VERIFICACION DE CANTIDAD DE CONCRETO EN OBRA

DATOS
DIAMETRO DE MOLDE 0.19 m
PESO DEL MIXER 12175 kg ( datos de guia)
VOL. MIXER 5 m3
PESO DEL MOLDE 3.535 kg
ALTURA DEL MOLDE 0.25 m datos de ensayo de campo
PESO TOTAL 20.74 kg

VOLUMEN DEL MOLDE 0.007 m3


CORROBORAMOS CON LOS VOL. DE MIXER
PV TEORICO 2435 m PV TEORICO 12175.00 kg
PV REAL 2457.86 kg PV REAL 12289.29 m3
DIFERENCIA DE VOLUMENES -114.29 m3
PESO DEL CONCRETO 17.21 kg
(COLOCAMOS EL VALOR QUE
VOLUMEN DEL MOLDE 0.007 m3 NOS SALIO DEL CALCULO)

RENDIMIENTO 0.99 m3
DIFERENCIA DE VOLUMENES -22.86 m3

DIFERENCIA DE VOLUMENES DE CADA -0.009 ESTO ES LO QUE NOS FALTARIA


M3 EN OBRA ( RPTA)
PLANTILLA DE N° DE TRABAJADORES DE OBRA

Calculo de ratios
PARTIDA ENCOFRADO m2
DATO DE REVISTA COSTO S/ 26.65 S/ x m2
RATIO CALCULADO 1.16 HH/m2

DATOS
PARTIDA ENCOFRADO
METRADO SECTORIZADO 290 m2
RATIO DE ENCOFRADO 1.16 HH/m2
DIAS LABORALES 9.6 HH
N° DE TRABAJADORES 35 TRABAJADORES
PLANTILLA DE PEDIDO DE CONCRETO

ESPESOR O ESPESOR VOLUMEN VOLUMEN VOLUMEN


FECHA GUIA F'C SLUMP CANTIDAD ELEMENTO LARGO ANCHO DESPERDICIO ( 5%) % OBSERVACIONES
ALTURA ADICIONAL TEORICO REAL SOLICITADO

SEM-42 10/16/2023 al 10/22/2023


10/17/2023 24 20.22 22.42 24 3.78 18.70%
LOSA INFERIOR CAMARA DE
446-1040620 210 4-6" 9 DESAGUE
2.45 2.9 0.2 2.95 1.421 1.45 0.02 1.72% vaciado contra - terreno
446-1040626 210 4 - 6" 7.5 ZAPATA EJE 5 ENTRE B Y C 2.1 1.5 0.6 2.13 1.89 2.68 0.79 42.00% vaciado contra - terreno
446-1040630 210 4 - 6" 7.5 ZAPATA EJE 5 ENTRE B Y C 4.6 2 0.6 2.16 5.52 5.96 0.44 8.00% vaciado contra - terreno
210 4 - 6" ZAPATA EJE 6 ENTRE A Y B 4.55 2.3 0.6 2.45 6.279 6.69 0.41 6.52% vaciado contra - terreno
210 4 - 6" LOSA INFERIOR POZO SUMIDERO 2.1 2.15 0.2 2.25 0.903 0.95 0.04 4.65% vaciado contra - terreno
210 4 - 6" LOSA PIT ASCENSOR TORRE C 2.35 2.65 0.5 2.93 3.11375 3.44 0.33 10.57% vaciado contra - terreno
LOSA PARA SSHH
210 4 - 6" PROVISIONALES
3.9 3.5 0.08 4 1.092 1.25 0.16 14.29% vaciado contra - terreno

