OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Item Descripción UNIDAD Metrado Precio Unitario MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7
MESES 6.00
MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 TOTAL REQUERIDO DIFERENCIA
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
OBRAS PROVISIONALES,TRABAJOS
01 PRELIMINARES, SEGURIDAD Y SALUD EN
OBRA, PLAN DE CONTINGENCIA
01.01 CONSTRUCCIONES PROVISIONALES
OFICINAS, TECNICA,SUPERVISION Y COMITE
01.01.01 m2 25.00 214.56 25.00 5,364.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,364.000
DE SEG. Y CONTROL DE CALIDAD
01.01.02 ALMACEN DE OBRA m2 72.00 139.74 72.00 10,061.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,061.280
01.01.03 CASETA DE GUARDIANÍA m2 10.00 160.61 10.00 1,606.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,606.100
01.01.04 COMEDOR PARA PERSONAL DE OBRA m2 40.00 198.29 40.00 7,931.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,931.600
CERCO PROVISIONAL DE OBRA CON MALLA
01.01.05 m2 818.00 15.05 818.00 12,310.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,310.900
RASHELL
CARTEL DE IDENTIFICACIÓN DE LA OBRA DE
01.01.06 und 1.00 752.42 1.00 752.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 752.420
3.60 x 2.40
PROVISIÓN DE ENERGIA ELÉCTRICA PARA
01.01.07 mes 1.00 600.00 1.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.000
LA CONSTRUCCIÓN
PROVISIÓN DE ENERGIA ELECTRICA PARA
01.01.08 mes 1.00 600.00 1.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.000
PLAN DE CONTINGENCIA
01.02 TRABAJOS PRELIMINARES
01.02.01 REMOCIONES
01.02.01.01 REMOCIONES DE PUERTAS m2 26.91 8.91 0.00 0.00 26.91 239.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 239.770
01.02.01.02 REMOCION DE PORTON m2 9.66 11.88 0.00 0.00 9.66 114.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.760
01.02.01.03 REMOCION DE VENTANAS m2 19.35 11.88 0.00 0.00 19.35 229.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 229.880
01.02.01.04 DESMONTAJE DE TECHO CALAMINA m2 709.99 7.90 0.00 0.00 709.99 5,395.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,395.920
01.02.01.05 DESMONTAJE DE ARMAZÓN DE MADERA m2 709.99 7.90 0.00 0.00 709.99 5,395.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,395.920
01.02.01.06 DESMONTAJE DE CIELO RASO DE TRIPLAY m2 421.59 5.27 0.00 0.00 421.59 2,137.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,137.460
01.02.01.07 DESMONTAJE DE REJILLA PARA CANALETA m 12.36 4.45 0.00 0.00 12.36 55.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.000
01.02.01.08 DESMONTAJE DE INODOROS und 7.00 44.52 0.00 0.00 7.00 311.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 311.640
01.02.01.09 DESMONTAJE DE LAVATORIOS und 1.00 44.52 0.00 0.00 1.00 44.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.520
01.02.01.10 DESMONTAJE DE ASTA DE BANDERA und 1.00 17.81 0.00 0.00 1.00 17.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.810
01.02.01.11 CLAUSURA DE INSTALACIONES SANITARIAS glb 1.00 209.10 0.00 0.00 1.00 209.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 209.100
01.02.01.12 CLAUSURA DE INSTALACIONES ELECTRICAS glb 1.00 178.07 0.00 0.00 1.00 178.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 178.070
01.02.01.13 REMOCION DE ARBOLES und 17.00 59.35 0.00 0.00 17.00 1,008.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,008.950
01.02.02 DEMOLICIONES
DEMOLICIÓN DE CIMIENTOS DE BARRO CON
01.02.02.01 m3 125.50 10.66 0.00 0.00 125.50 1,337.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,337.830
PIEDRA
01.02.02.02 DEMOLICION DE CONTRAFUERTE DE ADOBE m3 125.50 10.66 0.00 0.00 125.50 1,337.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,337.830
01.02.02.03 DEMOLICION DE MURO DE ADOBE m2 1,514.64 7.65 0.00 0.00 1,514.64 11,587.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,587.000
DEMOLICION DE URINARIOS Y BEBEDEROS
01.02.02.04 m 4.54 117.37 0.00 0.00 4.54 532.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 532.860
DE CONCRETO
DEMOLICIÓN DE PISO DE CONCRETO
01.02.02.05 m2 421.59 20.85 0.00 0.00 421.59 8,790.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,790.150
INCLUYE FALSO PISO
01.02.02.06 DEMOLICION DE GRADA DE CONCRETO m2 47.20 19.57 0.00 0.00 47.20 923.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 923.700
01.02.02.07 DEMOLICIÓN DE BANCAS DE CONCRETO m 8.70 20.85 0.00 0.00 8.70 181.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.400
01.02.02.08 DEMOLICION DE PILETA DE CONCRETO/AGUA und 1.00 29.33 0.00 0.00 1.00 29.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.330
DEMOLICION DE BUZON DE
01.02.02.09 und 1.00 293.40 0.00 0.00 1.00 293.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 293.400
CONCRETO/DESAGUE
DEMOLICION DE BUZON DE
01.02.02.10 und 1.00 117.37 0.00 0.00 1.00 117.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.370
CONCRETO/ELECTRICIDAD
ACARREO DE MATERIAL EXCENDENTE DE
01.02.02.11 m3 890.27 8.57 0.00 0.00 890.27 7,629.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,629.610
DEMOLICIONES
ELIMINACION DE MATERIAL EXCEDENTE DE
01.02.02.12 m3 890.27 15.17 0.00 0.00 890.27 13,505.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,505.400
DEMOLICIONES CON MAQUINARIA
MOVILIZACION DE CAMPAMENTO,
01.02.03
MAQUINARIA Y HERRAMIENTAS
MOVILIZACIÓN DE CAMPAMENTO,
01.02.03.01 glb 1.00 14,000.00 0.50 7,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 7,000.00 14,000.000
MAQUINARIA Y HERRAMIENTAS
01.02.03.02 FLETE DE MATERIALES glb 1.00 91,315.83 1.00 91,315.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91,315.830
01.02.04 TRAZO, NIVELES Y REPLANTEO
01.02.04.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 3,414.76 1.20 0.00 0.00 3,414.76 4,097.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,097.710
TRAZO, NEVELES Y EPLANTEO DURANTE LA
01.02.04.02 mes 6.00 4,764.46 0.00 0.00 1.20 5,717.35 1.20 5,717.35 1.20 5,717.35 1.20 5,717.35 1.20 5,717.35 28,586.750
EJECUCION DE LA OBRA
01.03 PLAN DE CONTINGENCIA
01.03.01 ESTRUCTURAS
01.03.01.01 MOVIMIENTO DE TIERRAS
01.03.01.01.01 EXCAVACIONES SIMPLES
EXCAVACIÓN CON MAQUINARIA DE ZANJAS
01.03.01.01.01.01 m3 4.80 9.24 4.80 44.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.350
PARA ZAPATAS
EXCAVACIÓN MANUAL DE ZANJAS PARA
01.03.01.01.01.02 m3 14.19 37.04 14.19 525.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 525.600
PIRCA
01.03.01.01.01.03 PERFILADO MANUAL DE ZANJAS m2 150.59 1.85 150.59 278.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 278.590
01.03.01.01.02 CORTES
01.03.01.01.02.01 CORTE PARA PLATAFORMADO m3 64.03 6.73 0.00 0.00 64.03 430.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 430.920
01.03.01.01.03 RELLENOS
01.03.01.01.03.01 RELLENO CON MATERIAL PROPIO m3 47.28 34.90 26.75 933.40 20.53 716.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,650.070
01.03.01.01.03.02 RELLENO CON MATERIAL DE PRÉSTAMO m3 171.04 159.47 171.04 27,275.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27,275.750
01.03.01.01.04 NIVELACION INTERIOR Y APISONADO
NIVELACIÓN INTERIOR Y APISONADO FINAL
01.03.01.01.04.01 PARA RECIBIR AL FALSO PISO CON EQUIPO m2 949.42 5.24 949.42 4,974.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,974.960
LIVIANO
01.03.01.02 OBRAS DE CONCRETO SIMPLE
01.03.01.02.01 CIMIENTO
CONCRETO CICLOPEO CEMENTO-HORMIGON
01.03.01.02.01.01 m3 0.36 356.89 0.36 128.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.480
1:8+30%PM dmax=6"
01.03.01.02.02 ZAPATAS
01.03.01.02.02.01 CONCRETO F'C=210KG/CM2 PARA ZAPATAS m3 2.40 457.66 2.40 1,098.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,098.380
01.03.01.02.03 SOLADOS
CONCRETO f'c=100kg/cm2 PARA SOLADOS
01.03.01.02.03.01 m2 4.00 33.95 4.00 135.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 135.800
h=0.10m
01.03.01.02.04 SOBRECIMIENTO
CONCRETO f'c= 175kg/cm2 PARA
01.03.01.02.04.01 m3 0.30 417.19 0.30 125.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.160
SOBRECIMIENTO
ENCOFRADO Y DESENCOFRADO DE
01.03.01.02.04.02 m2 3.20 63.67 3.20 203.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 203.740
SOBRECIMIENTO
01.03.01.02.05 GRADAS
01.03.01.02.05.01 CONCRETO f'c= 175kg/cm2 PARA GRADAS m3 8.64 417.19 8.64 3,604.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,604.520
01.03.01.02.05.02 ENCOFRADO Y DESENCOFRADO DE GRADAS m2 11.72 63.67 11.72 746.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 746.210
01.03.01.02.06 RAMPAS
CONCRETO f´c =175 kg/cm2 PARA RAMPAS
01.03.01.02.06.01 m2 1.25 42.63 0.00 0.00 1.25 53.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.290
h=0.10m
01.03.01.02.06.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 1.25 63.67 1.21 77.18 0.04 2.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.590
01.03.01.02.07 FALSO PISO
01.03.01.02.07.01 CONCRETO FC=175 kg/cm² - PARA FALSO PISO m2 654.18 42.63 654.18 27,887.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27,887.690
01.03.01.03 ESTRUCTURA METALICA
ESTRUCTURA DE APOYO DE TANQUE
01.03.01.03.01
ELEVADO
ESTRUCTURA METALICA PARA TANQUE
01.03.01.03.01.01 und 1.00 16,527.11 1.00 16,479.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16,479.110
ELEVADO
01.03.01.03.01.02 ESTRUCTURA METALICA PARA BARANDA und 1.00 1,556.28 1.00 1,544.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,544.280
01.03.01.03.01.03 ESCALERA DE ACCESO A TANQUE ELEVADO und 1.00 4,828.43 1.00 4,804.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,804.430
01.03.01.03.02 TIJERALES
01.03.01.03.02.01 TIJERALES DE ACERO GALVANIZADO und 45.00 328.76 45.00 14,704.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,704.200
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
01.03.01.03.03 CORREAS LONGITUDINALES
CORREAS LONGITUDINALES DE ACERO
01.03.01.03.03.01 m 1,186.68 10.15 1,186.68 11,926.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,926.130
GALVANIZADO
01.03.01.04 VARIOS
01.03.01.04.01 MURO DE CONTENCION
CONCRETO CICLOPEO-HORMIGÓN 1:10 + 30%
01.03.01.04.01.01 m3 103.19 356.89 103.19 36,827.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36,827.480
PM dmax = 8"
01.03.01.04.01.02 ENCOFRADO Y DESENCOFRADO m2 314.06 73.88 314.06 23,202.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23,202.750
01.03.02 ARQUITECTURA
01.03.02.01 TABIQUES DE ALBAÑILERÍA
01.03.02.01.01 TABIQUERÍA DE FIBROCEMENTO m2 1,196.06 76.62 1,196.06 91,642.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91,642.120
01.03.02.02 REVOQUES Y REVESTIMIENTOS
01.03.02.02.01 BRUÑAS E=1.0 CM, SEGÚN DETALLE m 933.15 8.32 933.15 7,763.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,763.810
PREPARACIÓN DE GRADAS DE CONCRETO
01.03.02.02.02 m 25.10 9.55 25.10 239.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 239.710
(paso: 0.30 x contrapaso 0.15 m.)
PREPARACIÓN DE GRADAS DE CONCRETO
01.03.02.02.03 m 1.50 37.75 1.50 56.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.630
(paso: 1.50 x contrapaso 0.15 m.)
PREPARACIÓN DE GRADAS DE CONCRETO
01.03.02.02.04 m 1.40 36.22 1.40 50.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.710
(paso: 1.35 x contrapaso 0.15 m.)
GRADAS DE CONCRETO (paso: 0.30 x contrapaso
01.03.02.02.05 m 20.60 25.49 20.60 525.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 525.090
0.15 m.)
GRADAS DE CONCRETO (paso: 1.50 x contrapaso
01.03.02.02.06 m 1.50 140.89 1.50 211.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 211.340
0.15 m.)
GRADAS DE CONCRETO (paso: 1.35 x contrapaso
01.03.02.02.07 m 1.40 127.91 1.40 179.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 179.070
0.15 m.)
01.03.02.03 CIELO RASOS
01.03.02.03.01 FALSO CIELO RASO DE DRYWALL m2 361.29 44.21 0.00 0.00 361.29 15,781.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,781.150
01.03.02.04 PISOS Y PAVIMENTOS
01.03.02.04.01 CONTRAPISO
01.03.02.04.01.01 CONTRAPISO DE 40 mm m2 607.07 32.35 584.15 18,897.27 22.92 741.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,638.710
01.03.02.04.02 PISOS DE CONCRETO
01.03.02.04.02.01 PISO CEMENTO SEMIFROTACHADO m2 607.07 9.66 0.00 0.00 607.07 5,864.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,864.300
01.03.02.05 ZOCALOS Y CONTRAZOCALOS
01.03.02.05.01 ZOCALOS
01.03.02.05.01.01 ZOCALO DE CERAMICO 0.45 x 0.45 m. m2 58.05 72.73 0.00 0.00 58.05 4,221.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,221.980
01.03.02.06 COBERTURA
COBERTURA PLANCHA ONDULADA DE
01.03.02.06.01 m2 350.50 29.06 345.04 9,888.74 5.46 156.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,045.330
FIBROCEMENTO
CUMBRERA PLANCHA ONDULADA DE
01.03.02.06.02 m 98.89 57.41 0.00 0.00 98.89 5,637.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,637.720
FIBROCEMENTO
01.03.02.07 CARPINTERIA DE MADERA
01.03.02.07.01 PUERTAS
01.03.02.07.01.01 PUERTA CONTRAPLACADA m2 36.75 443.39 0.00 0.00 36.75 16,294.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16,294.580
01.03.02.07.01.02 PUERTA MELAMINE m2 8.55 310.50 0.00 0.00 8.55 2,654.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,654.780
01.03.02.07.01.03 SEPARADORES DE MELAMINE EN SS.HH m2 25.28 165.10 0.00 0.00 25.28 4,173.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,173.730
01.03.02.08 CARPINTERIA METALICA Y HERRERIA
01.03.02.08.01 VENTANAS DE ALUMINIO
VENTANA DE ALUMINIO / VIDRIO SIMPLE
01.03.02.08.01.01 CON LAMINA DE SEGURIDAD 6 MM m2 43.22 325.60 0.00 0.00 43.22 14,072.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,072.430
(CORREDIZA)
01.03.02.08.02 PUERTA METALICA
PORTÓN METÁLICO DOBLE HOJA DE MALLA
01.03.02.08.02.01 m2 19.23 320.11 0.00 0.00 19.23 6,155.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,155.720
GALVANIZADA
PORTÓN METÁLICO UNA HOJA DE MALLA
01.03.02.08.02.02 m2 2.44 320.11 0.00 0.00 2.44 781.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 781.070
GALVANIZADA
01.03.02.08.03 BARANDAS
BARANDA DE PROTECCION TANQUE
ELEVADO H=1.00 m FIERRO NEGRO CON
01.03.02.08.03.01 m 6.60 142.39 0.00 0.00 6.60 939.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 939.770
PROTECCIÓN DE PINTURA ANTICORROSIVA
Y ESMALTE
01.03.02.08.04 ESCALERAS
ESCALERA DE GATO DE FIERRO
01.03.02.08.04.01 und 1.00 7,273.77 0.00 0.00 1.00 7,225.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,225.770
GALVANIZADO
01.03.02.08.05 CERCO METALICO
CERCO CON PARANTES 3" Y MALLA
01.03.02.08.05.01 m 148.09 141.33 0.00 0.00 148.09 20,929.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,929.560
GALVANIZADA 2", H = 2.44 m."
