SECCION SIMPLEMENTE REFORZADA (S-A). ING.

RUBEN ARBOLEDA

DATOS GEOMETRICOS DATOS PARTICULARES


b(cm)= 50 cu(rad)= 0.003
h(cm)= 60 As(cm2)= 30.00
d'(cm)= 5 y(rad)= 0.0020
d(cm)= 55 1= 0.85

CARACTERISTICAS DE LOS MATERIALES


f'c(kg/cm2)= 280 Ec(kg/cm2)= 252671
fy(kg/cm2)= 4200 n= 8.31
Es(kg/cm2)= 2100000 Asmin(cm2)= 9.17
1= 0.85 1.05-f'c/1400 0.85
0.651(1.05-f'c/1400) 0.85

1. Verificacin si la seccin est sub-reforzada.

Asb= 68.75 cm2 OK, SECCION SUB-REFORZADA

2. AGRIETAMIENTO. Momento y Curvatura de Agrietamiento.

HIPTESIS 2:

AREA DE SECCION EQUIVALENTE Ase= 3219.34 cm2


MODULO DE ROTURA Fr= 33.47 kg/cm2
PROF. EJE NEUTRO C= 31.70 cm
INERCIA DE SECCION EQUIVALENTE Ise= 1027745.16 cm4

Ma= 1215509.01 kg.cm


a= 4.7E-06 rad/cm
1
SECCION DOBLEMENTE REFORZADA (D-A). ING. ELIUD HERNANDEZ

DATOS GEOMETRICOS DATOS PARTICULARES


b(cm)= 50 cu(rad)= 0.003
h(cm)= 60 As(cm2)= 30
DIBUJO d'(cm)= 5 y(rad)= 0.0020
d(cm)= 55 1= 0.85
As'(cm2)= 12

CARACTERISTICAS DE LOS MATERIALES


f'c(kg/cm2)= 280 Ec(kg/cm2)= 252671

fy(kg/cm2)= 4200 n= 8.31


Es(kg/cm2)= 2100000 Asmin(cm2)= 9.17
1= 0.85 1.05-f'c/1400 0.85
0.651(1.05-f'c/1400) 0.85

0.0109

1. Verificacin si la seccin est sub-reforzada.

Asb= 69 cm2 OK, SECCION SUB-REFORZADA

2. AGRIETAMIENTO. Momento y Curvatura de Agrietamiento.

HIPTESIS 2:

AREA DE SECCION EQUIVALENTE Ase= 3307.07 cm2


MODULO DE ROTURA Fr = 33.47 kg/cm2
PROF. DEL EJE NEUTRO C= 30.99 cm
INERCIA DE SECCION EQUIVALENTE Ise= 1088645.71 cm4
Ma= 1256089 kg.cm
a= 4.6E-06 rad/cm

1
3. CEDENCIA. Momento y Curvatura Cedente.

HIPTESIS 1: Comportamiento elstico lineal del Concreto


El acero est en Cedencia
Comportamiento perfectamente plstico del acero
El Concreto no ha alcanzado el agotamiento

3.1. Determinacin del EJE NEUTRO. T=C= 126000

c=
(Ec*y*b) c + (2*AsFy) c - 2*AsFyd=0 c=
t.i.=

Prof. Del eje neutro c= 18.96 cm

3.2. Verificacin de hiptesis.


1 c= 0.001052 rad OK

0 Fc= 265.83 kg/cm2 NO CUMPLE


0 0.85*F'C= 238.00 kg/cm2

My= 6133714 kg.cm y= 5.55E-05

HIPTESIS 2: Comportamiento no lineal del Concreto


El acero est en Cedencia Aplica Hiptesis
Comportamiento perfectamente plstico del acero 2
El Concreto no ha alcanzado el agotamiento

3.3. Determinacin del EJE NEUTRO.

cy= 0.0009 rad


m= 16.93 cm

Prof. Del eje neutro c= 19.05 cm


3.4. Verificacin de hiptesis.
1 cdef.= 0.001060 rad OK
Fc= 267.85 kg/cm2
1 0.85*F'C= 238.00 kg/cm2 OK
1
My= 6126511 kg.cm y= 5.56E-05

3.3. Clculo de Momento Cedente y Curvatura Cedente.


My= 6126511 kg.cm
y= 5.56E-05 rad/cm
3. CEDENCIA. Momento y Curvatura Cedente.

