Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Operación San Tampinta Corregido 222
Operación San Tampinta Corregido 222
Proyecto
Elevacin
msnm
3805.50
3806.00
3807.00
3808.00
3809.00
3810.00
3811.00
3812.00
3813.00
3814.00
3815.00
3816.00
3817.00
3818.00
3819.00
3820.00
3821.00
3822.00
3823.00
3824.00
3825.00
3826.00
3827.00
3828.00
3829.00
3830.00
rea
(m2)
0.00
3.81
937.32
4264.39
8129.09
13162.30
17646.35
23690.70
29983.10
39921.55
50026.54
61921.64
75132.84
89684.80
105063.37
118415.10
135100.42
151509.99
169374.93
186217.83
202041.15
216901.85
275829.42
301684.84
330306.64
355991.49
Volumen
(m3)
0.00
0.90
471.80
3073.00
9269.70
19915.40
35319.70
55988.20
82825.10
117777.50
162751.50
218725.60
287252.80
369661.70
467035.70
578775.00
705532.70
848837.90
1009280.40
1187076.80
1381206.30
1590677.80
1837043.40
2125800.50
2441796.30
2784945.30
Volumen
til
0.00
177796.40
371925.90
581397.40
827763.00
3,622,716
453
VOLUMEN MNIMO:
ALTURA VOLUMEN MINIMO:
205,301
11.60
MES
JUN
JUL
m3
msnm
m
m
AGO
SEP
OCT
NOV
DIC
59,219 132,715
ENE
FEB
MAR
ABR
2,123,465
MAY
m3
m3
TOTAL
OFERTA DE AGUA
Quebrada Tampinta
81,439
65,453
52,985
45,244
81439
1912697
1994135
65453
1645275
1710728
52985
1347592
1400577
45244
1034312
1079556
59219
723439
782658
132715
413671
546385
283628
194124
477752
741796
114446
856242
881147
490128
1371275
804132
1037118
1841250
337820
2123465
2461285
137139
2123465
2260604
2.49
12,699
0.3
1274
13974
3.23
15,894
0.3
1192
17087
4.22
19,120
0.3
1096
20216
5.14
20,246
0.3
985
21230
6.27
22,087
0.3
852
22938
5.66
16,639
0.3
735
17375
5.84
16,571
0.3
686
17257
5.23
19,178
0.3
887
20065
5.01
20,500
0.3
1096
21596
4.74
24,065
0.3
1227
25292
3.47
644
0.3
1391
2035
2.88
516
0.3
1342
1858
1,980,161
1,693,641
1,380,361
1,058,325
759,720
529,011
460,495
836,177
1,349,679
1,815,957
2,459,250
2,258,746
334,886
346,049
346,049
334,886
346,049
334,886
346,049
346,049
312,561
346,049
334,886
346,049
0
334886
0
346049
346049.3
0
334886
0
346049
0
334886
0
346049
0
346049
0
312561
0
346049
0
334886
1,645,275
1,347,592
1,034,312
723,439
413,671
194,124
114,446
898
478.6
25.6
477.0
24.0
475.1
22.1
472.9
19.9
470.2
17.2
467.7
14.7
466.6
13.6
471.0
18.0
475.1
22.1
477.7
24.7
480.7
27.7
479.8
26.8
169924
163781
158984
152145
146069
138232
131280
121973
113563
101791
98064
83065
91491
74622
118299
107286
146191
138366
163614
157086
185515
180182
178902
173248
4.17
125.17
4.12
127.64
4.29
132.87
4.48
134.46
4.92
152.59
4.53
136.00
4.57
141.65
4.31
133.54
4.04
113.25
3.75
116.37
3.73
112.01
3.82
118.40
30.00
31.00
31.00
30.00
31.00
30.00
31.00
31.00
28.00
31.00
30.00
31.00
129.20
129.20
129.20
129.20
129.20
129.20
129.20
129.20
129.20
129.20
129.20
129.20
334,886.4
346,049.3
346,049.3 334,886.4
346,049.3
346,049.3
283,628
137,139 3,622,716
3622716
3,622,716
PERDIDAS
Evaporacin (mm/da)
Evaporacin (m3/mes)
Infiltracin (mm/da)
Infiltracin (m3/mes)
TOTAL PERDIDAS m3
188,159
12,764
201,821
H= 0.00013 A +
3.605097