01.03.02.09 CERRAJERIA
01.03.02.09.01 BISAGRAS
01.03.02.09.01.01 BISAGRA ALUMINIZADA DE 3 1/2" PESADA pza 117.00 10.20 0.00 0.00 117.00 1,193.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,193.400
01.03.02.09.02 CERRADURAS
CERRADURA DE PALANCA EN PUERTAS
01.03.02.09.02.01 pza 17.00 126.99 0.00 0.00 17.00 2,158.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,158.830
CONTRAPLACADAS
CERROJO DE BRONCE PARA PUERTA DE
01.03.02.09.02.02 pza 5.00 67.50 0.00 0.00 5.00 337.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 337.500
MELAMINE
01.03.02.09.02.03 JALADOR METALICO PARA PUERTA pza 5.00 55.47 0.00 0.00 5.00 277.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 277.350
01.03.02.10 PINTURA
PINTURA ESMALTE 2 MANOS EN
01.03.02.10.01 m2 51.50 26.14 0.00 0.00 51.50 1,346.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,346.210
ESTRUCTURAS METÁLICAS
01.03.02.11 JUNTAS
01.03.02.11.01 JUNTA VISIBLE 5 mm. m 853.45 4.79 853.45 4,088.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,088.030
01.03.02.12 AREAS VERDES
01.03.02.12.01 TIERRA CHACRA E=15 cm m2 327.46 12.21 0.00 0.00 327.46 3,998.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,998.290
01.03.02.12.02 GRASS AMERICANO NATURAL m2 327.46 8.71 0.00 0.00 327.46 2,852.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,852.180
01.03.02.12.03 SETO PARA CERCO VIVO m 22.40 45.61 0.00 0.00 22.40 1,021.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,021.660
01.03.02.13 VARIOS
ESPEJO BISELADO EN SS.HH. e=6mm,
01.03.02.13.01 m2 1.80 390.09 0.00 0.00 1.80 702.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 702.160
C/LAMINA DE SEGURIDAD
VENTANA DE ALUMINIO / VIDRIO SIMPLE
CON LAMINA DE SEGURIDAD 6 MM
01.03.02.13.02 m2 43.22 305.51 0.00 0.00 43.22 13,204.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,204.140
(CORREDIZA). EN VENTANAS CON SISTEMA
DIRECTO
01.03.02.14 EVACUACIÓN Y SEÑALIZACIÓN
01.03.02.14.01 SEÑALIZACION Y SEGURIDAD
SUMINISTRO Y COLOCACION DE SEÑAL DE
01.03.02.14.01.01 und 8.00 17.29 0.00 0.00 8.00 138.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.320
SALIDA
SUMINISTRO Y COLOCACIÓN DE RUTAS DE
01.03.02.14.01.02 und 12.00 17.29 0.00 0.00 12.00 207.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 207.480
EVACUACIÓN
SUMINISTRO Y COLOCACIÓN DE SEÑAL
01.03.02.14.01.03 und 3.00 17.29 0.00 0.00 3.00 51.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.870
EXTINTORES DE FUEGO
SUMINISTRO Y COLOCACIÓN DE SEÑAL
01.03.02.14.01.04 und 1.00 17.29 0.00 0.00 1.00 17.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.290
RIESGO ELECTRICO
SUMINISTRO Y COLOCACION DE SEÑAL DE
01.03.02.14.01.05 und 6.00 20.34 0.00 0.00 6.00 122.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.040
AFORO
SUMINISTRO Y COLOCACION DE SIMBOLO
01.03.02.14.01.06 und 1.00 20.34 0.00 0.00 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.340
DE BOTIQUÍN
01.03.02.14.02 RUTAS DE EVACUACIÓN
PINTADO EN ZONA DE SEGURIDAD EN PISO
01.03.02.14.02.01 m2 4.00 22.37 0.00 0.00 4.00 89.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.480
CON PINTURA DE TRAFICO
SUMINISTRO Y COLOCACION DE
01.03.02.14.02.02 und 4.00 19.38 0.00 0.00 4.00 77.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.520
SEÑALIZACION EN ZONA DE REUNION
01.03.02.14.03 VARIOS
SUMINISTRO Y COLOCACION DE BOTIQUIN
01.03.02.14.03.01 und 1.00 168.43 0.00 0.00 1.00 168.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 168.430
80X60X20CM. INC. MEDICAMENTOS
SUMINISTRO Y COLOCACION DE EXTINTOR
01.03.02.14.03.02 und 1.00 261.56 0.00 0.00 1.00 261.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 261.560
TIPO "K" 6LT.
SUMINISTRO Y COLOCACION DE EXTINTOR
01.03.02.14.03.03 und 1.00 261.56 0.00 0.00 1.00 261.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 261.560
CO2 DE 6KG.
01.03.03 INSTALACIONES SANITARIAS
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
SUMINISTRO E INSTALACION DE
01.03.03.01.01
APARATOS SANITARIOS
INODORO DE LOSA VITRIFICADA CON
DESCARGA INDIRECTA (TANQUE). MODELO:
01.03.03.01.01.01 und 2.00 234.71 1.93 452.15 0.07 17.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 469.420
RAPIJET PRIMIUN, COLOR BLANCO 1ra
CALIDAD - NIÑOS
INODORO DE LOSA VITRIFICADA CON
DESCARGA INDIRECTA (TANQUE). MODELO:
01.03.03.01.01.02 und 5.00 265.61 0.00 0.00 5.00 1,328.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,328.050
RAPIJET PRIMIUN, COLOR BLANCO 1ra
CALIDAD - ADULTOS
URINARIO DE PARED DE LOSA VITRIFICADA
01.03.03.01.01.03 und 1.00 495.08 0.92 456.34 0.08 38.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 495.080
BLANCA MODELO CADET O SIMILAR
LAVATORIO DE LOSA VITRIFICADA BLANCA
01.03.03.01.01.04 und 7.00 473.39 0.00 0.00 7.00 3,313.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,313.730
C/GRIFERIA
LAVADERO ACERO INOXIDABLE 01 POZA
01.03.03.01.01.05 und 1.00 502.40 0.00 0.00 1.00 502.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 502.400
C/ESCURRIDERO (INC. GRIFERIA)
DUCHA ACERO INOXIDABLE (INC.
01.03.03.01.01.06 und 1.00 303.39 0.00 0.00 1.00 303.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.390
ACCESORIOS)
SUMINISTRO E INSTALACION DE
01.03.03.01.02
ACCESORIOS
PORTARROLLO EMPOTRADO DE LOSA PARA
01.03.03.01.02.01 und 7.00 94.96 5.19 493.20 1.81 171.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 664.720
PAPEL HIGIÉNICO
01.03.03.01.02.02 LLAVE DE DUCHA CROMADA TIPO PALANCA und 1.00 182.72 0.98 178.42 0.02 4.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 182.720
01.03.03.01.02.03 BASURERO DE PLASTICO PARA BAÑO 35 LT. und 7.00 53.86 7.00 377.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 377.020
JABONERA DE ACERO INOX. CON
01.03.03.01.02.04 und 4.00 108.20 1.34 145.30 2.66 287.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 432.800
DISPENSADOR PARA JABÓN LÍQUIDO
01.03.03.01.02.05 JABONERA DE LOSA PARA DUCHA und 1.00 56.16 0.00 0.00 1.00 56.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.160
01.03.03.01.02.06 DISPENSADOR PARA PAPEL TOALLA und 5.00 72.03 0.00 0.00 5.00 360.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 360.150
01.03.03.01.02.07 GRIFO DE RIEGO und 1.00 51.70 0.00 0.00 1.00 51.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.700
01.03.03.02 SISTEMA DE AGUA FRIA
01.03.03.02.01 SALIDA DE AGUA FRIA
01.03.03.02.01.01 SALIDA DE AGUA FRIA - Ø = 1/2" PVC SAP pto 17.00 57.78 17.00 982.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 982.260
01.03.03.02.01.02 SALIDA DE AGUA FRIA - Ø = 3/4" PVC SAP pto 1.00 54.72 1.00 54.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.720
01.03.03.02.01.03 SALIDA DE AGUA FRIA - Ø = 1 1/4" PVC SAP pto 1.00 60.58 1.00 60.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.580
01.03.03.02.02 REDES DE DISTRIBUCION
RED DE DISTRIBUCION TUBERIA PVC CLASE
01.03.03.02.02.01 m 23.64 12.45 23.64 294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 294.320
10 DE 1/2"
RED DE DISTRIBUCION TUBERIA PVC CLASE
01.03.03.02.02.02 m 36.09 11.34 36.09 409.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 409.260
10 C/R DE 3/4"
RED DE DISTRIBUCION TUBERIA PVC CLASE
01.03.03.02.02.03 m 18.20 16.63 18.20 302.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 302.670
10 C/R DE 1"
01.03.03.02.03 REDES DE ALIMENTACION
RED DE ALIMENTACION TUBERIA PVC CLASE
01.03.03.02.03.01 m 15.00 10.52 15.00 157.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 157.800
10 C/R DE 1/2"
RED DE ALIMENTACION TUBERIA PVC CLASE
01.03.03.02.03.02 m 23.00 9.54 23.00 219.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 219.420
10 C/R DE 3/4"
RED DE ALIMENTACION TUBERIA PVC CLASE
01.03.03.02.03.03 m 15.00 13.87 15.00 208.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 208.050
10 C/R DE 1"
RED DE ALIMENTACION TUBERIA PVC CLASE
01.03.03.02.03.04 m 34.30 20.12 34.30 690.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 690.120
10 C/R DE 1 1/4"
EXCAVACION Y PICADO DE ZANJA PARA
01.03.03.02.03.05 m3 49.26 9.85 49.26 485.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 485.210
TUBERIA
REFINE Y NIVELACION DE ZANJA PARA
01.03.03.02.03.06 m2 61.57 1.85 61.57 113.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 113.900
TUBERIA
01.03.03.02.03.07 CAMA DE ARENA EN ZANJA P/TUB. m3 6.16 140.19 6.16 863.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 863.570
RELLENO MANUAL CON MATERIAL PROPIO
01.03.03.02.03.08 m3 24.63 33.44 24.63 823.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 823.630
(REDES DE INST. SANITARIAS)
ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.02.03.09 m3 30.79 15.17 30.79 467.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 467.080
MANUAL
01.03.03.02.03.10 PRUEBAS HIDRAULICAS Y DESINFECCION m 165.23 5.51 165.23 910.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 910.420
01.03.03.02.04 ACCESORIOS DE REDES
01.03.03.02.04.01 CODO PVC 90° SAP C-10 DE 1/2" und 31.00 8.71 31.00 270.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 270.010
01.03.03.02.04.02 CODO PVC 90° SAP C-10 DE 3/4" und 23.00 9.68 23.00 222.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 222.640
01.03.03.02.04.03 CODO PVC 90° SAP C-10 DE 1" und 4.00 11.07 4.00 44.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.280
01.03.03.02.04.04 CODO PVC 90° SAP C-10 DE 1 1/4" und 3.00 12.77 3.00 38.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.310
01.03.03.02.04.05 TEE PVC SAP C-10 DE 3/4" und 9.00 11.37 9.00 102.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.330
01.03.03.02.04.06 TEE PVC SAP C-10 DE 11/4" und 6.00 23.58 6.00 141.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 141.480
01.03.03.02.04.07 REDUCCIÓN PVC SAP C-10 DE 3/4" A 1/2" und 13.00 9.30 13.00 120.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.900
01.03.03.02.04.08 REDUCCIÓN PVC SAP C-10 DE 1" A 3/4" und 1.00 11.20 1.00 11.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.200
01.03.03.02.04.09 REDUCCIÓN PVC SAP C-10 DE 11/4" A 3/4" und 2.00 11.60 2.00 23.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.200
01.03.03.02.04.10 REDUCCIÓN PVC SAP C-10 DE 11/4" A 1" und 1.00 12.00 1.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.000
01.03.03.02.05 VALVULAS Y LLAVES
VALVULA ESFERICA DE BRONCE PESADA
01.03.03.02.05.01 und 1.00 102.46 0.00 0.00 1.00 102.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.460
Ø=1/2"
VALVULA ESFERICA DE BRONCE PESADA
01.03.03.02.05.02 und 4.00 127.78 0.00 0.00 4.00 511.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 511.120
Ø=3/4"
01.03.03.02.05.03 VALVULA ESFERICA DE BRONCE PESADA Ø1" und 2.00 161.67 0.00 0.00 2.00 323.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 323.340
VALVULA DE COMPUERTA DE BRONCE