HIPTESIS 1: Eje neutro entre As y As'


Comportamiento lineal elstico del concreto
El As esta cediendo o ya cedi
El Concreto no ha alcanzado el agotamiento y As' esta a compresin
El As' esta cediendo o ya cedio

3.1. Determinacin del EJE NEUTRO. TAs = Cc + CAs' 126000

c=
(Ec*y*b) c + (2*Fy(As-As')) c - 2*(As-As')Fy*d=0 c=
t.i.=

1 1
Prof. Del eje neutro c= 15.39 cm ok

3.2. Verificacin de hiptesis.


1 c= 0.000777 rad OK
0 's= 0.000525 rad No Cumple
1 Fc= 196.43 kg/cm2 OK
0 0.85*F'C= 238.00 kg/cm2
C=Cc+CAs'= 126000 kg

My= 6290051 kg.cm


Cc= 75600 kg
y= 5.05E-05 rad/cm
CAs'= 50400 kg

HIPTESIS 2: Eje neutro entre As y As'


Comportamiento lineal elstico del concreto Aplica Hiptesis
El As esta cediendo o ya cedi 2
El Concreto no se ha agotado y As' esta a compresi
El As' no est cediendo
TAs = Cc + CAs' 126000
3.1. Determinacin del EJE NEUTRO.
c=
(Ec*y*b/2) c + Fy(As+As') c - (Asd+As'd')Fy=0 c=
t.i.=
1 1
Prof. Del eje neutro c= 17.86 cm ok

3.2. Verificacin de hiptesis.


1 c= 0.000962 rad ok
1 's= 0.000693 rad ok
0 Fc= 243.06 kg/cm2 no cumple
0.85*F'C= 238.00 kg/cm2
0 C=Cc+CAs'= 126000 kg

My= 6196427 kg.cm


Cc= 108544 kg
y= 5.39E-05 rad/cm
CAs'= 17456 kg
kg

25267
252000
-13860000

rad/cm

Aplica Hiptesis
2
rad/cm

2
HIPTESIS 1:

esta a compresin

kg

25267
151200
-8316000

HIPTESIS 2:

Aplica Hiptesis
2

kg
12634
176400
-7182000

2
4. AGOTAMIENTO. Momento y Curvatura ltima.

HIPTESIS: El acero est cediendo o ya cedi


Comportamiento perfectamente plstico del acero
El Concreto est en condicin de agotamiento

T=C= 126000 kg

4.1. Determinacin del EJE NEUTRO.

Prof. Del eje neutro c= 12.46 cm

a= 10.59 cm

4.2. Clculo de Momento Ultima y Curvatura Ultima.

Mu= 6262941 kg.cm


u= 2.41E-04 rad/cm

Tabla de Momento Curvatura


Condicin Curvatura (Rad/cm) Momento (T-m) DUCTILIDAD
Inicial 0 0
Agrietamiento 4.68E-06 12.16 = 4.33
Cedencia 5.56E-05 61.27
ltima 2.41E-04 62.63

Diagram a de M om e nto-Curvatura

M om ento (T-m )

0 0.00005 0.0001 0.00015 0.0002 0.00025 0.0003

Curvatura (rad/cm )
M om ento (T-m )

0 0.00005 0.0001 0.00015 0.0002 0.00025 0.0003

Curvatura (rad/cm )
4. AGOTAMIENTO. Momento y Curvatura ltima.

