0147010001 CAPATAZ hh 624.4800 20.83 13,008.

00
0147010002 OPERARIO hh 2,824.9100 17.36 49,040.50
0147010003 OFICIAL hh 3,326.0800 14.39 47,862.25
0147010004 PEON hh 4,454.1300 12.84 57,190.99
0147010023 CONTROLADOR OFICIAL hh 62.8600 14.39 904.58
168,006.32
MATERIALES
0202010005 CLAVOS PARA MADERA C/C 3" kg 346.5100 4.20 1,455.34
0202040068 ALAMBRE NEGRO RECOCIDO # 16 kg 2,124.3200 4.20 8,922.13
0202040069 ALAMBRE NEGRO RECOCIDO # 8 kg 377.4700 4.20 1,585.38
0202100106 CLAVOS DE 2 1/2" C/C kg 21.3700 4.20 89.76
0202460094 PERNOS DE ANCLAJE DE 5/8" X 0.40 m. und 123.1000 19.00 2,338.90
0202510100 PERNOS 5/8" X 14" und 32.0000 2.50 80.00
PERNOS CON HUACHA, TUERCA y 12.0000 1.35 16.20
ARANDELA DE 3/8"
0202510103 und
0202630002 VARILLA LISA DE 1" m 10.0000 15.50 155.00
0202850031 TUBO DE FIERRO GALVANIZADO DE 3" ML 18.8000 23.00 432.40
0202940002 TUBO DE ACERO 2" pza 2.0000 30.00 60.00
ACERO CORRUGADO Fy=4,200 Kg/cm2 37,791.1200 3.30 124,710.70
GRADO 60
0203020005 kg
0204110024 ABONO ORGANICO (HUMUS) kg 45.0000 2.00 90.00
0205000003 PIEDRA CHANCADA DE 1/2" m3 304.8000 105.00 32,003.50
0205000033 GRAVA PARA FILTRO m3 48.3400 70.00 3,383.52
0205010004 ARENA GRUESA m3 199.2100 90.00 17,929.25
0205020020 PIEDRA MEDIANA m3 32.1300 70.00 2,249.31
0205300040 MATERIAL AFIRMADO m3 922.1000 30.00 27,663.00
0221000000 CEMENTO PORTLAND TIPO I (42.5KG) bls 4,365.6400 18.50 80,764.39
0229120065 NEOPRENO cm3 68,400.0000 0.08 5,472.00
0229200012 THINNER STANDER gln 0.4400 19.00 8.36
0229510001 OXIGENO m3 1.4400 83.00 119.19
0229510005 ACETILENO kg 10.1200 5.40 54.63
0230020001 YESO DE 28 Kg bls 5.3400 13.00 69.45
0230200005 LACA DESMOLDEADORA gln 0.2600 86.00 22.29
0230470003 SOLDADURA CELLOCORD P 3/16" kg 15.9200 28.00 445.62
0230670010 PINTURA REFLECTORIZANTE gln 0.1100 86.00 9.46
0230990007 CORDEL ML 8.0100 0.10 0.80
0232000045 FLETE TERRESTRE kg 237,146.0000 0.05 11,857.30
0232970002 MOVILIZACION Y DESMOVILIZACION GLB 1.0000 16,471.38 16,471.38

