OBRA
PROPIETARIO
FECHA
TIEMPO DE EJECUCIN
01
A V A N C E
D E
O B R A
V A L O R I Z A D O
: "CONSTRUCCION DE LOSA MULTIDEPORTIVA EN EL CASERIO PAJA BLANCA, DISTRITO DE CHUGAY - SANCHEZ CARRION - LA LIBERTAD"
: MUNICIPALIDAD DISTRITAL DE CHUGAY
: JUNIO DEL 2011
: 45 DAS CALENDARIOS
ACTIVIDAD
ITEM
D E
N
Dias
QUINCENA 01
1
QUINCENA 02
10
11
12 13 14 15
QUINCENA 03
10
11
12 13 14 15
10
11
12 13 14 15
SUB TOTAL
TOTAL
S/.
S/.
69,217.01
LOSA DEPORTIVA
2,200.00
6.00
2,200.00
5,957.62
4.00
5,957.62
17,734.24
10.00
30.00
17,734.24
9,587.66
17,976.86
8,389.20
35,953.72
1,714.69
6.00
1,714.69
1,906.74
01.06 PINTURA
8.00
1,906.74
3,750.00
01.07 EQUIPAMIENTO
02
3.00
3,750.00
32,462.14
GRADERIAS
373.96
3.00
373.96
2,851.73
10.00
2,851.73
773.03
10.00
20.00
773.03
1,546.05
13,781.75
4,593.92
18,375.66
2,842.11
02.05 ALBAILERIA
10.00
4,060.16
1,448.26
1,218.05
2,896.51
15.00
4,344.77
909.81
02.07 PINTURA
03
6.00
909.81
21,629.34
ILUMINACIN
162.83
3.00
162.83
2,379.28
10.00
2,379.28
3,648.24
5.00
03.04 CABLES
5.00
3,648.24
1,781.46
1,781.46
740.36
5.00
740.36
8,655.52
03.06 POSTES
6.00
8,655.52
1,757.64
C R O N O G R A M A
OBRA
PROPIETARIO
FECHA
TIEMPO DE EJECUCIN
A V A N C E
D E
O B R A
V A L O R I Z A D O
: "CONSTRUCCION DE LOSA MULTIDEPORTIVA EN EL CASERIO PAJA BLANCA, DISTRITO DE CHUGAY - SANCHEZ CARRION - LA LIBERTAD"
: MUNICIPALIDAD DISTRITAL DE CHUGAY
: JUNIO DEL 2011
: 45 DAS CALENDARIOS
N
Dias
ACTIVIDAD
ITEM
D E
QUINCENA 01
1
QUINCENA 02
10
11
12 13 14 15
QUINCENA 03
10
11
12 13 14 15
10
11
12 13 14 15
4.00
SUB TOTAL
TOTAL
S/.
S/.
1,757.64
2,004.01
4.00
2.00
2,004.01
500.00
10.00 %
UTILIDADES
10.00 %
SUBTOTAL
IGV
18.00 %
S/.
S/.
500.00
39,478.23
3,947.82
3,947.82
47,373.88
8,527.30
55,901.18
55,901.18
SON : CIENTO SETENTA Y CUATRO MIL SEISCIENTOS CUATRO CON 82/100 NUEVOS SOLES
45,534.17
4,553.42
4,553.42
54,641.00
9,835.38
64,476.38
120,377.56
38,296.09
3,829.61
3,829.61
45,955.31
8,271.95
54,227.26
174,604.82
123,308.49
12,330.85
12,330.85
147,970.19
26,634.63
174,604.82
en soles
RECURSOS
UNID
ACERO CORRUGADO FY=4200 KG/CM - GRADO 60
kg
AFIRMADO
m3
AGUA
m3
ALAMBRE NEGRO N 8
kg
ALAMBRE NEGRO N16
kg
ALMACEN OFICINA Y CASETA DE GUARDIANIA
GLB
ANDAMIO DE MADERA
p2
ARCOS DE FULBITO F G DE D=2" INC. TABLERO DE BASQUET Y
und
ARENA FINA
m3
ARENA GRUESA
m3
ASFALTO RC-250
gln
CABLE NYY 10 MM2
m
CABLE NYY 6 MM2
m
CAJA DE CONCRETO DE 10"x10"
und
CAJA PREFABRICADA DE 0.35x0.35x0.40M. INC. TAPA DE CONCRET und
CAJA PREFABRICADA DE 1.20x1.20x0.90M. INC. TAPA DE CONCRET und
CARTEL DE OBRA 3.60 x 4.80m
und
CEMENTO PORTLAND TIPO I (42.5KG)
BOL
CEMENTO PORTLAND TIPO MS
BOL
CINTA AISLANTE
und
CLAVOS CON CABEZA 2 1/2",3",4"
kg
CONECTOR DE COBRE AB 5/8"
und
CORDEL
m
CURVA PVC SAP- 25mm
und
DUCTO 1 VIA DE 4 PULG. DIAMET.
m
CANT S/.