01.03.03.02.05.04 und 7.00 162.38 0.00 0.00 7.00 1,136.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,136.660
PESADA Ø1 1/4"
01.03.03.02.05.05 VALVULA CHECK DE BRONCE Ø1" und 1.00 112.87 0.00 0.00 1.00 112.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.870
01.03.03.02.05.06 VALVULA CHECK DE BRONCE Ø1 1 /4" und 2.00 116.60 0.00 0.00 2.00 233.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 233.200
LLAVE DE RIEGO CON GRIFO DE Ø3/4" - EN
01.03.03.02.05.07 und 1.00 371.48 0.00 0.00 1.00 371.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 371.480
CAJUELA DE CONCRETO F´c=175 Kg/cm2
01.03.03.02.06 CAJAS PARA VALVULAS
01.03.03.02.06.01 CAJA NICHO PARA VALVULAS INC. TAPA und 5.00 199.66 5.00 998.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 998.300
01.03.03.02.06.02 CAJA NICHO PARA GRIFO DE RIEGO und 1.00 115.16 1.00 115.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 115.160
01.03.03.03 SISTEMA DE DRENAJE PLUVIAL
01.03.03.03.01 REDES COLECTORAS EXTERIORES
EXCAVACION Y PICADO DE ZANJA PARA
01.03.03.03.01.01 m3 6.54 42.33 6.54 276.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 276.840
CANALETA DE CONCRETO
REFINE Y NIVELACION DE ZANJA PARA
01.03.03.03.01.02 m2 11.90 1.24 11.90 14.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.760
CANALETA DE CONCRETO
ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.03.01.03 m3 6.54 15.17 6.54 99.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.210
MANUAL
01.03.03.03.01.04 TUBERIA DE PVC-U DN 6" m 39.65 33.69 39.65 1,335.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,335.810
01.03.03.03.01.05 TUBERÍA DE PVC 4" m 7.93 19.63 7.64 149.91 0.29 5.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.670
JUNTA DE CONSTRUCCION EN CANAL
01.03.03.03.01.06 m 8.59 8.00 0.00 0.00 8.59 68.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.720
PLUVIAL
01.03.03.03.02 REDES COLECTORAS EN TECHOS
CANALETA DE PLANCHA GALVANIZADA
01.03.03.03.02.01 m 95.54 36.01 86.10 3,065.99 9.44 336.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,402.180
D=6" e=1/32", INCLUYE SOPORTES
ABRAZADERA PARA TUBO Ø 4" PARA
01.03.03.03.02.02 und 42.00 19.84 0.00 0.00 42.00 833.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 833.280
MONTANTE DE RED PLUVIAL
01.03.03.03.02.03 CODO PVC 90 SAP C-10 DE 4" und 28.00 12.69 0.00 0.00 28.00 355.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 355.320
01.03.03.03.02.04 CODO PVC 45 SAP C-10 DE 4" und 28.00 12.69 0.00 0.00 28.00 355.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 355.320
01.03.03.03.02.05 CONCRETO F'C=175KG/CM2 EN COLUMNETA m3 0.79 417.19 0.00 0.00 0.79 329.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 329.580
ENCOFRADO Y DESENCOFRADO EN
01.03.03.03.02.06 m2 11.55 86.39 0.00 0.00 11.55 997.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 997.800
COLUMNETA
MONTANTE TUBERIA DE PVC SAL DE 4"
01.03.03.03.02.07 m 50.40 19.78 0.00 0.00 50.40 996.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 996.910
INCLUYE ACCESORIOS
01.03.03.04 DESAGÜE Y VENTILACIÓN
01.03.03.04.01 SALIDA DE DESAGUE Y VENTILACION
01.03.03.04.01.01 SALIDA DE DESAGUE EN PVC SAP Ø DE 2" pto 10.00 54.30 10.00 543.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.000
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
SALIDA DE DESAGUE EN PVC CP Ø DE 2" CON
01.03.03.04.01.02 pto 1.00 73.46 1.00 73.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.460
TRAMPA "P"
01.03.03.04.01.03 SALIDA DE DESAGUE EN PVC SAP Ø DE 4" pto 7.00 61.18 7.00 428.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 428.260
01.03.03.04.01.04 SALIDA DE VENTILACION EN PVC SAP Ø DE 2" pto 10.00 53.00 10.00 530.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 530.000
01.03.03.04.02 REDES DE DERIVACION
SUMINISTRO E INSTALACION DE TUBERIA
01.03.03.04.02.01 m 23.52 18.01 23.52 423.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 423.600
PVC DESAGUE DN=2"
SUMINISTRO E INSTALACION DE TUBERIA
01.03.03.04.02.02 ml 11.70 22.48 11.70 263.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 263.020
PVC DESAGUE DN=4"
SUMINISTRO E INSTALACIÓN DE MONTANTE
01.03.03.04.02.03 DE VENTILACIÓN PVC-CP 2" INC. m 33.60 19.79 33.60 664.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 664.940
ACCESORIOS
PRUEBA HIDRAULICA DE ESCORRENTIA DE
01.03.03.04.02.04 m 130.43 2.36 7.70 18.16 122.73 289.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 307.810
TUB. DESAGUE
01.03.03.04.03 ACCESORIOS DE REDES
01.03.03.04.03.01 TEE PVC-P Ø2"x2" PARA DESAGUE und 11.00 10.14 11.00 111.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.540
01.03.03.04.03.02 YEE PVC-P Ø2"x2" PARA DESAGUE und 5.00 12.26 5.00 61.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.300
01.03.03.04.03.03 YEE PVC-P Ø4"x2" PARA DESAGUE und 2.00 13.11 2.00 26.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.220
01.03.03.04.03.04 YEE PVC-P Ø4"x4" PARA DESAGUE und 2.00 14.21 2.00 28.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.420
01.03.03.04.03.05 CODO PVC-P Ø=2"x45° und 6.00 7.60 6.00 45.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.600
01.03.03.04.03.06 CODO PVC-P Ø=2"x90° und 26.00 7.09 26.00 184.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 184.340
01.03.03.04.03.07 CODO PVC-P Ø=4"x45° und 3.00 12.69 3.00 38.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.070
CODO PVC-CP Ø=4"x90° CON VENTILACION
01.03.03.04.03.08 und 3.00 23.32 3.00 69.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.960
DE Ø2"
01.03.03.04.03.09 REDUCCIÓN PVC - SAP DE 4" A 2" und 3.00 13.53 0.00 0.00 3.00 40.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.590
01.03.03.04.03.10 ABRAZADERAS F°G° PARA TUBERIAS 4" und 28.00 16.40 0.00 0.00 28.00 459.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 459.200
01.03.03.04.03.11 COLGADOR Ø DE 4" m 28.00 25.61 0.00 0.00 28.00 717.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 717.080
01.03.03.04.04 REDES COLECTORAS
SUMINISTRO E INSTALACIÓN DE TUBERIA DE
01.03.03.04.04.01 m 61.61 33.62 61.61 2,071.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,071.330
PVC SAP Ø DE 6"
EXCAVACION Y PICADO DE ZANJA PARA
01.03.03.04.04.02 m3 38.73 9.85 38.73 381.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 381.490
TUBERIA
REFINE Y NIVELACIÓN DE ZANJA PARA
01.03.03.04.04.03 m2 48.42 1.85 48.42 89.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.580
TUBERIA
01.03.03.04.04.04 CAMA DE ARENA EN ZANJA P/TUB. m3 4.82 140.19 4.82 675.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 675.720
RELLENO Y COMPACTADO CON CON EQUIPO
01.03.03.04.04.05 m3 19.37 33.44 13.70 458.20 5.67 189.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 647.730
Y MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.04.04.06 m3 29.05 15.17 0.00 0.00 29.05 440.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 440.690
MANUAL
01.03.03.04.05 ADITAMENTOS VARIOS
SUMIDERO DE BRONCE DE 2" PROVISION Y
01.03.03.04.05.01 und 6.00 19.64 0.00 0.00 6.00 117.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.840
COLOCACION
REGISTRO ROSCADO DE BRONCE DE 4"
01.03.03.04.05.02 und 13.00 35.90 0.00 0.00 13.00 466.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 466.700
PROVISION Y COLOCACION
01.03.03.04.05.03 SOMBRERO DE VENTILACION DE 2" PVC und 9.00 17.27 0.00 0.00 9.00 155.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.430
01.03.03.04.06 CAMARAS DE INSPECCION
CAJA DE REG. PREFAB. 12" x 24" (0.30x0.60)
01.03.03.04.06.01 und 4.00 138.69 0.00 0.00 4.00 554.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 554.760
C/TAPA CONCRETO REFORZADO
CAJA DE REG. PREFAB. 18" x 24" (0.45x0.60)
01.03.03.04.06.02 und 16.00 162.61 0.00 0.00 16.00 2,601.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,601.760
C/TAPA CONCRETO REFORZADO
CAJA DE REG. PREFAB. 24" x 24" (0.60x0.60)
01.03.03.04.06.03 und 4.00 167.75 0.00 0.00 4.00 671.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 671.000
C/TAPA CONCRETO REFORZADO
01.03.03.04.07 DISPOSICION DE AGUAS NEGRAS
01.03.03.04.07.01 BIODIGESTOR DE 3000 L
01.03.03.04.07.02 EXCAVACION DE MANUAL m3 18.22 42.33 17.84 755.18 0.38 16.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 771.250
ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.04.07.03 m3 24.84 15.17 0.00 0.00 24.84 376.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 376.820
MANUAL
SUMINISTRO E INSTALACION DE
01.03.03.04.07.04 BIODIGESTOR PREFABRICADO TIPO I DE 600- und 1.00 1,534.00 0.00 0.00 1.00 1,534.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,534.000
700 LTS
RED DE DERIVACIÓN DE TUBERIA PVC - SAP
01.03.03.04.07.05 m 6.00 21.83 0.00 0.00 6.00 130.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.980
Ø DE 4"
RED DE DERIVACIÓN DE TUBERIA PVC - SAP
01.03.03.04.07.06 m 6.00 33.62 0.00 0.00 6.00 201.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 201.720
Ø DE 6"
01.03.03.04.07.07 CAJA DE LODOS
01.03.03.04.07.08 EXCAVACION DE MANUAL m3 1.33 42.33 0.00 0.00 1.33 56.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.300
ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.04.07.09 m3 1.82 15.17 0.00 0.00 1.82 27.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.610
MANUAL
01.03.03.04.07.10 POZO DE PERCOLACION
01.03.03.04.07.11 EXCAVACION DE MANUAL m3 41.40 42.33 0.00 0.00 41.40 1,752.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,752.460
ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.04.07.12 m3 56.45 15.17 0.00 0.00 56.45 856.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 856.350
MANUAL
TAPA DE CONCRETO DE 0.60 X 0.60 e=0.05m
01.03.03.04.07.13 und 1.00 65.00 0.00 0.00 1.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.000
P/POZO DE PERCOLACION
MURO DE LADRILLO SOLIDO ARTESANAL
01.03.03.04.07.14 m2 3.31 72.58 0.00 0.00 3.31 240.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 240.240
D/CABEZA C/JUNTA ABIERTA
SISTEMA DE ALMACENAMIENTO DE
01.03.03.05
CISTERNA Y TANQUE ELEVADO
01.03.03.05.01 REDES DE ALIMENTACIÓN
SUMINISTRO E INSTALACION DE TANQUE DE
01.03.03.05.01.01 2500 LITROS INCLUYE VALVULAS Y glb 1.00 1,394.42 0.00 0.00 1.00 1,394.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,394.420
ACCESORIOS
SUMINISTRO E INSTALACION DE TANQUE DE
01.03.03.05.01.02 5000 LITROS INCLUYE VALVULAS Y glb 1.00 5,498.06 0.00 0.00 1.00 5,498.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,498.060
ACCESORIOS
SUMINISTRO E INSTALACIÓN DE
01.03.03.05.02
ELECTROBOMBA
SUMINISTRO E INSTALACION DE EQUIPO DE
BOMBEO; 02 ELECTROBOMBAS
01.03.03.05.02.01 GLB 2.00 1,136.59 0.00 0.00 2.00 2,273.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,273.180
CENTRIFUGAS (Q=2.11 LPS, HDT=22.00, Pot.