0.359
H=
DEMANDA DE AGUA
AGUA POTABLE
0.1437 V
diferencia:
RIEGO
CAUDAL ECOLGICO
TOTAL REQUERIDO m3
RESTO UTIL EMBALSE m3
REBALSE POR VERTEDOR EXCED. m3
Cota [m.s.n.m,]
Altura [m]
AREA INUNDADA m2
346,049.3 334,886.4
0
0
346049 4,074,451
13.60 m
2.00 m
26.85 m
Altura de la presa:
27.75 m
1,912,697
898
1543.94
4,074,451
Altura
[m]
0
1
453
454
2.37
235.41
0.00
118.89
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
1,950.07
4,787.93
8,771.41
14,699.94
21,279.09
26,768.94
33,480.78
39,889.03
46,707.30
52,340.74
59,317.82
64,631.05
71,286.00
78,414.78
86,130.72
93,772.29
100,770.13
109,420.61
116,204.51
123,771.55
130,743.31
137,977.85
144,625.69
151,317.81
157,908.18
167,051.81
175,899.92
186,528.25
194,882.62
206,805.80
219,509.04
227,824.91
236,928.77
243,637.46
250,615.73
257,183.68
1,211.63
4,580.63
11,360.30
23,095.98
41,085.49
65,109.51
95,234.37
131,919.27
175,217.44
224,741.46
280,570.74
342,545.17
410,503.70
485,354.09
567,626.83
657,578.34
754,849.55
859,944.92
972,757.48
1,092,745.51
1,220,002.94
1,354,363.52
1,495,665.29
1,643,637.04
1,798,250.03
1,960,730.03
2,132,205.89
2,313,419.98
2,504,125.41
2,704,969.62
2,918,127.04
3,141,794.02
3,374,170.86
3,614,453.97
3,861,580.57
4,115,480.27
PLANILLA DE INTERPOLACIN
JUN
REA
COTAS
###
168,775.51
480.19
HvA
40
35
30
25
20
15
10
5
0
0.00
100,000.00
H=
200,000.0
E INTERPOLACIN
JUL
AGO
SEP
OCT
NOV
DIC
### ###
### 782,658.05 546,385.48 ###
### ### 122,939.74 103,059.07 84,138.60 ###
480.19 ###
480.19
480.19
480.19 ###
ENE
FEB
MAR
ABR
###
###
###
###
###
### 160,328.01 193,005.87
### #
480.19
480.19
HvV
HvA
40
01342134x + 3.605097295
16212864
35
30
25
20
15
10
5
100,000.00
200,000.00
300,000.00
0
0.00
2,000,000.00
4,000,000.00
0.359
0.000134 A +
3.605097
H = 0.1437 V
6,000,000
00,000.00
MAY
###
183,430.54
480.19
6,000,000.00
ESTACIN
ALTURA
VILLAMONTES *
CAMPANARIO
CENAVIT
CHOCLOCA
COIMATA
EL TEJAR
EMBALSE SAN JACINTO
ENTRE ROS [EL PAJONAL]
JUNTAS
SAN ANDRS
SAN JACINTO SUD
SELLA QDAS.
TRANCAS
TURUMAYO
340 m.s.n.m.
3,460 m.s.n.m.
1,730 m.s.n.m.
1,795 m.s.n.m.
2,027 m.s.n.m.
1,859 m.s.n.m.
1,800 m.s.n.m.
1,260 m.s.n.m.
1,882 m.s.n.m.
1,987 m.s.n.m.
1,820 m.s.n.m.
2,145 m.s.n.m.
2,198 m.s.n.m.
1,978 m.s.n.m.
5.23
4.66
5.70
5.06
4.04
4.43
5.09
5.01
7.73
4.06
4.98
4.31
4.52
3.88
5.01
4.46
5.51
4.80
4.17
4.33
4.91
4.58
6.70
3.98
5.15
4.04
4.79
3.37
4.74
4.26
5.04
4.37
3.90
3.95
4.08
4.73
6.43
3.30
4.71
3.75
3.85
2.99
3.47
4.69
4.55
3.46
3.30
3.43
4.41
3.37
7.90
2.87
4.43
3.73
3.87
2.56
JUN.
JUL.
AGO. SEP.
OCT. NOV.
DIC.
ANUAL
4.22
5.90
4.94
4.13
3.78
3.98
4.98
4.18
12.59
4.11
5.03
4.29
4.58
3.30
6.27
6.07
6.41
5.76
4.85
5.35
6.44
5.32
11.73
4.56
6.91
4.92
5.23
4.14
5.84
5.55
6.22
5.29
4.88
4.79
5.51
5.08
8.98
4.17
5.83
4.57
4.81
3.95
4.52
5.30
5.18
4.34
3.88
4.06
4.89
4.21
9.58
3.69
5.08
4.23
4.54
3.28
5.14
6.12
6.10
4.91
4.34
4.76
5.90
4.87
12.37
4.56
6.04
4.48
5.17
3.95
5.66
6.04
6.40
5.21
4.75
5.06
5.75
5.19
9.78
4.54
6.28
4.53
5.39
4.61