Está en la página 1de 15

RESULTADO TOTAL DEL MES

(Expresado en Dolares Americanos)


PRESUPUESTO

MES:

may-12

FECHA:

10/07/2012

RESULTADOS

VARIACIONES

PRECIOS UNITARIOS

ORIGINAL
VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

(TM)
(TM)
(TM)
(M2)

REVISADO

ACUM. MES ANTERIOR

DEL MES

ACUM. PRESENTE MES

SALDO ESTIMADO

PROYECTADO

22,798
22,798
22,798
630,091

24,925
24,925
24,925
636,465

10,267
11,531
13,479
282,227

896
576
1,032
14,899

11,163
12,107
14,511
297,126

13,743
12,806
10,414
332,940

24,906
24,913
24,925
630,065

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,725
936
294
17%
24%
7%

2,787
950
383
18%
20%
4%

3,401
1,450
453
12%
0%
0%

5,840
3,024
1,076
12%
33%
6%

3,517
1,552
483
12%
30%
13%

2,338
922
287
12%
27%
8%

2,911
1,228
382
12%
29%
11%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

23,705

27,969,659

1,116
2,037

2,121,105
1,078,406

25,713
0
0
0
0
48
336
1,294
2,212

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

424,473
35,026

930,778
261,771

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

630,091
4
126

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO
TRANSPORTE A OBRA
OTROS
TOTAL DE COSTOS DE SUMINISTROS
PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- ESTRUCTURAS 2D Y 3D - CONGA "ARBOLES"
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

62,124,507

69,471,317

3,361,674

39,212,434
14,143
0
0
0
0
0
336
659
46

14,942,911
0
0
0
0
117,098
0
1,288,500
740,504

1,164
0
0
0
0
0
0
4
4

1,273,666
0
0
0
0
0

465,041
37,565

30,576,944
0
0
0
0
47,337
0
2,502,622
1,465,228
0
1,033,799
255,633

145,034
7,955

298,818
85,258

3,533,477
48,266
58,892

636,465
4
216

3,772,667
57,299
96,703

275,194
0
319

21,781
50
25

1,587,615
41,723
62,925

24,508
27
11

2,366,353
39,965
104,945

(GLOB)
(GLOB)
(GLOB)

32
24

1,633,060
337,132
18,000

26
25
0

(GLOB)
(GLOB)

189
24

238,473
859,133

243
22

(US$)
(US$)

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

40,780,414
21,344,093

42,574,108

29,945,583

REALES

72,519,690 3,048,374
(US$)
27,426,161
3,150,783
0
0
0
0
0
0
0
0
164,435
-117,098
0
0
2,517,642
-15,020
1,229,279
235,948

RELATIVAS

7,351
16,376

15,307
0
0
0
0
0
336
663
50

16,216,576
0
0
0
0
117,098
0
1,295,851
756,880

10,926
0
0
0
0
48
0
676
142

11,209,584
0
0
0
0
47,337
0
1,221,791
472,399

26,232
0
0
0
0
48
336
1,339
192

8,076
2,535

17,411
9,804

153,109
10,490

316,230
95,062

114,717
0

240,623
5,000

267,827
10,490

556,853
100,062

476,946
155,571

46%
61%

1,536,860
5,827
129,265

14,666
54

112,296
0
20,080

289,860
0
373

1,649,156
5,827
149,346

324,414
1
70

1,532,306
11,109
24,421

614,274
1
443

3,181,463
16,936
173,767

591,205
40,363
-77,064

16%
70%
-80%

12,217
98
6

1,602,025
36,982
40,689

1,038
0
0

91,931
2,705
4,118

13,254
98
6

1,693,955
39,687
44,807

8,061
12
4

691,565
2,791
43,859

21,314
111
10

2,385,520
42,478
88,666

-19,168
-2,513
16,279

-1%
-6%
16%

2,077,828
384,519
20,708

9
8
0

690,430
110,118
0

159
26,832
0

9
8
0

690,589
136,949
0

18
14
1

1,355,783
226,178
0

27
22
1

2,046,371
363,127
0

31,456
21,392
20,708

2%
6%
100%

410,083
570,971

211
4

330,778
531,940

1,959
36,001

211
4

332,736
567,941

2
15

3,292
724,409

213
19

336,029
1,292,350

74,054
-721,379

18%
-126%

22,488,003
16,724,431

1,620,688
1,740,986

41,921,139
30,598,551

0%
0%
-4%
-24%
-21%
-8%
-35%
55%

2,985
790
3,290
2,326
519
650

995,860
293,636
1,110,952
683,279
182,436
210,171

73
81
29
14
11
255

34,438
43,213
14,995
6,869
5,210
110,178

3,058
870
3,319
2,339
530
905

1,030,298
336,849
1,125,947
690,147
187,646
320,348

12
1,255
2,259
2,097
2,604
318

3,316
363,308
467,424
417,769
599,713
137,449

3,070
2,125
5,578
4,436
3,134
1,222

1,033,615
700,157
1,593,372
1,107,916
787,359
457,798

337,827
637,345

604
119
114
102
477
669
879

990,975
563,573
1,315,698
1,028,870
581,883
1,024,529
0
361,653
84,889
89,204
165,060
364,593
636,478
677,651

3,862,465
6,910,838
0
0
-42,640
-136,583
-277,674
-79,046
-205,476
566,732

951
386
156
71
459
233
301

480,684
181,165
103,733
12,442
35,737
206,499
214,493

280
107
91
26
44
8
8

124,337
67,408
41,728
21,504
15,908
7,103
10,227

1,231
493
247
97
503
240
308

605,021
248,573
145,460
33,946
51,645
213,602
224,719

59
18
38
148
140
381
574

110,069
20,149
36,957
89,393
117,601
288,376
417,263

1,290
511
285
245
642
621
882

715,090
268,723
182,417
123,339
169,246
501,977
641,982

-353,437
-183,833
-93,213
41,721
195,347
134,501
35,669

-98%
-217%
-104%
25%
54%
21%
5%

0
0
242,218

0
17,241
0

24,938
32,240
51,667

5,986

697
10,581
78,780

0
23,227
0

25,635
42,821
130,447

0
1,423
1

0
2,595
135,560

0
24,651
1

25,635
45,416
266,007

-25,635
-45,416
-23,789

0%
0%
-10%

0
761,593
651,890

5,877
267,447
270,677

14,781
98,475
293,652

294
11,119
14,605

330
5,468
20,432

6,170
278,566
285,282

15,111
103,943
314,084

117
313,364
326,342

523
187,335
279,715

6,287
591,930
611,624

15,634
291,278
593,799

-15,634
470,315
58,090

0%
62%
9%

3673.255
2,015
6,911
4,493
3,708

849784
487,193
1,616,802
869,827
546,533

2,127

454
925

45,783,604
23,687,713

3,202
2,322
5,171
5,338
3,748
1,224

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

120,000

0
0
1

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

0
594,782
630,091

653,144
581,321

0
606,322
631,026

24,108,691
18,789,109

17,812,448
11,809,442

10%
0%
0%
0%
0%
-247%
0%
-1%
16%

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

6,701,903

9,540,757

5,226,838

619,406

5,846,243

3,674,515

9,520,759

19,998

MARGEN DE CONTRIBUCIN

(US$)

14,642,190

14,146,956

11,497,593

1,121,581

12,942,866

8,134,927

21,077,793

6,930,836

49%

GASTOS INDIRECTOS DE FABRICACIN*


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

4,883,784
5,225,240

5,324,876
5,715,793

3,765,356
2,848,886

602,098
314,139

4,367,454
3,163,025

3,317,984
2,505,347

7,685,438
5,668,372

-2,360,562
47,421

-44%
1%

(US$)

4,533,166

3,106,287

4,883,351

205,344

5,412,387

2,311,596

7,723,983

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO A LA FECHA:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
0.00%
0.00%
0.00%

PEDRO BERRIOS
Analista de Costos

RICARDO VIDALN
Gerente de Administracin y Finanzas

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20146
N OT:
CLIENTE:
OBRA:

20146
Minera Chinalco Per S.A.
Transportadores Toromocho
PRECIOS UNITARIOS

PRESUPUESTO
ORIGINAL

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

REVISADO (4)

ACUM. MES ANTERIOR

DEL MES

SALDO ESTIMADO

0
172
217
5,771

0
0
10
49

0
172
227
5,820

231
60
4
1,083

231
231
231
6,903

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,726
1,194
466
6%
27%
15%

2,726
963
287
27%
18%
9%

5,001
2,089
559
11%
31%
-2%

0
0
0
10%
202%
259%

4,854
1,853
620
11%
25%
-10%

1,082
139
46
-7%
9%
-26%

3,881
1,411
472
10%
24%
-11%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

876

2,555,163
(US$)
826,242

82
31

138,806
119,975

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

14,849
0

32,669

4,066
0

8,944
0

1,951
0

4,118
976

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

28,844

190,058

6,903
0
0

53,413
0
0

5,771
0
15

26,119
0
5,697

1,216
0
1

145,970
0
4,295

1,242
14
0

149,063
2,012
0

1
1
0

2,257
1,602
0

0
0
0

0
1

0
2,765

0
0

937

67,553

15,687

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

8
1

29,033
5,852

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

10,100

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,435,975
1,119,188
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

788

16
16

0
28,844
28,844

323,459

11,945
71,565

15,864
14,422

FERNANDO MARIN

PROYECTADO

231
231
231
6,903

(GLOB)
(GLOB)
(GLOB)

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

937
937
937
28,844

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

may-12

FECHA:

RESULTADOS

(TM)
(TM)
(TM)
(M2)

(Q)

MES:

(Q)
223
0
0
0
0
48
0
33
35

877,728
(US$)
204,803
0
0
0
0
47,337
0
57,371
126,398

655,155
222,573
(US$)

(Q)
206
0
0
0
0
0
0
33
0

858,066
(US$)
233,203
0
0
0
0
0
0
61,228
1,365

(Q)

(Q)

832,792
(US$)
244,047
0
0
0
0
0
0
61,228
1,365

(Q)

(Q)

372
0

2,123
0

4,490
976

41
0

83
0

2,165
0

4,573
976

4,371
-976

49%
0%

49
0

3,803
0
0

5,820
0
15

29,922
0
5,697

701
0
0

-840
0
0

6,521
0
15

29,082
0
5,697

24,331
0
-5,697

46%
0%
0%

0
0
0

0
0
0

1,242
14
0

149,063
2,012
0

0
0
1

0
0
4,295

1,242
14
1

149,063
2,012
4,295

-3,093
-2,012
0

-2%
0%
0%

134
2,540
0

0
259
0

0
0
0

134
2,799
0

1
1
0

568
54
0

1
1
0

702
2,853
0

1,555
-1,251
0

69%
-78%
0%

0
13,210

0
0

0
0

0
13,210

0
1

0
1,000

0
1

0
14,210

0
-11,445

0%
-414%

571,183
326,111
(US$)

0
186
1
0
0
0

0
53,044
244
0
0
0

0
172
1
0
0
0

0
67,417
410
0
0
0

0
10
0
0
0
0

0
6,370
0
0
0
0

0
182
1
0
0
0

0
73,787
410
0
0
0

0
4
0
0
0
0

0
1,542
0
0
0
0

0
186
1
0
0
0

0
75,329
410
0
0
0

9
0
0
0
0
4
0

2,578
0
0
0
0
2,929
0

9
0
0
0
0
4
0

3,890
61
0
0
0
4,876
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

9
0
0
0
0
4
0

3,890
61
0
0
0
4,876
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

9
0
0
0
0
4
0

3,890
61
0
0
0
4,876
0

-1,312
-61
0
0
0
-1,947
0

-51%
0%
0%
0%
0%
-66%
0%

0
0
0

0
0
0

0
31
0

0
57
10,082

0
0
4,137

0
31
0

0
57
14,220

0
6
0

0
11
0

0
36
0

0
68
14,220

0
-68
-14,220

0%
0%
0%

0
6,903
7,517

0
3,797
3,759

582
5,471
5,189

2,755
1,457
4,878

49
0
0

55
0
0

631
5,471
5,189

2,810
1,457
4,878

117
1,013
583

523
270
421

748
6,484
5,772

3,333
1,727
5,300

-3,333
2,070
-1,541

0%
55%
-41%

-42,863

(Q)