Estimada= 1.5HP)
01.03.04 SISTEMA ELÉCTRICO Y MECÁNICO
CONEXIÓN A LA RED EXTERNA DE
01.03.04.01
MEDIDORES
01.03.04.01.01 SUMINISTRO ELÉCTRICO TEMPORAL und 1.00 388.47 1.00 388.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 388.470
01.03.04.02 SALIDAS
01.03.04.02.01 SALIDAS PARA ALUMBRADO
SALIDA DE INTERIOR (CENTRO DE LUZ) -
01.03.04.02.01.01 pto 9.00 41.01 9.00 369.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 369.090
LUMINARIA LED CIRCULAR
SALIDA DE INTERIOR (CENTRO DE LUZ) -
01.03.04.02.01.02 pto 39.00 41.01 17.01 697.61 21.99 901.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,599.390
LUMINARIA LED CUADRADA
SALIDA PARA LUZ DE EMERGENCIA EN
01.03.04.02.01.03 pto 8.00 40.61 0.00 0.00 8.00 324.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 324.880
PARED
01.03.04.02.02 SALIDAS PARA TOMACORRIENTE
SALIDA PARA TOMACORRIENTE BIPOLAR
01.03.04.02.02.01 pto 22.00 72.79 0.00 0.00 22.00 1,601.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,601.380
DOBLE CON PT (NORMAL)
01.03.04.02.03 SALIDAS PARA INTERRUPTORES
01.03.04.02.03.01 SALIDA PARA INTERRUPTOR SIMPLE pto 6.00 71.68 5.77 413.78 0.23 16.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 430.080
01.03.04.02.03.02 SALIDA PARA INTERRUPTOR DOBLE pto 8.00 83.78 0.00 0.00 8.00 670.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 670.240
01.03.04.02.03.03 SALIDA PARA INTERRUPTOR TRIPLE pto 2.00 84.78 0.00 0.00 2.00 169.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 169.560
01.03.04.03 CONDUCTOS Y/O TUBERIAS
01.03.04.03.01 TUBERÍAS EMPOTRADAS
01.03.04.03.01.01 TUBERIA PVC-SAP ELECTRICA DE 25mm m 3.70 11.73 3.70 43.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.400
TUBERIA PVC-SAP ELECTRICA DE 20mm
01.03.04.03.01.02 m 138.82 7.76 138.82 1,077.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,077.240
(ILUMINACIÓN)
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
TUBERIA PVC-SAP ELECTRICA DE 20mm
01.03.04.03.01.03 m 72.00 7.76 72.00 558.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 558.720
(TOMACORRIENTES)
TUBERIA PVC-SAP ELECTRICA DE 25mm
01.03.04.03.01.04 m 78.74 11.73 78.74 923.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 923.620
(ALIMENTADORES)
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
CONCRETO f'c=210 kg/cm2 PATIO DE
02.02.05.01 FORMACION E=15CM, INCLUYE ACABADO m2 165.07 89.84 0.00 0.00 0.00 0.00 0.00 0.00 165.07 14,829.89 0.00 0.00 0.00 0.00 14,829.890
SEMIPULIDO Y BRUÑADO
ENCOFRADO Y DESENCOFRADO EN PATIOS
02.02.05.02 m2 178.36 60.85 0.00 0.00 0.00 0.00 0.00 0.00 178.36 10,853.21 0.00 0.00 0.00 0.00 10,853.210
DE FORMACION
02.02.05.03 JUNTA ASFALTICA 1"X 2" m 461.10 7.32 0.00 0.00 0.00 0.00 0.00 0.00 415.97 3,044.88 45.13 330.37 0.00 0.00 3,375.250
02.02.06 FALSA ZAPATA
02.03.08.03 ACERO f'y = 4200 kg/cm² EN VIGAS DE AMARRE kg 5,188.66 6.53 0.00 0.00 0.00 0.00 0.00 0.00 5,188.66 33,881.95 0.00 0.00 0.00 0.00 33,881.950
02.03.09.02.05 CURADO DE CONCRETO EN LOSA ALIGERADA m2 778.67 1.31 0.00 0.00 0.00 0.00 0.00 0.00 778.67 1,020.06 0.00 0.00 0.00 0.00 1,020.060
02.03.10 TANQUE SEPTICO
CONCRETO f'c=280kg/cm2 EN TANQUE
02.03.10.01 m3 15.08 530.23 0.00 0.00 0.00 0.00 0.00 0.00 15.08 7,995.87 0.00 0.00 0.00 0.00 7,995.870
SEPTICO
ENCOFRADO Y DESENCOFRADO DE TANQUE
02.03.10.02 m2 72.63 72.34 0.00 0.00 0.00 0.00 0.00 0.00 72.63 5,254.05 0.00 0.00 0.00 0.00 5,254.050
SEPTICO
02.03.10.03 ACERO f'y = 4200 kg/cm² - TANQUE SEPTICO kg 1,068.87 6.53 0.00 0.00 0.00 0.00 0.00 0.00 1,068.87 6,979.72 0.00 0.00 0.00 0.00 6,979.720
02.03.10.04 CURADO DE CONCRETO EN TANQUE SEPTICO m2 18.13 1.31 0.00 0.00 0.00 0.00 0.00 0.00 18.13 23.75 0.00 0.00 0.00 0.00 23.750
02.03.11 GRADERIAS
CONCRETO F'C= 210 KG/CM2. PARA
02.03.11.01 m3 25.99 417.19 0.00 0.00 0.00 0.00 0.00 0.00 25.99 10,842.77 0.00 0.00 0.00 0.00 10,842.770
GRADERIAS
ENCOFRADO Y DESENCOFRADO EN
02.03.11.02 m2 185.92 63.67 0.00 0.00 0.00 0.00 0.00 0.00 185.92 11,837.53 0.00 0.00 0.00 0.00 11,837.530
GRADERIAS
02.03.11.03 ACERO f'y = 4200 kg/cm² PARA GRADERIAS kg 839.29 6.53 0.00 0.00 0.00 0.00 0.00 0.00 839.29 5,480.56 0.00 0.00 0.00 0.00 5,480.560
02.03.11.04 CURADO DE CONCRETO PARA GRADERIAS m2 43.20 1.17 0.00 0.00 0.00 0.00 0.00 0.00 43.20 50.54 0.00 0.00 0.00 0.00 50.540
02.03.12 ESCALERAS
02.03.12.01 CONCRETO f'c=175 kg/cm2 PARA ESCALERAS m3 8.23 417.19 0.00 0.00 0.00 0.00 0.00 0.00 8.23 3,433.47 0.00 0.00 0.00 0.00 3,433.470
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
ENCOFRADO Y DESENCOFRADO EN
02.03.12.02 m2 40.74 63.67 0.00 0.00 0.00 0.00 0.00 0.00 40.74 2,593.92 0.00 0.00 0.00 0.00 2,593.920
ESCALERAS
02.03.12.03 ACERO f'y= 4200 kg/cm2 EN ESCALERAS kg 490.72 6.53 0.00 0.00 0.00 0.00 0.00 0.00 490.72 3,204.40 0.00 0.00 0.00 0.00 3,204.400
02.03.12.04 CURADO DE CONCRETO EN ESCALERAS m2 40.74 1.17 0.00 0.00 0.00 0.00 0.00 0.00 40.74 47.67 0.00 0.00 0.00 0.00 47.670
02.03.13 RAMPAS
02.03.13.01 CONCRETO f'c=175 kg/cm2 PARA RAMPAS m3 11.66 417.19 0.00 0.00 0.00 0.00 0.00 0.00 11.66 4,864.44 0.00 0.00 0.00 0.00 4,864.440
02.03.13.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 13.16 63.67 0.00 0.00 0.00 0.00 0.00 0.00 13.16 837.90 0.00 0.00 0.00 0.00 837.900
02.03.13.03 ACERO fy=4200 kg/cm2 EN RAMPAS kg 342.22 6.53 0.00 0.00 0.00 0.00 0.00 0.00 342.22 2,234.70 0.00 0.00 0.00 0.00 2,234.700
02.03.13.04 CURADO DE CONCRETO EN RAMPAS m2 58.95 1.17 0.00 0.00 0.00 0.00 0.00 0.00 58.95 68.97 0.00 0.00 0.00 0.00 68.970
PEDESTAL DE CONCRETO - PATIO DE
02.03.14
HONOR
02.03.14.01 CONCRETO f'c=175 kg/cm2 PARA PEDESTAL m3 7.10 475.89 0.00 0.00 0.00 0.00 0.00 0.00 7.10 3,378.82 0.00 0.00 0.00 0.00 3,378.820
ENCOFRADO Y DESENCOFRADO EN
02.03.14.02 m2 16.00 80.99 0.00 0.00 0.00 0.00 0.00 0.00 16.00 1,295.84 0.00 0.00 0.00 0.00 1,295.840
PEDESTAL
02.03.14.03 ACERO f'y= 4200 kg/cm2 EN PEDESTAL kg 87.31 6.53 0.00 0.00 0.00 0.00 0.00 0.00 87.31 570.13 0.00 0.00 0.00 0.00 570.130
02.03.14.04 CURADO DE CONCRETO EN PEDESTAL m2 16.00 1.03 0.00 0.00 0.00 0.00 0.00 0.00 14.54 14.98 1.46 1.50 0.00 0.00 16.480
02.03.15 BANCAS DE CONCRETO
02.03.15.01 CONCRETO F'C= 175KG/CM2. - EN BANCAS m3 6.64 466.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.64 3,096.30 0.00 0.00 3,096.300
02.03.15.02 ENCOFRADO Y DESENCOFRADO EN BANCAS m2 46.40 91.12 0.00 0.00 0.00 0.00 0.00 0.00 6.11 556.48 40.29 3,671.49 0.00 0.00 4,227.970
02.03.15.03 ACERO f'y = 4200 kg/cm² - EN BANCAS kg 510.00 6.53 0.00 0.00 0.00 0.00 0.00 0.00 510.00 3,330.30 0.00 0.00 0.00 0.00 3,330.300
02.03.15.04 CURADO DE CONCRETO EN BANCAS m2 14.32 1.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.32 14.75 0.00 0.00 14.750
02.03.16 CISTERNA ,TANQUE ELEVADO
CONCRETO F'C= 280KG/CM2 EN CISTERNA,
02.03.16.01 m3 42.33 466.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.33 19,747.37 0.00 0.00 19,747.370
TANQUE ELEVADO
ENCOFRADO Y DESENCOFRADO EN
02.03.16.02 m2 232.74 76.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.74 17,907.02 0.00 0.00 17,907.020
CISTERNA, TANQUE ELEVADO
ACERO f'y = 4200 kg/cm² - EN CISTERNA
02.03.16.03 kg 3,880.68 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,880.68 25,340.84 0.00 0.00 25,340.840
TANQUE ELEVADO
CURADO DE CONCRETO EN CISTERNA,
02.03.16.04 m2 278.41 4.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 278.41 1,124.78 0.00 0.00 1,124.780
TANQUE ELEVADO
02.03.17 CAMARA DE DISTRIBUCION
CONCRETO F'C= 210KG/CM2 EN CAMARA DE
02.03.17.01 m3 2.37 474.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.37 1,123.81 0.00 0.00 1,123.810
DISTRIBUCION
ENCOFRADO Y DESENCOFRADO EN CAMARA
02.03.17.02 m2 7.46 74.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.46 556.44 0.00 0.00 556.440
DE DISTRIBUCION
ACERO f'y = 4200 kg/cm² - EN CAMARA DE
02.03.17.03 kg 54.09 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.09 353.21 0.00 0.00 353.210
DISTRIBUCION
CURADO DE CONCRETO EN CAMARA DE
02.03.17.04 m2 6.10 1.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.10 7.99 0.00 0.00 7.990
DISTRIBUCION
02.03.18 POZO PERCOLADOR
CONCRETO F'C= 210KG/CM2 EN POZO
02.03.18.01 m3 1.49 474.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.49 706.53 0.00 0.00 706.530
PERCOLADOR
ENCOFRADO Y DESENCOFRADO EN POZO
02.03.18.02 m2 5.92 74.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.92 441.57 0.00 0.00 441.570
PERCOLADOR
ACERO f'y = 4200 kg/cm² - EN POZO
02.03.18.03 kg 263.94 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 263.94 1,723.53 0.00 0.00 1,723.530
PERCOLADOR
CURADO DE CONCRETO EN POZO
02.03.18.04 m2 12.41 1.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.41 16.26 0.00 0.00 16.260
PERCOLADOR
CAIDAS ESPECIALES EN LINEA DE
02.03.19
DESAGÜE
CONCRETO F'C= 210KG/CM2 EN CAIDA
02.03.19.01 m3 0.66 474.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 312.96 0.00 0.00 312.960
ESPECIAL
ENCOFRADO Y DESENCOFRADO EN CAIDA
02.03.19.02 m2 7.72 74.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.72 575.83 0.00 0.00 575.830
ESPECIAL
02.03.19.03 ACERO f'y = 4200 kg/cm² - EN CAIDA ESPECIAL kg 46.48 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.48 303.51 0.00 0.00 303.510
02.03.19.04 CURADO DE CONCRETO EN CAIDA ESPECIAL m2 7.72 1.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.72 10.11 0.00 0.00 10.110
02.04 ESTRUCTURAS METALICAS
02.04.01 APOYOS Y COLUMNAS METALICAS
ANCLAJE METALICO EN PEDESTAL, DOBLE
02.04.01.01 und 6.00 1,236.26 0.00 0.00 0.00 0.00 0.00 0.00 6.00 7,417.56 0.00 0.00 0.00 0.00 7,417.560
PLACA 0.40x0.40 m e=1/2"
02.04.01.02 COLUMNA METALICA H=4.50M und 6.00 526.80 0.00 0.00 0.00 0.00 0.00 0.00 6.00 3,160.80 0.00 0.00 0.00 0.00 3,160.800
02.04.01.03 APOYO METALICO FIJO und 7.00 2,495.65 0.00 0.00 0.00 0.00 0.00 0.00 6.92 17,266.40 0.08 203.15 0.00 0.00 17,469.550
02.04.01.04 APOYO METALICO MOVIL und 7.00 2,599.64 0.00 0.00 0.00 0.00 0.00 0.00 6.18 16,065.59 0.82 2,131.89 0.00 0.00 18,197.480
02.04.02 ARCOS Y VIGAS
02.04.02.01 VIGA PRINCIPAL VP-01 m 40.70 316.64 0.00 0.00 0.00 0.00 0.00 0.00 40.70 12,887.25 0.00 0.00 0.00 0.00 12,887.250
02.04.02.02 VIGUETA 01 2"X4"X3/16" m 64.50 89.64 0.00 0.00 0.00 0.00 0.00 0.00 57.59 5,162.00 6.91 619.78 0.00 0.00 5,781.780
02.04.02.03 ARCO PARABOLICO SEGUN DETALLE und 7.00 22,773.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 ### 0.00 0.00 159,415.620
TENSOR ENTRE ARCO DE TIJERALES VAR.
02.04.02.04 m 463.20 14.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 463.20 6,572.81 0.00 0.00 6,572.810
LISA DE 1/2"
02.04.02.05 ARRIOSTRE 3"X3X3/16" m 185.58 61.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 185.58 11,374.20 0.00 0.00 11,374.200
02.04.02.06 COLGADOR DE ACERO LISO 5/8" m 123.76 66.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 123.76 8,190.44 0.00 0.00 8,190.440
02.04.02.07 TENSOR Ø 1" m 173.60 44.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 173.60 7,641.87 0.00 0.00 7,641.870
02.04.03 CORREAS METALICAS
02.04.03.01 CORREAS METALICAS DE 4"X4"X1/4" m 731.40 111.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 731.40 81,185.40 0.00 0.00 81,185.400
CORREAS TUBO CUADRADO DE 1.5" x 1.5" x
02.04.03.02 m 83.40 35.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.46 2,900.07 1.94 68.97 2,969.040
3mm.
