POZO: CWZ-6
LOCALIZACION: CWZ-6
EQUIPO: HP-135
20 "
AGUAGEL
9.20
1000
II.- REVESTIDOR
GRADO
DIAMETRO
PESO
(PULG)
(lbs/pie)
20
94
K-55
CUELLO
INTERVALO
LONG.
DESDE
HASTA
(pie)
B-OMEGA
1002
1002
COLAPSO
ESTALLIDO
TENSION
TORQUE
(LPC)
(LPC)
(Lbsx1000)
(Lbf-Pie)
520
2110
1480
Base Triangulo
DIAMETRO
PESO
(PULG)
Lbs/Pie)
20
94
K-55
IV.- CAPACIDADES
DESCRIP.
DIAMETRO
PESO
DI
CAPACIDAD
(PULG)
(lbs/pie)
(PULG)
(BLs/Pie)
19.5
4.276
0.01776
94
19.124
0.35528
Dp's
REV.
20
INCADO
30
29
0.81698
HOYO
26
26
0.65669
REV-HOYO
20
26
0.26812
Dp's - REV
20
0.33100
REV.-INCADO
20
30
0.42840
V4
V3
Tope lechada
Principal
long. 148
V3
V1=
V2=
V3=
V4=
V5=
VT=
V2
long. 717.51
Tope Zapata
Tope Interno Zapata
Base Zapata
PT.
1000
1001
1002
1004
Vdespla=
V1
1.31
192.38
36.60
63.40
293.69
DESPLAZAMIENTO
17.78
long. 2
LECHADA DE BARRIDO
LECHADA PRINCIPAL
100
194
SACOS
326
914
Bls
Bls
REND
1.720
1.190
PULG
%
PIE
long. 136.49
284.49
V2
26.00
1.0
0.0
HOYO (TEORICO) :
% DE EXCESO
TOPE CEMENTO
148
VOLUMEN
60
100
194
15.78
2
TASA
4
3
3
2
2
BPM
BPM
BPM
BPM
BPM
TOTAL
TIEMPO DE OPERACIN:
TIEMPO DE ESPESAMIENTO LECHADA DE BARRIDO:
TIEMPO DE ESPESAMIENTO LECHADA DE ANCLAJE:
3 Hrs.
TIEMPO (MIN)
15.00
33.33
64.56
7.89
1
60
181.79
2 Min
5 Hrs, 40 Min
3 Hrs, 30 Min
BLS
BLS
BLS
BLS
BLS
BLS
BLS
V1 =
V2 =
CMT
long. 284.49
LODO
CMT
284.49
VT = V1+V2
Desplazamiento Metalico DP'S
Volumen del Revestidor
V1
CMT
VT=
17.78
331.66
349.44
Bls
Bls
Bls
Vdespl.Metal.=
6.53
Bls
VRevest.=
355.64
Bls
583.56
479.36
104.21
178.93
63.57
292.07
Psi
Psi
Psi
Pie
Bls
Bls
CMT
long. 719.51
V2
V2
1000
1001
1002
1004
long. 2
IX.- FLOTABILIDAD:
DENSIDAD LODO (LBS/GAL)
9.2
1002
20
19.124
15.6
13.5
94.0
F1 = F Cemento = PH cemento x A =
F2 = PH Lodo x A
Revest idor x Ff) =
246,106.09 Lbs
FLOTA
CON LA DENSIDAD DE 9,2 LBS/GAL EL REVESTIDOR
FLOTA
+ (Peso
231,879.54 Lbs
10.151
Lbs/Gal
246,106.09
246,106.09
0.00
Lbs
Lbs
Lbs
NOTA: SE RECOMIENDA UTILIZAR UNA DENSIDAD PARA EVITAR QUE EL REV. FLOTE.
Densidad (Lbs/Gal) =
F1 (Fuerza Hacia Arriba) =
F2 (Fuerza Hacia Abajo) =
Diferencia de Fuerza =
11.2
Lbs/Gal
246,106.09
261,812.48
15,706.39
Lbs
Lbs
Lbs
NO FLOTA
PHLodo A=
PHLodo Rev.=
PH=
H PH =
Vsin Llenar dentroRev. =
V a Llenar dentro Rev. =
V a Llenar dentro Rev.Dp's y Dp's =
57.04
Bls
172.32
Bls
53.98
Bls
Cantidad
--1
1
1
1
10
1
1
---
Descripcin
Bolsillo
Zapata
STINGER P/ZAPATA 20"
PUP JOINT DE 5"
CROSS OVER
PAREJAS DE DP'S DE 5 1/2" H/PAREJA #10
Long.