(Q)

(Q)

56,241
8,262
(US$)

(Q)

(Q)

(US$)

437,255

66,350

95,884

10,562

106,446

2,767

109,213

MARGEN DE CONTRIBUCIN

(US$)

681,933

156,223

262,518

-51,115

211,403

5,495

216,898

60,675

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

147,353
151,306

36,343
37,318

154,469
123,588

7,573
6,661

162,042
130,249

12,751
9,729

174,793
139,978

-138,450
-102,660

(US$)

383,274

82,561

-15,539

-65,349

-80,888

-16,985

-97,873

RUBRO
PRECIO DE VENTA RECONOCIDO POR Minera Chinalco Per S.A. PARA LA OT 20146:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

-21%
0%
0%
0%
0%
0%
0%
-7%
99%

83,972
103,538
(US$)
0
0
-22,286
-166
0
0
0

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

MARGEN OPERACIONAL

173
0

514,942
317,850
(US$)

221
0
0
0
0
48
0
33
0

897,294 19,566
(US$)
(US$)
247,790
-42,987
0
0
0
0
0
0
0
0
47,337
0
0
0
61,228
-3,857
1,365
125,032

0
0

15,278
-40,552
(US$)

4
0
0
0
0
48
0
0
0

64,502
(US$)
3,744
0
0
0
0
47,337
0
0
0

RELATIVAS

217
0
0
0
0
0
0
33
0

499,664
358,402
(US$)

11
0
0
0
0
0
0
0
0

-25,274
(US$)
10,844
0
0
0
0
0

REALES

%
$ 832,792
$ 638,931
$ 584,784
$ 193,861

76.72%
70.22%
23.28%

PEDRO BERRIOS
Analista de Costos

FERNANDO MARIN
ADC

%
0%
0%
-42%
-68%
0%
0%
0%

-381%
-275%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20152
N OT:
CLIENTE:
OBRA:

20152
Thyssenkrupp Robins
Overland Conveyor System - Antapaccay Project
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

REVISADO (3)

ACUM. MES ANTERIOR

SALDO ESTIMADO

48
38
11
1,167

313
314
317
8,945

6
5
2
197

319
319
319
9,142

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,681
832
241
9%
22%
6%

2,681
554
237
27%
12%
-4%

3,171
1,067
481
13%
18%
-8%

1,016
32
702
17%
-66%
-89%

2,910
941
508
13%
15%
-11%

-9,283
1,897
1,023
5%
-9%
-6%

2,711
957
516
13%
16%
-12%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

164

26
28

52,289
108,372

334
0
0
0
0
0
0
45
32

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

2,725
737

5,996
4,603

2,725
1,208

5,996
7,548

2,060
0

4,353
-409

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

5,575

21,735

9,142
0
0

48,940
0
0

8,178
0
41

81,190
0
17,199

176

10,561

319
0
1

46,212
0
15,711

319
0
0

56,095
962
1,977

9,250
1,000

0
0
0

9,250
1,815
0

0
0
0

0
0

0
1,976

0
0

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)
(US$)
(US$)

373,536
168,109
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

(Q)

1,650

136

10
4

0
4,838
5,575

33,233

7,820
2,138

2,661
2,788

GONZALO RODRIGUEZ

PROYECTADO

266
276
306
7,778

(GLOB)
(GLOB)
(GLOB)

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

319
319
319
9,142

541,645
(US$)
158,080

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

DEL MES

202
202
202
5,575

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

may-12

FECHA:

RESULTADOS

(TM)
(TM)
(TM)
(M2)

(Q)

MES:

856,460
(US$)
320,974
0
0
0
0
0
0
92,723
128,284

679,429
177,030
(US$)

(Q)
299
0
0
0
0
0
0
44
0

875,620
(US$)
289,046
0
0
0
0
0
0
83,450
0

(Q)

(Q)

914,246
(US$)
302,715
0
0
0
0
0
0
83,450
6,014

(Q)

(Q)

61
0

133
0

2,121
0

4,486
-409

13
0

27
0

2,135
0

4,513
-409

1,483
7,957

25%
105%

1,167
0

16,934
0
0

9,345
0
41

98,125
0
17,199

197
0
3

-64,728
0
1,185

9,542
0
44

33,397
0
18,384

15,543
0
-18,384

32%
0%
0%

1
0
0

64
311
238

319
0
0

56,160
1,273
2,215

0
0
1

0
100
2,086

319
0
1

56,160
1,373
4,301

-9,948
-1,373
11,410

-22%
0%
73%

21,437
2,431
0

0
45
0

0
0
0

21,437
2,476
0

0
0
0

771
16
0

0
0
0

22,208
2,492
0

-12,958
-677
0

-140%
-37%
0%

178
23,163

0
0

0
0

178
23,163

0
0

0
200

0
0

178
23,363

-178
-21,387

0%
-1082%

560,285
305,639
(US$)

30
21
52
31
21

8,961
4,346
9,830
5,277
4,654

24
34
48
28
22
0

8,087
11,513
14,823
8,647
6,978
0

3
0
0
0
0
0

1,927
0
0
0
0
0

27
34
48
28
22
0

10,014
11,513
14,823
8,647
6,978
0

2
0
0
0
0
0

678
0
0
0
0
0

29
34
48
28
22
0

10,692
11,513
14,823
8,647
6,978
0

16
38
4
0
0
19
5

4,800
9,139
1,200
0
0
14,369
3,196

16
52
5
0
3
19
11

12,947
19,935
5,095
7
1,069
14,487
13,368

0
8
0
0
0
0
0

0
5,436
0
0
0
0
0

16
59
5
0
3
19
11

12,947
25,371
5,095
7
1,069
14,487
13,368

0
0
0
0
0
0
0

0
0
0
0
0
0
0

16
59
5
0
3
19
11

12,947
25,371
5,095
7
1,069
14,487
13,368

-8,147
-16,232
-3,895
-7
-1,069
-118
-10,172

-170%
-178%
-325%
0%
0%
-1%
-318%

0
0
0

0
0
0

0
1,708
0

690
3,496
0

372

0
688
16,612

0
2,080
0

690
4,184
16,612

0
0
0

0
0
4,447

0
2,080
0

690
4,184
21,059

-690
-4,184
-21,059

0%
0%
0%

0
7,934
9,142

0
4,364
5,571

522
7,451
6,371

2,207
2,146
7,344

0
795
1,167

0
391
1,632

522
8,246
7,538

2,207
2,537
8,976

0
197
197

0
59
142

522
8,443
7,735

2,207
2,596
9,119

-2,207
1,768
-3,548

0%
41%
-64%

-89,144

(Q)

(Q)

(Q)

-58,197
9,876
(US$)

5%
0%
0%
0%
0%
0%
0%
10%
95%

119,144
128,608
(US$)
0
-1,731
-7,167
-4,993
-3,370
-2,324
0

(Q)

618,483
295,763
(US$)

315
0
0
0
0
0
0
44
0

865,924 9,464
(US$)
(US$)
304,861
16,114
0
0
0
0
0
0
0
0
0
0
0
0
83,450
9,273
6,014
122,270

0
6,014

37,409
1,217
(US$)

2
0
0
0
0
0
0
0
0

-48,322
(US$)
2,146
0
0
0
0
0
0
0
0

RELATIVAS

313
0
0
0
0
0
0
44
0

581,074
294,546
(US$)

14
0
0
0
0
0
0
0
0

38,626
(US$)
13,669
0
0
0
0
0

REALES

(Q)

(Q)

%
0%
-19%
-165%
-51%
-64%
-50%
0%

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

48,640

75,707

132,838

26,687

159,525

5,327

164,852

MARGEN DE CONTRIBUCIN

(US$)

119,469

101,323

161,709

-25,471

136,238

4,549

140,787

39,464

39%

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

38,058
48,912

60,179
77,341

128,198
103,564

5,738
3,346

133,936
106,911

988
754

134,925
107,665

-74,746
-30,324

-124%
-39%

(US$)

32,499

-36,196

-70,054

-34,555

-104,609

2,806

-101,802

-65,606

181%

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO POR Thyssenkrupp Robins PARA LA OT 20152:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 914,246
$ 618,119
$ 556,361
$ 296,126

67.61%
60.85%
32.39%

PEDRO BERRIOS
Analista de Costos

GONZALO RODRIGUEZ
ADC

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20153
N OT:
CLIENTE:
OBRA:

20153
STM S.A
Inplant Conveyor System - Antapaccay Project - Tintaya Expansion
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

may-12

FECHA:

10/07/2012

ADC:

GONZALO RODRIGUEZ

RESULTADOS

REVISADO (3)

ACUM. MES ANTERIOR

DEL MES

ACUM. PRESENTE MES

VARIACIONES
SALDO ESTIMADO

PROYECTADO

(TM)
(TM)
(TM)
(M2)

890
890
890
25,452

340
340
340
10,196

264
314
337
8,668

24
7
0
232

288
321
337
8,900

51
19
3
1,296

340
340
340
10,196

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,774
1,118
555
10%
20%
6%

2,967
1,078
840
5%
8%
-5%

3,916
1,502
762
11%
19%
-3%

1,047
1,018
461
0%
53%
28%

3,857
1,493
756
11%
19%
-3%

455
723
366
0%
78%
3%

3,671
1,450
735
10%
19%
-3%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

858

2,467,746
(US$)
887,021

91
29

202,110
31,260

328
0
0
0
0
0
0
25
4

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

12,204
11,407

26,849
85,553

5,252
10,196

11,554
76,470

2,702
0

5,811
0

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

25,452

142,189

71,095
0
7,800

7,124
0
26

51,775
0
10,057

(Q)

MES:

(Q)

1,007,249
(US$)
340,864
0
0
0
0
0
0
55,228
10,231

(Q)
334
0
0
0
0
0
0
25
15

1,230,901
(US$)
324,639
0
0
0
0
117,098
0
49,242
37,172

(Q)
0
0
0
0
0
0
0
0
0

6,920
(US$)
0
0
0
0
0
0

(Q)

1,237,821
(US$)
324,639
0
0
0
0
117,098
0
49,242
37,172

(Q)
0
0
0
0
0
0
0
0
1

8,480
(US$)
0
0
0
0
0
0
0
0
2,250

(Q)
334
0
0
0
0
0
0
25
15

REALES

1,246,301 239,052
(US$)
(US$)
324,639
16,225
0
0
0
0
0
0
0
0
117,098
-117,098
0
0
49,242
5,986
39,422
-29,191

RELATIVAS

0
0

334
0
0
0
0
0
0
25
15

5%
0%
0%
0%
0%
0%
0%
11%
-285%

0
0

0
0

2,702
0

5,811
0

22
0

45
0

2,725
0

5,856
0

5,699
76,470

49%
100%

0
0

0
0
0

7,124
0
26

51,775
0
10,057

1,843
0
0

-12,322
0
0

8,967
0
26

39,453
0
10,057

31,642
0
-2,257

45%
0%
-29%

0
0
0

0
0
0

1,019
2
2

149,479
1,399
1,944

0
0
0

0
0
0

1,019
2
2

149,479
1,399
1,944

-109,056
1,347
2,191

-270%
49%
53%

17

7,800

10,196
0
17

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

890
42
16

46,967
6,380
9,610

340
18
6

40,423
2,746
4,135

1,019
2
2

149,479
1,399
1,944

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

1,800
5,500

1
1
0

1,800
5,500
0

1
1
0

576
5,761
0

0
188
0

1
1
0

576
5,949
0

0
1
0

0
49
0

1
2
0

576
5,998
0

1,224
-498
0

68%
-9%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

20,588

0
0

0
13,360

0
0

0
3,716

0
0

0
0

0
3,716

0
0

0
5,000

0
0

0
8,716

0
4,644

0%
35%

753,880
492,421
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,473,627
994,119
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

606

50
122

0
14,045
25,452

214,223

37,442
223,644

7,023
11,453

641,206
366,043
(US$)
0
6
247
0
0
2

0
4,045
167,961
0
0
1,385

0
6
230
0
0
0

0
3,191
162,032
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
6
230
0
0
0

0
3,191
162,032
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
6
230
0
0
0

