CRONOGRAMA DE INCIO DE OBRA DEPARTAMENTO DE WASHINGTON

PROYECTO: DEPARTAMENTO -CERCADO DE LIMA INICIO 21-03-2024 FIN 19-05-2024 30 DIAS - CALENDARIO

UBICACIÓN: LIMA - LIMA - LIMA

ITEM PARTIDAS DIA 01 DIA 02 DIA 03


DIA
DIA 05 DIA 06 DIA 07 DIA 08 DIA 09 DIA 10 DIA 11 DIA 12 DIA 13 DIA 14 DIA 15 DIA 16 DIA 17 DIA 18 DIA 19 DIA 20 DIA 21 DIA 22 DIA 23 DIA 24 DIA 25 DIA 26 DIA 27 DIA 28 DIA 29 DIA 30 DIA 31 DIA 32 DIA 33 DIA 34 DIA 35 DIA 36 DIA 37 DIA 38 DIA 39 DIA 40 DIA 41 DIA 42 DIA 43 DIA 44 DIA 45 DIA 46 DIA 47 DIA 48 DIA 49 DIA 50 DIA 51 DIA 52 DIA 53 DIA 54 DIA 55 DIA 56 DIA 57 DIA 58 DIA 59 DIA 60
04

24/04/0 24/04/0 24/04/0 24/04 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/04/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/ 24/05/
1 2 3 /04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

01.00.00 ACTIVIDADES PROVISIONALES, PRELIMINARES, SEGURIDAD Y SALUD

01.01.00 TRABAJOS PRELIMINARES


RETIRO DE ACCESORIOS SANITARIOS (INODORO, LAVAMANOS,
01.01.01
COLGADORES, ETC)
01.01.02 RETIRO DE PUERTAS Y VENTANAS EXISTENTES

01.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS

01.02.00 SEGURIDAD Y SALUD


01.02.01 EQUIPOS DE PROTECCION INDIVIDUAL
01.02.02 EQUIPOS DE PROTECCION COLECTIVA
01.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD
SUMINISTRO Y CERRAMIENTO CON MALLA RACHELL Y/O PLASTICO LOS
01.02.04
VANOS DE DEPARTAMENTO
01.03.00 RETIRO, DESMONTAJE Y DEMOLICIONES
01.03.01 RETIRO DE CERAMICO EXISTENTE EN DEPARTAMENTO
01.03.02 RETIRO DE REVOQUE AFECTADA POR HUMEDAD
RETIRO DE FALSA COLUMNA EN PARTE INFERIOR DE MONTANTE DE
01.03.03
DESAGUE.
01.03.04 DEMOLICION DE MUROS INTERVENIDOS
01.03.05 DEMOLICION DE PISO EN BAÑO DE INVITADOS
01.03.06 PERFILAMIENTO DE VANOS NUEVOS
01.03.07 ELIMINACION DE MATERIAL EXCEDENTE Y/O DEMOLIDOS
01.04.00 OBRAS DE CONCRETO SIMPLE
01.04.01 SUMINISTRO DE ANTISALITRE, CEMENTO Y ARENA FINA
RESANE DE ENLUCIDO CON WATERTITE EN AREAS AFECTADAS POR
01.04.02
SALITRE
01.04.03 RESANE DE DERRAMES EN NUEVOS VANOS
01.05.00 OBRAS DE CONCRETO ARMADO
01.05.01 REFUERZO CON ZAPATAS
01.05.01.01 SUMINISTRO DE ACERO PARA REFUERZOS ESTRUCTURALES
01.05.01.02 FORADO PARA ZAPATA DE REFUERZO
01.05.01.03 CONCRETO F'c=210 kg/cm2 EN ZAPATAS
01.05.01.04 ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATAS
01.05.01.05 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS
01.05.01.06 CURADO (CON AGUA)
01.05.04 REFUERZO DE COLUMNAS Y PLACAS
01.05.04.01 CONCRETO F'C=210 KG/CM2.
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL
01.05.04.03 ACERO DE REFUERZO f´y=4200kg/cm2
01.05.04.04 CURADO (CON AGUA Y ADITIVO)
01.05.05 REFUERZO CON VIGAS
01.05.05.01 CONCRETO F'C=210 KG/CM2.
01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL
01.05.05.03 ACERO DE REFUERZO f´y=4200kg/cm2
01.05.05.04 CURADO (CON AGUA Y ADITIVO)
02.00.00 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 SUMINISTRO DE LADRILLOS KK 18 HUECOS
INSTALACION DE NUEVOS MURO DE SOGAS CON LADR. KK 18 HUECOS
02.01.02
AMARRE
2.02 REVOQUES, ENLUCIDOS Y MOLDURAS

02.02.02 TARRAJEO FROTACHADO EN INTERIORES E = 1.5 cm MEZCLA C:A 1:5

02.02.04 TARRAJEO FROTACHADO COLUMNAS E = 1.5 cm MEZCLA C:A 1:5

02.02.05 TARRAJEO FROTACHADO VIGAS PERALTADAS E = 1.5 cm MEZCLA C:A 1:6

2.04 PISOS
02.04.01 CONTRAPISO DE CONCRETO (DE ENCONTRARSE NECESARIO)
02.04.02 SUMINISTRO DE CERAMICO, Y PEGAMENTO
02.04.03 INSTALACION DE NUEVO PISO CERAMICO SEGÚN PRESUPUESTO
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO PULIDO E=2" MEZCLA C:A 1:4
03.00.00 INSTALACIONES SANITARIAS
3.01 SISTEMA DE AGUA FRIA
03.01.01 SALIDA DE AGUA FRIA
03.01.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC C-10 DE 1/2"
03.01.02 REDES DE AGUA FRIA
03.01.02.02 TUBERIA DE AGUA FRIA DE PVC C-10 DE 1/2"
03.01.04 VALVULAS EMPOTRADAS
03.01.04.01 VALVULA DE COMPUERTA DE GALVANIZADA
3.02 SISTEMA DE DESAGUE Y VENTILACION
03.02.01 ACCESORIOS DE REDES DE DERIVACION Y COLECTORAS
03.02.01.01 REGISTROS DE BRONCE ENROSCADO CROMADO 4"
03.02.01.02 SUMIDERO DE BRONCE 2"
03.02.01.03 SOMBRERO DE VENTILACION DE PVC DE 2"
03.02.01.04 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"
04.00.00 INSTALACIONES ELECTRICAS
4.01 TUBERIAS Y CANALIZACIONES
04.01.01 INSTALACION DE TUBERIA 50mm PVC SAP ACOMETIDA
04.01.02 INSTALACION DE ENTUBADO GENERAL EN DEPARTAMENTO
04.01.03 PRUEBA HIDRAULICA PARA EL BUEN FUNCIONAMIENTO
4.03 CAJAS DE PASE
04.03.01 CAJA DE FIERRO GALVANIZADO y/o PCV DE 100 x 100 mm
04.03.02 CAJA DE FIERRO GALVANIZADO Y/O PVC DE 200 x 200 x 100 mm
4.04 SALIDAS DE ALUMBRADO Y TOMACORRIENTE