MATERIALES PESO P.E. VOL. ABSOLUTO PESO R.U. PESO PESO R.U. BRIQUETA 4"x8" (3kg) CONO DE ABRAMS VIGA 32 I BOLSA)
(25kg)
DATOS DE DISEÑO Y LABORATORIO
CEMENTO 426 3.15 0.135 1 426 1 0.53 4.45 5.70 42.50
X 1000 ADICION 0.0 0.92 0.000 0.000 0 0.000 0.000 0.00 0.00 0.00
SLUMP = 4" AGUA 200 1 0.200 0.469 206 0.484 0.26 2.16 2.76 20.57
SIN FIBRA PIEDRA 910.80 2.84 0.321 2.138 918 2.155 1.15 9.60 12.29 91.59
0.645
f'c = 280 kg/cm2 ARENA 836.70 2.58 0.324 1.964 841 1.974 1.06 8.79 11.25 83.90
AIRE % 2 0.020
1.000 32.00
SIN AIRE INCORPORADO 1.000 m3 5.613 3.00 25.00
CEMENTO
Andino Tipo I PASO 01: Determinacion de f'cr Nota: Se suma a f'c
P. Especifico = 3.15 g/cm3 f'c = 280 f'c < 210 70
f'cr = 364 kg/cm2 210 ≤ f'c ≤ 350 84
PIEDRA CHANCADA (Agregado Grueso) f'c > 350 98
MFG = 3.00 PASO 02: Calculo de Agua (INTERPOLAR)
Abs % = 0.94 (%) AIRE ATRAPADO 2 % 3 ----------> 200
Hum % = 0.78 SLUMP = 4" 4 ----------> X= 200.00
P. Especifico = 2.84 Tnmax = 3/4" 4 ----------> 200
PUS = 1405 AGUA = 200.00 lt.
PUC = 1518
Tnmax = 3/4" PASO 03: Calculo de Cemento 400 ---------- > 0.43
f'cr = 364 364 ---------- > X= 0.466
ARENA ( Agregado Fino) a/c = interpolar ---------- > 350 ---------- > 0.48
MFF = 3.00 a/c interp.= 0.47
Abs % = 1.09 Cemento = 426.000 kg. 8.40 357.1
Hum % = 0.50
P. Especifico = 2.58 PASO 04: Calculo de Pd y Ar
PUS = 1705 Vol. Pd+Ar = 0.645
PUC = 1778 Se determinó el porcentaje definitivo de piedra y arena para la combinación de agregados
2.8 ----------> 0.62
3 ----------> 0.6
Pd = 910.80 3 ----------> X= 0.60
% DE FIBRA 0.0% Ar = 836.70 b/bo 0.6
VOLUMEN DE FIBRA 0 pdr 910.8
PASO 05: Correccion de Pd y Ar por Humedad
Pd = 917.90 kg.