1890.50
3026.17
295.97
364.37
176.14
1200.00
242.10
2900.00
113.54
1975.09
522.24
425.25
1020.60
15.00
60.00
480.00
1000.00
15405.52
1582.51
17.88
575.56
180.00
37.87
5.00
1559.25
QUINCENA 01
1008.72
98.66
QUINCENA 02
1417.88
1513.09
147.99
273.28
132.11
QUINCENA 03
472.63
504.36
49.33
91.09
44.04
80.70
161.40
2900.00
75.69
329.18
522.24
1200.00
658.36
37.85
987.55
425.25
1020.60
15.00
60.00
480.00
1000.00
527.50
191.85
5135.17
791.26
17.88
287.78
37.87
5.00
1559.25
10270.35
263.75
95.93
180.00
en soles
RECURSOS
HORMIGON
IMPRIMANTE
LADRILLO K.K. DE ARCILLA DE 18 HUECOS (10x14x24 CM)
LIJA PARA CONCRETO
MADERA TORNILLO
PEGAMENTO PVC
PIEDRA CHANCADA DE 1/2"-3/4"
PIEDRA MEDIANA DE 6"
PINTURA ESMALTE SINTETICO
PINTURA LATEX VENCELATEX ESPECIAL
POSTE DE CONCRETO ARMADO H=12.00mx200mm
POSTES DE FG PARA VOLEY, D=2" INC NET
PROTECCION DE BAJADA DE ACOMETIDA
REFLECTOR HLF 4321-400W CON EQUIPO Y LAMPARA
REGLA DE MADERA
TABLERO DE CONTROL METALICO P'INTEMPERIE
THINER
THOR GEL
TIERRA DE CHACRA O VEGETAL
TRANSPORTE DE EQUIPOS Y HERRAMIENTAS
TUBERIA PVC - SAP (ELECT.) 25 mm x 3m
TUBERIA PVC SAP 2"
VARILLA DE COBRE d=5/8" DE 2.5m
YESO EN BOLSAS DE 20 KG.
UNID
m3
gln
und
und
p2
gln
m3
m3
gln
gln
pza
und
GLB
und
p2
und
gln
kg
m3
GLB
m
m
und
und
CANT S/.
219.30
37.10
2323.56
33.73
8440.02
30.38
4263.59
271.04
565.65
379.44
7200.00
850.00
650.00
1680.00
37.85
450.00
55.59
32.50
40.00
3000.00
33.00
1530.90
45.00
437.20
QUINCENA 01
164.48
2813.34
1421.20
135.52
QUINCENA 02
54.83
12.37
1626.49
11.24
4220.01
30.38
2131.80
135.52
126.48
12.62
18.93
1000.00
1000.00
33.00
1530.90
QUINCENA 03
24.73
697.07
22.49
1406.67
710.60
565.65
252.96
7200.00
850.00
650.00
1680.00
6.31
450.00
55.59
32.50
40.00
1000.00
45.00
437.20
OBRA
PROPIETARIO
FECHA
TIEMPO DE EJECUCIN
: 45 DAS CALENDARIOS
VALOR REFERENCIAL :
S/.
174,604.82
Item
Descripcin
Und.
Cant.
Duracin de
Proyecto
Precio
Unitario S/.
Valor Total
S/.
Glb.
1.00
1.00
1200.00
1,200.00
Glb.
1.00
1.00
500.00
500.00
Otros
Glb.
1.00
1.00
211.28
211.28
1,911.28
Item
Descripcin
Und.
Cant.
Cant. Unidad
Precio
Unitario S/.
Valor Total
S/.
rea de Produccin
Ing. Residente.
Mes
1.00
1.50
2500.00
3,750.00
Asistente de Obra
Mes
1.00
1.50
1200.00
1,800.00
Maestro de Obra.
Mes
1.00
1.50
1200.00
1,800.00
Guardian/Almacenero.
Mes
1.00
1.50
1000.00
1,500.00
rea Administrativa
Mes
0.25
1.50
1000.00
375.00
OBRA
PROPIETARIO
FECHA
TIEMPO DE EJECUCIN
: 45 DAS CALENDARIOS
VALOR REFERENCIAL :
S/.
174,604.82
Mes
1.00
1.50
400.00
600.00
Equipos de Seguridad.
Mes
1.00
1.50
300.00
450.00
Mes
1.00
1.50
46.38
69.57
Botiquin.
Mes
1.00
1.50
50.00
75.00
12,330.85
10.00%
UTILIDADES
12,330.85
10.00%
COSTO DIRECTO
123,308.49
1,911.28
1.55%
10,419.57
8.45%
TOTAL
10.00%