0
3,191
162,032
0
0
0

-112,673
126,379
(US$)
0
0
854
5,929
0
0
1,385

0
0
0
0
0
21
36

0
0
0
0
0
15,750
82,479

0
16
0
0
0
21
18

0
11,360
6,209
0
0
23,716
19,637

0
0
0
0
0
0
0

0
-11,360
0
0
0
0
0

0
16
0
0
0
21
18

0
0
6,209
0
0
23,716
19,637

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
16
0
0
0
21
18

0
0
6,209
0
0
23,716
19,637

0
0
-6,209
0
0
-7,965
62,842

0%
0%
0%
0%
0%
-51%
76%

0
0
0

0
0
1,989

0
559
0

0
1,039
0

0
0
13,970

0
559
0

0
1,039
13,970

0
0
0

0
0
6,500

0
559
0

0
1,039
20,470

0
-1,039
-18,480

0%
0%
-929%

0
10,196
10,196

0
7,023
4,588

247
8,720
8,668

1,278
2,317
8,758

0
232
232

0
114
325

247
8,952
8,901

1,278
2,431
9,083

0
47
410

0
13
304

247
8,999
9,311

1,278
2,444
9,387

-1,278
4,579
-4,799

0%
65%
-105%

(Q)

(Q)

758,669
472,232
(US$)

188
6,732
(US$)

(Q)

758,857
478,963
(US$)

(Q)

-4,978
13,458
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

493,785

285,222

239,539

3,049

242,587

6,816

249,404

35,818

MARGEN DE CONTRIBUCIN

(US$)

500,334

80,820

232,693

3,683

236,376

6,642

243,018

162,197

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

173,803
178,466

66,336
68,116

174,313
96,808

1,330
414

175,643
97,222

3,612
2,756

179,256
99,978

-112,920
-31,862

(US$)

148,065

-53,632

-38,428

1,938

-36,490

273

-36,216

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO POR STM S.A PARA LA OT 20153:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 1,237,821
$ 1,104,728
$ 586,297
$ 133,092

89.25%
47.37%
10.75%

PEDRO BERRIOS
Analista de Costos

GONZALO RODRIGUEZ
ADC

%
0%
0%
21%
4%
0%
0%
100%

-170%
-47%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20155
N OT:
CLIENTE:
OBRA:

20155
Ajani S.A.C.
Nueva Planta de Chancado - Proyecto Jessica
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

REVISADO (2)

ACUM. MES ANTERIOR

DEL MES

SALDO ESTIMADO

478
606
648
15,865

43
5
2
134

522
611
651
15,999

235
145
106
1,860

757
757
757
17,859

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,677
814
228
10%
22%
3%

2,924
897
252
13%
23%
5%

3,022
1,330
404
12%
31%
7%

-5,901
-7,654
216
13%
133%
141%

2,949
1,256
403
12%
29%
5%

2,351
555
178
14%
16%
-4%

2,835
1,122
360
12%
27%
4%

559

59
1

132,573
63,733

GONZALO RODRIGUEZ

PROYECTADO

757
757
757
17,859

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(GLOB)

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

560
560
560
15,799

1,499,943
(US$)
628,054

may-12

FECHA:

RESULTADOS

(TM)
(TM)
(TM)
(M2)

(Q)

MES:

813
0
0
0
0
0
0
48
1

2,144,595
(US$)
930,620
0
0
0
0
0
0
109,240
98,614

(Q)

681
0
0
0
0
0
0
48
0

1,833,011
(US$)
675,341
0
0
0
0
0
0
101,209
0

(Q)

(Q)
2
0
0
0
0
0
0
0
0

-29,543
(US$)
2,051
0
0
0
0
0

683
0
0
0
0
0
0
49
0

1,803,468
(US$)
677,392
0
0
0
0
0
0
101,689
0

(Q)

481
0

122
0
0
0
0
0
0
0
1

341,127
(US$)
119,416
0
0
0
0
0
0
0
98,614

(Q)

(Q)
806
0
0
0
0
0
0
49
1

REALES

2,144,595 0
(US$)
796,808
0
0
0
0
0
0
101,689
98,614

(US$)
133,812
0
0
0
0
0
0
7,551
0

RELATIVAS

%
14%
0%
0%
0%
0%
0%
0%
7%
0%

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

9,937
0

21,862

45,000
0

99,003
0

5,671
1,055

11,926
3,989

1
0

2
0

5,672
1,055

11,928
3,989

924
0

1,858
0

6,596
1,055

13,786
3,989

85,217
-3,989

86%
0%

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

15,799
1

82,601
4,135

17,859
1
0

97,957
4,135
0

15,865
0
52

59,210
0
19,937

134
0

6,246
0
0

15,999
0
52

65,456
0
19,937

531
0
0

2,171
0
0

16,530
0
52

67,626
0
19,937

30,331
4,135
-19,937

31%
100%
0%

0
0
0

0
0
0

753
28
1

91,730
3,021
4,202

0
0
0

0
0
0

753
28
1

91,730
3,021
4,202

-31,202
-3,021
-4,202

-52%
0%
0%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

560

44,830

757
0
0

60,528
0
0

753
28
1

91,730
3,021
4,202

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

53,283
10,641

1
1
0

53,283
10,641
0

0
0
0

50,954
4,967
0

0
0
0

0
0
0

50,954
4,967
0

1
1
0

36,290
809
0

1
1
0

87,244
5,776
0

-33,961
4,865
0

-64%
46%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

1,898

0
1

0
1,898

0
0

0
0

0
0

0
0

0
0

0
1

0
1,500

0
1

0
1,500

0
398

0%
21%

1,295,921
848,674
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,043,610
456,333
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

5.99

1775

470

88,747

7
21

0
15,799
15,799

5,517
2,974

7,900
20,855

1,465,918
678,677
(US$)
215
140
76
47
186
0

54,306
30,763
15,247
8,448
29,775
0

5
33
311
4
21
0

1,327
12,186
82,425
1,635
7,695
0

0
0
0
0
0
0

0
26
0
0
0
0

5
33
311
4
21
0

1,327
12,212
82,425
1,635
7,695
0

10
13
0
0
19
0

2,638
3,969
0
0
5,234
0

15
46
311
4
40
0

3,965
16,181
82,425
1,635
12,928
0

169,997
169,997
(US$)
0
50,341
14,582
-67,178
6,813
16,847
0

0
0
0
0
0
21
22

0
0
0
0
0
15,942
3,823

157
2
6
4
0
13
44

71,670
1,698
1,854
717
0
11,101
27,478

0
2
0
0
0
0
0

0
803
0
0
0
0
0

157
4
6
4
0
13
44

71,670
2,501
1,854
717
0
11,101
27,478

0
0
0
61
0
3
0

0
0
0
11,292
0
2,543
0

157
4
6
64
0
16
44

71,670
2,501
1,854
12,009
0
13,644
27,478

-71,670
-2,501
-1,854
-12,009
0
2,298
-23,655

0%
0%
0%
0%
0%
14%
-619%

0
0
0

0
0
0

0
2,217
0

0
4,120
0

0
0
0

0
2,217
0

0
4,120
0

0
0
0

0
0
0

0
2,217
0

0
4,120
0

0
-4,120
0

0%
0%
0%

0
17,859
17,859

0
8,930
23,574

1,733
12,917
14,621

5,027
3,156
13,065

0
134
134

0
66
187

1,733
13,051
14,755

5,027
3,222
13,252

0
233
67

0
70
48

1,733
13,283
14,822

5,027
3,291
13,301

-5,027
5,639
10,274

0%
63%
44%

-81,220

(Q)

1,026,485
806,526
(US$)

(Q)

8,779
-38,322
(US$)

(Q)

1,035,264
768,204
(US$)

(Q)

260,657
80,469
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

127,768

190,808

245,153

1,082

246,235

25,793

272,028

MARGEN DE CONTRIBUCIN

(US$)

328,565

487,868

561,373

-39,404

521,969

54,676

576,645

88,777

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

138,205
141,912

186,598
191,604

249,530
180,929

1,055
1,318

250,584
182,247

38,169
29,122

288,754
211,369

-102,155
-19,765

(US$)

48,448

109,665

130,914

-41,777

89,137

-12,615

76,522

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO POR Ajani S.A.C. PARA LA OT 20155:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 1,803,468
$ 1,549,200
$ 1,254,150
$ 254,268

85.90%
69.54%
14.10%

PEDRO BERRIOS
Analista de Costos

GONZALO RODRIGUEZ
ADC

%
0%
93%
47%
-441%
81%
57%
0%

-55%
-10%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20158
N OT:
CLIENTE:
OBRA:

20158
Thyssenkrupp Robins
Overland Conveyor System, Cooper Ore - Structures Packags 3 - Antapaccay
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

may-12

FECHA:

10/07/2012

ADC:

GONZALO RODRIGUEZ

RESULTADOS

REVISADO (1)

ACUM. MES ANTERIOR

DEL MES

ACUM. PRESENTE MES

VARIACIONES
SALDO ESTIMADO

PROYECTADO

(TM)
(TM)
(TM)
(M2)

1,004
1,004
1,004
34,240

1,148
1,148
1,148
33,957

776
901
1,082
24,594

297
230
66
4,307

1,073
1,131
1,148
28,901

74
17
0
5,056

1,148
1,148
1,148
33,957

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,948
1,037
295
9%
25%
8%

2,948
1,044
335
9%
24%
7%

3,611
1,581
645
11%
26%
3%

1,447
909
372
11%
37%
18%

3,170
1,444
590
12%
27%
4%

6,281
1,278
522
0%
12%
6%

3,215
1,442
589
12%
27%
4%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

MES:

(Q)
1,019

2,959,648
(US$)
1,151,541

77
2

146,732
4,783

1,168
0
0
0
0
0
0
77
9

(Q)

3,383,803
(US$)
1,241,532
0
0
0
0
0
0
146,732
29,854

(Q)
1,111
0
0
0
0
0
0
85
17

3,252,798
(US$)
1,181,049
0
0
0
0
0
0
196,393
61,092

(Q)
69
0
0
0
0
0
0
0
4

333,174
(US$)
73,316
0
0
0
0
0
0
10,361

(Q)
1,180
0
0
0
0
0
0
85
21

3,585,972
(US$)
1,254,365
0
0
0
0
0
0
196,393
71,453

(Q)
0
0
0
0
0
0
0
0
0

104,228
(US$)
0
0
0
0
0
0
0
0
0

(Q)
1,180
0
0
0
0
0
0
85
21

REALES

3,690,200 306,397
(US$)
(US$)
1,254,365
-12,833
0
0
0
0
0
0
0
0
0
0
0
0
196,393
-49,661
71,453
-41,600

RELATIVAS

%
-1%
0%
0%
0%
0%
0%
0%
-34%
-139%

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

28,449
22,882

62,588
171,615

28,449
26,161

62,588
171,615

9,708
2,850

20,342
28,880

128
2,535

277
9,804

9,836
5,385

20,619
38,684

0
0

0
0

9,836
5,385

20,619
38,684

41,969
132,931

67%
77%

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

34,240

137,041
33,088

137,041
0
33,088

18,809
0
60

89,461
0
22,222

4,307

77

33,957
0
77

13,141
0
0

23,116
0
60

102,602
0
22,222

5,135
0
25

22,124
0
9,082

28,251
0
85

124,726
0
31,304

12,315
0
1,784

9%
0%
5%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

1,004
1
1

61,234
1,528
36,630

1,065
1
1

140,559
1,528
55,761

1,148
4
1

158,300
3,495
1,793

7
0
0

1,206
341
3,880

1,155
4
1

159,506
3,836
5,673

0
0
1

0
0
36,630

1,155
4
2

159,506
3,836
42,303

-18,947
-2,308
13,458

-13%
-151%
24%

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

76,115
14,847

1
1
0

76,115
14,847
0

0
0
0

36,018
21,947
0

136
1,806
0

0
0
0

36,154
23,753
0

1
1
0

7,772
0
0

1
1
0

43,926
23,753
0

32,189
-8,906
0

42%
-60%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

20,807

0
1

0
73,975

0
0

0
7,674

0
9,759

0
0

0
17,433

0
1

0
7,417

0
1

0
24,850

0
49,125

0%
66%

2,035,717
1,654,483
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,918,549
1,041,099
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES, REFABRICACIONES, PREMONTAJE Y ACELERACIN