2
1.5
1
15.00
4.25
944.59
31.21
25.00
4.55
La zapata mide 2,5' en la parte exterior y por dentro mide 1,5' se toma este valor para el espaciamiento (es d
el stinger se mete 1' dentro de la zapata de 20").
Desde
1020
1018
1016.5
1015.5
1000.5
996.25
51.66
20.45
4.55
Hasta
1018
1016.5
1015.5
1000.5
996.25
51.66
20.45
-4.55
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
POZO:
CDS-2
LOCALIZACIN:
CDS-2
EQUIPO:
MAE-42
INFORMACIN GENERAL
REVESTIDOR (Pulg):
TIPO DE FLUIDO:
DENSIDAD DEL FLUIDO (Lpg):
PROFUNDIDAD TOTAL (Pies):
HOYO (Pulg):
13.375
13-3/8"
CBM
8.8
4000
17.5
17-1/2"
REVESTIDOR
Dimetro (pulg)
Peso (lbs/pie)
Grado
Cuello
13.375
68
J-55
INTERVALO
BTC
Desde
0
Hasta
4000
Longitud (pie)
4000
Dimetro (pulg)
Peso (lbs/pie)
Grado
Colapso (lpc)
Estallido (lpc)
Tensin (lbs
x 1000)
13.375
68
J-55
1950
3450
1069
Peso
94
DI
23.129
Capacidad
0.51967
68
68
94 X 68
12.415
17.500
12.415
12.415
0.14973
0.29750
0.12372
0.34589
Torque (lbs/pie)
6750
CAPACIDADES
Descripcin
Conductor
Revestidor
Revestidor
Hoyo
Anular Hoyo/Rev
Anular Rev. 30"/Rev. 13-3/8"
Dimetro (pulg)
30
13.375
17.500
17.500
23.129
13.375
13.375
PDVSA
GERENCIA DE CONSTRUCCIN Y MANTENIMIENTO DE POZOS
LAGO - VERTICAL
CEUTA - REA 2 SUR
VOLUMEN DE CEMENTO
Prof. (pies)
Hincado de 30"
200
V5
V5
long.
200
V4
V4
long.
2800
V3
V3
long.
997.0
3000
Tope lechada anclaje
3952.0
3953.5
3995.5
3997
3
4000
V1
% DE EXCESO
Hoyo terico
Tope cemento
V1=
V2=
V3=
V4=
V5=
VT=
Vdespla=
long.
V2
6.29
0.89
123.35
346.42
69.2
546.1
%
PULG
PIES
BLS
BLS
BLS
BLS
BLS
BLS
DESPLAZAMIENTO
592
BLS
3
0
3000.0
1.00
17.5
0
Rendim.
LECHADA DE BARRIDO
416.00
1046.5
2.23
LECHADA PRINCIPAL
131.00
621.1
1.18
PIES
PIES
PDVSA
GERENCIA DE CONSTRUCCIN Y MANTENIMIENTO DE POZOS
LAGO - VERTICAL
CEUTA - REA 2 SUR
7
TIEMPO DE OPERACIN
VOLUMEN
40
416.00
131.00
580
10
5
2
TOTAL
5 Hrs
5 Hrs, 30 Min
3 Hrs, 30 Min
TIEMPO DE OPERACIN:
TIEMPO DE ESPESAMIENTO LECHADA DE BARRIDO (REF):
TIEMPO DE ESPESAMIENTO LECHADA DE PRINCIPAL (REF):
TASA DE BOMBEO
4
BPM
4
BPM
4
BPM
BPM
BPM
TIEMPO (MIN)
10
104
33
5
116
5
60
332.7
30 Min
FLOTABILIDAD:
1000
13.375
12.415
8.8
3000
12.60
15.6
68.0
3997.0
3952.0
F1 = F Cemento = PH cemento x A =
390,142.34 Lbs
490,716.94 Lbs
DIFERENCIA DE FUERZAS
100,574.60
Lbs
NO FLOTA
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
9
DIAGRAMA DE PRESIONES
PRESION DEL YACIMIENTO (PSI)
PRESION DE FRACTURA (PSI)
PROFUNDIDAD DE LA PRESION (PIES)
GRADIENTE DE FORMACION:
GRADIENTE DE FRACTURA:
Prof. (pies)
0.310
0.830
PESO
V5
Hincado de 30"
1600
3270
3000
V5
long.
