Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Costos de Túnel
Costos de Túnel
MALLA DE PERNOS
DISTANCIA DE ACARREO DE MARINAS
146563
170618
130009
384965
0
531529
1.0 m X 1.0 m
150 m
594
0.9688
Ao 2004
1.1258
Ao 2004
US$
US$
US$
US$
US$
ACTIVIDAD
1.- CONSTRUCCIN DE GALERA
1.1 PERFORACIN
ACEROS
MANO DE OBRA
EQUIPOS
1.2 TRONADURA
EXPLOSIVOS
MANO DE OBRA
EQUIPOS
VENTILACIN
PARCIAL
US$
9172.04
4794.09
24856.91
55993.56
7951.54
3217.10
3914.49
10325.46
26337.93
DESARROLLOS
ACUMULADO
US$
38823.05
71076.70
36663.38
146563.13
MANO DE OBRA
LECHADA
EQUIPO UTILITARIO
PERNOS
TOTAL
US$
146563.13
83677.27
86940.69
32009.79
3677.99
14914.39
36338.53
170617.96
12763.61
35713.32
12901.08
20016.58
35713.32
12901.08
70025.18
13704.46
608.91
317181.09
61378.01
68630.98
130008.99
447190.07
84338.55
531528.62
5. CARPETA DE RODADO
MANO DE OBRA
HORMIGN
TOTAL DESARROLLO DE GALERA
531529
TIPO DE ROCA
RADIO TECHO GALERA(RG)
ANCHO GALERA (a)
ALTO GALERA (b)
AREA TIL O FACTOR
NUMERO DE TIROS HUECOS
NUMERO DE TIROS CARGADOS
TOTAL DE PERFORACIONES
DIAMETRO DE TIRO HUECO
DIAMETRO DE TIROS CARGADOS
LONGITUD DE PERFORACIN
EFECTIVIDAD EN EL AVANCE
AVANCE REAL POR DISPARO
VOLUMEN DE MATERIAL TRONADO
LONGITUD DE TACO
LONGITUD DE CARGUO
METROS BARRENADOS/DISPARO
DENSIDAD IN-SITU MATERIAL / ESPONJADA 1,4
CARGA LINEAL
SEPARACIN ENTRE CORRIDAS DE PERNOS
SEPARACIN ENTRE PERNOS
0,21 m/mp
2.70
5.40
5.25
25.515
2
63
65
102
45
2.80
90%
2.5
63.79
0.45
2.35
182
2.00
0.87
1
0.9
m
m
m
m2
unid
unid
unid
mm
mm
ml
m av
m3
m
m
mb
t/m3
Kg/m
m
m
RENDIMIENTO
LONGITUD A BARRENAR
LONGITUD A BARRENAR / DISP
HORAS DE OPERACIN (2 BRAZOS)
E.ELECTRICA (95% VALOR NOMINAL)
CONSUMO DE AGUA
mb/min
2.80
182
0.96
46.08
90
m/Tiro
mb/disp
hr
Kwh
lt/min
TARIFA
UNIDAD
TOTAL
US$/disp
105.8252
0.0482
0.1938
US$/hr
US$/Kwr
US$/m3
101.59219
2.02
1.00
US$/disp
US$
104.62
24856.91
1
0.96
0.50
1.96
102.94
10
HT/EQUIPO
hr
hr cada vez
hr
US$/HT
hr
US$/disp
20.18
US$
4794.09
CONSUMO
COSTO
US$/UNID
TOTAL
US$/disp
0.04
0.06
0.0600
0.26
133.610
27.515
13.633
54.31985
9.73
2.78
1.38
24.72
US$/disp
US$
38.60
9172.04
2500
1800
1800
400
TOTAL ACEROS
