Planilla de Metrado Redes de Alcantarillado
Planilla de Metrado Redes de Alcantarillado
PROYECTO
: RENOVACIN DE REDES DE AGUA POTABLE Y ALCANTARILLADO EN EL P.J. SAN MIGUEL - PRIMERA ETAPA
UBICACIN
LOCALIDAD
FECHA
ITEM
DESCRIPCION
UND
N
VECES
1.00
OBRAS PROVISIONALES
1.01
2.00
TRABAJOS PRELIMINARES
2.01
2.02
GLB
1.00
ML
1.00
ML
1.00
2.03
ML
2.04
3.00
MOVIMIENTO DE TIERRA
3.01
3.02
MEDIDAS (m)
LARGO
ANCHO
PARCIAL
TOTAL
ALTO
1.00
1.00
3,867.90
3,867.90
3,867.90
3,867.90
3,867.90
3,867.90
1.00
3,867.90
3,867.90
3,867.90
ML
1.00
3,867.90
3,867.90
3,867.90
ML
1.00
1,387.90
1,387.90
1,387.90
ML
1.00
1,079.60
1,079.60
1,079.60
3.03
ML
1.00
1,040.50
1,040.50
1,040.50
3.04
ML
1.00
75.10
75.10
75.10
3.05
ML
1.00
107.10
107.10
107.10
3.06
ML
1.00
33.05
33.05
33.05
3.07
ML
1.00
43.85
43.85
43.85
3.08
ML
1.00
3,767.10
3,767.10
3,767.10
3.09
ML
1.00
3,767.10
3,767.10
3,767.10
3.10
ML
1.00
1,387.90
1,387.90
1,387.90
3.11
ML
1.00
1,079.60
1,079.60
1,079.60
3.12
ML
1.00
1,040.50
1,040.50
1,040.50
3.13
ML
1.00
75.10
75.10
75.10
3.14
ML
1.00
107.10
107.10
107.10
3.15
ML
1.00
33.05
33.05
33.05
3.16
ML
1.00
43.85
43.85
3.17
M3
43.85
5,496.72
Excavacin
Profundidad de 1.00 - 1.50, Ancho de 1.00 mt. (1.3 Factor de Esponj)
1.30
1,387.90
1.50 (AREA)
2,706.41
1.30
1,079.60
2.00 (AREA)
2,806.96
1.30
1,040.50
3.75 (AREA)
5,072.44
1.30
75.10
5.63 (AREA)
549.17
1.30
107.10
7.00 (AREA)
974.61
1.30
33.05
9.50 (AREA)
408.17
1.30
43.85
11.25 (AREA)
641.31
-1.20
1,387.90
0.90 (AREA)
-1,498.93
-1.20
1,079.60
1.40 (AREA)
-1,813.73
-1.20
1,040.50
3.08 (AREA)
-3,843.19
-1.20
75.10
4.92 (AREA)
-443.39
-1.20
107.10
6.31 (AREA)
-810.64
-1.20
33.05
8.76 (AREA)
-347.22
-1.20
43.85
10.53 (AREA)
-554.09
28.00
1.30
1.77
1.70
109.53
17.00
1.30
1.77
2.20
86.06
14.00
1.30
1.77
2.70
86.98
6.00
1.30
1.77
3.20
44.18
3.00
1.30
1.77
3.70
25.54
1.00
1.30
1.77
4.20
9.66
Relleno
Buzones
1.00
1.30
1.77
4.70
10.81
Conex. Dom. Desag. PVC-UF DN=160 mm S-25 L.Prom.=5.00m (1.3 Factor de Espoj)
129.00
5.00
0.60
0.50
251.55
Conex. Dom. Desag. PVC-UF DN=160 mm S-25 L.Prom.=6.00m (1.3 Factor de Espoj)
38.00
6.00
0.60
0.50
88.92
Conex. Dom. Desag. PVC-UF DN=160 mm S-25 L.Prom.=7.00m (1.3 Factor de Espoj)
212.00
7.00
0.60
0.50
578.76
Conexiones Domiciliarias
Conex. Dom. Desag. PVC-UF DN=160 mm S-25 L.Prom.=8.00m (1.3 Factor de Espoj)
64.00
8.00
0.60
0.50
199.68
Conex. Dom. Desag. PVC-UF DN=160 mm S-25 L.Prom.=10.00m (1.3 Factor de Espoj)
26.00
10.00
0.60
0.50
101.40
Conex. Dom. Desag. PVC-UF DN=160 mm S-25 L.Prom.=13.00m (1.3 Factor de Espoj)
11.00
13.00
0.60
0.50
55.77
3.18
ML
1.00
1,115.60
1,115.60
1,115.60
3.19
ML
1.00
184.00
184.00
184.00
4.00
BUZONES
4.01
UND
28.00
28.00
28.00
4.02
UND
17.00
17.00
17.00
4.03
UND
14.00
14.00
14.00
4.04
UND
6.00
6.00
6.00
4.05
UND
3.00
3.00
3.00
4.06
UND
1.00
1.00
1.00
4.07
UND
1.00
1.00
1.00
4.08
UND
70.00
70.00
70.00
5.00
5.01
ML.
1.00
3,767.10
3,767.10
6.00
PRUEBA HIDRAULICA
6.01
ML.
1.00
3,767.10
3,767.10
3,767.10
6.02
ML.
1.00
3,767.10
3,767.10
3,767.10
7.00
DADO DE CONCRETO
7.01
UND
175.00
175.00
175.00
8.00
CONEXIONES DOMICILIARIAS
8.01
UND
146.00
146.00
146.00
8.02
UND
37.00
37.00
37.00
8.03
UND
224.00
224.00
224.00
8.04
UND
64.00
64.00
64.00
8.05
UND
26.00
26.00
26.00
8.06
UND
11.00
11.00
11.00
9.00
OBRAS COMPLEMENTARIAS
9.01
UND
508.00
508.00
508.00
3,767.10