RENGLON
CANTIDAD
UNIDAD
COSTO
UNITARIO
COSTO
TOTAL
Q36,390.00
Q36,390.00
Q32,365.00
Q32,365.00
Q245,500.00
Q245,500.00
Q93,988.00
Q93,988.00
1.00
Global
1.00
Global
1.00
Global
1.00
Global
1.00
Global
Q169,792.00
Q169,792.00
1.00
Global
Q61,954.00
Q61,954.00
1.00
Global
Q106,740.00
Q106,740.00
1.00
Global
Q53,720.00
Q53,720.00
1.00
Global
Q463,500.00
Q463,500.00
1.00
Global
Q51,466.00
Q51,466.00
1.00
Global
Q540,000.00
Q540,000.00
1.00
Global
Q136,020.00
Q136,020.00
1.00
Global
Q69,202.00
Q69,202.00
1 Trabajos Preliminares
2 Bodega
Dragado del ro
3 Reparacin de Presa de captacin
Linea de conduccin de paso libre
Q 2,060,637.00
TRANSPORTE
1.00
Global
Q103,031.85
Q103,031.85
COSTOS ADMINISTRATIVOS
1.00
Global
Q154,547.78
Q154,547.78
1.00
Global
Q206,063.70
Q206,063.70
1.00
Global
Q245,400.00
Q245,400.00
1.00
Global
Q154,547.78
Q154,547.78
SUPERVISIN
Costos de mantenimiento 2 aos (3 fontaneros)
12 IMPREVISTOS
10 COSTO TOTAL
Q 2,924,228.10
TRABAJOS PRELIMINARES
No.
1
2
3
4
5
6
7
8
9
RENGLON
CANTIDAD
UNIDAD
Herramientas
BOMBAS DE GASOLINA DE 2 PULG,
PALAS
PIOCHAS
MANGUERA DE 2 PULGADAS
Carretas
subtotal
2.00
12.00
6.00
50.00
6.00
UNIDAD
UNIDAD
UNIDAD
M
Unidad
MANO DE OBRA
Limpieza de Tanque de Filtrador y Sedimendator
excavacin de zanja de linea de conduccin
excavacin de cajas reunidora de caudales
Excavacin de zapatas de columnas de tuberia
subtotal
2.00
50.00
2.00
12.00
COSTO
UNITARIO
Q6,000.00
Q120.00
Q450.00
Q50.00
Q300.00
COSTO
TOTAL
Q12,000.00
Q1,440.00
Q2,700.00
Q2,500.00
Q1,800.00
20,440.00
unidad
m
unidad
UNIDAD
Q2,500.00
Q75.00
Q1,200.00
Q400.00
Q5,000.00
Q3,750.00
Q2,400.00
Q4,800.00
15,950.00
Q36,390.00
COSTO TOTAL
BODEGA
No.
1
2
3
4
5
6
RENGLON
CANTIDAD
UNIDAD
Herramientas
PARALES DE 3X4 DE 10 PIES
TABLA DE 10 PIES
Bolsas de Cal
Lamina de12 pies
Clavo de 4 Pulgadas
Clavo de 3 Pulgadas
subtotal
48.00
48.00
10.00
42.00
25.00
25.00
UNIDAD
UNIDAD
UNIDAD
UNIDAD
Libras
Libras
COSTO
UNITARIO
Q55.00
Q65.00
Q30.00
Q165.00
Q7.50
Q7.50
COSTO
TOTAL
Q2,640.00
Q3,120.00
Q300.00
Q6,930.00
Q187.50
Q187.50
13,365.00
MANO DE OBRA
7 Armar y Desarmar Bodega
8 Bodeguero guardian
subtotal
1.00
Global
5.00
meses
Q3,000.00
Q3,000.00
Q3,200.00
Q16,000.00
19,000.00
Q32,365.00
COSTO TOTAL
DRAGADO DEL RO
No.