HIPTESIS 1: El As y el As' est cediendo o ya cedi


Comportamiento elstico perfectamente plstico del acero
El Concreto alcanz el agotamiento
Eje neutro entre As y As'; As' en compresin

DIBUJO

1 1
4.1. Determinacin del EJE NEUTRO. TAs = Cc + CAs' 126000

Prof. Del eje neutro c= 7.47 cm ok

0 's= 0.0009930556 rad no cumple


0 a= 6.35 cm

Mu= 6437859 kg.cm


Cc= 75600 kg
u= 0.00040 rad/cm Aplica hiptesis
CAs'= 50400 kg 2
HIPTESIS 2: As' no ha cedido
Comportamiento elstico perfectamente plstico del acero
As esta en cedencia y el Concreto no ha agotado
Eje neutro entre As y As'; As' en compresin

4.2. Determinacin del EJE NEUTRO. TAs = Cc + CAs' 126000

c=
(0.85f'c1b) c + (As'Escu-AsFy) c - As'd'Escu=0 c=
t.i.=
1 1
Prof. Del eje neutro c= 9.09 cm ok

1 's= 0.001350 rad ok

Mu= 6404446 kg.cm


Cc= 91972.08 kg
u= 0.00033 rad/cm
CAs'= 34028 kg
DUCTILIDAD
3
kg

Aplica hiptesis
2

kg

10115
-50400
-378000
3
ESTIMACION DEL FACTOR DE REDUCCIN DE RESPUESTA (SECCION SIMPLEMENTE REFORZADA)

Lc 270 cms (Longitud Libre de la Columna)


hv 60 cms (Altura total de la Seccin de la Viga)

Lp = hv / 2 30 cms (Long Plastica Aprox) Ductilidad del Entrepiso para


la Condicin Columna Fuerte
d 1 + 3*( Lp / Lc)*( -1 ) 2.11 / Viga Debil

d / 0.49 (Relacin de Ductilidades)


Tabla de Momento Curvatura
Condicin Curvatura (Rad/cm) Momento (T-m) DUCTILIDAD
Inicial 0 0
Agrietamiento 4.57E-06 12.56 = 6.13
Cedencia 5.39E-05 61.96
ltima 3.30E-04 64.04

Diagram a de M om e nto-Curvatura

M om ento (T.m )

0 0.00005 0.0001 0.00015 0.0002 0.00025 0.0003 0.00035

Curvatura (rad/cm )

ESTIMACION DEL FACTOR DE REDUCCIN DE RESPUESTA (SECCION DOBLEMENTE REFORZADA)

Lc 270 cms (Longitud Libre de la Columna)


hv 60 cms (Altura total de la Seccin de la Viga)

Lp = hv / 2 30 cms (Long Plastica Aprox) Ductilidad del Entrepiso para


la Condicin Columna Fuerte /
d 1 + 3*( Lp / Lc)*( -1 ) 2.71 Viga Debil

d / 0.44 (Relacin de Ductilidades)


ON SIMPLEMENTE REFORZADA)

Ductilidad del Entrepiso para


la Condicin Columna Fuerte
/ Viga Debil

R (aprox) 2.64
DUCTILIDAD

ON DOBLEMENTE REFORZADA)

Ductilidad del Entrepiso para


la Condicin Columna Fuerte /
Viga Debil

R (aprox) 3.39
4
Datos Generales
As top (left)
Ancho 50 cm
Alto 60 cm
rec 5 cm
d 55 cm
F'c 280 Kgf/cm2
fy 4200 Kgf/cm2 As bot (left)
L Libre Viga 680 cm
(Caso Ssmico) 0.6 adm

1) Cap. Moment (Left)

Descripcin Ubicacin As (cm2) a (cms) Mu (Ton-cm)


Cap.M.Neg (Left) As Top (Left) 29.330 12.94 7472.79
Cap.M.Pos (Left) As Bot (left) 13.905 6.13 3791.15

2) Cap. Moment (Right)

Extremo Ubicacin As (cm2) a (cms) Mu (Ton-cm)


Cap.M.Neg (Right) As Top (Right) 27.453 12.11 7054.24
Cap.M.Pos (Right) As Bot (Right) 13.065 5.76 3574.84

