Está en la página 1de 2

CONTRATO No.: CONTRATISTA: CYFOIL CIA. LTDA.

PROYECTO: # OT/OS: OS 123895


REG. No.: 07B020-05-RGT-024-01-010 LOCACION: BLOQUE 7 - PAYAMINO
FECHA DE EMISIN: 8/7/2014
07:00-12:00 5h
13:00-18:00 5h
1.90%
SIGNIFICATIVO :
4.08% IMPORTANTE : STAND BY :
2.18% MENOR : HORAS PERDIDAS :
% PLANEADO
%
REAL
%
AVANCE REAL
DIARIO
%
AVANCE REAL
ACUMULADO ANTERIOR
1.90% 4.08% 4.08%
87.50% 21.00% 21.00% 0.00%
87.50% 21.00% 0.00% 21.00%
0.00% 71.10% 71.10% 0.00%
0.00% 56.25% 1.04% 55.21%
0.00% 87.88% 1.52% 86.36%
0.00% 3.02% 3.02% 0.00%
0.00% 61.13% 5.26% 55.88%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%




Predoblado de tubera
Balizado demarcarcatorio del eje de la tubera
Desfile o regado de tubera
Prueba OTDR
Predoblado de tubera
Topografa del eje de la tubera
ACTIVIDADES DIARIAS DESCRIPCION DE ACTIVIDADES
ACTIVIDADES PROGRAMADAS
C CONSTRUCCION: DUCTO DE TRANSFERENCIA DE 8 DE 800
METROS, DESDE ESTACIN PAYAMINO HACIA DUCTO DE 12 GACELA
- EST. COCA.
1 Desfile o Regado de tubera
11 Conexionado de lingadas de tubera soldada (Tie-ins)
D CONSTRUCCION, SOLDADURA, MONTAJE Y PINTURA DE
INTERCONEXIN DE 6"
3 Instalacin de elementos bridados ANSI 300# tales como vlvulas, filtros,
equipos de medicin, filtros en Y, de dimetros mayores a 4 pulgadas y de
hasta 12 pulgadas de dimetro nominal
4 Soldadura de juntas de campo para tubera de acero al carbono A-106,
Grado B, de acuerdo a normas ASME B31.3 o similar.
5 Soportes tubera, incluye cimentacin y soportera
SISTEMA DE GESTION DE CALIDAD
REPORTE DIARIO DE OBRA (RDO)
05-RGT-024-01
SERVICIOS ESPECIALIZADOS PARA LA CONSTRUCCIN DE DUCTO DE
TRANSFERENCIA DE 8 DE 800 METROS, DESDE ESTACIN PAYAMINO HACIA
DUCTO DE 12 GACELA - EST. COCA BLOQUE 7 DE PAM EP
B CONSTRUCCIN DE DERECHO DE VA
FECHA DE EJECUCIN FECHA DE OTQ
10
CONDICIONES CLIMTICAS
FECHA DE INICIO 29-Jul-2014 NUBLADO
FECHA FINAL 30-Sep-2014 SOLEADO
FECHA REPORTE 7-Aug-2014 LLUVIOSO
PROGRESO GENERAL
TABLA DE PORCENTAJES DE AVANCE
PROGRAMADO
REPROGRAMADO
TIPO DE INCIDENTE EJECUTADO
DIFERENCIA
SERVICIOS ESPECIALIZADOS PARA LA CONSTRUCCIN DE DUCTO
DE TRANSFERENCIA DE 8 DE 800 METROS, DESDE ESTACIN
PAYAMINO HACIA DUCTO DE 12 GACELA - EST. COCA BLOQUE 7
DE PAM EP
A INGENIERA
1 Ingeniera: incluye validacin, planos de detalle, levantamiento AS BUILT de
la lnea de flujo.
2 Montaje e instalacin de spools prefabricados de tubera de acero al
carbono A-106, Grado B, de acuerdo a normas ASME B31.3 o similar.
1 Topografa y replanteo
2 Desbroce manual y mecnico
13 Limpieza de tubera, marraneado y prueba hidrosttica (Incluye costo de
contratacin de empresa verificadora)
12 Cruces de va y plataforma
8 Sandbalsting para anclaje de pintura y aplicacin de la segunda y tercera
capa de revestimiento epxico y poliuretano en tuberas de acero al carbono
1 Soldadura de Tubera de acero al carbono A-106, Grado B, de acuerdo a
normas ASME B31.3 o similar.
6 Prueba Hidrosttica de baja presin <= 3000 psi
7 Sandbalsting y aplicacin de primer en tuberas de acero al carbono
(inorgnico de zinc)
8 Zanjado
9 Bajado de tubera
10 Tapado (Incluye reconformacin)
N/A
2 Doblado de tubera
3 Soldadura de Tubera
4 Instalacin de scotch Kote 323 en juntas soldadas
5 Prueba de holiday
6 Reparacin del revestimiento externo
7 Instalacin de marcos H
CONTRATO No.: CONTRATISTA: CYFOIL CIA. LTDA.
PROYECTO: # OT/OS: OS 123895
REG. No.: 07B020-05-RGT-024-01-010 LOCACION: BLOQUE 7 - PAYAMINO
FECHA DE EMISIN: 8/7/2014
07:00-12:00 5h
13:00-18:00 5h
SISTEMA DE GESTION DE CALIDAD
REPORTE DIARIO DE OBRA (RDO)
05-RGT-024-01
SERVICIOS ESPECIALIZADOS PARA LA CONSTRUCCIN DE DUCTO DE
TRANSFERENCIA DE 8 DE 800 METROS, DESDE ESTACIN PAYAMINO HACIA
DUCTO DE 12 GACELA - EST. COCA BLOQUE 7 DE PAM EP
FECHA DE EJECUCIN FECHA DE OTQ
10
CONDICIONES CLIMTICAS
FECHA DE INICIO 29-Jul-2014 NUBLADO
FECHA FINAL 30-Sep-2014 SOLEADO
FECHA REPORTE 7-Aug-2014 LLUVIOSO
