Está en la página 1de 41

PROYECT"DISEO DE PRESA EN LA LAGUNA HUINCHOS"

REGION ANCASH
PROVINCHUARAZ

RESUMEN :

REQUERIMIENTO DE RIEGO:
NIVEL DE ALMACENAMIENTO MINIMO (NAM):
NIVEL DE ALMACENAMIENTO DE NORMAL ELEVACION (NAN
NIVEL DE ALMACENAMIENTO DE MAXIMA ELEVACION (NAM
COTA DE LA CORONA (NANE+BL) :
ALTURA MAXIMA DE DISEO :
CALCULOS
HUINCHOS"

390535.08 m3
AM): 4,627.80 m.s.n.m
ELEVACION (NANE): 4,638.01 m.s.n.m
ELEVACION (NAME) = NANE + H : 4,638.30 m.s.n.m
4,639.01 m.s.n.m
11.21 m
DISTRITO: COCHABAMBA
FECHA: May-16
PROYECTO: "DISEO DE PRESA EN LA LAGUNA HUINCHOS"
REGION : ANCASH
PROVINCIA: HUARAZ

1. VOLUMEN MUERTO:

COTA (m.s.n.m) AREA (m2)

4619 598.97
4620 1,073.74
4621 1,439.77
4622 1,717.12
4623 3,697.12
4624 5,079.44
4625 5,974.83
4626 6,984.15
4627.8 8,056.04

2. CAPACIDAD DE VASO

COTA (m.s.n.m) AREA (m2)


4627.8 8,056.04
4627 8971.1329
4628 10116.2758
4629 11161.7782
4630 12025.5694
4631 14609.2741
4632 17278.9725
4633 20017.592
4634 21468.0999
4635 22948.4736
4636 24460.1524
4637 26002.747
4638 27576.0656

BALANC

DEDUCCIONES
APORTE
MESES EVAPORACION
M3 mm
SETIEMBRE
OCTUBRE 6,325.00 163.40
NOVIEMBRE
DICIEMBRE
86,728.00 141.80
ENERO 86,728.00 141.80
FEBRERO
MARZO
ABRIL 101,203.00 119.60
MAYO
JUNIO
JULIO 16,402.00 155.20
AGOSTO
TOTAL 210,658.00 992.40

REQUERIMIENTO DE RIEGO:

NIVEL DE ALMACENAMIENTO MINIMO (NAM):


NIVEL DE ALMACENAMIENTO DE NORMAL ELEVACION (NANE):
NIVEL DE ALMACENAMIENTO DE MAXIMA ELEVACION (NAME) = NANE + H

DISE
1. CIMENTACION

2. SELECCIN DEL EJE DE PRESA

3. ALTURA DE LA PRESA

SEGN: " MANUAL PARA PROYECTOS DE PEQUEAS


UNIVERSIDAD DE CHAPINGO MEXICO
H H v H d H o HL
Donde:
H= Altura maxima del diseo (m)
Hv= Distancia Vertical entre elevaciones de la seccion de con
Hd= Carga hidraulica sobre el vertedero (m)
Ho= Altura maxima de olas (m)
HL= Altura libre

BL= Borde libre (m): BL=Ho+HL


HL= Proporciona un control de seguridad contra situaciones im
ocurrencia de avenida mayor a la avenida de diseo
asentamiento del borde mayores a los conciderados

Calculo de la distancia vertical entre elevaciones de la seccion

Hv= NANE - NAM

NAM = 4,627.80m.s.n.m
NANE = 4,638.30m.s.n.m

Calculo de la Carga Hidraulica Sobre el Vertedero Hd:

3/ 2
Q C .L.H
Q=
C=
L=

Q= 6.75 m3/seg
C= 2.2
L= 20.00 m

Calculo de la haltura maxima de olas (Ho):

H O (0.005.V 0.068). F

Donde:
V= Velocidad del viento (km/h)
F= fetch (km):(Distancia maxima en linea recta que existe e