200
200
V4
V4
long.
PROF.
FLUIDO
Phid
Pyac
Pfract
ANULAR
DELTA P
Pfract - Ph
(LPG)
(PIES)
(PSI)
(PSI)
(PSI)
(PSI)
12.60
3,000
1966
930
2490
524
15.6
4,000
2777
1240
3320
543
2800
3000
Tope lechada anclaje
3952.0
3953.5
Tope Zapata
3995.5
Base zapata
Bolsillo
3997
3
PT
4000
V3
long.
997.0
long.
V3
V1
V2
10
Pmax=
516
LPC
11
Pmax=
932
LPC
12
Paset.=
1432
LPC
PDVSA
RACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
DELTA P
Ph - Py
(PSI)
1036
1537
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
6
CAPACIDADES
DE
Lpp
DI
Desde (pies)
Hasta (pies)
Long. (pies)
Revestidor
DESCRIPCION
9 5/8
53.50
8.535
11,000
11,000
Revestidor
9 5/8
53.50
8.535
11000
14,342
3,342
Revestidor Superficial
13 3/8
68.00
12.415
3,997
3,997
Hoyo terico:
12 1/4
12.250
3997
14,390
10,393
12 1/4 x 9 5/8
12 1/4 x 9 5/8
12,415" X 9 5/8"
0.000
-
3997
3997
3997
0
14,390
14,390
14390
3997
10,393
10,393
10,393
3,997
VOLUMEN DE CEMENTO
Prof. (pies)
DESCRIPCION
Volumen Integrado Hoyo
513.11
BLS
179.29
91.38
3,997
3,997
Pldora de lodo
6,180
Lav. B. Aceite
7973
Lav. B. Agua
8,869
Espaciador
9,766
T. Barrido
11,200
long.
7,203
EXCESO:
1.30
HOYO TEORICO
12 1/4
V1 =
3.08
Bls
V2 =
V3 =
V4 =
0.57
100.58
130.52
Bls
Bls
Bls
V1=
V2 =
V3 =
V4 =
V barrido=
V principal=
V TOTAL=
131.00
104.00
235.00
V llenado=
V principal=
V TOTAL=
-162.00
-122.00
-284.00
T. Principal
V4
Tope Zapata
Base Zapata
1,342
50.00
50.00
80.00
131.00
104.00
14,342.0
14,343.5
V1
V1
14,385.5
14,387
11,200
13,000
long.
1.5
long.
42.0
DESPLAZAMIENTO
Vol. Rev.9 5/8", 53,5 Lbs/Pie
778.4
Bls
long.
1.5
236.5
Bls
long.
1015.00
Bls
Desplaz. Total
14,390
NUMERO DE SACOS DE CEMENTO
Lechada de Barrido
Lechada Principal
long.
V3
V2
PT
1,800
100.00
13,000
V3
Tope Cuello Flotador
Base Cuello Flotador
long.
