 0.0 0.0 0.0 0.0 0.0 100.0
09.04 PINTURA ANTICORROSIVA Y ESMALTE EN CARPINTERIA METALICA (2 MANOS) m2 155.46 0.0 0.0 0.0 0.0 0.0 100.0
09.05 PINTURA ESMALTE EN CONTRAZOCALOS m2 86.86 0.0 0.0 0.0 0.0 0.0 100.0
10 VARIOS, LIMPIEZA Y JARDINERIA
10.01 JUNTA DE DILATACION CON JEBE MICROPOROSO m 250.6 0.0 0.0 50.0 50.0 0.0 0.0
10.02 JUNTA DE DILATACION ASFALTICA E=1" m 518 0.0 0.0 0.0 0.0 0.0 100.0
10.03 JUNTA DE CONSTRUCCION CON TEKNOPORT, E=1" m 3.44 0.0 0.0 0.0 100.0 0.0 0.0
10.04 MESA DE CONCRETO ARMADO REVESTIDO CON CERAMICA 20X30 m 17.5 0.0 0.0 0.0 0.0 100.0 0.0
10.05 CURADO CON ADITIVO QUIMICO EN CONCRETO m2 3657.26 0.0 0.0 33.3 33.3 33.3 0.0
10.06 CONSTRUCCION DE GRUTA SEGN DETALLES und 1 0.0 0.0 0.0 0.0 0.0 100.0
10.07 SUMINISTRO E INSTALACION DE ESCALERA METALICA und 1 0.0 0.0 0.0 0.0 0.0 100.0
10.08 LIMPIEZA PERMANENTE Y FINAL DE OBRA m2 2304.73 0.0 0.0 0.0 0.0 0.0 100.0
11 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTAL
11.01 SUMINISTRO DE DEPOSITO PARA RESIDUOS SOLIDOS und 6 100.0 0.0 0.0 0.0 0.0 0.0
11.02 CAPACITACION AMBIENTAL mes 1 0.0 0.0 0.0 0.0 100.0 0.0
11.03 SUMINISTRO E INSTALACION DE BAOS QUIMICOS mes 6 16.7 16.7 16.7 16.7 16.7 16.7

