Está en la página 1de 12

6.

00 M

3.00 M

CANTIDAD DE TABIQUE
0.07 M
0.14 M
HILADA 01
20 2/3
HILADA 02
20 1/3
TOTAL
37.50
TOTAL
769 3/7
CANTIDAD DE MEZCLA
PROP.
1:3
HILADA 01
20.00
HILADA 02
21.00
HORIZONTAL
38.00

CANTIDAD DE MATERIALES
UNIDAD
ARENA
M3
CEMENTO
TON
AGUA
M3
TIEMPO POR ACARREO
0.07 M
0.14 M

D DE TABIQUE
0.28 M
TABIQUES
TABIQUES
HILADAS
TABIQUES

D DE MEZCLA

TIEMPO DE EJECUCION
COLOCACION C/TABIQUE
00:00:20
REVISION C/3 HILADAS
00:15:00
MEZCLA POR C/BULTO
00:30:00
ACARREO C/MILLAR
02:51:30

CEMENTO-ARENA
0.01 M ESPESOR
0.00196 M3
0.00206 M3
0.31920 M3
0.39454 M3

JUNTAS
JUNTAS
LINEAS
TOTAL

DE MATERIALES
COSTO
$225.00
$1,420.00
$18.00

POR ACARREO
0.28 M

RENDIMIENTO / JORNAL
18.00 M2
12.20 M2

1:3

1:4
1:5
CANTIDAD
CANTIDAD / M3 / MORTERO
EN MURO
1.15000
1.20000
1.22000
0.45372
0.52800
0.40000
0.36000
0.20832
0.30000
0.30000
0.30000
0.11836
M3/PZA
0.00274

PZA/M3
364.43

M3/CARRET
0.16

1000.00
58.31
17.15
00:10:00
02:51:30

SUMA
SUMA
SUMA
SUMA
TOTAL

04:16:29
03:15:00
02:04:59
02:11:57
11:48:26

RENDIMIENTO / JORNAL
11:48:26
8:00:00

23.88 BOTES
4.16632 BULTOS
6.23 BOTES
MILLAR
PZA/CARRET
CARRET
C/ACARREO
C/MILLAR

3.80

3.80 M
x

4.00

COSTOS Y PRESUPUESTOS
EJERCICIO 0001
ALB-001

MURO DE 14 CM DE ESPESOR, DE TABIQUE DE CERAMICA SANTA JULIA, DOS CAR


ROJO, PERFORADO VERTICAL 10x10x20 CM, ASENTADO CON MEZCLA CEMENTO
PROPORCION 1:4 EN JUNTA DE 1 CM DE ESPESOR, CON CASTILLOS AHOGADOS @
CONCRETO F'C=150 KG/CM2, UNA VARILLA DEL NO.3 ACABADO APARENTE, INCL
MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

Cdigo
MAT-001
MAT-002
MAT-003
MAT-004
BAS-001
BAS-002
CUAD-001
EQU-001
%MO-001
%MO-002

Descripcin
TABIQUE DE CERAMICA SANTA JULIA
REFUERZO HORIZONTAL PARA MURO
VARILLA DEL NO.3
ALAMBRE RECOCIDO NO.18
MORTERO CEMENTO ARENA 1:4
CONCRETO F'C=150KG/CM2
OFICIAL ALBAIL + PEON
ANDAMIOS
HERRAMIENTA MENOR
EQUIPO DE SEGURIDAD

Tipo
1
1
1
1
4
4
2
3
3
3

Unidad
PZA
M3
KG
KG
M3
M3
JOR
%
%
%

COSTO DIRECTO

1.55 M

CANTIDAD DE TABIQUE
0.10 M
0.14 M
HILADA 01
18 5/7
HILADA 02
18 2/7
TOTAL
15.00
TOTAL
277 3/5
CANTIDAD DE MEZCLA
PROP.
1:3
HILADA 01
18.00
HILADA 02
19.00
HORIZONTAL
16.00

CANTIDAD DE MATERIALES
UNIDAD
ARENA
M3
CEMENTO
TON
AGUA
M3
TIEMPO POR ACARREO
0.10 M
0.14 M

SANTA JULIA, DOS CARAS, COLOR


ON MEZCLA CEMENTO ARENA
STILLOS AHOGADOS @90 CM DE
BADO APARENTE, INCLUYE

5.89 M2

Costo
Cantidad
Importe
$18.52
306.28
$5,672.31
$5.00
0.00000
$0.00
$10.51
0.00000
$0.00
$15.00
0.00000
$0.00
$956.92
0.17670
$169.09
$999.05
0.00000
$0.00
$837.32
41.23000
$20.31
$119.62
0.00000
$0.00
$119.62
0.17670
$21.14
$119.62
0.00000
$0.00