Pildora Dispersa
Sacos tericos
471.5
402.7
Sacos Caliper
0
0
Rendimiento Pcps
1.5600
1.4500
TIEMPO DE OPERACIN
ACTIVIDAD
Bombeando
Soltando
Bombeando
Bombeando
Bombeando
Soltando
CANT
100
1
50
50
80
1
DESCRIPCIN
Bls de pldora
Tapon Rojo # 1
Bls lavador base aceite
Bls lavador base agua
Bls de espaciador b.agua
Tapon Rojo # 2
Bombeando
131
Bombeando
Soltando
Desplazando
Desplazando
Desplazando
104
1
975
20
10
TASA DE BOMBEO
6
Bpm
6
6
6
Bpm
Bpm
Bpm
Bpm
26.20
Min
Bpm
10
5
2
Bpm
Bpm
Bpm
20.80
7.00
97.50
4.00
5.00
Min
Min
Min
Min
Min
60.00
281.2
Min
Min
Tiempo de Seguridad
TIEMPO DE OPERACIN:
TIEMPO DE OPERACIN
16.67
Min
7.00
Min
8.33
Min
8.33
Min
13.33
Min
7.00
Min
TOTAL
4 Hrs
41 Min
PDVSA
RACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
( Bpp )
0.070763
0.070763
0.149724
0.145771
0.000000
0.055780
(0.089991)
0.059733
DIAMETRO SEGN CALIPER
DIAMETRO (Pulg)
4.214
10.084
7.149
1.30
12 1/4
Bls
Bls
Bls
Bls
Bls
Bls
Leyenda del Grfico
Bls
Bls
Bls
Bls
Bls
Bls
Pies
Pies
PDVSA
GERENCIA DE CONSTRUCCIN Y MANTENIMIENTO DE POZOS
LAGO - VERTICAL
CEUTA - REA 2 SUR
POZO:
CDS-2
LOCALIZACION:
CDS-2
EQUIPO:
MAE-42
INFORMACION GENERAL
9.625
100% ACEITE
REVESTIDOR (Pulg):
TIPO DE LODO:
14390
PESO
(lbs/pie)
53.5
53.5
GRADO
CUELLO
P-110
HC-110
BTC
BTC
PESO
(lbs/pie)
53 1/2
53 1/2
GRADO
P-110
HC-110
COLAPSO
(LPC)
7950
11160
INTERVALO
DESDE
HASTA
0
11000
11000
14390
LONG.
(pie)
11000
3390
12.70
REVESTIDOR
DIAMETRO
(PULG)
9 5/8
9 5/8
ESTALLIDO
(LPC)
10900
10900
TENSION
(lbsx1000)
1710
1710
TORQUE
(lbf-pie)
10620*
14220*
RESISTENCIAS
A.- Al Colapso:
Fs = 1,0
Fc =
1.16
B.- Al Estallido.
Fs = 1.1
Fe =
1.15
Fs = 1.6
Ft =
2.76
FLOTABILIDAD
DENSIDAD LODO (LBS/GAL)
PROFUNDIDAD DEL CUELLO (PIE):
LONGITUD REVEST. 53,5 LBS/PIE (PIE)
12.7
14342
11000
3387
9 5/8
8.535
53.5
53.5
15.6
16.2
13.40
7.2
8.34
13
1800
1390
1793
896
896
1,434
6180
DIFERENCIA DE FUERZAS
702,541.82
Lbs
1,311,598.98
Lbs
609,057.16
Lbs
EL REVESTIDOR
NO FLOTA
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
10
DIAGRAMA DE PRESIONES
PRESION DEL YACIMIENTO (PSI)
9500
15000
14390
GRADIENTE DE FORMACION:
0.660
GRADIENTE DE FRACTURA:
1.042
PESO
Prof. (pies)
Pyac
Pfract
DELTA P
DELTA P
Pfract - Ph
Ph - Py
(LPG)
(PIES)
PROF.
(PSI)
(PSI)
(PSI)
(PSI)
(PSI)
13.4
7973
5556
5264
8311
2755
292
FLUIDO
long.
3,997
long.
7,203
Phid
ANULAR
3,997
Pldora de lodo
6,180
Lav. B. Aceite
7973
Lav. B. Agua
8,869
7.2
8,869
5891
5855
9245
3354
36
Espaciador
9,766
8.34
9,766
6280
6447
10180
3900
-167
13.0
11,200
7249
7394
11675
4425
-145
T. Barrido
11,200
15.6
13,000
8710
8582
13551
4841
127
16.2
14,387
9878
9498
14997
5119
380
V4
V4
long.
T. Principal
13,000
long.
V3
14,342.0
14,343.5
Tope Zapata
14,385.5
Base Zapata
14,387
1,342
V3
V1
V1
V2
PT
1,800
long.
1.5
long.
42.0
long.
1.5
long.
