CATEDRA:

CONSTRUCCIONES METALICAS

GUA DE TRABAJOS PRACTICO BASE CON COLUMNA EMPOTRADA


DATOS:
V = 5,90 t H = 2,30 t M = 2000 kgm e = 33,9 cm sH =40 kg/cm2 st = 1 kg/cm2 gH = 2,40 t/m3 gtr = 1,60 t/m3 (AC 3.3.2.4.3.) Seccin de columna = 2 PNU 160 a = 24 cm F = 48cm2 Ix = 1850 cm4 Wx = 232 cm3 ix =6,21 cm i1 = 1,89 cm ey = 1,84 cm Iy = 5130 cm4 Wy = 428 cm3 iy = 10,3 cm
1 1

* s=

V a1 * b1

sHadm

** s=

V M + a1 * b1 ( a1 * b12 ) / 6

sHadm

adopto a1 = a + 2 PNL 80/65/10 = 37 cm * b1 =

5900kg 30kg / cm 2 * 37cm

= 5,31cm

adopto b1 = 16 cm (PNU) + 2a PNL 80/65/10 = 31 cm ** strab=

5900 200000 + 31 * 37 31 * 37 2 / 6

= 33,42 kg/cm2 < sHadm

q tr = 33,42 kg/cm2

CALCULO DE PLACA INFERIOR DE ASIENTO

Pgina 1 de 4

2 1

2 1

Determinacin de momentos considerando placas (losas) s/eje 1-1 M1 = s/eje 2-2


q * l1 2 = 2

706 kgcm/cm

1 2 2

M2 = Losa central M3 ap y M3 tr y Dimensionado Acero F24 Clase II Destino C Cargas P S g = 1,45 de s =

706 kgcm/cm

= =

-595 kgcm/cm 602 kgcm/cm

sadm = 1.665 kg/cm2

M1 M = s adm W 1cm * e 2 / 6

tnec =

706 .kgcm * 6 1665 kg / cm 2 * 1cm

Adopto

tnec = 1,59 cm t = 19,0 mm

(3/4")

CALCULO DE UNIONES SOLDADAS

> 0,3 mm as = ancho soldadura < 0,7 tmin= 0,7 mm

UNION VERTICAL CARTELA-PERFIL U F=

V M + = 5.641 .kg 2*n=2 a*n=2


2 F t adm = 1245 kg/cm as * l

CIRSOC 304 T7
F

tsold = < 0 . 3 * 1245 l nec


F
= 15 . cm

l sold = l nec + 2a = 15,6 cm l sold = l nec + 2a =7,87 cm

> 0.7 * 1245 = 6.47.cm

> 15 amin = 4,5 cm l sold < 60 a = 42 cm adopto l sold = 8 cm

Pgina 2 de 4

UNION HORIZONTAL CARTELA-PERFIL U as = 0,7 cm l=


H = 1,54 .cm 4 * a s * t adm

adopto

l sold = 6 cm

VERIFICACION DE LA CARTELA q = qtr * 31cm/2 = 518 kg/cm se considera como una mnsula corta: h M =

q * l2 518 * 6.5 2 cm 2 = = 10 .943 .kgcm 2 2

se adopta t = 10mm
10943 .kgcm M = s adm W t * h2 6

h nec= 6,28 cm

se adopta h = 20 cm (constructivo)

CALCULO DE PERNOS DE ANCLAJE


N M r
s max x = a1 s max + s min

smax;min = a1 Z x smin = 23,13 y smax = -33,39 D e = 33,9 cm

N 6*e (1 )= A a1

smin = smax =

23,13 -33,39

x = 21,85 cm y = 2/3 a1 = 24,67 cm

Se debe considerar la situacin ms desfavorable, que es el caso hipottico de que N = 0 y slo est actuando el M Z = M/y = 200000 kgcm/24,67 cm = 8.107 kg Si est actuando N = 5.900 kg r = a/2 - x/3 = 11,22 cm 5.424 kg

M = 0
D

Z=

M - N * r 200 .000 - 5.900 * 11 .22 = = y 24 .67

A nec = adopto l anclaje =

8.107.kg Z = = 1.63.cm2 n* s adm 3 * 1.665kg / cm2

Fnec = 1,43 cm/,87 = 1,63 cm

Fperno = 1,6 cm

(5/8")

verifica tambin para la situacin de N=5.900 kg 90 cm > 10F = 16 cm

8.107 .kg Z = = n*p * f * t adm 3 * 3,14 * 1,6 * 6.kg / cm 2

Pgina 3 de 4

n*p * f * t adm

3 * 3,14 * 1,6 * 6.kg / cm 2

CALCULO DE LA BASE DE HORMIGN


R = N + B + T = 5900 kg + (vol T * gt)+(vol h * gh) = M H gt = Volt = gh = Volh = 1.600 kg/m3 2,4 m3 estimado 2.400 kg/m3 1,4 m3 estimado f N l=1m e R 13.100 kg

a=b es conveniente que las tensiones sobre el terreno sean positivas inferiores a la admisible. e =
H * d + M (2.300 * 1m) + 2.000 kgm = = R 13 .100 .kg

0,33 m

a = b = 2m

s1 = s1-2 =

0,65 kg/cm2 0,003 kg/cm2

R (1 a*b

6*e ) a

=
s2 =

se deben verificar las siguientes condiciones constructivas: 1)el ngulo de talud debe ser > 50 por ser hormign simple F = arctg100 /

( 200 - 37 ) = 2

F = 50,8 (BC) 2) la altura de la base debe ser mayor a ala longitud de anclaje del perno l > 90 cm (se adopta l = 100 cm)