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

526.025

150969

207

36,816

44
151

0
11,075
34,240

32,635
48,074

5,538
22,412

2,185,235
1,198,568
(US$)
526
0
74
207
62
0

150,969
0
16,587
36,816
21,556
0

425
12
70
1
2
0

179,389
5,536
27,083
505
781
0

0
5
2
0
0
0

0
2,940
1,380
303
0
0

425
17
72
2
2
0

179,389
8,476
28,463
807
781
0

0
0
0
0
0
0

0
0
0
0
0
0

425
17
72
2
2
0

179,389
8,476
28,463
807
781
0

149,518
455,915
(US$)
0
-28,420
-8,476
-11,876
36,009
20,775
0

0
0
0
0
0
44
15

0
0
0
0
0
32,635
12,638

273
81
28
7
11
20
57

210,332
41,137
11,357
258
2,097
16,617
31,150

15
2
29
0
0
2
2

6,346
1,439
22,952
1,709
0
1,527
2,977

288
84
57
8
11
22
59

216,679
42,576
34,309
1,967
2,097
18,144
34,126

0
0
0
0
0
0
0

0
0
0
0
0
0
0

288
84
57
8
11
22
59

216,679
42,576
34,309
1,967
2,097
18,144
34,126

-216,679
-42,576
-34,309
-1,967
-2,097
14,491
-21,488

0%
0%
0%
0%
0%
44%
-170%

0
0
0

0
0
85,000

0
4,738
0

1,877
8,788
11,696

1,828

494
3,427
32,804

0
6,566
0

2,371
12,215
44,500

0
0
0

0
0
4,613

0
6,566
0

2,371
12,215
49,113

-2,371
-12,215
35,887

0%
0%
42%

0
11,075
33,957

0
5,538
22,227

2,433
16,619
18,306

2,955
5,526
24,334

48
2,479
4,259

54
1,219
5,958

2,481
19,098
22,565

3,008
6,745
30,292

0
0
5,056

0
0
4,045

2,481
19,098
27,621

3,008
6,745
34,337

-3,008
-1,207
-12,111

0%
-22%
-54%

(Q)

1,828,665
1,424,132
(US$)

(Q)

124,027
209,147
(US$)

(Q)

1,952,692
1,633,280
(US$)

(Q)

83,024
21,204
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

296,444

383,966

581,416

85,529

666,945

8,658

675,603

-291,638

MARGEN DE CONTRIBUCIN

(US$)

744,655

814,602

842,716

123,619

966,335

12,545

978,880

164,278

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

250,580
257,303

286,492
294,178

440,886
309,650

42,473
19,524

483,359
329,174

3,626
2,766

486,985
331,940

-200,493
-37,762

(US$)

236,772

233,933

92,181

61,622

153,803

6,153

159,955

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO POR Thyssenkrupp Robins PARA LA OT 20158:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 3,585,972
$ 2,290,161
$ 2,090,245
$ 1,295,811

63.86%
58.29%
36.14%

PEDRO BERRIOS
Analista de Costos

GONZALO RODRIGUEZ
ADC

%
0%
-19%
0%
-72%
98%
96%
0%

-70%
-13%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20159
N OT:
CLIENTE:
OBRA:

20159
SNC - Lavalin
Structural Steel Fabrication - Fenix Power Peru Project
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

may-12

FECHA:

10/07/2012

ADC:

JAVIER POZO

RESULTADOS

REVISADO (3)

ACUM. MES ANTERIOR

DEL MES

VARIACIONES

ACUM. PRESENTE MES

SALDO ESTIMADO

PROYECTADO

(TM)
(TM)
(TM)
(M2)

884
884
884
14,424

1,188
1,188
1,188
23,841

1,092
1,093
1,103
18,100

25
24
43
907

1,118
1,117
1,146
19,007

70
71
42
4,834

1,188
1,188
1,188
23,841

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,618
892
202
12%
26%
10%

3,194
1,273
240
17%
32%
19%

3,361
1,650
390
13%
38%
17%

2,436
145
1,675
12%
-63%
-129%

3,341
1,618
418
13%
36%
15%

883
818
211
13%
69%
25%

3,194
1,570
406
13%
36%
15%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

991

2,314,217
(US$)
1,209,745

21,526

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

17,407
0

38,296

23,759
0

3,793,976
(US$)
1,560,211
0
0
0
0
0
0
192,682
0
0
52,271
0

12,483
0

26,524
0

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

14,424

48,231

23,841
0
84

139,971
0
33,510

18,100
0
62

121,960
0
21,892

(Q)

MES:

(Q)
1,323
0
0
0
0
0
0
84
0

(Q)
1,187
0
0
0
0
0
0
72
0

3,671,897
(US$)
1,248,827
0
0
0
0
0
0
161,092
159

(Q)

59,319
(US$)
44,893
0
0
0
0
0

3,731,216
(US$)
1,293,721
0
0
0
0
0
0
161,325
159

62,760
(US$)
30,986
0
0
0
0
0
0
12,132
0

(Q)
1,271
0
0
0
0
0
0
84
0

3,793,976 0
(US$)
1,324,707
0
0
0
0
0
0
173,457
159

233
0

0
0

0
0

12,483
0

26,524
0

460
0

924
0

12,943
0

27,448
0

24,823
0

47%
0%

907
3

5,550
0
973

19,007
0
65

127,510
0
22,865

2,739
0
19

-52,274
780
6,822

21,747
0
84

75,236
780
29,687

64,735
-780
3,823

46%
0%
11%

11
0
0

1,317
0
0

79
1
0

96,720
99
0

0
0
0

0
31
0

79
1
0

96,720
130
0

-1,684
-34
0

-2%
-35%
0%

35
0
0
0
0
0
0
12
0

(US$)
235,504
0
0
0
0
0
0
19,225
-159

RELATIVAS

(Q)
1,235
0
0
0
0
0
0
72
0

48
0
0
0
0
0
0
0
0

(Q)

REALES

%
15%
0%
0%
0%
0%
0%
0%
10%
0%

1,777

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

884
1

70,707
96

1,188
1
0

95,036
96
0

68
1
0

95,402
99
0

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

78,613
10,000

1
1
0

132,159
10,000
0

1
1
0

129,575
7,500
0

0
856
0

1
1
0

129,575
8,356
0

1
1
0

0
308
0

2
2
0

129,575
8,664
0

2,584
1,336
0

2%
13%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

74
1

39,664
6,987

109
1

58,424
6,987

31
1

50,363
5,380

1,959
0

31
1

52,321
5,380

2
1

3,292
1,607

33
2

55,613
6,987

2,811
0

5%
0%

1,929,162
1,864,814
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,525,642
788,575
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

38
137
695

4
1

0
14,424
14,424

8,311
27,379
125,166

2,759
572

7,212
7,212

2,281,347
1,512,629
(US$)
0
65
95
558
237
0

0
14,271
19,008
100,472
42,734
0

0
16
443
52
237
0

69
5,507
140,946
15,866
75,358
0

0
0
0
0
0
0

0
0
0
0
0
0

0
16
443
52
237
0

69
5,507
140,946
15,866
75,358
0

0
24
0
0
0
0

0
6,858
0
0
0
0

0
40
443
52
237
0

69
12,365
140,946
15,866
75,358
0

352,185
352,185
(US$)
0
-69
1,906
-121,938
84,607
-32,623
0

11
29
52
11
11
26
10

1,906
6,360
10,303
1,906
1,906
19,562
7,411

11
29
57
51
86
19
29

8,805
7,172
48,039
8,916
14,134
18,383
33,341

1
25
15
3
0
1
0

539
17,370
6,922
1,267
0
1,370
143

13
54
72
54
86
20
29

9,344
24,542
54,961
10,183
14,134
19,753
33,484

0
0
0
0
0
2
5

0
0
0
0
0
1,804
3,540

13
54
72
54
86
23
34

9,344
24,542
54,961
10,183
14,134
21,557
37,024

-7,439
-18,182
-44,658
-8,277
-12,228
-1,995
-29,613

-390%
-286%
-433%
-434%
-642%
-10%
-400%

0
0
0

0
0
35,229

0
1,815
0

2,146
3,378
19,201

185

0
312
11,257

0
2,000
0

2,146
3,690
30,458

0
0
0

0
0
0

0
2,000
0

2,146
3,690
30,458

-2,146
-3,690
4,771

0%
0%
14%

0
23,841
23,841

0
11,920
11,920

0
19,771
17,397

0
5,860
18,776

0
722
907

0
355
1,269

0
20,493
18,304

0
6,215
20,045

0
1,011
3,443

0
307
2,513

0
21,504
21,747

0
6,522
22,558

0
5,398
-10,638

0%
45%
-89%

(Q)

1,868,773
1,803,124
(US$)

(Q)

55,782
3,538
(US$)

(Q)

1,924,555
1,806,662
(US$)

(Q)

4,607
58,153
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

178,611

284,907

425,898

40,804

466,702

15,022

481,724

-196,817

MARGEN DE CONTRIBUCIN

(US$)

609,964

1,227,722

1,377,226

-37,266

1,339,960

43,130

1,383,090

155,368

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

186,766
191,776

251,029
257,763

433,948
304,157

26,045
13,254

459,993
317,411

15,679
11,962

475,672
329,374

-224,643
-71,610

(US$)

231,422

718,930

639,121

-76,565

562,556

15,489

578,045

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO POR SNC - Lavalin PARA LA OT 20159:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 3,731,216
$ 2,804,974
$ 2,684,572
$ 926,243

75.18%
71.95%
24.82%

PEDRO BERRIOS
Analista de Costos

JAVIER POZO
ADC

%
0%
0%
13%
-641%
84%
-76%
0%

-89%
-28%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20164
N OT:
CLIENTE:
OBRA:

20164
Minera Yanacocha S.R.L.
Proyecto Conga
PRECIOS UNITARIOS

PRESUPUESTO
ORIGINAL

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

(TM)
(TM)
(TM)
(M2)
(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

ACUM. MES ANTERIOR

DEL MES

SALDO ESTIMADO

0
456
1,422
5,386

222
46
610
646

222
501
2,032
6,032

9,556
9,276
7,746
228,825

9,778
9,778
9,778
234,857

2,668
850
268
8%
22%
6%

2,688
834
336
8%
19%
3%

10,374
5,366
1,105
12%
41%
7%

47,077
27,210
5,270
12%
47%
23%

13,716
7,354
1,485
12%
43%
12%

2,214
908
238
12%
30%
9%

2,804
1,239
302
12%
33%
10%

990,612

MARTN CARRIN

PROYECTADO

9,778
9,778
9,778
234,857

541

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

9,015
9,015
9,015
236,229

24,047,930
(US$)
12,410,921

may-12

FECHA:

RESULTADOS

REVISADO (1)

(Q)
9,208

MES:

9,956
0
0
0
0
0
0
607
0

26,280,677
(US$)
13,450,775
0
0
0
0
0
0
1,109,657
0

(Q)
1,613
0
0
0
0
0
0
0
0

(Q)

4,727,636
(US$)
1,875,124
0
0
0
0
0
0
0
0

(Q)
691
0
0
0
0
0
0
0
0

2,148,873
(US$)
808,470
0
0
0
0
0
0
0

(Q)
2,304
0
0
0
0
0
0
0
0

6,876,509
(US$)
2,683,594
0
0
0
0
0
0
0
0

(Q)
8,087
0
0
0
0
0
0
607
0

20,540,803
(US$)
8,527,836
0
0
0
0
0
0
1,095,176
0

(Q)
10,391
0
0
0
0
0
0
607
0

REALES

RELATIVAS

27,417,312 1,136,635
(US$)
(US$)
11,211,431
2,239,344
0
0
0
0
0
0
0
0
0
0
0
0
1,095,176
14,481
0
0

%
17%
0%
0%
0%
0%
0%
0%
1%
0%

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

166,560
0

359,103

174,526
0

385,526
0

19,543
0

40,381
0

5,565
0

12,000
0

25,109
0

52,380
0

95,722
0

199,690
0

120,831
0

252,070
0

133,456
0

35%
0%

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

236,229

800,416

234,857
0
0

778,470
0
0

5,386
0
0

24,789
0
0

646
0

5,196
0
0

6,032
0
0

29,985
0
0

228,825
0
0

557,158
0
0

234,857
0
0

587,143
0
0

191,328
0
0

25%
0%
0%

396
0
0

38,002
0
0

3,323
0
0

325,212
4,621
0

6,664
1
0

652,176
635
0

9,987
1
0

977,388
5,256
0

249,052
-3,563
0

20%
-210%
0%

0
20,924
0

0
0
0

81
48,983
0

1
1
0

817,032
186,739
0

1
1
0

817,113
235,722
0

-81
-3,322
0

0%
-1%
0%

0
22,185

0
22,247

0
0

0
44,433

0
1

0
80,985

0
1

0
125,418

0
0

0%
0%

2,282,449
2,445,187
(US$)