02.04.04 COBERTURA
02.04.04.01 COBERTURA METÁLICA - ALUZIN TR4-AZ150 m2 945.19 31.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 945.19 29,716.77 29,716.770
02.04.05 VARIOS
02.04.05.01 MURO DE LADRILLO C/JUNTA ABIERTA m2 38.42 115.24 0.00 0.00 0.00 0.00 0.00 0.00 38.42 4,427.52 0.00 0.00 0.00 0.00 4,427.520
RELLENO CON GRAVA EN POZO DE
02.04.05.02 m3 6.68 150.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.68 1,008.28 0.00 0.00 1,008.280
PERCOLACION
02.04.05.03 JUNTA DE 1" WATER STOP C/SELLADOR m 10.80 23.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.80 258.77 0.00 0.00 258.770
JUNTA DE POLIESTIRENO EXPANDIDO
02.04.05.04 m 538.09 9.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 501.24 4,771.80 36.85 350.82 5,122.620
SELLADO CON POLIURETANO DE 1"
02.04.05.05 JUNTA ASFALTICA DE 1" m 86.17 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.17 689.36 689.360
ARQUITECTURA, EVACUACIÓN Y
03
SEÑALIZACIÓN
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MUROS DE ALBAÑILERIA CONFINADA
MURO DE LADRILLO KK TIPO IV CANTO M:1:4
03.01.01.01 m2 40.33 72.35 0.00 0.00 0.00 0.00 0.00 0.00 40.33 2,917.88 0.00 0.00 0.00 0.00 2,917.880
E=1.5 cm
MURO DE LADRILLO KK TIPO IV SOGA M:1:4
03.01.01.02 m2 1,335.85 75.83 0.00 0.00 0.00 0.00 0.00 0.00 1,326.56 ### 9.29 704.09 0.00 0.00 101,297.510
E=1.5 cm
MURO DE LADRILLO KK TIPO IV CABEZA
03.01.01.03 m2 68.32 125.43 0.00 0.00 0.00 0.00 0.00 0.00 10.87 1,363.82 57.45 7,205.56 0.00 0.00 8,569.380
M:1:4 E=1.5 cm
03.01.01.04 MURO DE DRYWALL m2 15.98 81.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.98 1,306.37 0.00 0.00 1,306.370
03.02 REVOQUES Y REVESTIMIENTOS
03.02.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 m2 271.43 31.67 0.00 0.00 0.00 0.00 0.00 0.00 262.29 8,306.58 9.14 289.61 0.00 0.00 8,596.190
TARRAJEO EN MUROS INTERIORES E=1.5 cm,
03.02.02 m2 1,380.18 25.48 0.00 0.00 0.00 0.00 0.00 0.00 1,380.18 35,166.99 0.00 0.00 0.00 0.00 35,166.990
MEZCLA 1:5
TARRAJEO EN MUROS EXTERIORES E=1.5 cm,
03.02.03 m2 1,272.71 38.14 0.00 0.00 0.00 0.00 0.00 0.00 1,272.71 48,541.16 0.00 0.00 0.00 0.00 48,541.160
MEZCLA 1:5
TARRAJEO DE COLUMNAS INTERIOR E=1.5
03.02.04 m2 581.02 47.73 0.00 0.00 0.00 0.00 0.00 0.00 581.02 27,732.08 0.00 0.00 0.00 0.00 27,732.080
cm, MEZCLA 1:5
TARRAJEO DE COLUMNAS EXTERIOR E=1.5
03.02.05 m2 531.52 54.23 0.00 0.00 0.00 0.00 0.00 0.00 531.52 28,824.33 0.00 0.00 0.00 0.00 28,824.330
cm, MEZCLA 1:5
TARRAJEO DE COLUMNETAS INTERIOR E=1.5
03.02.06 m2 196.96 54.19 0.00 0.00 0.00 0.00 0.00 0.00 196.96 10,673.26 0.00 0.00 0.00 0.00 10,673.260
cm, MEZCLA 1:5
TARRAJEO DE COLUMNETAS EXTERIOR E=1.5
03.02.07 m2 81.44 54.19 0.00 0.00 0.00 0.00 0.00 0.00 81.44 4,413.23 0.00 0.00 0.00 0.00 4,413.230
cm, MEZCLA 1:5
TARRAJEO DE VIGAS INTERIOR E=1.5 cm,
03.02.08 m2 606.34 65.36 0.00 0.00 0.00 0.00 0.00 0.00 606.34 39,630.38 0.00 0.00 0.00 0.00 39,630.380
MEZCLA 1:5
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
TARRAJEO DE VIGAS EXTERIOR E=1.5 cm,
03.02.09 m2 482.51 65.36 0.00 0.00 0.00 0.00 0.00 0.00 482.51 31,536.85 0.00 0.00 0.00 0.00 31,536.850
MEZCLA 1:5
TARRAJEO DE VIGUETAS INTERIOR E=1.5 cm,
03.02.10 m2 94.75 65.36 0.00 0.00 0.00 0.00 0.00 0.00 94.75 6,192.86 0.00 0.00 0.00 0.00 6,192.860
MEZCLA 1:5
TARRAJEO DE VIGUETAS EXTERIOR E=1.5 cm,
03.02.11 m2 36.73 65.36 0.00 0.00 0.00 0.00 0.00 0.00 36.73 2,400.67 0.00 0.00 0.00 0.00 2,400.670
MEZCLA 1:5
03.02.12 VESTIDURA DE DERRAMES (1:5) m 583.13 17.99 0.00 0.00 0.00 0.00 0.00 0.00 583.13 10,490.51 0.00 0.00 0.00 0.00 10,490.510
TARRAJEO DE PEDESTALES PARA ASTAS
03.02.13 m2 4.00 41.23 0.00 0.00 0.00 0.00 0.00 0.00 4.00 164.92 0.00 0.00 0.00 0.00 164.920
E=1.5 cm, MEZCLA 1:5
03.02.14 BRUÑAS E=1.0 CM, SEGÚN DETALLE m 3,993.64 8.32 0.00 0.00 0.00 0.00 0.00 0.00 3,993.64 33,227.08 0.00 0.00 0.00 0.00 33,227.080
TARRAJEO DE MUROS DE CONTENCIÓN E=1.5
03.02.15 m2 662.05 38.14 0.00 0.00 0.00 0.00 0.00 0.00 662.05 25,250.59 0.00 0.00 0.00 0.00 25,250.590
cm, MEZCLA 1:5
TARRAJEO DE MURO EN RAMPAS E=1.5 cm,
03.02.16 m2 224.58 38.14 0.00 0.00 0.00 0.00 0.00 0.00 83.26 3,175.39 141.32 5,390.09 0.00 0.00 8,565.480
MEZCLA 1:5
TARRAJEO DE MURO EN JARDINERA E=1.5
03.02.17 m2 50.57 31.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.57 1,603.57 0.00 0.00 1,603.570
cm, MEZCLA 1:5
JUNTA DILATACIÓN DE 1" CON RELLENO DE
03.02.18 m 230.00 33.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 230.00 7,626.80 0.00 0.00 7,626.800
TECNOPOR Y SELLADO CON CAUCHO (M.C.)
03.03 CIELO RASO
03.03.01 CIELO RASO CON MEZCLA C:A 1:5 m2 1,087.26 46.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 967.83 45,042.92 119.43 5,558.16 50,601.080
03.04 PISOS Y PAVIMENTOS
03.04.01 CONTRAPISOS
03.04.01.01 CONTRAPISO DE 40 mm m2 1,940.11 32.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,940.11 62,762.56 0.00 0.00 62,762.560
03.04.02 PISOS
PISO PORCELANATO ALTO TRANSITO
03.04.02.01 m2 378.62 90.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 284.33 25,848.37 94.29 8,571.97 34,420.340
0.60x0.60 ACABADO BRILLANTE Y LISO BEIGE
PISO CERÁMICO ANTIDESLIZANTE COLOR
03.04.02.02 45x45 CM ALTO TRÁNSITO COLOR MARFIL O m2 172.30 57.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 152.04 8,795.42 20.26 1,172.14 9,967.560
SIMILAR
03.04.03 PISOS DE CONCRETO
03.04.03.01 PISO DE CEMENTO SEMI PULIDO m2 434.89 12.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 434.89 5,544.85 5,544.850
03.04.04 VEREDAS
CONCRETO EN VEREDA H=0.10M, INCLUYE
03.04.04.01 m2 412.39 42.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 412.39 17,580.19 0.00 0.00 17,580.190
ACABADO SEMIPULIDO
ENCOFRADO Y DESENCOFRADO PARA
03.04.04.02 m2 32.48 56.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.48 1,842.59 0.00 0.00 1,842.590
VEREDA
03.04.04.03 JUNTA DE CONSTRUCCION EN VEREDAS E=1" m 86.15 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.15 689.20 0.00 0.00 689.200
03.04.04.04 CONCRETO EN UÑAS DE VEREDA m3 32.27 417.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.27 13,462.72 0.00 0.00 13,462.720
03.04.05 RAMPAS
03.04.05.01 FROTACHADO Y BRUÑADO @ 0.10 m. m2 64.80 23.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.80 1,500.12 0.00 0.00 1,500.120
03.04.06 SARDINELES
REVESTIDO DE SARDINELES MORTERO C:A,
03.04.06.01 m 68.35 8.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.35 574.14 0.00 0.00 574.140
1:4, e=1.5CM
RELLENO DE JUNTAS (CON MATERIAL
03.04.06.02 m 111.98 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.98 895.84 0.00 0.00 895.840
ASFÁLTICO)
03.05 ZOCALOS Y CONTRAZOCALOS
03.05.01 ZOCALOS
03.05.01.01 ZOCALO DE CERAMICO H=1.50 E=2 CM m2 604.20 58.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 577.11 34,015.01 27.09 1,596.54 35,611.550
REVESTIMIENTO DE MESADA DE CONCRETO
03.05.01.02 m2 32.15 93.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.07 2,438.23 6.08 569.08 3,007.310
CON CERAMICO
REVESTIMIENTO DE MESADA DE CONCRETO
03.05.01.03 m2 39.43 93.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.94 930.02 29.49 2,758.26 3,688.280
CON PORCELANATO 1.20x0.60
03.05.02 CONTRAZOCALOS
CONTRAZOCALO DE PORCELANATO H=10 CM
03.05.02.01 m 220.56 22.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 185.53 4,216.99 35.03 796.34 5,013.330
E=1.5 CM
CONTRAZOCALO DE CERAMICO H=10 CM
03.05.02.02 m 67.31 37.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 67.31 2,507.30 2,507.300
E=1.5 CM
CONTRAZOCALOS CEMENTO PULIDO CON
03.05.02.03 m 154.14 49.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.85 6,891.24 15.29 758.73 7,649.970
ENDURECEDOR H=10 CM E=1.5 CM
CONTRAZOCALOS CEMENTO PULIDO CON
03.05.02.04 m 234.38 54.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 137.82 7,485.19 96.56 5,243.99 12,729.180
ENDURECEDOR H=30 CM E=1.5 CM
03.06 COBERTURAS
COBERTURA TEJA ANDINA DE
03.06.01 m2 1,158.21 63.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,158.21 73,974.87 73,974.870
FIBRACEMENTO 1.14x0.72
03.06.02 CUMBRERA PARA TEJA ANDINA m 112.38 62.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.38 6,994.53 6,994.530
LISTONES TUBO RECTANGULAR
03.06.03 m 1,167.39 30.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,167.39 35,628.74 35,628.740
GALVANIZADO 40x60x1.8mm
03.06.04 LADRILLO PASTELERO 0.24 x 0.24 x 0.03 m. m2 15.98 55.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.98 886.89 886.890
03.07 CARPINTERIA DE MADERA
03.07.01 PUERTAS
PUERTA APANELADA DE MARCOJO CAJON
DE 2"x4" DE MADERA TORNILLO, HOJA
03.07.01.01 m2 72.39 525.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.39 38,069.18 38,069.180
ENCHAPADA DE PLAFÓN DE MADERA
TORNILLO
PUERTA APANELADA DE MARCOJO CAJON
03.07.01.02 DE 2"x4" DE MADERA TORNILLO, HOJA DE m2 8.82 511.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.82 4,510.28 4,510.280
TRIPLAY LUPUNA,MDF O SIMILAR DE 4mm
PUERTA DE MELAMINE ESTRUCTURA DE
03.07.01.03 ALUMINIO, HOJA DE MELAMINE RH DE 18mm. m2 7.56 718.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.56 5,435.49 5,435.490
RESISTENTE AL AGUA(RH)
03.07.02 MOBILIARIO EXTERIOR
LISTONES PARA BANCA DE MADERA
03.07.02.01 und 8.00 49.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 392.00 392.000
TORNILLO 1.55 m. X 3" X 2"
03.08 CARPINTERIA METALICA Y HERRERIA
03.08.01 VENTANAS DE ALUMINIO
VENTANA DE ALUMINIO CON VIDRIO
03.08.01.01 TEMPLADO CON LAMINA DE SEGURIDAD 6 m2 142.86 745.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 142.86 ### 106,476.420
MM (CORREDIZA)
03.08.02 PUERTA METALICA
REJA METALICA PLEGABLE DE CINCO
03.08.02.01 m2 8.85 169.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.85 1,499.99 1,499.990
ACORDEONES CON RODANTE SELLADOS
PUERTA - REJA METALICA SISTEMA
03.08.02.02 m2 4.15 169.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.15 703.38 703.380
PLEGABLE
03.08.02.03 PUERTA METALICA DE INGRESOS m2 28.80 376.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.80 10,850.69 10,850.690
03.08.03 PASAMANOS
PASAMANOS TUBULAR DE ACERO
03.08.03.01 und 6.00 80.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 485.34 485.340
INOXIDABLE DE Ø = 1-1/2" EN SS.HH.