10/18/2023 38.0 31.49 36.78 38.00 6.51 20.67%


402-00039921 210 4 - 6" 9 CIMIENTO CORTE 42 8.05 1.00 0.60 4.83 5.07 0.24 0.05 Vaciado contra-terreno
402-00039926 210 4 - 6" 7.5 CIMIENTO CORTE 40 4.00 0.70 0.60 1.68 1.78 0.10 0.06 Vaciado contra-terreno
402-00039928 210 4 - 6" 7.5 CIMIENTO CORTE 39 2.00 0.70 0.60 0.84 0.96 0.12 0.14 Vaciado contra-terreno
402-00039931 210 4 - 6" 8 CIMIENTO CORTE 49 5.55 0.60 0.60 2.00 2.50 0.50 0.25 Vaciado contra-terreno
402-00039933 210 4 - 6" 6 CIMIENTO CORTE 46 2.80 0.70 0.60 1.18 1.43 0.25 0.21 Vaciado contra-terreno
CIMIENTO CORTE 38A 3.30 0.70 0.60 1.39 1.48 0.10 0.07 Vaciado contra-terreno
POZO SUMIDERO CORTE 47 DER 1.70 0.20 2.35 0.80 1.76 0.96 1.20 Vaciado contra-terreno
POZO SUMIDERO CORTE 45
FONDO
2.10 0.25 2.35 1.23 1.68 0.44 0.36 Vaciado contra-terreno
POZO SUMIDERO CORTE 47 IZQ 1.70 0.20 2.35 0.80 1.18 0.39 0.48 Vaciado contra-terreno
POZO SUMIDERO CORTE 45
FRONT
2.10 0.20 2.35 0.99 1.18 0.20 0.20 Vaciado contra-terreno
CÁMARA DESAGÜE CORTE 51 3.60 3.60 0.20 2.59 2.59
CÁMARA DESAGÜE CIMIENTO 12.00 0.60 0.40 2.88 3.12 0.24 0.08 Vaciado contra-terreno
VIGA PLATEA CORTE 2 - HASTA
FL
1.80 0.30 1.00 0.54 0.76 0.22 0.40 Vaciado contra-terreno
VIGA PLATEA CORTE 1 - HASTA
FL
4.80 0.30 1.00 1.44 1.82 0.38 0.27 Vaciado contra-terreno
VIGA PLATEA CORTE 1 - HASTA
FL
3.90 0.30 1.00 1.17 1.52 0.35 0.30 Vaciado contra-terreno
VIGA PLATEA CORTE 4 - HASTA
FL
1.40 0.30 1.00 0.42 0.42
VIGA PLATEA CORTE 18 - HASTA
FL
3.00 0.30 1.00 0.90 0.90
VIGA PLATEA CORTE 5 - HASTA
FL
3.30 0.30 1.00 0.99 0.99
VIGA PLATEA CORTE 6 - HASTA
FL
1.35 0.30 1.00 0.41 0.49 0.08 0.20 Vaciado contra-terreno
VIGA PLATEA CORTE 7 - HASTA
FL
3.05 0.30 1.00 0.91 1.13 0.21 0.23 Vaciado contra-terreno
VIGA PLATEA CORTE 8 - HASTA
FL
2.85 0.30 1.00 0.86 1.08 0.23 0.27 Vaciado contra-terreno
VIGA PLATEA CORTE 1 - HASTA
FL
2.85 0.30 1.00 0.86 1.14 0.29 0.33 Vaciado contra-terreno
VIGA PLATEA CORTE 18 - HASTA
FL
0.95 0.30 1.00 0.29 0.29
VIGA PLATEA CORTE 17 - HASTA
FL
0.95 0.30 1.00 0.29 0.29
VIGA PLATEA CORTE 18 - HASTA
FL
0.90 0.30 1.00 0.27 0.27
VIGA PLATEA CORTE 17 - HASTA
FL
3.2 0.30 1.00 0.96 0.96