PROGRESO GENERAL
TABLA DE PORCENTAJES DE AVANCE
N/A
0.00% 1.95% 1.95% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 33.33% 0.00% 33.33%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
AYER (H) HOY (H) ACUMULADO (H) AYER (H) HOY (H) ACUMULADO(H)
1 90 10 100 1 100 10 110
1 90 10 100 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 1 40 10 50
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
2 180 20 200 0 0 0 0
2 180 20 200 0 0 0 0
0 0 0 0 0 0 0 0
1 90 10 100 0 0 0 0
0 0 0 0 1 20 10 30
0 0 0 0 0 0 0 0
1 90 10 100 0 0 0 0
1 90 10 100 1 40 10 50
1 40 10 50 0 0 0 0
2 80 20 100 1 30 10 40
1 90 10 100 0 0 0 0
1 40 10 50 0 0 0 0
2 130 20 150 0 0 0 0
1 40 10 50 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
1 40 10 50 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
2 40 20 60
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
6 240 60 300
0 0 0 0
Total Personal 26 1550 260 1810 Total Equipo y Herramientas 5 230 50 280
Cargo: Cargo: Cargo: SUPERVISOR PAM EP
Fecha: Fecha: Fecha: 7-Aug-14
SUPERVISOR DE CONSTRUCCIONES
7-Aug-14
Instrumentista B
Ayudante de Instrumentacin
Guardia
Obreros
Mdico
Nombre: LUIS CRDENAS/FERNANDO COELLO
Elctrico A
Elctrico B
Doblador
Cadenero
Bodeguero-Adm
Operador
Chofer
Soldador ASME
Capataz
Fierrero
Carpintero
Albail
Ayudante Civil
OBSERVACIONES C&F OBSERVACIONES FISCALIZACIN
REPORTE PROGRAMADO & EJECUTADO REPORTE FOTOGRAFICO
Ayudante Equipo Pesado
Soldador API
Supervisor QA/QC Mecnico
Supervisor QA/QC Elctrico
Supervisor QA/QC Instrumentacin
Supervisor HES (SSA)
Paramdico
Topgrafo
Concretera
Volqueta
Motosoldadora a diesel
Martillo de Pilotaje
Control de Proyectos
Asistente de Control de Proyectos
Control de Documentos
Supervisor Civil
Supervisor Mecnico
Camion Gra
Supervisor Elctrico
Ingeniero de Diseo
Supervisor QA/QC Civil
Rodillo Compactador
Tanquero de agua
Equipo de oxicorte
Cama alta de 2 ejes
Cama baja de 3 ejes
Camin con equipo de suelda
Bomba de agua
Nivel automtico
Gra de castillo
Estacin Total
Retroexcavadora
PERSONAL EQUIPOS
DESCRIPCIN
3 Ingreso de cable de fibra ptica hacia cuarto del operador incluye
instalacin de bandejas y soportes
Superintendente
7 Empalmes (splices) de cable fibra ptica (24 fibras)
Camin Grua 5 ton.
Vibroapisonador
Vibrador manual de Plancha
Camioneta 4X4
DESCRIPCIN
Excavadora
Buseta
Bus
Tractor
E INSTALACION DE CABLE DE FIBRA OPTICA DESDE ESTACION
PAYAMINO HACIA DDV GACELA - COCA
1 Instalacin de SPC: (incluye ingeniera, procura de materiales, sealtica y
comisionado y puesta en marcha).
1 Construccin de cajas de hormign armado (fc= 210 Kg/cm2), incluye tapa
metlica
5 Instalacin de fibra ptica en biducto (dos corridas)
6 Instalacin de PVC de 4" para proteccin de biducto en cruces especiales,
plataformas, pantanos y esteros (para cruces de va se instalar casing 3 1/2")
2 Instalacin de tubera de PVC de 4" en el area de plataforma (incluye cama
de arena)
4 Instalacin de biducto (incluye cama de arena en el rea de plataforma)
8 Instalacin de terminaciones de cable de fibra ptica en ODFs
9 Prueba OTDR bidireccional y de potencia para cable de hasta 24 hilos
CANTIDAD
CANTIDADES
F SISTEMA DE PROTECCION CATODICA
10 Instalacin de panel comunicaciones COMM
0
ELABORADO POR (CONTRATISTA DE CONSTRUCCIN)
Soldador estructural AWS
Instrumentista A
Esmerilador
Ayudante de soldador
FISCALIZADOR
7-Aug-14
APROBADO POR (FISCALIZACIN)
Nombre: EDWIN GUAMANQUISPE / CARLOS JIMENEZ Nombre: MILTON VILLACIS / RAL CARRASCO
RECIBIDO POR (FACILIDADES PAM EP)
Tanquero de combustible
Medidor de Densidades
CANTIDAD
CANTIDADES
REPORTE FOTOGRFICO
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2
9
- J
u
l
5
-
A
u
g
1
2
- A
u
g
1
9
- A
u
g
2
6
- A
u
g
2
-
S
e
p
9
-
S
e
p
1
6
- S
e
p
2
3
- S
e
p
3
0
- S
e
p
Programado Real
1
-o
c
t

Predoblado de tubera Predoblado de tubera Regado, desfile de tubera

También podría gustarte