906,839
1,242,034
(US$)

15,306,715
12,110,597
(US$)

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

8,995
1

747,600
635

9,987
1
0

1,226,440
1,693
0

2,927
0
0

287,209
4,621
0

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

763,691
199,593

1
1
0

817,032
232,400
0

0
0
0

81
28,059
0

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

0
125,418

0
0

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- ESTRUCTURAS 2D Y 3D - CONGA "ARBOLES"
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)
(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(GLOB)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

819
1,519
1,557
759
3,532

0
1

111,334
16,383,905
7,664,025
(US$)
222309
312,610
289,913
119,011
519,204

18,127,411
8,153,266
(US$)
0
1,428
1,900
1,078
3,222
1,222

0
293,882
355,970
169,099
473,610
1,023,144

105
304
34
27
155
650

44,054
98,972
10,655
8,879
55,357
210,171

45
21
0
0
2
255

20,284
9,552
0
0
819
110,178

150
325
34
27
156
905

64,338
108,525
10,655
8,879
56,176
320,348

0
1,047
1,822
1,052
2,585
318

0
285,336
400,283
214,977
594,479
137,449

150
1,372
1,856
1,078
2,742
1,222

64,338
393,861
410,938
223,856
650,655
457,798

2,820,695
3,957,331
(US$)
0
-64,338
-99,979
-54,968
-54,757
-177,045
565,346

0
0
0
0
0
128,625
55,047

82
22
8
0
32
0
5

30,950
12,101
1,717
0
4,163
0
2,289

188
34
37
0
28
0
0

69,600
15,287
8,468
0
3,257
0
0

270
56
44
0
60
0
5

100,550
27,388
10,185
0
7,421
0
2,289

0
0
0
0
0
175
140

0
0
0
0
0
126,000
70,212

270
56
44
0
60
175
145

100,550
27,388
10,185
0
7,421
126,000
72,500

-100,550
-27,388
-10,185
0
-7,421
2,625
-17,453

0%
0%
0%
0%
0%
2%
-32%

(Q)

(Q)

(Q)

3,189,289
3,687,221
(US$)

(Q)

12,117,426
8,423,377
(US$)

(Q)

(Q)

153
151

112,455
45,717

120,000

0
0
1

0
0
120,000

0
4,015
0

8,784
7,518
0

1,067

203
1,987
0

0
5,082
0

8,987
9,504
0

0
0
1

0
0
120,000

0
5,082
1

8,987
9,504
120,000

-8,987
-9,504
0

0%
0%
0%

0
236,229
236,229

360,325
311,822

0
234,857
234,857

0
358,158
310,086

0
1,371
5,386

0
570
7,554

0
0
646

0
0
904

0
1,371
6,032

0
570
8,458

0
228,404
228,825

0
93,646
167,042

0
229,775
234,857

0
94,216
175,500

0
263,942
134,586

0%
74%
43%

(US$)
(US$)

2,413,366

3,287,621

503,734

240,539

744,273

2,209,424

2,953,697

333,924

5,250,659

4,865,645

1,941,453

1,001,494

2,942,948

6,213,953

9,156,901

4,291,255

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

1,878,691
1,929,092

2,037,593
2,092,257

915,256
716,730

317,240
181,512

1,232,496
898,242

2,450,146
1,869,381

3,682,642
2,767,623

-1,645,048
-675,366

(US$)

1,442,876

735,795

309,467

502,743

812,210

1,894,426

2,706,635

RUBRO
PRECIO DE VENTA RECONOCIDO POR Minera Yanacocha S.R.L. PARA LA OT 20164:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

0%
0%
-34%
-15%
-32%
-37%
55%

0
0
0
0
0
175
145

MARGEN DE CONTRIBUCIN

MARGEN OPERACIONAL

%
$ 6,876,509
$ 8,987,047
$ 7,373,957
-$ 2,110,537

130.69%
107.23%
-30.69%

PEDRO BERRIOS
Analista de Costos

MARTN CARRIN
ADC

-81%
-32%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20170
N OT:
CLIENTE:
OBRA:

20170
EDYCE
Lomas Bayas - Estructuras Mesas
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

REVISADO (1)

ACUM. MES ANTERIOR

DEL MES

10/07/2012

ADC:

FERNANDO MARIN

VARIACIONES

ACUM. PRESENTE MES

SALDO ESTIMADO

PROYECTADO

235
235
235
8,247

275
275
275
10,847

61
89
171
3,082

152
129
101
5,520

213
218
272
8,601

63
58
3
2,246

275
275
275
10,847

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

2,402
920
255
8%
28%
12%

2,946
1,314
411
9%
31%
18%

5,644
2,990
1,109
12%
33%
19%

2,259
1,110
697
16%
18%
-22%

3,641
1,877
866
13%
28%
4%

311
157
72
20%
27%
-61%

2,946
1,518
700
13%
28%
2%

564,364
(US$)
255,375

may-12

FECHA:

RESULTADOS

(TM)
(TM)
(TM)
(M2)

(Q)

MES:

(Q)
303
0
0
0
0
0
0
0
0

811,449
(US$)
310,766
0
0
0
0
0
0
0
0

(Q)
194
0
0
0
0
0
0
0
0

502,319
(US$)
190,366
0
0
0
0
0
0
0
0

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

257

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

4,699
0

10,336

2,918
0

6,420
0

1,365
0

2,794
0

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

8,247

37,627

10,847
0
0

57,273
0
0

3,082
0
0

21,188
0
0

(Q)
120
0
0
0
0
0
0
0
0

291,264
(US$)
123,781
0
0
0
0
0

(Q)

793,584
(US$)
314,147
0
0
0
0
0
0
0
0

(Q)
4
0
0
0
0
0
0
0
0

17,865
(US$)
3,833
0
0
0
0
0
0
0
0

(Q)
318
0
0
0
0
0
0
0
0

REALES

811,449 0
(US$)
317,980
0
0
0
0
0
0
0
0

(US$)
-7,214
0
0
0
0
0
0
0
0

RELATIVAS

0
0

314
0
0
0
0
0
0
0
0

-2%
0%
0%
0%
0%
0%
0%
0%
0%

0
0

0
0

1,365
0

2,794
0

15
0

31
0

1,380
0

2,825
0

3,595
0

56%
0%

5,520
0

24,393
0
0

8,601
0
0

45,581
0
0

2,246
0
0

3,015
0
0

10,847
0
0

48,595
0
0

8,678
0
0

15%
0%
0%

0
0
0

0
0
0

275
0
0

1,649
0
0

0
0
0

0
0
0

275
0
0

1,649
0
0

1,656
0
0

50%
0%
0%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

235

18,798

275
0
0

3,305
0
0

275
0
0

1,649
0
0

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

21,146
1,645

1
1
0

5,829
1,928
0

0
0
0

20,268
0
0

0
0
0

0
0
0

20,268
0
0

1
1
0

55
1,928
0

1
1
0

20,323
1,928
0

-14,494
0
0

-249%
0%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

3,183

1
0

63,902
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

63,902
0

100%
0%

393,300
418,149
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

348,110
216,254
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

449,423
362,026
(US$)

(Q)

148,174
143,090
(US$)

0
6
76
0
0
0

0
4,182
23,952
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
6
76
0
0
0

0
4,182
23,952
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
6
76
0
0
0

0
4,182
23,952
0
0
0

56,123
56,123
(US$)
0
0
-4,182
45,375
0
0
0

67
22
0
0
0
0
0

52,232
12,659
0
0
0
0
0

72
29
0
0
0
0
0

46,297
33,011
0
0
0
0
0

138
52
0
0
0
0
0

98,529
45,670
0
0
0
0
0

3
0
0
0
0
0
0

1,549
0
0
0
0
0
0

141
52
0
0
0
0
0

100,078
45,670
0
0
0
0
0

-93,117
-45,670
0
0
0
0
0

-1338%
0%
0%
0%
0%
0%
0%

(Q)

384,439
409,145
(US$)

(Q)

8,862
9,004
(US$)

(Q)

(Q)

%
0%
0%
0%
65%
0%
0%
0%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

200
0
0
0
0
0
0

0
0
69,327
0
0
0
0
6,961
0
0
0
0
0
0

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

0
0
0

0
0
0

0
52
0

0
65
0

135

0
253
0

0
187
0

0
318
0

0
0
0

0
0
0

0
187
0

0
318
0

0
-318
0

0%
0%
0%

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

0
10,847
10,847

0
29,691
7,126

0
3,106
3,082

0
1,213
4,420

0
5,385
5,520

0
2,648
7,722

0
8,491
8,601

0
3,861
12,142

0
2,169
2,246

0
986
1,617

0
10,660
10,847

0
4,847
13,759

0
24,844
-6,633

0%
84%
-93%

235

0
8,247
8,247

51,690

4,123
4,123

0
0
75.9
0
0
0

236,264
266,055
(US$)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

59,936

113,105

98,723

89,930

188,654

4,152

192,806

-79,701

MARGEN DE CONTRIBUCIN

(US$)

156,318

248,921

167,332

53,159

220,491

4,852

225,343

-23,578

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

43,711
44,883

51,243
52,617

42,125
31,172

87,068
30,420

129,194
61,592

7,408
8,303

136,602
69,895

-85,359
-17,278

(US$)

67,724

145,061

94,034

-64,329

29,705

-10,859

18,846

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO POR EDYCE PARA LA OT 20170:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 793,584
$ 439,552
$0
$ 354,031

55.39%
0.00%
44.61%

PEDRO BERRIOS
Analista de Costos

FERNANDO MARIN
ADC

-167%
-33%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20171
N OT:
CLIENTE:
OBRA:

20171
Fluor Chile S.A.
Ing. Complementaria de Pozo - Lagunas Norte
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

ACUM. MES ANTERIOR

DEL MES

SALDO ESTIMADO

0
10
284
167

13
27
125
522

13
37
409
689

466
443
71
12,813

480
480
480
13,502

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

3,201
1,025
232
10%
25%
10%

3,201
1,025
232
10%
25%
10%

84,610
31,676
10,408
15%
25%
2%

10,944
4,459
2,365
10%
19%
-15%

30,382
11,641
4,487
13%
24%
-2%

1,001
243
94
3%
15%
-11%

3,266
1,122
432
11%
21%
-5%

39
0

73,566
611

JAVIER POZO

PROYECTADO

480
480
480
13,502

491

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

480
480
480
13,502

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

REVISADO (0)

1,535,323
(US$)
562,777

may-12

FECHA:

RESULTADOS

(TM)
(TM)
(TM)
(M2)

(Q)

MES:

(Q)
491
0
0
0
0
0
0
39
0

1,535,323
(US$)
562,777
0
0
0
0
0
0
73,566
611

(Q)
259
0
0
0
0
0
0
62
0

825,639
(US$)
248,303
0
0
0
0
0
0
112,084
0

(Q)
136
0
0
0
0
0
0
3
0

297,927
(US$)
123,803
0
0
0
0
0

(Q)

5,116
0

395
0
0
0
0
0
0
65
0

1,123,566
(US$)
372,106
0
0
0
0
0
0
117,200
0

(Q)
73
0
0
0
0
0
0
0
0

443,257
(US$)
67,248
0
0
0
0
0
0
0
611

(Q)
468
0
0
0
0
0
0
65
0

REALES

RELATIVAS

1,566,823 31,500
(US$)
(US$)
439,354
123,423
0
0
0
0
0
0
0
0
0
0
0
0
117,200
-43,634
611
0

%
22%
0%
0%
0%
0%
0%
0%
-59%
0%

(KG)
(M2)