PASAMANOS DE FIERRO GALVANIZADO DE
03.08.03.02 m 101.75 72.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 101.75 7,384.00 7,384.000
Ø 2" X 1/4
03.08.04 BARANDAS
BARANDA DE PROTECCION EN RAMPAS
03.08.04.01 H=1.00 m FIERRO NEGRO CON PROTECCIÓN m 89.25 67.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.25 6,021.70 6,021.700
DE PINTURA ANTICORROSIVA Y ESMALTE
03.08.05 ESCALERAS
ESCALERA DE GATO DE FIERRO
03.08.05.01 und 1.00 7,225.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7,225.77 7,225.770
GALVANIZADO
03.08.05.02 ESCALERA DE ACCESO A CISTERNA und 1.00 292.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 292.87 292.870
03.08.06 ELEMENTOS METÁLICOS ESPECIALES
MARCO Y TAPA METÁLICA DE 0.80X0.80 EN
03.08.06.01 und 2.00 263.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 527.70 527.700
CISTERNA
03.08.06.02 CANTONERA DE ALUMINIO m 79.65 29.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.65 2,331.36 2,331.360
03.08.07 CERCO DE MALLA METALICA
03.08.07.01 CERCO DE MALLA METALICA CON PARANTES m 63.70 196.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.70 12,523.42 12,523.420
03.09 CERRAJERIA
03.09.01 BISAGRAS
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
03.09.01.01 BISAGRA ALUMINIZADA DE 3 1/2" PESADA pza 147.00 9.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 147.00 1,365.63 1,365.630
03.09.02 CERRADURAS
CERRADURA DE TRES GOLPES EN PUERTAS
03.09.02.01 pza 19.00 114.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 2,184.62 2,184.620
EXTERIORES
CERRADURA DE PERILLA EN PUERTAS
03.09.02.02 pza 6.00 94.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 566.16 566.160
INTERIORES
03.09.02.03 CERRADURA TIPO PALANCA pza 22.00 98.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,156.66 2,156.660
03.09.02.04 JALADOR METALICO PARA PUERTA und 4.00 55.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 221.88 221.880
03.09.02.05 TOPES DE GOMA PARA PUERTAS pza 22.00 19.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 427.02 427.020
GANCHO METALICO PARA REJA PERFORADO
03.09.02.06 pza 2.00 34.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 68.78 68.780
PARA CANDADO
03.10 PINTURA
PINTURA LATEX 2 MANOS EN MUROS
03.10.01 m2 1,380.18 15.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,380.18 20,757.91 20,757.910
INTERIORES
PINTURA LATEX 2 MANOS EN MUROS
03.10.02 m2 1,272.71 16.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,272.71 21,216.08 21,216.080
EXTERIORES
PINTURA LATEX 2 MANOS EN MUROS DE
03.10.03 m2 15.98 15.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.98 240.34 240.340
DRYWALL
PINTURA LATEX 2 MANOS EN COLUMNAS
03.10.04 m2 581.02 15.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 581.02 8,738.54 8,738.540
INTERIORES
PINTURA LATEX 2 MANOS EN COLUMNAS
03.10.05 m2 531.54 18.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 531.54 9,721.87 9,721.870
EXTERIORES
PINTURA LATEX 2 MANOS EN COLUMNETAS
03.10.06 m2 196.96 17.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 196.96 3,448.77 3,448.770
INTERIORES
PINTURA LATEX 2 MANOS EN COLUMNETAS
03.10.07 m2 81.45 21.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.45 1,765.02 1,765.020
EXTERIORES
PINTURA LATEX 2 MANOS EN VIGAS
03.10.08 m2 606.34 17.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 606.34 10,617.01 10,617.010
INTERIORES
PINTURA LATEX 2 MANOS EN VIGAS
03.10.09 m2 482.51 21.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 482.51 10,455.99 10,455.990
EXTERIORES
PINTURA LATEX 2 MANOS EN VIGUETAS
03.10.10 m2 94.75 20.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94.75 1,938.59 1,938.590
INTERIORES
PINTURA LATEX 2 MANOS EN VIGUETAS
03.10.11 m2 36.72 22.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.72 827.67 827.670
EXTERIORES
03.10.12 PINTURA LATEX 2 MANOS EN DERRAMES m 583.13 6.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 583.13 3,912.80 3,912.800
03.10.13 PINTURA LATEX 2 MANOS EN CIELO RASO m2 1,087.26 18.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,087.26 19,885.99 19,885.990
PINTURA PARA DEMARCACIÓN EN LOSA
03.10.14 m 443.10 6.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 443.10 2,667.46 2,667.460
DEPORTIVA
03.10.15 PINTURA EN PEDESTALES PARA ASTAS m2 4.00 20.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 82.76 82.760
03.11 JUNTAS
JUNTA DE DILATACION CON ESPUMA
03.11.01 m 593.30 16.75 0.00 0.00 0.00 0.00 0.00 0.00 591.55 9,908.53 1.75 29.25 0.00 0.00 9,937.780
PLASTICA+JEBE MICROPOROSO
03.12 AREAS VERDES
TIERRA PREPARADA E=15 cm PATIO DE
03.12.01 m2 3,798.92 12.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,798.92 46,384.81 46,384.810
JUEGOS
03.12.02 GRASS NATURAL EN PATIO DE JUEGOS m2 3,798.92 8.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,798.92 33,088.59 33,088.590
SIEMBRA DE ARBUSTOS NATURALES DE LA
03.12.03 u 50.00 45.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 2,280.50 2,280.500
ZONA
03.13 VARIOS
ARCO Y TABLERO FULBITO-BASKET(MET-
03.13.01 und 2.00 1,806.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 3,612.04 3,612.040
MAD)
PARANTES PARA NET DE VOLEYBALL
03.13.02 und 2.00 633.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,266.16 1,266.160
(INCLUIDA LA NED)
03.13.03 ASTA DE BANDERA TIPICO pza 2.00 713.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,427.96 1,427.960
SUMINISTRO E INSTALACION DE PLACA
03.13.04 RECORDATORIA DE MARMOL (45x50 cm) EN glb 1.00 963.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 963.98 963.980
MURO
TACHOS DE BASURA METÁLICOS EN
03.13.05 pza 2.00 365.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 730.06 730.060
EXTERIORES
03.13.06 BANCAS DE MADERA EN EXTERIORES und 4.00 226.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 906.48 906.480
NOMBRE EN ACERO INOXIDABLE EN
03.13.07 GLB 2.00 10,205.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 20,411.78 20,411.780
PORTADA (LETRA)
ESPEJO BISELADO EN SS.HH. e=6mm,
03.13.08 m2 5.00 375.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,876.40 1,876.400
C/LAMINA DE SEGURIDAD
COLOCACION DE MOBILIARIO Y
03.13.09 GLB 1.00 1,438.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,438.40 1,438.400
EQUIPAMIENTO
03.14 LIMPIEZA FINAL DE OBRA
03.14.01 LIMPIEZA FINAL DE OBRA glb 2.00 740.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,481.56 1,481.560
03.15 EVACUACIÓN Y SEÑALIZACIÓN
03.15.01 SEÑALIZACION Y SEGURIDAD
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.01 und 4.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 81.36 81.360
FOTOLUMINISCENTE DE EXTINTOR
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.02 FOTOLUMINISCENTE DE DIRECCION DE und 9.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 183.06 183.060
SALIDA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.03 FOTOLUMINISCENTE DE ALARMA CONTRA und 2.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 40.68 40.680
INCENDIOS
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.04 und 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.34 20.340
FOTOLUMINISCENTE DE AVISADOR SONORO
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.05 und 14.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 284.76 284.760
FOTOLUMINISCENTE DE PUERTA DE SALIDA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.06 FOTOLUMINISCENTE DE SEÑAL DE und 6.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 122.04 122.040
PROHIBIDO EL INGRESO
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.07 FOTOLUMINISCENTE DE SEÑAL und 12.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 244.08 244.080
INFORMATIVA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.08 FOTOLUMINISCENTE DE SEÑAL PROHIBIDO und 2.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 40.68 40.680
FUMAR
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.09 FOTOLUMINISCENTE DE BOTIQUIN DE und 5.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 101.70 101.700
PRIMEROS AUXILIOS
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.10 FOTOLUMINISCENTE DE DETECTOR DE und 7.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 142.38 142.380
HUMO
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.11 und 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.34 20.340
FOTOLUMINISCENTE DE RIESGO ELECTRICO
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.12 FOTOLUMINISCENTE DE LUZ DE und 44.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.00 894.96 894.960
EMERGENCIA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.13 FOTOLUMINISCENTE DE SEÑAL DE ZONA und 19.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 386.46 386.460
SEGURA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.14 FOTOLUMINISCENTE DE SEÑAL DE PUESTA A und 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.34 20.340
TIERRA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.15 und 6.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 122.04 122.040
FOTOLUMINISCENTE DE SEÑAL AFORO
03.15.02 PINTURA TRAFICO
MARCAS EN EL PAVIMENTO - SÍMBOLOS Y
03.15.02.01 und 7.00 56.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 398.37 398.370
LETRAS
04 INSTALACIONES SANITARIAS
04.01 APARATOS Y ACCESORIOS SANITARIOS
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
SUMINISTRO E INSTALACION DE
04.01.01
APARATOS SANITARIOS
INODORO DE LOSA VITRIFICADA CON
DESCARGA INDIRECTA (TANQUE). MODELO:
04.01.01.01 und 2.00 234.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 469.42 469.420
RAPIJET PRIMIUN, COLOR BLANCO 1ra
CALIDAD - NIÑOS
INODORO DE LOSA VITRIFICADA CON
DESCARGA INDIRECTA (TANQUE). MODELO:
04.01.01.02 und 13.00 265.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 3,452.93 3,452.930
RAPIJET PRIMIUN, COLOR BLANCO 1ra
CALIDAD - ADULTOS
URINARIO DE PARED DE LOSA VITRIFICADA
04.01.01.03 und 5.00 495.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,475.40 2,475.400
BLANCA MODELO CADET O SIMILAR
LAVATORIO DE LOSA VITRIFICADA BLANCA
04.01.01.04 und 10.00 464.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 4,649.20 4,649.200
TIPO OVALIN C/GRIFERIA
LAVATORIO DE LOSA VITRIFICADA BLANCA
04.01.01.05 und 6.00 473.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2,840.34 2,840.340
C/GRIFERIA
LAVADERO ACERO INOXIDABLE 01 POZA
04.01.01.06 und 7.00 460.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 3,220.49 3,220.490
S/ESCURRIDERO (INC. GRIFERIA)
LAVADERO ACERO INOXIDABLE 01 POZA
04.01.01.07 und 3.00 502.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,507.20 1,507.200
C/ESCURRIDERO (INC. GRIFERIA)
DUCHA ACERO INOXIDABLE (INC.
04.01.01.08 und 1.00 303.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 303.39 303.390
ACCESORIOS)
SUMINISTRO E INSTALACION DE
04.01.02
ACCESORIOS
PORTARROLLO EMPOTRADO DE LOSA PARA
04.01.02.01 und 15.00 94.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,424.40 1,424.400
PAPEL HIGIÉNICO
BARRA RECTA DE ACERO INOXIDABLE DE 1
04.01.02.02 und 3.00 140.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 421.08 421.080
1/2" PARA PERSONAS CON DISCAPACIDAD
04.01.02.03 PORTAMULETAS DE ACERO INOXIDABLE und 3.00 111.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 335.73 335.730
04.01.02.04 LLAVE DE DUCHA CROMADA TIPO PALANCA und 1.00 182.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 182.72 182.720
04.01.02.05 BASURERO DE PLASTICO PARA BAÑO 35 LT. und 15.00 53.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 807.90 807.900
JABONERA DE ACERO INOX. CON
04.01.02.06 und 15.00 108.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,623.00 1,623.000
DISPENSADOR PARA JABÓN LÍQUIDO
04.01.02.07 JABONERA DE LOSA PARA DUCHA und 1.00 56.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.16 56.160
04.01.02.08 DISPENSADOR PARA PAPEL TOALLA und 14.00 72.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 1,008.42 1,008.420
04.01.02.09 GRIFO DE RIEGO und 5.00 51.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 258.50 258.500
04.02 SISTEMA DE AGUA FRIA
04.02.01 SALIDA DE AGUA FRIA
04.02.01.01 SALIDA DE AGUA FRIA - Ø = 1/2" PVC SAP pto 44.00 57.78 0.00 0.00 0.00 0.00 0.00 0.00 44.00 2,542.32 0.00 0.00 0.00 0.00 2,542.320
04.02.01.02 SALIDA DE AGUA FRIA - Ø = 3/4" PVC SAP pto 5.00 54.72 0.00 0.00 0.00 0.00 0.00 0.00 5.00 273.60 0.00 0.00 0.00 0.00 273.600
04.02.01.03 SALIDA DE AGUA FRIA - Ø = 2" PVC SAP pto 1.00 102.11 0.00 0.00 0.00 0.00 0.00 0.00 1.00 102.11 0.00 0.00 0.00 0.00 102.110
04.02.02 REDES DE DISTRIBUCION DE AGUA FRIA
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
REFINE Y NIVELACION DE ZANJA PARA
04.03.01.02 m2 64.38 1.24 0.00 0.00 0.00 0.00 0.00 0.00 64.38 79.83 0.00 0.00 0.00 0.00 79.830
CANALETA DE CONCRETO
ELIMINACION DE MATERIAL EXCEDENTE
04.03.01.03 m3 31.67 15.17 0.00 0.00 0.00 0.00 0.00 0.00 31.67 480.43 0.00 0.00 0.00 0.00 480.430
MANUAL
CANAL PLUVIAL ENCOFRADO Y
04.03.01.04 m2 193.14 58.33 0.00 0.00 0.00 0.00 0.00 0.00 193.14 11,265.86 0.00 0.00 0.00 0.00 11,265.860