10/19/2023 35.0 28.83 31.61 35.00 6.17 21.39%


358-2024180 210 4 - 6" 8.0 CIMIENTO CORTE 35 18.05 0.70 0.60 0.86 7.58 9.26 1.68 22.14% Vaciado contra-terreno
358-2024182 210 4 - 6" 7.0 CIMIENTO CORTE 38 4.45 0.70 0.60 0.73 1.87 1.95 0.08 4.29% Vaciado contra-terreno
358-2024190 210 4 - 6" 7.0 CIMIENTO CORTE 36 8.05 0.70 0.60 0.75 3.38 3.62 0.24 7.14% Vaciado contra-terreno
439-1040393 210 4 - 6" 7.0 CIMIENTO CORTE 37 2.6 0.70 0.60 0.74 1.09 1.15 0.06 5.71% Vaciado contra-terreno
CÁMARA DESAGÜE CORTE 41
440-2033630 210 4 - 6" 6.0 (e=20)
4.95 0.20 1.90 0.20 1.88 1.88 0.00 0.00%
CÁMARA DESAGÜE CORTE 41
(e=25)
4.9 0.25 1.90 0.23 2.33 2.14 -0.19 -8.00% Vaciado contra-terreno
VIGA PLATEA CORTE 1 - HASTA
FL
1 0.30 1.00 0.45 0.30 0.45 0.15 50.00% Vaciado contra-terreno
VIGA PLATEA CORTE 3 - HASTA
FL
2.35 0.30 1.00 0.45 0.71 1.06 0.35 50.00% Vaciado contra-muro
VIGA PLATEA CORTE 1 - HASTA
FL
4.45 0.30 1.00 0.35 1.34 1.56 0.22 16.67% Vaciado contra-muro
VIGA PLATEA CORTE 18 - HASTA
FL
3 0.30 1.00 0.30 0.90 0.90 0.00 0.00%
VIGA PLATEA CORTE 13 - HASTA
FL
3.3 0.30 1.00 0.30 0.99 0.99 0.00 0.00%
VIGA PLATEA CORTE 18 - HASTA
FL
6.3 0.30 1.00 0.30 1.89 1.89 0.00 0.00%
VIGA PLATEA CORTE 3 - HASTA
FL
2.9 0.30 1.00 0.36 0.87 1.04 0.17 20.00% Vaciado contra-muro
VIGA PLATEA CORTE 14 - HASTA
FL
2.45 0.30 1.00 0.30 0.74 0.74 0.00 0.00%
VIGA PLATEA CORTE 1 - HASTA
FL
2.5 0.30 1.00 0.30 0.75 0.75 0.00 0.00%
VIGA PLATEA CORTE 1 - HASTA
FL
1.9 0.38 1.00 0.38 0.72 0.72 0.00 0.00%
VIGA PLATEA CORTE 3 - HASTA
FL
3.58 0.42 1.00 0.42 1.50 1.50 0.00 0.00%

10/20/2023 25.5 21.69 24.42 25.50 3.81 17.58%


440-2033670 210 4 - 6" 7.5 CIMIENTO CORTE 35 10.65 0.70 0.60 0.80 4.47 5.11 0.64 14.29%
446-1040799 210 4 - 6" 9.0 CIMIENTO CORTE 35 6.80 0.70 0.60 0.78 2.86 3.18 0.33 11.43%
446-1040802 210 4 - 6" 9.0 CIMIENTO CORTE 35 1.95 0.70 0.60 0.70 0.82 0.82 0.00 0.00%
CIMIENTO CORTE 36 2.60 0.70 0.60 0.85 1.09 1.33 0.23 21.43%
CIMIENTO CORTE 37 4.90 0.70 0.60 0.74 2.06 2.18 0.12 5.71%
CIMIENTO CORTE 44 2.20 0.70 0.60 0.70 0.92 0.92 0.00 0.00%
ZAPATA CENTRAL CISTERNA 2.00 1.50 0.60 1.50 1.80 1.80 0.00 0.00%
CÁMARA DESAGÜE 2 CORTE 51
SUP
3.60 0.25 2.45 0.29 2.21 2.51 0.31 14.00%
CÁMARA DESAGÜE 2 CORTE 51
INF
3.60 0.25 2.45 0.30 2.21 2.62 0.41 18.67%
CÁMARA DESAGÜE 2 CORTE 50
IZQ
3.10 0.25 2.45 0.28 1.90 2.10 0.20 10.67%
CÁMARA DESAGÜE 2 CORTE 50
DER
3.10 0.25 1.75 0.34 1.36 1.84 0.49 36.00%