INSTALACIONES ELECTRICAS

01 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION MANUAL DE ZANJAS TERRENO NORMAL m 310 0.0 100.0 0.0 0.0 0.0 0.0
01.02 REFINE DE ZANJAS INCLUYE CAMA Y CINTA SEALIZADORA m 310 0.0 100.0 0.0 0.0 0.0 0.0
01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m 310 0.0 100.0 0.0 0.0 0.0 0.0
02 CONDUCTORES, DUCTOS Y ACCESORIOS
02.01 SUMINISTRO DE MATERIALES PARA CONDUCTORES und 1 0.0 0.0 50.0 50.0 0.0 0.0
02.02 TUBERIA PVC SEL Y SAP ELECTRICA (SUMINISTRO) und 1 0.0 0.0 50.0 50.0 0.0 0.0
02.03 ACCESORIOS (SUMINISTRO) und 1 0.0 0.0 50.0 50.0 0.0 0.0
02.04 INSTALACION DE CONDUCTORES Y ACCESORIOS m 6689 0.0 0.0 50.0 50.0 0.0 0.0
03 ARTEFACTOS DE ILUMINACION
03.01 SUMINISTRO E INSTALACION DE LUMINARIAS und 1 0.0 0.0 0.0 0.0 0.0 100.0
03.02 SUMINISTRO E INSTALACION DE INTERUPTORES, TOMACORRIENTES, CAJAS Y ACCESORIOS und 1 0.0 0.0 0.0 0.0 0.0 100.0
04 INTERRUPTORES TERMOMAGNETICOS MONOFASICOS Y TRIFASICOS
04.01 INTERRUPTOR TERMOMAGNETICO TRIFASICO und 1 0.0 0.0 0.0 0.0 0.0 100.0
04.02 INTERRUPTOR TERMOMAGNETICO MONOFASICO und 1 0.0 0.0 0.0 0.0 0.0 100.0
04.03 INTERRUPTOR DIFERENCIAL und 1 0.0 0.0 0.0 0.0 0.0 100.0
05 AUDIO, VOZ Y DATA
05.01 SUMINISTRO E INSTALACION DE TOMAS DE RED pto 8 0.0 0.0 0.0 0.0 0.0 100.0
05.02 SUMINISTRO E INSTALACION DE SWITCH DE BORDE DE 16 PUERTOS pto 2 0.0 0.0 0.0 0.0 0.0 100.0
05.03 SUMINISTRO E INSTALACION DE CABLE UTP CAT 5E BELDEN m 629 0.0 0.0 0.0 0.0 0.0 100.0
05.04 SUMINISTRO E INSTALACION DE CABLE UTP TELEFONICO PLANO DE 4 HILOS m 171 0.0 0.0 0.0 0.0 0.0 100.0
05.05 SUMINISTRO E INSTAL. EQUIPO NVR DE 16 CAMARAS , DISCO 4TB TCP/IP /1 USB 2.0/1 USB 3.0 und 1 0.0 0.0 0.0 0.0 0.0 100.0
05.06 SUMINISTRO E INSTAL.CAMARAS DOMO IP 3Mp Full HD 1080p 30fps | CMOS 1/3" ICR| IR 20 a 30 und 4 0.0 0.0 0.0 0.0 0.0 100.0
05.07 SUMINISTRO E INSTALACION DE ACCESORIOS PVC und 1 0.0 0.0 0.0 0.0 0.0 100.0
06 TABLERO GENERAL DE DISTRIBUCION
06.01 TABLERO ELECTRICO TRIFASICO und 1 0.0 0.0 0.0 0.0 100.0 0.0
06.02 TABLERO ELECTRICO MONOFASICO und 1 0.0 0.0 0.0 0.0 100.0 0.0
07 VENTILADORES
07.01 SUMINISTRO E INSTALACION DE VENTILADORES DE TECHO und 4 0.0 0.0 0.0 0.0 0.0 100.0
08 POSTES DE FG Y CONCRETO
08.01 POSTE DE F N DE 4 M und 4 0.0 0.0 0.0 0.0 0.0 100.0
09 PUESTA A TIERRA
09.01 INSTALACION DE POZO DE CONEXION A TIERRA und 6 0.0 0.0 0.0 0.0 0.0 100.0
10 VARIOS
10.01 BUZON DE PASO und 6 0.0 0.0 0.0 0.0 0.0 100.0
10.02 CONDUIT FLEXIBLE DE 2O MM (EN ELECTROBOMBA) m 8 0.0 0.0 0.0 0.0 0.0 100.0
10.03 MURETE P/TABLERO DE BOMBAS und 1 0.0 0.0 0.0 0.0 0.0 100.0
11 PRUEBAS Y PUESTA EN SERVICIO
11.01 PRUEBA Y PUESTA EN SERVICIO DE LAS INSTALACIONES ELECTRICAS und 1 0.0 0.0 0.0 0.0 0.0 100.0