ALB-001

MURO DE 14 CM DE ESPES
PERFORADO VERTICAL 10x
1:4 EN JUNTA DE 1 CM DE
F'C=150 KG/CM2, UNA VAR
OBRA, EQUIPO Y HERRAMIE

Cdigo
MAT-001
MAT-002
MAT-003
MAT-004
BAS-001
BAS-002
CUAD-001
EQU-001
%MO-001
%MO-002

Descripcin
TABIQUE DE CERAMICA SA
REFUERZO HORIZONTAL PA
VARILLA DEL NO.3
ALAMBRE RECOCIDO NO.1
MORTERO CEMENTO AREN
CONCRETO F'C=150KG/CM
OFICIAL ALBAIL + PEON
ANDAMIOS
HERRAMIENTA MENOR
EQUIPO DE SEGURIDAD

$5,882.8

COSTO DIRECTO

D DE TABIQUE
0.20 M
TABIQUES
TABIQUES
HILADAS
TABIQUES

D DE MEZCLA

TIEMPO DE EJECUCION
COLOCACION C/TABIQUE
00:00:20
REVISION C/3 HILADAS
00:30:00
MEZCLA POR C/BULTO
00:30:00
ACARREO C/MILLAR
02:42:06

CEMENTO-ARENA
0.01 M ESPESOR
0.00199 M3
0.00210 M3
0.07065 M3
0.10129 M3

JUNTAS
JUNTAS
LINEAS
TOTAL

DE MATERIALES
COSTO
$225.00
$1,420.00
$18.00

POR ACARREO
0.20 M

RENDIMIENTO / JORNAL
5.89 M2
8.09 M2

1:3

1:4
1:5
CANTIDAD
CANTIDAD / M3 / MORTERO
EN MURO
1.15000
1.20000
1.22000
0.11649
0.52800
0.40000
0.36000
0.05348
0.30000
0.30000
0.30000
0.03039
M3/PZA
0.00259

PZA/M3
385.58

M3/CARRET
0.16

1000.00
61.69
16.21
00:10:00
02:42:06

O DE 14 CM DE ESPESOR, DE TABIQUE DE CERAMICA SANTA JULIA, DOS CARAS, COLOR ROJO,


FORADO VERTICAL 10x10x20 CM, ASENTADO CON MEZCLA CEMENTO ARENA PROPORCION
EN JUNTA DE 1 CM DE ESPESOR, CON CASTILLOS AHOGADOS @90 CM DE CONCRETO
150 KG/CM2, UNA VARILLA DEL NO.3 ACABADO APARENTE, INCLUYE MATERIALES, MANO DE
A, EQUIPO Y HERRAMIENTA.

cripcin
QUE DE CERAMICA SANTA JULIA
UERZO HORIZONTAL PARA MURO
LLA DEL NO.3
MBRE RECOCIDO NO.18
TERO CEMENTO ARENA 1:4
CRETO F'C=150KG/CM2
IAL ALBAIL + PEON

RAMIENTA MENOR
IPO DE SEGURIDAD

Tipo
1
1
1
1
4
4
2
3
3
3

Unidad
PZA
M3
KG
KG
M3
M3
JOR
%
%
%

Costo
$18.52
$5.00
$10.51
$15.00
$956.92
$999.05
$837.32
$119.62
$119.62
$119.62

TO DIRECTO

SUMA
SUMA
SUMA
SUMA
TOTAL

01:32:32
03:00:00 C/REFUERZO
00:32:05
00:45:00
05:49:37

RENDIMIENTO / JORNAL
5:49:37
8:00:00

6.13 BOTES
1.06965 BULTOS
1.60 BOTES
MILLAR
PZA/CARRET
CARRET
C/ACARREO
C/MILLAR

CARAS, COLOR ROJO,


RENA PROPORCION
E CONCRETO
TERIALES, MANO DE

1.00 M2

Cantidad
Importe
52.00000
$963.04
0.00000
$0.00
0.00000
$0.00
0.00000
$0.00
0.03000
$28.71
0.00000
$0.00
7.00000
$119.62
0.00000
$0.00
0.03000
$3.59
0.00000
$0.00

3.33333
0.474
0.0135

0.05

$1,115.0