10/21/2023 20.0 17.35 18.66 20.00 2.65 15.26%


402-0040056 210 4 - 6" 7.0 COLUMNA C2 0.90 0.25 3.40 0.25 0.77 0.77 0.00 0.00%
446-1040846 210 4 - 6" 7.0 0.40 0.30 3.40 0.30 0.41 0.41 0.00 0.00%
446-1040850 210 4 - 6" 6.0 COLUMNA C1 0.90 0.25 2.50 0.25 0.56 0.56 0.00 0.00%
MURO CORTE 49 2.25 0.20 1.00 0.20 0.45 0.45 0.00 0.00%
MURO CORTE 49 2.50 0.20 1.00 0.20 0.50 0.50 0.00 0.00%
LOSA PARTE SUP NFP -0.75 3.70 2.60 0.20 2.60 1.92 1.92 0.00 0.00%
CORTE 9 - HASTA FL 1.35 0.30 1.00 0.30 0.41 0.41 0.00 0.00%
CORTE 10 - HASTA FL 2.15 0.30 1.00 0.30 0.64 0.64 0.00 0.00%
CORTE 11 - ASCENSOR
2.35 0.50 1.50 0.50 1.76 1.76 0.00 0.00%
2.35 0.50 1.50 0.50 1.76 1.76 0.00 0.00%
1.65 0.50 1.50 0.50 1.24 1.24 0.00 0.00%
1.65 0.15 2.00 0.15 0.49 0.49 0.00 0.00%
CORTE 12 - HASTA FL 1.25 0.30 1.00 0.38 0.38 0.48 0.10 26.67% Vaciado contra-terreno
CORTE 15 - HASTA FL 1.60 0.30 1.00 0.38 0.48 0.61 0.13 26.67% Vaciado contra-terreno
CORTE 16 - HASTA FL 1.95 0.30 1.00 0.38 0.59 0.74 0.16 26.67% Vaciado contra-terreno
CORTE 14 - HASTA FL 2.45 0.30 1.00 0.35 0.74 0.86 0.12 16.67% Vaciado contra-terreno
CORTE 8 - HASTA FL 3.45 0.30 1.00 0.38 1.04 1.31 0.28 26.67% Vaciado contra-terreno
CORTE 16 - HASTA FL 4.35 0.30 1.00 0.32 1.31 1.39 0.09 6.67% Vaciado contra-terreno
CORTE 8 - HASTA FL 2.55 0.30 1.00 0.35 0.76 0.89 0.13 16.67% Vaciado contra-terreno
CORTE 1 - HASTA FL 3.85 0.30 1.00 0.38 1.16 1.46 0.31 26.67% Vaciado contra-terreno
FORMATO DE PEDIDOS

Persona(s) de contacto:

Fecha de Solicitud : 16/10

Cliente : CONSTRUCTORA TERRAZUL SAC

Obra : PRINT

¿Solicitud
Inicio (hr) de
Fecha de Vaciado Confirmada? (Sí/No) Código del Diseño Vol (m3) Frecuencia (min)
Colocación
*Nota 1

17/10 Sí 13:30 1210N57B 23.50 30 min


Nota 2. Los pedidos con Bomba se han reservado mediante esta solicitud. Se ha provisionado su servicio por lo que cualquier cancelación será sujeta a cargos por monto mínimo de Bomba.
Considerar 1 pedido por cada tipo de elemento, frente de trabajo o en caso requiera un cambio de posición de tuberia para vaciados con bomba.
Mediante el presente pedido, se dan por aceptadas las Condiciones Generales de Venta e Inicio de Obra.
RMATO DE PEDIDOS

Teléfono(s) de Contacto:

Indicar Restricción Horaria

A/C:

Código de Cliente:

SERVICIO DE BOMBEO *Nota 2

Elemento SÍ NO Bomba Sugerida Observaciones

Falsas Zapatas X BB Pluma 32


quier cancelación será sujeta a cargos por monto mínimo de Bomba.
para vaciados con bomba.
FORMATO DE PEDIDOS

Persona(s) de contacto: Teléfono(s) de Contacto:

Fecha de Solicitud : Indicar Restricción Horaria

Cliente : A/C:

Obra :
Código de Cliente:

SERVICIO DE BOMBEO *Nota 2

¿Solicitud
Inicio (hr) de Código del Frecuencia Bomba
Fecha de Vaciado Confirmada? (Sí/No) Vol (m3) Elemento SÍ NO Observaci
Colocación Diseño (min) Sugerida
*Nota 1

Nota 1: En caso su pedido no requiera confirmación del cliente previa a su vaciado colocar "Sí". La anulación de pedidos confirmados está sujeta a un cargo en S/. equivalente al 10% del valor d
Nota 2. Los pedidos con Bomba se han reservado mediante esta solicitud. Se ha provisionado su servicio por lo que cualquier cancelación será sujeta a cargos por monto mínimo de Bomba.
Considerar 1 pedido por cada tipo de elemento, frente de trabajo o en caso requiera un cambio de posición de tuberia para vaciados con bomba.
Mediante el presente pedido, se dan por aceptadas las Condiciones Generales de Venta e Inicio de Obra.
Altura de piso a piso 2.680
N° Pasos 15
Paso a hallar 15
Restar ref 1.025

Medida 1.655