INSTALACIONES SANITARIAS
01 TRABAJOS PRELIMINARES
01.01 TRAZO DE NIVELES Y REPLANTEO DE REDES DE AGUA Y ALCANTARILLADO m 293.39 0.0 100.0 0.0 0.0 0.0 0.0
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION DE ZANJA MANUAL P/RED DE AGUA Y ALCANTARILLADO m3 92.44 0.0 0.0 100.0 0.0 0.0 0.0
02.02 RELLENO DE ZANJAS CON MATERIAL PROPIO ZARANDEADO m3 92.44 0.0 0.0 100.0 0.0 0.0 0.0
02.03 CAMA DE APOYO E = 10 CM. CON MATERIAL PROPIO ZARANDEADO EN RED DE ALCANTARILLAD m2 131.12 0.0 0.0 100.0 0.0 0.0 0.0
02.04 ACARREO MANUAL DE MATERIAL EXCEDENTE m3 20.27 0.0 0.0 100.0 0.0 0.0 0.0
02.05 ELIMINACION DE MATERIAL EXCEDENTE Dp=05 Km. m3 20.27 0.0 0.0 100.0 0.0 0.0 0.0
03 RED DE AGUA EXTERIOR N.T.P. 399.16
03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 1 1/2" C-10 m 94.19 0.0 0.0 100.0 0.0 0.0 0.0
03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC 3/4" C-10 m 35.43 0.0 0.0 100.0 0.0 0.0 0.0
03.03 SUMINISTRO E INSTALACION DE TUBERIA PVC 1/2" C-10 m 26.1 0.0 0.0 100.0 0.0 0.0 0.0
03.04 SUMINISTRO E INSTALACION DE ACCESORIOS RED DE DISTRIBUCION DE AGUA und 1 0.0 0.0 100.0 0.0 0.0 0.0
03.05 SUMINISTRO E INSTALACION DE VALVULA CHECK DE BRONCE DE 3/4" und 1 0.0 0.0 100.0 0.0 0.0 0.0
03.06 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE 1 1/2" und 2 0.0 0.0 100.0 0.0 0.0 0.0
03.07 GRIFO DE RIEGO DE 1/2" P/JARDINES . SUMINISTRO E INSTALACION und 2 0.0 0.0 100.0 0.0 0.0 0.0
03.08 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DE AGUA m 155.72 0.0 0.0 100.0 0.0 0.0 0.0
03.09 CAJA BY PASS CONCRETO F'c = 175 kG/CM2, 0.60 X 0.90 INC. VALVULAS Y ACC. und 1 0.0 0.0 100.0 0.0 0.0 0.0
03.10 CONEXION A RED DE AGUA EXISTENTE und 1 0.0 0.0 100.0 0.0 0.0 0.0
04 RED DE ALCANTARILLADO EXTERIOR N.T.P. 4435
04.01 TUBERIA PVC UF S 20 DN 6", SUMINISTRO E INSTALACION m 25.15 0.0 0.0 100.0 0.0 0.0 0.0
04.02 TUBERIA PVC UF S 20 DN 4", SUMINISTRO E INSTALACION m 112.52 0.0 0.0 100.0 0.0 0.0 0.0
04.03 CAJAS DE REGISTRO DE DESAGUE 10" x 24" H=60 CM. SUMINISTRO E INSTALACION und 13 0.0 0.0 100.0 0.0 0.0 0.0
04.04 CAJAS DE REGISTRO DE DESAGUE 12" x 24" H=80 CM. SUMINISTRO E INSTALACION und 3 0.0 0.0 100.0 0.0 0.0 0.0
04.05 PRUEBA HIDRAULICA EN RED DE ALCANTARILLADO m 137.67 0.0 0.0 100.0 0.0 0.0 0.0
04.06 CONEXION DE DESAGUE A RED EXISTENTE und 1 0.0 0.0 100.0 0.0 0.0 0.0
05 APARATOS Y ACCESORIOS SANITARIOS
05.01 INODORO NACIONAL BABY INTEGRADO (SUMINISTRO) und 6 0.0 0.0 0.0 0.0 100.0 0.0
05.02 INODORO TANQUE BAJO BLANCO (SUMINISTRO) und 8 0.0 0.0 0.0 0.0 100.0 0.0
05.03 LAVATORIO NACIONAL OVALIN BLANCO (SUMINISTRO) und 14 0.0 0.0 0.0 0.0 100.0 0.0
05.04 PAPELERA DE LOSA Y BARRA PLASTICA COLOR BLANCO (SUMINISTRO) und 8 0.0 0.0 0.0 0.0 100.0 0.0
05.05 DISPENSADOR DE JABON CROMADO und 10 0.0 0.0 0.0 0.0 100.0 0.0
05.06 URINARIO NACIONAL DE LOSA DE PICO, BLANCO INC./ACCESORIOS (SUMINISTRO) und 7 0.0 0.0 0.0 0.0 100.0 0.0
05.07 LAVADERO DE ACERO INOXIDABLE UNA POZA CON ESCURRIDERO und 1 0.0 0.0 0.0 0.0 100.0 0.0
05.08 COLOCACION DE ACCESORIOS SANITARIOS und 53 0.0 0.0 0.0 0.0 100.0 0.0
05.09 GRIFERIA (SUMINISTRO E INSTALACION) und 1 0.0 0.0 0.0 0.0 100.0 0.0
06 SISTEMA DE DESAGUE
06.01 SALIDA DE DESAGUE Y VENTILACION
06.01.01 SALIDAS DE PVC SAL P/DESAGUE DE 4" Y 2" pto 36 0.0 0.0 50.0 50.0 0.0 0.0
06.01.02 SALIDA VENTILACION DE PVC-SAL 2" pto 10 0.0 0.0 50.0 50.0 0.0 0.0
06.01.03 REGISTRO DE BRONCE CROMADO DE 4", PROVISION E INSTALACION und 7 0.0 0.0 50.0 50.0 0.0 0.0
06.01.04 SUMIDERO DE BRONCE ROSCADO 2", PROVISION Y COLOCACION und 10 0.0 0.0 50.0 50.0 0.0 0.0
06.01.05 ACCESORIOS DE RED DE DESAGUE und 1 0.0 0.0 50.0 50.0 0.0 0.0
07 SISTEMA DE AGUA FRIA Y CONTRAINCENDIO
07.01 SISTEMA DE AGUA FRIA
07.01.01 SALIDA DE AGUA FRIA TUBERIA PVC SAP 1/2" - 3/4" pto 36 0.0 0.0 50.0 50.0 0.0 0.0
07.02 VALVULAS DE CONTROL Y ACCESORIOS
07.02.01 VALVULA COMPUERTA DE BRONCE DE 1/2" und 11 0.0 0.0 0.0 0.0 100.0 0.0
08 VARIOS
08.01 EMPALME DE DESFOGUE DE CANALETA PLUVIAL A CERCO PERIMETRICO und 2 0.0 0.0 0.0 0.0 0.0 100.0