0232970003 CAPACITACION Y SENSIBILIZACION GLB 1.0000 5,000.00 5,000.00


0238000004 HORMIGON (PUESTO EN OBRA) M3. 43.7100 90.00 3,933.90
0239050000 AGUA m3 108.7000 1.00 108.70
0239060014 OXIGENO m3 0.7400 83.00 61.30
CAMPAMENTO,DEPOS.,ALMACENES,TAL 1.0000 3,500.00 3,500.00
LERES,ETC
0239900083 est
CARTEL DE OBRA INC.INSTALACION Y 1.0000 1,200.00 1,200.00
TRANSP
0239900095 GLB
MADERA NACIONAL 6,943.9600 2.10 14,582.31
P/ENCOFRADO-CARP
0243000025 P2.
0243000036 REGLA DE MADERA p2 1.8000 3.00 5.40
0243160052 POMA ROSA und 90.0000 2.50 225.00
0243400036 SEALIZACION DE MANEJO AMBIENTAL und 5.0000 50.00 250.00
0243510061 ESTACA DE MADERA p2 80.1400 2.10 168.29
0244030000 TRIPLAY LUPUNA DE 4'x8'x 10 mm pln 0.6000 75.00 45.36
BARRAS DE ACERO LIVIANO CUADRADO 3.6000 13.80 49.68
3/8" X 6 m
0251000027 var
0251010073 ANGULO ACERO 4"X4"1/2"X6 pza 2.4000 368.60 884.57
0251130061 PLATINA DE ACERO DE 1" X 1/4" 6.00 mts m 73.8600 4.75 350.84
0251130062 PLATINA DE ACERO 1/4" X 5 " X 5" pza 8.0000 3.13 25.04
0251130063 PLATINA DE ACERO 1/4" X 2 " X 3.5" pza 12.0000 2.45 29.40
0254220005 PINTURA ESMALTE EPOXICA gln 3.6000 51.20 184.07
0254220009 PINTURA ANTICORROSIVA EPOXICA gln 3.2900 60.50 198.89
0256220101 PLANCHA ACERO 8" X 10.5"X1/2" kg 332.3700 4.60 1,528.90
S10 Pgina : 2
Precios y cantidades de recursos requeridos
Obra CONSTRUCCION DEL PUENTE CARROZABLE SOBRE EL RIO AUTIKI EN EL C.P. SAN M
AUTIKI, DISTRITO DE PICHANAQUI - CHANCHAMAYO - JUNIN
204006
Fecha 01/04/2015
Lugar 120303 JUNIN - CHANCHAMAYO - PICHANAQUI
Cdigo Recurso Unidad Cantidad Precio S/. Parcial S/.
0256220102 PLANCHA DE ACERO 3/16" x 4.5" x 2.5" und 32.0000 1.16 37.12
0261000001 PLANCHA GALVANIZADA DE 1/16" m2 3.6000 65.00 234.00
TUBO REDONDO ACERO A-36 D=2.5 " 360.0700 20.00 7,201.35
e=2.5 mm
0265010026 ML
0265910004 PLANCHA 8"X8"X5/8" und 8.0000 16.60 132.80
0273010035 TUBERIA PVC SAL 2" X 3 m pza 2.0000 15.00 30.00
SOMBRERO DE VENTILACION PVC SAL 2.0000 1.50 3.00
2"

0273230001 pza
0274010102 TUBO PVC SAP 3" pza 1.0000 29.00 29.00
0274010103 TUBO PVC SAP 4" pza 2.8400 35.00 99.56
378,557.74
EQUIPOS
0337010001 HERRAMIENTAS MANUALES %MO 5,073.97
0337540011 TEODOLITO HE 23.2500 12.00 279.05
MEZCLADORA DE CONCRETO DE 9 237.0600 25.00 5,926.54
-11P3
0348010011 H.M
0348040048 CAMION VOLQUETE 10 M3 hm 105.3300 155.00 16,326.48
0348080000 MOTOBOMBA 10 HP 4" hm 337.6300 20.00 6,752.64
CAMION CISTERNA 4X2 (AGUA) 2,000 15.6200 115.00 1,796.46
GAL.
0348120002 H.M
0348210052 EQUIPO DE CORTE H.M 51.1600 18.00 920.88
0348210064 MAQUINA SOLDADORA H.M 62.3600 25.00 1,559.01
RODILLO LISO VIBR AUTOP 70-100 HP 42.8200 155.00 6,637.35
7-9 T.
0349030013 hm
0349040009 CARGADOR S/LLANTAS 125 HP 2.5 YD3. hm 39.1000 190.00 7,428.81
RETROEXCAVADOR S/LLANTAS 58 HP 1 50.2400 140.00 7,033.95
YD3.
0349040021 hm
RETROEXCAVADOR S/ORUG 115-165HP 77.8000 260.00 20,228.42
.75-1.4Y
0349040023 hm
0349040034 TRACTOR DE ORUGAS DE 190-240 HP hm 53.3000 255.00 13,591.22
0349070052 VIBRADOR DE CONCRETO 3/4" - 2" hm 166.7800 10.00 1,667.83
0349090000 MOTONIVELADORA DE 125 HP hm 27.1900 190.00 5,165.25
0349150014 GRUPO ELECTROGENO 89 HP 50 KW hm 102.3200 20.00 2,046.40
0349890003 NIVEL TOPOGRAFICO CON TRIPODE HE 23.2500 6.25 145.34