3) Capacity Vp (Clockwise)

Descripcin Mu (Ton-cm) Vp (Ton)


Cap.M.Neg (Left) 7472.79
16.247
Cap.M.Pos (Right) 3574.84

4) Capacity Vp (Counter-Clockwise)

Descripcin Mu (Ton-cm) Vp (Ton)


Cap.M.Pos (Left) 3791.15
15.949
Cap.M.Neg (Right) 7054.24

5) Shear Design

Descripcin Valor Unidad


Vp1 16.247 Ton
Vp2 15.949 Ton
Vpdef 16.247 Ton
Vg 14.076 Ton
Vp def + Vg 30.323 Ton
Vu Anlisis 32.251 Ton
Vu Def 32.251 Ton Ramas
Vc 0.000 Ton
Vs 53.752 Ton
Av/s 0.233 cm2/cm
Ramas 4.00 adm
s 10.00 cms
A estribo 0.582 cm2

Utilizar 2 Estribos 3/8" c/.10


As top
(right)

As bot
(right)
1) Datos de Vigas

Descripcin Ancho Alto rec d f'c fy


Viga 1 50 60 5 55 280 4200
Viga 2 50 60 5 55 280 4200
Viga 3 50 60 5 55 280 4200
Viga 4 50 60 5 55 280 4200

2) Capacidad de Vigas

a a Capacity (Ton-cm)
Descripcin (Bot) (Top) Mom.Pos. Mom. Neg
Viga 1 4.61 9.69 2891.50 5783.04
Viga 2 4.64 9.74 2905.89 5811.76
Viga 3 5.51 11.71 3424.68 6849.16 Viga 1
Viga 4 0.00 1.57 0.00 1013.95

3) Datos de Columnas

Descripcin Ancho Alto As %


Col. Superior 60 60 48.000 1.33
Col. Inferior 65 65 68.129 1.61

Capacity (Eje Mayor)


Descripcin Mom.Pos. Mom. Neg
Col. Superior 6289.58 6289.58 Capacity Moment Beam
Col. Inferior 9609.95 9609.95
M = Fy As ( d - (a/2) )
Capacity (Eje Menor)
Descripcin Mom.Pos. Mom. Neg a = Fy As / 0.85 f'c b
Col. Superior 6289.58 6289.58
Col. Inferior 9609.95 9609.95

4) Sumatoria de Momentos Resistentes


Eje Mayor (Clockwise)
Eje mayor (Direccin 1) Sum.Beam.Cap = Mom.Neg.Viga 1 + Mom.Pos.Viga 2
Descripcin Sum.Beam.Cap. Sum.Col.Cap.
Clockwise 8688.93 15899.53 Eje Mayor (CounterClockwise)
Counter-Clockwise 8703.26 15899.53 Sum.Beam.Cap = Mom.Pos.Viga 1 + Mom.Neg.Viga 2

Eje menor (Direccin 2) Eje Menor (Clockwise)


Descripcin Sum.Beam.Cap. Sum.Col.Cap. Sum.Beam.Cap = Mom.Pos.Viga 3 + Mom.Neg.Viga 4
Clockwise 4438.63 15899.53
Counter-Clockwise 6849.16 15899.53 Eje Menor (CounterClockwise)
Sum.Beam.Cap = Mom.Neg.Viga 3 + Mom.Pos.Viga 4

5) Column/Beam Capacity

Eje Mayor Eje Menor Eje Mayor Eje Menor


Descripcin (6/5)Beam/Col (6/5)Beam/Col Col/Beam Col/Beam
Clockwise 0.657 0.517 1.827 2.321
Counter-Clockwise 0.656 0.335 1.830 3.582
Areas de Acero (cm2)
(Bot) (Top)
13.065 27.453
13.133 27.604
15.607 33.183
0 4.453