14,390
11
Pmax=
4863
LPC
12
Pmax=
369
LPC
13
Paset.=
869
LPC
PDVSA
ERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
CAPACIDADES
DESCRIPCION
DE
Liner
DI
Desde
Hasta (pies)
Long. (pies)
Cap.(Bpp)
6.004
13887
15337
1450
0.035017
13887
13887
0.017761
Drill pipe
19.50
4.276
Drill pipe
3 1/2
13.30
2.764
0.007421
Rev. Intermedio
9 5/8
53.50
8.535
11000
11000
0.070763
Rev. intermedio
9 5/8
53.50
8.535
11000
14387
3387
0.070763
Hoyo terico
8 1/2
8.500
14387
15340
953
0.070184
0.000
14387
15340
953
0.000000
13887
13887
0.046478
13887
14387
500
14387
15337
950
0.022585
0.000
14387
15337
950
(0.047599)
Lpp
35.00
9 5/8 x 5
9 5/8 x 7
8 1/2 x 7
8 1/2 x 7
VOLUMEN DE CEMENTO
Prof. (pies)
DESCRIPCION
Pies^3
BLS
DIAMETRO (Pulg)
1006.72
179.29
13.916
513.11
91.38
12.154
3,997
Pldora de lodo
10,029.3
Lav. B. Aceite
11,105.1
EXCESO:
Lav. B. Agua
long.
13,887.0
11,965.7
Cemento
13,687.0
8 1/2
V1 =
1.47
Bls
V5 =
11.58
Bls
V2 =
1.47
Bls
V6 =
14.15
Bls
V3 =
0.21
Bls
V4 =
21.46
Bls
50.00
Bls
V TOTAL =
V6
V6
HOYO SEGN CLIPER
Colgador 7"
13,887.0
V5
V5
V1 =
1.47
Bls
V5 =
11.6
Bls
V2 =
1.47
Bls
V6 =
14.2
Bls
V3 =
0.0
Bls
V4 =
-45.22
Bls
-17.00
Bls
50.0
Bls
40.0
Bls
0.0
Bls
80.0
Bls
Lechada de Anclaje
50.00
Bls
V TOTAL =
Rev. 9 5/8"
13.035
1.00
HOYO TEORICO:
11,965.7
Espaciador
0.023164
14,387.0
long.
1,361.5
15,248.5
15,250.0
V4
V4
long.
V1
15,292.0
15,293.5
15,335.5
15,337.0
long.
V2
long.
1.5
long.
42.0
long.
1.5
long.
13687 Pies
DESPLAZAMIENTO
3.0
15,340.0
0.0
Bls
246.7
Bls
47.7
Bls
294.00
Bls
Desplaz. Total
SACOS DE CEMENTO
Sacos Tericos
Sacos Cliper
Rendimiento Pcps
195.00
1.440
Lechada nica
42.0
V3
TD
1.5
TIEMPO DE OPERACION.
ACTIVIDAD
CANT
DESCRIPCIN
TASA DE BOMBEO
TIEMPO DE OPERACIN
Bombeando
50
Bpm
10.00
Min
Bombeando
40
Bpm
8.00
Min
Bombeando
Bpm
0.00
Min
Bombeando
80
Bls de espaciador
Bpm
16.00
Min
Bombeando
50
Bpm
10.00
Min
Soltando
10.00
Min
Desplazando
235
Bls de Lodo
Bpm
46.93
Min
Desplazando
10
Bpm
5.00
Min
Desplazando
38
Bls de Lodo
Bpm
7.54
Min
Desplazando
10
Bpm
5.00
Min
Sacando
Parejas
Min / Pareja
16.00
Min
Sacando
12
Parejas
Min / Pareja
24.00
Min
Tiempo de Seguridad
60.00
Total
TIEMPO DE OPERACIN:
TIEMPO DE ESPESAMIENTO LECHADA UNICA:
Min
218.47
3 Hrs
5 Hrs, 00 Min (REF)
38 Min
Min
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
POZO:
CDS-2
LOCALIZACION:
CDS-2
EQUIPO:
MAE-42
INFORMACION GENERAL
REVESTIDOR (Pulg):
7
ACEITE
TIPO DE LODO:
13.00
15340
REVESTIDOR
PESO
(PULG)
(lbs/pie)
CUELLO
INTERVALO
LONG.
DESDE
HASTA
(pie)
15,337
1,450
35
P-110
HYD-513
13,887
DIAMETRO
PESO
GRADO
COLAPSO
ESTALLIDO
TENSION
TORQUE
(PULG)
(lbs/pie)
(LPC)
(LPC)
(lbsx1000)
(lbf-pie)
P-110
13030
13700
1119
14100
7
4
GRADO
DIAMETRO
35
RESISTENCIAS
A.- Al Colapso:
Fs = 1,0
Fc =
1.24
B.- Al Estallido.