8,451
0

18,591

8,451
0

18,591
0

2,882
0

5,933
0

2,065
0

4,453
0

4,947
0

10,386
0

862
0

1,810
0

5,809
0

12,196
0

6,395
0

34%
0%

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(GLOB)
(TM)

13,502
1

214,950
10,329

13,502
1
0

214,950
10,329
0

167
0
0

27,035
0
0

522
52

18,263
0
19,107

689
0
52

45,298
0
19,107

11,194
1
13

142,221
10,329
4,836

11,883
1
65

187,519
10,329
23,943

27,431
0
-23,943

13%
0%
0%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

480

38,374

480
0
0

38,374
0
0

839
0
0

115,717
282
0

0
0
0

0
670
0

839
0
0

115,717
952
0

0
0
0

0
0
0

839
0
0

115,717
952
0

-77,343
-952
0

-202%
0%
0%

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

104,785
5,814

1
1
0

104,785
5,814
0

0
0
0

0
1,058
0

22
1,112
0

0
0
0

22
2,170
0

1
1
0

104,785
378
0

1
1
0

104,807
2,548
0

-22
3,266
0

0%
56%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

13,635

0
1

0
13,635

0
0

0
6,125

0
3,995

0
0

0
10,119

0
1

0
3,516

0
1

0
13,635

0
0

0%
0%

1,028,811
538,012
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,043,432
491,891
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

127
179
115

19
40

0
13,502
13,502

27,863
35,896
20,700

14,250
1,240

4,726
6,614

1,043,432
491,891
(US$)
0
127
179
115
0
0

0
27,863
35,896
20,700
0
0

18
33
49
12
64
0

8,252
13,440
20,306
5,119
26,528
0

24
41
26
13
9
0

12,227
20,752
13,332
6,566
4,391
0

42
74
75
25
73
0

20,478
34,191
33,638
11,685
30,920
0

0
71
0
0
0
0

0
24,983
0
0
0
0

42
145
75
25
73
0

20,478
59,174
33,638
11,685
30,920
0

14,621
46,121
(US$)
0
-20,478
-31,311
2,258
9,015
-30,920
0

0
0
0
0
0
19
40

0
0
0
0
0
14,250
1,240

7
8
20
0
0
14
0

2,773
3,798
6,141
0
0
13,902
0

4
0
5
0
0
0
0

1,362
14
1,163
0
0
0
0

11
8
24
0
0
14
0

4,135
3,812
7,304
0
0
13,902
0

0
0
0
0
0
5
1

0
0
0
0
0
4,909
35

11
8
24
0
0
19
1

4,135
3,812
7,304
0
0
18,811
35

-4,135
-3,812
-7,304
0
0
-4,561
1,205

0%
0%
0%
0%
0%
-32%
97%

0
0
0

0
0
0

0
602
0

0
1,019
0

2,353

0
3,838
0

0
2,955
0

0
4,857
0

0
0
0

0
0
0

0
2,955
0

0
4,857
0

0
-4,857
0

0%
0%
0%

0
13,502
13,502

0
4,726
6,614

0
57
167

0
26
264

0
0
522

0
0
730

0
57
689

0
26
994

0
8,872
11,195

0
3,460
8,060

0
8,929
11,884

0
3,486
9,055

0
1,240
-2,441

0%
26%
-37%

(Q)

516,536
309,103
(US$)

(Q)

176,541
121,386
(US$)

(Q)

693,077
430,489
(US$)

(Q)

335,734
107,523
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

111,289

111,289

101,568

64,375

165,942

41,447

207,390

-96,101

MARGEN DE CONTRIBUCIN

(US$)

380,602

380,602

207,536

57,011

264,546

66,076

330,622

-49,980

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

112,032
115,038

112,032
115,038

100,831
88,437

64,657
35,798

165,488
124,235

64,910
49,524

230,398
173,760

-118,366
-58,722

(US$)

153,532

153,532

18,267

-43,444

-25,177

-48,358

-73,535

MARGEN OPERACIONAL
RUBRO
PRECIO DE VENTA RECONOCIDO POR Fluor Chile S.A. PARA LA OT 20171:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 1,123,566
$ 767,783
$ 383,891
$ 355,783

68.33%
34.17%
31.67%

PEDRO BERRIOS
Analista de Costos

JAVIER POZO
ADC

%
0%
0%
-112%
6%
44%
0%
0%

-106%
-51%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20173
N OT:
CLIENTE:
OBRA:

20173
Compaa Minera Antamina S.A.
Estructuras Adicionales - Expansin Antamina
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

may-12

FECHA:

10/07/2012

ADC:

FERNANDO MARIN

RESULTADOS

REVISADO (1)

ACUM. MES ANTERIOR

DEL MES

VARIACIONES

ACUM. PRESENTE MES

SALDO ESTIMADO

PROYECTADO

(TM)
(TM)
(TM)
(M2)

100
100
100
3,145

166
166
166
4,168

95
96
118
2,194

39
37
32
860

134
133
151
3,054

32
33
15
1,114

166
166
166
4,168

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

3,911
2,012
529
10%
38%
30%

4,029
1,730
381
10%
33%
26%

4,953
2,961
676
10%
46%
32%

3,311
2,285
738
10%
47%
25%

4,495
2,773
693
10%
46%
31%

2,161
1,214
303
14%
42%
26%

4,029
2,461
615
10%
46%
30%

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

104

391,087
(US$)
118,431

14,436

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

2,000
0

4,400

3,313
0

7,289
0

1,318
0

2,719
0

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

3,145

17,735

4,168
0
0

77,861
0
0

2,194
0
0

18,675
0
0

(Q)

MES:

(Q)
161
0
0
0
0
0
0
21
0

667,375
(US$)
181,863
0
0
0
0
0
0
53,516
0

(Q)
107
0
0
0
0
0
0
22
0

473,251
(US$)
99,765
0
0
0
0
0
0
40,389
0

(Q)
35
0
0
0
0
0
0
1
0

122,576
(US$)
33,707
0
0
0
0
0

(Q)

595,828
(US$)
133,472
0
0
0
0
0
0
41,570
0

(Q)
17
0
0
0
0
0
0
0
0

71,547
(US$)
15,913
0
0
0
0
0
0
0
0

(Q)
159
0
0
0
0
0
0
22
0

REALES

667,375 0
(US$)
149,385
0
0
0
0
0
0
41,570
0

(US$)
32,478
0
0
0
0
0
0
11,946
0

RELATIVAS

1,181
0

142
0
0
0
0
0
0
22
0

18%
0%
0%
0%
0%
0%
0%
22%
0%

55
0

119
0

1,373
0

2,838
0

134
0

270
0

1,508
0

3,108
0

4,181
0

57%
0%

860
0

778
0
0

3,054
0
0

19,453
0
0

1,114
0
0

6,608
0
0

4,168
0
0

26,061
0
0

51,800
0
0

67%
0%
0%

4
0
0

461
112
0

169
0
1

20,325
832
165

0
1
0

0
450
0

169
1
1

20,325
1,282
165

-446
-537
-165

-2%
-72%
0%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

100
1

12,000
450

166
1
0

19,879
745
0

166
0
1

19,864
720
165

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

5,479
1,351

1
1
0

11,545
2,238
0

1
1
0

7,747
273
0

0
1,637
0

1
1
0

7,747
1,910
0

1
1
1

0
187
0

2
2
1

7,747
2,096
0

3,798
142
0

33%
6%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

15,617

0
1

0
25,872

0
0

0
0

0
0

0
0

0
0

0
1

0
7,924

0
1

0
7,924

0
17,948

0%
69%

259,663
407,712
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

189,899
201,188
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

15
25
25
25

2
3

0
3,145
3,145

11463
8,114
7,375
6,801

1,838
4,409

8,684
4,168

380,808
286,567
(US$)
12
35
8
19
14
0

8,812
11,382
2,239
5,212
7,354
0

1
24
25
16
13
0

366
16,219
15,442
12,521
7,599
0

0
3
0
0
0
0

0
2,810
48
0
0
0

1
27
25
16
13
0

366
19,030
15,490
12,521
7,599
0

0
0
0
0
0
0

0
0
0
0
0
0

1
27
25
16
13
0

366
19,030
15,490
12,521
7,599
0

121,145
121,145
(US$)
0
8,446
-7,647
-13,251
-7,309
-245
0

0
0
0
0
0
8
3

0
0
0
0
0
7,499
3,582

0
2
6
7
0
2
0

-71
1,439
2,244
1,773
0
2,926
101

0
3
0
20
1
4
0

138
1,839
183
16,380
780
3,092
419

0
6
6
27
1
6
1

66
3,278
2,427
18,153
780
6,018
520

0
0
10
0
0
2
3

0
0
3,809
0
0
1,641
3,560

0
6
16
27
1
8
3

66
3,278
6,235
18,153
780
7,659
4,080

-66
-3,278
-6,235
-18,153
-780
-160
-498

0%
0%
0%
0%
0%
-2%
-14%

0
0
0

0
0
0

0
159
0

0
293
0

29

0
53
0

0
188
0

0
346
0

0
0
0

0
0
0

0
188
0

0
346
0

0
-346
0

0%
0%
0%

0
4,168
4,168

0
11,509
5,524

121
2,489
2,073

137
906
2,655

185
832
675

207
409
945

306
3,321
2,748

345
1,315
3,600

0
660
1,114

0
257
780

306
3,981
3,862

345
1,572
4,380

-345
9,937
1,144

0%
86%
21%

-38,789

(Q)

190,317
282,934
(US$)

(Q)

37,994
84,582
(US$)

(Q)

228,311
367,516
(US$)

(Q)

31,351
40,196
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

52,852

63,113

64,552

27,304

91,856

10,046

101,902

MARGEN DE CONTRIBUCIN

(US$)

148,336

223,453

218,382

57,278

275,660

30,149

305,810

82,356

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

15,300
15,710

25,346
26,025

40,054
27,203

17,225
9,221

57,279
36,425

6,406
4,888

63,685
41,312

-38,340
-15,287

(US$)

117,326

172,082

151,124

30,833

181,957

18,855

200,812

MARGEN OPERACIONAL
RUBRO

PRECIO DE VENTA RECONOCIDO POR Compaa Minera Antamina S.A. PARA LA OT 20173:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 595,828
$ 195,544
$ 195,544
$ 400,284

32.82%
32.82%
67.18%

PEDRO BERRIOS
Analista de Costos

FERNANDO MARIN
ADC

%
0%
96%
-67%
-592%
-140%
-3%
0%

-151%
-59%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20174
N OT:
CLIENTE:
OBRA:

20174
Volcn Compaa Minera S.A.A.
Proyecto de Profundizacion del Pique Jacob Timmers
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL
(TM)
(TM)
(TM)
(M2)
(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

(GLOB)
(GLOB)
(GLOB)

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

26
26
26
1,407

3,549
1,665
605
11%
30%
6%

3,840
2,056
657
11%
36%
14%

4,069
2,321
1,009
20%
32%
30%

1,866
-42
1,079
14%
-60%
-106%

3,414
1,619
1,030
18%
17%
8%

24,137
128
82
118%
0%
-2%

3,840
1,589
1,010
37%
15%
7%

0
0

892
1,590

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

(Q)
27
0
0
0
0
0
0
1
1

100,600
(US$)
26,897
0
0
0
0
0
0
2,646
4,717

(Q)
22
0
0
0
0
0
0
1
0

73,399
(US$)
23,780
0
0
0
0
0
0
1,108
0

(Q)
9
0
0
0
0
0
0
0
0

14,225
(US$)
11,099
0
0
0
0
0

(Q)
31
0
0
0
0
0
0
1
0

341
0

87,624
(US$)
34,879
0
0
0
0
0
0
1,448
0

7
0
0
0
0
0
0
0
1

12,976
(US$)
6,671
0
0
0
0
0
0
0
4,717

(Q)

