Está en la página 1de 1

ETAPA 2 N

A CONSTRUIR
IÓN
STAC
SUBE

LOTE 32
PEND. 5%

CUBIERTA EN TEJA THERMOACOUSTIC

5.00
LOTE 33
2.50

1.00

LOTE 31
Cesion 4
LOTE 1 1107,20 m2
LOTE 37

TEJA TRASLUCIDA

CANAL
CANAL
R3= 128.00

LOTE 8
LOTE 9 LOTE 7

CANAL
CANAL
LOTE 6 LOTE 3 LOTE 2 LOTE 30
LOTE 10 LOTE 5 LOTE 36

CANAL
CANAL
Cesion 5

CANAL

CANAL
CANAL
CANAL
2
LOTE 4 650,00 m

CANAL
CANAL

CANAL
CANAL
LOTE 11 LOTE 35

CANAL

CANAL
CANAL
CANAL

CANAL
CANAL

TEJA TRASLUCIDA
CANAL
TEJA TRASLUCIDA
CANAL
R3 LOTE 35 MANGO

LOTE 12 LOTE 29 NARANJO

MANDARINO MANGO

B
D
A
LOTE 34 PALMA

LOTE 13 LOTE 28 LOTE 38 MANGO

MANGO
MANGO
R1= 126.85

LOTE 27 LOTE 39
1.00
5.00

LOTE 26 1.00

go 1 2.176,494 m2
MANGO

LOTE 44 R1
R3.70

TRONCO
R6.00 2
R2= 148.90 1.775,24 m
E

R2 ZAPOTE GUANABANO

Lote cesion para


R6.00

LOTE 40

Servidumbre La
LOTE 17 LOTE 18 LOTE 19 LOTE 20 LOTE 42 LOTE 43
LOTE 16
LOTE 41
Cesion 3
LOTE 15 PLANTA
ELÉCTRICA
525,30 m2
CORONA

CAÑO
LOTE 14 RETIRO DE 30M DE FUENTE HIDRICA CORONA
FF .00m
15
P

Cesion lago B
=

23.440,90 m2
.0 =
0m
15 FP

DETALLE PEDESTAL
F

15

MIRADOR LAGO 1
.00

2065,30 m2
HUMEDAL LOS CERROS MALABAR
m

FIRMA Y SELLOS:

Icc 3Ø=4.626A

Icc 3Ø=4.626A
2x(3#4/0+1#4/0)AL

2x(3#4/0+1#4/0)AL

M 3 Fases
Doble tarifa
act-react Icc 3Ø=4.017A RECOMENDACIONES:
300A-3F-5H Icc 1Ø=3.664A

250MCM AL
Icc 3Ø=4.017A
250 m 1/0 Cu 300A-3F-5H 300A-3F-5H Icc 1Ø=3.664A

M 3 Fases
Doble tarifa
2
0
act-react
3

3 x 80A
2/0
170m 12m 172m
0
3 x 80A M 3 Fases
Doble tarifa
D BZME1-A80
BZME1-A80
36 KA 1 5 12 P 36 KA 2x(3#4/0+1#4/0)AL 2
0
act-react PROYECTO:
88m 2/0 3
0
1 S

URBANISMO MALABAR RESERVADO ETAPA 2


6 Cu 3 x 80A
(28) 6 70m 1/0Cu Icc 3Ø=3.905A 250m 170m 12m 172m
1 D D BZME1-A80
4 Cu 97m 150A-3F-5H Icc 1Ø=3.504A
36 KA
39m (31) 76m A P 1 88m 5 12 P
16 1 S
2 7 15 13 S (28)
Cu 4 Cu 8 4 AL∅2" 6 70m 1/0Cu Icc 3Ø=3.905A
1 4 AL∅2" 2x(3#4/0+1#4/0)AL
T. Provisional de Obra 2
(2,27)
3
(1,29,30)
1
(32)
4
(37,38,40,41) (44) 39m
1
(31) 76m 97m 150A-3F-5H Icc 1Ø=3.504A
38m
45m 0.76% 21m 32m 47m
B 2 7 15 13 Cu 4 Cu 8 CONTIENE: RADICACIÓN N°.
16 2 3 1 4 1 4 AL∅2" 4 AL∅ 2"
14 3x50A 3x32A 2x40A 2x40A (44)
3 8 16 BZME1-A50 BZME1-A32 (2,27) (1,29,30) (32) (37,38,40,41)
2 1 1 2x(3#4/0+1#4/0)AL
36 KA 36 KA 0.76% 21m 32m 47m
(3,26) 3 (36) (39) 45m
0 73m
14 3x50A 3x32A 2x40A 2x40A
36m C 3 8 16
42m 2.56 % 2 1 1
BZME1-A50 BZME1-A32 FECHA:
2
3x50A 3x32A 12 36 KA 36 KA
4 9 (42,43) (3,26) 3 (36) (39)
2 1 BZME1-A50 BZME1-A32 2x(3#4/0+1#4/0)AL 0

2.36 % 36 KA 36 KA 36m
(4,25) (35)
76m 42m 2.56 %
2
43m D 4 9 3x50A 3x32A
3.9% 4 8 T 8 2 1
(42,43)
BZME1-A50 BZME1-A32
RAMAL 1 1
10
RAMAL 3 Icc 3Ø=530A 10 Icc 3Ø=364A 10
cto. 1-3 cto. 2-4 2x(3#4/0+1#4/0)AL
(4,25) (35) 2.36 % 36 KA 36 KA
(34) Icc 1Ø=321A Icc 1Ø=217A
3.9%
43m
T DISEÑO: UBICACIÓN: ESCALA:
50m Alum. Ext. Alum. Ext. 67m
4 8
E 10 MALABAR ENTRADA No. 6
11
2
0 T. Bomba T. Portería 3
RAMAL 1 1
(34)
RAMAL 3 Icc 3Ø=530A
Icc 1Ø=321A
10 Icc 3Ø=364A
Icc 1Ø=217A
10
cto. 1-3 cto. 2-4
Ing. CARMENZA DEL S. ALZATE KM 7 VIA PEREIRA CERRITOS
1:1000
1 50m Alum. Ext. Alum. Ext. MATRICULA: RS205-07809
(33)
RAMAL 4 2
0 T. Bomba T. Portería
11 CONSTRUCTOR: PROPIETARIO: FECHA DEL DISEÑO:
1.56 % 1
QUALITY CONSTRUCTORA
RAMAL 2
(33)
1.56 % Ing. ANDRÉS FELIPE TAMAYO SANCHEZ SEPTIEMBRE 2023
RAMAL 2 MATRICULA: QN205-104337
RECIBIDO POR Y FECHA: PLANO:
1/2

También podría gustarte