Fs = 1.1
Fe =
1.33
Fs = 1.6
Ft =
27.51
FLOTABILIDAD
DENSIDAD LODO (LBS/GAL)
PROFUNDIDAD DEL LANDING COLLAR (PIE)
LONGITUD LINER 35 LBS/PIE (PIE)
DIAMETRO EXTERNO LINER (PULG)
DIAMETRO INTERNO LINER (PULG)
PESO LINER (LBS/PIE)
DENSIDAD LECAHDA PRINCIPAL (LBS/GAL)
DENSIDAD PILDORA DE LODO (LBS/GAL)
DENSIDAD LAVADOR BASE ACEITE (LBS/GAL)
DENSIDAD LAVADOR BASE AGUA (LBS/GAL)
DENSIDAD ESPACIADOR (LBS/GAL)
LONGITUD LECHADA PRINCIPAL (PIES)
LONGITUD LAVADOR BASE ACEITE (PIES)
LONGITUD LAVADOR BASE AGUA (PIES)
13.0
15,248.5
1,450.0
7
6.004
35.0
16
13.00
7.2
15.00
1,650
861
0
1,721
10,029
377,819.82 Lbs
DIFERENCIA DE FUERZAS
52,366.62
Lbs
NO FLOTA
10
DIAGRAMA DE PRESIONES
PRESION DEL YACIMIENTO (PSI)
9400
16000
0.615
GRADIENTE DE FRACTURA:
1.047
15284
PESO
Prof. (pies)
(LPG)
Rev. 13 3/8"
PROF.
FLUIDO
Phid
Pyac
Pfract
(PSI)
(PSI)
ANULAR
(PIES)
(PSI)
DELTA P
DELTA P
Pfract - Ph
Ph - Py
(PSI)
(PSI)
3,997
Pldora de lodo
10,029.3
Lav. B. Aceite
11,105.1
13.0
11105.1
7507
6830
11625
4118
677
Lav. B. Agua
11,965.7
7.2
11,966
7829
7359
12526
4697
470
Espaciador
11,965.7
0.0
11,966
7829
7359
12526
4697
470
Cemento
13,687.0
15.0
13,687
9172
8418
14328
5156
754
16.0
13,887
9338
8541
14538
5199
797
16.0
15,337
10545
9433
16055
5511
1112
long.
V6
Colgador 7"
V6
13,887.0
V5
Rev. 9 5/8"
13,887.0
V5
14,387.0
15,248.5
15,250.0
V4
15,292.0
15,293.5
V2
15,335.5
15,337.0
TD
15,340.0
1,361.5
long.
1.5
long.
42.0
V4
V1
long.
V3
long.
1.5
long.
42.0
long.
1.5
long.
3.0
11
Pmax=
5235
LPC
12
Pmax=
163
LPC
13
Paset.=
663
LPC
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
CAPACIDADES
DI
Desde (pies)
Long. (pies)
Cap.(Bpp)
23.000
150
150
0.513871
Rev. Superficie
DESCRIPCION
13 3/8
DE
68.00
12.415
3997
3997
0.149724
Rev intermedio
9 5/8
47.00
8.681
9500
9500
0.073204
Rev intermedio
9 5/8
53.50
8.535
9500
13887
4387
0.070763
Liner 1
35.00
6.004
13887
15037
1150
0.035017
Liner 2
4 1/2
15.10
3.826
15037
16000
963
0.014220
Drill pipe
19.50
4.276
12732
12732
0.017761
Drill pipe
3 1/2
13.30
2.764
12732
15037
2305
0.007421
Hoyo terico
5 7/8
5.875
15337
16000
663
0.033528
0.000
15337
16000
663
0.000000
9500
9500
0.048919
9500
12732
-3232
0.046478
12732
13887
1155
0.058863
13887
15037
1150
15337
16000
663
15037
15337
300
0.015346
15337
16000
663
(0.019671)
Conductor
Lpp
24
9 5/8 x 5
9 5/8 x 5
3,340.5
155.3
-105.257513024
-1,788.2
9 5/8 x 3 1/2
7 x 3 1/2
7 x 4 1/2
7 x 4 1/2
7 x 4 1/2
0.000
VOLUMEN DE CEMENTO
Prof. (pies)
Rev. 13 3/8"
3,997
DESCRIPCION
Volumen Integrado Hoyo
Volumen Integrado Anular - Liner
DP 5"
Pldora de lodo
long.
