Está en la página 1de 1

REPORTE DE INSPECCION DE SET-UP Rev. 1/9/2023 Num. Op.

10 (Machining)
PP: Primera Pieza / CL: Cambio de Lote / UP: Ultima Pieza >>> PP / CL / UP PP / CL / UP PP / CL / UP PP / CL / UP PP / CL / UP PP / CL / UP

NUM. DE PARTE: 3448491 FECHA:


CLIENTE: Olson Internacional INSPECTOR
Bracket Front
DESCRIPCION DISPOSICION
CAVIDADES/FIXTURES 1 cavity JOB
REVISION AK-AN No. LOTE
DIM ITEM CARACTERISTICA DIMENSIONES DE DIBUJO O ESPECIFICATIONES CON
NO.
INSTRUCCIONES Y NOTAS METODO DE INSPECCION
CRITICA SYMBOL TOLERANCIA DIMENSIONES ACTUALES (Las discrepancias deben ser circuladas)

{k!|_0_._3_|A_|B_|C}
G-3448491 (Gage) IN ZONE X1 --X3
38 Profile SC-01
Once piece per nest SIMULTANEOUSLY AFTER
FINAL MACHINING
{i!|_0_._2_}
IN ZONE X1 -- X3
39 Flatness G-3448491 (Gage)
SIMULTANEOUSLY AFTER
FINAL MACHINING

Free of machining shavings, burrs and


* Part cleanliness Visual
contamination

Burrs to be no greater than 10% of the


2 Burrs Height gage
material thickness

* Part identification Visual Part identification: 8491

Year: "XX" Julian date: "XXX" Cav"1 or


* Traceability identification Visual
2"
Free of visual defects such as marks,
* Part quality Visual 0 burrs, sharp edges, fractures, cracks,
rust, contaminations.

4 Part Quality Visual CC-02 Part to be free of cracks and splits

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

REPORTE DE INSPECCION DE SET-UP


Aprobado por: H.Balderas
Revisión: 01/09/23

También podría gustarte