COSTO DIRECTO S/. 9.1 19.2 20.5 19.6 19.3 12.3


GASTOS GENERALES (10%) 9.1 19.2 20.5 19.6 19.3 12.3
UTILIDAD (10%) 9.1 19.2 20.5 19.6 19.3 12.3
SUBTOTAL 9.1 19.2 20.5 19.6 19.3 12.3
IGV 18% 9.1 19.2 20.5 19.6 19.3 12.3
TOTAL PRESUPUESTO S/. TOTAL DEL PRESUPUESTO 9.1 19.2 20.5 19.6 19.3 12.3

EQUIPAMIENTO
01 EQUIPAMIENTO
01.01 COMPUTADORA PERSONAL, INC. LICENCIA Y ANTIVIRUS (T-50) und 33 0.0 0.0 0.0 0.0 0.0 100.0
01.02 ECRAN DE PARED ENROLLABLE (T-53) und 1 0.0 0.0 0.0 0.0 0.0 100.0
01.03 AIRE ACONDICIONADO, (AA3) und 2 0.0 0.0 0.0 0.0 0.0 100.0
01.04 PROYECTOR MULTIMEDIA, (PM5) und 1 0.0 0.0 0.0 0.0 0.0 100.0
01.05 VENTILADOR DE PIE, (VT3) und 2 0.0 0.0 0.0 0.0 0.0 100.0
01.06 COCINA DE 4 HORNILLAS CON HORNO, (CC2) und 1 0.0 0.0 0.0 0.0 0.0 100.0
01.07 EQUIPO DE SONIDO, (T-6) und 1 0.0 0.0 0.0 0.0 0.0 100.0
01.08 IMPRESORA MULTIFUNCIONAL, (T-110) und 1 0.0 0.0 0.0 0.0 0.0 100.0
01.09 TELEVISOR LED SMART TV DE 42" INC. RACK, (T-16) und 1 0.0 0.0 0.0 0.0 0.0 100.0
01.10 CONGELADORA, (CC5) und 1 0.0 0.0 0.0 0.0 0.0 100.0
01.11 INSTALACION DE EQUIPOS und 1 0.0 0.0 0.0 0.0 0.0 100.0
02 MOBILIARIO
02.01 MESA DE MADERA DE 1.20X2.40M, SEGUN DISEO(MU) und 2 0.0 0.0 0.0 0.0 50.0 50.0
02.02 SILLA METALICA APILABLE (SL) und 171 0.0 0.0 0.0 0.0 50.0 50.0
02.03 ESCRITORIO ESTANDAR (M22) und 32 0.0 0.0 0.0 0.0 50.0 50.0
02.04 PAPELERA DE PLASTICO (M3) und 14 0.0 0.0 0.0 0.0 50.0 50.0
02.05 SILLA METALICA GIRATORIA RODABLE (M-39) und 4 0.0 0.0 0.0 0.0 50.0 50.0
02.06 PAPELERA METALICA DE PISO (M2) und 13 0.0 0.0 0.0 0.0 50.0 50.0
02.07 PIZARRA ACRILICA DE 2.50X1.50M P/ADOSAR A PARED (P2) und 2 0.0 0.0 0.0 0.0 50.0 50.0
02.08 ESCRITORIO EJECUTIVO, SEGUN DISEO (ES) und 2 0.0 0.0 0.0 0.0 50.0 50.0
02.09 BANCOS DE MADERA, SEGUN DISEO (BB3) und 4 0.0 0.0 0.0 0.0 50.0 50.0
02.10 LIBRERO DE MADERA, SEGUN DISEO (B1) und 1 0.0 0.0 0.0 0.0 50.0 50.0
02.11 ESTANTE METALICO, (ST) und 16 0.0 0.0 0.0 0.0 50.0 50.0
02.12 BANDEJA ACRILICA DOBLE PARA ESCRITOTIO (M17) und 1 0.0 0.0 0.0 0.0 50.0 50.0
02.13 SILLA DE MADERA PARA NIOS, (S3) und 54 0.0 0.0 0.0 0.0 50.0 50.0