V= 52.00km/h
F= 0.41km

Calculo de la haltura libre (HL):


POR LO TANTO LA ALTURA MAXIMA DEL DISEO SERA:

H H v H d H o HL
Hv= 10.50 m
Hd= 0.29 m
Ho= 0.12 m
HL= 0.30 m

Calculo del borde libre (BL):

BL H O HL
Ho= 0.12 m
HL= 0.30 m

ELEVACION DE LA CORONA

CTA.CORONA NAM H
NAM= 4,627.80m.s.n.m
H= 11.21 m

SEGN: " MEMORIAS DEL SEMINARIO DISEO DE P

DETERMINACION DEL BORDE LIBRE

_=_+_++_
Donde:
HBL= Distancia vertical entre la corona del terrapln y la su
Hv= Amplitud del oleaje generado por el viento
Hr= Altura de rodamiento de las olas sobre el talud aguas ar
H= Asentamiento mximo de la corona
Hs= Margen de seguridad.Hs, es el mayor de los valores:
Un tercio de la diferencia entre el nivel de operacin
Altura de la ola
60 cm

Clculo de la amplitud del oleaje generado por el viento (Hv):

H V 3.22 VF 76 26.94 F
Donde:
V= Velocidad del viento (Km/hora)
F= Fetch (Km)

V= 100.00km/h
F= 0.51km

Clculo de la altura de rodamiento de las olas sobre el talud ag

La altura de rodamiento de la ola Hr, para taludes usuales en pr

=0.33*H
v
Clculo del asentamiento mximo de la corona (H):

=^2
Donde:
K= Factor que tiene en cuenta la compresibilidad de la prop
H= Altura de presa
La cimentacin es es de material CL

K= 0.00002cm-1
H= 1,120.82 cm

Clculo del margen de seguridad (Hs

NANE= 4,638.01m.s.n.m
NAME= 4,638.30m.s.n.m
HS1=(NA
Altura d
HS3=

POR LO TANTO:

ELEVACION DE LA CORONA

. =. +
NAME= 4,638.30m.s.n.m
HBL= 2.03 m

SEGN: " PREDIMENSIONAMIENTO Y ESTIMACION D


CIDIAT

DETERMINACION DEL BORDE LIBRE

BL=HL +
Donde: BLA
BL= Borde Libre
HL= Altura de ola (m)
BLA= 1.5HL=
Esta frmula es aceptable cuando la proteccin del para

Clculo de la altura de ola (HL):

HL (0.005VV 0.068) F
Donde:
Vv= Velocidad del viento (Km/hora)
F= Fetch (Km)

Vv= 52.00km/h
F= 0.41km

Clculo de borde libre adicional (BLA):


BLA = 1.5
HL= HL
0.12 m

POR LO TANTO:

ELEVACION DE LA CORONA

. =. +
NAME= 4,638.30m.s.n.m
HBL= 0.31 m

RESUMEN

"MANUAL PARA PROYECTOS DE PEQUEAS


OBRAS HIDRAULICAS PARA RIEGO Y
ABREVADERO"
COTA DE CORONA 4,639.01 m
BORDE LIBRE 0.42 m

4. PREDIMENSIONAMIENTO DE LA PRESA

Ancho de la corona (m) :


SEGN DISEO DE PEQUEAS PRESAS, BUREAU OF R
z
w 10
5

donde:
w= Ancho de la cresta en pies
z= Altura de la presa en pies

z= 11.208 m

SEGN PROYECTOS DE OBRAS HIDRULICAS, JESS

Para anchos mnimos de corona:


Para una presa de hasta 12 metros de altura

SEGN SEGN G. POST-P. LONDE:

B 1,65 H

donde:
B= ancho de la corona en metros
H= altura de la presa en metros

H= 11.208 m

De los tres mtodos descritos anteriormente el ancho promedio de la corona resulta

B prom=

FINALMENTE:

