- NÚMERO DE NIVELES: 7
RESULTADOS
MURO DIVISORIO/
EXTREMO CONTINUO_ 8.3/12= 0.6916_ R=0.70
MURO DIVISORIO/
AMBOS EXTREMOS CONTINUOS_ 8/14_0.5714_ R=0.58
RECUMBRIMIENTO DE LA PESO
ESPESOR PESO
LOSA VOLUMÉTRICO
ESQUINA_ (4.15M * 4.15M) * 7 * 0.72 T/M2 * 1.50 /0.2 (3500 T/M2)= 0.186M2 (.45M * .45M)
LATERAL_ (4.15M * 8.3M) * 7 * 0.72 T/M2 * 1.25 /0.25 (3500 T/M2)= 0.248M2 (.50M * .50M)
INTERIOR_ (8.3M * 8.3M) * 7 * 0.72 T/M2 * 1.10 /0.3 (3500 T/M2)= 0.363M2 (.60M * .60M)
<NIVEL 2
ESQUINA_ (4.15M * 4.15M) * 6 * 0.72 T/M2 * 1.50 /0.2 (3500 T/M2)= 0.154M2 (.40M * .40M)
LATERAL_ (4.15M * 8.3M) * 6 * 0.72 T/M2 * 1.25 /0.25 (3500 T/M2)= 0.212M2 (.50M * .50M)
INTERIOR_ (8.3M * 8.3M) * 6 * 0.72 T/M2 * 1.10 /0.3 (3500 T/M2)= 0.311M2 (.60M * .60M)
<NIVEL 3
ESQUINA _ (4.15M * 4.1M) * 5 * 0.72 T/M2 * 1.50 /0.2 (3500 T/M2)= 0.132M2 (.40M * .40M)
LATERAL _ (4.15M * 8.3M) * 5 * 0.72 T/M2 * 1.25 /0.25 (3500 T/M2)= 0.177M2 (.45M * .45M)
INTERIOR_ (8.3M * 8.3M) * 5 * 0.72 T/M2 * 1.10 /0.3 (3500 T/M2)= 0.254M2 (.55M * .55M)
<NIVEL 4
ESQUINA_ (4.15M * 4.15M) * 4 * 0.72 T/M2 * 1.50 /0.2 (3500 T/M2)= 0.106M2 (.35M * .35M)
LATERAL_ (4.15M * 8.3M) * 4 * 0.72 T/M2 * 1.25 /0.25 (3500 T/M2)= 0.141M2 (.40M * .40M)
INTERIOR_ (8.3M * 8.3M) * 4 * 0.72 T/M2 * 1.10 /0.25 (3500 T/M2)= 0.249M2 (.50M * .50M)
<NIVEL 5
ESQUINA_ (4.15M * 4.15M) * 3 * 0.72 T/M2 * 1.50 /0.2 (3500 T/M2)= 0.079M2 (.30M * .30M)
LATERAL_ (4.15M * 8.3M) * 3 * 0.72 T/M2 * 1.25 /0.25 (3500 T/M2)= 0.106M2 (.35M * .35M)
INTERIOR_ (8.3M * 8.3M) * 3 * 0.72 T/M2 * 1.10 /0.25 (3500 T/M2)= 0.187M2 (.45M * .45M)
<NIVEL 6
ESQUINA_ (4.15M * 4.15M) * 2 * 0.72 T/M2 * 1.50 /0.2 (3500 T/M2)= 0.053M2 (.25M * .25M)
LATERAL_ (8.3M * 4.15M) * 2 * 0.72 T/M2 * 1.25 /0.25 (3500 T/M2)= 0.070M2 (.30M * .30M)
INTERIOR_ (8.3M * 8.3M) * 2 * 0.72 T/M2 * 1.10 /0.25 (3500 T/M2)= 0.124M2 (.40M * .40M)
<NIVEL 7
ESQUINA_ (4.15M * 4.15M) * 0.72 T/M2 * 1.50 /0.2 (3500 T/M2)= 0.026M2 (.20M * .20M)
LATERAL_ (8.3M * 4.15M) * 0.72 T/M2 * 1.25 /0.25 (3500 T/M2)= 0.035M2 (.20M * .20M)
INTERIOR_ (8.3M * 8.3M) * 0.72 T/M2 * 1.10 /0.25 (3500 T/M2)= 0.062M2 (.25M * .25M)
REVISION DEL PREDIMENSIONAMIENTO POR DENSIDAD ESTRUCTURAL
D.E.= 10.0125/964.84=1.03%
TRABES
P.VOL
NIVEL AREA TRANSVERSAL M2 LONGITUD (M) PESO (TON)
(KG/M2)
CARGA PESO
NIVEL ALTURA LONGITUD (M)
(KG/M2) (TON)
1 4.5 1450
6960
FUERZAS CORTANTES DE ENTREPISO (VI)
WI * HI (TON-
NIVEL HI(M) WI(TON) FI (TON) VI (TON)
M)
696.36 + 206.62=
4 12.6 + 3.6 = 16.2 982 15908.4 206.62
1069.74
1069.74 + 134.04=
2 4.5 + 4.5 = 9 1147 10323 134.07
1203.81
171.48
TON
280.83
TON
244.05 TON
206.62 TON
166.76
TON
134.07
TON
87.74 TON
VB 1288.59