R 0.02 Qm 3.13 Lt/s E pvc 30000 Kg/cm2 n 22 años QDM 3.76 Lt/s k 2.07 Kg/cm2 DOT 200 Lt/hab/dia QB 6.01 Lt/s PE 100.00 m TB 15 horas n amortizacion 10 años LH 285 m TB 450 H/mes i anual 0.15 Ld 299.25 m P. Energia 2.1 Q/Kw*hora # Tubos 50 unidades PVC SDR 17 Eficiencia C 150 Diametro Economico Amortizacion D1 2.44 Pulgadas i mensual 0.0125 D2 4.45 Pulgadas n amortizacion 120 meses 2.5" 3" 4" A 0.016 2.537 3.088 3.97 Costo de Material Costo Energetico Φ A # Tubos P. Unitario (Q.) Costo Mensual (Q.) Φ Horas mes Hf (m) Pot (Hp) Pot (Kw) P. Energia (Q.) Costo Mensual (Q.) 2.5" 0.016 50 332.54 267.58 2.5" 450 14.59 1.92 1.43 2.1 1355.70 3" 0.016 50 490.07 394.34 3" 450 5.60 0.74 0.55 2.1 520.57 4" 0.016 50 792.37 637.59 4" 450 1.65 0.22 0.16 2.1 153.14
Costo Total Golpe de Ariete Potencia de la Bomba
Φ Costo Total Mensual α 355.21 Hs 2.00 m 2.5" 1623.28 V 0.75 Hfs 0.01 m 3" 914.90 ΔP 27.27 H 100.00 m 4" 790.73 Presion Total 127.27 Hi 1.65 m SDR Cumple SI Hfv 0.04 m Hfm 0.16 m CDT 103.86 m POT 14 Hp