ANCHO DE LA CORONA=
ELEVACION DE LA CORONA=

Taludes :

Para secciones homogneas tipo, en funcin de la altura mxima de dise

ALTURA ANCHO
MXIMA CORONA
(m) (m)
6.00 - 7.50 4
7.50 - 9.00 4.5
9.00 - 10.50 4.5
10.50 - 12.00 5
12.00 - 13.50 5
13.50 - 15.00 5.5

__________________________________________________________
Asentamientos :
CALCULOS
PRESA EN LA LAGUNA HUINCHOS"

VOLUMEN (m3)

PARCIAL ACUULADO
0 0.00
836.36 836.36
1,256.76 2,093.11
1,578.45 3,671.56
2,707.12 6,378.68
4,388.28 10,766.96
5,527.13 16,294.09 4650.256
6,479.49 22,773.58
13,536.17 36,309.75

VOLUMEN (m3)
PARCIAL ACUULADO
0 0.00
-6810.8689200016 -6,810.87
9543.70435 2,732.84
10639.027 13,371.86
11593.6738 24,965.54
13317.42175 38,282.96
15944.1233 54,227.08
18648.28225 72,875.36
20742.84595 93,618.21
22208.28675 115,826.50
23704.313 139,530.81
25231.4497 164,762.26
26789.4063 191,551.67

BALANCE HIDRICO DE LA LAGUNA HUINCHOS

DEDUCCIONES REA (M2)


EVAPORACION REQ. RIEGO INICIO
M3 M3 M2

97.87 0.00 8,056.04

1,310.49 0.00 9,241.82


1,310.49 0.00 9,241.82

2,560.20 0.00 21,406.34

4,277.82 390,535.08 27,563.30

8,246.38

NTO DE RIEGO: 390535.08 m3

(NAM):
MAL ELEVACION (NANE):
IMA ELEVACION (NAME) = NANE + H :

DISEO DE LA PRESA

AL PARA PROYECTOS DE PEQUEAS OBRAS HIDRAULICAS PARA RIEGO Y ABREVADERO"


DAD DE CHAPINGO MEXICO
H d H o HL

del diseo (m)


cal entre elevaciones de la seccion de control y el fondo del cauce del arroyo (m)
a sobre el vertedero (m)
de olas (m)

: BL=Ho+HL
control de seguridad contra situaciones imprevistas como:
avenida mayor a la avenida de diseo
del borde mayores a los conciderados

tical entre elevaciones de la seccion de control y el fondo de cimentacin (Hv):

Hv= 10.50 m

ulica Sobre el Vertedero Hd:

Caudal de Descarga
Coeficiente
Se asume,condicin topografica

Hd= .29 m

ma de olas (Ho):

iento (km/h)
tancia maxima en linea recta que existe entre la cortina y el punto mas alejado de la misma)

Ho= 0.12 m

(Asumido)
HL= 0.30 m
IMA DEL DISEO SERA:

H d H o HL

H= 11.21 m

O HL

BL= 0.42 m

ONA NAM H
COTA DE
4,639.01 m
CORONA=

RIAS DEL SEMINARIO DISEO DE PRESAS DE TIERA" UNI.FIC.CISMID

DE LIBRE

+_++_
cal entre la corona del terrapln y la superficie del agua del vaso en un nivel mximo
eaje generado por el viento
miento de las olas sobre el talud aguas arriba.
mximo de la corona
uridad.Hs, es el mayor de los valores:
a diferencia entre el nivel de operacin normal y el nivel de mxima avenida

oleaje generado por el viento (Hv):


F 76 26.9 4 F Frmula de Stevenson modificada por Molitor

iento (Km/hora)

Hv= 0.76 m
Hv= 0.76 m

damiento de las olas sobre el talud aguas arriba (Hr):

to de la ola Hr, para taludes usuales en presas de tierra y enrocado (1.5:1 a 4:1) vara de: 0.33H