DESENCOFRADO
04.03.01.05 CANAL PLUVIAL CONCRETO F'C=175KG/CM2 m3 25.75 492.37 0.00 0.00 0.00 0.00 0.00 0.00 25.75 12,678.53 0.00 0.00 0.00 0.00 12,678.530
REJILLA METALICA EN CANAL PLUVIAL
04.03.01.06 m 193.14 125.57 0.00 0.00 0.00 0.00 0.00 0.00 193.14 24,252.59 0.00 0.00 0.00 0.00 24,252.590
S/DISEÑO
JUNTA DE CONSTRUCCION EN CANAL
04.03.01.07 m 46.50 8.00 0.00 0.00 0.00 0.00 0.00 0.00 46.50 372.00 0.00 0.00 0.00 0.00 372.000
PLUVIAL
04.03.02 REDES COLECTORAS EN TECHOS
CANALETA DE PLANCHA GALVANIZADA
04.03.02.01 m 296.30 36.01 0.00 0.00 0.00 0.00 0.00 0.00 242.45 8,633.67 53.85 1,917.57 0.00 0.00 10,551.240
D=6" e=1/32", INCLUYE SOPORTES
MONTANTE TUBERIA DE PVC SAL DE 4"
04.03.02.02 m 106.64 19.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 106.64 2,109.34 0.00 0.00 2,109.340
INCLUYE ACCESORIOS
04.03.02.03 TUBERIA PVC SAP DE 4" EN EXTERIORES m 17.98 22.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.98 404.19 0.00 0.00 404.190
ABRAZADERA PARA TUBO 4" PARA
04.03.02.04 und 123.00 11.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 123.00 1,394.82 0.00 0.00 1,394.820
MONTANTE DE RED PLUVIAL
04.03.02.05 CODO PVC 90 SAP C-10 DE 4" und 43.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.00 545.67 0.00 0.00 545.670
04.03.02.06 CONCRETO F'C=175KG/CM2 EN COLUMNETA m3 1.69 417.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.69 705.05 0.00 0.00 705.050
ENCOFRADO Y DESENCOFRADO EN
04.03.02.07 m2 24.75 86.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.75 2,138.15 0.00 0.00 2,138.150
COLUMNETA
04.04 SISTEMA DE DESAGUE
04.04.01 SALIDAS DE DESAGUE Y VENTILACION
04.04.01.01 SALIDA DE DESAGUE EN PVC SAP Ø DE 2" pto 31.00 54.30 0.00 0.00 0.00 0.00 0.00 0.00 31.00 1,683.30 0.00 0.00 0.00 0.00 1,683.300
SALIDA DE DESAGUE EN PVC CP Ø DE 2" CON
04.04.01.02 pto 10.00 73.46 0.00 0.00 0.00 0.00 0.00 0.00 10.00 734.60 0.00 0.00 0.00 0.00 734.600
TRAMPA "P"
04.04.01.03 SALIDA DE DESAGUE EN PVC SAP Ø DE 4" pto 14.00 61.18 0.00 0.00 0.00 0.00 0.00 0.00 14.00 856.52 0.00 0.00 0.00 0.00 856.520
04.04.01.04 SALIDA DE VENTILACION EN PVC SAP Ø DE 2" pto 44.00 53.00 0.00 0.00 0.00 0.00 0.00 0.00 38.60 2,045.63 5.40 286.37 0.00 0.00 2,332.000
04.04.02 REDES DE DISTRIBUCION
RED DE DISTRIBUCION DE TUBERIA PVC -
04.04.02.01 m 115.00 18.01 0.00 0.00 0.00 0.00 0.00 0.00 115.00 2,071.15 0.00 0.00 0.00 0.00 2,071.150
SAP Ø DE 2"
RED DE DISTRIBUCION DE TUBERIA PVC -
04.04.02.02 m 53.05 22.48 0.00 0.00 0.00 0.00 0.00 0.00 53.05 1,192.56 0.00 0.00 0.00 0.00 1,192.560
SAP Ø DE 4"
RED DE VENTILACION DE TUBERIA PVC - SAP
04.04.02.03 m 40.16 19.79 0.00 0.00 0.00 0.00 0.00 0.00 40.16 794.77 0.00 0.00 0.00 0.00 794.770
Ø DE 2"
04.04.03 ACCESORIOS DE REDES DE DESAGUE
04.04.03.01 ACCESORIOS DE REDES DE DESAGUE
04.04.03.01.01 TEE PVC-P Ø2"x2" PARA DESAGUE und 14.00 10.14 0.00 0.00 0.00 0.00 0.00 0.00 14.00 141.96 0.00 0.00 0.00 0.00 141.960
04.04.03.01.02 YEE PVC-P Ø2"x2" PARA DESAGUE und 24.00 12.26 0.00 0.00 0.00 0.00 0.00 0.00 24.00 294.24 0.00 0.00 0.00 0.00 294.240
04.04.03.01.03 YEE PVC-P Ø4"x2" PARA DESAGUE und 16.00 13.11 0.00 0.00 0.00 0.00 0.00 0.00 16.00 209.76 0.00 0.00 0.00 0.00 209.760
04.04.03.01.04 YEE PVC-P Ø4"x4" PARA DESAGUE und 9.00 14.21 0.00 0.00 0.00 0.00 0.00 0.00 9.00 127.89 0.00 0.00 0.00 0.00 127.890
04.04.03.01.05 CODO PVC-P Ø=2"x45° und 34.00 7.60 0.00 0.00 0.00 0.00 0.00 0.00 34.00 258.40 0.00 0.00 0.00 0.00 258.400
04.04.03.01.06 CODO PVC-P Ø=2"x90° und 67.00 7.09 0.00 0.00 0.00 0.00 0.00 0.00 67.00 475.03 0.00 0.00 0.00 0.00 475.030
04.04.03.01.07 CODO PVC-P Ø=4"x45° und 3.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 3.00 38.07 0.00 0.00 0.00 0.00 38.070
04.04.03.01.08 CODO PVC-P Ø=4"x90° und 3.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 3.00 38.07 0.00 0.00 0.00 0.00 38.070
CODO PVC-P Ø=4"x90° CON REDUCCION DE
04.04.03.01.09 und 9.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 9.00 114.21 0.00 0.00 0.00 0.00 114.210
Ø2"
04.04.03.01.10 REDUCCIÓN PVC - SAP DE 4" A 2" und 1.00 13.53 0.00 0.00 0.00 0.00 0.00 0.00 1.00 13.53 0.00 0.00 0.00 0.00 13.530
04.04.04 REDES COLECTORAS DE DESAGUE
RED COLECTORA CON TUBERIA DE PVC SAP
04.04.04.01 m 15.85 21.83 0.00 0.00 0.00 0.00 0.00 0.00 15.85 346.01 0.00 0.00 0.00 0.00 346.010
Ø DE 4"
RED COLECTORA CON TUBERIA DE PVC SAP
04.04.04.02 m 344.97 33.42 0.00 0.00 0.00 0.00 0.00 0.00 344.97 11,528.90 0.00 0.00 0.00 0.00 11,528.900
Ø DE 6"
RED COLECTORA CON TUBERIA DE PVC SAP
04.04.04.03 m 60.05 52.71 0.00 0.00 0.00 0.00 0.00 0.00 60.05 3,165.24 0.00 0.00 0.00 0.00 3,165.240
Ø DE 8"
EXCAVACION Y PICADO DE ZANJA PARA
04.04.04.04 m3 157.23 9.85 0.00 0.00 0.00 0.00 0.00 0.00 157.23 1,548.72 0.00 0.00 0.00 0.00 1,548.720
TUBERIA
REFINE Y NIVELACIÓN DE ZANJA PARA
04.04.04.05 m2 195.61 1.85 0.00 0.00 0.00 0.00 0.00 0.00 195.61 361.88 0.00 0.00 0.00 0.00 361.880
TUBERIA
04.04.04.06 CAMA DE ARENA EN ZANJA P/TUB. m3 19.74 140.19 0.00 0.00 0.00 0.00 0.00 0.00 19.74 2,767.35 0.00 0.00 0.00 0.00 2,767.350
RELLENO Y COMPACTADO CON CON EQUIPO
04.04.04.07 m3 77.09 33.44 0.00 0.00 0.00 0.00 0.00 0.00 7.37 246.35 69.72 2,331.54 0.00 0.00 2,577.890
Y MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
04.04.04.08 m3 115.57 15.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 115.57 1,753.20 0.00 0.00 1,753.200
MANUAL
04.04.05 ADITAMENTOS VARIOS
SUMIDERO DE BRONCE DE 2" PROVISION Y
04.04.05.01 und 20.00 19.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 392.80 0.00 0.00 392.800
COLOCACION
REGISTRO ROSCADO DE BRONCE DE 2"
04.04.05.02 u 6.00 18.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 108.18 0.00 0.00 108.180
PROVISION Y COLOCACION
REGISTRO ROSCADO DE BRONCE DE 4"
04.04.05.03 und 40.00 35.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 1,436.00 0.00 0.00 1,436.000
PROVISION Y COLOCACION
04.04.05.04 SOMBRERO DE VENTILACION DE 2" PVC und 13.00 17.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 224.51 0.00 0.00 224.510
04.04.06 CAMARAS
04.04.06.01 CAJAS DE REGISTRO
CAJA DE REG. PREFAB. 12" x 24" (0.30x0.60)
04.04.06.01.01 und 12.00 138.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,664.28 0.00 0.00 1,664.280
C/TAPA CONCRETO REFORZADO
CAJA DE REG. PREFAB. 18" x 24" (0.45x0.60)
04.04.06.01.02 und 4.00 162.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 650.44 0.00 0.00 650.440
C/TAPA CONCRETO REFORZADO
CAJA DE REG. PREFAB. 24" x 24" (0.60x0.60)
04.04.06.01.03 und 11.00 167.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 1,845.25 0.00 0.00 1,845.250
C/TAPA CONCRETO REFORZADO
04.04.06.01.04 CAMARAS
04.04.06.01.05 TRAMPA DE GRASA und 3.00 1,039.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 3,117.09 0.00 0.00 3,117.090
04.04.07 PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA DE ESCORRENTIA DE
04.04.07.01 m 370.03 2.36 0.00 0.00 0.00 0.00 0.00 0.00 370.03 873.27 0.00 0.00 0.00 0.00 873.270
TUB. DESAGUE
COLUMNETA DE FIBROCEMENTO DE 0.15 m
04.04.08
x 0.15 m
COLUMNETA DE FIBROCEMENTO DE 0.15 m x
04.04.08.01 m 9.60 112.19 0.00 0.00 0.00 0.00 0.00 0.00 9.60 1,077.02 0.00 0.00 0.00 0.00 1,077.020
0.15 m
SISTEMA DE ALMACENAMIENTO DE
04.05
CISTERNA Y TANQUE ELEVADO
04.05.01 REDES DE ALIMENTACION DE AGUA
SUMINISTRO E INSTALACION LINEA DE
04.05.01.01 INGRESO Ø = 2" INCLUYE VALVULAS Y GLB 1.00 651.68 0.00 0.00 0.00 0.00 0.00 0.00 1.00 651.68 0.00 0.00 0.00 0.00 651.680
ACCESORIOS
SUMINISTRO E INSTALACION LINEA DE
04.05.01.02 ALIMENTACION Ø = 2" INCLUYE VALVULAS GLB 1.00 1,522.15 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,522.15 0.00 0.00 0.00 0.00 1,522.150
Y ACCESORIOS
SUMINISTRO E INSTALACION LINEA DE
04.05.01.03 IMPULSION Ø = 1 1/2" INCLUYE VALVULAS Y GLB 1.00 2,264.69 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,264.69 0.00 0.00 0.00 0.00 2,264.690
ACCESORIOS
SUMINISTRO E INSTALACION LINEA DE
04.05.01.04 SUCCION Ø = 2" INCLUYE VALVULAS Y GLB 1.00 670.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 670.89 0.00 0.00 0.00 0.00 670.890
ACCESORIOS
SUMINISTRO E INSTALACION LINEA DE
04.05.01.05 REBOSE Y LIMPIA Ø = 2", PARA TANQUE GLB 1.00 1,340.16 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,340.16 0.00 0.00 0.00 0.00 1,340.160
ELEVADO
SUMINISTRO E INSTALACION LINEA DE
04.05.01.06 GLB 1.00 626.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 626.00 0.00 0.00 0.00 0.00 626.000
REBOSE Ø = 2", PARA CISTERNA
PRUEBA HIDRAULICA DE ESTANQUIEDAD Y
04.05.01.07 DESINFECCIÓN EN SISTEMA DE BOMBEO DE GLB 1.00 519.59 0.00 0.00 0.00 0.00 0.00 0.00 1.00 519.59 0.00 0.00 0.00 0.00 519.590
CISTERNA
SUMINISTRO E INSTALACIÓN DE
04.05.01.08
ELECTROBOMBA
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
SUMINISTRO E INSTALACION DE EQUIPO DE
BOMBEO; 02 ELECTROBOMBAS
04.05.01.08.01 GLB 2.00 1,136.59 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2,273.18 0.00 0.00 0.00 0.00 2,273.180
CENTRIFUGAS (Q=2.11 LPS, HDT=22.00, Pot.
Estimada= 1.5HP)
04.05.02 TRATAMIENTO DE AGUAS SERVIDAS
04.05.02.01 TANQUE SEPTICO
SUMINISTRO E INSTALACION DE TANQUE
04.05.02.01.01 GLB 1.00 752.06 0.00 0.00 0.00 0.00 0.00 0.00 1.00 752.06 0.00 0.00 0.00 0.00 752.060
SEPTICO, INCLUYE ACCESORIOS
04.05.02.02 CAMARA DE DISTRIBUCCION
VERTEDERO METALICO TRIANGULAR
04.05.02.02.01 und 2.00 529.55 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,059.10 0.00 0.00 0.00 0.00 1,059.100
TRIANGULAR(E=3/4")
04.05.02.03 POZO DE PERCOLACION
TAPA DE CONCRETO DE 0.60 X 0.60 e=0.05m
04.05.02.03.01 und 2.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 130.00 0.00 0.00 0.00 0.00 130.000
P/POZO DE PERCOLACION
INSTALACIONES ELECTRICAS Y
05
MECANICAS
CONEXIÓN A LA RED EXTERNA DE
05.01
MEDIDORES
05.01.01 EQUIPAMIENTO DE SUMINISTRO ELÉCTRICO und 1.00 34.66 1.00 34.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.660
SALIDAS PARA ALUMBRADO,
05.02 TOMACORRIENTES, FUERZA Y SEÑALES
DEBILES
05.02.01 SALIDA
05.02.01.01 SALIDA PARA ALUMBRADO
SALIDA DE TECHO (CENTRO DE LUZ) -
05.02.01.01.01 pto 86.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.00 3,526.86 3,526.860
LUMINARIA LED HERMETICA 55W
SALIDA DE TECHO (CENTRO DE LUZ) -
LUMINARIA LED HERMETICA 57W - DE 6000lm
05.02.01.01.02 pto 12.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 492.12 492.120
/CRI>=80/FP>=0.90/VIDA UTIL>=50000 HORAS/
>=6500K
SALIDA EN TECHO (CENTRO DE LUZ) -
LUMINARIA LED CUADRADA 24W, DE
05.02.01.01.03 pto 6.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 246.06 246.060
1800lm /CRI>=80/FP>=0.90/VIDA UTIL>= 30000
HORAS/ >=4000K
SALIDA EN TECHO (CENTRO DE LUZ) -
LUMINARIA LED CIRCULAR 24W, DE
05.02.01.01.04 pto 39.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 1,599.39 1,599.390
1800lm /CRI>=80/FP>=0.90/VIDA UTIL>= 30000
HORAS/ >=4000K
SALIDA EN TECHO (CENTRO DE LUZ) -
LUMINARIA LED CIRCULAR 18W, DE
05.02.01.01.05 pto 38.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 1,558.38 1,558.380
1500lm /CRI>=80/FP>= 0.90/VIDA UTIL >=30000
HORAS/ >=4000K
SALIDA DE PARED (APLIQUE LED EXTERIOR)
- LED 24W - 30W, IP65 DE 2600lm
05.02.01.01.06 pto 2.00 40.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 81.22 81.220
/CRI>=80/FP>=0.90/VIDA UTIL>= 25000 HORAS/
>=300
SALIDA PARA LUZ DE EMERGENCIA EN
05.02.01.01.07 PARED CON DOS LAMPARAS DE 2X16W LED, pto 57.00 40.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.00 2,314.77 2,314.770
CON DOS HORAS DE AUTONOMIA
SALIDA PARA LUMINARIA SMARTLED HIGH
BAY 240W, DE 24000lm /CRI
05.02.01.01.08 pto 16.00 67.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 1,083.36 1,083.360
>=85/FP>=0.90/VIDA UTIL>= 50000 HORAS/
>4000K, IP65
SALIDA PARA LUMINARIA VALENTINO LED
05.02.01.01.09 71W, DE 7700lm /CRI>=85/FP>= 0.90/VIDA pto 16.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 656.16 656.160
UTIL>=80000 HORAS/>=4000K, IP66
05.02.01.02 SALIDA PARA TOMACORRIENTES
SALIDA PARA TOMACORRIENTE 3 LINEA +
05.02.01.02.01 SCHUKO DOBLE - 250V/16A (IGUAL O pto 65.00 122.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 7,954.70 7,954.700
SIMILAR A DOMINO SENCIA DE BTICINO)
SALIDA PARA TOMACORRIENTE 3 LINEA +
SCHUKO DOBLE A PRUEBA DE AGUA -
05.02.01.02.02 pto 5.00 134.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 671.80 671.800
250V/16A (IGUAL O SIMILAR A HIDROBOX DE
BTICINO)
05.02.01.03 SALIDA PARA INTERRUPTORES
SALIDA PARA INTERRUPTOR DE SIMPLE -
05.02.01.03.01 250V/10A (CON INT. SIMILAR O IGUAL A pto 42.00 71.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 3,010.56 3,010.560
DOMINO SENCIA DE BTICINO)
SALIDA PARA INTERRUPTOR DE DOBLE -
05.02.01.03.02 250V/10A (CON INT. SIMILAR O IGUAL A pto 6.00 83.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 502.68 502.680
DOMINO SENCIA DE BTICINO)
SALIDA PARA INTERRUPTOR DE TRIPLE -
05.02.01.03.03 250V/10A (CON INT. SIMILAR O IGUAL A pto 1.00 84.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 84.78 84.780
DOMINO SENCIA DE BTICINO)
SALIDA PARA INTERRUPTOR DE
CONMUTACION SIMPLE - 250V/10A (CON INT.