4.20 1,455.34
3200 4.20 8,922.13
00 4.20 1,585.38

nd 123.1000 19.00 2,338.90

18.8000 23.00 432.40


124,710.70

05.00 32,003.50

65.6400 18.50 80,764.39

0 28.00 445.62

000 16,471.38 16,471.38

00 5,000.00 5,000.00
90.00 3,933.90

5.0000 50.00 250.00

0 75.00 45.36

8.60 884.57
73.8600 4.75 350.84
00 3.13 25.04
0000 2.45 29.40

00 60.50 198.89
00 4.60 1,528.90

EL RIO AUTIKI EN EL C.P. SAN MIGUEL DE

32.0000 1.16 37.12


0 65.00 234.00

5.00 16,326.48

39.1000 190.00 7,428.81

3.3000 255.00 13,591.22


7800 10.00 1,667.83
190.00 5,165.25
2.3200 20.00 2,046.40
500 6.25 145.34

CRONOGRAMA DE ADQUISIC
OBRA

: "CONSTRUCCION DEL PUENTE CARROZABLE SOBRE EL RIO AUTIKI EN EL CENTRO POBLADO SAN MIGUEL DE AUTIKI DEL DISTRITO DE PICHA
PROVINCIA DE CHANCHAMAYO Y DEPARTAMENTO DE JUNIN"

ENTIDAD
EJECUTOR
REGION
PROVINCIA
DISTRITO

: MUNICIPALIDAD DISTRITAL DE PICHANAQUI


: RISCASA SRL
: JUNIN
: CHANCHAMAYO
: PICHANAQUI

Item N

UND
2.00 ALAMBRE NEGRO RECOCIDO # 16
11.00 ACERO CORRUGADO Fy=4,200
17.00 MATERIAL AFIRMADO
18.00 CEMENTO PORTLAND TIPO I (42.5KG)
35.00 MADERA NACIONAL P/ENCOFRADO
CAMPAMENTO, DEPOS, TALLERES

KG
KG
M3
BLS
P2
EST

METRADO
1,986.09
37,791.12
922.10
4,365.64
6,943.96
1.00

COSTO UNITARIO
4.20
3.30
30.00
18.50
2.10
3,500.00

COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 8%
SUB TOTAL
IGV 18%
TOTAL
PRESUPUESTO ADELANTADO
PRESUPUESTO ACUMULADO
Porcentaje % segn cronograma valorizado de obra

CRONOGRAMA DE ADQUISICIN DE MATERIALES/INSUMOS


MIGUEL DE AUTIKI DEL DISTRITO DE PICHANAQUI,

PRESUPUESTO BASE
MONTO DE CONTRATO
PLAZO DE EJECUCION
ADELANTO DE MATERIALES
MONTO S/.

1 Mes

PLAZO DE EJECUCION (EN MESES)


3 Mes
4 Mes

2 Mes

:
:
:
:

5 Mes

8,341.56
124,710.70
27,663.00
80,764.34
14,582.32
3,500.00

1,390.26
20,785.12
4,610.50
13,460.72
2,430.39
583.33

1,390.26
20,785.12
4,610.50
13,460.72
2,430.39
583.33

1,390.26
20,785.12
4,610.50
13,460.72
2,430.39
583.33

1,390.26
20,785.12
4,610.50
13,460.72
2,430.39
583.33

1,390.26
20,785.12
4,610.50
13,460.72
2,430.39
583.33

259,561.91
25,956.19
20,764.95
306,283.05
55,130.95
361,414.00
PRESUPUESTO ADELANTADO
PRESUPUESTO ACUMULADO

41,529.91
4,152.99
3,322.39
49,005.29
8,820.95
57,826.24
57,826.24
57,826.24

41,529.91
4,152.99
3,322.39
49,005.29
8,820.95
57,826.24
57,826.24
115,652.48

41,529.91
4,152.99
3,322.39
49,005.29
8,820.95
57,826.24
57,826.24
173,478.72

41,529.91
4,152.99
3,322.39
49,005.29
8,820.95
57,826.24
57,826.24
231,304.96

41,529.91
4,152.99
3,322.39
49,005.29
8,820.95
57,826.24
57,826.24
289,131.20

segn cronograma valorizado de obra

6.40%

12.80%

19.20%

25.60%

32.00%

S/. 903,537.02
S/. 903,537.02
180 Dias calendarios
S/. 361,414.00

40.00%

6 Mes

PARCIAL
1,390.26
20,785.12
4,610.50
13,460.72
2,430.39
583.33

8,341.56
124,710.70
27,663.00
80,764.34
14,582.32
3,500.00

51,912.38
5,191.24
4,152.99
61,256.61
11,026.19
72,282.80
72,282.80
361,414.00

259,561.91
25,956.19
20,764.95
306,283.05
55,130.95
361,414.00
361,414.00

40.00%