TOTAL ACEROS
PEFORAC
mb/disp
182
182
182
182
1.2 TRONADURA
EXPLOSIVOS
ESQUEMA DE CARGUO
CARGA DE FONDO
TIROS
CANTIDAD
1 1/8 X 8
24
10
7
12
10
2
65
24
10
7
12
10
14
24
63
14
70
Costo
US$/Unid
Total
US$
0.597
0.495
0.664
1.745
1.745
0.259
1.768
0.462
29.33
38.14
46.50
41.88
68.05
7.77
3.54
0.46
RAINURAS
CORONAS
CAJAS
AUXILIARES
ZAPATERAS
HUECOS
TOTAL
ANFO
TRONEX 1 1/8" X 8"
SOFTRON
RETARDOS MS
RETARDOS LP
CORDON DETONANTE
GUIA IGNICIN 20'
THERMALITA LENTA
49.15
77
70
24
39
30
2
1
ANFO
CARGA DE COLUMNA
1 1/8 X 8
SOFT
ACCESORIOS
ANFO
MS10'
20.5
24
26
20
10
7
12
10
28.65
Kg
Unidad
Unidad
Unidad
Unidad
m
Unidad
m
49.15
24
US$/Disp
US$
33.47
7951.54
TARIFA
UNIDAD
TOTAL
US$/disp
20.2644
0.04824624
US$/hr
US$/Kwr
12.06
1.48
US$/Disp
US$
13.54
3217.10
TARIFA
UNIDAD
TOTAL
US$/disp
10.1322
0.048
US$/hr
US$/Kwr
15.55
0.93
EXPLOSIVOS
US$/Disp
235.66
EXPLOSIVOS
US$
55993.56
HT/EQUIPO
83.248984
US$/HT
0.67
5
Hr
Hr
0.67
45
Hr
Kwh
VENTILACIN ASPIRANTE
TIEMPO DE VENTILACIN
EQUIPO DE VENTILACIN (35 HP)
MANGA VENTILACIN FLEXIBLE D=0.6 m
E. ELECTRICA (95 % VALOR NOMINAL)
0.5
Hrs
26
1.73
12.35
Kwh
m
Kwh
LP 10'
39
TOTAL VENTILACIN
US$
3914.49
1.00
min
12.50
150
1.44
2.44
20.49
144
130
63.79
1.70
6
Km/Hr
m
min
min
FACTOR DE LLENADO
CAPACIDAD POR BALDE
CAPACIDAD DEL BALDE
MATERIAL A TRANSPORTAR
NUMERO DE VIAJES
0.90
4.6
7.02
127.58
18.18
208
m/min
TARIFA
UNIDAD
TOTAL
US$/disp
t/Hr
m
m3
t/m3
Yd3
m3
t/vje
t
vjes
0.89
Hr
43.9062
US$/hr
38.95
25
L/Hr
0.203
US$/L
4.51
TOTAL LHD
US$/Disp
43.46
TOTAL LHD
US$
10325.46
US$/Disp
42.35
US$/Disp
US$
68.50
26337.93
1
2
HT/EQUIPO
HT/EQUIPO
102.945
83.249
0.89
US$/HT
US$/HT
hr
0.5
0.67
2.06
5
hr
hr
hr
hr
1
594
6.28
9.88
11.0
594.00
6534
11
11
11
METROS
METROS
METROS
PERNOS
PARADAS
PERNOS
PERNOS / ml
TUERCAS/ml
PLANCHU/ml
Costo
US$/Unid
Total
US$/ml
PERNOS
TUERCAS
11
11
PERNOS / ml
TUERCAS/ml
4.109
0.484
45.20
5.33
PLANCHUELAS
11
PLANCHU/ml
0.968
10.65
US$
36338.53
TARIFA
UNIDAD
TOTAL
US$/ml
124.9638
0.1938
0.0482
US$/hr
US$/m3
US$/Kwh
114.55
0.75
1.21
US$
69205.70
COSTO
US$/UNID
TOTAL
US$/disp
98.29
13.62
46.95
US$
1.24
0.29
3.96
3260.89
PERNOS
TIROS BARRENADOS/TNO