05.02.01.03.04 pto 16.00 99.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 1,590.08 1,590.080
SIMILAR O IGUAL A DOMINO SENCIA DE
BTICINO)
05.02.01.04 SALIDA OTROS
05.02.01.04.01 SALIDA PARA PULSADOR DE TIMBRE pto 4.00 98.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 392.72 392.720
05.02.01.04.02 TIMBRE TIPO CAMPANA INDUSTRIAL DE 8" pto 2.00 139.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 278.24 278.240
05.02.01.04.03 TIMBRE MUSICAL pto 2.00 164.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 329.24 329.240
SALIDA PARA CONTROL DE PERSONAL,
05.02.01.04.04 pto 2.00 875.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,750.84 1,750.840
INCLUYE EQUIPO
CANALIZACIONES, CONDUCTOS O
05.02.02
TUBERIAS
05.02.02.01 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA REDES
05.02.02.01.01 m3 75.36 9.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.36 742.30 0.00 0.00 742.300
ELECTRICAS Y COMUNICACION
PROTECCION DE CABLE ELECTRICO Y
05.02.02.01.02 m 314.00 4.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 314.00 1,284.26 0.00 0.00 1,284.260
COMUNICACION
RELLENO MANUAL CON MATERIAL PROPIO
05.02.02.01.03 (REDES DE INST. ELECTRICAS Y m3 70.56 33.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.56 2,359.53 0.00 0.00 2,359.530
COMUNICACION)
ELIMINACIÓN DE MATERIAL EXCEDENTE DE
05.02.02.01.04 INSTALACIONES ELÉCTRICAS Y m3 4.80 15.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.80 72.82 0.00 0.00 72.820
COMUNICACIONES
05.02.02.02 TUBERIAS EMPOTRADAS
05.02.02.02.01 TUBERIA PVC - P 20mm Ø X 3M m 1,096.20 7.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,096.20 8,506.51 0.00 0.00 8,506.510
05.02.02.02.02 TUBERIA PVC - P 25mm Ø X 3M m 481.95 11.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 481.95 5,653.27 0.00 0.00 5,653.270
05.02.02.02.03 TUBERIA PVC - P 35mm Ø X 3M m 42.00 17.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 727.44 0.00 0.00 727.440
05.02.02.02.04 TUBERIA PVC - P 40mm Ø X 3M m 140.70 17.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.70 2,441.15 0.00 0.00 2,441.150
05.02.02.02.05 TUBERIA PVC - P 50mm Ø X 3M m 19.95 29.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.95 586.93 0.00 0.00 586.930
05.02.02.03 TUBERÍA VISIBLE
05.02.02.03.01 TUBERIA PVC - FLEXIBLE CONDUIT 3/4" m 2.10 25.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.10 52.77 0.00 0.00 52.770
05.02.02.03.02 TUBERIA CONDUIT 1" EMT m 130.00 20.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.00 2,614.30 0.00 0.00 2,614.300
05.02.02.03.03 ACCESORIOS PARA TUBERIA CONDUIT m 36.00 44.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 1,586.16 0.00 0.00 1,586.160
CONDUCTORES Y CABLES DE ENERGIA EN
05.02.03
TUBERIA
05.02.03.01 ALIMENTADORES
SUMINISTRO E INST. DE ALIMENTADOR CAB
05.02.03.01.01 m 2,655.40 3.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,655.40 9,798.43 9,798.430
NH-80 Ø 2.5 mm2
SUMINISTRO E INST. DE ALIMENTADOR CAB
05.02.03.01.02 m 927.30 4.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 927.30 4,404.68 4,404.680
NH-80 Ø 4mm2
SUMINISTRO E INST. DE ALIMENTADOR CAB
05.02.03.01.03 m 445.50 7.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 445.50 3,167.51 3,167.510
NH-80 Ø 6mm2
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
SUMINISTRO E INST. DE ALIMENTADOR CAB
05.02.03.01.04 m 917.40 7.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 917.40 6,495.19 6,495.190
N2XOH Ø 6mm2
SUMINISTRO E INST. DE ALIMENTADOR CAB
05.02.03.01.05 m 416.85 10.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 416.85 4,506.15 4,506.150
N2XOH Ø 10mm2
SUMINISTRO E INST. DE ALIMENTADOR CAB
05.02.03.01.06 m 281.40 14.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 281.40 4,164.72 4,164.720
N2XOH Ø 16mm2
SUMINISTRO E INST. DE ALIMENTADOR CAB
05.02.03.01.07 m 41.80 28.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.80 1,194.23 1,194.230
N2XOH Ø 35mm2
05.02.04 SISTEMA DE CONDUCTOS
BUZON DE INSTALACIONES ELECTRICAS
05.02.04.01 und 1.00 329.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 329.69 0.00 0.00 329.690
(0.8x0.8x0.9m)
BUZON DE INSTALACIONES ELÉCTRICAS
05.02.04.02 und 6.00 294.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,764.78 0.00 0.00 1,764.780
(0.65x0.65x0.85cm)
BUZON DE INSTALACIONES DE
05.02.04.03 und 8.00 294.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,353.04 0.00 0.00 2,353.040
COMUNICACIÓNES (0.65x0.65x0.85cm)
05.02.05 TABLEROS PRINCIPALES
TG C/BARRAS 2x120A: 4 Int. Ter. 2x32A, 5 Int.
05.02.05.01 Ter. 2x25A, 1 Int. Ter. 2x20A, 1 Int. Ter. 2x16A, 3 und 1.00 1,591.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,591.03 0.00 0.00 1,591.030
Int. Dif. 2x25A, 28
TABLERO DE DISTRIBUCION
05.02.06
ALIMENTADORES
TD-01 C/BARRAS 2x25A: 3 int. 2x16A, 2 Int. Ter.
05.02.06.01 2x20A, 2 Int. Dif. 2x25A(30mA), 01 Int. Horario, 16 und 1.00 1,057.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,057.94 1,057.940
Polos Empotradodo
TD-02 C/BARRAS 2x25A: 4 int. 2x16A, 2 Int. Ter.
05.02.06.02 2x20A, 2 Int. Ter. 2x25A, 2 Int. Dif. 2x25A(30mA), und 1.00 1,091.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,091.94 1,091.940
18 Polos Empotrado
TD-03 C/BARRAS 2x32A: 3 int. 2x16A, 4 Int. Ter.
05.02.06.03 2x20A, 4 Int. Dif. 2x25A(30mA), 20 Polos und 1.00 1,438.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,438.74 1,438.740
Empotrado
TD-04 C/BARRAS 2x25A: 1 int. 2x16A, 1 Int. Ter.
05.02.06.04 2x20A, 1 Int. Dif. 2x25A(30mA), 10 Polos und 1.00 507.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 507.24 507.240
Empotrado
TD-05 C/BARRAS 2x32A: 3 int. 2x16A, 3 Int. Ter.
05.02.06.05 2x20A, 3 Int. Dif. 2x25A(30mA), 18 Polos und 1.00 1,202.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,202.14 1,202.140
Empotrado
TD-06 C/BARRAS 2x25A: 2 int. 2x16A, 1 Int. Ter.
05.02.06.06 2x20A, 1 Int. Dif. 2x25A(30mA), 12 Polos und 1.00 562.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 562.04 562.040
Empotrado
TD-07 C/BARRAS 2x32A: 5 int. 2x16A, 4 Int. Ter.
05.02.06.07 2x20A, 3 Int. Dif. 2x25A(30mA), 24 Polos und 1.00 1,364.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,364.54 1,364.540
Empotrado
TD-08 C/BARRAS 2x25A: 1 int. 2x16A, 1 Int. Ter.
05.02.06.08 2x20A, 1 Int. Ter. 2x25A, 1 Int. Dif. 2x25A(30mA), und 1.00 562.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 562.04 562.040
12 Polos Empotrado
TD-09 C/BARRAS 2x32A: 2 Int. Ter. 2x20A, 10
05.02.06.09 und 1.00 319.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 319.24 319.240
Polos Empotrado
TABLERO DE CONTROL AUTOMATICO DE
05.02.06.10 und 1.00 734.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 734.78 734.780
ELECTROBOMBAS
05.02.06.11 TABLERO DE TRANSFERENCIA 20KVA und 1.00 1,373.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,373.88 1,373.880
DISPOSITIVOS DE MANIOBRA Y
05.02.07
PROTECCIÓN
CAJA DE PASE OCTOGONAL PVC C/TAPA
05.02.07.01 und 11.00 12.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 142.67 142.670
CIEGA 100 X 55 mm
CAJA DE PASE RECTANGULAR PVC C/TAPA
05.02.07.02 und 1.00 13.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 13.82 13.820
CIEGA 100 X 50 X 50 mm
CAJA DE PASE F°G° 100X100X50 MM - (4" X 4"
05.02.07.03 und 16.00 26.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 423.52 423.520
X 2")
CAJA DE PASE F°G° 150X150X100 MM - (6" X 6"
05.02.07.04 und 4.00 31.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 127.36 127.360
X 4")
05.03 INSTALACION DE PARARRAYO
PARARRAYOS OINIFLASH MACH MODELO
05.03.01 und 1.00 5,796.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,796.89 5,796.890
NG60 NIVEL 1 RP<85 O SIMILAR
INSTALACION DE SISTEMA DE PUESTA A
05.04
TIERRA
SUMINISTRO E INSTALACION DE POZO
05.04.01 PUESTA A TIERRA R< 15 OHMIOS (VARILLA und 8.00 1,559.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 12,475.52 12,475.520
DE 5/8)
SUMINISTRO E INSTALACION DE POZO
05.04.02 PUESTA A TIERRAR< 15 OHMIOS (VARILLA und 3.00 2,751.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 8,253.45 8,253.450
DE 3/4 - PARARRAYO)
05.05 ARTEFACTOS
05.05.01 LUMINARIAS
LUMINARIA PANEL LE 40W 1.20X0.30X0.05 M.
05.05.01.01 DE 4000lm /CRI ? 80/FP? 0.90/VIDA UTIL ? 30000 und 86.00 179.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.00 15,443.88 15,443.880
HORAS/ ?5000K
LUMINARIA LED HERMETICA 57W - DE 6000lm
05.05.01.02 /CRI >= 80/FP>= 0.90/VIDA UTIL >= 50000 und 12.00 139.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,674.96 1,674.960
HORAS/ >=6500K
LUMINARIA LED CUADRADA 24W, DE
05.05.01.03 1800lm /CRI >= 80/FP>= 0.90/VIDA UTIL >= 30000 und 6.00 114.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 687.48 687.480
HORAS/ >=4000K
LUMINARIA LED CIRCULAR 24W, DE
05.05.01.04 1500lm /CRI >= 80/FP>= 0.90/VIDA UTIL >= 30000 und 39.00 99.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 3,883.62 3,883.620
HORAS/ >=4000K
LUMINARIA LED CIRCULAR 18W, DE
05.05.01.05 1500lm /CRI >= 80/FP>= 0.90/VIDA UTIL >= 30000 und 38.00 75.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 2,872.04 2,872.040
HORAS/ >=4000K
LUMINARIA APLIQUE RECTANGULAR LED
05.05.01.06 24W - 30W, IP65 DE 2600lm /CRI >= 80/FP>= und 2.00 115.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 231.16 231.160
0.90/VIDA UTIL >= 25000 HORAS/ >=3000K
LUMINARIA DE EMERGENCIA EN PARED CON
05.05.01.07 DOS LAMPARAS DE 2X16W LED, CON DOS und 57.00 184.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.00 10,524.48 10,524.480
HORAS DE AUTONOMIA
LUMINARIA SMARTLED HIGH BAY 240W, DE
05.05.01.08 24000lm /CRI >= 85/FP>= 0.90/VIDA UTIL >= und 16.00 504.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 8,074.88 8,074.880
50000 HORAS/ >4000K, IP65
LUMINARIA VALENTINO LED 71W, DE
05.05.01.09 7700lm /CRI >= 85/FP>= 0.90/VIDA UTIL >= 80000 und 16.00 587.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 9,393.76 9,393.760
HORAS/ >=4000K, IP66
05.06 EQUIPOS ELÉCTRICOS Y MECÁNICOS
05.06.01 GRUPOS ELECTROGENOS
GRUPO ELECTROGENO, ENCAPSULADO E
05.06.01.01 INSONORIZADO, POTENCIA CONTINUA DE und 1.00 22,033.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 22,033.90 0.00 0.00 22,033.900
20KVA, 220V, 60Hz
05.06.02 POSTES
POSTE DE ACERO NEGRO REVESTIDO CON
05.06.02.01 und 16.00 475.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 7,600.16 0.00 0.00 7,600.160
MATERIAL ESCA D=15CM, LONGITUD 3.5 M.
05.06.02.02 POSTE DE CAC 9M/300 und 1.00 1,096.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,096.76 0.00 0.00 1,096.760
DADO DE CONCRETO 0.40X0.40M H=1.1,
05.06.02.03 und 16.00 154.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 2,472.16 0.00 0.00 2,472.160
ACABADO PULIDO
Lugar LA LIBERTAD - JULCAN - CARABAMBA Tiempo de Ejecucion 180 dias Modalidad Ejecución Presupuestaria Por Contrato
1 1 2 2 3 3 4 4 5 5 6 6
PRECIO MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
METRAD
Item Descripción UNIDAD UNITARI TOTAL
O Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
O S/.
MEDICIÓN DE LA RESISTENCIA DE LOS
05.07.02 und 11.00 174.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 1,916.42 0.00 0.00 1,916.420
POZOS DE PUESTA A TIERRA
06 INSTALACIONES DE COMUNICACIONES
CABLEADO ESTRUCTURADO EN
06.01
INTERIORES DE EDIFICIOS
06.01.01 CABLES EN TUBERIAS
CABLES PARA SISTEMA DE EMERGENCIA FLP
06.01.01.01 m 870.10 5.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 870.10 4,550.62 0.00 0.00 4,550.620
BLINDADO 4X18, CERTIFICACION CL/NEC
06.01.01.02 CABLES PARA TELEVISION COAXIAL RG-5 m 309.10 4.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 309.10 1,517.68 0.00 0.00 1,517.680
CABLES PARA
06.01.01.03 TELEFONO/INTERNET/CAMARA DE VIDEO m 1,427.60 6.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,427.60 9,707.68 0.00 0.00 9,707.680
UTP CAT 6A
CABLES PARA VIDEO-PROYECTOR, CABLE
06.01.01.04 m 43.40 4.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.40 203.98 0.00 0.00 203.980
HDMI 20MTS V.1.4 HIGH FULL MAX
06.01.01.05 CONDUCTOR DE PERIFONEO 2X14 R/N m 50.60 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.90 648.65 0.70 9.15 657.800
06.02 CANALETAS CONDUCTOS O TUBERIAS
06.02.01 TUBERIA 20mmØ PVC m 680.40 7.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 680.40 5,041.76 0.00 0.00 5,041.760
06.02.02 TUBERIA 25mmØ PVC m 292.95 13.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 292.95 3,992.91 0.00 0.00 3,992.910
06.02.03 TUBERIA 35mmØ PVC m 57.75 14.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.75 832.18 0.00 0.00 832.180
06.03 SALIDAS
06.03.01 SALIDAS RED
06.03.01.01 SALIDA DE SERVIDOR pto 1.00 1,116.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,116.66 0.00 0.00 1,116.660
SALIDA PARA RED DATA CON TOMA RJ45
06.03.01.02 pto 10.00 111.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 1,117.80 0.00 0.00 1,117.800
0,40 - PARED
06.03.01.03 SALIDA PARA TOMA HDMI EN PARED pto 6.00 73.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.20 308.78 1.80 132.16 440.940
06.03.01.04 SALIDA PARA PROYECTORES pto 6.00 80.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 480.12 480.120
06.03.02 SALIDAS DE SISTEMA CONTRA INCENDIO
TOTAL DE OBRAS CIVILES 719,852.53 387,998.68 2,951,996.48 2,076,520.23 1,060,795.30 1,191,006.12 8,388,169.35
GASTOS COVID - 19 7,124.85 7,124.85 7,124.85 7,124.85 7,124.85 7,124.86 42,749.11
MOBILIARIO 0.00 0.00 0.00 0.00 0.00 105,115.33 105,115.33
PRESUPUESTO TOTAL 726,977.38 395,123.53 2,959,121.33 2,083,645.08 1,067,920.15 1,303,246.31 8,536,033.78
SUPERVISIÓN 59,990.71 59,990.71 59,990.71 59,990.71 59,990.71 59,990.70 359,944.25
TOTAL DE INVERSIÓN PARA LA OBRA 786,968.09 455,114.24 3,019,112.04 2,143,635.79 1,127,910.86 1,363,237.01 8,895,978.03
% AVANCE MENSUAL 16.67% 4.63% 34.67% 24.41% 12.51% 7.11% 100.00%
% DE AVANCE ACUMULADO 16.67% 21.30% 55.97% 80.38% 92.89% 100.00% 100.00%
Grafico de Distribución
40.00%
35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06
CURVA S
100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
Inicio Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06
CRONOGRAMA DE DESEMBOLSO
MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA
OBRA
DE JULCAN DEPARTAMENTO DE LA LIBERTAD
Descripci
MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL
ón