Viga 4

Direccin
1

Viga 2

Viga 3
Direccin
2

om.Neg.Viga 1 + Mom.Pos.Viga 2

om.Pos.Viga 1 + Mom.Neg.Viga 2

om.Pos.Viga 3 + Mom.Neg.Viga 4

om.Neg.Viga 3 + Mom.Pos.Viga 4
1) Datos de Vigas

Descripcin Ancho Alto rec d f'c fy


Viga 1 50 60 5 55 280 4200
Viga 2 50 60 5 55 280 4200
Viga 3 50 60 5 55 280 4200
Viga 4 50 60 5 55 280 4200

2) Datos de Columnas

Descripcin Ancho Alto As %


Col. Superior 60 60 48.000 1.33
Col. Inferior 65 65 68.129 1.61

3) Capacidad de Vigas

a a Capacity (Ton-cm) Tension (Ton)


Descripcin (Bot) (Top) Mom.Pos. Mom. Neg Mom.Pos. Mom. Neg
Viga 1 5.76 12.11 3574.84 7054.24 68.59 144.13
Viga 2 5.79 12.18 3592.41 7088.21 68.95 144.92
Viga 3 6.89 14.64 4224.44 8306.41 81.94 174.21
Viga 4 0.00 1.57 0.00 1013.95 0.00 18.70

TMNeg TMNeg
CMPos CMPos

TMPos CMNeg CMNeg TMPos

CounterClockwi
Clockwise se
4) Demanda T + C

Eje mayor (Direccin 1)


Descripcin TMNeg CMPos T+C
Clockwise 144.92 68.59 213.51 Capacity Moment Beam
Counter-Clockwise 144.13 68.95 213.08
M = 1.25 Fy As ( d - (a/2) )

Eje menor (Direccin 2) a = 1.25 Fy As / 0.85 f'c b


Descripcin TMNeg CMPos T+C
Clockwise 18.70 81.94 100.64
Counter-Clockwise 174.21 0.00 174.21

5) Determinacin del Corte de Diseo.

a) Corte por Capacidad

Caso 1: Corte (Ton) en el Tope de la Columna debido a las Capacidades de las Vigas

Capacity (Eje Mayor)


Descripcin Sum.Beam.Cap. L Col Vu (Top)
Clockwise 10646.65 330.00 32.26
Counter-Clockwise 10663.05 330.00 32.31

Capacity (Eje Menor)


Descripcin Sum.Beam.Cap. L Col Vu (Top)
Clockwise 5238.38 330.00 15.87
Counter-Clockwise 8306.41 330.00 25.17

Caso 2: Corte (Ton) en el Tope de la Columna por Capacidad de la seccin

Descripcin Mom.Pos Mom.Neg L Col Vu (Top)


Mayor 7086.33 7086.33 330.00 42.95
Menor 7086.33 7086.33 330.00 42.95

b) Corte (Ton) en el Tope de la columna (Definitvo) Menor entre 1 y 2

Eje Mayor Eje Menor


Descripcin Vu (Top) Vu (Top)
Clockwise 32.26 15.87
Counter-Clockwise 32.31 25.17

6) Condicin de Confinamiento

Descripcin Mayor-Front Mayor-Back Minor-Front Minor-Back


Viga 50 50 50 50
Columna 65 65 65 65
Confinado Si Si Si No

Caras Confinadas 3

7) Capacidad por Corte en la Junta

Descripcin Area Columna f'c Vc Vu Total D/C


Mayor 4225 280 239.05 181.25 0.758
Menor 4225 280 239.05 149.04 0.623
Areas de Acero (cm2)
(Bot) (Top)
13.065 27.453
13.133 27.604
15.607 33.183
0 4.453

Viga 4
Direccin
1
Viga
Viga 1
2

Viga 3
CMPos Direccin
2
TMPos

Capacity Tension Beam

Fy As ( d - (a/2) ) T = C = 1.25 Fy As

As / 0.85 f'c b
1) Datos de Vigas

Descripcin Ancho Alto rec d f'c fy


Viga 1 50 60 5 55 280 4200
Viga 2 50 60 5 55 280 4200
Viga 3 50 60 5 55 280 4200
Viga 4 50 60 5 55 280 4200