60
TIROS/TNO
LONGITUD A BARRENAR/PERNO
2.3
5
0.46
25.3
hr / tno
mb / min
mb / ml
UTILIZACIN JUMBO
CONSUMO DE AGUA
E.ELECTRICA (95% VALOR NOMINAL)
0.92
70
27.4
hr / ml
lt / min
Kwh
ACEROS
CULATIN HEMBRA
BARRA R32 R28
BIT 1 1/2"
VIDA UTIL
mb
PERFORAC
mb/ml
CONSUMO
2000
25.3
1200
25.3
300
25.3
TOTAL JUMBO EMPERNADOR
0.02
0.03
0.12
1
0.92
102.945
5
HT/EQUIPO
hr/ml
US$/HT
hr/ml
US$
11210.68
HT
2
55
11
5
1.00
HT
PERNOS/TNO
PERNOS/hr
hr
HORAS/ml
102.94
US$/HT
83.25
US$/HT
US$
32009.79
US$
3677.99
TARIFA
UNIDAD
TOTAL
US$/disp
MATERIALES
CANTIDAD DE PERNOS
TARIFA LECHADA
11
0.5629
PERNOS / ml
US$/Perno
LECHADA
UTILITARIO
COMBUSTIBLE
1.00
HORAS/ml
20.2644
US$/hr
20.26
20
l/hr
0.2422
US$/L
4.84
US$
14914.39
MATERIAL
LONGITUD DE GALERA A FORTIF. (*)
AVANCE DE LA MALLA (S/TRASLAPE)
PAOS FORTIFICACIN CON MALLA
PERIMETRO A FORTIFICAR CON MALLA
LONGITUD DE MALLA DE ALTO 2.2 m
LONGITUD DE CADA ROLLO
594
2
297
6.3
1871.1
25
m
Paos
ml
m Malla
m
74.8
Rollos
MALLA
US$/UNIDAD
US$
170.54
12763.61
US$
12763.61
1
HT/EQUIPO
2
HT
102.9447
US$/HT
83.24898
US$/HT
2.2314
hr/unidad
5
hr
TOTAL M.O.
2.2314
20
Hr
l/Hr
US$
35713.32
TARIFA
UNIDAD
TOTAL
US$/disp
20.2644
0.2034
US$/hr
US$/L
45.22
9.08
US$
12901.08
TOTAL EQUIPO
594
2
m
m
297
9.88
2934.36
Paos
ml
m Malla
25
117.37
Rollos
MALLA
US$/UNIDAD
US$
170.54
20017
US$
20016.58
OPERARIO EQUIPO
OPERARIOS
COSTO M.O. EQUIPO
COSOTO M.O. OPERARIO
TIEMPO COLOCACIN PAO
HORAS EFECTIVAS POR TURNO
1
2
102.945
83.249
2.2314
5
HT/EQUIPO
HT
US$/HT
US$/HT
hr/unidad
hr
TOTAL M.O.
2.2314
20
Hr
l/Hr
US$
35713.32
TARIFA
UNIDAD
TOTAL
US$/disp
20.2644
0.203
US$/hr
US$/L
45.22
9.08
US$
12901.08
4.- FORTIFICACIN
MATERIAL
LONGITUD DE GALERA A FORTIF. (*)
594
2.5
9.88
10.1
0.13
m
ml
ml / TNO
m3 / m2
CONSUMO SHOTCRETE
1.28
US$/m3
US$
91.78
117.89
US$
70025.18
US$
13704.46
TARIFA
UNIDAD
TOTAL
US$/disp
m3 / ml
SHOTCRETE
1
2
102.9447
83.24898
3
0.4
HT/EQUIPO
HT
US$/HT
US$/HT
m3/hr
hr/ml
hr
TOTAL M.O.
ALIVA
0.4
Hr
4.73
US$/hr
2.024
ENERGA ELCTRICA
AIRE PROYECCIN
AGUA
2.2
480
0.9
Kwh
m3/Hr
m3/Hr
0.048
0.002
0.19
US$/Kwh
US$/m3
US$/m3
0.05
0.42
0.07
US$
608.91
TOTAL EQUIPO