DISEÑO DE MEZCLA - MODULO DE FINEZA DISEÑO ESTATICO DISEÑO DINAMICO 25

MATERIALES PESO P.E. VOL. ABSOLUTO PESO R.U. PESO PESO R.U. BRIQUETA 4"x8" (3kg) CONO DE ABRAMS VIGA 32 I BOLSA)
(25kg)
DATOS DE DISEÑO Y LABORATORIO
CEMENTO 426 3.15 0.135 1 426 1 0.53 4.45 5.70 42.50
X 1000 ADICION 0.0 0.92 0.000 0.000 0 0.000 0.000 0.00 0.00 0.00
SLUMP = 4" AGUA 200 1 0.200 0.469 206 0.484 0.26 2.16 2.76 20.57
SIN FIBRA PIEDRA 910.80 2.84 0.321 2.138 918 2.155 1.15 9.60 12.29 91.59
0.645
f'c = 280 kg/cm2 ARENA 836.70 2.58 0.324 1.964 841 1.974 1.06 8.79 11.25 83.90
AIRE % 2 0.020
1.000 32.00
SIN AIRE INCORPORADO 1.000 m3 5.613 3.00 25.00

CEMENTO
Andino Tipo I PASO 01: Determinacion de f'cr Nota: Se suma a f'c
P. Especifico = 3.15 g/cm3 f'c = 280 f'c < 210 70
f'cr = 364 kg/cm2 210 ≤ f'c ≤ 350 84
PIEDRA CHANCADA (Agregado Grueso) f'c > 350 98
MFG = 3.00 PASO 02: Calculo de Agua (INTERPOLAR)
Abs % = 0.94 (%) AIRE ATRAPADO 2 % 3 ----------> 200
Hum % = 0.78 SLUMP = 4" 4 ----------> X= 200.00
P. Especifico = 2.84 Tnmax = 3/4" 4 ----------> 200
PUS = 1405 AGUA = 200.00 lt.
PUC = 1518
Tnmax = 3/4" PASO 03: Calculo de Cemento 400 ---------- > 0.43
f'cr = 364 364 ---------- > X= 0.466
ARENA ( Agregado Fino) a/c = interpolar ---------- > 350 ---------- > 0.48
MFF = 3.00 a/c interp.= 0.47
Abs % = 1.09 Cemento = 426.000 kg. 8.40 357.1
Hum % = 0.50
P. Especifico = 2.58 PASO 04: Calculo de Pd y Ar
PUS = 1705 Vol. Pd+Ar = 0.645
PUC = 1778 Se determinó el porcentaje definitivo de piedra y arena para la combinación de agregados
2.8 ----------> 0.62
3 ----------> 0.6
Pd = 910.80 3 ----------> X= 0.60
% DE FIBRA 0.0% Ar = 836.70 b/bo 0.6
VOLUMEN DE FIBRA 0 pdr 910.8
PASO 05: Correccion de Pd y Ar por Humedad
Pd = 917.90 kg.
Ar = 840.88 kg.

PASO 06: Corrección de Agua


H2O-Pd = -1.46
H2O-Ar = -4.94
H2O-Obra = 206.4 lt.

TABLA N° 1 REQUISITOS DE AGUA DE MEZCLADO EN FUNCION DE Tnm Y EL SLUMP (pulg.)


Tnm (pulg.)
SLUMP (pulg.)
3/8" 1/2" 3/4" 1" 1 1/2" 2" 3" 6"
1" 2" 205 200 296 180 160 155 145 125
3" 4" 225 215 200 195 175 170 160 140
6" 7" 240 230 210 205 185 180 170 0
SIN AIRE
1" 2" 180 175 135 160 145 140 135 120
INCORPORADO
3" 4" 200 190 180 175 160 155 150 135
6" 7" 215 205 190 185 170 165 160 0
CON AIRE
INCORPORADO
TABLA N° 2 RELACION a/c Y LA RESISTENCIA f'cr TABLA N° 3 VOL. DE AGREGADO GRUESO POR UNIDAD DE VOL.DE CONDRETO
MODULO DE FINURA DE LA ARENA
SIN AIRE CON AIRE
f'cr INCORPORADO INCORPORADO Tnm (pulg.)
2.4 2.6 2.8 3.0 3.2
TABLA N° 4
450 0.38 - 3/8" 0.50 0.48 0.46 0.44 0.42 (%) AIRE
400 0.43 - 1/2" 0.59 0.57 0.55 0.53 0.51 ATRAPADO
350 0.48 0.40 3/4" 0.66 0.64 0.62 0.60 0.58 3.00
300 0.55 0.46 1" 0.71 0.69 0.67 0.56 0.63 2.50
250 0.62 0.53 1 1/2" 0.76 0.74 0.72 0.70 0.67 2.00
200 0.70 0.60 2" 0.78 0.76 0.74 0.72 0.70 1.50
150 0.80 0.71 3" 0.81 0.79 0.77 DE
MODULO 0.75 0.74 1.00
0.87 0.85 FINEZA DE LA
0.83 0.81 0.79
6" COMBINACIO 0.50
N DE 0.30
AGREGADOS
TABLA N° 5 RELACION a/c EN CONDICIONES DE EXPOSICIÓN TABLA N° 7 MODULO DE FINEZA DE LA COMBINACION DE AGREGADOS
QUE DA LAS 0.20
CONDICIONES DE EXPOSICIÓN a/c MEJORES
CONDICIONE
a) EXPUESTO A AGUA DULCE 0.5 Tnm S PARA LOS
CONCRETO (pulg.) CONTENIDOS
IMPERMEABLE
b) EXPUESTO A AGUA DE MAR O AGUAS SAL 0.45
DE CEMENTO
c) EXPUESTO A AGUAS CLOACALES 0.45 6
EN (saco/m3 7 8
CONCRETO EXPUESTO A PROCESOS DE CONGELACION Y HIELO EN CONDICIONES de concreto)
HUMEDAS 3/8" 3.96 4.04 4.11
a) SARDINELES, CUNERAS, SECCIONES DELGADAS 0.45 1/2" 4.46 4.54 4.61 9
b) OTROS ELEMENTOS 0.5 3/4" 4.96 5.04 5.11 4.19
PROTECCION CONTRA LA CORROSION DEL CONCRETO EXPUESTO A
AGUAS DE MAR SALOBRES, NEBLINAS O ROCIO DE ESTAS AGUAS 0.4 1" 5.26 5.34 5.41 4.69
SI EL RECUBRIMIENTO MINIMO SE AUMENTA EN 13mm 0.45 1 1/2" 5.56 5.64 5.74 5.19
2" 5.86 5.94 6.01 5.49
3" 6.16 6.24 6.31 5.79
6.09
6.39