02.14 MESA DE MADERA PARA NIOS, (MM) und 9 0.0 0.0 0.0 0.0 50.0 50.0
02.15 ESTANTE DE MADERA, SEGUN DISEO (SM) und 15 0.0 0.0 0.0 0.0 50.0 50.0
02.16 ESCRITORIO PARA PROFESOR (AL2) und 7 0.0 0.0 0.0 0.0 50.0 50.0
02.17 MATERIAL DIDACTICO PARA NIOS, (MD2) und 3 0.0 0.0 0.0 0.0 50.0 50.0
02.18 CARPETA UNIPERSONAL, SEGUN DISEO (CU) und 140 0.0 0.0 0.0 0.0 50.0 50.0
02.19 PISO MICROPOROSO, (PF3) und 3 0.0 0.0 0.0 0.0 50.0 50.0
02.20 SILLA DE MADERA PARA PROFESOR, (SM5) und 7 0.0 0.0 0.0 0.0 50.0 50.0
02.21 PIZARRA ACRILICA DE 3.50X1.50M, P/ADOSAR A PARED (P3) und 4 0.0 0.0 0.0 0.0 50.0 50.0
02.22 CAMILLA METALICA, (CM2) und 1 0.0 0.0 0.0 0.0 50.0 50.0
02.23 SILLON SEMICONFORTABLE, (M-46) und 4 0.0 0.0 0.0 0.0 50.0 50.0
02.24 VITRINA METALICA PARA LIBROS, (VTL) und 4 0.0 0.0 0.0 0.0 50.0 50.0
02.25 VITRINA DE MADERA P/ANUNCIOS C/PUERTA CORREDIZA DE VIDRIO, (M-10) und 1 0.0 0.0 0.0 0.0 50.0 50.0
02.26 BIOMBO METALICO, (BM1) und 1 0.0 0.0 0.0 0.0 50.0 50.0
02.27 CASA DE PLASTICO DE 1.10X1.10M, (CA) und 2 0.0 0.0 0.0 0.0 50.0 50.0
02.28 BALANCIN DE PLASTICO, (BL) und 2 0.0 0.0 0.0 0.0 50.0 50.0
02.29 RESBALADERA DE PLASTICO, (RT) und 2 0.0 0.0 0.0 0.0 50.0 50.0
02.30 CASTILLO PATIO CENTRAL (MODELO SANTA CLARA) und 1 0.0 0.0 0.0 0.0 50.0 50.0
02.31 INSTALACION DE MOBILIARIO und 1 0.0 0.0 0.0 0.0 0.0 100.0

COSTO DIRECTO S/. COSTO DIRECTO 293034.8


GASTOS GENERALES (5.00%) 14651.74
SUBTOTAL 307686.54
IGV 18% IGV 18% 55383.5772
TOTAL PRESUPUESTO S/. TOTAL DEL PRESUPUESTO 363070.1172

VALOR REFERENCIAL TOTAL 2746857.107


% DE AVANCE
COSTO DIRECTO S/.
GASTOS GENERALES (10%)
UTILIDAD (10%)
SUBTOTAL
IGV 18%
TOTAL PRESUPUESTO S/. TOTAL DEL PRESUPUESTO
ACUMULADO

TOTAL DE PRES
120.0

100.0

80.0

Axis Title 60.0

40.0

20.0

0.0
1 2 3
9.1 19.2 20.5 19.6 19.3 12.3
9.1 19.2 20.5 19.6 19.3 12.3
9.1 19.2 20.5 19.6 19.3 12.3
9.1 19.2 20.5 19.6 19.3 12.3
9.1 19.2 20.5 19.6 19.3 12.3
9.1 19.2 20.5 19.6 19.3 12.3
9.1 28.3 48.8 68.4 87.7 100.0

TOTAL DE PRESUPUESTO
120.0

100.0

80.0

60.0

40.0

20.0

0.0
1 2 3 4 5 6