(Q)
38
0
0
0
0
0
0
1
1

REALES

100,600 0
(US$)
41,550
0
0
0
0
0
0
1,448
4,717

RELATIVAS

(US$)
-14,653
0
0
0
0
0
0
1,198
0

237

3
0

703
0

0
0

0
0

1
0

1
0

1
0

1
0

0
0

0
0

1
0

1
0

702
0

100%
0%

1,514

1,407
0
1

5,918
0
667

916
0
1

2,182
0
164

425
0

3,105
0
0

1,341
0
1

5,287
0
164

0
0
1

0
0
213

1,341
0
1

5,287
0
377

631
0
290

11%
0%
44%

26
0
1

3,144
0
848

26
0
0

3,385
52
200

0
0
0

0
0
0

26
0
0

3,385
52
200

0
0
1

0
0
848

26
0
1

3,385
52
1,048

-240
-52
-200

-8%
0%
-24%

1
1
0

874
86
0

1
0
0

656
0
0

0
0
0

1
0
0

656
0
0

1
0
0

218
0
0

2
0
0

874
0
0

0
86
0

0%
100%
0%

0
1

0
240

0
0

0
0

0
0

0
0

0
0

0
1

0
240

0
1

0
240

0
0

0%
0%

58,979
41,622
(US$)

225

1,060

848

1
1

874
86

240
16,633
14,709
(US$)

0
3

0
360
360

1,364

145
2,403

958
477

46,741
53,859
(US$)
0
0
16
0
0
0

0
0
4,046
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
22
0
0
0
0

0
0
0
0
0
0

0
22
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
22
0
0
0
0

-12,238
-12,238
(US$)
0
0
-22
4,046
0
0
0

0
0
0
0
0
1
8

0
0
0
0
0
430
7,128

8
0
0
0
0
0
9

5,588
0
0
0
0
178
11,090

0
1
3
0
0
0
4

55
1,024
1,262
0
0
0
5,051

8
1
3
0
0
0
13

5,643
1,024
1,262
0
0
178
16,141

0
0
0
0
0
0
0

0
0
0
0
0
0
0

8
1
3
0
0
0
13

5,643
1,024
1,262
0
0
178
16,141

-5,643
-1,024
-1,262
0
0
252
-9,012

0%
0%
0%
0%
0%
59%
-126%

0
0
0

0
0
0

0
0
0

0
0
0

10

0
13
0

0
10
0

0
13
0

0
0
0

0
0
0

0
10
0

0
13
0

0
-13
0

0%
0%
0%

0
1,407
1,407

0
3,745
1,864

0
938
893

0
292
1,051

0
415
425

0
204
595

0
1,353
1,318

0
496
1,646

0
10
55

0
4
40

0
1,363
1,374

0
500
1,686

0
3,245
178

0%
87%
10%

(Q)

31,526
41,873
(US$)

(Q)

14,545
-320
(US$)

(Q)

46,072
41,552
(US$)

(Q)

12,907
69
(Q)

(US$)

(Q)

(US$)

5,347

17,214

18,198

8,226

26,424

44

26,468

-9,254

MARGEN DE CONTRIBUCIN

(US$)

9,362

36,646

23,675

-8,546

15,128

25

15,153

-21,492

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

3,691
3,790

10,950
11,244

1,447
15

4,081
2,387

5,528
2,402

164
125

5,692
2,527

5,258
8,717

(US$)

1,881

14,452

22,212

-15,014

7,198

-264

6,934

RUBRO
PRECIO DE VENTA RECONOCIDO POR Volcn Compaa Minera S.A.A. PARA LA OT 20174:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

-54%
0%
0%
0%
0%
0%
0%
45%
0%

1
0

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

MARGEN OPERACIONAL

360

(Q)

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

JAVIER POZO

PROYECTADO

4
1
0
66

(US$)
(US$)

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

SALDO ESTIMADO

22
26
26
1,341

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

4
8
8
425

(M2)
(M2)
(TM)

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

DEL MES

18
18
18
916

(GLOB)
(M2)

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

ACUM. MES ANTERIOR

26
26
26
1,407

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

REVISADO (1)

31,342
(US$)
9,067

may-12

FECHA:

RESULTADOS

9
9
9
360

(Q)

MES:

%
$ 87,624
$ 64,030
$0
$ 23,594

73.07%
0.00%
26.93%

PEDRO BERRIOS
Analista de Costos

JAVIER POZO
ADC

%
0%
0%
0%
100%
0%
0%
0%

48%
78%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20175
N OT:
CLIENTE:
OBRA:

20175
Empresa Administradora Chungar S.A.C.
Proyecto de Construccin del Pique Roberto Letts - Andaychagua
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

REVISADO (0)

ACUM. MES ANTERIOR

DEL MES

SALDO ESTIMADO

79
81
123
2,431

18
18
23
80

97
99
146
2,511

509
507
460
15,636

606
606
606
18,148

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

3,382
1,599
589
9%
30%
15%

3,322
1,540
589
9%
29%
13%

5,536
2,291
740
12%
28%
16%

2,818
1,307
1,132
12%
6%
-30%

5,042
2,112
811
12%
26%
11%

2,989
1,618
622
12%
33%
17%

3,322
1,699
653
12%
31%
16%

679

11
5

22,724
15,038

JAVIER POZO

PROYECTADO

606
606
606
18,148

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

636
636
636
19,038

2,150,078
(US$)
763,993

may-12

FECHA:

RESULTADOS

(TM)
(TM)
(TM)
(M2)

(Q)

MES:

(Q)
648
0
0
0
0
0
0
11
5

2,013,414
(US$)
728,265
0
0
0
0
0
0
21,661
14,335

(Q)
116
0
0
0
0
0
0
21
0

446,308
(US$)
111,255
0
0
0
0
0
0
38,530
54

(Q)
26
0
0
0
0
0
0
0
0

50,538
(US$)
25,381
0
0
0
0
0

(Q)

0
0

142
0
0
0
0
0
0
21
0

496,846
(US$)
136,636
0
0
0
0
0
0
38,530
54

(Q)
520
0
0
0
0
0
0
0
5

1,516,568
(US$)
527,531
0
0
0
0
0
0
0
2,357

(Q)
662
0
0
0
0
0
0
21
5

REALES

2,013,414 0
(US$)
664,167
0
0
0
0
0
0
38,530
2,410

(US$)
64,098
0
0
0
0
0
0
-16,869
11,924

RELATIVAS

%
9%
0%
0%
0%
0%
0%
0%
-78%
83%

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

9,009
0

19,819

8,588
0

18,892
0

1,140
0

2,362
0

26
0

55
0

1,165
0

2,417
0

3,682
0

7,637
0

4,848
0

10,054
0

8,838
0

47%
0%

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

19,038

156,170

18,148
0
0

148,867
0
0

2,431
0
15

27,208
0
5,578

80
0

191
0
0

2,511
0
15

27,398
0
5,578

14,987
0
6

83,112
0
2,284

17,498
0
21

110,510
0
7,862

38,356
0
-7,862

26%
0%
0%

0
0
0

200
1,270
0

606
1
0

66,260
2,365
1,098

0
0
0

0
274
0

606
1
0

66,260
2,639
1,098

-17,781
14,776
-1,098

-37%
85%
0%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

636
1

50,858
18,270

606
1
0

48,480
17,416
0

606
1
0

66,060
1,095
1,098

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

66,975
4,347

1
1
0

63,843
4,144
0

1
0
0

7,226
357
0

0
6
0

1
0
0

7,226
363
0

1
1
0

56,617
1,147
0

2
1
0

63,843
1,510
0

0
2,634
0

0%
64%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

15,087

0
1

0
14,381

0
0

0
807

0
0

0
0

0
807

0
1

0
14,381

0
1

0
15,188

0
-807

0%
-6%

984,072
1,029,342
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,133,281
1,016,797
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

25.03
131
201
21

6
251

0
19,038
19,038

12618
42,958
45,418
3,665

5,152
187,421

51,922
25,130

1,080,283
933,131
(US$)
24
125
191
20
0
0

12,028
40,949
43,294
3,494
0
0

0
29
54
0
0
0

0
14,295
25,611
0
0
0

0
1
0
0
0
0

0
741
235
0
0
0

0
30
54
0
0
0

0
15,036
25,846
0
0
0

0
96
138
0
0
0

0
40,620
50,255
0
0
0

0
126
192
0
0
0

0
55,656
76,100
0
0
0

96,211
96,211
(US$)
0
12,028
-14,707
-32,806
3,494
0
0

0
0
0
0
0
6
239

0
0
0
0
0
4,911
178,656

0
9
1
0
0
1
7

0
6,871
502
0
0
1,435
5,892

0
2
0
3
14
1
1

0
2,409
0
2,148
11,871
1,113
1,637

0
12
1
3
14
2
8

0
9,280
502
2,148
11,871
2,548
7,529

0
0
0
0
0
2
220

0
0
0
0
0
2,239
203,896

0
12
1
3
14
4
228

0
9,280
502
2,148
11,871
4,787
211,425

0
-9,280
-502
-2,148
-11,871
124
-32,769

0%
0%
0%
0%
0%
3%
-18%

0
0
0

0
0
0

0
228
0

0
415
0

0
0
0

0
228
0

0
415
0

0
1,418
0

0
2,584
0

0
1,645
0

0
2,999
0

0
-2,999
0

0%
0%
0%

0
18,148
18,148

0
49,494
23,955

6
2,931
2,425

7
1,255
3,372

0
80
80

0
40
112

6
3,011
2,506

7
1,294
3,484

0
12,962
15,108

0
5,055
10,877

6
15,974
17,613

7
6,350
14,362

-7
43,144
9,593

0%
87%
40%

-38,706

(Q)

261,630
184,678
(US$)

(Q)

27,103
23,435
(US$)

(Q)

288,733
208,113
(US$)

(Q)

695,339
821,229
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

374,284

356,781

59,654

20,306

79,960

315,527

395,487

MARGEN DE CONTRIBUCIN

(US$)

642,513

576,350

125,024

3,130

128,153

505,702

633,855

57,505

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

157,883
162,118

150,499
154,537

30,751
24,325

11,782
6,489

42,533
30,814

140,059
106,860

182,592
137,674

-32,092
16,863

(US$)

322,512

271,314

69,947

-15,141

54,806

258,783

313,589

MARGEN OPERACIONAL
RUBRO

PRECIO DE VENTA RECONOCIDO POR Empresa Administradora Chungar S.A.C. PARA LA OT 20175:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 496,846
$ 474,314
$ 474,314
$ 22,532

95.47%
95.47%
4.53%

PEDRO BERRIOS
Analista de Costos

JAVIER POZO
ADC

%
0%
100%
-36%
-76%
100%
0%
0%

-21%
11%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20176
N OT:
CLIENTE:
OBRA:

20176
Southern Per Copper Corporation
CUAWAL Optimizing Crushing Plant Cuajone - Polysius
PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL

REVISADO (1)

ACUM. MES ANTERIOR

DEL MES

SALDO ESTIMADO

0
0
1
5

0
0
0
0

0
0
1
5

857
857
855
22,826

857
857
857
22,831

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$

3,815
1,268
380
9%
23%
11%

4,292
2,053
1,600
19%
11%
0%

0
0
0
48%
0%
-7%

0
0
0
0%
2%
0%

0
0
0
48%
1%
-4%

4,181
1,807
825
11%
23%
11%

4,292
1,810
827
12%
23%
11%

558

6,771

FERNANDO MARIN

PROYECTADO

857
857
857
22,831

(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

10/07/2012

ADC:

VARIACIONES

ACUM. PRESENTE MES

508
508
508
13,541

1,938,268
(US$)
563,486

may-12

FECHA:

RESULTADOS

(TM)
(TM)
(TM)
(M2)

(Q)

MES:

(Q)
818
0
0
0
0
0
0
57
134

3,676,867
(US$)
854,056
0
0
0
0
0
0
114,483
356,145

2
0
0
0
0
0
0
0
0

43,700
(US$)
985
0
0
0
0
0
0
0
0

(Q)

(Q)
0
0
0
0
0
0
0
0
0

51,558
(US$)
0
0
0
0
0
0
0
0

2
0
0
0
0
0
0
0
0

95,258
(US$)
985
0
0
0
0
0
0
0
0

(Q)

