tablas

2.6 habilitar a 2.6 x .30

viga 5m largo
peraltre.40
ancho .30
BARROTES 1.50 -1.2

LISTA DE MATERIALES ALBAILERIA


OBRA
: CLARO
UBICACIN : RIMAC

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00

DESCRIPCION

CANTIDAD

COSTO UNT.

SUB TOTAL

Tablas 2-3mts
triplay 8mm
Listones1"y3"
Clavos 2"Y3"C/U.
Clavos d acero x libra
Alambre#16
radial de mano
Serrucho
Amoladora
extension x 30 mts
tiralinea
nivel de mano 0.60
1.2
arco sierra
taladro percutor
brocas sds 3/8"
1/2"
5/8"
escalera recta
arneses
caja herramientas
tubo galv.1/2"
trampa 1/2"
pistola calor

8.00
2.00
10.00
1.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
3mts
4.00
1.00
1.00
1.00
1.00

S/. 32.00
S/. 42.00
S/. 12.00
S/. 4.00
S/. 11.00
S/. 5.00
S/. 0.00
S/. 45.00
S/. 240.00
S/. 270.00
S/. 15.00
S/. 25.00
S/. 80.00
S/. 18.00
S/. 480.00
S/. 12.00
S/. 15.00
S/. 20.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 10.00
S/. 10.00
S/. 150.00

S/. 256.00
S/. 84.00
S/. 120.00
S/. 4.00
S/. 11.00
S/. 40.00
S/. 0.00
S/. 45.00
S/. 240.00
S/. 270.00
S/. 15.00
S/. 25.00
S/. 80.00
S/. 18.00
S/. 480.00
S/. 24.00
S/. 15.00
S/. 20.00

Descripcion

Cantidad

Costo unit.

Sub.total

Arena gruesa
Piedra chancada de 1/2"
Cemento
Fierro corrugado 3/8"
Sikadur-31 x 5kg

1.50
0.50
14.00
10.00
1.00

S/. 60.00
S/. 60.00
S/. 19.80
S/. 15.00
S/. 320.00

S/. 90.00
S/. 30.00
S/. 277.20
S/. 150.00
S/. 320.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 10.00
S/. 10.00
S/. 150.00
S/. 0.00
S/. 0.00

1.00
2.00
3.00
4.00
5.00

S/. 0.00
1.00
2.00

Descripcion

Cantidad

Costo unit.

Sub.total

Tubo 2" sap electricas


Caja de paso 0.30x0.30

23.00
2.00

S/. 48.00
S/. 18.00

S/. 1,104.00
S/. 36.00

3.00
4.00
5.00
6.00
7.00
8.00
9.00

Abrazaderas de 2"c/doble oreja


Pegamento pvc x1/4"
Curvas 2" sap electricos
Adaptadores 2"c/rosca
Uniones pvc 2"
Tarrugos madera 3/8"
Tornillos spax 35mm

50.00

S/. 0.80

S/. 40.00

1.00
12.00
12.00
12.00
100.00
300.00

S/. 28.00
S/. 4.50
S/. 3.50
S/. 3.50
S/. 0.10
S/. 0.15

S/. 28.00
S/. 54.00
S/. 42.00
S/. 42.00
S/. 10.00
S/. 45.00

S/. 4,185.20

Segundo requerimiento de materiales 09 mayo.


Descripcion
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00

Super board
Parantes metalicos 90mm
Rieles metalicos 90mm
Tornillos rock-on 32mm caja x millar
Tornillos Pam 11mm caja x millar
Clavos acerados 1" caja x 100
Fulminante marron caja x 100
Sellador poliuretano Sika AT-facade

Cantidad

Costo unit.

Sub.total

38.00
30.00
16.00
2.00
1.00
2.00
2.00
6.00

S/. 95.00

S/. 3,610.00
S/. 0.00
S/. 160.00
S/. 80.00
S/. 30.00
S/. 30.00
S/. 56.00
S/. 144.00

S/. 10.00
S/. 40.00
S/. 30.00
S/. 15.00
S/. 28.00
S/. 24.00

Disco para corte de super board

3.00

S/. 24.00

S/. 72.00

Descripcion

Cantidad

Costo unit.

Sub.total

Tubo 3"x3"x e:2mm x Ml.


Tubo 4"x4"x e:2mm x Ml.
Planchas 1/4" x M2.
Soldadura supersito AWS-7018 xKg.
Esparragos de grado 1/2"xMl.
Esparragos de grado 5/8"Ml.
Tuercas de grado 1/2"x ciento
Tuercas de grado 5/8"Mlx ciento
Arandelas de grado 1/2"x ciento
Arandelas de grado 5/8"x ciento
Wachas de presion 1/2"x ciento
Wachas de presion 5/8" x ciento
Dsicos de desbaste 4 1/2"
Disco de corte 9"
Disco de corte 4 1/2"
Maquina se soldar.
Esmeril de 9".
Extension pesada 50 mts.
Alquiler de andamios x dia.

66.00
9.00
1.00
10.00
6.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
12.00
3.00
18.00
1.00
1.00
1.00
6.00

S/. 14.50
S/. 16.80
S/. 130.00
S/. 14.00
S/. 15.00
S/. 18.00
S/. 25.00
S/. 30.00
S/. 12.00
S/. 15.00
S/. 12.00
S/. 15.00
S/. 5.00
S/. 12.00
S/. 5.50
S/. 0.00
S/. 450.00
S/. 0.00
S/. 120.00

S/. 957.00
S/. 151.20
S/. 130.00
S/. 140.00
S/. 90.00
S/. 72.00
S/. 25.00
S/. 30.00
S/. 12.00
S/. 15.00
S/. 12.00
S/. 15.00
S/. 60.00
S/. 36.00
S/. 99.00
S/. 0.00
S/. 450.00
S/. 0.00
S/. 720.00

S/. 7,196.20

Ejecucion de sardineles/revestido de
tuberias,herramientas y equipos.

Materiales obra civil

Entubados electricos

Tabiqueria de Super board.

Estructuras metalicas

También podría gustarte