RENGLON
CANTIDAD
UNIDAD
COSTO
UNITARIO
COSTO
TOTAL
MAQUINARIA Y EQUIPO
1
2
3
4
RESTROESCAVADORA GRANDE
alquiler equipo topografia
Camiones de volteo de 12 metros cubicos
Transporte de maquinaria
subtotal
MANO DE OBRA
5 Topografo
6 Cadenero
7 ayudantes de maquinaria
30.00
30.00
100.00
2.00
da
dia
viajes
Unidad
Q4,800.00
Q350.00
Q400.00
Q3,000.00
Q144,000.00
Q10,500.00
Q40,000.00
Q6,000.00
200,500.00
30.00
60.00
60.00
dia
dias
dias
Q300.00
Q300.00
Q300.00
subtotal
Q9,000.00
Q18,000.00
Q18,000.00
45,000.00
Q245,500.00
COSTO TOTAL
RENGLON
CANTIDAD
UNIDAD
10.00
12.00
120.00
10.00
8.00
8.00
1.00
2.00
4.00
1.00
8.00
6.00
48.00
60.00
m
m
sacos
Quintal
Quintal
UNIDAD
UNIDAD
UNIDAD
UNIDAD
Galon
rollos
UNIDAD
UNIDAD
UNIDAD
COSTO
UNITARIO
COSTO
TOTAL
MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
COSTO TOTAL
Q225.00
Q185.00
Q78.00
Q390.00
Q390.00
Q1,600.00
Q3,000.00
Q5,200.00
Q1,050.00
Q470.00
Q16.00
Q1,200.00
Q55.00
Q65.00
Q2,250.00
Q2,220.00
Q9,360.00
Q3,900.00
Q3,120.00
Q12,800.00
Q3,000.00
10,400.00
4,200.00
470.00
128.00
7,200.00
2,640.00
3,900.00
65,588.00
45.00
1.00
2.00
1.00
1.00
1.00
m
Unidad
Unidad
Unidad
Global
Global
Q100.00
Q4,500.00
Q1,200.00
Q8,000.00
Q5,000.00
Q4,000.00
Q4,500.00
Q4,500.00
Q2,400.00
Q8,000.00
Q5,000.00
Q4,000.00
28,400.00
Q93,988.00
No.
RENGLON
CANTIDAD
UNIDAD
COSTO
UNITARIO
14.00
6.00
60.00
6.00
1.00
2.00
4.00
1.00
40.00
80.00
24.00
30.00
3.00
5.00
UNIDAD
m
sacos
UNIDAD
Galon
UNIDAD
UNIDAD
unidad
UNIDAD
UNIDAD
UNIDAD
UNIDAD
Quintal
Quintal
Q5,400.00
Q185.00
Q78.00
Q225.00
Q462.00
Q9,500.00
Q2,500.00
Q10,000.00
Q200.00
Q25.00
Q55.00
Q65.00
Q390.00
Q390.00
COSTO
TOTAL
Q75,600.00
Q1,110.00
Q4,680.00
Q1,350.00
462.00
19,000.00
10,000.00
10,000.00
8,000.00
2,000.00
1,320.00
1,950.00
1,170.00
1,950.00
MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
20
COSTO TOTAL
138,592.00
20.00
40.00
20.00
84.00
UNIDAD
UNIDAD
UNIDAD
m
Q700.00
Q120.00
Q200.00
Q100.00
Q14,000.00
Q4,800.00
Q4,000.00
Q8,400.00
31,200.00
Q169,792.00
RENGLON
UNITARIO
COSTO
TOTAL
CANTIDAD
UNIDAD
12.00
12.00
72.00
15.00
15.00
1.00
2.00
6.00
3.00
100.00
3.00
3.00
30.00
4.00
5.00
m
m
sacos
UNIDAD
UNIDAD
Rollos
UNIDAD
UNIDAD
UNIDAD
libras
Quintal
Quintal
libras
UNIDAD
tubos
Q245.00
Q185.00
Q77.00
Q65.00
Q55.00
Q1,400.00
Q3,000.00
Q200.00
Q5,400.00
Q10.00
Q390.00
Q390.00
Q15.00
Q75.00
Q250.00
Q2,940.00
Q2,220.00
Q5,544.00
Q975.00
Q825.00
Q1,400.00
Q6,000.00
Q1,200.00
Q16,200.00
Q1,000.00
Q1,170.00
Q1,170.00
Q450.00
Q300.00
Q1,250.00
Q42,644.00
3.00
3.00
50.00
150.00
14.00
30.00
45.00
2.00
6.00
UNIDAD
UNIDAD
m
m
M
m
m
UNIDAD
UNIDAD
Q700.00
Q250.00
Q100.00
Q30.00
Q100.00