(Q)
750
0
0
0
0
0
0
57
134

3,581,609
(US$)
710,508
0
0
0
0
0
0
114,483
356,145

(Q)
753
0
0
0
0
0
0
57
134

REALES

3,676,867 0
(US$)
711,493
0
0
0
0
0
0
114,483
356,145

RELATIVAS

(US$)
142,563
0
0
0
0
0
0
0
0

%
17%
0%
0%
0%
0%
0%
0%
0%
0%

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

9,161
0

20,154

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0%
0%

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

13,541

136,920

22,831
0
0

230,890
0
0

5
0
0

0
0
0

0
0

0
0
0

5
0
0

0
0
0

19,473
0
0

196,934
0
0

19,478
0
0

196,934
0
0

33,956
0
0

15%
0%
0%

617
0
0

50,483
0
0

1,059
0
0

92,011
0
0

81
0
0

8,100
0
0

1,140
0
0

100,111
0
0

2,687
0
0

3%
0%
0%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

508

60,960

857
0
0

102,798
0
0

442
0
0

41,528
0
0

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

49,615
10,885

1
1
0

183,651
18,356
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

1
1
0

183,651
18,356
0

1
1
0

183,651
18,356
0

0
0
0

0%
0%
0%

TRANSPORTE A OBRA
OTROS (Incluye puertas y louvers)

(GLOB)
(GLOB)

445,219

0
1

0
57,706

0
0

0
0

0
0

0
0

0
0

0
1

0
445,219

0
1

0
445,219

0
-387,513

0%
-672%

2,126,392
1,550,475
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

1,294,010
644,258
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

71
23
36
110
176

16
74

0
13,541
13,541

25818
7,416
8,088
19,109
27,329

13,169
28,240

36,926
26,811

1,918,085
1,758,782
(US$)
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

-208,307
-208,307
(US$)
0
0
0
0
0
0
0

56
18
28
87
140
131
205

225,603
56,434
68,912
162,364
244,481
222,660
282,772

0
0
0
0
0
1
0

0
116
0
0
0
902
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
1
0

0
116
0
0
0
902
0

56
18
28
87
140
130
205

108,520
20,149
33,148
78,101
117,601
106,203
136,020

56
18
28
87
140
131
205

108,520
20,265
33,148
78,101
117,601
107,105
136,020

117,083
36,169
35,764
84,263
126,880
115,555
146,752

52%
64%
52%
52%
52%
52%
52%

0
0
0

0
0
0

0
4
0

0
5
0

0
5
0

0
8
0

0
10
0

0
0
0

0
0
0

0
8
0

0
10
0

0
-10
0

0%
0%
0%

0
22,831
22,831

0
62,260
45,205

5
0
0

6
0
0

0
0
0

0
0
0

5
0
0

6
0
0

0
22,823
22,826

0
62,239
45,195

5
22,823
22,826

6
62,239
45,195

-6
21
10

0%
0%
0%

(Q)

42,514
1,187
(US$)

(Q)

50,483
1,075
(US$)

(Q)

92,996
2,262
(US$)

(Q)

2,033,396
1,548,213
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

192,906

1,370,691

1,028

1,033

707,177

708,210

662,481

MARGEN DE CONTRIBUCIN

(US$)

451,352

388,091

158

1,070

1,229

841,036

842,264

454,173

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

117,495
120,647

198,134
203,450

2,730
629

166
1,151

2,896
1,779

250,088
190,809

252,984
192,588

-54,850
10,862

(US$)

213,209

-13,493

-3,200

-246

-3,447

400,139

396,692

MARGEN OPERACIONAL
RUBRO

PRECIO DE VENTA RECONOCIDO POR Southern Per Copper Corporation PARA LA OT 20176:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 95,258
$ 581,480
$ 581,480
-$ 486,222

610.43%
610.43%
-510.43%

PEDRO BERRIOS
Analista de Costos

FERNANDO MARIN
ADC

%
0%
0%
0%
0%
0%
0%
0%

-28%
5%

RESULTADOS POR ORDEN DE TRABAJO


(Expresado en Dolares Americanos)
OT 20178
N OT:
CLIENTE:
OBRA:

20178
Southern Per Copper Corporation
Ampliacin rea 2 y 3 - Optimizacin de la Planta de Chancado PRECIOS UNITARIOS

VOLUMEN:
PRODUCTO TERMINADO DESPACHADO
PRODUCTO TERMINADO
PRODUCTO EN NEGRO
AREA DEL PROYECTO
INDICES:
PRECIO DE VENTA UNITARIO
PRECIO DE VENTA OPERACIONAL UNITARIO
COSTO MANO DE OBRA DIRECTA
% DESPERDICIO O DESPUNTE
MARGEN DE CONTRIBUCION
MARGEN OPERACIONAL
PRECIO DE VENTA
COSTOS DE SUMINISTROS
ACEROS ESTRUCTURALES
PERFILES VARIOS
PLANCHAS
TUBOS
OTROS ACEROS
ACERO A VENDER AL CLIENTE
ACERO DEL CLIENTE
PARRILLAS Y PELDAOS
SUMINISTROS A TODO COSTO

PRESUPUESTO
ORIGINAL
(TM)
(TM)
(TM)
(M2)

(US$/TM)
(US$/TM)
(US$/TM)
(%)
(%)
(%)
US$
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

3,113
1,471
416
11%
33%
10%

24

75,014
(US$)
24,916

2
0

4,004
382

(Q)

ACUM. MES ANTERIOR

25
25
25
793

3,113
1,383
465
10%
29%
6%

may-12

FECHA:

10/07/2012

ADC:

FERNANDO MARIN

RESULTADOS

REVISADO (0)

24
24
24
813

MES:

(Q)
26
0
0
0
0
0
0
2
0

81,567
(US$)
26,228
0
0
0
0
0
0
4,673
0

DEL MES

VARIACIONES

ACUM. PRESENTE MES

SALDO ESTIMADO

PROYECTADO

1
18
24
579

11
7
2
49

13
25
26
628

13
0
0
165

25
25
25
793

4,331
2,178
711
13%
34%
33%

211
-134
143
3%
-131%
-221%

3,185
1,535
553
12%
31%
28%

-1,752,285
-1,593,976
-574,313
0%
58%
-13%

3,213
1,560
562
14%
31%
28%

(Q)
25
0
0
0
0
0
0
2
0

79,376
(US$)
23,983
0
0
0
0
0
0
4,716
0

(Q)
2
0
0
0
0
0
0
0
0

1,491
(US$)
1,746
0
0
0
0
0

(Q)
27
0
0
0
0
0
0
2
0

0
0

80,866
(US$)
25,729
0
0
0
0
0
0
4,716
0

(Q)
0
0
0
0
0
0
0
0
0

701
(US$)
0
0
0
0
0
0
0
0
0

(Q)
27
0
0
0
0
0
0
2
0

81,567 0
(US$)
25,729
0
0
0
0
0
0
4,716
0

REALES

RELATIVAS

(US$)

%
499
0
0
0
0
0
0
-43
0

2%
0%
0%
0%
0%
0%
0%
-1%
0%

SOLDADURAS (ALAMBRE, FUNDENTE, MANUAL)


SUMINISTROS POR GRANALLADO

(KG)
(M2)

399
0

878

420
0

925
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

925
0

100%
0%

SUMINISTRO DE PINTURA
PINTURA DE RETOQUE
SERVICIOS DE GALVANIZADO

(M2)
(M2)
(TM)

813

6,343

793
0
0

6,323
0
0

579
0
0

7,002
0
0

49
0

526
0
0

628
0
0

7,528
0
0

106
0
2

-1,915
0
0

734
0
2

5,612
0
0

711
0
0

11%
0%
0%

PLANOS (DETALLAMIENTO Y CHEQUEO)


SERVICIOS DE PLEGADO (CORTE Y DOBLEZ)
SERVICIOS DE MECANIZADO

(GLOB)
(GLOB)
(GLOB)

24

2,892

25
0
0

2,892
0
0

24
0
0

2,419
0
0

2
0
0

167
0
0

25
0
0

2,586
0
0

0
0
0

9
0
0

25
0
0

2,595
0
0

297
0
0

10%
0%
0%

PERNOS ESTRUCTURALES Y MECANICOS


PRUEBAS DE CONTROL DE SOLDADURAS
EQUIPAMIENTO DE SOFTWARE Y ENTRENAMIENTO

(GLOB)
(GLOB)
(GLOB)

1
1

1,182
299

1
1
0

2,569
299
0

0
0
0

1,135
200
0

0
0
0

0
0
0

1,135
200
0

1
1
0

1,182
-4
0

1
1
0

2,317
197
0

252
102
0

10%
34%
0%

TRANSPORTE A OBRA
OTROS

(GLOB)
(GLOB)

791

0
1

0
306

0
0

0
0

0
0

0
0

0
0

0
1

0
791

0
1

0
791

0
-485

0%
-158%

41,958
39,609
(US$)

TOTAL DE COSTOS DE SUMINISTROS


PRECIO DE VENTA OPERACIONAL
MANO DE OBRA DIRECTA
FE
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- MISCELANEOS
TERCEROS
- ENREJADOS
- FABRICACIN DE ESTRUCTURAS LIVIANAS
- FABRICACIN DE ESTRUCTURAS MEDIANAS
- FABRICACIN DE ESTRUCTURAS PESADAS
- FABRICACIN DE ESTRUCTURAS EXTRA PESADAS
- BARANDAS
- MISCELANEOS

(US$)
(US$)

41,687
33,327
(US$)

(Q)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)
(TM)

OTROS SERVICIOS TERCEROS


- SERVICIO DE SOLDADO
- SERVICIO DE GRANALLADO
- REPARACIONES Y REFABRICACIONES

(TM)
(TM)
(TM)

APLICACIN DE PINTURA POR TERCEROS


GRANALLADO DE ESTRUCTURAS
APLICACIN DE PINTURA DE ACABADO

(M2)
(M2)
(M2)

12
4
4

1
3

0
813
813

3,991
909
651

820
815

2,219
1,811

44,215
37,352
(US$)
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

2,257
2,257
(US$)
0
0
0
0
0
0
0

0
6
10
5
0
2
2

0
1,916
2,211
790
0
1,314
591

0
9
3
2
0
0
10

0
1,852
1,217
772
0
0
7,938

0
0
2
0
0
0
0

0
136
779
0
0
0
0

0
9
4
2
0
0
10

0
1,989
1,996
772
0
0
7,938

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
9
4
2
0
0
10

0
1,989
1,996
772
0
0
7,938

0
-73
215
18
0
1,314
-7,347

0%
-4%
10%
2%
0%
100%
-1243%

0
0
0

0
0
0

0
35
0

0
44
0

0
5
0

0
40
0

0
49
0

0
0
0

0
0
0

0
40
0

0
49
0

0
-49
0

0%
0%
0%

0
793
793

0
2,162
1,569

117
708
462

132
348
730

12
45
37

14
22
52

129
753
499

146
370
782

0
40
294

0
15
214

129
793
793

146
386
996

-146
1,776
573

0%
82%
37%

(Q)

39,455
39,921
(US$)

(Q)

2,439
-949
(US$)

(Q)

41,894
38,972
(US$)

(Q)

63
638
(US$)

(Q)

(Q)

TOTAL DE COSTOS DE MANO DE OBRA DIRECTA

(US$)

11,216

10,553

13,034

1,007

14,042

230

14,271

-3,718

MARGEN DE CONTRIBUCIN

(US$)

22,111

26,799

26,886

-1,956

24,930

408

25,338

-1,461

GASTOS INDIRECTOS DE FABRICACIN


GASTOS DE ADMINISTRACIN Y VENTAS

(US$)
(US$)

8,689
8,922

9,153
9,399

818
0

834
498

1,652
498

283
216

1,935
714

7,219
8,684

(US$)

4,501

8,247

26,068

-3,288

22,780

-91

22,689

MARGEN OPERACIONAL
RUBRO

PRECIO DE VENTA RECONOCIDO POR Southern Per Copper Corporation PARA LA OT 20178:
MONTO FACTURADO A LA FECHA:
MONTO CANCELADO A LA FECHA:
MONTO POR FACTURAR A LA FECHA:

%
$ 80,866
$ 37,507
$0
$ 43,359

46.38%
0.00%
53.62%

PEDRO BERRIOS
Analista de Costos

FERNANDO MARIN
ADC

%
0%
0%
0%
0%
0%
0%
0%

79%
92%

También podría gustarte