2) Datos de Columnas Capacity Moment Beam

Descripcin Ancho Alto As % M = 1.25 Fy As ( d - (a/2


Col. Superior 60 60 48.000 1.33
Col. Inferior 65 65 68.129 1.61 a = 1.25 Fy As / 0.85 f'c b

3) Capacidad de Vigas

a a Capacity (Ton-cm)
Descripcin (Bot) (Top) Mom.Pos. Mom. Neg
Viga 1 5.76 12.11 3574.84 7054.24 Direccin
Viga 2 5.79 12.18 3592.41 7088.21 1
Viga 3 6.89 14.64 4224.44 8306.41
Viga 4 0.00 1.57 0.00 1013.95

4) Determinacin del Corte de Diseo.

a) Corte por Capacidad

Caso 1: Corte (Ton) en el Tope de la Columna debido a las Capacidades de las Vigas

Capacity (Eje Mayor)


Descripcin Sum.Beam.Cap. L Col Vu (Top)
Clockwise 10646.65 330.00 32.26
Counter-Clockwise 10663.05 330.00 32.31

Capacity (Eje Menor)


Descripcin Sum.Beam.Cap. L Col Vu (Top)
Clockwise 5238.38 330.00 15.87
Counter-Clockwise 8306.41 330.00 25.17

Descripcin Vu (Top)
Mayor 32.31
Menor 25.17

Caso 2: Corte (Ton) en el Tope de la Columna por Capacidad de la seccin

Descripcin Mom.Pos Mom.Neg L Col Vu (Top)


Mayor 11339.41 11339.41 330.00 68.72
Menor 11624.58 11624.58 330.00 70.45

b) Corte (Ton) Definitivo por Capacidad en el Tope de la columna (Menor entre Caso 1 y Caso 2)
Descripcin Vu (Top)
Mayor 32.31
Menor 25.17

c) Corte (Ton) en el Tope de la columna proveniente del Anlisis

Descripcin Vu (Top)
Mayor 33.10
Menor 11.41

d) Corte (Ton) de Diseo en el Tope de la columna (Mayor valor entre b y c)

Descripcin Vu (Top)
Mayor 33.10
Menor 25.17

5) Acero por Corte

a) Datos

Descripcin Valor Unidad


d 60 cm
F'c 280 Kgf/cm2
Fys 4200 Kgf/cm2
(Caso Ssmico) 0.60 adm

b) Acero requerido en el Eje mayor

Vu Def 33.100 Ton


Vc 24.239 Ton
Vs 8.861 Ton
Av/s 0.059 cm2/cm
Ramas 4.00 adm
s 10.00 cms
A Lig 0.147 cm2

Nota: Revisar Acero Mnimo Ash.


Areas de Acero (cm2)
(Bot) (Top)
13.065 27.453
13.133 27.604
15.607 33.183
0 4.453

Capacity Moment Beam

M = 1.25 Fy As ( d - (a/2) )

a = 1.25 Fy As / 0.85 f'c b

Viga 4

Direccin
1
Viga
Viga 1
2

Direccin Viga 3
2
DIRECCION X
DESCRIPCION As Sup Izq As Inf Izq As Sup Der As Inf Der
V50X60-T1 30 15 30 15
V50X60-T2 24 12 24 12

DIRECCION Y
DESCRIPCION As Sup Izq As Inf Izq As Sup Der As Inf Der
V50X60-T3 42 21 42 21
V50X60-T4 32 16 32 16
DISEO DE LOSA MACIZA
Mu 7700 Kgf.m
Fy 4200 Kgf/cm2
e 18 cms
rec 5 cms
d 13 cms
As 17.81 cm2/m
Usar 1/2 c/.15 (8.50cm2/m)
Vu 2500 Kgf
f'c 280 Kgf/cm2
Vc 9800 Kgf
Vu/Vc 0.255 Ok