Lav. B. Aceite
10,943.8
Colgador 7"
13,887.0
-38.0
-8.0384768947
-347.7
Rev. 9 5/8"
Lav. B. Agua
14,387.0
12,241.6
Espaciador
13,539.3
Cemento
14,837.0
DP 3-1/2"
DP 3-1/2"
long.
long.
0.023117
0.013858
DIAMETRO (Pulg)
16.685
12.733
14.709
12,732.0
V1 =
V2 =
V3 =
V4 =
EXCESO:
HOYO TEORICO:
0.60 Bls
0.60 Bls
0.1 Bls
9.15 Bls
V1 =
V2 =
9,391.5
-646.2
Hasta (pies)
1,155.0
1,150.0
V3 =
0.0 Bls
V4 =
-12.98 Bls
1.00
5 7/8
4.6 Bls
4.6 Bls
V5 =
V6 =
V TOTAL =
20.00 Bls
V5 =
V6 =
0
4.6 Bls
7.0 Bls
V TOTAL =
0.00 Bls
1,297.7
V6
V6
V5
V5
15,037.0
15,337.0
long.
871.5
Pldora de Terpeno
50.0
Bls
30.0
Bls
30.0
Bls
30.0
20.00
Bls
Bls
871.5
V4
110.5
15,908.5
15,910.0
15,952.0
15,953.5
15,995.5
15,997.0
TD
16,000.0
V4
V1
V2
V3
SACOS DE CEMENTO
TIEMPO DE OPERACION.
ACTIVIDAD
Bombeando
CANT
1.5
long.
42.0
long.
1.5
long.
42.0
long.
1.5
long.
3.0
Desplaz. Total
Sacos Tericos
Sacos Cliper
Lechada nica
78.00
DESCRIPCIN
TASA DE BOMBEO
10
Bpm
30
Bpm
Bombeando
30
Bpm
Bombeando
30
Bpm
Soltando
Bombeando
Soltando
Desplazando
Desplazando
Desplazando
Desplazando
Sacando
Sacando
Tiempo de Seguridad
1
20
1
233
10
2
10
4
12
Tapn inferior
Bls de lechada de anclaje
Bpm
Tapn superior
Bls de Lodo
Bls de Lodo
Bls de Lodo
Bls de Lodo
Parejas
Parejas
TIEMPO DE OPERACIN:
TIEMPO DE ESPESAMIENTO LECHADA UNICA:
5
2
5
2
4
2
14837 Pies
DESPLAZAMIENTO
Vol. DP's 5"
226.1
Vol. DP's 3-1/2"
17.1
Vol. Liner 7"
12.4
Bombeando
Soltando
50
long.
Bpm
Bpm
Bpm
Bpm
Min / Pareja
Min / Pareja
Total
3 Hrs
5 Hrs, 00 Min
3.418781614
Rendimiento Pcps
1.44
TIEMPO DE OPERACIN
5.00
Min
7.00
Min
6.00
Min
6.00
Min
6.00
Min
7.00
Min
4.00
Min
7.00
Min
46.65
5.00
0.48
5.00
16.00
24.00
60.00
205.13
22 Min
256.00
Min
Min
Min
Min
Min
Min
Min
Min
Bls
Bls
Bls
Bls
PDVSA
GERENCIA DE OPERACIN Y MANTENIMIENTO DE TALADROS
LAGO - VERTICAL
CEUTA - REA 2 SUR
POZO:
VLG-3912
LOCALIZACION:
CJR-2
EQUIPO:
GP-23
INFORMACION GENERAL
REVESTIDOR (Pulg):
4 1/2
ACEITE
TIPO DE LODO:
16000
PESO
(lbs/pie)
15.1
GRADO
CUELLO
P-110
HYD-513
PESO
(lbs/pie)
15 1/10
GRADO
COLAPSO
(LPC)
14340
INTERVALO
DESDE
HASTA
15,037
15,997
LONG.
(pie)
960
14.40
REVESTIDOR
DIAMETRO
(PULG)
4 1/2
P-110
ESTALLIDO
(LPC)
14420
TENSION
(lbsx1000)
405
TORQUE
(lbf-pie)
6200
FLOTABILIDAD
14.4
15,908.5
960.0
4 1/2
3.826
15.1
16.2
14.40
7.4
8.4
15.4
1,160
3,443
1,298
1,298
9,392
174,002.53 Lbs
196,106.01 Lbs
22,103.48
Lbs
NO FLOTA