Q50.00
Q60.00
Q500.00
Q60.00
Q2,100.00
Q750.00
Q5,000.00
Q4,500.00
Q1,400.00
Q1,500.00
Q2,700.00
Q1,000.00
Q360.00
MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
21
21
22
23
24
19,310.00
Q61,954.00
RENGLON
COSTO
UNITARIO
COSTO
TOTAL
CANTIDAD
UNIDAD
12.00
12.00
100.00
24.00
24.00
1.00
4.00
8.00
14.00
40.00
10.00
10.00
100.00
10.00
m
m
sacos
UNIDAD
UNIDAD
Rollos
UNIDAD
UNIDAD
UNIDAD
libras
Quintal
Quintal
libras
tubos
Q245.00
Q185.00
Q77.00
Q65.00
Q55.00
Q1,400.00
Q3,400.00
Q250.00
Q1,000.00
Q10.00
Q390.00
Q390.00
Q15.00
Q250.00
Q2,940.00
Q2,220.00
Q7,700.00
Q1,560.00
Q1,320.00
Q1,400.00
Q13,600.00
Q2,000.00
Q14,000.00
Q400.00
Q3,900.00
Q3,900.00
Q1,500.00
Q2,500.00
Q58,940.00
200.00
170.00
4.00
4.00
120.00
1.00
1.00
m
m
UNIDAD
UNIDAD
m
UNIDAD
UNIDAD
Q100.00
Q30.00
Q500.00
Q500.00
Q60.00
Q5,000.00
Q6,500.00
Q20,000.00
Q5,100.00
Q2,000.00
Q2,000.00
Q7,200.00
Q5,000.00
Q6,500.00
MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
17
18
19
20
21
22
22
47,800.00
Q106,740.00
RENGLON
CANTIDAD
UNIDAD
5.00
5.00
40.00
1.00
1.00
5.00
25.00
m
m
sacos
UNIDAD
UNIDAD
Rollos
tubos
120.00
120.00
48.00
360.00
2.00
m
m
m
m
unidad
COSTO
UNITARIO
COSTO
TOTAL
MATERIALES
1
2
3
4
5
6
7
17
18
19
20
21
Q245.00
Q185.00
Q78.00
Q3,000.00
Q1,400.00
Q1,400.00
Q250.00
Q1,225.00
Q925.00
Q3,120.00
Q3,000.00
Q1,400.00
Q7,000.00
Q6,250.00
Q22,920.00
Q25.00
Q15.00
Q75.00
Q60.00
Q400.00
Q3,000.00
Q1,800.00
Q3,600.00
Q21,600.00
Q800.00
30,800.00
Q53,720.00
COSTO TOTAL
RENGLON
CANTIDAD
UNIDAD
190.00
8.00
6.00
6.00
2.00
2.00
10.00
25.00
TUBOS
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
ROLLOS
tubos
COSTO
UNITARIO
COSTO
TOTAL
MATERIALES
1
2
3
4
5
6
7
8
MANO DE OBRA
17 armado y Fundicin de cajas de valvular
18 Excavacin de zanja de linea de conduccin
19 Pegado de tubera
subtotal
COSTO TOTAL
2.00
1,100.00
1,100.00
Unidad
m
m
Q1,600.00
Q1,100.00
Q450.00
Q1,100.00
Q1,200.00
Q5,200.00
Q15.00
Q250.00
Q304,000.00
Q8,800.00
Q2,700.00
Q6,600.00
Q2,400.00
Q10,400.00
Q150.00
Q6,250.00
Q341,300.00
Q600.00
Q60.00
Q50.00
Q1,200.00
Q66,000.00
Q55,000.00
122,200.00
Q463,500.00
RENGLON
COSTO
UNITARIO
COSTO
TOTAL
CANTIDAD
UNIDAD
4.00
72.00
12.00
8.00
6.00
4.00
10.00
10.00
24.00
16.00
TUBOS
sacos
m
m
Quintal
Quintal
ROLLOS
tubos
UNIDAD
UNIDAD
Q5,400.00
Q78.00
Q185.00
Q245.00
Q390.00
Q390.00
Q15.00
Q255.00
Q65.00
Q55.00
Q21,600.00
Q5,616.00
Q2,220.00
Q1,960.00
Q2,340.00
Q1,560.00
Q150.00
Q2,550.00
Q1,560.00
Q880.00
Q40,436.00
33.00
45.00
1.00
1.00
2.00
24.00
Unidad
m
Global
Global
Global
Global
Q120.00
Q30.00
Q600.00
Q2,000.00
Q600.00
Q80.00
Q3,960.00
Q1,350.00
Q600.00
Q2,000.00
Q1,200.00
Q1,920.00
MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
11,030.00
Q51,466.00
COSTO TOTAL
RENGLON
CANTIDAD
UNIDAD
COSTO
UNITARIO
COSTO
TOTAL
10.00
20.00
2.00
2.00
4.00
1.00
300.00
1.00
60.00
60.00
TUBOS
sacos
m
m
UNIDAD
UNIDAD
METROS
UNIDAD
METROS
METROS
Q6,000.00
Q78.00
Q185.00
Q245.00
Q500.00
Q35,000.00
Q50.00
Q1,800.00
Q20.00
Q60.00
Q60,000.00
Q1,560.00
Q370.00
Q490.00
Q2,000.00
Q35,000.00
Q15,000.00
Q1,800.00
Q1,200.00
Q3,600.00
Q121,020.00
10.00
1.00
10.00
1.00
Unidad
Global
Global
Global
Q300.00
Q3,000.00
Q150.00
Q7,500.00
Q3,000.00
Q3,000.00
Q1,500.00
Q7,500.00
MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
POSTES
CEMENTO
ARENA
PIEDRIN
CABLES Y TENSORES EN TIERRA
TRANSFORMADOR
INSTALACIN DE CABLE
COLOCACIN DE ACOMETIDA ESPECIAL
POLIDUCTO FLEXIBLE PARA CONEXIN
CABLE CALIBRE 14 ESPECIAL TRIFASICO
subtotal
MANO DE OBRA
COLOCACIN DE POSTES
INSTALACIONES DE ENERGIA TRIFASICA
Fudicin de postes
Tramites de licencia y permito de instalacin
subtotal
COSTO TOTAL
15,000.00
Q136,020.00
CASETA DE FILTRACIN
No.
RENGLON
COSTO
UNITARIO
COSTO
TOTAL
CANTIDAD
UNIDAD
54.00
6.00
6.00
800.00
5.00
6.00
30.00
20.00
10.00
12.00
1.00
2.00
4.00
4.00
2.00
2.00
1.00
2.00
2.00
sacos
m
m
UNIDAD
UNIDAD
UNIDAD
Libras
Libras
UNIDAD
UNIDAD
Global
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
Q78.00
Q185.00
Q245.00
Q5.00
Q390.00
Q390.00
Q10.00
Q10.00
Q250.00
Q185.00
Q600.00
Q5,400.00
Q1,050.00
Q1,600.00
Q1,100.00
Q450.00
Q2,400.00
Q1,800.00
Q1,100.00
Q4,212.00
Q1,110.00
Q1,470.00
Q4,000.00
Q1,950.00
Q2,340.00
Q300.00
Q200.00
Q2,500.00
Q2,220.00
Q600.00
Q10,800.00
Q4,200.00
Q6,400.00
Q2,200.00
Q900.00
Q2,400.00
Q3,600.00
Q2,200.00
Q53,602.00
60.00
1.00
8.00
3.00
1.00
3.00
25.00
m
Global
UNIDAD
UNIDAD
Global
UNIDAD
m
Q60.00
Q2,000.00
Q650.00
Q300.00
Q2,000.00
Q300.00
Q40.00
Q3,600.00
Q2,000.00
Q5,200.00
Q900.00
Q2,000.00
Q900.00
Q1,000.00
MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
11
12
13
14
15
16
17
CEMENTO
ARENA
PIEDRIN
BLOCK DE 0.15X0.20X0.40
Acero No. 4
Acero No. 3
Alambre de amarre
Clavos
Costaneras de 4X2
Laminasde 12 pies
instalacin de Caja de flipones
Valvulas de Compuerta de 8 pulgadas
Adaptadores machos de 8 pulgadas
Tobo PVC de 9 Pulgadas de 160 PSI
CODOS A 45 PVC DE 8 PULGADAS
COPLAS PVC DE 8 PULGADAS
Puerta de metal de 0.90x2.10
Ventanas de 1.20X1.00 con balcon
CODOS A 90 PVC DE 8 PULGADAS
subtotal
MANO DE OBRA
Levantado de muro de block
Instalacin de techo de lamina
Fudicin de columnas y zapatas
Tallado de ventana y puertas
Instalacin de iluminacin y energa
Colocacin de puerta y ventana
Fundicin de piso de concreto
subtotal
COSTO TOTAL
15,600.00
Q69,202.00