Hr= 0.25 m
mximo de la corona (H):

e en cuenta la compresibilidad de la propia masa y de la cimentacin

es es de material CL

H= 0.25 m

guridad (Hs):

0.10 m
Hs= 0.76 m
0.76 m
0.60 m

HBL= 2.03 m

+
COTA DE
4,640.33 m
CORONA=

MENSIONAMIENTO Y ESTIMACION DE COSTOS DE OBRAS DE PRESAS A NIVEL PRELIMINAR

DE LIBRE
Borde Libre adicional
s aceptable cuando la proteccin del paramento de aguas arriba se hace con un enrocado volcado.

VV 0.068) F

iento (Km/hora)

HL= 0.12 m

cional (BLA):

BLA= 0.19 m

BL= 0.31 m

. +
COTA DE
4,638.61 m
CORONA=

RA PROYECTOS DE PEQUEAS
" MEMORIAS DEL SEMINARIO DISEO
IDRAULICAS PARA RIEGO Y
DE PRESAS DE TIERA" UNI.FIC.CISMID
ABREVADERO"
4,639.01 m 4,640.33 m
0.42 m 2.03 m

DE LA PRESA

E PEQUEAS PRESAS, BUREAU OF RECLAMEATION U.S.A


esta en pies
esa en pies

36.77 pie

w= 17.35 pie
w= 5.29 m

OS DE OBRAS HIDRULICAS, JESS VILLASEOR

B= 3.00 m

POST-P. LONDE:

rona en metros
sa en metros

B= 5.52 m

nte el ancho promedio de la corona resulta:

4.60 m

ANCHO DE LA CORONA= 4.70 m


ELEVACION DE LA CORONA= 4,639.01 m

o, en funcin de la altura mxima de diseo:

TALUD TALUD
AGUAS ARRIBA AGUAS ABAJO

2.5 : 1 2.0 : 1
2.5 : 1 2.5 : 1
3.0 : 1 2.5 : 1
3.0 : 1 3.0 : 1
3.5 : 1 3.0 : 1
3.5 : 1 3.5 : 1

_____________
S

DISTRITO: COCHABAMBA
FECHA: May-16

598.97
474.77
366.03
277.35
1,979.99
1,382.32
10766.1329 895.39
1,009.32
1,071.89

A HUINCHOS

REA (M2) VOLUMEN (M3) COTAS (m.s.n.m.)


FIN INICIO FIN INICIO
M2 M3 M3 m.s.n.m.

9,241.82 -188,123.46 6,227.13 4,627.80

21,406.34 6,227.13 91,644.64 4,628.99


21,406.34 6,227.13 91,644.64 4,628.99

27,563.30 91,644.64 190,287.44 4,633.98

5,278.07 190,287.44 -188,123.46 4,638.01

4,627.80m.s.n.m
4,638.01m.s.n.m
4,638.30m.s.n.m

PRESA

PARA RIEGO Y ABREVADERO"


arroyo (m)

cimentacin (Hv):

as alejado de la misma)
IC.CISMID

n un nivel mximo

avenida

a por Molitor
1.5:1 a 4:1) vara de: 0.33H v a Hv.

DE PRESAS A NIVEL PRELIMINAR"


hace con un enrocado volcado.

"PREDIMENSIONAMIENTO Y ESTIMACION DE
COSTOS DE OBRAS DE PRESAS A NIVEL
PRELIMINAR" CIDIAT
4,638.61 m
0.31 m

Segn Diseo de Pequeas Presas, Bureau of Reclameation U.S.A


Segn Proyectos de Obras Hidrulicas, Jess Villaseor

Segn Segn G. Post-P. Londe:


OTAS (m.s.n.m.)
FIN
m.s.n.m.

4,628.99

4,633.98
4,633.98

4,638.01
NANE

4,627.80
NAM
f Reclameation U.S.A
rulicas, Jess Villaseor

. Post-P. Londe:

También podría gustarte