CONSTRUCCION DE CUBIERTA Y GRADERIOS
LISTA DE MATERIALES
DESCRIPCION
IO TOTAL
ALAMBRE DE AMARRE
92.61
ANTICORROCIVO CROMADO 5
330.55
ANTICORROCIVO PLOMO
330.55
AR-2000
4,379.52
ARENA
33.06
Agua
1.01
Arena de ro
247.36
CEMENTO
116.67
CUMBREROS
119.59
Cemento
1,493.03
Clavos
20.04
ELECTRO SUELDA 6011
1,325.43
Encofrado recto
485.53
HIERRO
2,890.47
Herramienta menor
380.05
PERFIL U.G.L.
3,606.59
PIEDRA BOLA
77.28
PLACA DE ACERO 500X400X8MM
180.30
Pintura esmalte
53.55
Ripio
55.17
Ripio minado
412.23
Suelda
343.22
THINNER
72.12
TIRAFONDOS
120.80
Tiras

UNID.

PRECIO UNIT

CANTIDAD

LBS

0.44

210.47

GL

11.00

30.05

GL

11.00

30.05

M2

5.80

755.09

M3

10.63

3.11

m3

0.20

5.04

m3

10.63

23.27

SACO

5.62

20.76

3.96

30.20

kg

0.11

13,573.00

Kg

0.93

21.55

KG

3.15

420.77

m2

3.13

155.12

KG

0.80

3,613.09

hora

0.50

760.10

KG

0.60

6,010.98

M3

10.63

7.27

10.00

18.03

galn

12.31

4.35

m3

10.63

5.19

m3

10.63

38.78

kg

7.89

43.50

GL

4.00

18.03

KG

3.20

37.75

0.38

71.82

PREC

27.29
Tubo HG de 2"
243.25

2.33

104.40
=======

========
TOTAL =
7,437.26